+ All Categories
Home > Documents > 4 YEARS plus OF GOV UDOM EMMANUEL.cdr - Akwa Ibom ...

4 YEARS plus OF GOV UDOM EMMANUEL.cdr - Akwa Ibom ...

Date post: 05-Feb-2023
Category:
Upload: khangminh22
View: 2 times
Download: 0 times
Share this document with a friend
246
4 YEARS A K F W O A T I N B E O M M N S R T E A V T O E G TOUCHING LIVES
Transcript

4 YEARS

A KF WO AT IN BE O

M M

N SR TE AV TO E

G

TOUCHING LIVES

Job Creation

Poverty Alleviation

Wealth Creation

Economic & Political Inclusion

Infrastructural Consolidation & Expansion

The Five-Point Agendaof Governor Udom Emmanuel

N

SMALL & MEDIUM SCALE ENTERPRISES

INDUSTRIALIZATIONAVIATION

DEVELOPMENT

RURAL & RIVERINE AREA DEVELOPMENT

SECURITY

INFRASTRUCTURE AGRICULTURE

HUMAN CAPACITY DEVELOPMENT

COMPLETION AGENDA

May 2015

2016

2017

2018

May 2019

May 2019

2020

May 2023

2021

2022

The nextfour

years

02

www.akwaibomstate.gov.ng

TOUCHING LIVES IN MORE WAYS ...

Future Assured

His ExcellencyMr. Udom EmmanuelGovernor, Akwa Ibom State

Ag

ric

ult

ure

n 11,000 hectares of coconut plantation 3,240 hectares of cassava plantation in 15 LGAs (FADAMA)n 49,318 registered rice farmersn 450 youths trained on cocoa maintenancen Subsidized fertilizers, oil palm & cocoa seedlingsn Akwa Prime Hatchery -17,000 day old chicks weeklyn Free Improved Corn seedlingsn N300,000 grant to 250 beneficiaries under the Graduate Unemployment n

Youth SchemeOver 1,200 hectares of rice cultivatedn Setting up of Ibom FADAMA Micro Finance BanknVegetable Green Housesn Oil Palm Processing Plantn Cassava Processing Millsn Maize Shelling/Drying Milln Rice Processing Millsn

Ed

uc

ati

on

n Free & compulsory basic education in public schoolsTake over of 17 community secondary schoolsn Construction & Renovation of over 1,400 school blocksn Strategic interventions in Tertiary Institutions n

- roads, equipment, academic blocks, etc

Procurement & distribution of free text books & n other educational materials

Provision of over 20,000 dual-desks to public schools in the staten Subventions to public primary & secondary schoolsn Over N600 million WAEC fees for indigenes in n

public secondary schools annuallyConstruction of 10Nos computer laboratories in 10 secondary schoolsn Hosting of Education & Exhibition Summit n

Sa

lari

es

&

En

titl

em

en

ts n Prompt payment of salaries & allowances to Public Servants

Payment of gratuityn Payment of backlog of 10 years pensionn Approval for payment of N30,000 minimum wage with n

arrears from December 2019

Yo

uth

Em

po

we

rme

nt,

Ca

pa

cit

y B

uil

din

g &

S

po

rts

De

ve

lop

me

nts

n Over 30,000 youths trained in various skillsOngoing construction of 10 Modern Sports Centresn N2bn interest free loan for small scale entrepreneurs and n

traders First & second Ibom State Youth Sports Festivaln Through sound financial planning, investment and n

management, Akwa Ibom has become the Football Capital of Nigeria - Hosted the Super Eagles to becoming the first African Team to qualify for the Russia 2018 World Cup with a match still to play.

Akwa United won Nigeria’s FA Cup twice in 3 years�n Ibom Angels emerged runners up of 2017 Nigeria �n

Female FA Cup (the first time a female team from the state has ever qualified for the finals of a major national competition).

Team Akwa Ibom finished 2nd on the medals table at 2017 �n National Sports Festival

n The state received 3 Excellence Awards on Sports Development from the Federal Government n Most Comprehensive Sports Development Programme Most Patriotic Sports Supportersn Best Sports Infrastructuren

n Governor Udom Emmanuel was Best Sports Governor 2017 n Ongoing reconstruction of Eket sports stadium

n Sponsoring two State teams in the Nigeria Premier Leaguen Ongoing upgrade of Uyo Township stadium

n Over 00 rural development projects across 31LGAs3 Over 500 inter-ministerial rural intervention projectsn Rehabilitation/construction of over 500km n

of rural feeder roads Ru

ral

De

ve

lop

me

nt

Oth

ers

n 153+mw Ibom Power Plant & 3 sub-stationsn Incorporation of Ibom Airline (5 aircraft procured)n Donation of Patrol Vehicles to the Nigerian Police, Akwa Ibom State Command

200 wheel chairs to persons with disabilitiesn Health Insurance Scheme for Journalistsn

n Launch of Power-for-All 2021 Initiative

Healt

h

n Free medical services for children below 5 years, pregnant women & the aged.

36 Containers of state-of-the art medical equipmentn Construction & upgrading of secondary n

healthcare facilities across the state General Hospital, Ikono (Computerized) General ● ●

Relief for over 4,000 mal-nourished childrenn Free screening & treatment of over 15,000 people n

for various eye diseases Reconstruction of the Oxygen Plant, Ikot Ekpenen

Hospital, Ikot Okoro General Hospital, Etinan General Hospital, Ituk Mbang ● ● ● ● ● Immanuel General Hospital, Eket General Hospital, Iquita, Oron General Hospital, Awa Medical Centre, Okon Eket●

n Syringe Manufacturing Factory (Largest in Africa) Pencil Factory n Toothpick FactorynElectric Digital Metering Solutions Manufacturing Factory n Resuscitation of Ibom Paints Ltd (former Peacock Paints)n Fertilizer Blending Factoryn

n Rice Mill x 2 Flour Milln Plywood/Timber Manufacturing Factoryn Quality Ceramics, Itu (Ongoing)n Tissue Production Factory, Itu (Ongoing)n Coconut Refinery (Ongoing)n Ibom Industrial Park/Jetty loading...n

n Plastic Manufacturing Factory Palm oil/Kernel Crushing Plantn Cassava Processing Millsn Fish Processing Factoryn Starch Manufacturing Companyn Oil Palm Depot, Ibesikpon Virgin Forest Energy Farm Tankn

Ind

ustr

ializa

tio

nR

oad

s &

O

ther

Infr

astr

uctu

re

Over 1700km of roads n 40 bridges n Completion of the State Secretariat Annexn Construction of 2nd airport runway (taxiway) (on-going) n Upgrade of Airport main runway to category 2 n Only state to own & maintain an airport independentlyn

n Completion of Four Points by Sheraton Hotel (on-going)

International Worship Centre (on-going)n Eket International Modern Market (on-going)n Airport Terminal building (on-going)n Expansion of Shopping Mall at Ibom n

Tropicana Entertainment Centre (on-going) Completion of Governor’s Lodge, Lagosn

n Flood control at Nsikak Eduok Avenue, Uyo

21 Storey Intelligent office n complex...ongoing

Renovation of 85 Flats at n Wellington Bassey Army Barracks, Ibagwa

Private Hangar for State aircraftn

n Loan disbursement to 2,000 dry season vegetable farmers

MR. UDOM EMMANUEL GOVERNOR OF AKWA IBOM STATE

04

“we can look back and declare with

irresistible evidence, soaring hope

and inspired faith that that event was

not the triumph of Udom Emmanuel,

but the victory of Akwa Ibom State.

That event was not the end of a race,

but the beginning of a revolutionary

renewal for our State.

HIS EXCELLENCY,

MR. UDOM EMMANUEL GOVERNOR, AKWA IBOM STATE

05

“In our Completion Agenda, we

will raise the bar of

performance... and lift our

State to such an enviable

height that it will be the pride

of the nation

HIS EXCELLENCY,

MR. UDOM EMMANUEL GOVERNOR, AKWA IBOM STATE

Publisher/Editor at-large Charles Udoh

Editorial AdviserInyang Jameson

EditorIni Nkantion

EditorialAniekan UkpongIdris MabadejeGodwin Ibok

GraphicsNsikan EkwereEdidiong George

PhotographyAnthonia IbangaEsther OkonDaniel Obot TypesettingDavid Etuk

On-line AdminSolomon Eyo

A Publication of Ministry of Information, Uyo, Akwa Ibom State, Nigeria [email protected]

[email protected]/sms: 09076173782

Team

Five Point Agenda/Completion Agenda 2 1

All Correspondence To The Honourable Commissioner,

© February 2020

06

Introduction 7

Akwa Ibom, Arise and Shine 8

Sectoral Achievements 12 - 237

Accolades 238 - 239

The Team 240 - 245

● Industrialization 13

● Health 29

● Agriculture 41

● Transport And Aviation Development 47

● Social Welfare 52

● Family Empowerment And Youth

Re-orientation (feyrep) 57

Local Government/chieftaincy Matters 65●

● Education 67

● Power 76

● Economic And Entrepreneurship Development 78

● Revenue Generation And Finance

Management 81

● Lands And Housing 83

● Science And Technology 88

● Culture And Tourism 92

● Manpower Development And Workers'

Welfare 97

● Security 99

● Law and Order 101

● Environment And Waste Management 102

● Youth and Sports 110

● Information Management 116

● Rural Development 118

● Roads and Bridges 181

ContentsContents

he need to continually improve the Teconomic well-being of the citizenry

and territorial security architecture is the

basis of true governance. This is especially

so in a democracy where leadership is

bestowed through the trust and mandate

of the people.

Since May 29, 2015, His Excellency,

Governor Udom Emmanuel has

demonstrated an unparalleled

understanding of the essence of

governance, by implementing policies and

programmes that have both direct and

indirect positive impact on the lives of the

people. The imprints of his leadership

acumen span across all economic sectors,

setting new; higher standards, which defy

long held postulations and economic

indices. Indeed it's been a refreshing

departure from the era of 'anything goes'

in governance and a dawn of a new socio-

economic and political era.

Apart from remaining a leader in physical

infrastructural development, Akwa Ibom

has become a leading destination for

Foreign Direct Investments in Nigeria. With

18 industrial concerns and still counting;

over 1,700 kilometres of economic roads;

several world-class secondary healthcare

facilities, sustained free education up to

senior secondary school level, and yearly

payment of over N600m as WASCE fees

for indigenes, the state has attained a new

height in socio-economic development.

Other notable key performance indicators

include free medical services for children,

pregnant women and the aged in public

hospitals; unrivalled empowerment of

youths and women folk.

To cap it all, Akwa Ibom state opened a

new vista in the annals of history,

becoming the first state in Nigeria and

possibly the African continent to own a

full-fledged commercial airline. Ibom Air

has not entered the Nigerian airspace as

another 'also-ran brand' but as a game-

changer that is redefining aviation travels

in Nigeria. With a fleet of what is arguably

the most modern aircraft in the Nigerian

commercial airspace, the airline has

become the toast of domestic air travelers

with an 'on-time; every-time' schedule of

operations, adhering to international

standards and best practices in safety and

customer experience.

Despite the armada of jaw-dropping

achievements recorded by the current

administration, the Akwa Ibom story today

will not be complete if we fail to

acknowledge, loud and clear, the

doggedness and passion with which

Govenor Udom Emmanuel has successful

led the people of the only state on planet

earth named after God; the 'AkwaAbasi

Ibom' back to God. No man can play God

anymore, as all thanksgiving, praises and

adoration go to the ONLY GOD.

An infectious new wave of enterprise and

oneness currently pervades the state as

Akwa Ibomites are becoming increasingly

united in one accord and in pursuit of a

new social order where selfish and myopic

political interests are relegated to the back

seat in the vehicle of state building. A

common denominator is the fact that

there is a general consensus that the

choice of Mr. Udom Emmanuel as

Governor in 2015 and again in 2019 was

divinely ordained, and ONLY GOD has kept

us and sustained the unprecedented

successes we are witnessing.

This 'coffee-table' book encapsulates

strides recorded so far by the Udom

Emmanuel led administration across all

sectors from 2015. It is a one-stop

repository of information that would serve

as a reference material for Akwa Ibomites

at home and in the diaspora, Nigerians,

investors, tourists and other stakeholders

from around the world. An e-copy is

available on www.akwaibomstate.gov.ng.

Welcome to the land of promise!

#DiscoverAkwaibom

#AkwaIbomAyaiya

Come live, work and invest.

Charles Udoh, KSJ

Hon Commissioner for Information

February 2020

07

SETTING NEW;

HIGHER STANDARDS

AKWA IBOM ARISE AND SHINE

08

y dear compatriots, I invite you to Mshare in the majesty of this

auspicious moment in our history. A

moment set for our rebirth, reinvention

and rejuvenation. For we stand today at

an intersection where a glorious past

meets a hopeful future. If we were to

situate this moment in the context of

the Bible, it would be that we have

crossed River Jordan. Behind us is the

wilderness and before us is the

Promised Land.

We can look back and remember our

exodus from Cross River State, when

God granted our wish 28 years ago, with

the creation of this state that is

appropriately named after Him. We can

remember the years we toiled in the

wilderness as house helps and servants

in the nooks and crannies of our nation.

Yes, we can still remember the days we

wallowed in under-development and

scorn as we struggled to find our feet

and catch up with the other states in our

country.

Today, we have stepped out of the

wilderness and crossed the Jordan. We

behold the allure and beauty of the

possibilities before us. Though we can

still see the walls of Jericho (walls of

ethnicity and jealousy, walls of hatred

and avarice, walls of pettiness and

mischief), we are not daunted because

He who brought us this far did not bring

us to leave us.

Our problem is not with the walls we

see, but with the walls in our mind.

Many of us have left Egypt, but we still

carry the servile mind-set and the

divisive attitude of Egypt in our hearts.

But the demand of today, which has

brought us together to launch this

Dakkada campaign, is that we must rise

up as a people, take the ark of faith and

go around the walls so that they will

tumble down like the walls of Jericho.

This campaign mirrors the campaign of

the Israelites. They had to rise up and go

round the walls of Jericho. The walls of

Jericho did not go down the first day nor

the second day, but they kept going

boldly with confidence and open chests.

They held their heads high and their

chests out. Around and around, they

went. They sang and shouted for joy,

then the walls came tumbling down.

As the Dakkada campaign starts today,

the walls may not come down today. But

from where the sun now stands, we will

not retreat or surrender until every wall

comes tumbling down, and we step into

the dreams of our forefathers. The

beauty of the sunset is a proof that the

end of this our well thought out

Dakkada Initiative shall be beautiful. We

will march together and sing the

Dakkada song, and live its creed. We will

AKWA IBOMITES

RISE TO GREATNESS

This campaign mirrors the

campaign of the Israelites.

They had to rise up and go

round the walls of Jericho.

The walls of Jericho did not

go down the first day nor

the second day, but they

kept going boldly with

confidence and open chests.

They held their heads high

and their chests out. Around

and around, they went. They

sang and shouted for joy,

then the walls came

tumbling down

- Gov. Udom Emmanuel

09

encourage one another in this journey

of faith, and join our hands together. We

will not break our ranks nor break our

steps. Akwa Ibom is on the march, and

there is no stopping us.

My brothers and sisters, today is sunrise

in Akwa Ibom. We have come to sound

the clarion call for all to see the shafts of

sunlight bursting through the horizon

and rising up. Now is the time for us to

obey the Biblical injunction for us to

wake up the mighty men and beat our

pruning hooks into spears. Now is the

time to let our nation see our ingenuity.

Now is the time for creativity and

innovation in our land to manifest. Now

is the time to wake up the mighty men

and women so that our nation will know

that we are a great people and a blessed

generation.

We appeal to all tribalists to rise from

the valley of hatred to the mountain of

brotherhood. We remind them that he

who keeps a man down must stay down

with him. We appeal to the petty-

minded and remind them that it is only

when Akwa Ibom towers, that he can

become a giant. We appeal to the

hatemongers to know that he who digs

a pit for another will fall into that same

pit. So let us take this message to every

member of the Akwa Ibom family and

enjoin them to Dakkada and join the

march for a new Akwa Ibom anchored

on moral transformation, spiritual

rebirth, ethical re-orientation and

industrial renaissance.

On May 29, 2015, you graciously

extended to me the mandate to be your

Governor. In execution of this sacred

trust as your Governor, and in

observance of the oath I took before our

God and our good people, we have

spared no efforts in keeping faith with

that covenant. During my electioneering

campaign, I had laid out a bold plan in

my 5-Point agenda of wealth creation,

economic and political inclusion, poverty

alleviation, infrastructural consolidation

and expansion and job creation. So far,

we have kept our eyes on the ball, and

this is evident through the numerous

projects undertaken by this

administration.

We have so far undertaken the

construction of 137 kilometers of road

with 10 bridges spanning all the three

Senatorial Districts. We have pursued

the construction and completion of a

second runway at the Ibom

International Airport, and a 1.2km

underground drainage in Uyo by Nsikak

Eduok/Oron road junction.

Yesterday, we commissioned water

reticulation and head-works in Ifa Atai

and Idu Uruan, in Uyo and Uruan LGA

respectively. More of these water

projects will soon be commissioned.

One woman who typifies the Dakkada

philosophy is Dr (Sister) Ann Ward. Her

labours of love at St Luke’s Hospital,

Anua is legendary. Yesterday, we

decided to immortalize her name in an

ultra-modern gynaecology ward named

after her in the 78 year old Hospital. We

have also renovated a male and children

wards for the hospital.

The thrust of our administration is

industrialization. In driving this, we have

revitalized and re-commissioned

Peacock Paints. We have performed

ground-breaking ceremonies for a car

assembly plant in Itu LGA by a leading

Israeli auto manufacturing company-

Mimshac Merkavim as well as the Low

Energy Display (LED) Manufacturing

plant at Itam. We have brought the

Shoprite Mall to the Tropicana in Uyo.

We have also performed the ground-

10

mind. Let every Akwa Ibom son and

daughter know that no matter the

circumstances they find themselves,

they can rise and shine like a million

stars. Let us rise to illuminate our world

with our God-given talents and

potentials. It is a product of the mind. If

you can dream it, you can make it. That

is the power behind the Dakkada

Campaign.

An American, R. Buckminster Fuller,

thought his world had come to an end

and decided to commit suicide. He

wrote the suicide note and went to Lake

Michigan to commit suicide. But

something ministered to him that he

had no reason to end his life because he

did not create himself. He got up

(Dakkada) with a new resolve to succeed

in life. He succeeded and at his death

not only did he have over 180 patented

inventions in his name, but he was

inducted into the American Hall of Fame

as one of the greatest scientists,

mathematicians and architects to come

from America.

We declare to you that no matter your

circumstances, dakkada. We declare to

you that what you were born to see is

not what you were born to be, dakkada.

You may have been born in the slum but

the slum was not born in you, dakkada.

People may look down on you, and say

you will never amount to much, but they

only know where you are coming from,

not where you are going to. So their

opinion does not count, what counts is

your attitude, dakkada.

With a firm and unshakable belief in

God's guidance of the affairs of this

State, we commit this project into His

mighty hands and pray that He would

infuse it into our spirits, souls and

bodies. May we now rise together and

recite the Dakkada creed as prayer even

as we launch this campaign in the name

of the Father, Son and the Holy Spirit –

Amen.

...being the official Dakkada Launch

Speech.

rd© 23 September 2015

breaking ceremonies of the Fertilizer

Plant and the Daar Communications

Broadcast complex at Abak. At the same

time, Electric Meter Assembly and clay

Processing Plants are underway in Onna

LGA.

We hope to flourish in freight business.

That is why the Ibom Deep Sea-port

project is setting sail. We have built

more power substations and this has

improved electricity supply significantly.

We have invested heavily in skill and

manpower development for our

teeming youths, whom we are

committed to securing a brighter future

for. In this wise, we are training a

thousand youths in Oracle technology.

We have also sent our youths to acquire

skills in agriculture in Israel, while

another set will be sent for power sector

training. At the moment, about 329

youths will soon commence training in

photography and film production.

Compatriots, we have spared no efforts

in attracting foreign direct investment.

Our target is to build a prosperous

glittering State that will be the envy of

the world.

But the greatest development is in the

11

Since May 2015, Akwa Ibom State has witnessed

impressive milestones in her socio-economic

development consequent upon Governor

Emmanuel's 5-point agenda; Job Creation, Poverty

alleviation, Wealth creation, Infrastructural

consolidation and, Economic and Political

inclusion.

The Agenda has achieved life-touching projects in

various sectors of the economy.

With the ongoing 8-point Completion Agenda of

Industrialization, Aviation Development, Rural and

Riverine Area Development, Agriculture, Human

Capacity Development, Security, Infrastructure,

Small and Medium Scale Enterprises many more

landmark achievements are dott ing the

landscape of the State.

SECTORAL ACHIEVEMENTS

Industrialization

Health

Agriculture

Roads andBridges

FREYReP

Local Government/Chieftaincy Matters

Education

Economic and Entrepreneurship Development

Culture and Tourism

Manpower Development and Workers' Welfare

Revenue Generation and Finance Management

Environment and Waste Management

Security

Lands and Housing

Science and Technology

Rural Development

Information Management

Youth and Sports

Power

Law and Order

Transport & Aviation Development

Social Welfare

12

INDUSTRIALIZATION

Sectoral Achievements

¾ Syringe Manufacturing Factory (Largest in Africa), Onna Electric Digital Metering Solutions Manufacturing Factory, Onna¾

Pencil Factory, Itu¾ Toothpick Factory, Itu¾ Plastic Factory, Itu¾ Resuscitation of Ibom Paints Limited (former Peacock Paints Industry), Etinan¾ Fertilizer Blending Factory, Abak¾ Oil Palm Depot, Ibesikpo Asutan¾ Ufaini Palm Kernel Crushing Plant, Ukanafun¾ Flour Mill, Onna¾

Rice Mill, Ini¾ Starch Manufacturing Company, Oruk Anam¾ Cassava Processing Mill, Ikot Ekang, Abak¾ Cassava Processing Mill, Ibesikpo Asutan¾ Virgin Forest Energy Tank Farm, Oron¾ Palm Oil Processing Plant¾

¾ Fish Processing Plant ¾ Plywood & Timber Factory¾ Rice Mill, Ibiono Ibom¾ (Ongoing) Tissue Production Factory, Itu ¾ (Ongoing) Coconut Refinery

Ibom Deep Seaport ¾ (Ongoing) Ibom Industrial Park/Jetty ¾ (Ongoing) Quality Ceramics, Itu ¾ (Ongoing) Waste to Wealth Plant ¾ (Ongoing) Power plant, Refinery, Gas processing plant ¾ (Ongoing)

ver the years, Akwa Ibom has been known to be a civil service economy where government provides the main source of income Othat sustains the population. The mono economy of civil service with petty trading made the State vulnerable to unemployment

and its associated vices. To change this situation, Governor Udom Emmanuel, in over four years, has worked tirelessly to industrialise

the State, staking his highly prized integrity, earned over years of service in the private sector. So far, the Governor has changed the

status of the State to an industrialized economy. The Governor’s effort has produced:

13

¾�Jubilee Syringe Manufacturing Factory, Onna

INDUSTRIALIZATION

Sectoral Achievements

14

¾�Electric Digital Metering Solutions Manufacturing Factory, Onna

INDUSTRIALIZATION

Sectoral Achievements

15

¾�Plastic Factory, Itam Industrial Park, Itu

INDUSTRIALIZATION

Sectoral Achievements

16

¾�Fertilizer Blending Factory, Abak

17

INDUSTRIALIZATION

Sectoral Achievements

18

INDUSTRIALIZATION

Sectoral Achievements

¾�Ufaini Ibom Palm Kernel Processing Ltd, Ikot Akpa Nkuk, Ukanafun

19

INDUSTRIALIZATION

Sectoral Achievements

¾�Flour Mill, Onna

20

¾�Plywood/Timber Factory, Onna

21

INDUSTRIALIZATION

Sectoral Achievements

¾�Coconut Refinery, Mkpat Enin, under construction

22

INDUSTRIALIZATION

Sectoral Achievements

¾�Ibom Paints Limited, Etinan (former Peacock Paints Factory)

23

INDUSTRIALIZATION

Sectoral Achievements

¾�Pencil Factory, Itu

24

INDUSTRIALIZATION

Sectoral Achievements

¾ Ibom Cottage Industries Complex, Itu�

25

INDUSTRIALIZATION

Sectoral Achievements

26

¾�Toothpick Factory, Itu

27

INDUSTRIALIZATION

Sectoral Achievements

¾�Model of Ibom Industrial City

INDUSTRIALIZATION

Sectoral Achievements

¾�Model of Ibom Deep Sea Port

28

Sectoral Achievements

¾ Reconstruction & Equipping of Hospitals:

• General Hospital, Etinan

• General Hospital, Ituk Mbang, Uruan

• General Hospital, Ikono

• General Hospital, Ikot Okoro, Oruk Anam

• General Hospital, Iquita, Oron

• General Hospital, Ikot Ekpene (ongoing)

(ongoing)• General Hospital, Ikot Abasi

(ongoing)• Immanuel Hospital, Eket,

(ongoing)• General Hospital, Awa

(ongoing)• Leprosy Hospital, Ekpene Obom, Etinan

(ongoing)• Medical Centre, Okon, Eket

¾ Upgrade of Ibom Specialist Hospital

¾ Construction of Emergency Operation Centre s.(EOC), Ikot Ekpene and furnishing of Call Duty Doctors' flat

¾ Received 36 Containers of various sophisticated medical equipment procured from USA for the reconstructed hospitals in

the state and awaiting delivery of 64 more.

¾ Trained and Refreshed 20 Biomedical Engineers (for maintenance of hospital equipment in the state)

¾ kot Ekpene, for Supply of Oxygen to other Hospitals in the State.Reconstruction of the Oxygen Plant, I

¾ Continuous Professional Development of Doctors, as requirement by Medical and Dental Council of Nigeria-MDCN

¾ Payment of Consolidated Medical Salaries owed since 2014

• Doctors – CONMESS

• Nurses – CONHESS

ith the consciousness that a healthy population is a leading asset to the State, the Emmanuel-led administration has Wachieved a total turn around in the healthcare sector. The free healthcare policy of government has been sustained with

massive health infrastructure across the State.

29

HEALTH

Sectoral Achievements

HEALTH

¾�State-of-the-art facilities in General Hospital, Etinan

30

Sectoral Achievements

HEALTH

¾�General Hospital, Ituk Mbang, Uruan

31

Sectoral Achievements

HEALTH

¾�General Hospital, Ikono

32

Sectoral Achievements

HEALTH

¾ Conducted 21-day free eye care missions outreach (Glasses & Surgery) in partnership with MTN:

• 15,350 people treated

• 1,150 eye surgeries carried out

• 200 pairs of free glasses given out

¾ Provision of training and residential quarters for 98 House Officers in the state hospitals and the University of Uyo Teaching

Hospital (UUTH), every year since 2015

¾ Accreditation for five Schools of Nursing and Midwifery:

¾ Curbed the spread of Infectious diseases in the State promptly by special intervention thereby preventing death of

Akwa Ibom citizens:

• LASSA Fever

• Monkey pox

¾ Conducted e-Collection Training:

• SAVE One Million Lives (for Women & Children), a Federal Government joint initiative.

¾ Training and Certification of 100 Doctors and Nurses in Basic Lives Support (BLS) and Advanced Cardiac Life Support (ACLS),

with medical emergency training experts from the US.

¾ Procured AEDs (Automated External Defibrillators) and ECG Machines for Use in Emergency Response, to reverse Cardiac

Arrests. Now in all our ambulances.

¾ Conducted inauguration and training of “Health and Research and Ethics Committee” members.

¾ Treatment of 4,038 moderately malnourished and severely mal-nourished children in various parts of the state.

¾ Awareness and sensitization campaign for the Control of Tuberculosis and Leprosy (TLB) and treatment.

¾ nd Intervention in the State’s Cold Store for maintenance capacity and 2 round National Immunization Plus days campaign.

¾ Refurbishing and Maintenance of House Officers Residential Quarters at Obio Offot.

¾ Renewal of Contract for Consultant Specialist Doctors for Training of House Officers in the State. (Ongoing)

¾ Intervention in, and restoration of, the Services and facilities in Ibom Specialist Hospital.

¾ All the Reconstructed and Refurbished hospitals have been digitized.

• Turn-around time is reduced by more than 60%.

33

Sectoral Achievements

HEALTH

Digital Ambulance at Ibom Specialist Hospital

Ann Ward Gynaecology Block, St. Luke's Hospital, Anua, Uyo

34

General Hospital, Iquita, Oron

35

Sectoral Achievements

HEALTH

Sectoral Achievements

HEALTH

• Patients data in one hospital are now accessible in other refurbished or reconstructed hospitals.

• Makes patients' referrals online possible, quick and easy

• Durability of patients records assured.

¾ The Primary HealthCare Development Agency, PHCDA, bill has been signed into law with a Board constituted

¾ Saving One Million lives Performance for Results (SOML P for R): The State has been working with support from the Federal

Ministry of Health on implementing programme on maternal new-born and child health on all the pillars of: Malaria,

nutrition, immunization, HIV/AIDS, essential drugs, logistics management, and infrastructural development in strengthening

Primary Healthcare.

Intervention in Civil Works Under The Soml Perfomance for Results Intervention.

1. Mini water scheme at Primary Health Centre, Ediene Atai, Ikono

2. Mini water scheme at Primary Health Centre, Ikot Idem Udo, Onna

3. Mini water scheme at Primary Health Centre, IdungIniang, Eket

4. Construction of Perimeter Fence at Primary Health Centre, EdieneAtai, Ikono

5. Construction of Perimeter Fence at Primary Health Centre, Ndon Ebom, Uruan

6. Renovation of Maternity Block at Primary Health Centre, Ediene Atai, Ikono

7. Renovation of Maternity Block at Primary Health Centre, Ndom Ebom, Uruan

8. Renovation of Staff Quarters at Primary Health Centre, Ibong Otoro, Abak

Newly equipped ward, General Hospital,Ikot Okoro

36

�State-of-the-art facilities in General Hospital, Ikot Okoro

37

Sectoral Achievements

HEALTH

Sectoral Achievements

HEALTH

Rehabilitated Administrative block at St. Luke’s Hospital, Anua, Uyo

38

Emergency Operation Centre, Infectious Disease Hospital, Ikot Ekpene

39

Sectoral Achievements

HEALTH

Leprosy Hospital, Ekpene Obom, Etinan

40

Sectoral Achievements

HEALTH

41

Sectoral AchievementsAGRICULTURE

¾ Set up of Technical Committee on Agriculture and Food Sufficiency

¾ 11,000 hectares of coconut plantation and refinery

¾ 3,240 hectares of cassava plantation in 15 LGAs (FADAMA)

¾ Cultivation of over 1,200 hectares of rice

¾ Registration of 2,318 farmer cooperatives and groups, made up of 49,318 farmers, carried out for the Rice Anchor Borrowers

Scheme.

¾ 450 youths trained on cocoa maintenance

¾ 500,000 improved cocoa seedlings raised and distributed to farmers at highly-subsidized rate, across the 28 cocoa producing

local government areas

¾ Akwa Prime Hatchery producing 17,000 day-old chicks weekly, and processed poultry products.

¾ Establishment of Out-Growers Scheme for the Hatchery, and training of poultry farmers.

¾ 54,538,100 kg of Maize seedlings distributed to farmers, covering 11,858 Hectares of Akwa Ibom farm land.

¾ Installation of Maize Preservation/Shelling Machine at Nung Udoe

¾ Construction of Vegetable Green houses

¾ Construction of Cassava Micro-Processing Mills across the State

¾ Training of 300 youths under the Graduate Unemployment Youth Scheme (GUYS).

¾ Refurbishing of Cassava Processing Factories at Ikot Okudom, Eket L.G.A; Nung Udoe, Ibesikpo/Asutan LGA and Ikot Ekang in

Abak L.G.A and leasing to private operators for the production of high quality garri, odourless fufu and cassava flour.

¾ Procurement of 600,000 bags of fertilizer for farmers in the State

¾ Planting of 500 citrus seedlings, 1,000 pineapple suckers at the Horticulture Garden in Uyo LGA

¾ Establishment of large hybrid rubber nursery at Ebighi Anwa, Okobo L.G.A, in partnership with Rubber Research Institute of

Nigeria, for distribution to rubber farmers at highly subsidized rates

¾ Establishment of demonstration plots on various agricultural technologies for transfer of improved technologies to farmers

through Akwa Ibom Agricultural Development Programme (AKADEP)

¾ Establishment of 3 model villages for production, processing and packaging of Vitamin A products

¾ Partnering World Bamboo Organization for Bamboo development in the State

¾ Procurement of 40,000 Hybrid Plantain Suckers for free distribution to farmers across the 31 L.G.As of the State.

¾ Construction of Boreholes as part of infrastructural benefits of FADAMA at Sawah Rice production, Nnung Obong, Nsit Ubium

¾ Training of 360 youths in Israel on various agricultural enterprises

¾ Identification of water reservoirs for Inland Fisheries programmes in the State.

AGRICULTURE

overnor Udom Emmanuel's two-pronged approach to management of the agriculture sector by using the traditional civil service Gstructure and technical agency to drive the State's agricultural yields and thereby achieve food sufficiency has manifested in:

42

Sectoral Achievements

¾ Collaboration with Skye Bank (now Polaris Bank) and Central Bank of Nigeria (CBN) on Anchor Borrowers Scheme for:

I. Cassava farmers and mobilization of 5,000 farmers for the scheme, as well as creation of 15,000 jobs (downstream) and

about 45,000 jobs (upstream) through value addition.

ii. Cat fish farmers and mobilization of 2, 000 cat fish farmers for the scheme as well as creation of 6,000 jobs (downstream)

and 18, 000 (upstream) through value addition.

¾ Training of enumerators on the use of modern electronic gadgets for data capturing and field mapping under the RIFAN / CBN/

AKS Rice Anchor Borrowers Scheme.

¾ 120 Hectares of rice farm cultivated at Ikot Esen, Ibiono Ibom LGA.

¾ 33 processing sheds and assets constructed under FADAMA III + AF programme.

¾ 241 Cooperative Groups formed.

¾ Creating sustainable jobs to FADAMA GUYS trainees by providing grants in the tune of N95,384,000 to 249 beneficiaries.

¾ Construction of Agricultural Equipment Hiring Enterprise (AEHE) Centre at Awa Iman, Onna L.G.A; Ploughing and Ridging of 130

hectares by AEHE.

¾ Acquisition of Tractors with Accessories and 14 Implements.

¾ Harvesting of 330 Hectares of Cassava cultivated.

¾ Upgrading of hatchery at Mbiaya Uruan and Development of breeder farms.

¾ Successful training of 10 Akwa Ibom State Animal Scientists on Goat Multiplication and Insemination Programme in South

Africa.

¾ Cultivation of paddocks and perimeter fencing at the Goat Multiplication Centre in Ikot Itie Udung, Nsit Atai L.G.A.

¾ 33 processing Boreholes and Reticulation completed.

¾ 1 Borehole and Reticulation completed for Agricultural Equipment Hiring Enterprise (AEHE).

¾ Hosting and Training of Farmers (Training of Trainers, ToT) on Vegetable Production.

¾ Partnership with Ibom Agricon Rice for the production of Ibom Family Rice in Ini LGA.

¾ 10 hectares of land cultivated with vegetables like tomato at Ekeya, Okobo LGA, under the Akwa Ibom Enterprise Employment

Scheme (AKEES).

¾ School Farm Reviving Campaign across the State.

¾ 10 metric tons Cocoa Fermentation and Drying Plant at Ananammong, Ini LGA.

¾ MoU signed with Contec Global for the cultivation of improved variety of Banana for export on 2,000 hectares of land and

establishment of 300 hectares Bio Safe (Organic) Agricultural Hub.

43

Sectoral Achievements

AGRICULTURE

Rice Processing

Mill, Ini

Cucumber Plantation at

the Green House,Airport Road

44

Sectoral Achievements

AGRICULTURE

Cassava Processing Mill

Grater

Pressers Sievers

Fibrillator

45

Sectoral Achievements

AGRICULTURE

Cultivation of Hybrid Cocoa

Nursery,Odoro Ikpe, Ini

Aerial-view of Vegetable Green House

46

Sectoral Achievements

AGRICULTURE

47

Sectoral Achievements

TRANSPORT AND AVIATION DEVELOPMENT

48

Sectoral Achievements

¾ Construction of Taxiway at Victor Attah International Airport, 75% constructed

¾ Full upgrading of Airfield lighting system at Victor Attah International Airport

¾ Construction of Commercial Building at Victor Attah International Airport .

¾ Incorporation of Ibom Airline with five aircraft procured for operations.

¾ Security Perimeter Fencing at Victor Attah International Airport.

¾ Remodelling of Departure Hall of Victor Attah International Airport.

¾ Construction of the Main Terminal Building of Victor Attah International Airport (Ongoing)

¾ Construction of private hangar for State aircraft. (Ongoing)

¾ Job creation for over 469 people, especially the youths, as drivers, conductors and monitoring personnel.

¾ Tax free holidays for all tricycle operators in the state (these tax holidays include Saturdays, Sundays and Public holidays).

¾ Setting up of Compliance Monitoring Unit (CMU) to enforce rules and regulations in the sector. This has brought sanity to

the transport sector and enhanced government revenue.

¾ Training of compliance and monitoring officers, as well as vehicle inspection officers.

¾ Regulation of urban transportation.

¾ Presentation of mini bus and provision of one year free ticket to tricycle, mini bus, and truck operators winners of state

organized raffle draw.

¾ Re-organisation of tricycle business and unions in the state to engender peace in the sector. The recognised unions are:

• TOAN – Tricycle Owners and Association of Nigeria

• KORA- Keke Owners and Rider Association

• AKTA - Akwa Ibom Tricycle Association

• TOFF - Transporters Operators Foundation Forum

¾ Biometric capturing of Commercial transport operators across the state for security of lives and properties

¾ Introduction of Insurance Scheme for Tricycle Operators

¾ Inauguration of Akwa Ibom State Oil, Gas and Maritime Operations Regulatory Committee.

TRANSPORT AND AVIATION DEVELOPMENT

he Udom Emmanuel-led administration has made appreciable strides in transport and aviation that have engendered ease of Tmovement within and outside the State through air and land, as well as instituted maritime operation regulatory mechanism.

Achievements in this sub sector are:

49

Model of the new Terminal Building, Victor Attah International Airport

l-r Obong Victor Attah, Gov. Udom Emmanuel, Dr. Bukola Saraki, Rt. Hon. Onofiok Luke, Sen. Emmanuel Ibokessien and Otuekong Idongesit Nkanga inside Ibom Air

Gov. Udom Emmanuel stepping out from one of the aircraft acquired for Ibom Air, followed by Dr. Bukola Saraki, former Senate President

50

Redening the aviation industry in Nigeria

Sectoral Achievements

TRANSPORT AND AVIATION DEVELOPMENT

Ongoing construction of nd

Taxi way (2 Runway),

Victor Attah International Airport

Upgrade of main runway

to category 2, Victor Attah

International Airport

51

Sectoral Achievements

TRANSPORT AND AVIATION DEVELOPMENT

52

Sectoral Achievements

SOCIAL WELFARE

SOCIAL WELFARE

¾ Implementation of the Child's Right Law in the State. These include periodic public awareness campaigns and sensitization

against child abuse, abandonment, trafficking, baby factory, etc. Prosecution of Child's Rights offenders in the Family Courts in

collaboration with the Ministry of Justice, the State Judiciary, Police, Immigration and other security agencies. Over 200 cases thhave been recorded since 29 May, 2015 and about 121 cases determined. Nine persons have been jailed for raping of girl

children.

¾ Care for over 800 Orphans and less privileged children in the five Government Homes. Some of them are currently in higher

Institutions of learning viz:

• Special Children's Home, Uyo

• Divine Children's Home, Uyo

• Correctional Centre, Uyo

• Shelter Afrique Transit Camp, Uyo

• Government Children's Home, Ikot Ekpene

¾ Evacuation, Rehabilitation, Re-integration and Empowerment of 444 Lunatics between 2015 and 2018.

¾ Provision of N200,000 grant each for 700 women organisations across the 31 Local Government Areas of the State to enable

them start up or expand their businesses.

¾ Donation of over 200 Wheel Chairs and 100 special writing desks to persons with disabilities in secondary schools and tertiary

institutions.

¾ Provision of N50,000 grant each and wrappers for about 3000 widows across 31 Local Government Areas to boost their

businesses.

¾ Establishment of Gender-Based Violence (GBV) Prevention and Response Centre with toll free line in the Ministry of Women

Affairs and Social Welfare in collaboration with United Nations Population Fund (UNFPA), and synergising with other

humanitarian service providers and relevant law enforcement agencies for referrals. Undertaken Campaign against Gender-

Based Violence in the State.

¾ Celebration of International White Cane Safety Day, where White Canes were given to 350 visually impaired persons in the

State.

¾ Provision of Braille Machines, tape recorders, Laptops with Jaws to visually impaired undergraduate students.

¾ Training of 20 visually impaired persons in different skills at the Nigerian Farm Craft Centre, Lagos, and their subsequent

empowerment to start up their businesses.

¾ Care for 1000 Nigerian Legion Women.

¾ Establishment and Training of the Children's Parliament in the State and in the 31 LGAs as mouth piece of the children.'

¾ Sponsoring of participation at the United Nations Commission on the status of Women in New York.

¾ Provision of land for the establishment of a Women Development Centre for Skill Acquisition Training of women in different

skills in collaboration with Nigeria National Petroleum Corporation (NNPC) and Total Upstream Nigeria Limited in partnership

he basis for which Governor Udom Emmanuel's administration has been identified as a people-oriented government finds Tjustification in the large number of social welfare programmes with which the governor, with his dear wife, Martha has

touched a lot of lives in Akwa Ibom State. The programmes include:

53

Sectoral Achievements

with the Ministry of Women Affairs and Social Welfare.

¾ Collaboration with the AGAPE Sexual Assault Referral Centre at Immanuel General Hospital, Eket, to provide medical care for

over 100 violated and traumatized women and girls.

¾ Annual celebration of International Day of Persons with Disabilities, empowerment of members of the Association with basic

amenities for their wellbeing.

¾ Quarterly enlightenment/sensitization and support programme for over 300 women with multiple births in Akwa Ibom State in

collaboration with the office of the wife of Governor.

¾ Payment of interest on Central Bank of Nigeria (CBN) loan for over 5000 women by State government thereby making loan

accessible to all women.

¾ In 2015, Governor Udom Emmanuel sponsored 639 persons to pilgrimage in Israel.

¾ 150 youths trained in Agriculture during youth pilgrimage in Israel.

¾ In 2016, Governor Emmanuel sponsored 174 widows on pilgrimage to the Holy land.

¾ In 2017, Governor Udom sponsored youths on youth pilgrimage and 100 pilgrims to Israel.

¾ In 2018, the State hosted and sponsored the conference of leaders and managers of Christian pilgrimage from all the states of

the federation and Abuja.

¾ Health Insurance Scheme for Journalists in Akwa Ibom State.

Presentation of welfare packages to wives of legionnaires Reaching out to the physically challenged in the society

54

Sectoral Achievements

SOCIAL WELFARE

End of year party with children at a Government welfare home

55

SOCIAL WELFARE

Sectoral Achievements

¾�Wheel chairs and empowerment items donated to the physically challenged

56

Sectoral Achievements

SOCIAL WELFARE

Sectoral Achievements

Family Empowerment and Youth Re-orientation Path-Initiative (FEYReP) is a pet-project of the wife of the Governor, Mrs. Martha

Emmanuel, which aimed at reaching out to the indigent and vulnerable in the state.

In over four years of its existence as vehicle of social intervention, FEYReP has impacted positively on Akwa Ibom people through its life touching, multi-faceted programmes which include:

¾ Adoption of more than 1,500 orphans and vulnerable children.

¾ Back to school programme: Presentation of educational materials such as books, school bags, uniforms, school boxes etc to children in foster care centres across the state.

¾ Rehabilitation of abandoned children and those in foster care through monthly support, including food, cash for nine special children's home in the state.

¾ Over 500 pregnant teenagers across the 31 LGAs reached through Martha Care for Young Women initiative.

¾ Over 5,500 rural women and men have benefited from various economic empowerment exercise

¾ 300 Widows identified and provided with business start-up kids (equipment and cash)

¾ Through Martha's PregnaCare Outreach over 500 women have benefited with free medical care, counselling, and delivery packs

¾ Over 500 multiple birth families have received grants and other support

¾ More than 1000 Senior citizens benefited from FEYReP's intervention for the Elderly on every International Day for Old Persons

¾ Built and furnished 2/3 bedroom houses to 28 indigent families

¾ Cultivation of 17 hectares of Cassava

¾ Cassava processing factories at Ikot Aba, Ibiono Ibom LGA

¾ Fish processing factories at Ukpenekang, Ibeno LGA and Ibaka, Mbo LGA

¾ Palm Oil processing factories at Edem Akai, Etim Ekpo LGA and Aya Obio Akpa, Oruk Anam LGA.

FAMILY EMPOWERMENT AND YOUTH RE-ORIENTATION (FEYReP)

57

Wife of the Governor, Her Excellency, Mrs Martha Emmanuel, presenting a package to an elderly woman during the Elderly Sensitization Workshop in Uyo.

58

FEYReP

Sectoral Achievements

¾�FEYReP’s Cassava Processing Factory, Ananamong Village-Itu Mbunuso, Ini

59

FEYReP

Sectoral Achievements

FEYReP;s remodelled market stalls at Oruk Anam FEYReP's Oil palm factory in Oruk Anam LGA

Wife of the Governor, Mrs Martha Emmanuel during the Walk against Rape/ Violence against Women Campaign in Uyo Metropolis.

Some children of the Divine Childrens' Home, Atan-offot, a rehabilitation home run by FEYReP

60

FEYReP

Sectoral Achievements

Beneficiaries of FEYReP project

Before

After

61

FEYReP

Sectoral Achievements

¾�FEYReP’s Cassava farm, Ikono-offi Nsie, Okobo

62

FEYReP

Sectoral Achievements

Wife of the Governor, presenting empowerment items to physically challenged persons during FEYReP's Right to Rise Programme

63

FEYReP

Sectoral Achievements

Wife of the Governor, celebrating with the elderly as well as presenting empowerment items

64

FEYReP

Sectoral Achievements

Sectoral Achievements

LOCAL GOVERNMENT/CHIEFTAINCY MATTERS

¾ Official recognition/creation of three new clans in the State, one from each of the Senatorial Districts of Eket, Ikot Ekpene

and Uyo as follows:

i. Eket – Awa Afaha Clan in Onna Local Government Area

ii. Ikot Ekpene – Ukana East Clan in Essien Udim L.G.A.

iii. Uyo – South East Clan in Uruan L.G.A.

¾ Recognition/certification of two hundred and fifty-three (253) Traditional Rulers of which Eleven (11) were Paramount Rulers

and twenty-six (26) Clan Heads while the rest were Village heads.

¾ Approval of a two-year tenure of office for the Chairman, State Council of Chiefs.

¾ Payment of furniture allowance/palace renovation to eleven (11) Paramount Rulers duly sworn-in.

¾ Payment of Palace upkeep, car maintenance allowance, security vote as well as their stipends.

¾ Payment of Severance Allowance to former Councillors who served from 2012 – 2015.

¾ Registration of One Hundred (100) Churches as a licensed place of worship to conduct statutory marriages.

¾ Payment of outstanding leave grants to Unified Local Government Staff, 2015, 2016 and 2017.

¾ Payment of promotion Arrears 2004 – 2014 to Unified Local Government Staff.

¾ Payment of Gratuity Arrears for 2002 – 2011 in 2017 to Unified Local Government Staff.

¾ Promotion of 3,464 Unified Local Government Staff for 2015 – 2016.

¾ Upgrading of Primary Health Care Centre, Mbiabong Etoi to Akwa Ibom State Local Government Service Commission Staff

Clinic with state of the art facilities in partnership with Rotary Club of Uyo Shelter Afrique.

¾ Created maternal Care, Disease Prevention, Health Education and Learning Centre at the Local Government Service

Commission Headquarters in partnership with Rotary Club of Uyo Shelter Afrique.

¾ Organisation of 37 Capacity Building Workshop in 2017, 2018, 2019, to improve quality and standard of service delivery in

the third tier of government.

¾ Recruitment of 403 Health Workers and regularization of 125 un-captured Local Government Staff omitted by Skye Bank

since 2014.

¾ Presentation of SUV Prado to 7 newly sworn-in Paramount Rulers.

¾ Construction of State Chamber of Traditional Rulers (Ongoing).

ocal Government remains a duly recognised tier of government of the federation yet constitutes the basic, organised system of Lgovernance to cater for the rural populace. However, in appreciation and acceptance of the challenges of this level of grassroots

administration, the Udom Emmanuel government in its humane nature, has intervene to address these challenges thus:

Cross section of Paramount Rulers with their wives

65

Sectoral Achievements

LOCAL GOVERNMENT/CHIEFTAINCY MATTERS

Vehicles donated to Paramount Rulers in the state

66

¾ Free and compulsory basic education in public schools.

¾ Take-over of 17 Community Secondary Schools:

1. Technical College, Ikot Udom, Ikot Ekpene LGA.

2. Urban High School, Ikot Akpan Essien, Oruk Anam LGA.

3. Excellence Comprehensive Secondary School, Ikot Unya, Mkpat Enin LGA.

4. Migrant School, Emeruke, Eastern Obolo LGA.

5. Community Comprehensive Secondary School, Ekeya, Okobo LGA.

6. Union Secondary Sechool, Ibiaku, Ibiono Ibom LGA.

7. Community Comprehensive Sec. School, Ekeya, Okobo LGA.

8. Community Secondary School, Offi Uda, Mbo LGA.

9. Eket Vocational Technical College, Effoi, Eket LGA.

10. Q.I.C Comprehensive Secondary School, Ikot Osudu, Ikot Abasi LGA.

11. Comprehensive High School, Eweme, Okobo LGA.

12. Community Sec. School, Ikot Nsung Ikono, Uyo LGA.

13. Christian Comprehensive Secondary School, Ikot Abia Osom, Obot Akara LGA.

14. Comprehensive Secondary School, Mbiabet Ikpe, Ini LGA.

15. Community Secondary School, Mbak Obio Itam, Itu LGA.

16. A.M.E. Zion Sec. Commercial School, Mbokpu Oduobo, Okobo LGA.

17. Comprehensive High School, Idu, Uruan LGA.

¾ Hosting of First Education and Exhibition Summit in the State

¾ Construction of 10Nos Computer Laboratories with internet facilities in 10 secondary schools across the 10 Federal

Constituencies

¾ Establishment of Government Girls Model Secondary School, Ikot Ekang, Abak L.G.A

¾ Facilitated the establishment of Command Secondary School, Efa, Etinan L.G.A

¾ Facilitated the establishment of Nigerian Navy Military School, Ikot Ntuen, Ekparakwa, Oruk Anam L.G.A

¾ Facilitated the establishment of Special Police Protection Training Unit, Awa, Onna L.G.A

¾ Strategic interventions in Tertiary Institutions in the State such as roads, equipment supplies, academic blocks, etc

¾ Payment of subventions to public primary and secondary schools as well as Technical Colleges.

¾ Payment of over N600 million WAEC and NABTEB fees for indigenes in public secondary schools annually.

¾ Upgrading of Akwa Ibom State College of Arts and Science, Nung Ukim, Ikono L.G.A, to College of Science and Technology

¾ Installation of solar power and submersible water pump at Special Education Centre, Uyo

¾ Provision of training aids to mentally and physically challenged pupils at the Special Education Centre of the State

¾ Provision of training equipment at the Adult and Non-Formal Education Centres

¾ Computerization of the Examination Division of the Ministry of Education.

¾ Donation of over 200 wheel Chairs and 100 Special Writing Desks to physically challenged persons in tertiary institutions and

Sectoral Achievements

EDUCATION

nvestment in education has been one of the cardinal policies of Governor Udom Emmanuel from 2015 in an effort to build a bright Ifuture for Akwa Ibom youths. The investment in this sector spans from primary to tertiary levels. Some of the achievements of the

administration include:

67

Sectoral Achievements

EDUCATION

¾ Typical classroom settings in Akwa Ibom schools

68

Sectoral Achievements

EDUCATION

secondary schools.

¾ Recruitment of over 5,000 teachers into the education sector.

¾ Provision of facilities for accreditation of 38 academic programmes in the Akwa Ibom State University by National University

Commission (NUC).

¾ Provision of facilities and building of hostels, office blocks and lecture halls at the Akwa Ibom State University.

¾ Funding and Provision of facilities for accreditation of programmes by National Board for Technical Education at the Akwa

Ibom State Polytechnic, Ikot Osurua.

¾ Constitution of Task Force for the closure of Illegal Schools in the State.

¾th

Participation at the 20 edition of Junior Engineers, Technicians and Scientists ( JETS) Competition in 2017 at Lagos, where

Akwa Ibom was awarded the Overall Best State at the competition.

¾ Establishment of HIV/AIDS Friendly Club in 13 Tertiary Institutions in the state.

¾ Introduction and building of 60 numbers Modular Classroom Blocks in selected secondary/primary schools across the state.

¾ Facilitation of NUC resource visit to the Akwa Ibom State College of Education, Afaha Nsit and the eventual approval for the

commencement of degree programmes in 11 courses.

¾ Sponsorship of 3 Junior Students of Northern Annang Comprehensive Secondary School, Utu Etim Ekpo, Etim Ekpo L.G.A as

Nigeria's representatives at the Stockholm Junior Water Prize at Sweden in August, 2018 during the World Water Week

celebration where the students competed with other students from 49 countries at Stockholm, Sweden and the students ndemerged 2 Runners up.

¾nd

Winners at the Junior Secondary Schools category and 2 overall winners at the 2018 President Best School Award.

¾ Procurement of training materials for all Technical Colleges in the state.

¾ Renovation of ICT Laboratories and installation of Internet services in 7 Technical Colleges.

¾ Provision of basic workshop tools and laboratory equipment for Government Technical College Mbioto, Etinan L.G.A.

¾ Renovation of Government Technical College Effoi (Phase 1)

¾ Renovation of Government Technical College, Ikot Akata, Mkpat Enin LGA, jointly sponsored by the State Government and

Mobil Oil Producing Nigeria Limited.

¾ Approval for the regulation of Non-formal education practice in the state.

¾ In partnership with the Nigerian Girls Guide (NGGA), the Agency for Adult and Non Formal Education has established new

Adult Education Centres in Obio Offot in Uyo, Itu, Eket, Ikot Abasi, and Mkpat Enin Local Government Areas.

¾ In collaboration with Essien Udim Local Government Area and Mkpatak Community, the Agency established an Adult

Education Centre in Mkpatak and Essien Udim.

¾ 601 Projects executed by SUBEB through matching grant, between 2016 and 2018, comprising classroom blocks, boreholes

and modern toilet facilities.

¾ Provision of educational materials through matching grant between 2016 and 2018 comprising Pupils Plastic Chairs/Tables,

Desks, Teachers Tables/Chairs, Desktop computers, Laptop, Library resource materials, Sports facilities, Solar Panels

24v/150 Watts, 3.5KVAs Generators, Bags of Toys and Playing facilities to schools across the state.

¾ Conduct over 30 Training Workshops and Capacity Development programmes for Primary/JSS teachers.

¾ Training of 850 Teachers and 150 Head teachers (1000 teaching staff) on Jolly Phonics

¾st

Akwa Ibom State project “Biodegradable Waste to Wealth” emerged 1 Position at the JETS competition in Lagos.

¾ Distribution of 337 ICT text books to 33 Junior Secondary Schools.

¾ The administration has constructed and renovated over 500 School blocks as well as provided learning facilities through the

Inter-Ministerial Direct Labour Committee since 2015.

69

Sectoral Achievements

EDUCATION

¾ Ariel view of Akwa Ibom State University, Obio Akpa Campus showing newly constructed internal roads

70

¾ Nigeria Navy Military School, Ikot Ntuen, Ekparakwa, Oruk Anam

Sectoral Achievements

EDUCATION

71

72

¾ Modular Classroom Block at St. Peters Primary School, Mbiabong, Uyo

73

Sectoral Achievements

EDUCATION

Sectoral Achievements

EDUCATION

Theatre Arts Studio and Auditorium at Akwa Ibom State University, Obio Akpa Campus

Department of Communication Arts Studio, Akwa Ibom State University, Obio Akpa Campus

Television Studio at Akwa Ibom State University, Obio Akpa Campus

Radio Studio at Akwa Ibom State University, Obio Akpa Campus

Administrative Block, Akwa Ibom State University, Ikot Akpaden,Mkpat Enin

74

Interview session with Gov. Emmanuel and wife Martha, at the Radio Studio of Akwa Ibom State University, Obio Akpa Campus

Government Model Girls Secondary School, Ikot Ekang, Abak

Hostel block at Cornelia Cornelly College, Uyo

75

Sectoral Achievements

EDUCATION

POWER

¾ Construction of 2 x 5 MVA, 33/11 KV Injection Sub-station, Edet Akpan Avenue, Uyo

¾ Construction of Ibom International Airport 2x15 MVA Injection Sub-station

¾ Construction of 2x60MVA, 132/33KV Power Sub-station at Ekim, Mkpat Enin

¾ Rehabilitation of PHED facilities at Etim Ekpo, Mkpat Enin, Ikot Ekpene, Ikot Abasi Ekpu

¾ Installation of 1 x 60 MVA, 132/33KV Transmission Sub-station in Afaha Ube, Itam

¾ Acquisition of 1 x 30 MVA Transformer for Ikot Abasi communities.

¾ Secured license for generation of 685 Megawatt at Ibom Power Plant, Ikot Abasi

¾ Extension of Public Power supply through dedicated line to Four Point by Sheraton Hotel Complex, Ikot Ekpene

¾ Launch of Power-for-All by December 2021 Initiative

Sectoral Achievements

2x15 MVA Injection Sub-station at Akwa Ibom International Airport

ndustrilsing Akwa Ibom to a large extent is dependent on availability of power. Determined to change the status of Akwa Ibom from a Icivil service oriented one to an industrial State, power generation and injection received priority attention in over four years with the

construction of injection and sub-stations in many parts of the State:

¾ 2 x 15 MVA injection sub-station, Victor Attah International Airport

76

POWER

Sectoral Achievements

Power facility at 132 / 33 KV, 1 X 30 MVA TransmissionSub-Starion, Ekim, Mkpat Enin

1 x 60 MVA, 132/33KV Transmission Sub-station in

Afaha Ube, Itu

2 x 5 MVA, 33/11 KV injection Sub-station, Edet Akpan Avenue, Uyo.

77

¾ Provision of over N2bn interest free loan for small scale

entrepreneurs and traders

¾ Implementation of Ibom Enterprises Development

S c h e m e s ( I B E D S ) f o r t h e e m p ow e r m e n t o f

Entrepreneurs in the State.

¾ Construction of Eket International Market

¾ Expansion of Shopping Mall at Ibom Tropicana

Entertainment Centre (Ongoing)

¾ Establ ishment of Akwa Ibom Enterpr ise and

Employment Scheme (AKEES) that is promoting:

• AKEES ICT at AKEES Plaza, IBB Way, Uyo (ROOT

HUB)

• AKEES Common Facility and Equipment Centres

(SUNICKS CLOTHINGS), Uyo, Ikot Ekpene and

Eket

• Establishment of Tomato farms at Ibom

International Airport Road, Ifa; Ikono; Oruk

Anam; Shelter Afrique, etc. Several tonnes of

tomatoes have been harvested from there.

Ÿ Cultivation of over 20 hectares of onions,

cabbage, pepper, lettuce and radish farm.

• AKEES Integrated Commercial Farm: A 100-

hectare expanse of land, out of which 30

hectares have been cultivated with large yields of

cucumbers and watermelons that are also

exported. The integrated farm also has a piggery,

snailery, fishery, dwarf pawpaw, and yellow

maize plantation.

¾ Construction of a Skills Development Centre at Ikot

Akpamba, Nsit Ubium, to empower the rural dwellers

with sustainable skills

¾ Construction of a model Skills Development Centre at

Ikot Akpan Ndua, Ibesikpo Asutan LGA, for training of

youths and women in specialized skills

ECONOMIC AND ENTREPRENEURSHIP DEVELOPMENT

he proof of good governance is in turning the wheel of economic progress for the production sector of the State's economy to work Tand bear good result. So far, Governor Emmanuel has achieved economic vibrancy for Akwa Ibom State and accelerated

entrepreneurial development through:

¾ Provision of Food Processing Equipment and

Agricultural inputs to cooperative groups through the

Akwa Ibom State Life Enhancement Agency

¾ Provision of fishing equipment to groups in coastal

communities

¾ Setting up of the Micro Enterprise and Development

Agency by enacting the Akwa Ibom Micro Enterprise and

Development Agency Law (AKMEDA)

¾ 200 Akwa Ibom youths trained in solar panel

installation/maintenance

¾ Vocational training of youths in various sectors,

including agriculture, power and SMEs.

¾ Empowerment of women, youths, and elders through

Inter-ministerial Direct Labour jobs.

¾ Registration of 3,458 Cooperative Societies and

Development Associations between 2015 and 2018.

¾ Empowerment of 62 Cooperative Societies across the 31

local government areas.

¾ Training and certification of 129 youths on My

Entrepreneurship Goals Programme (MEGP)

¾ Arrangement of 36 interface with regulatory and

d e v e l o p m e n t a g e n c i e s o n b e h a l f o f M y

Entrepreneurship Goals Programme (MEGP)

Youths undergoing entrepreneurship training

78

Sectoral Achievements

¾ Eket International Market

Sectoral AchievementsECONOMIC AND

ENTREPRENEURSHIPDEVELOPMENT

79

¾ Governor Udom Emmanuel inspecting AKEES exhibition

80

Sectoral AchievementsECONOMIC AND

ENTREPRENEURSHIPDEVELOPMENT

¾ Internal Generated Revenue 2016 – N15 Billion

¾ Internal Generated Revenue 2017 – N16 Billion

¾ Internal Generated Revenue 2018 – N24.2 Billion

¾ Internal Generated Revenue 2019 – N32.3 Billion

¾th th

Joint Tax Board's ranking of states in Nigeria 2018, from 18 to 8 Position.

¾ Introduction of technology/automation of road taxes, Issuance of e-receipts, development of Tax

Management System (TMS), recalibration of TIN system, provision of Point of Sale (POS)

machines and tax payment through banks/tax education.

¾ Building a strong professional, transparent and inclusive institution through a state Joint

Revenue Committee.

¾ Restructuring and freezing up of the State Payroll System.

¾ Mobilization of Counterpart Fund for Universal Basic Education Interventions to secure N1,

938,094,591.00 (One Billion, Nine Hundred and Thirty-eight Million, Ninety-four Thousand, Five

Hundred and Ninety-One Naira) which was required to enable Akwa Ibom access grant for UBE

interventions in the State.

¾ Introduction of e-Receipt in the State for revenue collection under a Cashless Tax Payment

Regime.

¾ Repositioning of Akwa Savings and Loans Ltd.

¾ Regular publication of Akwa Ibom Statements of Account.

REVENUE GENERATION AND FINANCE MANAGEMENT

Passengers boarding Ibom Air

81

Sectoral Achievements

82

Sectoral AchievementsREVENUE GENERATION AND

FINANCE MANAGEMENT

¾ Completion of State Secretariat Annex.

¾ Facelift of the Idongesit Nkanga Secretariat Complex, with tarred roads and paved walk ways from the Civil Service Auditorium

to Block 5 and adjoining car parks.

¾ Completion of Four-Point by Sheraton Hotel, Ikot Ekpene.

¾ Construction and renovation of Governor's Lodge in Lagos and Abuja respectively.

¾ Ongoing construction of a 21-storey Smart Building at the Central Business District, Uyo.

¾ Ongoing construction of 8, 500 capacity International Worship Centre.

¾ Construction of Gully Erosion Control facilities at Government House Complex, Uyo, Aks.

¾ Renovation of 85 flats, quarters for soldiers at Wellington Bassey Barracks, 6 Amphibious Battalion, Ibagwa.

¾ Ongoing renovation of 84 flats, quarters for soldiers at Wellington Bassey Barracks, 6 Amphibious Battalion, Ibagwa.

¾ Ongoing rehabilitation of water works and reticulation at Wellington Bassey Barracks, 6 Amphibious Battalion, Ibagwa.

¾ Preparation of site plans for proposed and ongoing major projects including:

• Police Station at Iba Oku, Uyo.

• Military Officers' Residential Estate at Nung Oku, Ibesikpo Asutan LGA.

• Shopping Mall at Old Mechanic’s Village, Abak Road, Uyo.

• International Market at Ikot Ekpenyong, Ikot Ekpene.

• Bamboo Plantation at Adia, Ikot Esenam in Oruk Anam LGA.

• Banana Plantation at Ikot Osute, Oruk Anam LGA and Ikot Akpan in Ikot Abasi LGA.

• Waste Recycling Plants at Ikot Annang, Onna LGA and Ntak Inyang, Itu LGA.

• Incinerator at Itam/Nduetong Afaha Oku, Itu LGA.

• Quantum Petrochemical (methanol) at Ntaikang, Ibeno.

• School of Aviation, Ndon Ebom, Uruan.

• Luxury Estate at Ibiaku Ishiet, Uruan.

• Martha Vineyard Residential Estate, Ediene Ikot Obio Imo, Uyo Capital City.

• New Prison headquarters at Nung Ukim Ikono, Uyo LGA.

• Mechanic’s Village and Allied Services at Ikot Oku Ikono/Mbiahoku, Uyo.

• HQ 2 Brigade, Nigerian Army at Mbiokporo Nsit, Nsit Ibom LGA.

• Oil Palm plantation in Esit Eket, Nsit Ubium, Okobo, Urue Offong/Oruko, Mbo LGAs.

• Government Residential Estate, Mbak Issiet, Uruan LGA

• Integrated Agricultural projects in Ini LGA.

• Cocoa Plantation at Ediene Ikot Obio, Ikono LGA.

• Agricultural Project (Cattle Ranch) in Uruan LGA.

• Housing Estates for Civil Servants, Uyo LGA.

• International Market at Odiok Itam, Itu LGA.

LANDS AND HOUSING

ver time, Akwa Ibom State Government has invested enormous resources in acquiring, developing, and maintaining assets for Othe State. The administration of Governor Emmanuel has used its tenure to re-evaluate the State’s assets towards gainful value

addition that makes the state’s properties to continuously appreciate. Achievements in Lands and Housing sector include:

83

Sectoral Achievements

Sectoral Achievements

85 flats at Wellington Bassey Army Barracks, 6 Amphibious Battalion, Ibagwa, Abak

Before

LAND AND HOUSING

84

After

Model of International Worship Centre

Secretariat Annex, Udo Udoma, Uyo

85

Sectoral Achievements

LAND AND HOUSING

86

¾ 21 storey Smart Building at Central Business District, Uyo (under construction)

87

Sectoral Achievements

LAND AND HOUSING

¾ Construction and installation of 10 well equipped, internet-ready Computer Laboratories complete with power supply in 10

schools, one in each of the 10 Federal Constituencies in the State. The schools are:

• Cornellia Cornelly College, Afaha Oku, Uyo.

• Goretti Girls Secondary School, Ikot Ekpene.

• Community Secondary Commercial School, Ikot Akpan Ishiet, ONNA

• Etinan Institute, Etinan.

• QIC Secondary School, Minya, Mkpat Enin.

• Southern Annang Comp. School, Ikot Okoro, Oruk Anam.

• Saint Mary’s Senior Science College, Abak

• Methodist Senior Science College, Oron

• Presbyterian Senior Science College, Ididep, Ibiono Ibom

• Odoro Ikono Secondary School, Mbiabong Ikot Udofia, Ini

¾ Training of over 200 Akwa Ibom youths in Oracle, one of the ICT Masters around the world. Trainees were presented with laptop

computers at the end of the training.

¾ Training of about 3000 Akwa Ibom youths in Digital Marketing in collaboration with the Federal Government and Google. The

trainees were certificated by Google and Mind-the-Gap (ICT Facilitator).

¾ Provision of supports to major ICT Hubs in the State to continue to offer training to youths in the areas of Apps Development,

Robotics, Block Chain Technology and Artificial Intelligence, Internet of Things (IOT), etc.

¾ Training of 2050 Akwa Ibom youths in Web Development and Visual designing, in Partnership with a renowned ICT Company,

Hotel Booking Nigeria (hotels.ng). The best 50 participants were given automatic employment in private companies.

¾ Training of 200 Akwa Ibom youths in ICT Micro Works to enable them source for jobs online.

¾ Establishment of the Akwa Ibom State Oil and Gas Training Centre powered by Halliburton at the E-library for the training of

middle and high level personnel in the Oil and Gas sector.

¾ Establishment of the Ibom Hyundai Heavy Industries Welding and Fabrication Training Centre. The first batch of 50 Trainees has

completed their training.

¾ Installation of Internet Protocol Telephony for effective communication amongst MDA's (e-governance) with Cyber Space as the

resource company.

¾ Signing of MOU with Broadbased Communications Ltd for laying of Optic Fibre Cable across the State. This is to serve as the

main backbone infrastructure for ICT development.

¾ Signing of MOU with Serge Capital Investment Ltd for the reactivation, completion and repackaging of Ibom Science Park to

meet modern trends.

¾ Signing of MoU with Ibom Smart City Project for the provision of Wi-Fi connectivity across the State with CCTV cameras for

security surveillance.

SCIENCE AND TECHNOLOGY

oday's approach to economic management and governance of nations and States are technology-based. The administration of TGovernor Udom Emmanuel, since 2015 has instituted science and technology bases systems to ensure ease of governance

and public service delivery, promote science and technology education, as well as equip the youth to take their place in the

emerging opportunities in Akwa Ibom State through:

88

Sectoral Achievements

¾ Akwa Ibom State competed in and won several prizes in National Science and Technology Competitions and Expositions. These

include;nd

• 2 Prize in Biology in 774 Young Scientists Presidential Award (ABUJA, 2018).rd• Overall 3 position in 774 Young Scientists Presidential Award (Abuja, 2019).

nd• 2 Position in the Technology Entrepreneurs category in the National Science, Technology and Innovation Expo: (ABUJA,

2018).nd• 2 Position in the Technology Entrepreneurs category in National Science, Technology and Innovation Expo: (ENUGU,

2019).

¾ To boost internally generated revenue of the State, the Research and Development laboratory has been repositioned for

patronage by members of the public and corporate organizations. The Laboratory has been certificated by the Department of

Petroleum Resources (DPR), Federal Ministry of Environment (FME) and National Oil spill Detection and Response Agency

(NOSDRA).

¾ Midwifing the construction of a factory for manufacturing of Hi-tech solar components at Itam Industrial Estate by Hangzhou

MC2 Prudent Company Ltd.

¾ Commencement of the construction of Solar Farms in partnership with GVE Projects Ltd to provide uninterrupted power supply

to communities not linked to the National Grid, starting with Akpabom in Onna Local Government Area.

¾ Publication of the Akwa Ibom Solid Minerals Guide for Investors Vol. 1 (Glass Sands, Clays and Limestone) in partnership with

the Ministry of Environment and Mineral Resources and Environmental Management Committee (MIREMCO)

¾ Ground breaking for the construction of Ibom Blue Sea Science and Technology Park

Equipment for the Oil and Gas Training Institute at Ibom E-Library, Uyo. Laptop computers donated to ICT trainees

89

Sectoral Achievements

SCIENCE ANDTECHNOLOGY

¾�Students of Akwa Ibom State University during an excursion to Ministry of Science and Technology, Uyo

90

Sectoral Achievements

SCIENCE ANDTECHNOLOGY

¾�Computer Laboratory at Cornelia Cornnely College, Uyo

91

Sectoral Achievements

SCIENCE ANDTECHNOLOGY

¾ Emerged Best Overall participating State at African Festival of Arts and Culture Exhibition (AFAC EXPO 2015).

¾ th nd th Hosted the 29 Edition of the National Festival of Arts and Culture (NAFEST) in Uyo, the State Capital, from 2 to 9 October,

2016.

¾ Hosted the 2016, 2017, 2018 and 2019 Editions of the Akwa Ibom State Christmas Carol Festival.

¾ Hosted Usoro Uso Arts and Crafts Exhibition – an exhibition of Contemporary Nigerian Arts and Crafts. The first State event

to be staged at the Ibibio Union Museum since its construction.

¾ Hosted Orange September celebrations, which was an array of Cultural/Tourism events that re-ignited the strong bond of

brotherhood among Akwa Ibom people and projected the rich cultural, arts and tourism potentials of the State.

¾ “Orange September” Celebration was driven by the ”Colour me Orange” brand, where Akwa Ibomites and non-indigenes

within and outside the State and country proudly offered their images to be coloured orange on the social media.

¾ In 2017, Akwa Ibom State was honoured as one of the most active Tourism States in the Federation by AKWAABA, an

International Trade and Tourism Organization.

¾ Hosted “Ukapisua” Street Groove and Ibeno Mega Beach Fiesta in 2017. This was a nationally acknowledged street party

featuring A-list artistes from the country on parade of major streets of Uyo in five (5) different bands.

¾ Successful transition of operations from Le' Meridien Hotels and Golf Resort to Ibom Hotel and Golf Resort following the

withdrawal of service by Le' Meridien and Marriot Hotels in December 2017.

¾ Procurement of operating equipment, furniture fixing equipment and internet technology infrastructure for Four Point by

Sheraton Hotel, Ikot Ekpene.

¾ Arrangement for commencement of business at Four Points by Sheraton Hotel, Ikot Ekpene, with Marriot Hotels

International as potential operators.

¾ Successful hosting of the 2018 Akwa Ibom Talent Showcase.

¾ Successful hosting of the 2018 Ibeno Beach Festival in partnership with Ibeno Beach Committee.

¾ Successful staging of Christmas Village since 2017.

CULTURE AND TOURISM

kwa Ibom is a home of rich culture, salivating cuisines, beautiful sites and scenes that make the people of the State famous for Ahospitality. In recognition of these attributes, Governor Udom Emmanuel, since 2015 has continued to promote and sponsore

programmes that have made the State achieve many firsts, and make impact in national and international cultural and tourism

events. In addition, the efforts of the Governor in this sector, have elevated the status of 'Destination Akwa Ibom'. Under this

sector, the State:

92

Sectoral Achievements

Orange September

Ukapisua

¾�Celebration of Akwa Ibom Cultural/Tourism potentials

93

CULTURE AND TOURISM

Sectoral Achievements

8989

The Ibom Christmas Village offers unique blend of carnival-like atmosphere and entrepreneurial ensemble. With over 500 kiosks set at the grounds of the Unity Park, it is the largest collection of small and medium scale entrepreneurs during Christmas in Nigeria. Open for the entire month of December, It is one of the reasons the trend of outward migration from the state has been reversed.

Christmas Village 2019

Ariel-view of 2018 Akwa Ibom Christmas Carol Festival

94

Sectoral Achievements

CULTURE AND TOURISM

95

Ariel-view of 2019 Akwa Ibom Christmas Carol Festival

CULTURE AND TOURISM

Sectoral Achievements

RECORD BREAKING YULETIDE EVENTS

The Akwa Ibom Christmas Carols Festivals, which is listed in the Guinness Book of World Records, has remained the biggest event of its kind in the world. It is the Largest Assembly of Carol Singers in the world with over 40,000 people in attendance every year since its debut in 2008.

96

¾ Prompt/regular payment of salaries, pensions and leave grants to workers.

¾ The release of workers promotions, which elevated over 25,000 staff to their next salary grade levels.

¾ The appointment of 30 new Permanent Secretaries, between 2016 and 2019.

¾ Refund of the 7.5% contributory Pension Funds to contributors in various MDAs (ongoing)

¾ Verification, resolving of issues arising from Bank Verification Number (BVN) and payment of salaries of affected staff with

arrears which revealed some personnel in double and triple employments within the Akwa Ibom Public Service.

¾ Payment of pensions to retirees immediately after retirement through the process of seamless graduation from salary payroll

to pension payroll while waiting for the gratuity (bulk payment) as necessitated by the current economic realities.

¾ Payment of backlog of 10 years’ gratuity owed staff of the Unified Local Government and recommencement of payment of

gratuities in June, 2017 to retired officers.

¾ Bulk payment of arrears of salary owed staff employed in 2014.

¾ Recruitment of over 5,800 Teachers into the education sector, spanning through Primary and Secondary School Teachers,

Polytechnic and College of Education Lecturers, as well as into other critical areas of the service including the Judiciary Service.

¾ Issuance of Staff Audit Certificates to Ministries, Departments and Agencies that have completed their Personnel Audit.

¾ Automation of the payroll, which enables automatic migration from the integrated payroll to the Pension payroll on retirement

thus, eliminating build up of arrears of pension and ensures prompt payment of pension from the first month of retirement.

¾ Recommencement of granting of car loan to workers after many years of stoppage.

¾ Intervention/resolution of industrial disputes in College of Education, Afaha Nsit; Universal Energy Limited and Frontier Oil

Limited.

¾ Ensuring permanent industrial peace in the state through assiduous engagement with existing labour Unions in the State.

¾ Employment of 248 Medical Officers and renewal of contract for 57 Nurse Tutors and 49 Medical Consultants/Dental Officers.

¾ Payment of Consolidated Medical Salary to Doctors and Nurses; Doctors – CONMESS, Nurses (CONHESS) with effect from 2015.

¾ Payment of 2018 Christmas bonus to civil servants, including teachers.

¾ Recruitment of additional 400 medical personnel (Doctors and Nurses).

Sectoral Achievements

MANPOWER DEVELOPMENT AND WORKERS' WELFARE

anpower development and workers' welfare are mutually inclusive, be it in the private and public sector. In recognition of Mthis, Governor Udom Emmanuel has enhanced the capacity of workers in Akwa Ibom by motivating existing public servants,

recruiting new ones, and providing enabling environment for industrial peace in the State. He achieved these through:

97

98

7.5% contributory pensions fund

refunded by UDOM

10,353 public servants'

backlog of promotions from

2012-2014 released by UDOM

5,000 teachers

employed by UDOM

25,000 Civil Servants

promoted from 2015 to

2018 by UDOM

10 years backlog of gratuities to

staff of unified LG system and

teachers cleared by UDOM

N0 months UDOM

has owed workers' salaries NNN

3 years’ salary arrears cleared by UDOM (salaries of those employed in 2014)

UDOM has paid the CONMESS and

CONHESS salaries of 2,000 doctors

and nurses, with effect from 2015

0 pension arrears owed to workers

on retirement as a result of the UDOM

pension payroll system

8,759 public

servants trained

by UDOM in 2018

alone for effective

service delivery

38 Permanent Secretaries appointed BASED ON MERIT by UDOM since 2016

38 times, Labour Unions in the state have been

engaged by UDOM to ensure industrial peace

0 times Akwa Ibom civil servants have embarked on strike since

UDOM came on board

30,000 Naira – UDOM has approved the payment of minimum wage

WHY WORKERS HAIL GOV. EMMANUEL

Over 600

medical personnel

employed by UDOM

Over

automation ofpayroll system

¾ Ensuring that Akwa Ibom remains one of the most peaceful States in the country

¾ Nigeria Police Force ranked Akwa Ibom as the lowest in crime index in Nigeria for the year 2017

¾ Akwa Ibom safest in Nigeria'' – Maj. Gen. Jamil Sarham, GOC 6 Division, Nigerian Army

¾ Granting Amnesty to 400 militants in the State, now undergoing rehabilitation and re-integration process.

¾ Logistic support to security agencies to ensure security in the State

¾ Donation of 10 Patrol vehicles to the Nigeria Police AKS Command.

¾ Donation of additional 12 patrol vehicle to the Nigeria Police, Akwa Ibom State Command.

Sectoral Achievements

SECURITY

ne of the key reasons Akwa Ibom is now a centre of attraction for investment, tourism and livelihood is her peaceful and secure Ostate of being. This feat has been made possible by the quiet efforts of Governor Udom Emmanuel thus:

A fleet of Patrol vehicles donated by Akwa Ibom State Government to the Nigeria Police, Akwa Ibom CommandGovernor, inspecting one of the patrol

vehicles he donated to the Nigeria PoliceAkwa Ibom Command

99

Sectoral Achievements

SECURITY

Peace eluded the people of Etim Ekpo and Ukanafun Local Government Areas for over two years, arising from the activities of hoodlums and militant youths who terrorized the area, thus disrupting the socio-economic activities in the local government areas. But through the intervention of Governor Udom Emmanuel, over 400 repentant militants surrendered their arms and embraced peace, while government instituted amnesty programme that guaranteed their rehabilitation.

100

¾ Implementation of the Child Rights Law - Prosecution of Child's Rights offenders in collaboration with the Akwa Ibom State

Judiciary and Ministry of Justice, Security services. The cases include: Child Abuse, Child Neglect, Child Abandonment and

Trafficking, Maternal/Paternity issues, Rape, Baby Factory Operation and Disinheritance. Over 200 cases have been recorded

since 29th May 2015. About 120 such cases have been decided by the courts, and some of the convicts are serving their

respective jail terms.

¾ The bills drafted, passed, and assented to, include the following:

• Appropriation Bills for the years 2016, 2017, 2018 and 2019.

• Local Government Administration law, 2017.

• Akwa Ibom State Primary Healthcare Development Agency Law 2017.

• Akwa Ibom State Revenue Administration Law 2016.

• Akwa Ibom State Maritime Sector (Regulations) Law, 2017.

• Local Government (Administration) (Amendment) Law 2016.

• Traditional Rulers (Amendment) Law 2016.

• Akwa Ibom State Microfinance and Enterprise Development Agency Law, 2016.

• Akwa Ibom State Power to Dissolve Statutory Boards Law 2015.

• Akwa Ibom State Road Traffic Management Authority Law 2015.

• Akwa Ibom State Utility Infrastructure Management and Control Agency Law 2017.

• Akwa Ibom State Hotels and Tourism Board Bill, 2018.

• Akwa Ibom State Employment Opportunities for Indigenes in Corporate Organizations Bill 2018.

Some Drafted Regulations:

• Road Transport Regulation 2018.

• The Marine Transport Vessels and Equipment Fees and Charges Regulations 2018.

• The Cultism and Other Violent Behaviour (Prohibition) Order 2018.

Alternative Dispute Resolution:

The Centre for Alternative Dispute Resolution handled about 2,053 cases out of which about 1,987 were resolved while about

75 are still pending.

Sectoral Achievements

LAW AND ORDER

LAW AND ORDER

ince assumption of office in year 2015, Governor Udom Emmanuel, has been guided by the rule of law and other democratic Sideals. Within the period, law and order have ruled the State rather than the whims and caprices of men. The following have

been achieved in the sub sector:

101

¾ Re-introduction of Monthly Environmental Sanitation resulting in improved level of cleanliness and participation in the exercise

such that in a recent survey carried out by “Clean Up Nigeria” Akwa Ibom State and Uyo Capital City were adjudged the Cleanest

State and Cleanest State Capital in Nigeria.

¾ Improvement on the waste evacuation process in the State capital.

¾ Signing of Agreement with P and A Environmental Solutions Limited on the establishment of Municipal Solid Waste

Management and Recycling Plant in Akwa Ibom State.

¾ Facilitation of Akwa Ibom State participation in the Nigeria Erosion and Watershed Management Project (NEWMAP), a World

Bank Assisted Project.

¾ Facilitation of the installation of Early Flood Warning System by NEWMAP in Oron LGA

¾ Facilitation of the installation of Hydro-Meteorological Systems by NEWMAP and Cross River Basin Authority in Abak, Onna, and

Etinan.

¾ Intervention in St. Luke's Hospital and Etim Umana gully erosion sites.

¾ Successful hosting of the first Akwa Ibom State Climate Change and Clean Energy Summit/Expo and developement of a

Roadmap for

¾ Sustainable (Green) and Resilient Economic Development for Akwa Ibom State.

¾ Hosting of Sideline Event at COP22 in Marrakesh, Morocco, where His Excellency, the Governor, presented Akwa Ibom State's

Roadmap for Sustainable Development to foreign investors.

¾ Establishment of Mineral Resources Environmental and Management Committee (MIREMCO).

¾ Establishment of Mineral Resources Environmental and Management Committee (MIREMCO) to regulate policies and

guidelines for the development of the solid mineral resources sector in the state.

¾ Developed a Roadmap for Solid Mineral Exploration in the state and an Investor's guide on Solid Mineral Resources Evaluation.

¾ Management of signage and outdoor advertisement environment in the state.

¾ Intervention in Ntak Inyang (Calabar-Itu Highway) erosion site.

Sectoral Achievements

ENVIRONMENT AND WASTE MANAGEMENT

conducive and disaster free environment is necessary for comfortable human habitation and healthy living. To ensure this Acondition prevails for the good of the people living in the State, the administration has ensured the:

102

Sectoral Achievements

ENVIRONMENT AND WASTE MANAGEMENT

Eket Urban Erosion Control

Etim Umana Erosion Control, Uyo

During construction

During construction

103

Emergency Interventions at Ravine site along

Calabar - Itu Highway at Ntak Inyang

104

Sectoral Achievements

ENVIRONMENT AND WASTE MANAGEMENT

Emergency Interventions at Ravine site along

Calabar - Itu Highway at Anen Atai Junction

105

Sectoral Achievements

ENVIRONMENT AND WASTE MANAGEMENT

St. Luke's Hospital erosion control site, Anua, Uyo

Before

During intervention

106

Sectoral Achievements

ENVIRONMENT AND WASTE MANAGEMENT

Sectoral Achievements

ENVIRONMENT AND WASTE MANAGEMENT

Before

Aerial-view of Dominic Utuk Erosion control site, Uyo

107

108

Nsikak Eduok Avenue-Tropicana drainage, Uyo.

109

Sectoral Achievements

ENVIRONMENT AND WASTE MANAGEMENT

110

Sectoral Achievements

YOUTH AND SPORTS

¾ Organisation of the first, and second Youth Sports Festivals

¾ Construction of Sports Centre at West Itam Secondary School and an ongoing one in ONNA

¾ Ongoing reconstruction and upgrading of Eket Township Stadium to 15,000 seating capacity

¾ Intervention works at Uyo and Ikot Ekpene stadia

¾ Contractual maintenance of the Godswill Akpabio International Stadium

¾ Successful hosting of international matches: Nigeria's World Cup and African Cup of Nations qualifiers as well as

international friendly matches.

¾ Supporting Akwa United FC to win Nigeria's FA Cup (AITEO) in 2015 & 2017

¾ Supporting Ibom Angels FC to emerge runner-up of 2017 & 2018 Nigeria's female FA Cup

¾ Promotion of the state-owned Ibom Youth Football Club from Nigeria’s Nationwide League (Amateur Division) to Nigeria

National League (Pro-League Division) in 2018

¾ Provision of employment for Akwa Ibom citizens by sponsoring four professional football clubs in the state: Akwa United,

Ibom Angels, Akwa Starlet and Ibom Youth

¾ Supporting Team Akwa Ibom to finish second on the Medal Table at the 2017 National Youth Sports Festival held in Ilorin,

kwara state

¾ Sponsorship of eight indigenous athletes to participate at the African Youth Games in Algiers, where four won medals in the

colour of Nigeria in 2018

¾ Sponsorship of indigenous coaches to attend international championships and refresher courses outside the country

¾th rd

Hosting of national competitions: the 11 Nigeria Navy Games 2017, the 3 Nigerian Air force Inter-Command Combat

Sports Competition 2018, the South-South Elimination Series of National Youth Games 2018.

¾ Akwa Ibom took 4th position on the medal table in the National Youth Games 2019.

¾ Training of over 30,000 youths in various skills, including ICT, solar power installation and agro-based ventures

¾ Appointment of youths into various positions in government

¾ Sponsorship of youths to undergo foreign training programmes in specialised welding and other engineering fields in the

USA

¾ Interest-free loans to youths.

¾ Sponsoring two teams in the Nigeria Premier League: Akwa United FC and DAKKADA FC (formerly Akwa Starlet).

¾ Gov Udom Emmanuel was Best Sports Governor 2017.

¾ The State received 3 Excellence Awards on Sports Development from the Federal Government

1. Most Comprehensive Sports Development

2. Most Patriotic Sports Supporters

3. Best Sports Infrastructure.

YOUTH AND SPORTS

s an astute manager of resources, Mr. Udom Emmanuel has channelled the energies of the youths and State's potentials Ain sports to productive human endeavours. This has placed Akwa Ibom in the world sports’ map. The administration did

these through:

111

Sectoral Achievements

¾Governor Udom Emmanuel at the

Nest of Champions, Uyo, when

Spanish LaLiga side, Athletico Madrid

2018 Europa League Champions

played against CHAN Super Eagles as

part of LaLiga World Project tour of

Nigeria, May 22, 2018

112

Sectoral Achievements

YOUTH AND SPORTS

Spectators’ Stand / Athletics Tracks at the new sports centre, West Itam Secondary School, Itu

March-past by students during1st Akwa Ibom Youth Sports Festival

113

Sectoral Achievements

YOUTH AND SPORTS

Gov. Emmanuel lifting the 2015 Federation Cup won by AkwaUnited FC at the Teslim Balogun Stadium, Lagos

Akwa United FC celebrating after winning 2017 Aiteo Cup

Gov. Udom acknowledging cheers from the crowdduring the 2018 Youth Sports Festival

Basket ball court at West Itam Secondary School, Itu

114

Sectoral Achievements

YOUTH AND SPORTS

Eket Sports Stadium under construction

Sectoral Achievements

YOUTH AND SPORTS

115

Sectoral Achievements

INFORMATION MANAGEMENT

ith Governor Udom Emmanuel in-charge since 2015, Akwa Ibom, today, presents a proud study in using Information WCommunication Technology with strategic information management technology to make the State a brand in the world’s

investment map, as well as a highly participatory populace in the information flow traffic.

Projecting and branding the

state through strategic

information management.

Operation of functional and

interactive website:

www.akwaibomstate.gov.ng

Citizens' engagement through

town hall meetings, social media

and other online platforms.

Publication of mainstream

and online materials.

Setting up of Strategic Media Team for

harmonized and enhanced information management.

Design and installation

of Strategic Outdoor Media.

Public Awareness/

Sensitization Campaign.

Production and

circulation

of Public

Enlightenment

materials.

Production of Jingles

and Documentary series.

Operation of Citizens

Feedback Centre.

INFORMATION MANAGEMENT

116

■ Equipment/Studio upgrade at Akwa Ibom

Broadcasting Corporation (AKBC).

■ Renovation of office block at Akwa Ibom

Newspaper Corporation (AKNC).

Sectoral Achievements

INFORMATION MANAGEMENT

MEDIA CAMPAIGN STRATEGY ACTIONS

117

Opens working days9am - 4pm 9am - 4pm Opens working days9am - 4pm

akwaibomstate.gov.ngPeople-Oriented Governance

Let’s hear your VOICE...

sms & whatsapp only

0907 617 3782

CITIZEN CENTREFEEDBACK REPORTS SUGGESTIONS

Ministry of Information & Strategy © 2018

[email protected]

akwaibomstate.gov.nglive chat

■ Ikwe Group of Villages, Onna Local Government Area■ Ikot Udo Ide in Nsit Ubium Local Government Area.■ Ikot Obio Atai in Itu Local Government Area.■ Ikot Akpan Ibesit in Oruk Anam Local Government Area.■ Ibianga Ikpe in Oriuk Anam LGA.■ Iwerre Clan in Ini LGA.■ Uko Itak Eyulor, Mbo LGA.■ Ifa Ikot Idang, Uyo LGA.■ Nung Ukim Ikono, Uyo LGA.■ Ikot Ekang, Itu LGA.

■ 10km Ediene – Abak Ikot Ekan access road in Abak Local Government Area.■ 8.0km Manta II access road in Abak Local Government Area.■ 6.8km Ikot Ese II access road in Etinan Local Government Area.■ 8.3km Ikot Usop to Ikot Ada Udo access road in Ikot Abasi Local Government Area.■ 3km Eka Affiong Ekpor – Ikot Odongo –Ikot – udodia Ikot Ebom – Ikot Atai Road, Etim Ekpo LGA.■ 4 km Utu Etim Ekpo, Etim Ekpo LGA.■ 2.5km Obo Ekpo – Utu Ikot Ekpo Utu Nto Obio Ekpo, Etim Ekpo LGA.■ 3km Nto Unang – Ikot Edet Road, Etim Ekpo LGA.■ 2km Urua Ekpo – Abak Itenge, Uruk Ata Nsidung, Ndot Ikot Edah Road, Abak, Etim Ekpo, Oruk Anam LGA.■ 2km Prince Bernard Idiong Street, Oruk Anam LGA.■ 1.5km Obio Itiat Road, Oruk Anam LGA.

RURAL DEVELOPMENTRural development projects have been executed in communities across the 31 LGAs, in the areas of Electrification, Road grading, Water Schemes and Civic/Town Halls. The projects include:

ELECTRIFICATION ROAD GRADING

118

Sectoral Achievements

■ 1.5km Hon. Akaninyene Eno Eyo Street, Abak LGA.■ 7km Mbiabong Ikot Udo – Mbiabong Mbat to Rice Farm, Ini LGA.■ 3km Mbiabong – Ikpe – Ekoi Rice Farm, Ini LGA.■ 2km Ring Road, Mbiaya, Uruan LGA.■ 6km Mbiaya Ikot Udo – Ifiayong Obot, Uruan LGA.■ 11km Anakpa – Nung Oku Uruan Road.■ 1.5 Ekpene Ibia – Ikot Akpaekang, Uruan■ Mbiaya – Eman Road■ 3 km Edem Idim – Ishiet – Abak Ishiet – Ikot Ese – Ikot Obong Ishiet – Atiamkpat, Onna LGA.■ Grading of 1.5km Atiamkpat – Ikot Akpan Nko – Ikot Mbong, Onna Road.■ Awa Ndom – Awa – Uruan Ekpo Awa, Onna Road.■ Awa Ndon, Town Hall Road, Onna.■ Ikot Ndudot Mkpaeto Road, Onna.■ School Road Okom, Onna LGA.■ 2 km Ekim Village – Ikot Abia Minya, Mkpat Enin LGA.■ Ikot Akata Akpa Esop – Ntan Ide Ekpe Road, Mkpat Enin LGA.■ Mkpat Enin Junction – Ikot Ntot – Ikot Abasi – Ekparakwa Road, Mkpat Enin LGA.■ 6.7 km Mbokpu – Eyokwaha – Eyokwong – Oruko Market Road.

■ 10 km Eyulor Oro – Ukuda – Abiakobili-Mbokpu Eyokan Road, Urue Offong/Oruko LGA.■ Uya Oro Stream Road by Paramount Ruler's Palace, Oron LGA.■ 3 km Bako – Eyotong Road, Oron LGA.■ Edisco Avenue Oron.■ 6 km Estate Road to Udung Okung Ukpata Road, Oron LGA.■ Maritime Academy Road, off Estate Road, Oron LGA.■ Edet Osudu Street, Oron LGA.■ Elvis Okpo Street, Oron.■ Akai Atti Udesi – Eyokip Eyo Uya – Oruko market Road, Mbo

LGA.■ 8.9 km Ikpe Annang – General Hospital Ikpe Annang – through Itai Afe Annang Palace Ukana East, Essien Udim LGA.■ 2 km Uwa East – Ukana Essien Road, Essien Udim LGA.■ 10 km Ikot Igwe – Nto Ubiam – Ikot Oku – Nto Okpe Afa – Ikot Uko Etor Road, Essien Udim LGA.■ Ibong – Amanyam Road, Ikot Ekpene LGA.■ Ibong – Mbiaso Road, Ikot Ekpene LGA.■ Afaha Nsit – Mbiokporo Road, Nsit Ibom LGA.■ 10 km Obufi-Ube-Ebighi Village Road, Okobo LGA.■ Implementation of Niger Delta Support Programme for Water, Sanitation and Hygiene (WASH) projects in Obot Akara, Nsit Atai, Ikono and Esit Eket in collaboration with EU/UNICEF.

119

Sectoral Achievements

RURAL DEVELOPMENT

Intervention at Samuel Bill Theological College, Abak

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

1 ETINAN 7- Classroom block @ Primary Sch. Ekom Iman

Assembly Hall/Classrooms Block @ Comm. Sec. Sch. Asuna

Reno. of 6- Classroom/Office Block @ Primary Sch. Ikot Nte (Constituency Project)

Reno. of 5- Classroom Block @ Govt. Sch. Ikot Eboh (Constituency Project)

Reno. of Ass. Hall @ St. Theresa Sec. Sch. Edem Ekpat (Constituency project)

Water Project @ Afaha Akpan Ekpo

Reno. of Lab. Block/Female - Male Hostel/Staff Qtrs/Lib/Clsrm Blks/Admin Blks/Water Projects/Commandant Qtrs/Kitchen/Dinning Hall/Principal Qtrs/Parameter Fence @ Command Sec. Sch. Efa

Renovation of Assembly Hall/Classroom block @ Primary Sch. Efa

Renovation of Pit Toilet @ Primary Sch. Efa

Water Project @ Primary Sch. Efa

Reno. of Clsrm Blks 1 & 2 @ Etinan Institute (Ward Jobs)

Renov. of 3 Clrm Blk/Office, @ Qua Iboe PS, Ekpene Ukpa, (Constituency Project)

Reno.of Admin.Block @ General Hosp.,Etinan

Const. of Gate House/Security @ Army Sec. Sch. Efa

Rehab./Reticulation of Water @ Genral Hospital, Etinan

Reno. of Chapel/2 Offices/1No. Unit of Clsrm Blk/2 Offices/Physiotherapy Dept/Ward 1 (Female/Male) Offices/6 Toilets/6 Bathrooms/Kitchen/ @ Leprosy Hospital, Ekpenobom

Water Project @ Ikot Eboh(Constituency Project)

4 Unit Market @ Ward 1 & Mkpafi Mkt Ward 2 (Constituency Project)

Reconst of Ass Hall@ ACCS, Iwoetor

Elect of Afaha Iman

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

On-going

On-going

On-going

On-going

COMPLETED AND ONGOING PROJECTS UNDERTAKEN BYINTER-MINISTERIAL DIRECT LABOUR COORDINATING COMMITTEE

120

Admin. Block, Government Sec. Sch., Nto Nsek, Essien Udim

4 Classroom Block, St. Bridges Primary School Nung Ette, Ibesikpo Asutan

Science Laboatory Government Technical College, Abak

BeforeAfter

After

Before

After

Sectoral Achievements Rural Development

Before

121

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

Reno. of 4Clrm @ Sal Army P\S, Ekom Iman

Const of 4Clrm @ CSS, Asuna

Const. of Twin 2-Bedroom Flat @ Leprosy Hospital, Ekpenobom

Renovation of 4 Classroom Block @ Government Primary School, Ikot Nte (Special Intervention)

Reno. of 4 Clsrm Blk @ GPS Ikot Nte

Reno. of 4 Clsrm Blk @ CSS Asuna - Etinan (Special Intervention)

Reno. of 4 Clsrm Blk @ Sec. Cmm. Sch. Ikot Eba, Etinan

Reno. of 4 Clsrm Blk @ QIC Group Sch. Efa - Etinan (Special Intervention)

On-going

On-going

On-going

On-going

On-going

On-going

On-going

NSIT IBOM2 Water Project @ Nung Essien, Afaha Offiong (Special intervention)

3-classroom block-1. with offices @ Govt. Sch. Edebom 1

3- classroom block 2. with offices @ Govt Sch. Edebom 1

Completion of Civic Centre@ Mbiokporo II (Constituency Project)

Renovation of Civic Centre@ Ikot Offong Nsit (Constituency Project)

Renov. of 6 Clrm Blk/office @ Sec Sch Mbiokporo II (Constituency Project)

Reconst. of Youth Club/Council Hall @ Afaha Nsit Urua Nko (Constituency Project)

Renov. of Assembly Hall (Nurs. Sec.), @ PS, Oboyo Ikot Ita, Afia Nsit (Constituency Project)

Rehab. of Borehore @ Ikot Obio Edim (Constituency Project)

Reno.of 3 Clsrm Blk @ St. Andrew African P/S Edebom II

Elec. @ Mbiokporo Nsit 1

Reno.of Lab. @ Apostolic Church Sec .Sch ,Ikot Oku Nsit (Ward Jobs)

On-going

On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

On-going

122

Sectoral Achievements Rural Development

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

Classroom block, Comm. Sec. Sch. Eka Obong, Etim Ekpo

Assembly Hall And Ofce St. Silas Primary School Okoroette, Eastern Obolo

Classroom Block Q.I.C Primary School Ikot Udota, Eket

Before

123

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

Reno.of 4 Clrm Blk @ Comp. Sec. Sch, Obotim (Ward Jobs)

Reno.of 3 Clrm Blk @ Nsit Peoples Grammar Sch, Afaha Offiong (Ward Jobs)

Reno.of 4 Clrm Blk @ Apostolic Church Sec. Sch, Ikot Oku Nsit (Ward Jobs)

Reno. of 4 Clsrm Blk @ GPS Oboyo Ikot Ita - Nsit ibom (Special Intervention)

On-going

On-going

On-going

On-going

NSIT UBIUM3 3- Classroom block @ Govt. Sch. Ikot Akpabin

4- Classroom block @ Govt. Sch. Ikot Eyo

10 Market stalls @ Ikot Edibon

Renov. of 10 Market Stalls @ Ndukpoise (Constituency Project)

Water Project @ Ikot Asang (Constituency Project)

Water Project @ Obio Ekid (Constituency Project)

Constr.of 3 Clrm Block @Primary Sch,Ikot Akpafuk (Ward Jobs)

Reno. of Gen. Ward @ Cottage Hospital, Ikot Ekpene Udo (Ward Jobs)

Rehab. of water Facility @ Cottage Hospital, Ikot Ekpene Udo (Ward Jobs)

Lock up Shops @ Ikot Ubo

Water Project @ Ikot Abianyie

Water Project @ Ikot Ebita

Water Project @ Ndisiak

Water Project @ Ikot Udoatang

Reno. & Extention of Assembly Hall @ P/S Ikot Ubo (Ward Jobs)

Construction of Resorce/Information Centre @ Ikot Etobo (Constituency Project)

On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

124

Sectoral Achievements Rural Development

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

Classroom Block Holy Trinity Primary School Ikot Akpabio, Ibiono

Assembly Hall, St. Patrick Primary School Urua Inyang, Ika

Classroom block, Commercial Secondary School Eka Obong, Etim Ekpo

Before

125

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

80

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

Elect. @ Ikot Udo Ide

Ren of 3 Clrm @ Ikot Imo\Ikot Edikpe

Renovation of 4 Classroom Block/Office @ Comprehensive Secondary School, Ikot Ekpene Udo (Special Intervention)

Reno. of 4 Clsrm Blk @ Sal. Army P/S Ikot Uboh - Nsit Ubuim (Special Intervention)

Reno. of 6 CLsrm Blk @ St. Fabian P/S Ndukpoise - Nsit Ubium (Special Intervention)

Supply of Toilet Facilities @ GPS Ikot Akpabim - Nsit Ubium (Special Intervention)

Reno. of 4 Clsrm Blk @ P/S Ikot Akpan Abia - Nsit Ubium (Special Intervention)

Reno. of 4 Clsrm Blk @ P/S Ikot Ekpene Udo - Nsit Ubium (Special Intervention)

Reno. of 4 Clsrm Blk @ QIC P/S Ikot Akpan Abia - Nsit Ubium (Special Intervention)

Reno. of Assembly Hall @ Apostolic Sch. Nung Obong, Nsit Ubium

Reconst. of 6 Clsrm Blk/Office @ Comm. Sec. Sch. Ikot Uboh - Phase II

Reconst. of 6 Clsrm Blk/Office @ Comm. Sec. Sch. Ikot Uboh - Phase I

Reno.of 4 Clsrm Blk @ QIC P/S Ikot Ntung, Nsit Ubium

Reno.of 4 Clsrm Blk @ Primary Sch, Ndukpoise, Nsit Ubium On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

ITU4 Reno. of Assembly Hall , West Itam Sec. Sch. Itam

Reno. of 2 3- classroom block, West Itam Sec. Sch. West Itam

Reno. of 2 4- Classroom block, West Itam Sec. Sch. West Itam

Reno. of 2 6- Classroom block, West Itam Sec. Sch. West Itam

Perimeter fencing around Primary Health Centre, West Itam

Reno. of Block of Laboratory/workshop/classrooms @ Community Sec. Sch. Ibiaku Itam (Constituency project)

Completed

Completed

Completed

Completed

Completed

Completed

126

Sectoral Achievements Rural Development

Assembly Hall and Ofce Government Primary School, Mkpanak, Ibeno

Classroom Block at Comm. Primary Sch., Ikot Akpan Ike, Nsit Atai

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

Before

127

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

81

82

83

84

85

86

87

88

89

Const. of Emergency Unit @ PHC West Itam (Constituency Project)

Reno. of 4 Clsrm Blk @ Govt. Sch. Ekid Itam 1

Elect. @ West Itam Sec. Sch, Itu

Water Project @ West Itam Sec. Sch

Reno. of 2 5 Clsrm Blk @ P/S Ekit Itam (Ward Jobs) 5,6

Reno. of Intro. Tech. Lab @ West Itam Sec. Sch. Itam (Ward Jobs)

Ren. of Clrm Blk @ Ibiaku itam Sec. Sch. Ntiat (Constituency Project)

Parameter Fencing of Sec. Comm. School, Ibiaku Itam (Constituency Project)

Reno. of Ass. Hall @ Itam Sec. Sch, Itam

Elect. @ Ikot Ekang, Itam, Itu (Ward Jobs)

Reno. of 4 Clsrm (Blk C) @ Itam Sec. Sch., Itam

Reno. of chemistry & Physics Lab. @ Itam Sec. Sch., Itam

Intro. Tech. Blk @ Itam Sec. Sch. Itam

Reno. of 4 Clsrm (Blk F) @ Itam Sec. Sch., Itam

Reno. of 4 Clsrm Blk @ P/S Obong Itam - Itu (Special Intervention)

Reno. of 2 Clsrm/Hall @ St. Lukes P/S Ibiaku Itam - Itu (Special Intervention)

Reno. of 4 Clsrm Blk @ GPS Afaha Ube Itam - Itu (Special Intervention)

Reno.of 4 Classroom Blk @ GPS Obong Itam, Itu LGA

90

91

92

93

94

95

96

97

98

99

100

Completed

Completed

Completed

Completed

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

IBIONO IBOM5 Reno. of 4 Classroom block @ Holy Trinity sch. Ikot Akpabio

Reno. of Assembly Hall/office Holy Trinity Sch. Ikot Akpabio

Completed

Completed

128

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

3- Classroom block @ St. Paul Catholic Sch. Nkwa Ibiono

4 Clsrm Blk @ Presbyterian Sch. Ikot Osuk Ntan

5- classroom block @ Presbyterian Primary Sch. Ikot Ekpe

Water Project @ Ikot Antia Ididep

Water Project @ Ikot Udom (Constituency Project)

Water Project @ Itu Andem (Constituency Project)

Water Project @ Ikot Udo Efum (Constituency Project)

Reno. of Town Hall @ Ikot Edet (Constituency Project)

5 Clsrm Blk @ P/S Ikot Ekpe

Reno.of ANC @ St.Theresa Hosp.,Use Abat (Ward Jobs)

Reno.of Theatre @ St.Theresa Hosp.,use Abat (Ward Jobs)

Reno.of Walk way @ St.Theresa Hosp.,Use Abat (Ward Jobs)

Const. of Paremeter Fence @ St.Theresa Hosp.,Use Abat (Ward Jobs)

Elect. @ Ikot Edo, Ikot Mbit, Ibiono Ibom

Reno.of 6 Clsrm Blk/Office @ P/S Ikot Akpabio, Ibiono Ibom On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

UYO6 Reno. of 2 4- Class room block @ Comprehensive Sec. Sch. Four Towns

2- Class room block @ Comprehensive Sec. Sch. Four Towns

Introductory tech. block @ Comprehensive Sec. Sch. Four Towns

Reno. of 4 Clsrm blk @ QIC Group Sch. Ikot Oku Ikono (Special Intervention)

Reno. of 6 Clsrm Blk/Assembly Hall @ Jubilee P/S. Road

Completed

Completed

Completed

Completed

Completed

129

Sectoral Achievements Rural Development

3 Classroom Block and Ofce St. Nicholas Primary School Ikot Ekara, Ikot Abasi

3 Classroom Block and Ofce Secondary School, Oduo Ebughu, Mbo

4-Classroom Block and Office St. John Primary School, Asong, Mkpat Enin

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

Before

130

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

Elect. @ Nung Ukim Ikono (Ward Jobs)

Reno. of 3 Clsrm Blk @ St. Dominic's PS Mabk Etoi, Uyo (Special Project)

Reno. of Hall @ Govt. PS. Ifa Itai, Uyo (Special Intervention)

Reno. of 7 Clsrm Blk/Office @ GPS Ikot Ntuen Oku (Ward Jobs)

Const. of Library Block @ Vocation Sch. Ikot Ntuen Oku (Constituency Project)

Construction of Civic Centre @ Atan Offot (Constituency Project)

Electrification at Ifa Ikot Idang (Constituency Project)

Water Project @ Ifa Ikot Akpan, (Constituency Project)

Reno. of 7 Clsrm Blk @ QIC P/S Udua Udo, Ikono Uyo (Ward Jobs)

Reno. of Assembly Hall @ St. Dominic P/S Mbak Ikot Abasi Etoi, Uyo

Reno.of Long Hall@Group Sch, Ikot Odung / Ikot Obio Mkpong (Ward Jobs)

Ren of 2Halls\Clrm @ CCSS, Four Towns

Elect @ Atai Obio Offot\Nsukara Offot (Ward Jobs)

Electrification @ Ikot Odung village

Reconst. of Assembly Hall @ Offot Central School, Ikot Ekpe/Obio Offot (Special Intervention)

Renovation of 4 Clsrm Blk/Office @ Holy Child Primary School, Mbak Ikot Ebo (special Intervention)

Renovation of 2No. Hostel Blocks @ Daughters of Charity - Special Needs Centre, Nwniba Road. (Special Intervention)

Reno. of 4 Clsrm Blk @ St. Patrick's P/S Four Towns - Uyo (Spcial Intervention)

Reno. of 4 Clsrm Blk @ GPS Afaha Ubeh, Ikot Ekpene Rd, Uyo

Reno. of 4Clrm Blk @ Govt.Pri. Sch,Aka I,Obio Imo, Uyo Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

131

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

141

142

143

144

145

146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

Water Project @ St. Joseph Afaha Oku (Constituency Project)

Water Project @ Ifa Ikot Okpon (Constituency Project)

Electrification @ Atai Obio Offot, Uyo (Ward Jobs)

Perimeter Fence @ St. Joseph Afaha Oku (Constituency Project)

Const. of 4 Clsrm Blk @ Apostolic P/S Ifa Ikot Okpon, Etoi - Uyo (Spcial Intervention)

Reno. of 4 Clsrm Blk @ P/S ikot Mbon Ikono - Uyo (Spcial Intervention)

Reno. of Ass. Hall/Clsrm @ AME Zion P/S Ikot Mbon, Ikono - Uyo (Spcial Intervention)

On-going

On-going

On-going

On-going

On-going

On-going

On-going

URUAN7 7- Classroom block @ AME Zion Sec. Sch Ndon Ebom

Assembly Hall @ AME Zion Sec. Sch. Ndon Ebom

Electrification @ Ikot Inyang Esuk

4- Classroom Block @ St. John RCM Primary Sch. Ikpa Uruan

Renovation of classroom block @ Holy Trinity Primary Sch. Mbiakong

Fencing & Gate House, Mboho Unity Sch. Idu

Reno. of 6 Clsrm Blk/Office @ Holy Trinity P/S Mbiakong

Renovation of Civic Centre@ Ekim Enen (Constituency Project)

Renovation of 4 Classroom Block @ Community Secondary School, Ibiaku Uruan (Special Intervention)

Const. of 4 Clrm Block@ Meth. P/S, Adadia (Ward Jobs)

Reno.of 4 Clrm Block@ GPS,Ekpene Ibia (Ward Jobs)

Reno.of Ass. Hall @ Meth. PS,Adadia (Ward Jobs)

Const.of 3 Clrm/Office @ GPS,Ekpene Ibia (Ward Jobs) Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

132

Sectoral Achievements Rural Development

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

Classroom Hall, Primary School, Ikot Udu, Ndiya, Ikono

4-Classroom blockPrimary School, Esa Atan, Ikot Ekpene

Classroom Hall, Comm. Sec. Sch. Ikot Ukana

Before

133

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

Install. of Transformer @ Ishiet Inua Akpa with low Tension Reti. To Afaha Ikot Village, Ibeno Ishiet Inua Akpa village (Constituency Project)

Install. of Transformer @ Ana-Akpa Community with Low Tension Reti. To Ikot Inyang Esuk, Ana-Akpa & Nna Enin Village @ Ibeno Ishiet (Constituency Project)

Water Project @ Ekim Enen (Constituency Project)

Electrification @ Ekpene Ukim Village

Reno. of Ass. Hall/Clsrm @ Atakpo Sec.Sch. Mbiya, Uruan

Reno. of Hall/Offices @ Sec. School, Ibiaku Uruan (Special Intervention)

On-going

On-going

On-going

On-going

On-going

On-going

161

162

163

164

165

166

8 NSIT ATAI 3- Classroom block @ Comprehensive Sec. Sch. Ikot Akpan Ike (Ward Jobs)

Assembly Hall @ Govt. Sch. Ikot Ekpot

Reno./Extension of 3-4 Clsrm Blk @ Comm. Sec. Sch. Essien Itiaba, Ikot Asua (Ward Jobs)

Reno. of 4 Clsrm Blk @ Comm. P/S. Essien Itaiba, Ikot Asua (Ward Jobs)

Renovation of 4- classroom block/Hall/Offive @ Govt Sch. Okoro Atai (Constituency Project)

Electrification @ Ikot Abasi

Completion of Civic Centre@ Asan Ibia Ikot Idiaba (Constituency Project)

Water Project @ Ndisiak Village, Eastern Nsit (Constituency Project)

Water Project @ Ikot Abia Anyie Village (Constituency Project)

Water Project @ Ikot Ebita Village (Constituency Project)

Water Project @ Ikot Udotang

Reno. of 4 Clsrm Blk @ Methodist P/S Ikot Akpabio, Nsit Atai

Reno. & Extension of 3-4 Clsrm Blk @ Comm. Sec. Sch. Essien Itiaba

Constr.of 3 Clrm Block@ Comm.Sec.Sch, Ikot Asua

167

168

169

170

171

172

173

174

175

176

177

178

179

180 On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

134

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

181

182

183

184

185

186

187

188

189

190

191

192

193

194

195

196

197

198

199

Constr.of Ass.Hall@Holy Child PS, Ikot Asua

Reno. of 2 Clsrm Blk @ Govt. Sch. Ukat

Reno. of 4 Clsrm Blk @ Otu Abiyan, Nsit Atai

Rehab. of Ass. Hall @ P/S Ikot Ubok Udom

On-going

On-going

On-going

On-going

9IBESIKPO ASUTAN

Renovation of 4 classroom block @ Govt. Primary Sch. Akpautong

Reno. of 2No. 4- Classroom block A & B @ St. Patrick Primary Sch. Nung Atte

Reno. of Clsrm Blk @ P/S Ikot Osom (Ward Jobs)

Reno. of Clsrm Blk @ P/S Ikot Udo (Ward Jobs)

Renovation of Examination Hall/Office @ Ndikpo Grammar Sch. Ikot Obio Nko

Reno. of Clsrm Blk @ GPS. Aba Ukpo (Ward Jobs)

Reno. of Assembly Hall @ P/S Ikot Ide Etuk Udo

Reno. of Intro. Tech. Blk @ Sec. Comm. Sch. Iwawa Ikot Akpa Edung (Ward Jobs)

Reno. of 4 Clsrm Blk @ Luth. PS Nung Udoe

Water Project @ Govt. Sch. Ndikpo Atang (Constituency Project)

Construction of Civic Centre@ Mbikpong Ikot Edim (Constituency Project)

Ren of 4 Clrm Blk & 3 Clsrm Blk @ St Bridget PS, Nung Ette

Constr.of Exam. Hall @ Holy Child Primary Sch, Iwawa

Reno. of Assembly Hall @ Luth Primary Sch. Nung Udoe

Reno. of 5 Clsrm Blk/Office @ Govt. P/S Ikot Abasi Idem (Special Intervention)

Completion of Fencing @ Iwana Usung Eket Sec. Comm Sch. Ikot Akpa Edung

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

200 On-going

135

Sectoral Achievements Rural Development

4-classroom block, Primary School, Ibesit, Oruk Anam

Construction of 3-Classroom block, Primary Schol, Ikot Akpan Nkuk, Ukanafun

3-classroom and Ofce blockPrimary School, Ikot Afanga, Oruk Anam

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

Before

136

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

201

202

203

204

205

206

207

208

209

210

211

212

213

214

215

216

217

218

219

220

Reno. of Hall/Office @ Iwawa Usung Eket Sec. Sch. Ikot Akpa Edung (Special Intervention)

Const. of Exams Hall @ Sec. Comm. Sch. Iwawa, Ikot Akpaedung

Completion of OPD @ PHC, Nung Udoe (Constituency Project)

Civic Centre @ Ikot Ebre Edinam (Constituency Project)

Elec. of Mbierebe Obio

Reno. of Intro. Tech. Workshop @ Comp. Sec. Sch. Ikot Akpa Eto/Ediam Village

Electrification @ Ikot Akpa Edong

Reno. of Block @ P/S Obio Nko

Reno. of Block @ African Church Sch. Ikot Obok/Oboetok

Reno. of Blk @ GPS Nkwo Ossom

Provision of 2 Hybrid Water @ GPS Nkwo Ossom

Provision of 2 Hybrid Water @ GPS Ikot Akpabin

Const. of 4 Clsrm Blk @ P/S Ikot Akpabin

Reno. of 6 Clsrm Blk/Office Blk @ St. Patrick P/S Ndikpo Atang

Const. of 3 Clsrm Blk /Office @ Iwawa Usung Eket Sec. Comm. Sch. - Ibesikpo Asutan (Special Intervention)

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

10 EKET Renovation of 6- Class room block/Offices @ QIC Primary Sch. Ikot Udota

Renovation of 3- class room block (UBE Block) @ Govt. Primary Sch. Mkpok

Reno. of 3 Clsrm Blk @ Govt. P/S. Enen Ekpene St. Eket (Special Intervention)

Construction of Civic Centre & Skill Acquisition Centre@ Idua (Constituency Project)

Reno. of 3 6 Clsrm Blk/Toilet (A, B, C) @ AME Zion P.S Usung Inyang

Completed

Completed

Completed

Completed

Completed

137

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

221

222

223

224

225

226

227

228

229

230

231

232

233

234

235

236

237

238

239

240

Provision of Mini Water with Reticulation @ Okon Eket (Special Intervention)

Reno. of Boys Domitary (Storey Bulidling) @ Govt. Sec. Sch. Afaha Eket (Ward Jobs)

Renovation of Story Building/ Admin Block @ Sec School, Afaha Eket. (Constituency Project)

Reno.of Hostel Section A & B @Govt.Sec.Sch, Afaha Eket (Ward Jobs)

Reno. of 2 3 Clsrm Blk/Lab Blk 1&2/Ass. Hall/L-Shaped/Office @ CSCS. Ikot Uso Ekong, Eket (Special Intervention)

Reno. of 4 Clsrm Blk @ GPS Ikot Obio Anana - Okon, Eket (Special Intervention)

Reno. of 4 Clsrm Blk/Office And Store @ Govt. Main Sch. Afaha Eket, Eket

Const. of 4 Clsrm Blk @ Govt. P/S Idung Iniang - Eket (Special Intervention)

Const. of 3 Clsrm Blk @ GPS Mkpok - Eket (Special Intervention)

Const. of 4 Clsrm Blk @ QIC P/S Okon - Eket (Special Intervention)

Reno. of Assembly Hall @ Salvation Army P/S Ikot Uso Ekong, Eket (Special Intervention)

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

11 ONNA Renovation of 2 bedrooms Staff Qtrs 1. @ Cottage Hospital Ikot Iko Ibon

Renovation of 2 bedrooms Staff Qtrs 2. @ Cottage Hospital Ikot Iko Ibon

Renovation of Town hall @ Ikot Udo Essang (Constituency Project)

Water Project @ Ikot Udo Essang (Constituency Project)

Water Project @ Ndon Eyo (Constituency Project)

Water Project @ Awa Village (Special Intervention)

Const. of Civic Hall @ Ikot Akpan Nko (Constituency Project)

Renov of Town Hall @ Ikot Akpan Nko (Constituency Project)

Renov of Health Centre @ Ikot Akpan Nko (Constituency Project)

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

138

Sectoral Achievements Rural Development

Assembly Hall Q.I.C. School Ikot Ekpot, Nsit Atai

Assembly Hall Government School Ikot Eyo, Nsit Ubium

4 Classroom Block Govt. Pri. Schl. Nung Oku Ekanem, Onna

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

Before

139

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

241

242

243

244

245

246

247

248

249

250

251

252

253

254

255

256

257

258

259

260

Provision of VIP Toilet@ PS, Atiamkpat (Ward Jobs)

Reno. of 4 Clsrm Blk @ African Church P/S Awa Ubium

Ren of 4Clrm @ P\S, Nung Oku Ekanem

Reconst. of 3 Clsrm Blk @ P/S Atiamkpat (Ward Jobs)

Reno. of 3 Clsrm Blk @ P/S Ikot Edor (Ward Jobs)

Reno. of 4 Clsrm Blk @ P/S Ikot Eko Ibon (Ward Jobs)

3 Clsrm Blk @ QIC Group Sch. Ndon Eyo (Ward Jobs)

Reno. of 4 Clsrm Blk @ Govt. Sch. Ikot Akpan Nkpe/Ikot Nkang, Onna

Reno. of 4 Clsrm @ Sec. Sch. Ikot Ebiere, Onna

Reconst. of 4Clrm Block @ QIC Group Sch, Atimkpat (Special Intervention)

Electrification @ Ikot Akpan Nko

Electrification @ Awa

Const of Fen/Gate House @ QICPS, Awa

Construction of Corpers Lodge Quarters A, B, C @ Awa Afaha Clan (Special Intervention)

Reno. of Ass. Hall (Add 10m to Existing) @ Sec. Sch. Okat - Onna (Special Intervention)

Reno. of Dinning Hall @ Sci. Sch. Ndon Eyo - Onna (Special Intervention)

Reno. of Admin Blk @ Sci. Sch. Ndon Eyo - Onna(Special Intervention)

Completed

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

On-going

On-going

On-going

On-going

On-going

On-going

12 ESIT EKET Construction of Civic Centre @ Ebighi Anwa Uquo (Constituency Project)

Water Project @ Ebighi Anwang, Uquo, Eket. (Constituency Project)

Water Project @ Etebi Mbak Uyo, Esit Eket. (Constituency Project)

Completed

Completed

Completed

140

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

261

262

263

264

265

266

267

268

269

270

271

272

273

274

275

276

277

278

279

280

Water Project @ Mkt Square, Uqua Isi-Edoho Esit Eket. (Constituency Project)

Fen. of Sec. Sch, Edor

Elect. of Uquo & Environs

Const. Civic Centre @ Idung Atang Edem (Ward Jobs)

Const. of Civic Centre @ Ndon Eyo, Uquo

Reno.of 6Clrm Block @ PS, Etebi Idung Asang

Const. of Civic Centre @ Idung Obio Ekong, Afaha Ekpene Edi

Reno. of 4 Clsrm Blk @ GPS, Etebi - Esit Eket

On-going

Completed

On-going

On-going

On-going

On-going

On-going

On-going

Renovation of 4- class room block/offices @ Govt. Primary Sch. Mkpanak

Renovation of Assembly Hall/Office @ Govt. Primary Sch. Mkpanak

Reno. of Hostel Blk @ Sec. Gram. Sch. Upenekang (Constituency Project)

Water Project @ Ndon Eyo Uquo. (Constituency Project)

Assembly Hall @ Govt. P/S Upenekang

Reno. of 3ClsRm/Hall @ PS, Opolum

Reno.of Phy./Chem.Lab @Sec.Gram.Sch, Ibeno (Ward Jobs)

Reno.of 3Clrm Blk @ Comp.High Sch, Inua Eyet Ikot (Ward Jobs)

Reno. of 4 Clsrm Blk @ Technical Sch. Mkpanak (Ward Jobs)

Reno.of HM 3Bedrm@GPS,Okoroutip (Ward Jobs)

Electrification @ Upenekang

Completed

Completed

Completed

Completed

On-going

On-going

On-going

On-going

On-going

On-going

On-going

13 IBENO

Re-construction of Assembly Hall @ St. Nicholas Primary School Ikot Ekara Completed14 IKOT ABASI

141

Sectoral Achievements Rural Development

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

7 Classroom BlockAME Zion School, Ndon Ebom, Uruan

6 Classroom Block Community Secondary School, Four Towns, Uyo

Assembly Hall, AME Zion Sch. Ndon Ebom, Uruan

Before

142

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

281

282

283

284

285

286

287

288

289

290

291

292

293

294

295

296

297

298

299

300

Re-construction of 3- Class Room Blook/Offices. @ St. Nicholas Primary School, Ikot Ekara

Re-construction of 3- Class Room Blook/Offices. @ St. Georges Anglican Primary Sch. Ikot Abasi Urban (Constituency Project)

Renovation of 3- Class Room Block/offices @ Holy Child Convent School, Essene. (Constituency Project)

Electrification @ Ikot Enini

Civic Centre @ Esang Village, Ikot Abasi (Constituency Project)

Renovation of 4 Classroom Block @ Methodist Central School, Ette (Special Intervention)

Renovation of 3 Classroom Block/Office @ SS Peter & Paul Primary School, Essene (Special Intervention)

Water Project @ Ediduo, Edemaya

Renovation of 4 Classroom Block @ Community Secondary School, Odoro Atan (Special intervention)

Reno. of 4 Clsrm Blk @ QIC Group Sch., Ikot Usop, Ikot Abasi

Reno.of 4 Clsrm Blk @ SS P/S Ete, Ikot Abasi

Reno. of Female Ward @ General Hospital, Ikot Abasi

Reno. of Male Ward @ General Hospital, Ikot Abasi

Renov. of Hall @ P/S Ikot Akpan Udo, Ikot Abasi

Renov. of 4 Clsrm Blk/2 Office @ St. Anthony P/S, Ikot Ubo Akama, Edem-Aya

Renov. of ATN Theatre @ General Hospital, Ikot Abasi

Reno. of Town Hall Abasiute Village, Ette

Reno. of 3 Clsrm Blk @ P/S Ikot Akpan Udo - Ete - Ikot Abasi (Special Intervention)

Const. of 4 Clsrm Blk @ Sec. Comm. Sch. Ibekwe - Ikot Abasi (Special Intervention)

Reno. of 4 Clsrm Blk @ Convent P/S, Essene - Ikot Abasi (Special Intervention)

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

143

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

301

302

303

304

305

306

307

308

309

310

311

312

313

314

315

316

317

318

319

320

15 MKPAT ENIN Completion of 4 Class Room/Office @ St. John's Primary Sch. Asong.

Reconstruction of 3 Classroom/Office Block @ St. John's Primary Sch., Asong

Construction of Ikpa Ibom Unity Hall @ Ukam

Water Project @ Ukam

Water Project @ Ikot Ekpaw

Transformer Substation, Mkpat Enin Urban

Reno.of Block 3@ Cottage Hosp., Ikot Ekpaw

Reno. of Market Stalls @ Urua Akpaudo (Constituency Project)

Water Project @ Asong

Water Project @ Ikot Akata (Constituency Project)

Const. of Assembly Hall/Office @ Esetang Sec. Sch, Ekim

Reno.of Matron's Quarters @ Cottage Hosp.,Ikot Ekpaw

Reno.of Male Ward/Gate House @ Cottage Hosp.,Ikot Ekpaw

Reno. of Staff Quarters @ Cottage Hospital, Ikot Ekpaw (Ward Jobs)

Reconstruction of 4 Classroom Block @ QIC Secondary Commercial School, Minya (Special Intervention)

Const. of 3Clrm Block/Office @ Esetang Sec. Sch, Ekim (Ward Jobs)

Reno.of 4 Classroom Blk @ Govt. Sch. Ikot Ebak, Mkpat Enin

Const. of Assembly Hall/Office @ Primary Sch,Ikot Eyienye

Renovation of 3 Classroom Block @ St. Patrick's School Ikot Ekong (Special Intervention)

Reno.of 4 Classroom Blk @ P/S Ikot Ekop, Mkpat Enin

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

On-going

On-going

On-going

On-going

On-going

144

Sectoral Achievements Rural Development

3 Classroom Block and Office Government Primary School, Ekeya, Okobo

2 Bedroom Staff Quaters at Cottage Hospital, Ikot Iko Ibon, Onna

4 Classroom Block Government Primary School, Nung Oku Ekanem, ONNA

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

Before

145

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

16EASTERN OBOLO

3 Clsrm Blk @ P/S Atabrikang

Reno. of Assembly Hall/Office @ St. Silas Anglican Sch., Okoroette

3 Clsrm blk (UBE Blk) @ St. Silas Anglican Sch., Okoroette

Constr.of 3 Clrm Block @ GPS, Elile (Ward Jobs)

Constr.of 3 Clsrm Blk @ GPS, Okorombokho

Const. of 3 Clrm Block @ GPS, Atabrikang (Ward Jobs)

Const of 3Clrm\Office @ St Silas Aug, Okoro

321

322

323

324

325

326

327

328

329

330

331

332

333

334

335

336

337

338

339

340

Completed

On-going

On-going

On-going

On-going

On-going

On-going

17 ORON Reconstruction of Assembly Hall @ Holy Child Convent Sch

Renovation of 3- Class Room Block/offices @ Holy child Convent Sch

Renovation of town hall @ Uya Oro

Provision of Solar Powered mini water scheme @ Uya Oro

Elect. @ Uya Oron (Constituency Project)

Ren of 4Clrm @ Holy Child Convent Sch, Oron Town

Electrification @ Esin Ufot/Idua Afaha Edok

Renov. of 4 Clrm, @ GPS, Uko Oyukim, (Constituency Project)

Reno.of Staff Qtrs 1, 2, 3, 4 @General Hosp., Iquita (Ward Jobs)

Ren of 4Clrm @ Govt Sch, Uko Uyukim On-going

On-going

On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

18 MBO Construction of 3- Classroom block/offices @ Secondary Sch., Oduo Ebughu

Construction of 3- Classroom @ Secondary Sch., Oduo Ebughu

Renovation of 5- Classroom Block/Assembly Hall @ Community Sec. Sch., Udesi

Completed

Completed

Completed

146

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

341

342

343

314

315

346

347

348

349

350

351

352

353

354

PRR

356

357

358

359

360

Electrification @ Udinghi

Const. of Library, CSS Oduo Ebughu, (Constituency Project)

Electrification @ Uko Itak Eyulor

Renovation of 3 Classroom Block/Office @ Methodist Central School, Ebughu (Special Intervention)

Restoration of Broken Electric Poles & Installation of Transformer @ Akai Attih Udesi (Constituency Project)

Water Project @ Akprangkprang Uda (Constituency Project),

Reno. of 3 Clsrm Blk/Office @ P/S, Uko Itak Eyulor (Ward Jobs)

Constr.of Ass. Hall @ PS, Oduo Ebughu (Ward Jobs)

Reno.of 4 Clrm Block @St. Paul African PS,Ibaka (Ward Jobs)

Reno.of Staff Quaters @ Enwang Comp.Sec.Sch (Ward Jobs)

Reconstruction of 4 Classroom Block @ Okobo Ebughu Primary School (Special Intervention)

Reno. of 3 Clsrm Blk @ Meth. Central Sch., Ebughu - Mbo (Special Intervention)

Const. of 4 Clsrm Blk @ Mount Zion Mission P/S Asak-Ikang -, Ebughu, (Special Intervention)

Const. of 4 Clsrm Blk @ Meth. Central Sch., Akai Ebughu, Mbo (Special Intervention)

Completed

Completed

Completed

Completed

Completed

Completed

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

19 OKOBO Reconstruction of 3- class room block/office @ Govt P/Sch. Oyoku Asang

Renovation of 3 class room/office @ Govt. Sch., Ekeya

Reconstruction of 3- class room block/office @ Primary Sch., Ebighi Etta/Edu (Constitutency Project)

Reconstruction of 3- class room block/office @ St. Andrew's primary sch., Oti-Oro (Constitutency Project)

Assembly Hall/Office @ St. Bridgit's primary Sch., Udung Affiang

Reconstruction of 3- class room block/office @ St. Bridgit's mrimary Sch. Udung Affiang Completed

Completed

Completed

Completed

Completed

Completed

147

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

361

362

363

364

365

366

367

368

369

370

371

372

373

374

375

376

377

378

379

380

Const. of 3Clrm Block/Office @ AME Zion Mbiokpo Oduobo, Okobo (Constituency Project)

Reno. of 7 Clrm Blk @ Comm.Sec.Sch, Odobo (Ward Jobs)

Water Project @PS, Udung Affiang (Ward Jobs)

Reconst. Of 7 Clrm Blk/Office @ St. Joesph P/S Urutin/Atiabang (Special Intervention)

Reno. of Corper’s Lodge @ St. Vincent Sec. Sch. Oti-Oro (Constituency Project)

Const. of 2 Clsrm/Ass Hall Blk @ Comm. Sec. Sch. Mbokpu Oduobo, Okobo (Constituency project)

Elect. @ Ekeya-Utine NduoåÖ village

Renovation of Block 1@ General Hosp.,Amamong,Okobo (Ward Jobs)

Renovation of Block 2@ General Hosp.,Amamong,Okobo (Ward Jobs)

Ren of 4Clrm @ P\S, Oyoku Asang On-going

On-going

On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

20 UDUNG UKO Renovation of Assembly Hall/Office @ Comprehensive Sec. Sch. Edikor

Reconstruction of 120 open/Lock Up Stalls @ Udung Uko market

Renovation of 3 classroom block/office @ St. Vincent Primary Sch.,=bÇáâçê

Reno. of Mkt Stall, Erosion Contrl & Borehole/Toilet Phase I Udung Uko

Reno. of Mkt Stall, Erosion Control & Borehole/Toilet Phase II @ Urue Osung (Special Intervention)

Const.of 3Clrm Block@ Migrant Sch. Usung

Const.of Assembly Hall @ Govt. School, Eyo Uwe (Ward Jobs)

Completion of Civic Centre @ Eyonsek

Elect. @ Eyokponung\Eyokpu

Reno. of 6 Clsrm Blk @ St. Vincent P/S Edikor, Udung Uko

Completed

Completed

Completed

Completed

Completed

On-going

On-going

On-going

On-going

On-going

148

Sectoral Achievements Rural Development

4 Classroom Block and Ofce, Convent School, Oron

Assembly Hall and Ofce, Commercial Secondary School, Edikor, Urue-Offong/ Oruko

6 Classroom Block and Ofce, St. Patrick Government Primary School Mbukpo Eyo Akan, Urue-Offong/Oruko

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

Before

149

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

381

382

383

PUQ

385

386

387

388

389

390

391

392

393

394

PVR

396

397

398

399

400

Reno.of 4 Classroom Blk @ GPS Ekim Village,

Reno.of 4 Clsrm Blk @ GPS, Uboro Isong Inyang, Udung Uko

On-going

On-going

Renovation of 4 class room block @ St. Patrick Sch. Mbokpo Eyo Akan21Urue

Offong-Oruko

Electrification @ Mbukpu Eyoima

Water Project @ Edok Oruko

Construction of Town Hall @ Edok Oruko

Reno. of 3 Clsrm blk @ Meth. Sch. Ukuko (Special Intervention)

Water Project @ Comp. Sec Sch, Okossi (Constituency Project)

Const.of 3 Clrm Block @ Govt.PS, Uyoku Ibighi (Ward Jobs)

Reno.of 4 Clrm Block @ Govt. PS, Oyoku Ibighi (Ward Jobs)

Reno.of 4 Clrm Blk @ PS, Eyulor (Ward Jobs)

Renov. of 4Clrm Block, @ Sec. School, Ubodung Comm., Oruko (Constituency Project)

Const.of Assembly Uyoku Ibighi (Ward Jobs) Hall @ Govt. PS,

Ren of 3Clrm @ GPS, Mbokpu Eyo Akan

Reno.of 4 Clsrm Blk @ Ubodung Comm. Sch. Oduonim Oruko

Const. of 3 Clsrm Blk @ PS Oyoku Ibighi On-going

On-going

On-going

On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

22 ABAK Renovation of Building Dept. @ Govt. Tech. College, Abak

Renovation of 4 classroom block @ Govt. Tech. College, Abak

Reno. of Science Lab. @ Govt. Tech. College, Abak

Water Project @ Ibiakpan 2 Completed

Completed

ç̀ãéäÉíÉÇ

Completed

150

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

Water Project @ Ibiakpan No. 1

Water Project @ Uruk Uso

Reno. of 5 Clsrm Blk, Provost's Residence, Completion of 6 Long Hall Hostel Assembly Hall/6 Offices, Reconst. Of 2 Hall/2 Offices, Reconst. Of 4 Classroom Blk/3 Offices, Library Blk, Admin Blk/Walk Way, Provision of 2 Boreholes/Tank Stand/Reticulation, Const. of Gate House/Perimeter Fence, Electrification, 4 6Bedrm Hostels, Const. of Dinning Hall/Kitchen/Store @ Samuel Bill Theological College, Abak

401

402

403

404

405

406

407

408

409

410

411

412

413

414

415

416

417

418

419

420

Water Project @ Ukpom Abak

Water Project @ Abiakpo Otoro (Constituency Project)

Water Project @ Ntukuk Village, (Constituency Project)

Water Project @ Ikot Etukudo (Constituency Project)

Water Project @ Nto Otong (Constituency Project)

Reno. of 6 Clsrm Blk @ Holy Family College, Abak

Reno. of Library @ St. Mary's Science College, Ediene Abak

Reno. of Computer Resource Centre @ St. Mary's Science College, Ediene Abak

Reno. of Clinic @ St. Mary's Science College, Ediene Abak

Reno. of Laboratory Blks @ St. Mary's Science College, Ediene Abak

Const. of Dining Hall/Kitchen/Store/28 Hostel Blk on 2 Floors/Water Project/Long Hostel @ Samuel Bill Theological College

Reno.of 4Clrm Block @ St. Marys' Science College, Ediene Abak (Ward Jobs)

Reno. of 3 Clsrm Blk @ St. Mary's Science College, Ediene (Ward Jobs)

Reno.of 4 Clsrm Blk @ P/S Ukpom, Abak

Reno.of Ass.Hall @ St. Marys' Science College,Ediene Abak (Ward Jobs)

Reno.of Dinning Hall/Kitchen @ Govt. Tech. Sch., Abak

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

On-going

On-going

On-going

On-going

On-going

låJÖçáåÖ

On-going

On-going

On-going

On-going

On-going

oÉÅçåëíK=MÑ=P=̀äëêã=_äâ=]=̀pp=bâ~=lÄçåÖ Completed23 ETIM EKPO

151

Sectoral Achievements Rural Development

3 Classroom Block, Commercial Secondary School, Asuna, Etinan

Classroom Hall, Comm. Sec. Sch. Ikot Ukana, Obot Akara

Sectoral Achievements Rural Development

BeforeAfter

After

Before

After

3 Classroom Block, St. Paul Catholic School, Nkwa, Ibiono

Before

152

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

421

422

423

424

425

426

QOT

428

429

430

431

432

433

434

435

436

437

438

439

440

Renovation of Assembly Hall @ Community Pri. Sch. Eka Obong (Ward Jobs)

3 Clsrm Blk @ P/S Utu Nsekhe/Utu Ikot Eboro (Ward Jobs)

Reno. of 3 Clsrm Blk @ GPS. Nkwot Ikot Ebo

Elect. of CSS Eka Obong & Environs

Reconst of 4Clrm @ CSS, Eka Obong

Reconst. of Assembly Hall @ CSS Eka Obong

Renovation of 3 Classroom Block @ QIC Group School, Uruk/Ikono Eka Uruk Eshiet (Special Intervention)

Reconst. of 4 Clsrm Blk @ Govt. P/S Ndot Ikot Eda (Special Intervention)

Reno. of 4 Clsrm Blk @ P/S Uruk Ata, Ikot Isemin, Etim Ekpo

ç̀åëíK=çÑ=̂ëëK=e~ää=]=mLp=ríì=këÉâÜÉLríì=fâçí=bÄçêç==Et~êÇ=gçÄëF

Reno.of 4Clrm [email protected] PS,Ekaobong

Reno.of 3Clrm Block@Pri. Sch, Obong Ntak (Ward Jobs)

Reno. of Hall/2 Offices @ Holy Rosary Cath. P/S Udobong, Etim Ekpo (Special Intervention) On-going

On-going

On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Renovation of 4 classroom block @ St. Patrick Sch. Urua Inyang

Renovation of Assembly Hall @ St. Patrick Primary Sch. Urua Inyang

Construction of Civic Centre @ Ikot Esu

Water Project @ Ikot Esu

Reno.of 4Clrm Blk @ PS, Ikot Akpan Offiong (Ward Jobs)

Reno.of Clrm Blk @ GPS, Udi (Ward Jobs)

Reno.of 4 Clrm Block @ GPS, Achan (Ward Jobs)

24 IKA

Completed

Completed

Completed

Completed

Completed

ç̀ãéäÉíÉÇ

Completed

153

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

441

442

443

444

445

446

447

448

449

450

451

452

453

QRQ

455

456

457

458

459

460

Water Project @ PS, Ikot Akpan Offiong (Ward Jobs)

Electrification @ Nto Ntia Achan

Const. of 60No. Open Shops, Ika (Constituency Project)

Water Project @ Mkpohoeto-Ika. (Constituency Project)

Reno. of 4 Clsrm Blk @ QIC P/S Ikot Akpan Anwa - Ika (Special Intervention)

Reno. of 4 Clsrm blk @ P/S Nto Udewan - Ika (Special Intervention) On-going

On-going

On-going

On-going

Completed

Completed

25 IKONO Renovation of 4 classroom block @ Methodist Sch., Ndiya

Renovation of 4 classroom block @ Central Sch., Nung Udoe Itak

Renovation of 3 classroom block @ Central Sch., Nung Udoe Itak

Renovation of 6 classroom block/Office @ Govt. Primary Sch., Ibiaku Ikot Ukana

Renovation of 6 classroom block/Office @ Govt. Primary Sch., Mbiaobong Ukan

3 Clsrm Blk/Office @ St. Michael Cath. Sch., Ikot Okubo' Ikot Ayan, Ediene Ikono

Reno. of Quarters 1 @ General Hospital, Ikono (Ward Jobs)

Reno. of Quarters 2 @ General Hospital, Ikono (Ward Jobs)

Reno. of Quarters 3 @ General Hospital, Ikono (Ward Jobs)

Reno. of Quarters 4 @ General Hospital, Ikono (Ward Jobs)

Renov. of 4 Clrm Blk @ GPS Ndinya Mfia (Constituency Project)

Renov. of 4 Clrm Blk @ PS Nkwot Edem Edet (Constituency Project)

Reno.of 4 Classroom Blk @ P/S Ikot Efre Itak, Ikono

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

26 INI Renovation of Exam Hall @ Ini Sec. Sch.,=fâéÉ=fâçí=kâçå Completed

154

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

461

462

463

464

465

466

467

468

469

470

471

472

473

474

475

476

477

478

479

480

Construction of 4 classroom block @ Ini Sec. Sch., Ikpe Ikot Nkon

Market Stall @ Ini Market

Perimeter fencing/Gate House @ Primary Sch., Mbiabong Ikot Udofia

Renov of Market Sheds @ Urua Affiong Aran

Water Project @ Urua Affiong Aran

Electrification @ Akpayak Ikpe

Reno. of Exams Hall @ Comm. Sec. Sch. Nkari

Const. of 3 Clsrm Blk @ Meth. P/S Mbiakpa Ibakesi (Ward Jobs)

Const. of Corpers’ Lodge @ Sec Obotme. (Constituency Project)

Constr.of 3Clrm Block @ GPS PCN,Nchana Ebua (Ward Jobs)

Reconstr.of Ass. Hall @Comm.Sec.Sch,Nkari (Ward Jobs)

Electrification @ Nkwot Etok

Electrification @ Iwerre Clan (Ward Jobs)

oÉåçK=çÑ=S=̀äëêã=_äâ=]=dpp=bÄçI=fíìãÄçåìëç (Special Intervention) On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

OT IKOT EKPENE Reconstruction of 4 classroom block @ Primary Sch. Esa Atan Ikot Ekpene

Reconstruction of 3 classroom block @ Primary Sch. Esa Atan Ikot Ekpene

Electricity @ Hand Maid of Jesus, Ifuho

Borehole Water/Toilet facility @ Ikono Park (Ward Jobs)

Renovation of 4 classroom block @ Primary Sch, Amayam (Ward Jobs)

Reno. of Exams Hall @ Goretti Girls Sec. Sch. (Ward Jobs)

Completed

Completed

Completed

Completed

Completed

Completed

155

Sectoral Achievements Rural Development

Market Stalls at Ikot Edibon, Nsit Ubium Solar Powered Borehole, Ndiya, Nsit Ubium

Civic Centre, Mbikpong, Ikot Edim, Ibesikpo Asutan

Sectoral Achievements Rural Development

156

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

481

482

483

484

485

486

487

488

489

490

491

492

493

494

495

496

497

498

499

500

Reno. of Area Command's Quarters @ NPF, Ikot Ekpene (Special Intervention)

Provision of Borehole/Toilet @ ikot Ekpene Police Station (Special Intervention)

Elect. @ Abiakpo Ik Essien\Utu Edem Usung (Ward Jobs)

Electrification @ Uruk Uso

Const. of Community Dev. Centre @ Uruk Uso

Reno. of 3 Clsrm St. Saviour P/S Oruk Uso (Special Intervention)

Water project @ Ibiakpan (Special Intervention)

Water project @ Ikot Otu (Special Intervention)

Renovation of Library @ Ikot Ekpene (Special Intervention)

Reconst. of 4 Clsrm Blk @ St. Peter's P/S, Ikot Inyang

Reno. of 4 Clsrm Blk @ P/S Ikot Osurua (Special Intervention)

Reno. of 3 Clsrm blk @ PS Ikot Atasung,

Reno. of 3 Clsrm Blk @ P/S, Ikot Osurua (Special Intervention) On-going

On-going

On-going

On-going

On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

28 ESSIEN UDIM Reconst. of Library @ Govt. Sec. Sch, Nto Nsek

Reconst. of Computer Centre @ Govt. Sec. Sch, Nto Nsek

Reconst. of Science Lab. @ Govt. Sec. Sch., Nto Nsek

Renovation of Administrative block @ Govt. Sec. Sch., Nto Nsek

Reno. of 4 ClsRm @ GSS Nto Nsek

oÉåçK=çÑ=Q=̀äëêã=_äâ=]=jÉíÜçÇáëí=mêáã~êó=pÅÜI=̂Ñ~Ü~=fâçí=bÄ~â==Et~êÇ=gçÄëF

Reno. of 4 Clsrm Blk @ Govt. Sec. Sch., Ikot Esse - Afaha

Completed

Completed

Completed

Completed

Completed

Completed

Completed

157

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

501

502

503

504

505

506

507

508

509

510

511

512

513

514

515

516

517

518

519

520

Reno. of 2 clsrm Blk/Hall Blk @ P/S Ikot Esse

Construction of 4Clrm Blk @ PS, Okop Akama, Ukan Nuk

Reno.of Block 1 @ Gen. Hospital, Ikpe Annang (Ward Jobs)

Reno.of Block 2 @ Gen. Hospital, Ikpe Annang (Ward Jobs)

oÉåçKçÑ=_äçÅâ=P]=dÉåK=eçëéáí~äI=fâéÉ=̂åå~åÖ==Et~êÇ=gçÄëF

Water Project @ Ikot Ekpat Ukana

Reconst. of Assembly Hall @ Govt. Sch. Ukana

Reno. of 4 Clsrm Blk/Office @ St. Joseph's Cath. Sch. Okon - Essien Udim (Special Intervention)

Reno. of Intro. Tech. Blk/Offices @ Okon Sec. Comm. Sch., Ikot Oko Okon, Essien Udim

Reconst. of Male Hostel @ Sch. Of Midwifery, Urua Akpan (Special Intervention)

Reconst. of Female Hostel @ Sch. Of Midwifery, Urua Akpan (Special Intervention)

Reno. of 4 Clsrm Blk @ Sch. Of Midwifery, Urua Akpan (Special Intervention)

Reno. of Dining, kitchen & Toilet @ Sch. Of midwifery, Urua Akpan, Esien Udim

Const. of Traditional Council Hall @ Ukana Clan (Constituency Project)

Const. of 4Clrm Blk @ GPS, Ikot Umo Essien (Constituency Project)

Reno. of 4 Clsrm Blk @ P/S Ikot Ocho (Special Intervention) On-going

On-going

On-going

On-going

On-going

On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

29 OBOT AKARA Renovation of 5 Classroom block @ Methodist Primary Sch. Obot Atan

Renovation of Examination Hall @ Abia Okpo Community Sch.

Renovation of Exams Hall @ FIDA Sec. Sch. Urua Offiong Etok Udo

Renovation of Workshop @ FIDA Sec. Sch. Urua Offiong Etok Udo Completed

Completed

Completed

Completed

158

Sectoral Achievements Rural Development

Market Stalls at Ndukpoise, Nsit Ubium

Emergency, Unit, Primary Health Care Centre Itam, ItuCivic Centre, Ekim Enen, Uruan

Sectoral Achievements Rural Development

159

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

Renovation of Science Lab. @ FIDA Sec. Sch. Urua Offiong Etok Udo

Reconst. of 15 Market Sheds @ Urua Offiong Etor Udo (Constituency Project)

22No. Locked Up Shops @ Urua Offiong Etor Udo (Constituency Project)

Elect. @ Ikot Udo

Const. of 3 Clsrm Blk @ GSS. Ikpe Mbak Eyop (Ward Jobs)

Const. of 4 Clsrm Blk @ GSS. Ikpe Mbak Eyop (Ward Jobs)

Constr.of Ass.Hall @ Govt. Sec. Sch, Ikpe Mbakeyop (Ward Jobs)

521

522

523

524

525

526

527

528

529

530

531

RPO

533

534

535

536

537

538

539

540

On-going

On-going

On-going

Completed

Completed

Completed

Completed

30 UKANAFUN Renovation of Assembly Hall @ Primary Sch., Ikot Akpaidem

Reconstruction of 3 classroom block @ QIC Central Sch. Ikot Akpa Nkuk

Reconstruction of 4 classroom block @ QIC Central Sch. Ikot Akpa Nkuk

Renovation of 4 classroom block @ Govt Primary Sch.Ikot Akpaidem (Ward Jobs)

Reno. of 4 Clsrm Blk @ GPS Ukanafun Edem-Inyang

Reno. of 4 Clsrm Blk @ GPS Ikot Akpa Idem (Ward Jobs)

Reno. of Ass. Hall @ GPS Ukanafun Edem-Inyang (Ward Jobs)

Construction of Civic Centre @ Ikot Udo Mbang (Constituency Project)

Elec. @ Ikot Akpa Idem

Water Project @ Afaha Obo, Ikot Uko (Constituency Project)

Reno. of 6 Clsrm Blk @ Ikot Akpaneyo (Constituency Project)

Reno. of 3 Clsrm Blk @ Govt. Sch., Idung Urom Isor (Constituency Project)

Water Project @ Ata Essien Ukanafun Ikot Ekpat (Constituency Project) On-going

On-going

On-going

On-going

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

160

Sectoral Achievements Rural Development

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

541

542

543

544

545

546

547

548

549

550

551

552

553

554

555

556

557

558

559

560

Reconstruction of 4 Classroom Block @ Government Primary School, Idung Eka Uyo (Special Intervention)

Reno. of 4 Clsrm Blk/Office @ Govt. P/S Ikot Ndot, Afaha Obong (Special Intervention)

On-going

On-going

31 ORUK ANAM Construction of 4 classroom block @ Primary Sch., Ata Obio-Akpa

Reconst. of 6 Clsrm Blk @ Ntak Obio Akpa

Construction of Assembly Hall @ Primary Sch., Ata Obio-Akpa

Const. of 5 Clsrm Blk/Office @ Govt. P/S Ukpom Edem Inyang (Special Intervention)

Renov. of a blk of Hall/2Clrm @ PS, Ikot Akpan Essien

Rehab. of Electricity @ Ikot Esenam & Environs

Reno.of Clrm Blk@ Pentecostal Ass. Mission Sch, Inen Ikot Eteye

Const. of 500m Fence @ Navy Sec. Sch, Ikot Ntuen (Ward Jobs)

Elec. @ Udo Idiong Str. & Environs

Ren of 4Clrm @ SAPS, Ibesit Okpokoro

Renovation of 4 classroom block @ QIC. Ikot Afanga

Const. of 4No. Open Mkt sheds @ Ikot Esenam

Reno. of Clsrm Blk @ United Native African Sch. Ikot Akpan Eda (Ward Jobs)

Reno. of 4 Clsrm Blk/Office @ GPS, Ndot Ikot Eda (Special Intervention)

Renov. of Clrm Block @ CSS, Ikot Esenam (Constituency Project)

Reno. of Male - Female Ward/Lab/Theatre/Out-Patient Ward/Admin Blk/A&E Unit/Residential Qtrs 1 - 5/Electrification/Landscaping/HIV Unit @ General Hospital Ikot Okoro (Special Intervention)

Reno.of 3Clrm Block @ GPS, Ikot Essien/Ikot Obioruk (Ward Jobs)

Electrification @Ibianga Ikpe (Ward Jobs)

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

Completed

161

Sectoral Achievements Rural Development

Civic/ Skill Acquisition, Idua EketTownhall, Uya-Oro, Oron

Solar Powered, Mini Water Scheme, Ndon-Eyo, ONNA Solar Powered, Mini Water Scheme, Uya Oro, Oron

Sectoral Achievements Rural Development

162

S/NLOCAL GOVT.

ITEM PROJECT TITLE/LOCATIONPROJECT STATUS

561

562

563

564

565

566

567

568

569

570

571

572

573

574

575

576

577

578

579

Reno.of 4Clrm Block @ GPS, Ikot Oko

Reno.of 3Clrm Block @PS, Ukpom (Ward Jobs)

Renovation of 4 classroom block @ St. Andrew Catholic Sch., Ikot Akpan Eshiet

Renovation of 3 classroom block @ Salvation Army Sch., Ibesit Okpokoro

Reno of Clsrm @ PS Ikot Mbong, (Constituency Project)

Water Project @ PS Ikot Osukpong (Constituency Project)

Water Project @ Etim Ekpo (Constituency Project)

Electrification @ ikot Urua Ekpo

Water Project @ Ikot Ntuen - Oruk Anam (Special Intervention)

Reno.of 4 Classroom Blk @ Govt. P/S Inen Ekefre, Oruk Anam

Const. of 3 Clsrm Blk @ Faith Tab. Sch., Nnung Ikot Ita Obio Nkan

oÉåçKçÑ=̂ëëK=e~ää=]=dmp=̂íí~=bëëáÉå=lÄáç=̂âé~=lêìâ=̂å~ã

Const. of 4 Clsrm Blk @ St. Mary's PS, Ikot Eka Ide

Reno.of 3 Clsrm Blk @ Urban. High Sch. Ikot Akpan Essien

Reno.of 4 Classroom Blk @ GPS Eka-Nnung Ikot

Reno.of 4 Classroom Blk @ GPS Eka-Nnung Ikot

Reno. of 4 Clsrm Blk @ PS Ikot Ubom

Const. of 4 Clsrm Blk @ Comm. Sec. Sch. Inen Ekefre

Reno . of 3 Clsrm Blk @ Govt. Sch. Obio Ibesit Esa On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

On-going

163

Sectoral Achievements Rural Development

S/N COMMUNITY LOCATED DESCRIPTION OF PROJECT

1 Eyulor, Urue Offong/Oruko LGA Construction of Health Centre Completed

Provision of Motorized Borehole Completed

Construction of Box Culvert Completed

2 Nung Ukana Ikot Obio Akpan, Ibesukpo/Asutan LGA Extension of Electricity Completed

Provision of Motorized Borehole Completed

Construction of Viewing Centre Completed

3 Uruk Uso, Abak LGA Construction of Classroom Blocks Completed

Extension of Electricity Completed

Construction of Open Market Stalls Completed

4 Utu Ikot Ukpon, Essien Udim LGA Construction and Equipping of Community Health Centre

Completed

Renovation of Town Hall Completed

Provision of Motorized Borehole Completed

5 Ikot Aka Nung Ikono, Mkpat Enin LGA Construction of Open Market Stalls Completed

Provision of Motorized Borehole Completed

Construction and Equipping of Health Centre Completed

6 Ikot Abia Ndia, Ikot Abasi LGA Construction of Mini Bridge Completed

REMARKS

Provision of Motorized Borehole Completed

Construction of Town Hall Completed

■ Execution of 232 Micro projects: 176 completed and 56 ongoing, by Agency for Community and Social Development Program, in partnership with donor agencies, The projects are as shown on the table below:

164

Sectoral Achievements Rural Development

S/N COMMUNITY LOCATED DESCRIPTION OF PROJECT REMARKS

7 Ibong OkpoEto, Obot Akara LGA Construction of Town Hall Completed

Provision of Motorized Borehole Completed

Construction of Classroom Block Completed

8 Ikot Akpa Edung, Ibesikpo/Asutan LGA Construction and Equipping of Health Centre Completed

Extension of Electricity Completed

9 Ikot Nkim, Ibesikpo/Asutan LGA Construction of VIP Toilet Completed

Provision of Motorized Borehole Completed

Renovation of Classroom Blocks Completed

10 Ikot Oku Mfang, Abak LGA Extension of Electricity Completed

Provision of Motorized Borehole Completed

Construction of Culvert Completed

11 Ikot Okure, Obot Akara LGA Construction and Equipping of Health Centre Completed

Extension of Electricity Completed

Construction of VIP Toilet at Primary School Completed

12 Ikpe Ikot Nkon, Ini LGA Construction of Civic Centre Completed

Construction of Market Stalls Completed

13 Ikwa, Ikot Abasi LGA Renovation of Classroom Blocks Completed

165

Sectoral Achievements Rural Development

Civic Centre – Ikot Ama, Essien Udim LGA Open Market – Ikot Idaha, Ibiono Ibom LGA

Health Post – Ikot Ibanga, Essien Udim LGA

Cassava Mill – Ikot Akpan Obong, Ibiono Ibom LGA

BELOW ARE RURAL PROJECTS EXECUTED BY AKWA IBOM STATE GOVERNMENT IN CONJUNCTION WITH THE EUROPEAN

UNION/NIGER DELTA SUPPORT PROGRAMME EU-(NDSP), MINISTRY OF BUDGET AND NATIONAL PLANNING (MBNP)

166

Sectoral Achievements Rural Development

S/N COMMUNITY LOCATED DESCRIPTION OF PROJECT REMARKS

14 Mbokpo Eyo Akan, Urue Offong/Oruko Renovation of Market Completed

Drilling of Motorized Borehole Completed

Extension of Electricity Completed

15 Nda Nsit, Nsit Atai LGA Renovation of Civic Centre Completed

Construction of Open Market Stalls Completed

Extension of Electricity Completed

16 Nji Okon, Essien Udim LGA Construction of Civic Centre Completed

Construction of 24 Open Market Stalls Completed

Provision of Motorized Borehole Completed

17 Nsiak, Ikot Ekpene LGA Construction of Civic Centre Completed

18 Nto Ekot, Ika LGA Provision of Motorized Borehole Completed

Renovation of Town Hall Completed

Construction of Viewing Centre Completed

19 Obong Ikot Akpan, Etim Ekpo LGA Renovation of Primary School Block Completed

Construction of Civic Centre Completed

20 Odiok Itam, Itu LGA Renovation of Civic Centre Completed

Extension of Electricity Completed

Drilling of Motorized Borehole Completed

167

Sectoral Achievements Rural Development

S/N COMMUNITY LOCATED DESCRIPTION OF PROJECT REMARKS

21 Uruk Uso, Ikot Ekpene LGA Construction of Open Market Stalls Completed

Drilling of Motorized Borehole Completed

22 Ikot Abia, Mkpat Enin LGA Construction of Civic Centre Completed

23 Oyubia, Urue Offong/Oruko Construction of Market Completed

Extension of Electricity Completed

24 Abia Okpo, Abak LGA Construction of Town Hall Completed

Construction of Market Completed

Provision of Motorized Borehole Completed

25 Ikot Ayan, Ikono LGA Construction of Town Hall Completed

Provision of Motorized Borehole Completed

Construction of Market Completed

26 Ukana Nsasak, Essien Udim LGA Completion of Civic Centre Completed

Provision of Motorized Borehole Completed

27 Etok Uruk Eshiet, Etim Ekpo LGA Completion of Civic Centre Completed

Construction of 24 Open Market Stalls Completed

Renovation of Health Centre Completed

28 Ikot Onwon, Ikono LGA Construction of Health Centre Completed

Renovation of Primary School Block Completed

168

Sectoral Achievements Rural Development

Civic Centre at Nda Nsit Community, Nsit Atai L.G.A Primary School Block at Obong Ikot Akpan, Etim Ekpo L.G.A

Culvert / Small Bridge at Ikot Abia Ndia Community, Ikot Abasi L.G.A

Motorised Borehole at Ikot Etok Udo Community, Abak L.G.A

169

Sectoral Achievements Rural Development

S/N COMMUNITY LOCATED DESCRIPTION OF PROJECT REMARKS

29 Ikot Ediduk, Abak LGA Construction of Civic Centre Completed

Provision of Motorized Borehole Completed

Construction of Open Market Stalls Completed

30 Atai Otoro, Abak LGA Construction of Market Completed

Provision of Motorized Borehole Completed

Renovation of Primary School Block Completed

31 Abia Okpo Ikot Otu, Obot Akara LGA Construction of Civic Centre Completed

Construction of Open Market Stalls Completed

Provision of Motorized Borehole Completed

32 Atai Iwen, Obot Akara LGA Construction of Civic Centre Completed

Provision of Motorized Borehole Completed

33 Ikot Etok Udo, Abak LGA Construction of Open Market Stalls Completed

Provision of Motorized Borehole Completed

Extension of Electricity Completed

34 Ikot Ukono. Ikono LGA Extension of Electricity Completed

Construction of Town Hall Completed

35 Ikpe Ikot Ntuen, Essien Udim LGA Construction of Health Centre Completed

Provision of Motorized Borehole Completed

170

Sectoral Achievements Rural Development

S/N COMMUNITY LOCATED DESCRIPTION OF PROJECT REMARKS

36 Nsasak Afaha, Essien Udim LGA Provision of Motorized Borehole Completed

Construction of Civic Centre Completed

37 Nto Ekpe, Obot Akara LGA Construction of Civic Centre Completed

38 Uruk Uso, Abak LGA Construction of Classroom Blocks Completed

Extension of Electricity Completed

Construction of Open Market Stalls Completed

39 Ikpe Usung Ita, Essien Udim LGA Provision of Motorized Borehole Completed

40 Iwerre, Ini LGA Construction of Town Hall Completed

41 Ibakang, Nsit Atai LGA Renovation of Civic Centre Completed

Renovation of Open Market Stalls Completed

42 Mbiabong Ikot Udofia, Ini LGA Construction of Civic Centre Completed

Construction of Open Market Stalls Completed

43 Ikot Akpan Afaha, Ukanafun LGA Construction of Town Hall Completed

Construction of Assembly Hall Completed

44 Adiasim Ikot Essiendot, Essien Udim Construction of Civic Centre Completed

Construction of Culvert Completed

45 Ikot Oku Usung, Ukanafun LGA Construction of Open Market Stalls Completed

Extension of Electricity Completed

171

Sectoral Achievements Rural Development

Cassava Mill – Mkpatak-Ikot Obio Odok, Essien Udim LGA Water – Ikot Ntung, Ibiono Ibom LGA

Open market stalls in Oyubia community, Urue Offong/Oruko L.G.A

Electricity extended to households in Ikot Ukono community, Itu L.G.A

172

Sectoral Achievements Rural Development

S/N COMMUNITY LOCATED DESCRIPTION OF PROJECT REMARKS

46 Nto Uko-Obong Okpo Eto Ikot Imo, Obot Akara LGA Construction of Health Centre Completed

Renovation of Town Hall Completed

Provision of Motorized Borehole Completed

47 Ikot Eyem, Obot Akara LGA Construction of Town Hall Completed

Provision of Motorized Borehole Completed

Construction of Open Market Stalls Completed

48 Ikot Ada Utor, Essien Udim LGA Construction of Town Hall Completed

Renovation of Classroom Blocks Completed

49 Ibakesi Ikot Udo Asan, Ini LGA Construction of Classroom Blocks Completed

50 Ikot Igwe, Essien Udim LGA Construction of Civic Centre Completed

51 Ikpe Ata, Ini LGA Construction of Town Hall Completed

52 Atiamkpat, Onna LGA Completion of Civic Centre Completed

Extension of Electricity Completed

53 Ikot Ondo, Essien Udim LGA Construction of VIP Toilet Completed

Construction of Health Centre Completed

54 Uyo Obio, Ikono LGA Provision of Motorized Borehole Completed

Renovation of Town Hall Completed

Extension of Electricity Completed

173

Sectoral Achievements Rural Development

S/N COMMUNITY LOCATED DESCRIPTION OF PROJECT REMARKS

55 Eniong Offort, Uyo LGA Construction of Open Market Stalls Completed

56 Nto Ubiam, Essien Udim LGA Construction of Open Market Stalls Completed

Construction of Civic Centre Completed

Provision of Motorized Borehole Completed

57 Ikot Ebre, Ibesikpo/Asutan LGA Provision of Motorized Borehole Completed

Renovation of Open Market Stalls Completed

58 Minya Ikono, Uyo LGA Provision of Motorized Borehole Completed

Extension of Electricity Completed

59 Ikot Essien Ididep, Ibiono Ibom LGA Provision of Motorized Borehole Completed

Completion of Town Hall Completed

60 Ikot Ankit, Ibiono Ibom LGA Provision of Motorized Borehole Completed

Renovation of Town Hall Completed

61 Utu Ikot Essien, Ikot Ekpene LGA Construction of Town Hall Completed

Extension of Electricity Completed

62 Otomo, Ika LGA Extension of Electricity Completed

63 Utu Ikot Ekong, Essien Udim LGA Construction of Civic Centre Completed

64 Afaha Idoro, Uyo LGA Renovation of Town Hall Completed

Extension of Electricity Completed

174

Sectoral Achievements Rural Development

Oil Mill – Afaha Obio Eno, Ibiono Ibom LGA Civic Centre at Atai Ikwen community, Obot Akara L.G.A

Electrification Project at Ikot Ukono Community, Itu L.G.A Water – Mkpa Eto, Onna LGA

175

Sectoral Achievements Rural Development

S/N COMMUNITY LOCATED DESCRIPTION OF PROJECT REMARKS

65 Ikot Esop Nsit, Nsit Atai LGA Completion of Civic Centre Completed

Construction of Culvert Completed

Extension of Electricity Completed

66 Nung Asang Ikono, Uyo LGA Construction of Open Market Stalls Completed

67 Oduonim Isong Inyang, Urue Offong/Oruko LGA Construction of Health Centre Completed

68 Nung Ukana Ikot Efre, Ibesikpo/Asutan LGA Construction of Health Centre Completed

69 Nung Ido Ediene, Ikono LGA Provision of Motorized Borehole Completed

70 Ukana Mkpa Eyop, Abak LGA Construction of Classroom Block Completed

71 Ebo Itu Mbonuso, Ini LGA Renovation of Classroom Blocks Completed

72 Obio Etoi, Uyo LGA Construction of Open Market Stalls Completed

73 Ikot Ntuen Offot, Uyo LGA Construction of Open Market Stalls Completed

Extension of Electricity Completed

74 Ikot Akpan Essien, Oruk Anam Renovation of Classroom Blocks Completed

Construction of Civic Centre Completed

75 Ikot Udom, Obot Akara LGA Construction of Health Centre Completed

Provision of Motorized Borehole Completed

Construction of Culvert Completed

176

Sectoral Achievements Rural Development

S/N COMMUNITY LOCATED DESCRIPTION OF PROJECT REMARKS

76 Ikot Ufen, Abak LGA Provision of Motorized Borehole Completed

Construction of Open Market Stalls Completed

77 Ikot Ukpong Iman, Etinan LGA Construction of Open Market Stalls Completed

78 Ikot Essien, Essien Udim LGA Renovation of Civic Centre Completed

Installation of Transformer Completed

79 Afaha Akai, Okobo LGA Construction of Open Market Stalls Completed

80 Itie Ikpe, Ini LGA Completion of Town Hall Completed

81 Nto Ndang, Obot Akara LGA Construction of Town Hall Completed

Extension of Electricity Completed

Construction of Open Market Stalls Completed

82 Ikpe Ikot Akpan, Essien Udim LGA Extension of Electricity Completed

Renovation of Civic Centre Completed

83 Ikot Edibon, Nsit Ubium LGA Construction of Open Market Stalls Completed

Provision of Motorized Borehole Completed

Extension of Electricity Completed

177

Sectoral Achievements Rural Development

S/N COMMUNITY/LGA MICRO PROJECT

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

IKOT AKPA EDUNG/IBESIKPO ASUTAN Renovation of Town Hall

OBONG IKOT AKPAN/ETIM EKPO Provision of Motorised Borehole

URUK USO/IKOT EKPENE Construction of Viewing Centre

IKOT ABIA/MKPAT ENIN Renovation of Adult Education Centre

IKOT ONWON/IKONO Construction of VIP Toilet

EYULOR/URUE OFFONG ORUKO Renovation of Pry. School Block

OYUBIA/URUE OFFONG ORUKO Provision of Motorised Borehole

UKANA NSASAK/ESSIEN UDIM Construction of Health Staff Quarters

ATAI IKWEN/OBOT AKARA Extension of Electricity

IKOT UKONO ITAM/ITU Provision of Motorised Borehole

NSASAK AFAHA/ESSIEN UDIM Construction of Health Centre

NTO EKPE/OBOT AKARA Renovation of Pry. School Block

NSIE/OKOBO Construction of Health Centre

IKPE USUNG ITA/OBOT AKARAConstruction of Town HallConstruction of Drainage

IWERRE/INI Provision of Motorised Borehole

MBIABONG IKOT UDOFIA/INI Renovation of 2 Classroom Block

LIST SHOWING LOCATIONS OF ONGOING MPS

178

Sectoral Achievements Rural Development

S/N COMMUNITY/LGA MICRO PROJECT

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

MBIABET IKPE/INI Construction of Classroom Block

OKPOTO/INI Construction of Health Centre

ADIASIM IKOT ESSIENDOT/ESSIEN UDIM Provision of Motorised Borehole

IBAKESI IKOT UDOASAN/INI Construction of Civic Centre

IKOT IGWE/ESSIEN UDIMConstruction of Open Market StallsProvision of Motorised Borehole

IKPE ATAI/ETIM EKPO Construction of Open Market Stalls

ATIAMKPAT/ONNA Provision of Motorised Borehole

IKOT OTO NTO AMA/OBOT AKARA Construction of Town Hall

IKOT EBRE/IBESIKPO ASUTAN Renovation of Town Hall

MINYA IKONO/UYO Construction of Viewing Centre

IKOT ESSIEN IDIDEP/IBIONO IBOM Construction of Health Centre

UTU IKOT ESSIEN/IKOT EKPENE Provision of Motorised Borehole

OTOMO/IKAProvision of Motorised BoreholeRenovation of Town Hall

UTU IKOT EKONG/ESSIEN UDIMConstruction of CulvertProvision of Motorised Borehole

AFAHA IDORO/UYO Provision of Motorised Borehole

NUNG ASANG IKONO/UYO Renovation of Town Hall

179

Sectoral Achievements Rural Development

S/N COMMUNITY/LGA MICRO PROJECT

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

ODUONIM ISONG INYANG/URUE OFFONG/ORUKO Construction of Open Market Stalls

NNUNG IDIO IDIENE/IKONO Construction of Town Hall

UKANA MKPA EYOP/ABAKConstruction of Open Market StallsExtension of Electricity

EBO ITU MBONUSO/INI Extension of Electricity

OBIO ETOI/UYO Construction of Health Centre

IKOT NTUEN OFFOT/UYO Provision of Motorised Borehole

IKOT AKPAN ESSIEN/ORUK ANAM Renovation of Classroom Block

NDIYA/IKONOConstruction of Civic CentreProvision of Motorised Borehole

IKOT UFEN/ABAK Construction of Town Hall

IKOT ESSIEN/ESSIEN UDIM Construction of Open Market Stalls

AFAHA AKAI/OKOBOProvision of Motorised BoreholeConstruction of Health Centre

UTU NTO OBIO EKOP/ETIM EKPO Construction of Civic Centre

ITIE IKPE/INI Construction of Open Market Stalls

IKOT EDO IDIDEP/IBIONO IBOMConstruction of Civic CentreProvision of Motorised Borehole

IKPE IKOT AKPAN/ESSIEN UDIM Construction of Culvert

IKOT EDIBON/NSIT UBIOM Renovation of Town Hall

180

Sectoral Achievements Rural Development

Nto Edino-Ekwere Azu Road and Bridges, Obot Akara

181

Sectoral Achievements

ROADS AND BRIDGES

182

BEFORE

S/N NAME OF PROJECT CARRIAGEWAY SPECIFI-CATION

LOCATION LENGTH (KM)

WIDTH FACTOR

TOTAL LENGTH (KM)

REMARK

1. Dualization of 29.0km Etinan – Ndon Eyo Road with 2No Cable Bridges

Wizchino Engineering Limited

Dualized

Etinan/Onna 29.0 2 58

Near Completion

2.Dualization of 25.0km Uyo – Ikot Ekpene Road.

Julius Berger Nig. Plc

Dualized

Uyo, Itu, Ibiono, Ikono, EssienUdim,Ikot Ekpene

25.0 2 50Near Completion

3. Dualization of the 14.5km Uyo/Airport Junction – Okopedi Okobo Road, Phase I

Aquatix Construction Limited

Dualized Uyo/Okobo 14.5 2 29 Ongoing

4. Dualization of the 13.5km Okopedi – Oron Road by East-West Road Phase II

CCECC Limited Dualized

Okobo/Oron 13.5 2 27 Ongoing

5. Construction/Remodeling of Selected Roads, Strategic Roundabouts/Junctions in Eket Metropolis (Phases 1 & II). (1.6km Dualized & 2.2km expanded Carriageway (10m)

Nigerpet Structures Limited

Dualized/Single

Eket

1.6/2.2

2/1 5.8Phase INear Completion

6. Construction of Proposed 55.1km Ibom Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA)

Ebla Construction Limited

Dualized

Eket,Ibeno,Esit EketMbo

55.1 3 330.6 Ongoing

7. Dualization of the 19.5km Eket – Ibeno Road

CCECC Nigeria Ltd.

DualizedEket/Ibeno 19.5 2 39 Completed

Since the advent of Governor Udom Emmanuel, there has been a quantum leap in the number of roads and bridges constructed by the State government. So far recorded are over 1,700km of roads, and 40 bridges have been undertaken in addition to rehabilitation of many rural roads across the State. These include:

ROADS AND BRIDGES:

183

Sectoral Achievements

Completedsection

Before

After

After

After

Dualized Eket – Ibeno Road

184

Sectoral Achievements Roads and Bridges

Construction of Ikot Usop – Ikot Edeghe – Ikot Ekpuk Road with a 30m Span Bridge

Before

After

After

After

185

Sectoral Achievements Roads and Bridges

186

Sectoral Achievements Roads and Bridges

Uyo – Ikot Ekpene Road under construction

Awa Iman Road, Onna

Before

After

187

Sectoral Achievements Roads and Bridges

S/N NAME OF PROJECT CARRIAGEWAY SPECIFI-CATION

LOCATION LENGTH (KM)

WIDTH FACTOR

TOTAL LENGTH (KM)

REMARK

8. Dualization of 23.4km Eket – Etinan Road with 3Nos Bridges

CCECC Nigeria Ltd.

DualizedEket/Etinan 23.4 2 46 Ongoing

9. Dualization of 20.0km Uyo – Etinan Road (Ikot Oku Ikono) Julius Berger Plc Dualized

Uyo/Etinan 20.0 2 40 Ongoing

10. Dualization of 9.5km Ring Road III (From Aka Road – Oron Road – Nwaniba Road) with 3No Roundabounts

Hensek Integrated Services Limited

Dualized

Ibesi-kpo/Uyo

9.5 2 19 Ongoing

11. Dualization of 3.5km Ring Road II Qumecs Nig. Limited

DualizedUyo

3.5 2 7.0 Ongoing

12. Construction of 15.1km Ndon Eyo – Ikot Akpatek – Odio Road

VKS Nigeria Construction Limited

Dualized/Single

Onna/Eket 6/9.1 2/1 21.1 Ongoing

13. Construction of 2.1km Road Around State Secretariat Annex and Believers Assembly, Mbiabong Etoi, Uyo

Hamattan Construction Co. Limited

Dualized/Single

Uyo2.1 1 2.1 Completed

14. Construction of the 14.1km Odoro Ikpe – Ikpe Ikot Nkon – Obotme – Arochukwu Road with 110m Bridge through Alternative Project Funding Approach (APFA)

Messrs Peculiar Ultimate Concerns Limited

Single

Ini

14.1 1 14.1Near Completion

15. Construction of 6.41 km Nto Edino – Ekwere Azu Road with 2 45m Span Bridges in Obot Akara Local Government Area

Seyang Limited SingleObot Akara

6.41 1 6.41 Completed

188

Sectoral Achievements Roads and Bridges

Before

After

After

After

Idiaba – Nda Nsit - Ikot Abasi (Nung Udoe) Road

189

Sectoral Achievements Roads and Bridges

16. Construction of 23.25km Ikot Ekaide – Ikot Okoro – Ikot Ibritam Road in Oruk Anam Local Government Area.

Landsea Construction & Engineering

Single

Oruk Anam

23.25 1 23.25 Ongoing

17. Construction of 18.95km Ikot Ibritam – Ekeffe – Ikot Akpan Afaha Road with 1 Bridge in Oruk Anam Local Government Area

Almajdal Limited Single Oruk Anam 18.95 1 18.95 Ongoing

S/N NAME OF PROJECT CARRIAGEWAY SPECIFI-CATION

LOCATION LENGTH (KM)

WIDTH FACTOR

TOTAL LENGTH (KM)

REMARK

18. Construction of 1.5km Nsikak Eduok - Tropicana Outfall Drain

Julius Berger Nig. Plc

Single Uyo 1.5 1 1.5 Completed

19. Construction of the 6.1km Atan Offot Road in Uyo Local Government Area

Nigturks Civil Technologies Limited

Single Uyo 6.1 1 6.1 Completed

20. Construction of 6.0km Idiaba – Nda Nsit–Ikot Abasi (Nung Udoe) Road in Nsit Atai Local Government Area

Cossel Construction Company Nigeria Limited

Single Nsit Atai 6.0 1 6.0 Completed

21. Construction of 5.0km Ikot Usop – Ikot Edeghe – Ikot Ekpuk road with a 30m Span Bridge in Mkpat Enin Local Government Area

Benest Technical Services Limited.

Single Mkpat Enin 5.0 1 5.0 Completed

22. Construction of 13.5km Ikot Ebiere – Ikot Edor –Ikot Iko Ibon – Okom Road And Ukpana – Akpabom – Ikwe Road in Onna and Mkpat Enin LGAs

Beijing Jindi Xinxheng Company Nig Ltd.

SingleOnna/Mkpat Enin

13.5 1 13.5

Phase I CompletedPhase II Ongoing

23. Construction of 9.5km Ikot EbekpoIkot Ebidang Road with 1 Jetty

Benest Technical Services Limited

Single Onna 9.5 1 9.5Near Completion

190

Sectoral Achievements Roads and Bridges

Completedsection

25

Before

After

After

Gully Erosion Control Facilities at Oron/Isangedighi Road, Oron Urban

After

191

Sectoral Achievements Roads and Bridges

Completedsection

Completedsection

Before

AfterEtinan- Ndon-Eyo Road

After

192

Sectoral Achievements Roads and Bridges

S/N NAME OF PROJECT CARRIAGEWAY SPECIFI-CATION

LOCATION LENGTH (KM)

WIDTH FACTOR

TOTAL LENGTH (KM)

REMARK

24. Construction of 12.742 km Awa Iman – Asong – Ikot Edim – Ikot Emem Road with 2 Bridges in Onna and Mkpat Enin Local Government Areas

VKS Nig. Construction Limited.

SingleOnn/Mkpat Enin

12.742

1 12.742 Near Completion

25. Construction of 10.8km Awa – Nkana Road and 2.3km Ancillary Roads in Awa Village in Onna Local Government Area

VKS Nig. Construction Limited

Single Onna 13.1 1 13.1 Ongoing

26. Construction of 2.6km Abak Urban Roads

Hensek Integrated Services

Single Abak 2.6 1 2.6 Ongoing

27. Construction of 19.317km Anua – Mbak – Ishiet Road

Verini Constr. Co. Ltd.

Single Uyo/Uruan 19.317 1 19.317 Ongoing

28. Construction of 5.1km Internal Roads in Akwa Ibom State University, Obio Akpa

J. P. Sigma Nigeria Limited.

Single Oruk Anam 5.1 1 5.1Near Completion

29. Construction of 3.5km Ikot Udom Road with 15m Span Bridge in Ibiono Ibom LGA.

Verini Construction Co. Ltd.

Single Ibiono 3.5 1 3.5 Completed

30. Remodeling/Rehabilitation of Selected Roads, Strategic Junctions & Roundabouts In Uyo Metropolis, Phase I

Nigerpet Structures Limited

Expanded Carriage/Special features

Uyo 1.5 1.5 2.25 Ongoing

31. Emergency Rehabilitation of Okopedi Road By Community Health Centre Through Oti – Oron in Okobo L.G.A

Jafaar Limited

Construc-tion of culvertpavement overlay

Okobo/Oron

0.185 1 0.185 Completed

193

Sectoral Achievements Roads and Bridges

During Construction

After

Ikot Udom Road

194

Sectoral Achievements Roads and Bridges

32. Construction Of Gully Erosion Control Facilities at Oron/Isangedighi Road, Oron Urban

Nigerpet Structures Ltd.

Construction of Erosion Control Structures/other special features

OronCompleted

33. Emergency Works in the Completion of Oron Urban Road (6.3km) (Additional Works)

Wizchino Engineering Limited

Single Oron 6.3 1 6.3Phase 1 Completed

34. Construction of 14.0km Abak-Nsekhe – Ikot Akpa Nkuk – Ikot Etim – Ikot Ikara (Phase III Section A) Ikot Ikara to Ibesit Okpokoro

JMK Construction Company Ltd.

SingleAbakUknafun/OrukAnam

14.0 1 14 Ongoing

35. Construction of 9.76km Ancillary Roads with a 60m Span Bridge in NsitUbiumLGA

Bulletin Construction Company Ltd.

Single Nsit Ubium 9.76 1 9.76 Ongoing

36. Construction of 1.3km Ntiedo Udosen Street

Grapaviv Nigeria Limited

Single Uyo 1.3 1 1.3 Completed

37. Construction of 4.0km Mbiatok Ekritam - Mbiaya Uruan Road with Spur

Trident Energy System Ltd.

Single Itu/Uruan 4.0 1 4.0 Ongoing

38. Construction of 5.0km Mkpok Okat Road

Hensek Integrated Services Limited

Single Onna 5.0 1 5.0 Completed

S/N NAME OF PROJECT CARRIAGEWAY SPECIFI-CATION

LOCATION LENGTH (KM)

WIDTH FACTOR

TOTAL LENGTH (KM)

REMARK

195

Sectoral Achievements Roads and Bridges

After

BeforeMkpok-Okat Road, Onna

196

Sectoral Achievements Roads and Bridges

39. Construction of 19.0km Etebi – Enwang Road Project with 2No. Bridges

Amitec Construction & Development Ltd.

SingleMbo/EsitEket

19.0km

1 19.0km

Ongoing

40. Dualization of proposed 47.54km Abak - Ekparakwa – Ikot Abasi Single

Abak, Oruk Anam, IkotAbasi

47.54 2 95.08Awaiting Award

41. Construction of 8.5km Nduetong Oku IbiakuUruan – Ekritam Road & Spur in Itu/Uruan Local Government Area, AkwaIbom State, Under the Alternative Project Funding Approach (APFA)

Salvabogu Nigeria Limited

Single Itu/Uruan

8.5 Ongoing

42. C o n s t r u c t i o n o f 1 3 . 1 3 k m Akpambiet Edo – Edida Edo - Ebeekpe road, Ndon Edim – Idung Akpantuen road with Spurs and Rehabilitation of 1.7km Uquo Isi Edoho – Edo road, in Esit Eket Local Government Area

Benest Technical Service Limited

Single

EsitEket 1

8.5 Ongoing

43. Construction of 1.05km Information Drive, Uyo

Benest Technical Services Ltd.

Single Uyo 1.05km 1 1.05km

Completed

44. Construction of 4.6km School of Arts and Science Road, Nung Ukim, Ikono Local Government Area

Messrs HensekIntegrated Services Limited

Single Ikono 4.6km

1 4.6km Completed

S/N NAME OF PROJECT CARRIAGEWAY SPECIFI-CATION

LOCATION LENGTH (KM)

WIDTH FACTOR

TOTAL LENGTH (KM)

REMARK

13.13km

197

Sectoral Achievements Roads and Bridges

198

Sectoral Achievements Roads and Bridges

Uyo-Etinan Road, EtinanBefore

After

Atlantic FM Road, Uyo

After

Before

199

Sectoral Achievements Roads and Bridges

S/N NAME OF PROJECT CARRIAGEWAY SPECIFI-CATION

LOCATION LENGTH (KM)

WIDTH FACTOR

TOTAL LENGTH (KM)

REMARK

45. Construction of 9.0km Mbiaya Uruan - Ita – Ikpa – Mbiakong Uruan Road with 60m Span Bridge in Uruan Local Government Area through Alternative Project Funding Approach (APFA)

Zenith Construction Limited

Single Uruan 9.0km 1 9.0km Ongoing

46. Construction of 4.94km Ibesit Okpokoro - Ikot Ibritam in Oruk Anam Local Government Area

Nsik Engineering Company Limited

Single Oruk Anam 4.94km

1 4.94km

Ongoing

47. Construction of 5.0km EwetHousing Extension

Bulletine Construction Limited

Single Uyo 5.0km 1 5.0km Near Completion

48. Construction of 9.0km Secretariat – Ulliong Edikor – Udueta Road With Spur in Udung Uko Local Government Area, through Alternative Project Funding Approach (APFA)

Evomec Global Services Limited

Single Udung Uko 9.0km 1 9.0km Near Completion

49. Construction of 4.2km AbakIfia – Ikpe Mbak Eyop – Ikot Abia Osom – Nko Road and Spurs in Ikot Ekpene and Obot Akara LocalGovernment Areas.

GracibInvestment Limited

Single Ikot Ekepne/Obot Akara

4.2km 1 4.2km Ongoing

50.Emergency Work in the completion of Oron Urban Road

Wizchino Engineering Limited

Single Oron 6.3km 1 6.3km

200

Sectoral Achievements Roads and Bridges

Completed section of dualized Eket-Etinan Road with 3 Bridges Before

After

201

Sectoral Achievements Roads and Bridges

51 Construction of Ibekwe - Ikot Akata Road (Section 1)/ Ikot Unya- Ekpuk Road (Section 11) with 2 20m Span Bridges in Mkpat Enin L.G.A under APFA

Single Mkpat Enin 24.715km

1 24.715km

52. Construction of 18.97km Abak 10 –Nko Otoro – Manta Road with Spur in Abak Local Government Area.

J. P. Sigma Limited

Single Abak

18.97km

1

18.97km

Ongoing

53. Construction of 12.15km Enen Nsit - Obotong - Ikot Enwene – Edebom – Oboetuk – Ikot Obok – Mbiakom – Obo Atai -Oboyo Ikot Ita in Nsit Ibom and Ikot Akpa Edu – Ikot Iko - Ikot Akpan Abia Road in Ibesikpo Asutan LGA with 30m Span Bridge in Ibesikpo Asutan LGA.

HP Constructing Company Ltd.

Single Ibesikpo/NsitIbom

12.15km

112.15km

Ongoing

54. Construction of 15.13km Ikot Esu – Otomo – Azumini Road in Ika Local Government Area

Cossel Construction Company Nigeria

Single Etim Ekpo/Ika 22.0k

m

1

22.0km

55. Construction of 5.0km T Junction - Mary Slessor Hospital Road with 30m span Bridge.

Single

Itu 5.0km 1 5.0km

56. Construction of 15.0km Ikot Akpan Afaha – Ikot Oku Usung Road with Spurs in Ukanafun Local Government Area

Single

Ukanafun 15.0km

1 15.0km

S/N NAME OF PROJECT CARRIAGEWAY SPECIFI-CATION

LOCATION LENGTH KM

WIDTH FACTOR

TOTAL LENGTH KM

REMARK

202

Sectoral Achievements Roads and Bridges

During Construction

After

Ikot Iko Ibon-Okom Road

203

Sectoral Achievements Roads and Bridges

57. Construction of 6.36km Ikpe Mbak Eyop – Ikot Abia Osom – Nko Road In Obot Akara Local Government Area

Flash-Points Technical Services Limited

Single Obot Akara 6.36km

1 6.36km

58. Construction Of Urua Naria- Ikot Nseyen - Ikot Umo Essien - Nkwot - Nung Ukim Road and 45m Span Bridge in Ikono L. G. A. Akwa Ibom State

Single Ikono 16.232km

1 16.232km

59. Construction Ikot Nseyen- Ibakachi - Ikot Esen - Urua Edet Road, Ini Ikono L.G.A. through APFA

SingleIni 7.72

km

1 7.72km

60. Construction of Government Model Girl Secondary School Road, Ikot Ekan, Abak

Single

Abak

1.5km

1

1.5km

Near Completion

61. Construction of Ikot Ekan - Ediene Abak Road, Abak

SingleAbak 8.3km 1 8.3km

62. Construction of 2.05km Minya-Ikot Akpa Enin Road with 20m span bridge

Single

2.05km

1 2.05km

63. Construction of 3.75km Phase II (Additional Works at Ikot Udom - Ikot Essiet - Utit Obio Road).

Single

IbionoIbom 3.75km

1 3.75km

64. Construction of 3.1km Ikot Ekwere - Ikot Ebom Itam Road (Quality Ceramics)

Single

Itu

3.1km

1

3.1km

S/N NAME OF PROJECT CARRIAGEWAY SPECIFI-CATION

LOCATION LENGTH (KM)

WIDTH FACTOR

TOTAL LENGTH (KM)

REMARK

204

Sectoral Achievements Roads and Bridges

Youth Avenue, Uyo

Awana Esin Road, Oron Road in Ibaka, leading to Delmar Petroleum Harbour and Tank Farm

205

Sectoral Achievements Roads and Bridges

Internal Roads, Akwa Ibom State University, Obio Akpa Campus

S/N NAME OF PROJECT CARRIAGEWAY SPECIFI-CATION

LOCATION LENGTH (KM)

WIDTH FACTOR

TOTAL LENGTH (KM)

REMARK

65. Construction of 6.4km Utu Ikot Ekpo – Ika Road (Phase I) in Etim Ekpo Local Government Area

Single

Etim Ekpo

6.4km

�1

6.4km

66. Construction of 2.621km Spur Roads to Utu Ikot Ekpo – Ika Road (Phase II) in Etim Ekpo Local Government Area

Single

Etim Ekpo 2.621km

1 2.621km

67.

68

Construction of 17.8km Ikot ukpo Inua – Ikot Etenge Ndon – Atan Eka Iko – Ikot Akpabio – Ikot Okpok – Ikot Efre - Atan Ikpe Road With 4 Spurs, 1 120m And 2 15m Span Bridges In Ikot Abasi Local Government Area, Akwa Ibom State.Construction of Ikot Oku Ikono flyover

Single

Ikot Abasi17.8km

�1

17.8km

After

Before

Information Drive, Uyo

206

Sectoral Achievements Roads and Bridges

OngoingUyo

S/N PROJECT DESCRIPTION L.G.AAWARDED OR NOT YET AWARDED

REMARKS

Idongesit Henry Crescent (0.50km) Uyo Replaced

Ebong Lane (0.15km) Uyo Awarded Completed

Ebong Street (0.19km) Uyo Awarded Completed

Asutan (0.61km) Uyo Awarded Completed

Akparen Street (0.25km) Uyo Awarded Completed

Ibiono Lane (0.18km)

NearCompletion

Uyo Awarded

Etoi Street (0.25km) OngoingUyo Awarded

1

2

3

4

5

6

7

8

9

10

11

12

13

14

Nung Atai (0.54km) Uyo Awarded Ongoing

Umoren Extension (0.15km) Uyo AwardedYet to Commence

Library Avenue (0.21km) Uyo AwardedYet to Commence

Udotung Ubo Lane (0.16km) Uyo Awarded Completed

Afaha Etok Ibesikpo (2.7km) Awarded Ongoing

Afaha Ikot Obio Nkan (1.5km) Ibesikpo Awarded Completed

Afaha Atai Village Crescent (2.5km) Ibesikpo Awarded Ongoing

INTERVENTION PROJECTS

207

Sectoral Achievements Roads and Bridges

Before

After

Before

After

Afaha Ikot Obio Nkan Road Uyo.

Aka Community Roads.

Before

AfterHeritage Polytechnic Road, Eket.

208

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

15

16

17

18

19

20

21

22

23

24

25

26

27

28

Renovation of Secondary School Blocks/Fence at Ikot Akpan Ishiet

Onna Awarded Ongoing

Construction of Temporary Access to AKSU Campus, Ikot Akpaden, Mkpat Enin LGA

Mkpat Enin Awarded Ongoing

Construction of 3.0km Osiok Iko Eket Eket Awarded Ongoing

Construction of 2.7km Ikot Abasi Road in Eket Local Government Area

Eket Awarded Ongoing

Emergency Completion of Ikot Akpan Abia Road, Akwa Ima Estate Extension, off Goodluck Jonathan Boulevard

Uyo Awarded Ongoing

Ikot Udota – Ikot Afaha Road (2.0km) Eket Awarded Ongoing

College of Education Access Road Nsit Ibom Awarded Completed

Nim Nnong Road (1.6km) Eket Do

Ikot Ibiok – Ikot Udota Raod (0.9km) Eket Do

Odoho Oku – Ekpene Ibiok Nsehs Eket Do

Etebi Ikot Udota - Ikot Abasi Road (1.12km) Eket Do

Etebi Street (1.0km) Eket Do

Okopedi Street (1.5km) Eket Do

Edem Udo Street (1.0km) Eket Awarded Completed

L.G.A

209

Sectoral Achievements Roads and Bridges

Before

After

Before

After

Before

After

Akpasak Extension.

Akparen Street, Uyo.

Akpa Ube Road.

210

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

29

30

31

32

33

34

35

36

37

38

39

40

41

42

Enen Ekpene Street (0.8km) Eket Awarded

Ikot Udota James Town (0.48km) Eket Do

Pastor Umoren Avenue, Shelter Afrique, Uyo Uyo Do Ongoing

Access Road to Heritage Poly, Eket. Eket Awarded Completed

Adaha Ekpe Tutu Road (0.63km) Eket Do

Uqua – RCC Road (1.8km) Eket Awarded

Park Road - Park Avenue (0.45km) Eket Awarded Completed

Clinic Road (0.5km) Eket Awarded Ongoing

Okpong Okpong Street (1.5km) Eket Do

F-Line Ewet Housing (2.34km) Uyo Do Ongoing

A-Line Ewet Housing (1.0km) Uyo Awarded Ongoing

Vision Close, Nsukara (0.30km) Uyo Awarded Ongoing

Akpasak Extension (1.5km) Uyo Awarded Completed

Chief Whip Road, Ewet Housing (160km) Uyo Awarded Completed

L.G.A

211

Sectoral Achievements Roads and Bridges

Before

After

Before

After

Before

After

Asutan Street, Uyo.

Bassey Attah Street, Uyo.

Effiong Akpan Street, Uyo.

212

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

43

44

45

46

47

48

49

50

51

52

53

54

55

Graceland School Road, Shelter Afrique (1.0km) Uyo Awarded Completed

Mechanic’s Village – Udosen Udoyen - `GWT Filling Station (2.1km)

Uyo Awarded Ongoing

Internal Roads in Asongama Uyo Do Ongoing

Internal Roads in Shelter Afrique (5.0km) Shelter Uyo Do

Mbiabong Ikot Antem – Mission Road – Ifa Ikot Okpon – Loop with 500m Outfall Drain (4.5km)

Uyo Do

Eda Street, Ekpri Nsukara, off Nwaniba and Environs (4.0km)

Uyo Do

Akpa Ube Close off IBB Way (1.8km). Uyo Awarded Ongoing

John Udo Akpan Street, off Oron Road (2.5km) Uyo Awarded Ongoing

Aka Community School Road with Spur to Aka Road by “C” Division Police Station

Uyo Awarded Completed

Construction of 1.1km Tabernacle road off Ikot Ekpene Road with outfall drain

Uyo Awarded Ongoing

Proposed Completion of Nung Ette - Shelter Afrique Dual Carriage

Uyo Awarded Ongoing

Construction of Akpa Ube Crescent by AKEES Office Opposite Ibom Hall Ibom Hall and its environs (0.5km)

Uyo Awarded Completed

Access Road to Atlantic FM and its environs Uyo Awarded Completed

L.G.A

213

Sectoral Achievements Roads and Bridges

Before

After

Before

After

Before

After

Concrete Hotel Road.

College Of Education Access Road, Afaha Nsit.

Atlantic Fm Road, Uyo.

214

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

56

57

58

59

60

61

62

63

64

65

66

67

68

Gloria Anana Street, Asongama Estate (0.95km) Uyo Awarded Ongoing

Construction of 1.0km All Grace School Road and Prof. Offiong Street in Shelter Afrique

Uyo Awarded Completed

Construction of 2.08km Assam Crescent in Ede Urua Eket Local Government Area

Eket Awarded Ongoing

Construction of 2.51km Obio Etoi road by Godswill Akpabio International Stadium in Uyo/Nsit Ibom Local Government Area

Uyo/Nsit Ibom Awarded Ongoing

Construction of 0.35km Youth Avenue (Winners Chapel Mbiabong Road) in Uyo Local Government Area

Uyo Awarded Completed

Construction of 1.0km Redeem Church Road, Afaha Etok, Ibesikpo Local Government Area

Ibesikpo Awarded Completed

Construction of Concrete Hotel Road and other spurs in Ewet Housing Estate

Uyo Awarded Completed

Completion of Ediye Street, Akpan Andem Street, Stallion Hotel Road in Ewet Housing Estate

Uyo Awarded Completed

Model Girl’s Secondary School, Ikot Ekan Abak Abak Awarded Completed

Internal Roads in College of Education Nsit Ibom Awarded Ongoing

Completion of Emmanuel Bassey Uyo Awarded Completed

Construction of 0.58 Marcel off Syvanus Okon Uyo Awarded Ongoing

Construction of 1.9km Mbiabong Ikot Antem, Ifa Ikot Okpon Road

Uyo Awarded Ongoing

L.G.A

215

Sectoral Achievements Roads and Bridges

After

After

After

Youth Avenue.

Udotung Ubo Lane Uyo.

Udokang Street

Before

Before

Before

216

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

70

71

72

73

74

75

76

77

78

79

80

81

82

69 Construction of 0.5km Pastor Praise Okon Street Uyo Awarded Ongoing

Youth Avenue Extension Uyo Awarded Ongoing

Construction of 1.33km Nungette Crescent Uyo Awarded

Construction of 1.8km Heartland School Road, Osongama Estate, Uyo

Uyo Awarded Ongoing

Usanga Udo/Emco Lane Uyo Awarded Completed

Construction of 0.5km Effiong Udo Akpan Uyo Awarded Completed

Construction of 0.215km Justice Edet Nkop Street Uyo Awarded Completed

Construction of 0.250km Ebong Akpan Inyang Street, Abak

Abak Awarded

Construction of 0.250km Obio Odot Street, Abak Abak Awarded Completed

Rehabilitation of Ekpene Ukpa Street, Eket Eket Awarded Completed

Construction of 3.3km Idua Road, Eket Eket Awarded Ongoing

Rehabilitation of Apostolic Road, Eket Eket Awarded Completed

Construction of SDP Road, Eket Eket Awarded Completed

Construction of Udo Umoh Steet, Eket EketNot yet awarded

L.G.A

217

Sectoral Achievements Roads and Bridges

Before

After

Before

After

David Lawrence

Ebong Street, Uyo.

Before

AfterJustice Edet Nkop Street, Shelter Afrique.

218

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

83

84

85

86

87

88

89

90

91

92

93

94

95

96

Construction of 1.3km Frank Archibong Road, Eket

Eket Awarded Completed

Construction of 0.31km Akpa Isang Street Eket Awarded Ongoing

Construction of 0.18km Lakins Smith Street EketNot yet awarded

Construction of 0.52km Ukpong Street Eket Awarded Ongoing

Samuel Effanga Crescent Uyo Awarded Ongoing

Akpasak Estate Access Road Uyo Awarded Ongoing

Construction of School Building: Assembly Hall/Class Room Blocks/ Teachers' Quarters/ Laboratory Complex in Iwukem High School.

Etim Ekpo Awarded

David Lawrence Crescent/Emmanuel Enoidem Street in Shelter Afrique,

Uyo Awarded Ongoing

Nung Ette Lane, Shelter Afrique Uyo Awarded

Construction of 2.4km Afaha Akpan Ekpo Road and its Environ in Etinan.

Etinan Awarded

Ongoing

Construction of 1.8km Afaha Ube Itam Road and Itam Market Environment

Itu Awarded Ongoing

Construction of 0.64km AKADEP Road through Shelter Afrique to Udo Udoma Avenue

Uyo Awarded Ongoing

Construction of 0.8km Paul Ekpo Crescent in Shelter Afrique in Uyo.

Uyo Awarded Ongoing

Construction of 0.58km Daniel Bassey AvenueShelter Afrique

Uyo Awarded Ongoing

L.G.A

219

Sectoral Achievements Roads and Bridges

Before

After

Before

After

Before

After

Effiong Udo Akpan.

Edem Udo Street Eket.

Edem Udo Lane, Eket.

220

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

97

98

99

100

101

102

103

104

105

106

107

108

109

110

Akwa Efak Extension by Oron Road Uyo Awarded Completed

Construction of 0.2km Ibeno Street Awarded Ongoing

Comfort FM Environment

Construction of 1.82km Covenant City Road Mbierebe Obio

Ibsekpo Awarded Ongoing

Construction of 1.95km Fishery Terminal Junction to Esuk Utte Beach, Oduo Ebughu

Mbo Awarded Ongoing

Construction of 0.465km Elvis Okpo Abasi Street

Oron Awarded Ongoing

Construction of 0.305km Spring Road Oron Awarded Ongoing

Construction of Police Children School Facilities/Additional Works for Aka Community Sch. Road

Uyo Awarded Ongoing

Construction of Sir Mendie/Ekpenyong Okon Street

Uyo Awarded Completed

Construction of 1.1km Prelate Mbang Street/Owoidoho Close/Lucy Bassey Street

Eket Awarded Completed

Construction of Perimeter Fence/Renovation of Admin Block/Hall at Police Station, Onna

Onna Awarded

Re-Contruction of Akpabio Udo Ukpa Stadium. Onna Awarded Completed

Construction of Rev. Akwatang Road –Rev. Amaowo Road (1.0km - 320m)

Awarded Ongoing

Construction of 1.75km Mkpaeto – Ndudot Road

Awarded

L.G.A

221

Sectoral Achievements Roads and Bridges

Before

After

Before

After

Before

AfterGovernment Model Girls Secondary School, Ikot Ekang, Abak Lga.

Frank Archibong Rd, Eket.

Ekpene Ukpa Street, Eket.

222

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

111

112

113

114

115

116

117

118

119

120

121

122

123

124

Construction of 0.5km Victor Umondak Crescent Awarded Ongoing

Flood Control at Ekpene Obom in Esit Eket Awarded Ongoing

Construction of 0.320km Pastor Nicholas Ekarika Street

Awarded Ongoing

Construction of Additional Works at Ikot Udota -

Resurfacing of Silvanus Okon Avenue Awarded Ongoing

Deflooding of College of Education Awarded Ongoing

Road Grading in Ukana Ikot Ankan Awarded Completed

Agric Faculty/Green House Road in Obio Akpa Awarded Ongoing

Emergency Intervention/Flood Control at Shelter Afrique Entrance

Awarded Ongoing

Internal Road in Ikot Okoro (1km) Awarded Ongoing

Utang Lane by Sifon Clinic Awarded Completed

Construction of TAF-Plaza Close Awarded Completed

Construction of Mbiabong Ikot Essien RoadPhase II

Awarded Ongoing

Rev. Amawo – Mbiabong Ikot Essien Road Phase I

L.G.A

Essien Udim

223

Sectoral Achievements Roads and Bridges

Before

After

Before

After

Before

After

Idua Road, Eket.

Ibiono Lane, Uyo.

Graceland School.

224

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

125

126

127

128

129

130

131

132

133

134

135

136

137

138

Six Class Room Block at St. Paul Catholic Primary School, Minya/ikot Udo, Mkpat Enin

Awarded

Six Class Room Block at Community Primary School Ikot Akpan Okop, Mkpat Enin

Uyo Awarded

Spring Road off Ekpri Nsukara Road Uyo

Access Road to Afe Nkuku Anang Hall Uyo Awarded Ongoing

Road Around Secretariat Annex and Believers' Assembly (2.1km)

Uyo Awarded Completed

Construction of Ntiedo Udosen Street (1.3km) Uyo Awarded Completed

Construction of Pastor Umoren Lane (0.4km) Uyo Awarded Ongoing

Emergency Reconstruction and Asphalt Overlay of 1.8km Jetty Road in Mkpanak

Awarded

Emergency Reconstruction of 1.3km Apostolic/Choppy

Awarded

Emergency Rehabilitation of 0.28km Technical School Road in Mkpanak

Awarded

Emergency Rehabilitation of 0.72km College Road Not awarded

Reconstruction of Stadium Road in Abat Awarded

Renovation of Ministry Of Works Area Office Awarded Ongoing

Construction of Roads and Completion of Drains in Ikot Ukpong – Ikot Obio Atai in Okon Eket

Awarded Ongoing

Ukanafun

ONNA

Do

Ibeno

Ibeno

L.G.A

225

Sectoral Achievements Roads and Bridges

Before

After

Before

After

Before

After

Justice Edet Robert Nkop Avenue.

Ikot Udota Rd, Eket.

Ikot Odiong-ikot Abasi Road ,eket Lga.

226

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

139

140

141

142

143

144

145

146

147

148

149

150

151

152

Construction of 0.8km Edem Urua Street in Itiam

Awarded Ongoing

Construction of Ikot Ese Ishiet Link Road to Abak Ishiet

Not awarded

Construction of 0.52km Essien Inyang Street, off Udoette Street

Uyo Awarded

Construction of Sundubros industrial Road Uyo Not awarded

Mbokpu – Eyo Akan – Ukuda Road Urue Offong/Oruko

Not Awarded

Construction of 1.0km Friday Iwok Street in Shelter Afrique

Uyo Not Awarded

Construction of Ofuk – Nduo Eduo Eket Road.

Eket

Rehabilitation of an Overlay of 2.1km Mbikpong Ikot Edim – Afaha Ikot Edim Road

Ibesikpo

Construction of 0.91km Sir Mendo – Edem George Street in Akpasak Estate.

Uyo Awarded Ongoing

Construction of 2.0km Internal Road in Ikot Akpabin

Ibesikpo Awarded Ongoing

Construction of 2.0km Nung Obion Enang, Edem Idim Road

Uyo Awarded Ongoing

Construction of 0.6km Obot Atan Road in Ikpe Mbak Eyop

Obot Akara Awarded Ongoing

Construction of 0.35 Etuk Okpob Street in Shelter Afrique.

Uyo Awarded Ongoing

Construction of 0.69 Gen. Koko Essien Avenue, Shelter Afrique

Uyo Awarded Ongoing

ONNA

Uyo

L.G.A

227

Sectoral Achievements Roads and Bridges

Before

After

Before

After

Before

After

Obong Paul Ekpo Crescent.

Obio Ndot Street, Abak.

Lucy Bassey Street, Eket

228

Sectoral Achievements Roads and Bridges

S/N PROJECT DESCRIPTIONAWARDED OR NOT YET AWARDED

REMARKS

153

154

156

157

158

159

160

161

162

163

164

Special Education – Tropicana Road (350m) Uyo Awarded Ongoing

Albert Suit (L-Line) Ewet Housing Estate) Uyo Awarded Ongoing

Admiral Udofia Avenue

Ben Iyah Street (620m) Awarded Ongoing

Ebong Akpakpan Street Awarded Ongoing

Clement Udo Street (200m) Awarded Ongoing

Construction of Internal Road Awarded Ongoing

Construction of 0.71km Esin Ufot Edoho Street Eket Awarded Ongoing

Emergency Construction of 0.9km Ikot Ata Udo Road

Ikot Abasi

Repairs of failed section of the State Roads

Construction of Internal Roads

Ongoing

L.G.A

ONNA

ONNA

229

Sectoral Achievements Roads and Bridges

Before

After

Before

After

Before

After

Redeemed Church Road Afaha Etok.

Prof. Offiong Street, Shelter Afrique.

Osiok, Ebe Ekpe-iko Eket Road.

230

Sectoral Achievements Roads and Bridges

231

Sectoral Achievements Roads and Bridges

Construction of Ibom Super Highway (Ongoing)

Model

232

Sectoral Achievements Roads and Bridges

Construction of Flyover, Ikot Oku Ikono Junction, Uyo (Ongoing)

1. AKA ETINAN ROAD MULTIPLE POTHOLES COMPLETED

2. SERVICE LANE (EDET AKPAN AVENUE) PARTIAL RECONSTRUCTION /POTHOLES COMPLETED

3. NOAH UDO STREET PARTIAL RECONSTRUCTION COMPLETED

4. ETIM EKPO ROUNDABOUT PARTIAL RECONSTRUCTION COMPLETED

5. BROOKS STREET MULTIPLE POTHOLES COMPLETED

6. EKET – ORON ROAD. MAJOR PATCHING WORKS / POTHOLES COMPLETED

7. ENEN - NSIT ROAD MAJOR PATCHING /POTHOLES COMPLETED

8. OKOKON ETUK STREET PARTIAL RECONSTRUCTION COMPLETED

9. ABAK ROAD MULTIPLE POTHOLES COMPLETED

10. AKPAN EKPO CRESCENT, SHELTER AFRIQUE MULTIPLE POTHOLES COMPLETED

11. UDO UMANA BY AKPAN ANDEM MKT, UYO MAJOR PATCHING WORK COMPLETED

12. AKA ITIAM STREET MULTIPLE POTHOLES COMPLETED

13. EKIM ITAM JUNCTION, CALABAR – ITU – HIGHWAY MAJOR PATCHING WORK COMLPETED

14. IKPA ROAD MULTIPLE POTHOLES COMPLETED

15. AKTC PARK ROAD, ITAM PARTIAL RECONSTRUCTION COMPLETED

16. ITAM POLICE STATION PARTIAL RECONSTRUCTION COMPLETED

17. IKOT EKPENE – ABA ROAD. MULTIPLE POTHOLES COMPLETED

18. NWANIBA ROAD MAJOR PATCHING WORKS / POTHOLES COMPLETED

19. AFAHA OFFIONG – NUNG UDOE ROAD MULTIPLE POTHOLES COMPLETED

S/N COMMUNITY/LGA MICRO PROJECT

PROJECTS HANDLED BY AKWA IBOM ROADS AND OTHER INFRASTRUCTURE MAINTENANCE AGENCY (AKROIMA)

AS INTERVENTION IN THE YEAR 2017/2018 ROAD REHABILITATION ACROSS AKWA IBOM STATE

20. DEPUTY GOVERNOR'S CAR PARK, GOVERNOR'S

OFFICE, UYO.

PARTIAL RECONSTRUCTION / POTHOLES COMPLETED

21. CENOTAPH/ UNITY PARK RING ROAD MULTIPLE POTHOLES COMPLETED

22. EKOM IMAN ROUNDABOUT POTHOLE COMPLETED

23. ORON ROAD BY URUAN STREET CAPING OF UNDERGROUNDTUNNEL

DUCT

COMPLETED

233

Sectoral Achievements Roads

28. ABAK - IBAGWA -IKOT ABASI ROAD PARTIAL RECONSRUCTION / POTHOLES ONGOING

29. JOINT TASK FORCE BASE, IDU -URUAN MAJOR PATCHING /AMENDMENT WORKS 50%

30. MIN OF HEALTH WAREHOUSE SITE ITAM CLEARING, OPENING OF NEW INTERNAL

ROADS

COMPLETED

31. ATABONG BRIDGE HEAD, EKET PARTIAL RESURFACING COMPLETED

32. BROOKS STREET, UYO FULL RESURFACING COMPLETED

33. SERVICE LANE (FOUR LANE) 400M FULL RESURFACING COMPLETED

34. OSONGAMA ROAD POTHOLE AMENDMENT COMPLETED

35. AKA – ETINAN ROAD POTHOLE AMENDMENT COMPLETED

36. ORON ROAD (BY UDO UMANA) POTHOLE AMENDMENT COMPLETED

37. ST. PETERS PRIMARY MBIAOBONG (TIMBER MARKET) POTHOLE AMENDMENT COMPLETED

38. NWANIBA ROAD ( BY ST. LUKES HOSPITAL ANUA) POTHOLE AMENDMENT COMPLETED

39. ABAK ROAD BY UKANA OFFOT, EKOM IMAN

JUNCTION, MECHANIC VILLAGE

POTHOLE AMENDMENT COMPLETED

40. IKPA ROAD POTHOLE AMENDMENT COMPLETED

41. IKOT EKPENE ROAD POTHOLE AMENDMENT COMPLETED

42. DOMINIC UTUK AVENUE FULL RESURFACING COMPLETED

43. UDOUMANA STREET POTHOLE AMENDMENT COMPLETED

44. AIRPORT (ACCESS ROAD) POTHOLE AMENDMENT COMPLETED

45. EKET – ORON ROAD OVER LAY COMPLETED

46. PORT-HARCOURT STREET POTHOLE AMMENDMENT COMPLETED

S/N COMMUNITY/LGA MICRO PROJECT

24. OKOPEDI (OKOBO) – UYA ORON ROUNDABOUT FULL RESURFACING 80%

25. UDOBIO STREET POT HOLE 70%

26. UDO UMANA BY JOHNSON STREET MAJOR PATCHING WORKS / SLABS COMPLETED

27. AKPAN ETUK STREET PARTIAL RECONSTRUCTION COMPLETED

47. BABANGIDA AVENUE BY SAM LAW HOTEL

ENTRANCE TO FEDERAL HOUSING ESTATE

POTHOLE AMMENDMENT COMPLETED

48. NOAH UDO STREET POTHOLE AMMENDMENT COMPLETED

49. ANUA STREET POTHOLE AMMENDMENT COMPLETED

50. AKA ITAM ROAD MULTIPLE POTHOLE AMMENDMENT COMPLETED

234

Sectoral Achievements Roads

51. ABEL DAMINA ROAD OSONGAMA POTHOLE AMMENDMENT COMPLETED

52. UNIVERSITY OF UYO TEACHING HOSPITAL RESURFACING OF THE CAR PARK COMPLETED

53. UYO- ETINAN ROAD OVERLAY OF THE 10KM ROAD ONGOING

54. URUA EKPA ROAD RECONSTRUCTION OF DRAINAGE /

OVERLAY

COMPLETED

ABAK, ETIM EKPO, ORUK ANAM, INI LOCAL GOVERNMENT AREAS1. � Eka Affiong Ekpor - Ikot Odongo - Ikot Udodia - Ikot Ebo - Ikpe Atai roads (Etim Ekpo)2. � Utu Etim Ekpo - Etuk Uruk Eshiet Road. (Etim Ekpo)3. � Obo Ekpo - Utu Ikot Ekpo - Utu Nto Obio Ekop. (Etim Ekpo)4. � Nto Unang - Ikot Edet road - (Etim Ekpo)5. � Urua Ekpo (Ukanafun LGA) - Abakitenge (Abak L.G.A) -Uruk Ata Nsidung (Etim Ekpo), Ndot Ikot Edah road (Oruk Anam)6.� Prince Bernard Idiong Street – (Oruk Anam)7. � Obio Ibiat Road, (Oruk Anam)8. � Hon Akaniyene Eno Eyo Street, Abak. 9. � Mbiabong Ikot Udo - Mbiabong Mbat to rice farm Ini L.G.A.10. � Mbiabong – Ikpe - Ekoi-rice farm Ini L.G.A.11. � Afaha Esang road Abak L.G.A12.� Mbiaso – Ikot Inyang Road 11km. Oruk Anam L.G.A

235

Sectoral Achievements Roads

55. ROBERT UKO EKPO STREET, UYO OFF NSIKAK MULTIPLE POTHOLES COMPLETED

56 NSIKAK EDUOK AVENUE BY RAYFIELD NUSERY POTHOLES COMPLETED

57 BISHOP UDEME SIMON AVENUE WITH SPUR TO DEEPER LIFE BIBLE CHURCH, OSONGAMA.

MULTIPLE POTHOLES COMPLETED

58 ROAD BESIDES NNPC OSONGAMA BY APOSTOLIC CHURCH OSONAMA ASSEMBLY.

MULTIPLE POTHOLES COMPLETED

59 OSONGAMA ROAD BY GENERAL EDET AKPAN AVENUE

MULTIPLE POTHOLES COMPLETED

60 IKOT ABASI STREET MULTIPLE POTHOLES/ PARTIAL

RECONSTRUCTION

90% COMPLETED

61 BAPTIST AVENUE, EWET HOUSING ESTATE MULTIPLE POTHOLES COMPLETED

62 IKOT UDO ABIA ROAD BY ETINAN JUNCTION FULL RESURFACING COMPLETED

63 NELSON MANDELA ROAD, ITU L.G.A ROAD REHABILITATION/ FULL

RESURFACING

90% COMPLETED

64 EBONG ESSIEN STREET ROAD REHABILITATION ONGOING

65 PORTIONS ALONG ENEN NSIT ROAD PARTIAL RECONSTRUCTION ONGOING

66 AKA ETINAN ROAD FULL RESURFACING/ ROAD MARKING 90% ONGOING

EARTH ROADS:

URUAN LOCAL GOVERNMENT AREA.1. � Ring road – Mbiaya2. � Mbiaya - Ikot Udo - Ifiayong Obot3. � Anakpa - Nung oku Uruan4. � Ekpeneibia - Ikot Akpaekang5. � Mbiaya - Eman Uruan6. � Uyo Itam – Ibiaku Uruan Road. ONNA LOCAL GOVERNMENT AREA.1. � Edem Idim Ishiet - Abak Ishiet - Ikot Ese Ishiet - Ikot Obong Ishiet-Atiamkpat.2. � Atiamkpat - Ikot Akpan Nko - Ikot Mbong.3. � Awa Ndon – Awa Village (Urua Ekpo Nwa)4. � African Church (Awa Ndon) - Town hall.5. � Ikot Nduduot - Mkpa Etto.6. � School Road Ikot Eko Ibon- Okom Road.7. � Ikot Obong Ishiet – Ikot Ese Ishiet – Abak Ishiet

MKPAT ENIN LGA1. � Ekim Town - Ikot Aba Town Hall.2. � Ikot Aba – Minya Village.3. � Ikot Akata - Ikot Akpa Ekop – Ntan Ide Ekpe4. � Mkpat Enin Street5. � Mkpat Enin Junction – Ikot Ntot (Ikot Abasi/ Ekparakwa Highway)6. � Ekpuk Town Junction (On Ekparakwa/Etinan Highway) - Ikot Abasi Akpan - Ikot Essen Akpan Ntuen Junction7. � Ikot Essen Akpan Ntuen Junction – Efee Town - Ikot Unya 8. � Ikot Essen Akpan Ntuen Junction - Nya Odiong – Otokan (Ekparakwa/Etinan Highway)

URUE-OFFONG ORUKO, MBO, ORON LOCAL GOVERNMENT AREAS.1. � Umume – Uboro – Eyokwong - Oruko market Road.2. � Mbokpu Uko Akai – Eyokwaha – Eyokwong - Oruko market Road. 3. � Eyulor Oro – Ukuda – Abiakelibi - Mbokpu Eyokan Road.4. � Ukuda junction-Anaiokpo-Eyokpifie-Etebi Eket Road5. � Okossi and Mbokpu Eyokan Head bridges.6. � Uya Oro Stream road by Paramount Ruler's Palace to the stream.7. � Stream Road in Oron Local Government Area8. � Bako - Eyotong Road.9. � Edisco Avenue10. � Estate Road to Udung Okung Ukpata Road.11. � Maritime Academy Road, off Estate road.12. � Edet Osudu Street.13. � Elvis Okpo Sreet.14. � Akai Atti Udesi in Mbo L.G.A to Eyokip Eyo Uya to Oruko Market ESSIEN UDIM1. � Ikpe Annang – General Hospital Ikpe Annang- through the Palace of the Itai Afe Annang – Ukana East.2. � Uwa East – Ukana Essien.

236

Sectoral Achievements Roads

3. � Ukana Unuk Road.4. � Ikot Igwe-Nto Ubiam - Ikot Oko - Nto Okpe - Urua Afa - Ikot Uko Etor Road.5. � Methodist Church, Ukana Ikot Ngwo6. � Nto Ubon – Abiakpo Road7. � Ikot Uko – Odoro Ikot – Ikot Ibanga Road8. � Ukana Ikot Abio East Road9. � Ikot Akpan Omon (Internal roads)10. � Federal Government College Ikot Ekpene access roads

NSIT UBIUM1. � Ikot Eyo – Ikot Imo – Atan – Ikot Akpan II Road.2. � Ikot Okobo - Ikot Akpan II Road.3. � Ikot Edibon – Ukat Aran – Ikot Idekpe Road.4. � Ukat Aran – Ikot Idekpe – Ikot Ukobo – Ikot Udoime Road.5. � Ikot Ukobo – Ikot Akpatu – Ntit Oton –Ikot Akpabin Road.6. � Edem Idim Okpot –Ikot Eyo – Ukat Aran Road.7. � Ntit Oton – Ikot Ekpan Road.8. � Ikot Etobo (Internal Roads)9. � Ikot Okobo (Internal Roads)10. � Ikot Idekpe (Internal Roads) 11. � Ukat Aran (Internal Roads)12. � Ikot Imo (Internal Roads)13. � Ikot Eyo (Internal Roads)14.� Ikot Ukobo (internal Roads)15. � Ikot Udoime (internal roads)16.� Odoro Atasung Road17.� Ikot Inyang Eti – Atan Road18. � Ikot Inyang Eti – Ndiya Road

UYO1. � Nduetong – Iba Oku Road.2. � Ifa Ikot Idang Road.3. � Nung Obio Enang - Idoro Road4. � Obio Offot Village5. � Joyce Global Estate Avenue passing through Ifa Ikot Akpan, Ifa Ikot Idang and adjourning streets of the Estate.

IBESIKPO ASUTAN1. Ikot Obio Ofong - Nung Ukana - Afaha Udoeyop Road. IBIONO1. � Ikot Akpabio – Ikot Ekpene Road2. � Ikot Obong – Afaha Itiat Road3. � Edem Iyere – Edem Urua4. � Ikpanya – Etim Road5. � Ikot Akpan – Aka Ididep Road6. � Ikot Edok – Mbak Obio Itam Road7. � Ikot Ukap – Ikot Andem Itam Road

237

Sectoral Achievements Roads

ACCOLADES

Integrity and National Service Award

Leadership Newspaper Governor of the Year 2016

1. Leadership Newspaper Governor of the Year 2016

2. Sports Governor of the year (2017).

- Most Comprehensive Sports Development Programme

- State with the Best Sports Infrastructure in Nigeria

- State with the most Patriotic Sports Supporters in Nigeria

Presented by the Federal Ministry of Youth and Sports

3. Vanguard "Governor of the year" award 2018

4. Independent's "Best Governor on Industrialization"

5. Integrity and national service award, 2017.

Presented on 12 Feb. 2018

238

Governor Udom Emmanuel receiving Sports Governor of the Year Award 2017

239

THE TEAMA KF WO AT IN BE O

M M

N SR TE AV TO E

G

MAY 2015 to Date

His ExcellencyMr. Udom Emmanuel

Executive Governor

240

His ExcellencyMr. Moses Ekpo, MFR

Deputy Governor

Sir Etekamba Umoren, FNIMSecretary to State Government

2015 - 2018

Dr. Emmanuel Ekuwem

Secretary to State Government2018 - Date

THE TEAM MAY2015 Date

241

Mrs. Cecilia Udoessien Head of Civil Service

2015 - 2016

Mrs. Ekerebong Akpan

Head of Civil Service2016 - 2019

Elder Efong Edem Essien FNMGS

Head of Civil Service2019 - Date

Sir Monday Ebong UkoHon. Commissioner

Ministry of Youth & Sports2015 - Date

Dr. Dominic Inyang Ukpong

Honourable Commissioner Ministry of Health

Date2015 -

Dr. Glory Emmanuel EdetHonourable Commissioner

Ministry of Women Affairs & Social Welfare 2015 - 2019

Ministry of Agriculture & Women Affairs 2019 - Date

Uwemedimo Thomas Nwoko, EsqHon. Attorney-General & Commissioner for Justice

Date2015 -

Dr. Inibong Essien Honourable Commissioner

Ministry of Environment & Mineral Resources 2015 - 2019

Ministry of Science & Technology 2019 - Date

Mr. Ephraim Akparawa Inyang-EyenHon. Commissioner

Ministry of Works2015 - Date

Mr. Akan Okon Hon. Commissioner

Ministry of Finance 2015 -2016 Ministry of Housing & Special Duties 2016 - 2019

Ministry of Economic Development &Ibom Deep Sea Port 2019 - Date

Hon. Victor Antai, Hon. Commissioner

Ministry of Local of Government & Chieftaincy Affairs 2015 - 2016,

Ministry of Culture & Tourism 2016 - 2018

Dr. (Mrs.) Elizabeth Obot Honourable Commissioner

Ministry of Science & Technology 2015 - 2016

THE TEAM MAY2015

242

Date

Engr. Etido Inyang Honourable Commissioner

Ministry of Special Duties 2015 - 2016

Prince Godwin Ntukudeh Honourable Commissioner

Ministry of Transport 2015 - 2016

Rt. Hon. Uwem Ita Etuk Honourable Commissioner

Ministry of Lands & Town Planning 2015 - 2016

Mr. Aniekan Umanah Honourable Commissioner

Ministry of Information & Communications 2015 - 2016

Mr. Enobong Uwah Honourable Commissioner

Ministry of Housing & Urban Renewal 2015 - 2016

Dr. Mathew EkaetteHonourable Commissioner

Ministry of Agriculture & Natural Resources 2015 - 2016

Dr. Emmanuel OnwioduokitHonourable Commissioner

Ministry of Economic Planning & Development2015 - 2016

Otuekong Emmanuel IbiokHonourable Commissioner

Ministry of Culture & Tourism2015 - 2016

Rt. Hon. (Elder) Aniekan S. AkpanHonourable Commissioner

Ministry of Education2015 - 2016

243

THE TEAM MAY2015 Date

Pastor Paul Alexander UdoaHonourable Commissioner

Ministry of Education2015 - 2017

Mr. Idorenyin Sunday Udo

Honourable Commissioner Ministry of Economic Development

& Manpower Planning2016 - 2018

Arc. Ime Okon Ekpo

Honourable Commissioner Ministry of Lands & Town Planning

20192016 - Ministry of Lands & Water Resources

2019 - Date

Rt. Hon. (Barr.) Ekong Sampson , Ministry of Rural Honourable Commissioner

Devt 2015 - 2016; Special Adviser, Bureau of Political/Legislative Affairs & Water Resources

2016 - 2018; Hon. Comm. Min. of Economic Devt.,Labour & Manpower Planning 2018 - 2019; Min. of

Environment & Petroleum Resources 2019 - Date

Mr. Nsikan Linus NkanHonourable Commissioner

Ministry of Finance2016 - Date

Hon. Udo EkpenyongHonourable Commissioner

Ministry of Local Government & Chieftaincy Affairs 2015 - Date

Late Prof. Eno Blankson IkpeHonourable Commissioner

Ministry of Investment, Commerce & Industry 2016 - 2017

Charles Udoh KSJHonourable Commissioner

Ministry of Information & Strategy2016 - 2019

Ministry of Information 2019 - Date

Barr. Emmanuel Enoidem Honourable Commissioner

Ministry of Investment, Commerce & Industry 2015 - 2016

THE TEAM MAY2015

244

Date

Hon. Uno E. UnoHonourable Commissioner

Ministry of Culture and Tourism2018 - 2019

Ministry of Transport & Solid MineralResources 2019 - Date

Uduak Charles Udo-Inyang, PhDHonourable Commissioner

Ministry of Agriculture & Food Sufciency2016 - 2019

Prof. Nse Udo EssienHonourable Commissioner

Ministry of Science & Technology2016 - 2019

Ministry of Education 2019 - Date

Mrs. Ekemini David UmohSpecial Adviser

Bureau of Rural Development & Cooperatives

Date2016 -

Rt. Hon. Orman EsinHonourable Commissioner

Ministry of Transport & Petroleum Resources2016 - 2019

Ministry of Culture & Tourism 2019 - Date

Sir Ibanga Ime AkpabioHonourable Commissioner

Ministry of Labour, Productivity & Manpower Planning

2017- 2018

Mr. Enyinna EkpenyongSpecial Adviser

Bureau of Labour, Productivity & Manpower Planning 2015 - 2016

Hon. Anietie EtukSpecial Adviser

Bureau of Political & Legislative Affairs2015 - 2016

Prof. Victor Daniel Bassey InokaHonourable Commissioner

Ministry of Education2017 - 2019

Ministry of Labour & ManpowerPlanning 2019 - Date

Prince Ukpong AkpabioHonourable Commissioner

Ministry of Investment, Commerceand Industry 2018 - 2019

Ministry of Trade & Investment2019 - Date

Pastor (Hon) Sunny IbuotSpecial Adviser

Bureau of Political/Legislative Affairs& Water Resources 2018 - 2019

Bureau of Political/Legislative Affairs2019 - Date

Rt. Hon. Okpolupm Ikpong EttehHonourable Commissioner Ministry of Special Duties

2019 - Date

245

Rt. Hon Raphael BasseyHonourable Commissioner

Ministry of Housing2018 - Date

THE TEAM MAY2015 Date


Recommended