Date post: | 29-Mar-2023 |
Category: |
Documents |
Upload: | kyambogouniversity |
View: | 0 times |
Download: | 0 times |
Development Length In Recycled Steel Bar Reinforcement
J.K Byaruhanga [email protected]
Dept. of Mechanical Engineering, Makerere University, Kampala, Uganda
C. Senfuka [email protected]
Dept. of Mechanical and Production Engineering, Kyambogo University, Kampala Uganda J.B. Kirabira [email protected]. of Mechanical Engineering, Makerere University Kampala, Uganda
Abstract
P(X ≥ χ)
Keywords:
1. INTRODUCTION
τ ≤ ( τet al τc
.
Th c
f α
ρ λ
Steel
bars
FIGURE 3:
Transverse
cracks c α
Concrete
slab
Steel
reinforcement
c
FIGURE 2:
f
λ
ρ
P
ld
σ ≤τ
⁄
i) ii)
⁄
(
)
ld
y
τc db
iii) y/τc lclc y.
τc.
Steel
Bar
ld
FIGURE 5:
db
τ
τ
τ
τ P
Concrete
slab
Bar rib
Cylindrical
failure
surface
FIGURE 4:
Concrete
block