Environmental Monitoring Report
Quarterly Report April–June 2012
VIE: Greater Mekong Subregion Kunming–Hai
Phong Transport Corridor Noi Bai– Lao Cai Highway
Project
Prepared by Getinsa for the Vietnam Expressway Corporation, the Ministry of Transport, the
Government of Viet Nam, and the Asian Development Bank.
CURRENCY EQUIVALENTS (as of 1 July 2012)
Currency unit – dong (D)
D1.00 = $0.000047 $1.00 = D20,885
NOTE
In this report, "$" refers to US dollars unless otherwise stated. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
QUARTERLY ENVIRONMENTAL, HEALTH AND SAFETY MONITORING REPORT
APRIL - JUNE 2012
Hanoi office : 12th floor, Ocean Park Building, Dao Duy Anh Street, Dong Da District Vinh Phuc office: Huu Thu Hamlet, Kim Long Ward, Tam Duong Dist, Vinh Phuc Province Madrid Spain head office: C/ Ramón de Aguinaga No 8, 28028 Madrid, Spain/ Web Page: www.getinsa.com
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
i
INDEX
1 INTRODUCTION. FRAMEWORK OF THIS REPORT .......................................................... 1
1.1 FRAMEWORK OF THE REPORT ................................................................................... 1
1.2 DESCRIPTION OF THE PROJECT. DIVISION IN PACKAGES ...................................... 1
2 CONSTRUCTION WORKS PROGRESS DURING THE PERIOD ........................................ 4
2.1 PACKAGE A1 .................................................................................................................. 4
2.2 PACKAGE A2 .................................................................................................................. 6
2.3 PACKAGE A3 .................................................................................................................. 7
2.4 PACKAGE A4 .................................................................................................................. 8
2.5 PACKAGE A5 .................................................................................................................. 9
2.6 PACKAGE A6 ................................................................................................................ 10
2.7 PACKAGE A7 ................................................................................................................ 12
2.8 PACKAGE A8 ................................................................................................................ 13
3 CARRIED OUT TASKS DURING THE PERIOD ................................................................. 15
4 ENVIRONMENTAL MONITORING RESULTS. COMPLEMENTARY MEASURES TO BE
APPLIED ........................................................................................................................... 17
4.1 IMPACT ON AIR QUALITY ............................................................................................ 17
4.2 IMPACT ON WATER RESOURCES .............................................................................. 39
4.3 IMPACT ON SOILS QUALITY ....................................................................................... 61
4.4 IMPACT ON NOISE AND VIBRATION LEVELS ............................................................ 73
4.5 STREAMS AND RIVERSIDES MAINTENANCE ............................................................ 91
4.6 EROSION RISKS AND STABILITY IN SLOPES .......................................................... 100
4.7 HAZARDOUS SUBSTANCES MANAGEMENT ........................................................... 109
4.8 UNSUITABLE MATERIAL DISPOSALS AND BORROW PITS .................................... 119
4.9 WASTE AND CLEANLINESS IN SITE ......................................................................... 127
4.10 BIODIVERSITY PRESERVATION ............................................................................... 137
4.11 WORKERS’ CAMPS CONDITIONS ............................................................................. 143
4.12 LABOUR SAFETY EQUIPMENT ................................................................................. 154
4.13 TRAFFIC CONDITIONS AND SIGNPOSTING IN ROADS .......................................... 169
4.14 SIGNPOSTING IN DANGEROUS SURFACES ........................................................... 180
4.15 ACCIDENTS DUE TO THE LACK OF SAFETY MEASURES. RESPONSIBLES ......... 188
5 REFERENCE DOCUMENTS RELATIVE TO ENVIRONMENT, HEALTH AND SAFETY
ISSUES ........................................................................................................................... 193
5.1 PACKAGE A1 .............................................................................................................. 193
5.2 PACKAGE A2 .............................................................................................................. 193
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
ii
5.3 PACKAGE A3 .............................................................................................................. 194
5.4 PACKAGE A4 .............................................................................................................. 195
5.5 PACKAGE A5 .............................................................................................................. 195
5.6 PACKAGE A6 .............................................................................................................. 196
5.7 PACKAGE A7 .............................................................................................................. 198
5.8 PACKAGE A8 .............................................................................................................. 199
6 STATUS ON THE ECAP IMPLEMENTATION ................................................................... 200
6.1 CONTRACTORS’ ENVIRONMENTAL AND SAFETY MANAGERS MOBILIZATION ... 200
6.2 ENVIRONMENTAL CORRECTIVE ACTION PLAN (ECAP). UPDATE 30TH/06/2012 . 202
7 GRIEVANCE INTAKES. PUBLIC CONSULTATION.......................................................... 249
ANNEX 1: PHOTOGRAPHIC REPORT ................................................................................... 251
ANNEX 2: GRIEVANCE INTAKES. PUBLIC CONSULTATION ............................................... 253
ANNEX 3: ACCIDENT IN LO RIVER BRIDGE. INCIDENTS AND COMPLAINTS
INFORMATION SYSTEMS. SPECIFIC REPORT ............................................................ 255
ANNEX 4: ENVIRONMENTAL STATUS IN CONCRETE BATCHING PLANTS. SPECIFIC
REPORT .......................................................................................................................... 257
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
iii
ABBREVIATIONS
ADB Asian Development Bank
EIA Environmental Impact Assessment
EMR Environmental Monitoring Report
EPMU Expressway Project Management Unit
ESQR Environmental and Safety Quarterly Report
EWIR Environmental Weekly Inspection Report
MONRE Ministry of Natural Resources and Environment
MOT Ministry of Transport
NB-LC Noi Bai - Lao Cai
NS National Specialist (environmental)
PPE Personal Protection Equipment
PSC Project Supervision Consultant
SMR Safety Monitoring Report
TOR Terms Of Reference
VEC Vietnam Expressway Corporation
KPH Not detect
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
1
1 INTRODUCTION. FRAMEWORK OF THIS REPORT
1.1 FRAMEWORK OF THE REPORT
Within the framework of the Environmental Control Plans proposed by the contractors and the
duties of the Consultant (PSC) in this matter contained in the Consulting Services Contract, the
environmental team of national specialists (NS) in charge of inspecting the environmental
conditions of the works for the new highway, have done weekly inspections along the sites
and surroundings of all the Packages which nowadays are all with construction activities,
checking the environmental measures applied by the constructors and detecting any impacts
that could be generated by the building works during the period of reference of this report, that
means, January, February and March 2012. The results were included in the environmental
weekly inspection reports (EWIR) and the monthly environmental reports for each package
(EMR).
As the environmental team, therefore under its responsibility, is also in charge of monitoring
the healthy and safety conditions in site, specialists in site offices also have made weekly
inspections in all packages. Their results have been being included in the corresponding
monthly safety reports (SMR). Therefore these issues are also included in this quarterly report.
So, this document is defined as Environmental and Safety Monitoring Quarterly Report
(hereinafter called ESQR). It will be submitted to the Client, Vietnam Expressway Corporation
(VEC), through the Expressway Project Management Unit (EPMU) and following the Terms of
Reference (ToR) of the Consultant’s Contract, also to Asian Development Bank (ADB).
1.2 DESCRIPTION OF THE PROJECT. DIVISION IN PACKAGES
Noi Bai - Lao Cai (NB-LC) Highway is a part of Kunming - Hai Phong Transport Corridor, which
has been studied with a total length of 865 km passing Yunnan province of China and Lao Cai,
Yen Bai, Phu Tho, Vinh Phuc, Ha Noi, Bac Ninh, Hai Duong, Quang Ninh and Hai Phong
provinces of Vietnam.
Vietnam Expressway Corporation, which is a state owner company, is the proposer of this
project. Its executing agency is the Ministry of Transport (MOT), and it’s being financed by
Asian Development Bank (ADB) and the Government of Vietnam.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
2
According to original design, NB - LC Highway has a total length of about 262.4 km, passing
through 72 communes and 18 districts of provinces and cities as Ha Noi, Vinh Phuc, Phu Tho,
Yen Bai and Lao Cai.
The construction of project is divided into two phases, in which the first phase will construct
244 km with 4 lanes from Ha Noi to Yen Bai and 2 lanes from Yen Bai to Lao Cai. The second
phase will be the widen section of the former with 6 lanes from Ha Noi to Yen Bai and 4 lanes
from Yen Bai to Lao Cai (Chinese border, 262 km).
Construction of the whole project, first phase, is divided into 8 packages including A1, A2, A3,
A4, A5, A6, A7 and A8. All of them have already begun their construction activities. The length,
location and the status of works in each package at the end of the period are described in the
following paragraphs and tables.
- Package A1 is about 26.630 km of length with start point at station Km 0+070 and finishes at
station Km 26+700. Package A1 goes through the Soc Son district of Hanoi City and Vinh
Phuc province.
- Package A2 is about 22.120 km of length and goes through the Vinh Phuc province and a
little of Phu Tho province. Package A2 has start point at station Km 26+700 and finishes at
station Km 48+820. It must cross over Lo River, with a long bridge.
- Package A3 is about 32.240 km of length with start point at station Km48+360 and ending
point at station Km 80+00. Package A3 goes through the Phu Tho province. The most
significant structure is the bridge to cross over Red River.
- Package A4 has start point at Km 80+000 in Cam Khe district, Phu Tho province and ending
point at Km109+750 in Tran Yen district, Yen Bai province. Its total length is 29.750 km.
- Package A5 has start point at Km109+750 in Tran Yen district, Yen Bai province and
ending point at Km150+900 in Van Yen district, Yen Bai province. Its total length is 41.150 km.
- Package A6 lengthens from start point Km150+900 of Van Yen district, Yen Bai province to
Km190+420 in Van Ban district, Lao Cai province. Its total length is 39.520 km. Almost
alignment goes through high mountains in Yen Bai and Lao Cai province and crosses over
natural streams by 18 bridges. This section also includes 1 tunnel under range of mountain at
Km186+500.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
3
- Package A7 lengthens from start point Km190+420 in Van Ban district to Km 218+040 in Bao
Thang district, Lao Cai province. Almost alignment also goes through high mountains and 18
bridges are needed. Its total length is 27,620 m. Khe Sang bridge with a length of 287m is the
biggest one.
- Package A8 begins at station Km 218+040 in Bao Thang district and finishes at Km 244+155
in Bao Thang district, Lao Cai province. Its total length is 26,115 m. Suoi Trat bridge with a
length of 374.8 m is the biggest one.
Table 1.1: Current Status of Works at the end of the quarter
A1 A2 A3 A4
Site clearing 92,08 56,03 55,17 81,32 Earthworks 77,92 51,67 46,71 25,97 Drainage 43,91 7,40 23,34 17,01 Structures 68,95 53,54 41,41 36,93 Overall progress 48,57 33,84 26,44 15,80
A5 A6 A7 A8 Site clearing 79,37 91,43 102,05 91,68 Earthworks 13,40 40,82 106,87 60,20 Drainage 3,29 46,04 67,85 54,02 Structures 7,54 31,77 46,58 46,97 Overall progress 5,92 24,23 51,80 32,24
Data expressed in percentage of the total planned in the project
The environmental monitoring program is carried out in compliance with regulations of Vietnam
Government and ADB safeguard policy in order to control environmental impacts and to
ensure that the environment in the surroundings of the project area is well preserved. The VEC
proponent should perform environmental protection measures stated in the EIA report as well
as requirements written in the approval decision made by MONRE. In accordance with article
23 of the Environmental Protection Law and article 15 of Decree 80/2006/ND-CP, MONRE will
organize, direct, and monitor the environmental protection measures performed by VEC as
stated in the EIA report approved.
At present, this environmental monitoring program is being undertaken by Environmental
specialists of Getinsa hired by Vietnam Expressway Corporation. EPMU, the Project Manager,
with the Consultant’s support, monitors the environmental protection measures applied by the
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
4
contractors during the development of their works, incompliance with the environmental control
and protection plans proposed by contractors and already approved by PSC. Consultant
reports to EPMU-VEC as the main involved authority in the project.
In addition to that, during the monitoring process, the environmental specialists and contractors
will try to find out and mitigate unanticipated environmental impacts arising from the project
construction process.
2 CONSTRUCTION WORKS PROGRESS DURING THE PERIOD
In this chapter, they are included all the works already done or in process during the period, in
each package and detailing the section where the works are developed.
2.1 PACKAGE A1
April Sec 1: Km 0+900 ~ Km 4+350 Embankment work Sec 2: Km 0+080 ~ Km 1+000 & Km 4+350 ~ Km 7+661 Embankment work
Sec 3: Km 7+661 ~ Km 10+771 Embankment work Sec 4: Km 10+771 ~ Km15+030 Embankment work Sec 5: Km 15+030 ~ Km 18+400 Embankment work Sec 6: Km 18+400 ~ Km 21+900 Embankment work Sec 7: Km 21+900 ~ Km 23+900 Embankment work Sec 8: Km 23+900 ~ Km 26+700 Embankment work Underpass NH2 Structure work Kim Anh bridge (Km 1+901.05) Structure work TL402 bridge (Km 3+053.55) Structure work and PC voided slab Trung Kien bridge (Km 4+491.00) Structure work Dai Duong bridge (Km 7+392.65) Structure work Xuan Phuong bridge (Km 7+660.05) Structure work NTT bridge (Km 7 + 854.7) No activity Tan Loi bridge (Km 10+695.00) Structure work Ba Thien bridge (Km 14+026.00) Structure work I.C 3 bridge (Km 14+590.00) Structure work Bon bridge (Km 15+107.00) Structure work TL302B bridge (Km 15+825.00) No activity TL-TK bridge (Km 19+120.05) Structure work Cam I bridge (Km 21+910.05) Structure work Cam II bridge (Km 21+910.05) Structure work TL302CII bridge (Km 22+480.05) No activity Army I bridge (Km 23+855.45) No activity NH2B bridge (Km 24+946.00) Abutment backfilling
May Sec 1: Km 0+900 ~ Km 4+350 Embankment work Sec 2: Km 0+080 ~ Km 1+000 & Km 4+350 ~ Km 7+661 Embankment work
Sec 3: Km 7+661 ~ Km 10+771 Embankment work Sec 4: Km 10+771 ~ Km15+030 Embankment work Sec 5: Km 15+030 ~ Km 18+400 Embankment work
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
5
Sec 6: Km 18+400 ~ Km 21+900 Embankment work Sec 7: Km 21+900 ~ Km 23+900 Embankment work Sec 8: Km 23+900 ~ Km 26+700 Embankment work Underpass NH2 Structure work Kim Anh bridge (Km 1+901.05) Structure work TL402 bridge (Km 3+053.55) Structure work and PC voided slab Trung Kien bridge (Km 4+491.00) Structure work Dai Duong bridge (Km 7+392.65) Structure work Xuan Phuong bridge (Km 7+660.05)
Structure work
NTT bridge (Km 7 + 854.7) No activity Tan Loi bridge (Km 10+695.00) Structure work Ba Thien bridge (Km 14+026.00) Structure work I.C 3 bridge (Km 14+590.00) Structure work Bon bridge (Km 15+107.00) Structure work TL302B bridge (Km 15+825.00) No activity TL-TK bridge (Km 19+120.05) Structure work Cam I bridge (Km 21+910.05) Structure work Cam II bridge (Km 21+910.05) Structure work TL302CII bridge (Km 22+480.05) No activity Army I bridge (Km 23+855.45) No activity NH2B bridge (Km 24+946.00) Abutment backfilling
June Sec 1: Km 0+900 ~ Km 4+350 Embankment work Sec 2: Km 0+080 ~ Km 1+000 & Km 4+350 ~ Km 7+661 Embankment work
Sec 3: Km 7+661 ~ Km 10+771 Embankment work Sec 4: Km 10+771 ~ Km15+030 Embankment work Sec 5: Km 15+030 ~ Km 18+400 Embankment work Sec 6: Km 18+400 ~ Km 21+900 Embankment work Sec 7: Km 21+900 ~ Km 23+900 Embankment work Sec 8: Km 23+900 ~ Km 26+700 Embankment work Underpass NH2 Structure work Kim Anh bridge (Km 1+901.05) Structure work TL402 bridge (Km 3+053.55) Structure work and PC voided slab Trung Kien bridge (Km 4+491.00) Structure work Dai Duong bridge (Km 7+392.65) Structure work Xuan Phuong bridge (Km 7+660.05) Structure work NTT bridge (Km 7 + 854.7) No activity Tan Loi bridge (Km 10+695.00) Structure work Ba Thien bridge (Km 14+026.00) Structure work I.C 3 bridge (Km 14+590.00) Structure work Bon bridge (Km 15+107.00) Structure work TL302B bridge (Km 15+825.00) No activity TL-TK bridge (Km 19+120.05) Structure work Cam I bridge (Km 21+910.05) Structure work Cam II bridge (Km 21+910.05) Structure work TL302CII bridge (Km 22+480.05) No activity Army I bridge (Km 23+855.45) No activity NH2B bridge (Km 24+946.00) Abutment backfilling
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
6
2.2 PACKAGE A2
April Sec 1: Km 26+700~Km 32+700 Embankment work Sec 2: Km 32+700~Km 35+300 No activity Sec 3: Km 35+300~Km36+910 No activity Sec 4: Km 36+910~Km 39+850 Embankment work Sec 5: Km 39+580~Km 40+690 Embankment work Sec 6: Km 40+690~Km 43+400 No activity Sec 7: Km 43+400~Km 45+300 No activity Sec 8: Km 45+300~Km 47+660 Embankment work Army II Bridge (Km 27+015.00) Structure work Army III Bridge (Km 28+010.00) Structure work TL310 Bridge (Km 29+201.00) Structure work Ben Tre Bridge (Km 31+068.00) Structure work Tan Dung Bridge (Km 31+245.05) Structure work Muong Noi Bridge (Km 31+504.50) Bored pile work TL306I Bridge (Km 33+181.55) No activity Muong Dao Bridge (Km 33+295.00) Structure work Ben Gao Bridge (Km 35+211.05) Structure work TL305 Bridge (Km 37+951.55) Structure work Song Dao Bridge (Km 38+450.05) Structure work Phung Nguyen Bridge (Km 39+188.00) No activity Xuan Quang Bridge (Km 41+480.00) No activity Lo river Bridge (Km 48+181.30) Structure work
May Sec 1: Km 26+700~Km 32+700 Embankment work Sec 2: Km 32+700~Km 35+300 No activity Sec 3: Km 35+300~Km36+910 No activity Sec 4: Km 36+910~Km 39+850 Embankment work Sec 5: Km 39+580~Km 40+690 Embankment work Sec 6: Km 40+690~Km 43+400 No activity Sec 7: Km 43+400~Km 45+300 No activity Sec 8: Km 45+300~Km 47+660 Embankment work Army II Bridge (Km 27+015.00) Structure work Army III Bridge (Km 28+010.00) Structure work TL310 Bridge (Km 29+201.00) Structure work Ben Tre Bridge (Km 31+068.00) Structure work Tan Dung Bridge (Km 31+245.05) Structure work Muong Noi Bridge (Km 31+504.50) Bored pile work TL306I Bridge (Km 33+181.55) No activity Muong Dao Bridge (Km 33+295.00) Structure work Ben Gao Bridge (Km 35+211.05) Structure work TL305 Bridge (Km 37+951.55) Structure work Song Dao Bridge (Km 38+450.05) Structure work Phung Nguyen Bridge (Km 39+188.00) No activity Xuan Quang Bridge (Km 41+480.00) No activity Lo river Bridge (Km 48+181.30) Structure work
June Sec 1: Km 26+700~Km 32+700 Embankment work Sec 2: Km 32+700~Km 35+300 No activity Sec 3: Km 35+300~Km36+910 No activity Sec 4: Km 36+910~Km 39+850 Embankment work Sec 5: Km 39+580~Km 40+690 Embankment work Sec 6: Km 40+690~Km 43+400 Embankment work
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
7
Sec 7: Km 43+400~Km 45+300 Embankment work Sec 8: Km 45+300~Km 47+660 Embankment work Army II Bridge (Km 27+015.00) Structure work Army III Bridge (Km 28+010.00) No activity TL310 Bridge (Km 29+201.00) Structure work Ben Tre Bridge (Km 31+068.00) Structure work Tan Dung Bridge (Km 31+245.05) Structure work Muong Noi Bridge (Km 31+504.50) Bored pile work TL306I Bridge (Km 33+181.55) Structure work Muong Dao Bridge (Km 33+295.00) Structure work Ben Gao Bridge (Km 35+211.05) Structure work TL305 Bridge (Km 37+951.55) Structure work Song Dao Bridge (Km 38+450.05) Structure work Phung Nguyen Bridge (Km 39+188.00) No activity Xuan Quang Bridge (Km 41+480.00) Void slad girder Lo river Bridge (Km 48+181.30) Structure work
2.3 PACKAGE A3
April TL323B Bridge – Km 51 Finish. BaiBang railway Flyover - Km60+967.05 Finish drilling bore piles. Execute sub-structure IC8 - Km54+640 Execute sub-structure (stop work)
Red river Bridge – km77+800 Drilling bored piles at P4 on Red river. Finish drilling bore piles. Execute sub-structure
National railway flyover – Km77+246 Finish drilling bore piles. Execute sub-structure Ho Chi Minh IC- Km65+540 Finish drilling bore piles. Execute sub-structure Phai Din bridge- Km70+236 Finish. TL320C bridge-Km72+580 Building Foundation platform of A2 abutment Cam Phu bridge Km61+583 Drilling bore pile Xuan Thanh bridge Km66+947 Drilling bore pile TL315B bridge Km67+662 Drilling bore pile Phong Chau bridge Km59+020 Finish drilling bore piles. Execute sub-structure Section 1: Km48+360-Km54+000 Excavation & filling work
Section 2: Km54+000-Km59+600 Earth work and Implement box culvert
Section 3: Km59+600-Km65+390 Embankment work and Implement box and pipe culvert Section 4: Km65+390-Km69+070 Excavation & filling work Section 5: Km69+070-Km73+070 Excavation & filling work
Section 6: Km73+070-Km77+620 Excavation & filling work and Implement pipe and box culvert
Section 7: Km77+620-Km80+000 Not yet active (Obstruction) May
TL323B Bridge – Km 51 Finish. BaiBang railway Flyover - Km60+967.05 Finish drilling bore piles. Execute sub-structure IC8 - Km54+640 Execute sub-structure (stop work)
Red river Bridge – km77+800 Drilling bored piles at P4 on Red river. Finish drilling bore piles. Execute sub-structure
National railway flyover – Km77+246 Finish drilling bore piles. Execute sub-structure Ho Chi Minh IC- Km65+540 Finish drilling bore piles. Execute sub-structure Phai Din bridge- Km70+236 Finish. TL320C bridge-Km72+580 Building Foundation platform of A2 abutment Cam Phu bridge Km61+583 Drilling bore pile Xuan Thanh bridge Km66+947 Drilling bore pile TL315B bridge Km67+662 Drilling bore pile Phong Chau bridge Km59+020 Finish drilling bore piles. Execute sub-structure
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
8
Section 1: Km48+360-Km54+000 Excavation & filling work Section 2: Km54+000-Km59+600 Earth work and Implement box culvert Section 3: Km59+600-Km65+390 Embankment work and Implement box and pipe culvert Section 4: Km65+390-Km69+070 Excavation & filling work Section 5: Km69+070-Km73+070 Excavation & filling work
Section 6: Km73+070-Km77+620 Excavation & filling work and Implement pipe and box culvert
Section 7: Km77+620-Km80+000 Not yet active (Obstruction) June
TL323B Bridge – Km 51 Finish. BaiBang railway Flyover - Km60+967.05 Finish drilling bore piles. Execute sub-structure IC8 - Km54+640 Execute sub-structure (stop work)
Red river Bridge – km77+800 Drilling bored piles at P4 on Red river. Finish drilling bore piles. Execute sub-structure
National railway flyover – Km77+246 Finish drilling bore piles. Execute sub-structure Ho Chi Minh IC- Km65+540 Finish drilling bore piles. Execute sub-structure Phai Din bridge- Km70+236 Finish. TL320C bridge-Km72+580 Building Foundation platform of A2 abutment Cam Phu bridge Km61+583 Drilling bore pile Xuan Thanh bridge Km66+947 Drilling bore pile TL315B bridge Km67+662 Drilling bore pile Phong Chau bridge Km59+020 Finish drilling bore piles. Execute sub-structure Section 1: Km48+360-Km54+000 Excavation & filling work Section 2: Km54+000-Km59+600 Earth work and Implement box culvert Section 3: Km59+600-Km65+390 Embankment work and Implement box and pipe culvert Section 4: Km65+390-Km69+070 Excavation & filling work Section 5: Km69+070-Km73+070 Excavation & filling work
Section 6: Km73+070-Km77+620 Excavation & filling work and Implement pipe and box culvert
Section 7: Km77+620-Km80+000 Not yet active (Obstruction)
2.4 PACKAGE A4
April Ngoi Lao bridge - Km97+100 Drilling bore pile QL32C bypass bridge - Km107+533 Drilling bore pile Ngoi Van bridge - Km108+960 Drilling bore pile Dam Nang bridge –Km108+287 Drilling bore pile TL321C bridge – Km84+400 Drilling bore pile Ngoi Gianh bridge – Km88+760 Drilling bore pile Section 1: Km80+000-Km85+000 Earth work Section 2: Km85+000-Km89+600 Site clearing and Earth work Section 3: Km89+600-Km96+200 Earth work and top soil remove Section 4: Km96+200-Km100+000 Embankment and filling work Section 5: Km100+000-Km105+000 Embankment and filling work Section 6: Km105+000-Km109+750 Embankment and filling work
May Ngoi Lao bridge - Km97+100 Drilling bore pile QL32C bypass bridge - Km107+533 Drilling bore pile Ngoi Van bridge - Km108+960 Drilling bore pile Dam Nang bridge –Km108+287 Drilling bore pile TL321C bridge – Km84+400 Drilling bore pile Ngoi Gianh bridge – Km88+760 Drilling bore pile
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
9
Section 1: Km80+000-Km85+000 Earth work Section 2: Km85+000-Km89+600 Site clearing and Earth work Section 3: Km89+600-Km96+200 Earth work and top soil remove Section 4: Km96+200-Km100+000 Embankment and filling work Section 5: Km100+000-Km105+000 Embankment and filling work Section 6: Km105+000-Km109+750 Embankment and filling work
June Ngoi Lao bridge - Km97+100 Drilling bore pile QL32C bypass bridge - Km107+533 Drilling bore pile Ngoi Van bridge - Km108+960 Drilling bore pile Dam Nang bridge –Km108+287 Drilling bore pile TL321C bridge – Km84+400 Drilling bore pile Ngoi Gianh bridge – Km88+760 Drilling bore pile Section 1: Km80+000-Km85+000 Earth work Section 2: Km85+000-Km89+600 Site clearing and Earth work Section 3: Km89+600-Km96+200 Earth work and top soil remove Section 4: Km96+200-Km100+000 Embankment and filling work Section 5: Km100+000-Km105+000 Embankment and filling work Section 6: Km105+000-Km109+750 Embankment and filling work
2.5 PACKAGE A5
April Van Phu bridge – Km114+100.05 Building Foundation platform Hop Minh My bridge – Km118+920.05 No activity Ngoi Lau bridge – Km120+615.85 Building Foundation platform QL 37 bridge – Km121+433.05 Building Foundation platform Ngoi Gua bridge – Km128+665.46 Excavation & filling works Ngoi Rao bridge – Km130+916.30 Excavation & filling works Ngoi Thu bridge – Km136+108.35 No activity Ngoi Thap bridge – Km138+447.15 Excavation & filling works Ngoi Vien bridge – Km140+788.50 Building Foundation platform Xuan Thu bridge – Km141+483.55 No activity Ngoi Thia bridge – Km145+434.05 Building Foundation platform and Excavation & filling works Ngoi Buc bridge – Km 150+704.65 No activity Section 1: Km109+750 - Km115+800 Excavation & filling work Section 2: Km115+800 - Km120+000 Excavation & filling work Section 3: Km120+000 - Km125+000 Excavation & filling work Section 4: Km125+000 - Km130+000 Site clearing and excavation & filling work Section 5: Km130+000 - Km136+400 Site clearing and excavation & filling work Section 6: Km136+400 - Km142+000 Excavation & filling work Section 7: Km142+000 - Km148+000 Site clearing and excavation & filling work Section 8: Km148+000 - Km150+900 Site clearing and excavation & filling work
May Van Phu bridge – Km114+100.05 Building Foundation platform Hop Minh My bridge – Km118+920.05 No activity Ngoi Lau bridge – Km120+615.85 Building Foundation platform QL 37 bridge – Km121+433.05 Building Foundation platform Ngoi Gua bridge – Km128+665.46 Excavation & filling works Ngoi Rao bridge – Km130+916.30 Excavation & filling works Ngoi Thu bridge – Km136+108.35 No activity Ngoi Thap bridge – Km138+447.15 No activity Ngoi Vien bridge – Km140+788.50 Building Foundation platform Xuan Thu bridge – Km141+483.55 No activity Ngoi Thia bridge – Km145+434.05 Building Foundation platform and Excavation & filling works Ngoi Buc bridge – Km 150+704.65 No activity
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
10
Section 1: Km109+750 - Km115+800 Excavation & filling work Section 2: Km115+800 - Km120+000 Excavation & filling work Section 3: Km120+000 - Km125+000 Excavation & filling work Section 4: Km125+000 - Km130+000 Site clearing and excavation & filling work Section 5: Km130+000 - Km136+400 Site clearing and excavation & filling work Section 6: Km136+400 - Km142+000 Excavation & filling work Section 7: Km142+000 - Km148+000 Site clearing and excavation & filling work Section 8: Km148+000 - Km150+900 Site clearing and excavation & filling work
June Van Phu bridge – Km114+100.05 Structure work Hop Minh My bridge – Km118+920.05 No activity Ngoi Lau bridge – Km120+615.85 Structure work QL 37 bridge – Km121+433.05 Structure work Ngoi Gua bridge – Km128+665.46 Structure work Ngoi Rao bridge – Km130+916.30 Structure work Ngoi Thu bridge – Km136+108.35 No activity Ngoi Thap bridge – Km138+447.15 No activity Ngoi Vien bridge – Km140+788.50 Structure work Xuan Thu bridge – Km141+483.55 No activity Ngoi Thia bridge – Km145+434.05 No activity Ngoi Buc bridge – Km 150+704.65 No activity Section 1: Km109+750 - Km115+800 Excavation & filling work Section 2: Km115+800 - Km120+000 Excavation & filling work Section 3: Km120+000 - Km125+000 Excavation & filling work Section 4: Km125+000 - Km130+000 Site clearing and excavation & filling work Section 5: Km130+000 - Km136+400 Site clearing and excavation & filling work Section 6: Km136+400 - Km142+000 Excavation & filling work Section 7: Km142+000 - Km148+000 Excavation & filling work Section 8: Km148+000 - Km150+900 Site clearing and excavation & filling work
2.6 PACKAGE A6
April Khe Chuong bridge – Km153+355.05 Building Foundation platform Ngoi That bridge – Km155+971.55 Building Foundation platform Ngoi Rom bridge- Km157+517.05 No activity Ngoi Cong bridge – Km159+207.85 No activity Ngoi Giam I bridge – Km162+896.35 Building Foundation platform Ngoi Giam II bridge – Km163+126.00 Building Foundation platform Ngoi Hut bridge – Km165+110.50 Building Foundation platform Ngoi Chac bridge – Km169+412.00 Excavation & filling works Ngoi Pha bridge – Km170+312.50 No activity Suoi Quan bridge – Km173+434.00 No activity Ngoi Nhuoc bridge – Km176+661.85 Building Foundation platform Lang Nhay bridge – Km182+164.00 Building Foundation platform Lang Lau bridge – Km184+057.95 Building Foundation platform Ngoi Don bridge – Km185+077.75 Building Foundation platform and Excavation & filling works Dai Viet bridge – Km186+902.05 Building Foundation platform Van Xuan bridge – Km187+141.55 No activity Suoi Nau bridge – Km188+766.00 No activity Lang Nheo flyover – Km173+929 No activity Section 1: Km150+900 - Km156+000 Excavation & filling work Section 2: Km156+000 - Km162+000 Site clearing and excavation & filling work Section 3: Km162+000 - Km165+000 Excavation & filling work Section 4: Km165+000 - Km168+000 Site clearing and excavation & filling work Section 5: Km168+000 - Km172+000 Excavation & filling work
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
11
Section 6: Km172+000 - Km176+713 Excavation & filling work Section 7: Km176+713 - Km182+214 Excavation & filling work Section 8: Km182+214 - Km186+200 Site clearing and excavation & filling work Section 9: Km186+730 - Km190+420 Site clearing and excavation & filling work Tunnel (Km 186+200 – Km 186+730) 2 Tunnel Portals are being constructed by the Contractor.
May Khe Chuong bridge – Km153+355.05 Building Foundation platform Ngoi That bridge – Km155+971.55 Building Foundation platform Ngoi Rom bridge- Km157+517.05 No activity Ngoi Cong bridge – Km159+207.85 No activity Ngoi Giam I bridge – Km162+896.35 Building Foundation platform Ngoi Giam II bridge – Km163+126.00 Building Foundation platform Ngoi Hut bridge – Km165+110.50 Building Foundation platform Ngoi Chac bridge – Km169+412.00 Excavation & filling works Ngoi Pha bridge – Km170+312.50 No activity Suoi Quan bridge – Km173+434.00 No activity Ngoi Nhuoc bridge – Km176+661.85 Building Foundation platform Lang Nhay bridge – Km182+164.00 Building Foundation platform Lang Lau bridge – Km184+057.95 Building Foundation platform Ngoi Don bridge – Km185+077.75 Building Foundation platform and Excavation & filling works Dai Viet bridge – Km186+902.05 Building Foundation platform Van Xuan bridge – Km187+141.55 No activity Suoi Nau bridge – Km188+766.00 No activity Lang Nheo flyover – Km173+929 No activity Section 1: Km150+900 - Km156+000 Excavation & filling work Section 2: Km156+000 - Km162+000 Site clearing and excavation & filling work Section 3: Km162+000 - Km165+000 Excavation & filling work Section 4: Km165+000 - Km168+000 Site clearing and excavation & filling work Section 5: Km168+000 - Km172+000 Excavation & filling work Section 6: Km172+000 - Km176+713 Excavation & filling work Section 7: Km176+713 - Km182+214 Excavation & filling work Section 8: Km182+214 - Km186+200 Site clearing and excavation & filling work Section 9: Km186+730 - Km190+420 Site clearing and excavation & filling work Tunnel (Km 186+200 – Km 186+730) 2 Tunnel Portals are being constructed by the Contractor.
June Khe Chuong bridge – Km153+355.05 Structure work Ngoi That bridge – Km155+971.55 Structure work Ngoi Rom bridge- Km157+517.05 No activity Ngoi Cong bridge – Km159+207.85 Structure work Ngoi Giam I bridge – Km162+896.35 Structure work Ngoi Giam II bridge – Km163+126.00 Structure work Ngoi Hut bridge – Km165+110.50 Structure work Ngoi Chac bridge – Km169+412.00 Structure work Ngoi Pha bridge – Km170+312.50 No activity Suoi Quan bridge – Km173+434.00 No activity Ngoi Nhuoc bridge – Km176+661.85 Structure work Lang Nhay bridge – Km182+164.00 Structure work Lang Lau bridge – Km184+057.95 Structure work Ngoi Don bridge – Km185+077.75 Structure work Dai Viet bridge – Km186+902.05 Structure work Van Xuan bridge – Km187+141.55 No activity Suoi Nau bridge – Km188+766.00 No activity Lang Nheo flyover – Km173+929 No activity Section 1: Km150+900 - Km156+000 Excavation & filling work Section 2: Km156+000 - Km162+000 Excavation & filling work Section 3: Km162+000 - Km165+000 Excavation & filling work Section 4: Km165+000 - Km168+000 Excavation & filling work Section 5: Km168+000 - Km172+000 Excavation & filling work Section 6: Km172+000 - Km176+713 Excavation & filling work
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
12
Section 7: Km176+713 - Km182+214 Excavation & filling work Section 8: Km182+214 - Km186+200 Excavation & filling work Section 9: Km186+730 - Km190+420 Excavation & filling work Tunnel (Km 186+200 – Km 186+730) 2 Tunnel Portals are being constructed by the Contractor.
2.7 PACKAGE A7
April Khe Sang Brdge Structure concrete class C2: 100.0 m3; PC- I Girder, length
24m, height 1.45m: 2 each; P3, P7: Structure concrete class C2: 15m3, 6.6m3; PC- I Girder, length 24m, height 1.45m: 1 each
Khe Can Bridge PC- I Girder, length 24m, height 1.45m: 1 each Khe Dai bridge PC- I Girder, length 33m, height 1.65m: 1 each; Structure
concrete class C2: 50m3; PC- I Girder, length 33m, height 1.65m: 2 each
Thin Thung II Bridge P1: Structure concrete class C2: 180m3 Tan An Bridge A2, Structure concrete class C2: 17.5m3 Xom Danh Bridge Left: Structure concrete class C2: 29.4 m3; Right: Structure
concrete class C2: 21.6 m3; Ram AII: Structure concrete class C2: 30m3; Ram B: Structure concrete class C2: 23.2 m3
Ram AII Bridge Structure concrete class C2: 387.5 m3 Xom Cam Bridge Structure concrete class C2: 24m3 Ngoi Bong Bridge PC- I Girder, length 33m, height 1.65m: 1 each Section1: Km190+420-Km201+000 Unsuitable material, Rock excavation to fill and Common
excavation Section2: Km201+000-Km207+000 Common excavation and Rock excavation to fill Section3: Km207+000-Km218+040 Common excavation and Unsuitable material
May Khe Sang Brdge P3, P8: Structure concrete class C2: 88.7m3, 29.3m3; PC- I
Girder, length 24m, height 1.45m: 1 each Khe Can Bridge PC- I Girder, length 24m, height 1.45m: 1 each Tan Tien Bridge P2, P3: Structure concrete class C2: 18m3, 24m3 Thin Thung II Bridge P1: Structure concrete class C2: 156m3 Tan An Bridge P4: Structure concrete class C2: 15.8m3 Xom Danh Bridge Structure concrete class C2: 500m3; PC- I Girder, length 33m,
height 1.65m: 1 each Ram AII Bridge No activity Xom Cam Bridge Cast-in-place concrete pile (A1, A2 hole): 14m; P1: Structure
concrete class C2: 27m3 Ngoi Bong Bridge PC- I Girder, length 33m, height 1.65m: 1 each Tan Thuong Bridge A1: Structure concrete class C2: 50m3 Khe Hong Bridge P3: Structure concrete class C2: 20m3 Cam Con Bridge P2: Structure concrete class C2: 100m3 Section1: Km190+420-Km201+000 Unsuitable material and Rock excavation to fill Section2: Km201+000-Km207+000 Common excavation and Rock excavation to fill Section3: Km207+000-Km218+040 Common excavation and Unsuitable material
June Khe Sang Brdge No activate Khe Can Bridge No activate Tan Tien Bridge PC- I Girder, length 24m, height 1.45m: 1 each; A2 Structure
concrete class C2: 76m3 Thin Thung II Bridge P1 (right); P1 (left): Structure concrete class C2: 200m3,
31.9m3 Tan An Bridge No activate Xom Danh Bridge Structure concrete class C2: 500m3; PC- I Girder, length
33m, height 1.65m: 1 each
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
13
Ram AII Bridge No activate Xom Cam Bridge Cast-in-place concrete pile (A1, A2 hole): 14m Ngoi Bong Bridge No activate Tan Thuong Bridge No activate Khe Hong Bridge No activate Cam Con Bridge Structure excavation without cofferdam: 200m3 Chau Que Rhuong Bridge A1, A2, P1, P2: Structure concrete class C2: 50m3, 30m3,
30m3, 30m3; A2, P1: Structure concrete class C2: 56.9m3; 24m3
Ram B Bridge PC-I girder long: 24m, height 1.45m: 1 each Section1: Km190+420-Km201+000 Unsuitable material Section2: Km201+000-Km207+000 Common excavation and Rock excavation to fill Section3: Km207+000-Km218+040 Common excavation and Unsuitable material
2.8 PACKAGE A8
April IC18 Bridge No activity
Suoi Trat Bridge
cast-in-place concrete pile D=1000mm: 32m; PC-I girder, length 33m, height 1.65m: 1each; Structure; cast-in-place concrete pile D=1000mm: 12m; PC-I girder, length 33m, height 1.65m: 1each
Ngoi Bo Bridge Structural concrete G: 3.79m3; PC-I girder, length 33m, height 1.65m: 1each; cast-in-place concrete pile D=1000mm: 143m; Structural concrete C2: 71.29m3;
Suoi Nhu Bridge Structural concrete: 176.00m3; PC-I girder, length 25m, height 1.65m: 1each
Lang Tra Bridge Structure concrete lass G: 21.82m3; cast-in-place concrete pile D=1000mm: 92m.
IC17 Bridge cast-in-place concrete pile D=1000mm: 60m; PC-I girder, length 24m, height 1.45m: 1each; Structural concrete C2: 15.00m3; cast-in-place concrete pile D=1000mm: 44m.
Son Ha Bridge cast-in-place concrete pile D=1000mm: 184m Section1: Km218+080-Km223+000 Back to fill, Unsuitable material and common excavation Section2: Km223+000-Km225+000 Back to fill and common excavation Section3: Km225+000-Km229+000 No activity Section4: Km229+000-Km232+000 Back to fill and Unsuitable material Section5: Km232+000-Km235+000 Unsuitable material and common excavation Section6: Km235+000-Km238+000 No activity Section7: Km238+000-Km241+000 Back to fill, Unsuitable material and common excavation Section8: Km241+000-Km243+000 Unsuitable material and common excavation Section9: Km243+000-Km244+000 Unsuitable material and common excavation RAM IC18: Km244+000-Km244+570 Unsuitable material and common excavation
May IC18 Bridge No activity Suoi Trat Bridge PC-I girder, length 33m, height 1.65m: 1each Ngoi Bo Bridge Structural concrete C2: 3.79m3
Suoi Nhu Bridge Structural concrete: 9.2m3; PC-I girder, length 25m, height 1.65m: 1each
Lang Tra Bridge No activity IC17 Bridge No activity Son Ha Bridge No activity Section1: Km218+080-Km223+000 Back to fill and Unsuitable material and common excavation Section2: Km223+000-Km225+000 Unsuitable material Section3: Km225+000-Km229+000 No activity Section4: Km229+000-Km232+000 Common excavation Section5: Km232+000-Km235+000 Unsuitable material and common excavation
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
14
Section6: Km235+000-Km238+000 No activity Section7: Km238+000-Km241+000 Back to fill and Unsuitable material and common excavation Section8: Km241+000-Km243+000 Unsuitable material and common excavation Section9: Km243+000-Km244+000 Unsuitable material and common excavation RAM IC18: Km244+000-Km244+570 No activity
June IC18 Bridge Cast-in-place concrete Pile D=1000mm: 15m
Suoi Trat Bridge Structural concrete C2: 203,23m3 Ngoi Bo Bridge Cast-in-place concrete Pile D=1000mm: 31m Suoi Nhu Bridge PC-I girder, length 33m, height 1.65m: 1each
Lang Tra Bridge Cast-in-place concrete Pile D=1000mm: 14m; PC-I girder length 33m, height 1.65m: 1 each
IC17 Bridge Cast-in-place concrete Pile D=1000mm: 14m Son Ha Bridge Cast-in-place concrete Pile D=1000mm: 14m Section1: Km218+080-Km223+000 Back to fill and Unsuitable material and common excavation Section2: Km223+000-Km225+000 Unsuitable material Section3: Km225+000-Km229+000 Back to fill and Unsuitable material Section4: Km229+000-Km232+000 Common excavation Section5: Km232+000-Km235+000 Unsuitable material and common excavation Section6: Km235+000-Km238+000 Common excavation Section7: Km238+000-Km241+000 Back to fill and Unsuitable material and common excavation Section8: Km241+000-Km243+000 Unsuitable material and common excavation Section9: Km243+000-Km244+000 Unsuitable material and common excavation RAM IC18: Km244+000-Km244+570 No activity
Lo
an 2
391/
2392
– V
IE: G
MS
Kun
min
g –
Hai
Pho
ng T
rans
port
Cor
ridor
N
oi B
ai –
Lao
Cai
Hig
hway
Pro
ject
15
3 C
AR
RIE
D O
UT
TASK
S D
UR
ING
TH
E PE
RIO
D
Dur
ing
the
perio
d of
ref
eren
ce f
or t
his
quar
terly
rep
ort,
the
envi
ronm
enta
l tas
ks c
arrie
d ou
t by
the
spe
cial
ists
wer
e th
e fo
llow
ing
(see
tab
les
belo
w).
The
Wee
kly
Rep
orts
hav
e be
en in
clud
ed in
the
corr
espo
ndin
g M
onth
ly R
epor
ts. S
o, it
’s c
onsi
dere
d no
t nec
essa
ry o
r use
ful t
o in
clud
e ag
ain
that
info
rmat
ion
in th
is d
ocum
ent.
Pack
age
Gen
eral
Insp
ectio
n1 Pu
nctu
al In
spec
tion2
Wee
kly
Rep
ort
Subm
issi
on
Lette
r/Not
ifica
tion
Subm
issi
on
Wee
kly,
Mon
thly
and
Sp
ecifi
c M
eetin
g A
pr
May
Ju
ne
Apr
M
ay
June
A
pr
May
Ju
ne
Apr
M
ay
June
A
pr
May
Ju
ne
A1
3, 1
0,
17, 2
4
3, 8
,
22, 2
9
5, 1
2,
19
12, 1
9 10
, 28
7,
14,
21, 2
7
5, 1
2,
19, 2
6
2, 9
,
16, 2
3
9, 2
0,
25, 2
6
4, 2
4,
28, 3
0 6,
22
20
4, 2
4,
28
A2
4, 1
1,
18, 2
5
4, 9
,
21
6, 1
3,
20
22
, 30,
31
7,
14,
21, 2
7
5, 1
2,
19, 2
6
2, 9
,
16, 2
3
5, 9
,
13, 2
3,
25, 2
6
4, 1
4,
24, 2
8,
30
4, 6
,
14, 1
5,
22
4,
24,
28
A3
5, 1
2,
19, 2
6
9
7, 1
4,
21, 2
8
16
, 17,
24
19
A4
4, 1
1,
18, 2
5
16
7,
14,
21, 2
8
4,
16,
24
19
Lo
an 2
391/
2392
– V
IE: G
MS
Kun
min
g –
Hai
Pho
ng T
rans
port
Cor
ridor
N
oi B
ai –
Lao
Cai
Hig
hway
Pro
ject
16
Pack
age
Gen
eral
Insp
ectio
n1 Pu
nctu
al In
spec
tion2
Wee
kly
Rep
ort
Subm
issi
on
Lette
r/Not
ifica
tion
Subm
issi
on
Wee
kly,
Mon
thly
and
Sp
ecifi
c M
eetin
g A
pr
May
Ju
ne
Apr
M
ay
June
A
pr
May
Ju
ne
Apr
M
ay
June
A
pr
May
Ju
ne
A5
5, 9
,
17, 2
5
8, 1
4,
16, 2
5
7, 1
3,
19
3, 1
6 3,
17
1, 1
6,
25
7, 1
4,
21, 2
7
5, 1
2,
19, 2
5
2, 9
,
16, 2
3
3, 6
, 11,
12, 1
4,
18, 2
3,
24, 2
7
3, 7
, 9,
15, 1
6,
25, 2
6,
31
8, 1
3,
21
9, 2
3 2,
21,
28
11, 2
5
A6
9, 1
9,
25, 2
6
4, 1
0,
17, 2
3
1, 7
,
15, 2
2
2, 7
,
16
12, 1
5,
25
12
7, 1
4,
21, 2
7
5, 1
2,
19, 2
5
2, 9
,
16, 2
3
4, 1
0,
11, 1
9,
26, 2
7
3, 4
, 9,
14, 1
5,
25, 3
1
6, 1
3,
21
9, 2
3 2,
21,
28
11, 2
5
A7
6,
16,1
7 2,
16
29, 1
3 10
, 24
7, 2
1 7,
20
7, 1
4,
21, 2
7 12
, 19
2, 9
,
16, 2
3 2,
10
3, 4
, 8,
17, 2
2,
25
28, 3
0,
5, 1
2,
19, 2
5
5, 2
3 3,
18
31, 1
4
A8
13, 2
5 16
, 18,
24
30, 1
4 20
4,
8
6, 1
8 7,
14,
21, 2
7 12
, 19
2, 9
,
16, 2
3 2,
6
27, 3
28, 2
9,
8, 1
2,
18
5, 2
3 3,
18
31, 1
4
1 : Ins
pect
ions
alo
ng a
ll th
e pa
ckag
e or
, at l
east
, mos
t of i
t 2 : I
nspe
ctio
ns in
one
or f
ew lo
catio
ns, g
ener
ally
bec
ause
of a
ny s
peci
fic m
atte
r or p
robl
em
Lo
an 2
391/
2392
– V
IE: G
MS
Kun
min
g –
Hai
Pho
ng T
rans
port
Cor
ridor
N
oi B
ai –
Lao
Cai
Hig
hway
Pro
ject
17
4 EN
VIR
ON
MEN
TAL
MO
NIT
OR
ING
RES
ULT
S. C
OM
PLEM
ENTA
RY
MEA
SUR
ES T
O B
E A
PPLI
ED
4.1
IMPA
CT
ON
AIR
QU
ALI
TY
4.1.
1 Pa
ckag
e A
1
Tabl
e 4.
1: R
esul
ts o
f air
qual
ity in
Pac
kage
A1
in s
econ
d qu
arte
r, 20
12.
Stat
ion
Sens
itive
R
ecep
tors
Sa
mpl
ing
Dat
e &
Ti
me,
wea
ther
co
nditi
on
PAR
AM
ETER
S, µ
g/m
3 SO
2 C
O
NO
x TS
P PM
10
Apr
M
ay
June
A
pr
May
Ju
ne
Apr
M
ay
June
A
pr
May
Ju
ne
Apr
M
ay
June
Km
4+2
20
Pag
oda
and
resi
dent
are
a
22-A
pr-2
012
22-M
ay-2
012
14-J
un-2
012
(sun
ny, l
ight
win
d)
20
18
29
530
5800
64
00
23
26
0.02
8 15
0 12
0 15
0 90
10
0 12
0
Km
13+
100
Res
iden
t are
a
23-A
pr-2
012
23-M
ay-2
012
15-J
un-2
012
(sun
ny, l
ight
win
d)
22
21
23
570
5600
59
00
19
21
0.02
5 13
0 11
0 13
0 12
0 11
0 13
0
Km
19+
650
Sch
ool a
nd
resi
dent
are
a
24-A
pr-2
012
24-M
ay-2
012
18-J
un-2
012
(sun
ny, l
ight
win
d)
18
21
25
500
5600
56
00
24
22
0.02
3 10
0 12
0 16
0 10
0 12
0 12
0
Km
24+
900
Nur
sery
G
arde
n
25-A
pr-2
012
25-M
ay-2
012
19-J
un-2
012
(sun
ny, l
ight
win
d)
25
29
37
580
5600
59
00
19
17
0.02
2 17
0 14
0 15
0 11
0 10
0 13
0
QC
VN
05:2
009/
BTN
MT
350
(1-h
r) 30
,000
(1-h
r) 20
0 (1
-hr)
300
(1-h
r) 15
0 (2
4-hr
)
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
18
April
In the site inspections, we still found that the dirt is being tracked onto public roads where the
construction sites intersect them. The Contractor also doesn’t clean these areas to keep them
in cleanliness and sanitary condition; this issue causes high spread of airborne dust in the hot
windy days.
At section Km 0+665 ~ Km 3+000, we also didn’t see the Contractor to spray water on surface
of embankment section in order to minimize the spread of dust in this area. The PSC had
many times warned the Contractor of this problem but till last site inspection on April 24 we still
didn’t perceive the Contractor to implement our requirement.
At section Km 19+650, the Contractor has already installed the fence of iron sheet surrounding
the construction area to minimize the spread of noise during carrying out construction activities
in this area.
We don’t find serious problems at other sections during the site inspections this month.
May
In the site inspection on May 03, we found that the Contractor still has not implemented
watering activity on surface of embankment sections such as sections Km 0+665 ~ Km 3+000,
Km 4+800 ~ Km 5+000 and at Interchange No. 3. The PSC has many times requested the
Contractor to wáter surface of embankment section to minize the spread of airborne dust
during hot windy day; however, the Contractor doesn’t implement our requirements. During the
remaining time of the month, it usually rained so there was almost no embankment work and
the dust was naturally minimized.
At Trung Kien Bridge and Dai Duong Bridge, during the site inspection on May 22, we found
that the workers had burned trash on sites. This activity is usually happened on sites despite
recommendation of the Engineer.
At other sections, we didn’t find serious problems during the site inspections this month.
June
In the site inspection on May 03, we found that the Contractor still has not implemented
watering activity on surface of embankment sections such as sections Km 0+665 ~ Km 3+000,
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
19
Km 4+800 ~ Km 5+000 and at Interchange No. 3. The PSC has many times requested the
Contractor to wáter surface of embankment section to minize the spread of airborne dust
during hot windy day; however, the Contractor doesn’t implement our requirements. During the
remaining time of the month, it usually rained so there was almost no embankment work and
the dust was naturally minimized.
At Trung Kien Bridge and Dai Duong Bridge, during the site inspection on May 22, we found
that the workers had burned trash on sites. This activity is usually happened on sites despite
recommendation of the Engineer.
At other sections, we didn’t find serious problems during the site inspections this month.
Lo
an 2
391/
2392
– V
IE: G
MS
Kun
min
g –
Hai
Pho
ng T
rans
port
Cor
ridor
N
oi B
ai –
Lao
Cai
Hig
hway
Pro
ject
20
4.1.
2 Pa
ckag
e A
2
Tabl
e 4.
2: R
esul
ts o
f air
qual
ity in
Pac
kage
A2
in s
econ
d qu
arte
r, 20
12.
Stat
ion
Sens
itive
R
ecep
tors
Sa
mpl
ing
Dat
e &
Tim
e,
wea
ther
co
nditi
on
PAR
AM
ETER
S, µ
g/m
3 SO
2 C
O
NO
x TS
P PM
10
Apr
M
ay
June
A
pr
May
Ju
ne
Apr
M
ay
June
A
pr
May
Ju
ne
Apr
M
ay
June
Km
34+
780
Pag
oda
and
resi
dent
are
a
17-A
pr-2
012
17-M
ay-2
012
11-J
un-2
012
(sun
ny a
nd li
ght
win
d)
26
26
28
650
640
680
14
15
18
120
110
150
130
130
130
Km
36+
500
Res
iden
t ar
ea
18-A
pr-2
012
18-M
ay-2
012
12-J
un-2
012
(sun
ny a
nd li
ght
win
d)
24
24
24
570
580
590
13
12
16
130
140
170
80
80
90
Km
39+
130
Res
iden
t ar
ea
23-A
pr-2
012
21-M
ay-2
012
13-J
un-2
012
(sun
ny a
nd li
ght
win
d)
18
18
18
560
570
630
18
16
19
120
130
150
150
110
130
QC
VN
05:2
009/
BTN
MT
350
(1-h
r) 30
,000
(1-h
r) 20
0 (1
-hr)
300
(1-h
r) 15
0 (2
4-hr
)
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
21
April
By observations during this month we still perceived that the dirt is being tracked onto public
roads where the construction sites intersect them. The Contractor also doesn’t clean these
areas to keep them in cleanliness and sanitary condition; this issue causes high spread of
airborne dust in the hot windy days.
Along through way we also didn’t see the Contractor to carry out the watering activity on
surface of embankment sections to minimize the spread of dust during the hot windy day
despite many requirements of the Engineer. We issued the last warning to request the
Contractor to implement our requirements and if he still fails we will recommend the Employer
to deduct money.
At Batch Plant C, due to the Contractor still doesn’t comply with our requirements to install the
fence surrounding material stockpile area in order to limit the spread of airborne dust, therefore
the PSC has already deducted money.
At other section, there is no serious problem noted during the site inspections.
May
By observations during this month, we still perceived that the dirt is being tracked onto public
roads where the construction sites intersect them. The Contractor also does not clean these
areas to keep them in cleanliness and sanitary condition; this issue causes high spread of
airborne dust in the hot windy days.
Along through way we also did not see the Contractor to carry out the watering activity on
surface of embankment sections to minimize the spread of dust during the hot windy day
despite many requirements of the Engineer. We issued the last warning to request the
Contractor to implement our requirements and if he still fails we will recommend the Employer
to deduct money.
At Batch Plant C, due to the Contractor still doesn’t comply with our requirements to install the
fence surrounding material stockpile area in order to limit the spread of airborne dust, therefore
the PSC has already deducted money.
At other section, there is no serious problem noted during the site inspections.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
22
June
The status of tracking of dirt onto public road has not been mitigated. This matter caused
dirtiness and high spread of airborne dust, especially in hot windy days. At sections of
embankment, the Contractor also didn’t water the surface in dry days and this caused high
spread of dust, too. The PSC many times requested the Contractor to solve these problems
but up to now, there is no improvement recorded.
We didn’t see any improvement at Batch Plant C – Km 39+200, and in the site inspection on
May 21, together with expert of ADB, the Employer and the Contractor, we have taken public
consultation action in these areas and the local people disclosed that the level of dust is very
high during operation of this CBP. The PSC also stopped the work of this CBP until the
Contractor corrects the defect.
We also found that the trash was burned on site at Muong Dao Bridge. This activity is usually
happened on sites despite recommendation of the Engineer.
At other section, there is no serious problem noted during the site inspections.
4.1.3 Package A3
April
The results of Air quality monitoring in April (table 4.3).
Table 4.3: Results of air quality in Package A3 in April, 2012.
Station Monitoring Items
Max. value
(mg/m3)
Min. value
(mg/m3)
Average value
(mg/m3)
Standard value
(mg/m3)
Km 48+500
CO 3,197 3,199 3,198 30 NOx 0,0164 0,0168 0,0166 0,2 TSP 0,181 0,183 0,182 0,30 SO2 0,072 0,070 0,071 0,35 PM10 0,148 0,150 0,149 0,15 Phenol KPH KPH KPH 0,01 Vibration 0,053 0,051 0,052 0,055
Km 55+500
CO 3,466 3,464 3,465 30 NOx 0,0456 0,0454 0,0455 0,2 TSP 0,222 0,220 0,221 0,30 SO2 0,032 0,034 0,033 0,35 PM10 0,150 0,148 0,149 0,15 Phenol KPH KPH KPH 0,01 Vibration 0,050 0,052 0,051 0,055
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
23
Station Monitoring Items
Max. value
(mg/m3)
Min. value
(mg/m3)
Average value
(mg/m3)
Standard value
(mg/m3)
Km 67+700
CO 3,616 3,614 3,615 30 NOx 0,0160 0,0162 0,0161 0,2 TSP 0,299 0,297 0,298 0,30 SO2 0,030 0,032 0,031 0,35 PM10 0,150 0,148 0,149 0,15 Phenol KPH KPH KPH 0,01 Vibration 0,038 0,040 0,039 0,055
Km 78+900
CO 3,418 3,416 3,417 30 NOx 0,040 0,042 0,041 0,2 TSP 0,300 0,298 0,299 0,30 SO2 0,031 0,033 0,032 0,35 PM10 0,150 0,148 0,149 0,15 Phenol KPH KPH KPH 0,01 Vibration 0,021 0,023 0,022 0,055
The analyzed results of the air environment show that: At the monitoring area, the other
analyzed results were within the allowed standard.
During April, when inspection in site we has found that all dump trucks were not covered. Soil
from trucks was fallen a lot on existing roads (Km51+100, Km62, Km67…). Therefore, dust
was distributed much in the air. The Consultant requested Contractor must collect all fallen soil
on existing roads, spread water regularly on both existing roads and access roads along
package A3 base on site minutes dated April 17th, 2012 at Km66+300 to Km66+300 and letter
ref. GET2-P0S-A3-1204 dated April 24th, 2012.
May
The result of Air quality monitoring in May as bellow:
Table 4.4: Results of air quality in Package A3 in May, 2012.
Station Monitoring Items
Max. value
(mg/m3)
Min. value
(mg/m3)
Average value
(mg/m3)
Standard value
(mg/m3)
Km 48+500
CO 3,245 3,247 3,246 30 NOx 0,0188 0,0186 0,0187 0,2 TSP 0,175 0,177 0,176 0,30 SO2 0,090 0,088 0,089 0,35 PM10 0,137 0,137 0,137 0,15 Phenol KPH KPH KPH 0,01 Độ rung 0,051 0,051 0,051 0,055
Km 55+500
CO 3,550 3,552 3,551 30 NOx 0,0481 0,0483 0,0482 0,2 TSP 0,210 0,212 0,211 0,30 SO2 0,047 0,049 0,048 0,35
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
24
Station Monitoring Items
Max. value
(mg/m3)
Min. value
(mg/m3)
Average value
(mg/m3)
Standard value
(mg/m3) PM10 0,133 0,135 0,134 0,15 Phenol KPH KPH KPH 0,01 Độ rung 0,053 0,053 0,053 0,055
Km 67+700
CO 3,632 3,634 3,633 30 NOx 0,0181 0,0183 0,0182 0,2 TSP 0,276 0,276 0,276 0,30 SO2 0,041 0,043 0,042 0,35 PM10 0,138 0,140 0,139 0,15 Phenol KPH KPH KPH 0,01 Độ rung 0,040 0,042 0,041 0,055
Km78+900
CO 3,525 3,523 3,524 30 NOx 0,049 0,049 0,049 0,2 TSP 0,284 0,282 0,283 0,30 SO2 0,046 0,044 0,045 0,35 PM10 0,141 0,141 0,141 0,15 Phenol KPH KPH KPH 0,01 Độ rung 0,025 0,027 0,026 0,055
The analyzed results of the air environment show that: At the monitoring area, the other
analyzed results were within the allowed standard.
In May, after warning letter of Consultant from April, Contractor spread water for some existing
roads (Km68, Km75+400…). But when inspection in site we have found that on existing roads
(Km51+100, Km62, Km78+900…) dust was distributed much in the air so local people was
complain much about this problem.
Special after inspection tour of ADB mission on May 21st, 2012, the ADB’s specialist
interviewed some local people who lives next to construction site (Km78+900). These people
said that they can’t sleep because noise, vibration from construction activities during 24
hours/day. Beside, dust was full in the air on sunny and dry days, Contractor did not spread
water appropriately to minimize dust. Hence, ADB mission and Consultant requested
Contractor must build fence around construction site where next to residential area and limit
working time at night to minimize noise, vibration and avoid disturb local people’s life. On dry
days, Contractor must spread water appropriately to avoid dust.
The Consultant’s warning letter was ref. GET2-POS-A3-1285 dated June 1st, 2012 “Require to
overcome Environmental and Safety problems in package A3.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
25
June
By observations during this month we still perceived that the dirt is being tracked onto public
roads where the construction sites intersect them. The Contractor also does not clean these
areas to keep them in cleanliness and sanitary condition; this issue causes high spread of
airborne dust in the hot windy days.
4.1.4 Package A4
April
The result of Air quality monitoring in April (table 4.5).
Table 4.5: Results of air quality in Package A4 in April, 2012.
Station Monitoring Items
Max. value
(mg/m3)
Min. value
(mg/m3)
Average value
(mg/m3)
Standard value(mg/m3) Exceeded Standard Value
(mg/m3)
QCVN 05:2009/ BTNMT
QCVN 06:2009/ BTNMT
TCVN 6962:2001
Km 91+150
CO 3,801 3,801 3,801 30 - - 0 NOx 0,0327 0,0327 0,0327 0,2 - - 0 TSP 0,188 0,188 0,188 0,30 - - 0 SO2 0,119 0,119 0,119 0,35 - - 0 PM10 0,138 0,138 0,138 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration KPH KPH KPH - - 0,055 0
Km 95 + 100
CO 3,491 3,491 3,491 30 - - 0 NOx 0,049 0,049 0,049 0,2 - - 0 TSP 0,144 0,144 0,144 0,30 - - 0 SO2 0,041 0,041 0,041 0,35 - - 0 PM10 0,062 0,062 0,062 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration KPH KPH KPH - - 0,055 0
Tan Thanh batching plant
CO 3,871 3,871 3,871 30 - - 0 NOx 0,043 0,043 0,043 0,2 - - 0 TSP 0,275 0,275 0,275 0,30 - - 0 SO2 0,071 0,071 0,071 0,35 - - 0 PM10 0,130 0,130 0,130 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration 0,041 0,041 0,041 - - 0,055 0
Km 88 + 300 to Km 88+500
CO 3,991 3,991 3,991 30 - - 0 NOx 0,0244 0,0244 0,0244 0,2 - - 0 TSP 0,192 0,192 0,192 0,30 - - 0 SO2 0,128 0,128 0,128 0,35 - - 0 PM10 0,147 0,147 0,147 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration 0,023 0,023 0,023 - - 0,055 0
Km 104 + 900 to Km 105 +
CO 3,855 3,855 3,855 30 - - 0 NOx 0,0531 0,0531 0,0531 0,2 - - 0 TSP 0,193 0,193 0,193 0,30 - - 0
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
26
Station Monitoring Items
Max. value
(mg/m3)
Min. value
(mg/m3)
Average value
(mg/m3)
Standard value(mg/m3) Exceeded Standard Value
(mg/m3)
QCVN 05:2009/ BTNMT
QCVN 06:2009/ BTNMT
TCVN 6962:2001
350 SO2 0,133 0,133 0,133 0,35 - - 0 PM10 0,142 0,142 0,142 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration 0,018 0,018 0,018 - - 0,055 0
Km 106 + 500 to Km 107 + 600
CO 4,128 4,128 4,128 30 - - 0 NOx 0,198 0,198 0,198 0,2 - - 0 TSP 0,155 0,155 0,155 0,30 - - 0 SO2 0,135 0,135 0,135 0,35 - - 0 PM10 0,148 0,148 0,148 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration 0,015 0,015 0,015 - - 0,055 0
Km 106 + 227
CO 3,739 3,739 3,739 30 - - 0 NOx 0,037 0,037 0,037 0,2 - - 0 TSP 0,126 0,126 0,126 0,30 - - 0 SO2 0,029 0,029 0,029 0,35 - - 0 PM10 0,099 0,099 0,099 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration 0,024 0,024 0,024 - - 0,055 0
Ambient air monitoring results at the positions are in the Standard Value pursuant to QCVN
05:2009/BTNMT, QCVN 06:2009/BTNMT, QCVN 27:2010/BTNMT.
During April, we have detected that all dump trucks was not covered and it spread soil on
existing roads at Km88+200 box culvert, Km97+124, Km107+533, Km105-Km109… hence,
dust was distributed much on these roads. The Contractor was strongly requested to cover all
dump trucks, clean existing road and spread water appropriately and after April 25th, 2012 if
they still delay we will force to stop work in site. The Consultant’s letter ref. GET2-KEA-A4-630
dated April 24th, 2012.
May
The result of Air quality monitoring in May (table 4.6).
Table 4.6: Results of air quality in Package A4 in May, 2012.
Station Monitoring Items
Max. value
(mg/m3)
Min. value
(mg/m3)
Average value
(mg/m3)
Standardvalue(mg/m3) Exceeded Standard Value
(mg/m3)
QCVN 05:2009/ BTNMT
QCVN 06:2009/ BTNMT
TCVN 6962: 2001
Km 91+150
CO 3,601 3,603 3,602 30 - - 0 NOx 0,0410 0,0412 0,0411 0,2 - - 0 TSP 0,193 0,191 0,192 0,30 - - 0
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
27
Station Monitoring Items
Max. value
(mg/m3)
Min. value
(mg/m3)
Average value
(mg/m3)
Standardvalue(mg/m3) Exceeded Standard Value
(mg/m3)
QCVN 05:2009/ BTNMT
QCVN 06:2009/ BTNMT
TCVN 6962: 2001
SO2 0,134 0,132 0,133 0,35 - - 0 PM10 0,140 0,142 0,141 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration KPH KPH KPH - - 0,055 0
Km 95 + 100
CO 3,562 3,564 3,563 30 - - 0 NOx 0,057 0,059 0,058 0,2 - - 0 TSP 0,173 0,171 0,172 0,30 - - 0 SO2 0,050 0,048 0,049 0,35 - - 0 PM10 0,080 0,082 0,081 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration KPH KPH KPH - - 0,055 0
Tan
Thanh batching
plant
CO 4,014 4,016 4,015 30 - - 0 NOx 0,055 0,053 0,054 0,2 - - 0 TSP 0,255 0,257 0,256 0,30 - - 0 SO2 0,081 0,083 0,082 0,35 - - 0 PM10 0,119 0,119 0,119 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration 0,041 0,039 0,040 - - 0,055 0
Km 88 + 300 to
Km 88+500
CO 4,114 4,116 4,115 30 - - 0 NOx 0,0288 0,0288 0,0288 0,2 - - 0 TSP 0,185 0,183 0,184 0,30 - - 0 SO2 0,140 0,140 0,140 0,35 - - 0 PM10 0,140 0,142 0,141 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration 0,029 0,027 0,028 - - 0,055 0
Km 104 + 900 to
Km 105 + 350
CO 3,942 3,942 3,942 30 - - 0 NOx 0,0589 0,0587 0,0588 0,2 - - 0 TSP 0,186 0,184 0,185 0,30 - - 0 SO2 0,148 0,146 0,147 0,35 - - 0 PM10 0,137 0,139 0,138 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration 0,016 0,014 0,015 - - 0,055 0
Km 106 +
500 to Km 107 +
600
CO 4,235 4,235 4,235 30 - - 0 NOx 0,206 0,204 0,205 0,2 - - 0 TSP 0,142 0,144 0,143 0,30 - - 0 SO2 0,148 0,148 0,148 0,35 - - 0 PM10 0,141 0,139 0,140 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration 0,019 0,020 0,018 - - 0,055 0
Km 106 + 227
CO 3,853 3,851 3,852 30 - - 0 NOx 0,051 0,049 0,050 0,2 - - 0 TSP 0,119 0,117 0,118 0,30 - - 0 SO2 0,036 0,036 0,036 0,35 - - 0 PM10 0,090 0,088 0,089 0,15 - - 0 Phenol KPH KPH KPH - 0,01 - 0 Vibration 0,021 0,021 0,021 - - 0,055 0
Ambient air monitoring results at the positions are in the Standard Value pursuant to QCVN
05:2009/BTNMT, QCVN 06:2009/BTNMT, QCVN 27:2010/BTNMT.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
28
During May, we have detected that all dump trucks was not covered and it spread soil on
existing roads from section 1 to section 6. Hence, dust was distributed much in the air on dry
days. It gravely impacted to local people’s life. At some location (Km108+800), they set up
temporary barrier to stop all car or equipment go out or in construction site and requested
Contractor must spread water to minimize dust there. Consultant strongly requested
Contractor to cover all dump trucks, clean existing road and spread water appropriately but
they delay till May 12th 2012 they start spreading water for some existing roads at Km96-
Km97, Km106-Km107…
In inspection tour of ADB mission, they warned Contractor must water appropriately to
minimize dust and Contractor promise they will follow it. So Consultant will recheck carefully in
site on next month.
Consultant’s warning letter is ref.GET2-KEA-A4-638 dated May 4th, 2012 and GET2-KEA-A4-
680 dated June 1st, 2012.
June
In june, we have detected that all dump trucks was not covered and it spreads soil on existing
roads from section 1 to section 6. Hence, dust was distributed much in the air on dry days. It
gravely impacted to local people’s life. At some location (Km108+800), they set up temporary
barrier to stop all car or equipment go out or in construction site and requested Contractor
must spread water to minimize dust there.
4.1.5 Package A5
April
This month, through the inspection and supervision on site, the Consultant found that the
environment control and protection of the Contractor did not have much improvement. The
Contractor still failed to fully implement the measures to minimize the impacts on environment
in the process of construction and transportation of raw materials, such as:
- Most of the Contractor's trucks were not covered with canvas in the process of
construction and transportation of raw materials.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
29
- The Contractor did not perform the watering to minimize dust generated on site as well
as on the materials transportation roads such as at Km111, Km112, Km123, Km145, ...
- At the factories of the Contractor such as the RC Pipe Culvert Factory No. 1 (Km117),
RC Pipe Culvert Factory No. 2 (Km132), concrete batching plant No. 1 (Km123),
concrete batching plant No. 2 (Km132), the Contractor did not apply any measures to
minimize dust during operation.
This has caused adverse impacts on the regional air quality. The Consultant has reminded the
Contractor on these outstanding issues (mentioned in Ref. GET3-KEANGNAM-12-A5-361
dated April 24, 2012). In addition, the Consultant has also required the Contractor to apply
adequate measures to minimize dust during construction and transportation of materials to
prevent adverse impacts on the regional air environment.
In the weekly site inspections, the Consultant has also frequently requested the Contractor to
fully comply with the Method Statement as well as the Environment control and protection plan
during construction to ensure the air quality.
This month, the Contractor carried out air quality observation on 15th April, 2012 in the
construction locations of the Contractor which are close to residential areas; the observation
results of air environment criteria are represented by the following table:
Table 4.7: Results of air quality in Package A5 in April, 2012.
No Station/sampling point Parameter (µg/m3) SO2 CO NOx TSP PM10
1
Bao Long church (Km 117+050) A1 122 1465 109 112 65 A2 132 1343 169 143 56 A3 143 1409 171 167 88
2
Hop Minh My bridge (Km 118+820) A4 252 2633 163 189 83 A5 234 2541 173 201 103 A6 212 2251 162 213 79
3
QL37 bridge (Km 121+433) A7 163 2441 143 148 63 A8 154 1248 141 164 72 A9 176 2321 146 204 62
Min 122 1248 109 112 56 Max 252 2633 173 213 103 Mean 176.4 1961.3 153.0 171.2 74.6 QCVN 05 :2009- Cột 1 350 30000 200 300 -
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
30
At the present, the construction at monitoring locations mostly is site clearance and leveling
but not complex activities. The results showed that all of the measured values are lower than
referred correspondents stipulated in QCVN 05:2009-column 1.
May
Through the inspection and supervision on site, the Consultant found that there are still some
outstanding issues in the environment management of the Contractor during construction and
transportation of materials. This has affected the regional air environment, namely:
- The Contractor did not conduct water spraying to minimize dust generated during
construction and transportation of materials in some areas such as: Km111, Km117,
Km119, Km123, Km145, Km148...
- During the material transportation of the Contractor, most trucks were not covered with
canvas.
- The Contractor did not apply any measure to minimize dust generated in their factories,
such as the RC Pipe culvert factory No1 (Km117), RC Pipe culvert factory No 2
(Km132), concrete batching plant No 1 (Km123), concrete batching plant No 2
(Km132)...
To ensure the regional air environment, the Consultant has reminded the Contractor on these
outstanding issues (Ref. GET3-KEANGNAM-12-A5-438 dated May 16, 2012 and GET3-
KEANGNAM-12-A5-490 dated May 31, 2012). Besides, the Consultant has also required the
Contractor to quickly apply measures to resolve the outstanding issues. In addition, in the site
inspections, the Consultant has frequently required the Contractor to comply with the Method
Statement and the Environment Control and Protection Plan to prevent negative impact on the
region’s air environment during construction process.
This month, the Contractor carried out air quality observation on 10th May, 2012 in the
construction locations of the Contractor which are close to residential areas; the observation
results of air environment criteria are represented by the table 4.8.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
31
Table 4.8: Results of air quality in Package A5 in May, 2012.
No Station/sampling point Parameter (µg/m3) SO2 CO NOx TSP PM10
1
Bao Long church (Km 117+050) A1 113 1420 113 111 46 A2 142 1704 145 133 49 A3 129 1812 153 121 76
2
Hop Minh My bridge (Km 118+820) A4 267 2712 168 169 61 A5 241 2531 163 231 94 A6 225 2145 172 235 68
3
QL37 bridge (Km 121+433) A7 209 2342 163 135 68 A8 178 1453 153 154 73 A9 181 2413 152 183 57
Min 113 1420 113 111 113 Max 267 2712 172 235 267 Mean 187,2 2059,1 153,6 163,6 187,2 QCVN 05 :2009- Cột 1 350 30000 200 300 -
At the present, the construction at monitoring locations mostly is site clearance and leveling
but not complex activities. The results showed that all of the measured values are lower than
referred correspondents stipulated in QCVN 05:2009-column 1.
June
This month, through the inspection and supervision on site, the Consultant found that the
environment control and protection of the Contractor in had not much improvement over the
previous month; there are still some outstanding issues unresolved, such as:
- Most of the Contractor's trucks were not equipped with canvases in the process of raw
materials transportation.
- The water spraying to minimize dust generated during construction and materials
transportation of the Contractor was not conducted on sites and on transportation roads
such as: Km111, Km113, Km117, Km130, Km145, Km148...
- Measures to minimize dust generated in the plants of the Contractor have not yet been
applied fully such as in the concrete batching plant No. 1 (Km123), concrete batching
plant No. 2 (Km132)...
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
32
- In the process of construction and materials transportation, soil dropped on the public
roads such as at Km123+680, Km126, Km145... this created dust when the vehicles
drove through this area, especially in hot days.
The Consultant has warned the Contractor on the outstanding issues in Ref. GET3-
KEANGNAM-12-A5-565 dated June 27, 2012. In addition, the Consultant has also required the
Contractor to quickly take steps to address them and ensure the regional air quality during the
construction process.
This month, the Contractor carried out air quality observation on 15th May, 2012 in the
construction locations of the Contractor which are close to residential areas; the observation
results of air environment criteria are represented in the table 4.9.
At the present, the construction at monitoring locations mostly is site clearance and leveling
but not complex activities. The results showed that all of the measured values are lower than
referred correspondents stipulated in QCVN 05:2009-column 1.
Table 4.9: Results of air quality in Package A5 in June, 2012.
No. Station/sampling point Parameter (µg/m3) SO2 CO NOx TSP PM10
1
Bao Long church (Km 117+050) A1 174 1310 132 112 39 A2 163 1504 151 141 51 A3 121 1632 134 125 67
2
Hop Minh My bridge (Km 118+820) A4 253 2513 155 157 56 A5 232 2350 157 204 76 A6 214 2033 162 224 56
3
QL37 bridge (Km 121+433) A7 212 2123 155 23 65 A8 167 1345 167 137 67 A9 168 2241 153 162 59
Min 121 1310 132 23 39 Max 253 2513 167 224 76 Mean 189.3 1894.6 151.8 142.8 59.6 QCVN 05 :2009- Cột 1 350 30000 200 300 -
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
33
4.1.6 Package A6
April
This month, through the inspection and supervision on site, the Consultant found that the
Contractor has continued to perform watering to minimize dust on the site at some locations
such as: Km157, Km184, Km186, Km187... Besides, in the month there were some rainy days,
so the amount of dust generated during construction process and transportation of raw
materials was reduced significantly.
However, in this month, there are still some outstanding issues as follows:
- Most of the Contractor's trucks were not carefully covered with canvas in the
transporting process of raw materials.
- At the construction locations Km151-Km152, Km174, many soil dropped on public
roads during transportation of rzaw materials of the Contractor; this has generated dust
in the hot days.
- At some stations such as Km174, Km176, Km165, Km183..., the watering work on the
public roads and on site has still not been carried out regularly. Therefore, on some hot
and windy days, the vehicles driving through these locations caused dust, which
affected the regional air quality.
- In the factories of the Contractor such as batching plant Km163, batching plant Km165,
batching plant Km180, measures for minimizing dust during production process were
not fully applied by the Contractor.
The Consultant has reminded the Contractor on these outstanding issues (Ref. -DOOSAN-12-
A6-387 dated 19 April 2012). Besides, in the site inspections, the Consultant has also required
the Contractor to strictly comply with the Method Statement and the Environment Control and
Protection Plan which were approved by the Consultant to prevent negative impact on air
environment from the process of construction and materials transportation of the Contractor.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
34
May
Through the inspection and supervision on site this month, the Consultant found that
Contractor has still conducted water spraying to minimize dust at some construction locations
and transportation road of raw materials such as: Km157, Km158, Km165, Km184, Km185,
Km187... Besides, the amount of dust generated during construction and transportation of raw
materials has also been substantially reduced due to the number of rainy days in this month.
However, there are still some outstanding issues as follows:
- The Contractor's trucks were not covered with canvas in the process of transporting
raw materials.
- Soil was dropped on the public roads during construction and transportation such as at
Km151, Km159, Km174, Km157... this is the cause of the situation of dust when
vehicles drove on these public roads, especially in hot and windy day.
- The process of construction and materials transportation of the Contractor are
responsible for the generation of dust in areas such as: Km151, Km156+300,
Km156+475, Km161... The Contractor has carried out water spraying in these areas to
minimize dust, but the work was not done regularly and the frequency of water spraying
was less, so the amount of dust was generated in the process of raw materials
transporting, especially on sunny days.
- The Contractor has not yet fully applied measures to minimize dust generated during
operation of the factories such as the concrete batching plant Km163, Km165 and
Km180.
To ensure environment of the Project, the Consultant has reminded the Contractor on these
outstanding issues. Also, the Consultant has required the Contractor to apply measures to
minimize dust during construction, transportation (Ref. DOOSAN GET3-DOOSAN-12-A6-484
dated May 14, 2012) and during the operation of the Contractor’s batching plant (Ref. GET3-
DOOSAN-12-A6-452 dated May 3, 2012).
Besides, in the site inspections, the Consultant has required the Contractor to strictly comply
with the Method Statement and the Environment Control and Protection Plan approved by the
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
35
Consultant to prevent the negative effects on the air environment from the construction
activities and materials transportation of the Contractor.
June
Rainy season has started in this month, so there were many rainy days in the month, which
significantly reduced the amount of dust generated during construction and transportation of
raw materials. Besides, water spraying to ensure dust minority has being deployed in some
areas such as: Km157, Km156, Km165, Km176, Km185, Km184, etc.
However, through our inspection and supervision on site, we found that there were still some
outstanding issues which influence the air quality in the area as follow:
- In areas of Km151, Km165, Km155, Km174, ... there was a lot of soil spillage on public
roads during transportation of materials; besides, on a rainy day, the land from the
Project area flooded the public roads in the area of Km159 +690 , Km157+090,
Km155+220, Km151+200, etc., which was the cause of the condition of dust from traffic
vehicles in the area, especially in hot and windy day.
- Currently, most of the Contractor's truck did not make full use of canvas in the process
of transporting raw materials.
- In some areas such as: Km176, Km174, Km187, etc., although the Contractor carried
out water injection in these areas, the frequency of water spraying was not enough; so
it still underlied the condition of dust when a number of vehicles ran through this area,
especially on hot days, which affected the air quality in the region.
- In areas of concrete batching such as Km163, Km165, Km180, etc. measures to
minimize dust during operation were not fully applied.
The Consultant reminded the Contractor on the outstanding issues and we also required the
Contractor to implement measures to minimize dust generated during construction,
transportation of materials, in order to ensure air quality in the area (mentioned in Ref. GET3-
DOOSAN-12-A6-546 threads May 31, 2012 and GET3-DOOSAN-12-A6-569 threads June 9,
2012).
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
36
4.1.7 Package A7
April
In April, the air quality affected by material vehicles which were not covered by tarps and
watering was not frequent in sensitive areas.
Most material vehicles from Khe Lech quarry to section 2 of package A7 were not covered by
tarps in during April.
In addition some other activate as excavation or embankment also affect to ambient air quality
but acceptable.
May
On During time of May, the air quality affected by material vehicles which wasn’t cover by tarps
and watering didn’t frequently at sensitive area.
Most material vehicles from Khe Lech quarry to section2 of package A7 didn’t cover by tarps in
during May.
In addition some other activate as excavation or embankment also affect to ambient air quality
but acceptable.
Result of the Contractor air quality monitoring (carried out by Institute of Environmental
technology in April 2012) showed that construction works not effected to ambient air quality.
Table 4.10: Results of air quality in Package A7 in May, 2012.
No
Sample
Monitoring parameters
TSP (µg/m3) CO (µg/m3) SO2 (µg/m3) NO2 (µg/m3)
1 KK01 32 930 63 27 2 KK02 39 1730 70 39 3 KK03 34 2251 77 41 4 KK04 34 2020 113 35 5 KK05 25 940 143 28 6 KK06 26 1110 67 29 7 KK07 30 1068 57 27 8 KK08 36 1827 117 32 9 KK09 25 930 83 28
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
37
No
Sample
Monitoring parameters
TSP (µg/m3) CO (µg/m3) SO2 (µg/m3) NO2 (µg/m3)
10 KK10 26 1116 67 30 11 KK11 37 1102 57 32 12 KK12 36 2520 60 35 13 KK13 52 1742 93 29 14 KK14 28 994 97 25 QCVN 05: 2009/BTNMT QCVN 06: 2009/BTNMT
300 30,000 350 -
Note:
KK01: Xuan Sang 1 Primary School, Xuan Sang 1 Hamlet, Tan An Commune, Van ban District
(coordinates N: 22007.895’; E:104023.844’)
KK02: Concrete mixing plant No.1, Ngam Thin Hamlet, Tan Thuong Commune, Van Ban
District (coordinates N: 22009.615’; E:104020.459’)
KK03: Concrete mixing plant No.2, Dap Tran Hamlet, Tan Thuong Commune, Van Ban District
(coordinates N: 22009.249’; E:104020.751’)
KK04: Bridge girder casting yard, Xuan Sang 2 Hamlet, Tan An Commune, Van Ban District
(coordinates N: 22007.442’; E:104024.026’)
KK05: Equipment gathering yard, worker’s living area, Khe U Hamlet, Tan Thuong Commune,
Van Ban District (coordinates N: 22011.545’; E:104019.420’)
KK06: Cam Con Primary School, Khe Mai Hamlet, Cam Con Commune, Bao Yen District
(coordinates N: 22012.167’; E:104018.523’)
KK07: Cam Con Health Center, Tan Tien Commune, Bao Yen District (coordinates N:
22014.142’; E:104016.553’)
KK08: Drainage casting yard No.1, Khe Quat Hamlet, Tan An Commune, Van Ban District
(coordinates N: 22008.585’; E:104022.537’)
KK09: Khe U Primary School, Khe U Hamlet, Tan Thuong Commune, Van Ban District
(coordinates N: 22011.604’; E:104019.474’)
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
38
KK10: Residential areas at the right side of project road, Ban Ly Hamlet, Cam Con Commune,
Bao Yen District (coordinates N: 22012.217’; E:104018.563’)
KK11: Tan Thuong Secondary School, Khe Tep Hamlet, Tan Thuong Commune, Van Ban
District (coordinates N: 22011.021’; E:104020.370’)
KK12: Drainage casting yard No.2, Bong 1 Hamlet, Cam Con Commune, Bao Yen District
(coordinates N: 22013.532’; E:104016.995’)
KK13: Cam Con Secondary School, Hamlet 2, Cam Con Commune, Bao Yen District
(coordinates N: 22014.380’; E:104016.388’)
KK14: Tan An Kinder Garden, Tan Duong Hamlet, Tan An Commune, Van Ban District
(coordinates N: 22009.511’; E:104021.960’)
The results of air quality environmental monitoring in the above table are compared with the
limit values in the standards; it shows that most of the observation results are lower than the
prescribed limit values and ranges:
+ Dust concentration: Between 25 to 52 µg/m3,
+ CO concentration: Between 930 to 2520 µg/m3,
+ SO2 concentrations: Between 57 to 143 µg/m3,
+ NO2 concentration: Between 27 to 41 µg/m3,
June
During on June 2012 the contractor construction works the base and subbase layers at
section1; section2 and section3 with watering car according to project regulation in order to
mitigate the concentration of dust avoid effect to local people. Hence during the transfer
material (base and subbase) the contactor haven’t consequence watering along the exits
road, these are effects to local people, especial at section 3 Km207-Km218+040 date 28-June
2012.
So consultant required the contractor to consequences watering in order to mitigate
concentration of dust avoid effect to local people.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
39
4.1.8 Package A8
April
In April 2012, the contractor concentrated construction works the sub-base at Km238-
Km239+300 and foundation road belong package A8 combination with dry season created
dust on site, which can affect to ambient air quality. Hence consultant required the contractor
to support the watering car to decrease dust concentration and not effect to ambient air quality.
The contractors are reminded in letters No Ref. GET4- Vinaconex- 534.
May
On 16- May 2012 the contractor concentrated construction works the sub-base at Km238-
Km239+300 and foundation road belong package A8 combination with dry season created
dust on site, which can effect to ambient air quality. Hence consultant required the contractor
to support the watering car to decrease dust concentration and not effect to ambient air quality.
June
During on June 2012 the contractor construction works the base and subbase layers at
Km238-Km239+300 with watering car according to project regulation in order to mitigate the
concentration of dust avoid effect to local people. Hence during the transfer material (base and
subbase) the contactor haven’t consequence watering along the exits road, these are effects
to local people, especial at Km218+040- Km225+000.
So consultant required the contractor to consequences watering in order to mitigate
concentration of dust avoid effect to local people.
4.2 IMPACT ON WATER RESOURCES
4.2.1 Package A1
April
There is no improvement in last month at Tan Loi Bridge; however, the Contractor also does
not worsen the situation. The PSC still closes the procedures of payment of progress of all
items of this work until the Contractor corrects defects.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
40
The similar status was also recorded at Underpass NH2, the direct discharge of untreated
wastewater containing sand and mud into existing irrigation canal is still going on. The PSC
has strongly warned the Contractor and if he still fails to meet our requirements we will
consider applying the measure of money deduction. The next site inspection will be held on
May 03, 2012 to check the implementation of the Contractor.
At other sections, we did not see the serious problem happening during the site inspections.
May
In the site inspections this month, we still found that at Tan Loi Bridge the Contractor has not
taken any action to improve the status here. Due to the heavy rains, Piers 2 and 3 construction
site is now under the water.
At Underpass NH2 the Contractor constructed a sediment basin to catch sediment from
wastewater before discharge of it offsite. However, the capacity of this device is not enough
and the PSC has requested the Contractor to construct one more to ensure that the sediment
is not spilled-over existing drainage. And this time is in harvest and straw is available, so traw
bales were recommended as a sediment check dam to be installed at outlet of untreated
wastewater discharge area to remove sediment from wastewater.
At other sections, we did not see the serious problem happening during the site inspections.
June
In the site inspections this month, we still found that at Tan Loi Bridge the Contractor has not
taken any action to improve the status here. Due to the heavy rains, Piers 2 and 3 construction
site is now under the water.
At Underpass NH2 the Contractor constructed a sediment basin to catch sediment from
wastewater before discharge of it offsite. However, the capacity of this device is not enough
and the PSC has requested the Contractor to construct one more to ensure that the sediment
is not spilled-over existing drainage. And this time is in harvest and straw is available, so traw
bales were recommended as a sediment check dam to be installed at outlet of untreated
watewater discharge area to remove sediment from wastewater.
At other sections, we didn’t see the serious problem happening during the site inspections.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
41
4.2.2 Package A2
April
In the site inspections we found that there is no improvement at Ben Tre Bridge; however, the
Contractor also does not let the problem worse. The procedures of payment progress
suspension of all items of this work is still going on until the Contractor corrects the defects
completely.
At Muong Dao and Ban Gao Bridge, we perceived that the Contractor still didn’t take any
action to correct the issues and he even discharged the untreated wastewater that contains
sand and mud directly into river at Ben Gao Bridge. The PSC has many times requested the
Contractor to solve these problems as well as instructed him how to treat wastewater before
discharge of it but there was no improvement recorded. For Ben Gao Bridge, we have already
recommended the Employer to deduct money due to the Contractor didn’t solve the problems
and let them worsened. We also still close the procedures of payment progress of all items of
these works until the Contractor implements our requirements.
On Mar 28, we found that the Contractor had discharged the bentonite slurry into river at Pier 7
of Lo River Bridge. The PSC has strongly warned the Contractor and requested him to stop
this activity. However, in the site inspection on April 11, we again found that he already
disposed all the bentonite slurry, sand and mud – by product due to bentonite slurry recycle
into river at the place as before. The PSC has requested the Contractor to remove all the
unsuitable material that remains on riverside concomitant with persons in charge discipline.
At Batch Plant 2 of Lo River Bridge, the improvement is very behindhand. The settling pond is
very unsettled and it seems to be broken easily in heavy rain. There is also no drainage on
surface to handle the surfaced runoff so the surfaced wastewater could flow directly into river
in the rain.
At other places, we didn’t detect any serious problem happening during the site inspections
this month.
May
In the site inspections we found that there is no improvement at Ben Tre Bridge; however, the
Contractor also does not let the problem worse. The procedures of payment progress
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
42
suspension of all items of this work is still going on until the Contractor corrects the defects
completely.
At Muong Dao and Ban Gao Bridge, we perceived that the Contractor still did not take any
action to correct the issues and he even discharged the untreated wastewater that contains
sand and mud directly into river at Ben Gao Bridge. The PSC has many times requested the
Contractor to solve these problems as well as instructed him how to treat wastewater before
discharge of it but there was no improvement recorded. For Ben Gao Bridge, we have already
recommended the Employer to deduct money due to the Contractor didn’t solve the problems
and let them worsened. We also still close the procedures of payment progress of all items of
these works until the Contractor implements our requirements.
On Mar 28, we found that the Contractor had discharged the bentonite slurry into river at Pier 7
of Lo River Bridge. The PSC has strongly warned the Contractor and requested him to stop
this activity. However, in the site inspection on April 11, we again found that he already
disposed all the bentonite slurry, sand and mud – by product due to bentonite slurry recycle
into river at the place as before. The PSC has requested the Contractor to remove all the
unsuitable material that remains on riverside concomitant with persons in charge discipline.
At Batch Plant 2 of Lo River Bridge, the improvement is very behindhand. The settling pond is
very unsettled and it seems to be broken easily in heavy rain. There is also no drainage on
surface to handle the surfaced runoff so the surfaced wastewater could flow directly into river
in the rain.
At other places, we didn’t detect any serious problem happening during the site inspections
this month.
June
During the site inspections, we found that there is no improvement at Ben Tre Bridge, Muong
Dao Bridge and Ben Gao Bridge despite the requirements of the Engineer. The surfaced clear
water here is still being impacted due to the Contractor has not removed the soil from
riverbeds.
At CBP B – Km 28+500, it’s noted that cement-laden wastewater spilled-over the drainage.
The PSC has requested the Contractor to solve this by removing the sediment in settling pond
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
43
to ensure its capacity. On May 22, we found that the Contractor has implemented our
requirement.
On May 21, in the site inspection we found that the settling ponds of CBPs 1 and 2 of Lo River
Bridge were full already. To prevent leaking of untreated cement-laden wastewater into
adjacent water resources the PSC has requested the Contractor to immediately remove the
sediment in settling ponds to ensure their capacity or install new ones to replace. We will
recheck these area in the next site inspection on May 30, 2012.
At other places, we didn’t detect any serious problem happening during the site inspections
this month.
4.2.3 Package A3
April
The result of Water quality monitoring in April is described in table 4.11.
The results of analysis of environmental quality of surface water showed that the monitoring
items are within permitted limits under by regulation Vietnam QCVN 08:2008/ BTNMT, column
B1.
Table 4.11: Results of water quality in Package A3 in April, 2012.
Order Monitoring Items
Max. value (mg/l)
Min. value (mg/l)
Average Value (mg/l)
QCVN 08:2008/BTNMT
Column B1
Km 67+000
pH 6,91 6,91 6,91 5,5 – 9 TSS 49 49 49 50 Fecal Coli form 37 37 37 100 Total Coli form 7.300 7.300 7.300 7.500 Petroleum KPH KPH KPH 0,1 BOD 14 14 14 15 COD 29 29 29 30 Total Nitrogen 1,80 1,80 1,80 - Total Phosphor 0,99 0,99 0,99 -
Km 78+000
pH 6,94 6,94 6,94 5,5 – 9 TSS 49 49 49 50 Fecal Coli form 42 42 42 100 Total Coli form 7.400 7.400 7.400 7.500 Petroleum KPH KPH KPH 0,1 BOD 14 14 14 15 COD 29 29 29 30 Total Nitrogen 1,93 1,93 1,93 -
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
44
Order Monitoring Items
Max. value (mg/l)
Min. value (mg/l)
Average Value (mg/l)
QCVN 08:2008/BTNMT
Column B1 Total Phosphor 1,50 1,50 1,50 -
At P3 Red river bridge, the Contractor set up a big hole to collect all waste water contain
cement from batching plant here.
In inspection tour on April 12th, 2012, we has detected that the existing irrigation canal was
blocked by soil and rubbish which was fallen from construction activities at Km51. the
Contractor was strongly requested to unblock all irrigation canals which was blocked by
construction activities. The Consultant’s letter was ref. GET2-P0S-A3-1204 dated April 24th,
2012.
May
The result of Water quality monitoring in May is showed in table 4.12.
The results of analysis of environmental quality of surface water showed that the monitoring
items are within permitted limits under by regulation Vietnam QCVN 08:2008/ BTNMT, column
B1.
Table 4.12: Results of water quality in Package A3 in May, 2012.
Order Monitoring Items
Max. value (mg/l)
Min. Value (mg/l)
Average Value (mg/l)
QCVN 08:2008/BTNMT
Column B1
Km 67+000
pH 6,85 6,85 6,85 5,5 – 9
TSS 50 48 49 50 Fecal Coli 38 40 39 100 Tổng Coliform 7.260 7.240 7.250 7.500 Dầu mỡ KPH KPH KPH 0,1 BOD 11 13 12 15 COD 24 26 25 30 Tổng Nitơ 1,80 1,80 1,80 - Tổng P 1,42 1,40 1,41 -
Km 78+000
pH 6,83 6,83 6,83 5,5 – 9 TSS 48 50 49 50 Fecal Coli 36 34 35 100 Tổng coliform 7.090 7.110 7.100 7.500 Dầu mỡ KPH KPH KPH 0,1 BOD 10 12 11 15 COD 24 24 24 30
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
45
Order Monitoring Items
Max. value (mg/l)
Min. Value (mg/l)
Average Value (mg/l)
QCVN 08:2008/BTNMT
Column B1 Tổng Nitơ 1,64 1,62 1,63 - Tổng P 0,89 0,87 0,88 -
At P3 Red river bridge, the Contractor set up a big hole to collect all waste water contain
cement from batching plant here. But it’s too small compare with waste water volume, and it
had no canal to lead waste water from batching plant to sediment control hole. So we
requested Contractor must extend this hole to satisfy waste water volume of this plant. This
action will ensure that waste water contain cement not overflow into Red river.
At P7 Red river bridge, Contractor did not dig sediment control hole to collect waste water from
batching plant although Consultant requested many times.
In inspection tour of ADB mission, they requested Contractor must set up sediment control
hole on each Cement batching plant. Deadline is June 8th, 2012, if Contractor still delay
Consultant will force to stop work at these Cement batching plant.
The Consultant’s letter was ref. GET2-POS-A3-1285 dated June 1st, 2012 “Require to
overcome Environmental and Safety problems in package A3.
June
This month, rainfall should reduce. Consequently, the amount of suspended matter reduces
than the rainy season and is within permissible limits. However, the contractor should ensure
the safe method statement so it does not affect the water environment.
4.2.4 Package A4
April
The result of Water quality monitoring in April is showed in table 4.13.
Table 4.13: Results of water quality in Package A4 in April, 2012.
Order Monitoring Items
Max. value (mg/l)
Min. value (mg/l)
Average value (mg/l)
QCVN 08:2008/BTNMT Colume B1
Km 88+700
pH 6,74 6,74 6,74 5,5- 9 TSS 48 48 48 50
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
46
Order Monitoring Items
Max. value (mg/l)
Min. value (mg/l)
Average value (mg/l)
QCVN 08:2008/BTNMT Colume B1
Fecal Coliform 49 49 49 100 Total Coliform 6.900 6.900 6.900 7.500 Petroleum KPH KPH KPH 0,1 BOD 14 14 14 15 COD 29 29 29 30 Total Nitrogen 1,27 1,27 1,27 - Total phosphorus 0,68 0,68 0,68 -
Km 97+500
pH 6,83 6,83 6,83 5,5- 9 TSS 45 45 45 50 Fecal Coliform 41 41 41 100 Total Coliform 6.900 6.900 6.900 7.500 Petroleum KPH KPH KPH 0,1 BOD 14 14 14 15 COD 29 29 29 30 Total Nitrogen 1,30 1,30 1,30 - Total Phosphorus 0,81 0,81 0,81 -
Km 101+000 to Km 101 + 900
pH 6,81 6,81 6,81 5,5- 9 TSS 32 32 32 50 Fecal Coliform 30 30 30 100 Total Coliform 6.100 6.100 6.100 7.500 Petroleum KPH KPH KPH 0,1 BOD 13 13 13 15 COD 28 28 28 30 Total Nitrogen 1,28 1,28 1,28 - Total Phosphorus 0,78 0,78 0,78 -
Km 109 + 000
pH 6,79 6,79 6,79 5,5- 9 TSS 42 42 42 50 Fecal Coliform 27 27 27 100 Total Coliform 6.600 6.600 6.600 7.500 Petroleum KPH KPH KPH 0,1 BOD 13 13 13 15 COD 28 28 28 30 Total Nitrogen 1,21 1,21 1,21 - Total Phosphorus 0,89 0,89 0,89 -
Km 108 + 227
pH 6,91 6,91 6,91 5,5- 9 TSS 46 46 46 50 Fecal Coliform 34 34 34 100 Total Coliform 6.800 6.800 6.800 7.500 Petroleum KPH KPH KPH 0,1 BOD 14 14 14 15 COD 29 29 29 30 Total Nitrogen 1,27 1,27 1,27 - Total Phosphorus 0,97 0,97 0,97 -
The analysis results of surface water quality shown that: All parameters are still under the
allow limits according to Vietnamese regulation QCVN 08:2008/ BTNMT, column B1.
Bentonite was poured directly into Ngoi Gianh river. Beside, pebble and soil which was
washout from access road filled more than haft of this river bed. It impacted to water quality of
this river.
In addition, at Ngoi Lao and Ngoi Van river, pebble and soil which was washout from
construction activities. Although Contractor have some solution in Ngoi Lao to avoid bentonite
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
47
overflow into river as: set up a small hole to collect waste bentonite but it was not efficient.
Now they finish drilling bore pile in this riverside but waste bentonite was not resolved
absolutely. It occupied a part of river bed. And the other riverside of Ngoi Lao, soil and stone
was fallen much into this river. The Consultant warned Contractor must resolve this problem
absolutely. If not we will force to stop work here in next month.
May
The result of Water quality monitoring in May is showed in table 4.14.
Table 4.14: Results of water quality in Package A4 in May, 2012.
Order Monitoring Items
Max. value (mg/l)
Min. value (mg/l)
Average value (mg/l)
QCVN 08:2008/BTNMT Colume B1
Km
88+700
pH 6,80 6,80 6,80 5,5- 9 TSS 51 49 50 50 Fecal Coliform 44 46 45 100 Total Coliform 6.750 6.750 6.750 7.500 Petroleum KPH KPH KPH 0,1 BOD 12 12 12 15 COD 26 24 25 30 Total Nitrogen 1,10 1,12 1,11 - Total phosphorus 0,55 0,53 0,54 -
Km 97+500
pH 6,75 6,75 6,75 5,5- 9 TSS 49 47 48 50 Fecal Coliform 36 38 37 100 Total Coliform 6.710 6.730 6.720 7.500 Petroleum KPH KPH KPH 0,1 BOD 12 14 13 15 COD 26 24 25 30 Total Nitrogen 1,19 1,17 1,18 - Total Phosphorus 0,76 0,74 0,75 -
Km 101+000
to Km 101 + 900
pH 6,89 6,89 6,89 5,5- 9 TSS 40 42 41 50 Fecal Coliform 27 29 28 100 Total Coliform 5.940 5.940 5.940 7.500 Petroleum KPH KPH KPH 0,1 BOD 10 12 11 15 COD 25 25 25 30 Total Nitrogen 1,16 1,14 1,15 - Total Phosphorus 0,71 0,71 0,71 -
Km 109 + 000
pH 6,82 6,82 6,82 5,5- 9 TSS 47 47 47 50 Fecal Coliform 25 23 24 100 Total Coliform 6.470 6.490 6.480 7.500 Petroleum KPH KPH KPH 0,1 BOD 10 12 11 15 COD 22 24 23 30 Total Nitrogen 1,18 1,18 1,18 - Total Phosphorus 0,78 0,76 0,77 -
Km
108 +
pH 6,86 6,86 6,86 5,5- 9 TSS 50 48 49 50 Fecal Coliform 31 29 30 100
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
48
Order Monitoring Items
Max. value (mg/l)
Min. value (mg/l)
Average value (mg/l)
QCVN 08:2008/BTNMT Colume B1
227 Total Coliform 6.660 6.680 6.670 7.500 Petroleum KPH KPH KPH 0,1 BOD 13 13 13 15 COD 26 26 26 30 Total Nitrogen 1,21 1,23 1,22 - Total Phosphorus 0,90 0,88 0,89 -
The analysis results of surface water quality shown that: All parameters are still under the
allow limits according to Vietnamese regulation QCVN 08:2008/ BTNMT, column B1.
During inspection tour of ADB mission, Consultant showed them many serious impacts on
water quality in package A4 which were not resolved by Contractor in long time as:
- Bentonite was poured directly into Ngoi Gianh river. Beside, pebble and soil which was
washout from access road filled more than haft of this river bed. It impacted to water
quality of this river.
- In addition, at Ngoi Lao and Ngoi Van river, pebble and soil which was washout from
construction activities. Although Contractor have some solution in Ngoi Lao to avoid
bentonite overflow into river as: set up a small hole to collect waste bentonite but it was
not efficient. Now they finish drilling bore pile in this riverside but waste bentonite was
not resolved absolutely. It occupied a part of river bed. And the other riverside of Ngoi
Lao, soil and stone was fallen much into this river.
ADB mission requested Contractor must dredge all waste mud or bentonite which was
occupying a part of riverbeds immediately they finish construction works (drilling bore pile,
concrete foundation of pier…). Contractor promised they will resolve it before June 15th, 2012.
Therefore, Consultant we will closely recheck in site on next month.
Consultant’s warning letter is ref.GET2-KEA-A4-638 dated May 4th, 2012 and GET2-KEA-A4-
680 dated June 1st, 2012.
June
This month, rainfall should reduce. Consequently, the amount of suspended matter reduces
than the rainy season and is within permissible limits. However, the contractor should ensure
the safe method statement so it does not affect the water environment.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
49
4.2.5 Package A5
April
This month, through the inspection and supervision on site, the Consultant found that there are
some outstanding issues as follows:
- The bentonite was not strictly controlled by the Contractor at some construction
locations such as Ngoi Gua bridge, Ngoi Rao bridge, Ngoi Thia bridge... This has led to
the situation of bentonite running down to the stream areas.
- The fuel control of the Contractor has not been done well at the fuel stations such as
Km136, Km112, Km145... The Consultant has found traces of oil leaked on the ground.
- At most of the workers’ camps of the Contractor, appropriate wastewater treatment
systems have not been built such as at Km120, Km136... The wastewater from the
workers’ camps was discharged directly into the environment.
This situation has affected the region's water quality. The Consultant has reminded the
Contractor on these outstanding issues in Ref. GET3-KEANGNAM-12-A5-361 dated April 24,
2012. Beside, the Consultant has also required the Contractor to apply measures to address
thoroughly these outstanding issues to ensure the region's water quality and prevent negative
impacts on the Project’s environment.
This month, the Contractor carried out observation of water quality in some areas; the
observation results are shown in the table 4.15.
Table 4.15: Results of water quality in Package A5 in April, 2012.
No Parameter pH DO TSS COD BOD5 (20oC) Surf. Oil and
Grease Fecal
Coliform Total
Coliform
Unit - mg/l mg/l mg/l mg/l mg/l mg/l MPN/100ml MPN/100ml
1 W1 6,8 6,7 24 8,1 6 < 0,1 < 0,1 44 1200 2 W2 6,9 6,6 25 7,6 5 < 0,1 < 0,1 65 900 3 W3 6,8 6,5 25 7,8 5 < 0,1 < 0,1 45 830 4 W4 7,2 6,6 24 8,2 6 < 0,1 < 0,1 32 670 5 W5 7,1 6,5 23 7,5 5 < 0,1 < 0,1 46 770 6 W6 6,9 6,5 21 6,8 4 < 0,1 < 0,1 67 820 7 W7 6,9 6,9 25 7,2 5 < 0,1 < 0,1 52 830 8 W8 6,7 6,6 24 8,6 6 < 0,1 < 0,1 53 740 9 W9 7,1 5,5 21 21,9 14 0,20 0,13 460 5600 10 W10 6,8 5,7 21 26,8 16 0,27 0,13 650 6400
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
50
No Parameter pH DO TSS COD BOD5 (20oC) Surf. Oil and
Grease Fecal
Coliform Total
Coliform 11 W11 6,7 5,7 25 23,4 13 0,16 0,11 510 5500 12 W12 6,8 5,9 22 25,2 16 0,21 0,11 630 5600
QCVN08:08 5,5-
9 ≥ 4 50 30 15 0,4 0,1 - 7500
The data showed that the values of pollution parameters are below the limitation value in
QCVN 08:2008.
May
Through the inspection and supervision on site this month, the Consultant found that the
Environment control and protection of the Contractor has not much been improved over the
previous month. The Contractor has not fully complied with the requirements of the Consultant
and of the Project, which has led to a number of outstanding issues as follows:
- The fuel control of the Contractor has not been implemented well at the fuel stations in
areas such as Ngoi Gua bridge, Ngoi Rao bridge, Ngoi Thia bridge... In the site
inspections, the Consultant found traces of oil leaked on the ground.
- The contractor did not comply with the requiremennts and the instructions of the
Consultant about the bentonite control in the construction process at the construction
locations such as Ngoi Gua bridge, Ngoi Rao bridge, Van Phu bridge... which has led
to bentonite running down to the stream areas.
- Suitable waste water treatment systems were not built by the Contractor in the workers’
camps such as Km136, Km145, Km120... As the result, the waste water from the
camps area was discharged directly into the environment.
- The Contractor has not built waste water treatment system at some factories such as
RC Pipe Culvert Factory No. 1, RC Pipe Culvert Factory No. 2, RC Pipe Culvert Factory
No. 3...
- At station Km123+740, the Contractor poured soil into the lake Y Kan, which has
affected the water quality of the lake.
These issues have affected the region's water quality. The Consultant has asked the
Contractor to quickly resolve these outstanding issues, ensuring the water quality of the area
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
51
(Ref. GET3-KEANGNAM-12-A5-387 dated 03 May 2012, GET3-KEANGNAM-12-A5-439 dated
16 May 2012, GET3-KEANGNAM-12-A5-437 dated 16 May 2012 and GET3-KEANGNAM-12-
A5-490 dated 31 May 2012).
This month, the Contractor carried out observation of water quality in some areas; the
observation results are shown in the table 4.16:
Table 4.16: Results of water quality in Package A5 in May, 2012.
No Parameter pH DO TSS COD BOD5
(20oC) Surf. Oil and Grease
Fecal Coliform
Total Coliform
Unit - mg/l mg/l mg/l mg/l mg/l mg/l MPN/100ml MPN/100ml
1 W1 7,1 6,3 19 7,2 6 < 0,1 < 0,1 37 1300 2 W2 7,2 6,4 22 7,4 5 < 0,1 < 0,1 56 730 3 W3 7,1 6,4 20 7,2 4 < 0,1 < 0,1 41 630 4 W4 7,2 6,2 18 7,4 5 < 0,1 < 0,1 26 650 5 W5 7,1 6,4 23 7,1 5 < 0,1 < 0,1 35 720 6 W6 6,9 6,7 19 6,4 4 < 0,1 < 0,1 53 780 7 W7 6,9 6,5 24 7,3 4 < 0,1 < 0,1 46 730 8 W8 6,8 6,4 22 8,3 6 < 0,1 < 0,1 49 750 9 W9 7,1 5,2 20 18,9 13 0,17 0,08 430 5500
10 W10 7,1 5,4 22 17,3 13 0,16 0,05 540 6200 11 W11 6,9 5,5 28 19,4 14 0,16 0,09 520 5100 12 W12 6,9 5,7 24 23,2 13 0,17 0,12 610 5200
QCVN08:08 5,5-9 ≥ 4 50 30 15 0,4 0,1 - 7500
The data showed that the values of pollution parameters are below the limitation value in
QCVN 08:2008.
June
This month, through the inspection and supervision on site, the Consultant found that the
Contractor did not fulfill the requirements of the Consultant and the Project; some outstanding
issues remained unresolved such as:
- Bentonite was not controlled tightly in the construction process of Van Phu bridge, Ngoi
Gua bridge, Ngoi Thia bridge... Bentonite has flooded down the streams in the area of
Van Phu bridge.
- The fuel management of the Contractor had no improvement; at the fuel stations of the
Contractor such as Ngoi Rao bridge, Ngoi Thia bridge, Van Phu bridge, Ngoi Gua
bridge... the Consultant still found the fuel tanks located directly on the ground without
any devices to prevent fuel leaks.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
52
- In Y Can Lake area, Km123+740, the Contractor poured soil into the lake. However, so
far, the Contractor have not yet collected and moved soil to the disposal area.
- At stations Km136, Km145, Km120... suitable wastewater treatment systems were not
built by the Contractor in the workers’ camps, and all wastewater from the camps was
discharged directly into the environment.
- In the RC pipe culvert factory No. 1, RC pipe culvert factory No. 2, RC pipe culvert
factory No. 3... the Contractor has still not built waste water treatment system.
To ensure the region's environment, the Consultant has reminded the Contractor on the
outstanding issues. Beside, the Consultant has also strongly requested the Contractor to
quickly adapt appropriate measures to solve the problems to ensure the region's water quality
during construction process.
This month, the Contractor carried out observation of water quality in some areas; the
observation results are shown in the table 4.17.
Table 4.17: Results of water quality in Package A5 in June, 2012.
No Parameter pH DO TSS COD BOD5
(20oC) Surf. Oil and Grease
Fecal Coliform
Total Coliform
Unit - mg/l mg/l mg/l mg/l mg/l mg/l MPN/100ml MPN/100ml
1 W1 7,2 6,5 24 7 < 5 < 0,1 < 0,1 40 1400 2 W2 7,1 6,3 28 7 < 5 < 0,1 < 0,1 53 710 3 W3 6,9 6,3 26 7 < 5 < 0,1 < 0,1 40 610 4 W4 6,8 6,5 26 7 < 5 < 0,1 < 0,1 29 620 5 W5 7,1 6,3 23 6 < 5 < 0,1 < 0,1 33 710 6 W6 6,8 6,1 19 7 < 5 < 0,1 < 0,1 51 730 7 W7 6,9 6,5 26 6 < 5 < 0,1 < 0,1 43 750 8 W8 6,8 6,1 23 6 < 5 < 0,1 < 0,1 46 720 9 W9 6,8 5,6 25 20 14 0,13 0,09 410 5700
10 W10 7,2 5,3 26 18 12 0,14 0,03 510 6100 11 W11 6,9 5,3 24 19 12 0,14 0,05 520 5200 12 W12 7,1 5,5 22 23 15 0,16 0,09 570 5600
QCVN08:08 5,5-9
≥ 4 50 30 15 0,4 0,1 - 7500
The data showed that the values of pollution parameters are below the limitation value in
QCVN 08:2008.
Note: Locations are the following:
W1: Ngoi Thia river (Km145+500) – The bridge pier
W2: Ngoi Thia river (Km145+500) – 50m from the bridge pier (toward upstream)
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
53
W3: Ngoi Thia river (Km145+500 – 200 m from the bridge pier (toward downstream)
W4: Ngoi Thia river (Km145+500 – 400 m from the bridge pier (toward downstream)
W5: Y Can lake (Km126+000) – Surface water sample at position No. 1
W6: Y Can lake (Km126+000) – Surface water sample at position No. 2
W7: Y Can lake (Km126+000) – Surface water sample at position No. 3
W8: Y Can lake (Km126+000) – Surface water sample at position No. 4
W9: Nuoc Mat lake (Km122+000) – Surface water sample at position No. 1
W10: Nuoc Mat lake (Km122+000) – Surface water sample at position No. 2
W11: Nuoc Mat lake (Km122+000) – Surface water sample at position No. 3
W12: Nuoc Mat lake (Km122+000) – Surface water sample at position No. 4
4.2.6 Package A6
April
This month, through the inspection and supervision on site, the Consultant found that the
construction activities of the Contractor have not created serious impacts on the regional water
quality. Most of the Contractor's construction works did not produce hazardous substances to
the aquatic environment.
However, in this month, there are still some outstanding issues as follows:
- The fuel management of the Contractor has not much been improved this month, such
as at Km186, Km173, Km155... there were still many oil barrels located directly on the
ground, and they did not have any equipment to prevent oil leakage, which could lead
to oil leakage. Then, when there was rain, the rain brought oil to the region's water
source, affecting the water quality.
- The factories of the Contractor such as batching plant Km165, batching plant Km163,
batching plant Km180, batching plant Km1184. The waste water treatment systems of
the plants were still not under construction.
- At the workers camps of the Contractor, proper waste water treatment systems were
not built; therefore, the waste water from the camps area was discharged directly into
the surrounding environment.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
54
The Consultant has reminded the Contractor about these outstanding issues (mentioned in
Ref. GET3-DOOSAN-12-A6-387 dated 19 April, 2012, GET3-DOOSAN-12-A6-435 dated 27
April, 2012). In addition, the Consultant has also required the Contractor to quickly apply
appropriate measures to address them thoroughly to ensure the region's water quality.
In the weekly site inspections, the Consultant has also frequently reminded the Contractor to
comply with the Method Statement as well as the Environmental Control and Protection Plan of
the Project to prevent adverse impacts on the regional nature water from the construction
activities of Contractor.
May
Through the inspection and supervision on site this month, the Consultant found that the
region's water quality has not been seriously affected by the construction activities of the
Contractor. Most of them were conducted within the project’s limit and have not made serious
impacts to the water quality. In addition, the Contractor also has built the trap basins in the
batching plant to deposit solids before discharging water from the plant area into the
surrounding environment. However, there are still some outstanding issues as follows:
- In the south portal of tunnel areas, the Contractor has still not built waste waster
treatment system as in the requirements in the Method Statement, and the lack of
attention in the use of temporary waste water treatment system. This has led to the
situation of waste water from the tunnel construction area which was not thoroughly
treated before discharged into the surrounding environment. The Consultant has
warned the Contractor about this in Ref. GET3-DOOSAN-12-A6-457 dated May 4,
2012.
- The fuel management of the Contractor has not yet been done well at some fuel
stations such as: Km186+200, Km155+300... in these areas, the Consultant has found
that the fuel tanks were placed directly on the ground and they did not have any
equipment to prevent fuel leakage. The Consultant has provided specific instruction for
this issue in Ref. GET3-DOOSAN-12-A6-300.
- A number of workers’ camps of the Contractor such as Km184+057, Km182+160,
Km167+879, Km163+126... the Contractor has not built waste water treatment system
suitable for the workers’ camps, so the waste water from the camps area was
discharged directly into the surrounding environment. The Consultant has requested
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
55
the Contractor to resolve the outstanding issues in Ref. GET3-DOOSAN-12-A6-491
May 15, 2012.
Also, in the weekly site inspections, the Consultant has frequently reminded the Contractor to
comply with the Method Statement and the Environment Control and Protection Plan of the
Project to prevent negative effects on the region's water quality from the contractor’s
construction activities.
June
This month, through the inspection and supervision on site, Consultant found that the
construction activities of the Contractor have not caused serious impacts to soil quality in the
region. During this period, the major construction activities of the Contractor remains
earthworks (excavation, embankment...) and built the piers of the bridge, etc., so there has
been no generated substances that cause serious impacts to water quality.
In addition, in concrete batching areas such as Km180, Km165, Km184,etc, the Contractor has
also built trap basins to recover waste water, as deposition of solids in the water before
discharge into surrounding environment.
However, through our supervision and inspection on site, we found that there were still some
outstanding issues as follows:
- The Contractor has started the tunnel construction work since a long time, but waste
water treatment system mentioned in the Application methods has not been under
construction yet.
- The fuel management of the Contractor has improved, however, there were still fuel
tanks placed directly on the ground as in Km186 +200, +300 Km155, Km178 +200, etc.
- Waste water treatment system at workers’ camps in the area of Km184+057,
Km182+160, Km163+126, etc., has not been built properly, waste water from the camp
area has been discharged directly into the environment.
To ensure the Project's environment, the Consultant reminded the Contractor on these
outstanding issues, at the same time, we also required the Contractor to apply measures to
resolve the outstanding issues in order to ensure environment quality of the Project in general
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
56
and the water quality in particular (mentioned in Ref. GET3- DOOSAN -12-A6-546 and GET3-
DOOSAN -12-A6-633).
4.2.7 Package A7
April
In April, the contractor had submitted the documents related to unsuitable material waste
disposal at Km191+300, Km194+486, Km194+800 and planting grass to prevent the erosion
and landside into Red river. However, the contractor dumping the earth at Km209+800 and
Km201+815, which serious violated the provision contacts and can effect to water quality. The
consultant has required the contractor to stop dumping and plant grass to protect the erosion
and landside into water source.
May
On 29-May 2012 the contractor had planted grass to prevent the erosion and landside into Red
river. However the contractor is dumping the earth at Km201+815 and Km204+581, which
serious violated the provision contacts and can effect to water quality. The consultant has
required the contractor to stop dumping and plan grass to protect the erosion and landside into
water source.
Other at moment the concrete batching plant Km209+329, Km194+765, Km198+400 haven’t
sediment control pond to collect and treatment waste water, now waste water from mixer
trucks and water washing the concrete batching plan discharged directly into ground and into
water source. Consultant required the contractor to provide the sediment control pond for each
concrete batching plan before 5-June 2012
Monitoring result of the Contractor about water surface quality of stream around construction
work (carried out by Institute of Environmental technology in April 2012) showed that
construction works not effected to water surface quality of stream.
The analyzed results of surface water samples were compared with QCVN 08:2008/BTNMT.
The National Technical Regulations on surface water quality are as follows:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
57
Table 4.18: Results of water quality in Package A7 in May, 2012.
No Parameters Unit NM-1A NM-1B NM-2A NM-2B NM-3A NM-3B QCVN 08:2008/
BTNMT(A2)
1 pH - 7.0 7.1 7.1 7.0 7.2 7.0 6-8.5
2 Temperature oC 25 24.5 19 19.5 21 21 -
3 DO mg/l 6.8 6.9 6.7 6.5 6.4 6.6
≥5
4 TSS mg/l 0.10 0.09 0.02 0.02 0.18 0.16 30
5 COD mg O2/l 21 22 15 14.5 23 22 15
6 BOD5 mg/l 14.2 13.9 21 21.7 25.5 24.6 6
7 Coliform MPN/100ml
38 35 96 89 43 51 5000
8 Grease & oil mg/l 0.13 0.134 0.110 0.114 0.121 0.123 0.02
9 NO3- mg/l 0.325 0.341 0.436 0.423 0.512 0.493 5
10 NH4+
- N mg/l 0.012 0.011 0.031 0.029 0.045 0.043 0.2
11 SO42- mg/l 6.370 4.230 7.250 3.580 2.360 2.520 -
12 PO43- mg/l 0.015 0.010 0.032 0.040 0.006 0.007 0.2
13 Total N mg/l 0.735 0.743 0.893 0.887 0.912 0.889 -
14 Total P mg/l 0.020 0.015 0.037 0.040 0.008 0.009 -
15 Fe mg/l 1.300 1.250 0.650 0.700 0.800 0.750 1.0
16 Cd mg/l <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 0.005
17 As mg/l 0.001 <0.001 <0.001 <0.001 0.003 0.002 0.02
18 Mn mg/l 0.100 0.096 0,088 0.09 0.122 0.124 -
19 Pb mg/l 0.001 0.001 <0.001 <0.001 <0.001 <0.001 0.02
20 Zn mg/l 0.023 0.024 0.011 0.013 0.045 0.046 1.0
Table 4.18: Monitoring results of surface water in Package A7 in May, 2012.
No Parameters Unit NM-4A NM-4B NM-5A NM-5B NM-6A NM-6B QCVN
08:2008/ BTNMT(A2)
1 pH - 7.2 7.3 7.0 7.1 7.0 7.3 6-8.5 2 Temp. oC 24 24 25 24 22 22 - 3 DO mg/l 6.9 6.7 6.9 6.7 6.7 6.4 ≥5
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
58
No Parameters Unit NM-4A NM-4B NM-5A NM-5B NM-6A NM-6B QCVN
08:2008/ BTNMT(A2)
4 TSS mg/l 0.08 0.07 0.10 0.09 0.12 0.10 30 5 COD mg O2/l 17 18 22 22.5 23.0 22.5 15 6 BOD5 mg/l 20 21.2 17.7 17.3 26.2 26.1 6 7 Coliform MPN/100
mg/l 75 81 200 213 210 221 5000
8 Grease & oil
mg/l 0.110 0.125 0.132 0.135 0.100 0.112 0.02
9 NO3- mg/l 0.519 0.521 0.724 0.732 0.914 0.932 5
10 NH4+
- N mg/l 0.046 0.051 0.072 0.069 0.079 0.081 0.2 11 SO4
2- mg/l 1.820 2.100 2.030 2.870 4.150 3.920 - 12 PO4
3- mg/l 0.070 0.080 0.300 0.200 0.017 0.010 0.2 13 Total N mg/l 0.981 0.903 1.313 1.321 1.761 1.694 - 14 Total P mg/l 0.087 0.095 0.400 0.350 0.020 0.010 - 15 Fe mg/l 0.960 0.900 1.950 2.100 0.970 0.900 1.0 16 Cd mg/l <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 0.005 17 As mg/l 0.0031 <0.001 0.001 <0.001 0.003 0.003 0.02 18 Mn mg/l 0.125 0.123 0.314 0.324 0.229 0.301 - 19 Pb mg/l <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.02 20 Zn mg/l 0.009 0.009 0.013 0.012 0.017 0.016 1.0
Table 4.19: Monitoring results of surface water in Package A7 in May, 2012.
No Parameters Unit NM-7ª NM-7B NM-8A NM-8B QCVN 08:2008/ BTNMT(A2)
1 pH - 6.9 7.0 6.7 6.9 6-8.5
2 Temperature oC 23 22.5 25 25 - 3 DO mg/l 6.4 6.5 7.0 6.9 ≥5 4 TSS mg/l 0.16 0.17 0.20 0.19 30 5 COD mg O2/l 23.5 24 25 24 15 6 BOD5 mg/l 15.7 16.1 27.6 27.3 6 7 Coliform MPN/100ml 240 239 43 47 5000 8 Grease & oil mg/l 0.100 0.121 0.110 0.114 0.02 9 NO3
- mg/l 0.639 0.705 1.205 1.217 5 10 NH4
+ - N mg/l 0.061 0.057 0.105 0.112 0.2
11 SO42- mg/l 3.150 3.260 4.070 4.530 -
12 PO43- mg/l 0.013 0.010 0.009 0.007 0.2
13 Total N mg/l 1.057 1.123 3.083 3.121 - 14 Total P mg/l 0.020 0.018 0.010 0.020 - 15 Fe mg/l 1.300 1.500 0.750 0.850 1.0 16 Cd mg/l <0.0002 <0.0002 <0.0002 <0.0002 0.005 17 As mg/l 0.001 <0.001 0.001 <0.001 0.02 18 Mn mg/l 0.150 0.152 0.212 0.224 - 19 Pb mg/l <0.001 <0.001 0.001 0.001 0.02 20 Zn mg/l 0.016 0.017 0.014 0.014 1.0
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
59
The analytical results of 16 surface water samples showed that: almost all of parameters are
lower than allowable limit values. However, the concentration of grease and oil, Fe, COD,
BOD5 in some samples are over the allowable limit values regulated in National Technical
Regulation (QCVN 08:2008/BTNMT).
Note: Locations are the following:
NM-1A: 100m upstream of Com Stream (Coordinates N: 22009,227’, E: 104020,747’)
NM-1B: 100m downstream of Com Stream (Coordinates N: 22009,294’, E: 104020,763’)
NM-2A: 100m upstream of Khe Sang Stream (Coordinates N: 22015,210’, E: 105048,008’)
NM-2B: 100m downstream of Khe Sang Stream (Coordinates N: 22007,448’, E: 104024,075’)
NM-3A: 100m upstream of Khe Quat Stream (Coordinates N: 22008,536’, E: 104022,536’)
NM-3B: 100m downstream of Khe Quat Stream (Coordinates N: 22008,560’, E: 104022,561’)
NM-4A: 100m upstream of Khe U Stream (Coordinates N: 22011,531’, E: 104019,354’)
NM-4B: 100m downstream of Khe U Stream (Coordinates N: 22011,544’, E: 104019,408’)
NM-5A: 100m upstream of Bong Stream (Coordinates N: 22013,446’, E: 104016,961’)
NM-5B: 100m downstream of Bong Stream (Coordinates N: 22014,536’, E: 104016,760)
NM-6A: 100m upstream of Cam 4 Stream (Coordinates N: 22009,509’, E: 104021,959’)
NM-6B: 100m downstream of Cam 4 Stream (Coordinates N: 22015,210’, E: 104015,445’)
NM-7A: 100m upstream of Mai Hong Stream (Coordinates N: 22008,572’, E: 104022,565’)
NM-7B: 100m downstream of Mai Hong Stream (Coordinates N: 22008,607’, E: 104022,597’)
NM-8A: 100m upstream of Ban Ly 1 Stream (Coordinates N: 22012,324’, E: 104018,185’)
NM-8B: 100m downstream of Ban Ly 1 Stream (Coordinates N: 22011,299’, E: 104019,176’)
June
At Km201+815 and Km204+581, the contractor stopped dumping the material here, so the
contractor didn’t apply the method of slope protection to avoid landside and erosion into
streams and rivers. Consultant required the contractor to apply according to consultant
instructions.
Date 15-June 2012 the contractor had installed the sediment control ponds at concrete
batching plan Km209+329 and Km198+400. However, the concrete batching plan at
Km194+765 was not installed the sediment control pond. Other at concrete batching plan
Km191+353 had sediment control pond but now it is already full and contractor was required to
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
60
recleaning, so far date 28-June the contractor didn’t recleaning according to consultant
instruction.
4.2.8 Package A8
April
On April 13th, 2012 while drilling the bore pile of Lang Tra Bridge Km220+993, Son Ha Bridge
Km224+369 and Suoi Trat Bridge Km231+889, the contractor had trenched to guide waste
water to sediment control pond, however the sediment control ponds is full and some
wastewater overflows. Due to the consultant required the contractor makes a bigger sediment
control ponds.
Addition, the batching plant at Suoi Nhu Bridge, Suoi Trat Bridge and Ngoi Bo Bridge now
don’t having sediment control ponds, which to collect and sediment the waste water before
discharging to water source. So consultant required the contractor make a sediment control
ponds for each batching plant before 15 April 2012. But up to now the contractor didn’t
according to the consultant instruction.
May
On 16-May 2012 the contractor is dumping the earth at Km231+889, which serious violated the
provision contacts and can effect to water quality. The consultant has required the contractor
to stop dumping and plan grass to protect the erosion and landside into water source.
Other at moment the concrete batching plant Km218+040, Km238+265; Km231+889 haven’t
sediment control pond to collect and treatment waste water, now waste water from mixer
trucks and water washing the concrete batching plan discharged directly into ground and into
water source. Consultant required the contractor to provide the sediment control pond for each
concrete batching plan before 5-June 2012.
June
On 16-June 2012 the contractor is dumping the earth at Km231+889, which seriously violated
the provision contracts and can effect water quality. The consultant has required the contractor
to stop dumping and plan grass to protect the erosion and landside into water source.
However, so far the contractor didn’t overcome according to the consultant instruction.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
61
Date 5-June 2012 the contractor had installed the sediment control ponds for concrete
batching plan at Suoi Trat Km231+889, Ngoi Bo Km238+265, Suoi Nhu Km218+040.
4.3 IMPACT ON SOILS QUALITY
4.3.1 Package A1
April
In the site inspections, we again detected the sloppy status in oil usage at Trung Kien Bridge,
Tan Loi Bridge, Tam Long – Thien Ke Bridge, Km 4+700, the oil barrels were put on ground in
disorder and lying on their side. The PSC had strongly warned the Contractor of this issue and
requested him to comply with regulations in oil usage and management. In the site inspections,
on April 04, we found that there was improvement at Km 4+700 and Tam Long – Thien Ke
Bridge but Trung Kien Bridge and Tan Loi Bridge. At Trung Kien Bridge and Tan Loi Bridge,
the Contractor still let this issue happen that caused leak of oil on ground. In the next site
inspections we also did not see any improvement in these areas.
At Underpass NH2 construction site, the direct discharge of untreated wastewater that
contains sand and mud into existing irrigation canal is still going on. The Contractor does not
implement the requirements of Engineer to mobilize dewatering tank or gravity bag filter to
remove sediment from wastewater before discharge of it. The PSC already issued a warning
letter to request the Contractor to implement our requirements and if he still fails to meet
requirement of us, we will consider applying the measure of money deduction.
The riverside landslide risk is still high at Tan Loi Bridge, especially in the rainy season due to
the Contractor doesn’t apply any countermeasure in this area. Similar issue was found at Xuan
Phuong Bridge. The PSC has many times requested the Contractor to solve this issue to
protect riversides but up to now he doesn’t take any action to implement our requirements.
At section Km 4+700 ~ Km 4+800, almost the unsuitable material was removed.
May
In the site inspections we found that the oil leaked on ground at Trung Kien Bridge and Tan Loi
Bridge. At Ba Thien Bridge and Tam Long – Thien Ke Bridge the oil barrels were put on
ground in disorder and in lying on their side. The PSC has strongly requested the Contractor to
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
62
solve these issues, but till May 22, there was only improvement at Ba Thien and Tam Long –
Thien Ke Bridge. The PSC has seriously warned the Contractor and if in the next site
inspection we still realize that this problem is not solved we will consider deducting money.
The Contractor already constructed a sediment basin to catch sediment from waterwater at
Underpass NH2 construction site. However, this sediment basin is not enough capacity so the
Engineer has requested the Contractor to supplement another beside to ensure that almost
sediment will be remove from wastewater before it spills-over existing drainage. The straw
bales installation at outlet of wastewater discharge area were also recommended as a effective
measure to remove sand and mud from wastewater.
By observations during this month, we realized that there is no improvement at Tan Loi Bridge
and Xuan Phuong Bridge. The Contractor still has not applied any riverside protection
measures to prevent landslide happening on riversides.
June
In the site inspections we found that the oil leaked on ground at Trung Kien Bridge and Tan Loi
Bridge. At Ba Thien Bridge and Tam Long – Thien Ke Bridge the oil barrels were put on
ground in disorder and in lying on their side. The PSC has strongly requested the Contractor to
solve these issues, but till May 22, there was only improvement at Ba Thien and Tam Long –
Thien Ke Bridge. The PSC has seriously warned the Contractor and if in the next site
inspection we still realize that this problem is not solved we will consider deducting money.
The Contractor already constructed a sediment basin to catch sediment from waterwater at
Underpass NH2 construction site. However, this sediment basin is not enough capacity so the
Engineer has requested the Contractor to supplement another beside to ensure that almost
sediment will be remove from wastewater before it spills-over existing drainage. The straw
bales installation at outlet of wastewater discharge area were also recommended as a effective
measure to remove sand and mud from wastewater.
By observations during this month, we realized that there is no improvement at Tan Loi Bridge
and Xuan Phuong Bridge. The Contractor still has not apply any riverside protection measures
to prevent landslide happening on riversides.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
63
4.3.2 Package A2
April
At section Km 42+200 ~ Km 42+670, there is still no improvement in this month, the Contractor
has not applied any erosion and sediment control measure so the soil is still being tracked into
the adjacent croplands. We still close the procedures of payment progress of all items in this
section until the Contractor implemented our requirements.
In the site inspections, at section Interchange No 6, we did not see any change in this area.
The unsuitable material is still being disposed on site where is close to croplands and local
resident area. The PSC has many times requested the Contractor to remove all this material to
approved disposal places but up to now he still has not implemented requirements of us. We
have issued a warning letter and if the Contractor still fails to meet our requirements, we will
recommend the Employer to deduct money. The next site inspection will be held on May 04,
2012.
At Batch Plant 2 of Lo River Bridge, in the site inspection on March 28, we found that the
Contractor located the oil tank/barrels on ground without any leak/spillage control measure. A
leak of oil on ground was noted in this area and the PSC has requested the Contractor to
immediately to comply with regulations in oil usage and management to rearrange the oil
storage as well as remove polluted soil and disposed of it properly. Till April 18, we perceived
the Contractor had surrounded oil storage with fence and a brick berm to prevent spillage of
oil; the waterproof roof was also installed.
On April 11 we found that the Contractor had discharged the bentonite slurry and its by-
product after recycling on riverside at Pier 7 of Lo River Bridge. This issue contaminated top
soil in this area. The PSC has requested the Contractor to immediately collect and remove all
these materials to disposal place but up to the day he still has not implemented our
requirements.
May
At section Km 42+200 ~ Km 42+670, there is still no improvement in this month, the Contractor
has not applied any erosion and sediment control measure so the soil is still being tracked into
the adjacent croplands. We still close the procedures of payment progress of all items in this
section until the Contractor implemented our requirements.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
64
In the site inspections, at section Interchange No. 6 we didn’t see any change in this area. The
unsuitable material is still being disposed on site where is close to croplands and local resident
area. The PSC has many times requested the Contractor to remove all this material to
approved disposal places but up to now he still has not implemented requirements of us. We
have issued a warning letter and if the Contractor still fails to meet our requirements, we will
recommend the Employer to deduct money. The next site inspection will be held on May 04,
2012.
At Batch Plant 2 of Lo River Bridge, in the site inspection on March 28, we found that the
Contractor located the oil tank/barrels on ground without any leak/spillage control measure. A
leak of oil on ground was noted in this area and the PSC has requested the Contractor to
immediately to comply with regulations in oil usage and management to rearrange the oil
storage as well as remove polluted soil and disposed of it properly. Till April 18, we perceived
the Contractor had surrounded oil storage with fence and a brick berm to prevent spillage of
oil; the waterproof roof was also installed.
On April 11 we found that the Contractor had discharged the bentonite slurry and its by-
product after recycling on riverside at Pier 7 of Lo River Bridge. This issue contaminated top
soil in this area. The PSC has requested the Contractor to immediately collect and remove all
these materials to disposal place but up to the day he still has not implemented our
requirements.
June
We didn’t see any improvement at section Km 42+200 ~ Km 42+670. The erosion still leads
the soil into cropland and the Contractor has not applied any countermeasure to mitigate.
At Interchange No. 6 section, the spoil is still being disposed along the site despite the warning
of the Engineer. The Engineer had approved the disposal place for unsuitable material in this
area and requested the Contractor to remove all this material to approved disposal place but
the Contractor doesn’t comply with our requirement.
High risk of leak of oil was found at Ben Tre Bridge, Km 42+200, and Lo River Bridge. The
PSC has requested the Contractor to solve this issue by contructing oil storage area with level
concreted ground and waterproof roof; a berm surrounding to prevent spill-over is also
required. However, up to now, the Contractor has not implemented our requirements.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
65
4.3.3 Package A3
April
Almost subcontractor store fuel in the big tanks and these tanks were put directly on ground or
buried underground without concreted foundation. After that, when they use fuel for satisfy
work in site they pump it into some oil drums and move it to site. In this process oil was leaking
much on ground. It can pollute soil or underwater resource. So we have some warning letter to
Contractor request them to resolve this violation.
We have some suggestion in site such as: The subcontractor explained that burry big oil tank
underground is safer than put it on ground because it’s avoid all fire risk and the skin of this
tank have 2 layer and it’s very firm. But the Consultant has realized that they burry the big tank
under ground it could avoid fire risk if oil was not leaked around from pumping oil process.
Beside, leaking oil will damage to soil and underwater resource (if have). So if the big oil tank
are full of oil and it’s difficult for subcontractor to pick up it on ground (in case this tank was
buried underground) to reinforce foundation by concrete, they can concrete ground around oil
modulator valve with suitable area. And they must concrete the foundation of oil drums
storage, install some sand drums and fire extinguishers.
The subcontractor clean up oil leaking on ground and reground all oil drums in a regulation
place in site but they still delay to concrete storage’s foundation. We continue push them must
concrete foundation to avoid oil spill over ground as before.
May
Almost subcontractor store fuel in the big tanks and these tanks were put directly on ground or
buried underground without concreted foundation. After that, when they use fuel for satisfy
work in site they pump it into some oil drums and move it to site. In this process oil was leaking
much on ground. It can pollute soil or underwater resource. So we have some warning letter to
Contractor request them to resolve this violation.
We have some suggestion in site such as: The subcontractor explained that burry big oil tank
underground is safer than put it on ground because it’s avoid all fire risk and the skin of this
tank have 2 layer and it’s very firm. But the Consultant has realized that they burry the big tank
under ground it could avoid fire risk if oil was not leaked around from pumping oil process.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
66
Beside, leaking oil will damage to soil and underwater resource (if have). So if the big oil tank
are full of oil and it’s difficult for subcontractor to pick up it on ground (in case this tank was
buried underground) to reinforce foundation by concrete, they can concrete ground around oil
modulator valve with suitable area. And they must concrete the foundation of oil drums
storage, install some sand drums and fire extinguishers.
The subcontractor clean up oil leaking on ground and reground all oil drums in a regulation
place in site but they still delay to concrete storage’s foundation.
The Consultant’s letter was ref. GET2-POS-A3-1285 dated June 1st, 2012 “Require to
overcome Environmental and Safety problems in package A3.
June
Construction operation on sites affects a little on quality of soils. Contractor should ensure safe
construction operation in order to avoid the erosion on sites.
4.3.4 Package A4
April
The Contractor stored fuel in site by the big tanks and drums to satisfy construction activities.
But they buried big oil tank underground (Km93+300) or put directly on ground without
protected measures (Km106+500 near worker’s camp of Long Giang subcontractor,
Km91+500, Km107+200, Km97+124). It pollute soil resource be cause oil was spilled over
ground a lot. So we warned them must carry out some suitable method to prevent this risk,
such as: concrete foundation to avoid oil spill over ground, set up sand drums and fire
extinguisher to prevent fire risk.
But the Contractor still delay.
May
The Contractor stored fuel in site by the big tanks and drums to satisfy construction activities.
But they buried big oil tank underground (Km93+300) or put directly on ground without
protected measures (Km106+500 near worker’s camp of Long Giang subcontractor,
Km91+500, Km107+200, Km97+124). It pollute soil resource be cause oil was spilled over
ground a lot. So we warned them must carry out some suitable method to prevent this risk,
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
67
such as: concrete foundation to avoid oil spill over ground, set up sand drums and fire
extinguisher to prevent fire risk.
But the Contractor still delay. Deadline is June 15th, 2012. Consultant’s warning letter is
ref.GET2-KEA-A4-638 dated May 4th, 2012 and GET2-KEA-A4-680 dated June 1st, 2012.
June
Construction operation on sites affects a little on quality of soils. Contractor should ensure safe
construction operation in order to avoid the erosion on sites.
4.3.5 Package A5
April
This month, the major items of the package’s construction works are soil work and some other
activities such as bridges, sewers, under pass box culvert... and the majority of them did not
make substances that cause serious impacts to soil quality in the region.
However, because the Contractor did not fully comply with the requirements of the Project as
well as the instructions of the Consultant, some outstanding issues has occurred as follows:
- The performance of the Contractor in managing fuel was still poor; this has led to oil
leakage at some fuel stations of the Contractor such as Km136, Ngoi Thia bridge, ...
This has affected the soil quality of the area.
- Bentonite has not been controlled tightly by the Contractor during the construction
process in areas such as Ngoi Rao brigde, Ngoi Gua bridge... This has led to the
bentonite surface runoff, which affected soil quality of the area.
- At some stations such as Km118 - Km119, Km116 - Km117, the soil from the Project’s
area flooded the production areas of local people (agricultural land, forest land,
aquaculture land). In the rain, this has affected the soil quality of the local people.
The Consultant has requested the Contractor to quickly apply effective measures to address
thoroughly these outstanding issues to ensure the region's soil quality. Besides, in the weekly
site inspections, the Consultant has also frequently required the Contractor to comply with the
Method Statement as well as the Environment Control and Protection Plan of the Project
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
68
during construction process to prevent negative impacts of the project on environment in
general and on the soil quality in particular.
May
Through the inspection and supervision this month, the Consultant found some outstanding
issues as follows:
- Because the Contractor did not fully comply with the instructions and requirements of
the Consultant. On some days of heavy rain, soil from the Project’s area flooded the
production areas of local people (agricultural land, forestry land, aquaculture land); this
has affected the regional soil quality such as Km116 - Km117, Km117 - Km118,
Km119, Km126, Km127...
- The Contractor has not fully applied necessary measures to control the bentonite
during the construction process. This has led to the phenomenon of bentonite surface
runoff in areas such as Ngoi Rao bridge, Ngoi Thia bridge, Ngoi Gua bridge...
- This month, the contractor's fuel management has had no improvement. At the fuel
station such as Ngoi Gua bridge, Ngoi Rao bridge, Van Phu bridge... the Consultant
has found traces of oil leaked on the ground.
- At some construction locations such as Km111, Km123, Km148..., the Contractor has
gathered unsuitable soil in areas which have not yet been approved by Consultant.
To ensure the regional soil quality, the Consultant has requested the contractor to quickly
apply effective measures to resolve these outstanding issues (Ref. GET3-KEANGNAM-12-A5-
490 dated 31 May 2012). Besides, in the weekly site inspections, the Consultant has also
frequently required the Contractor to comply with the Method Statement as well as the
Environment Control and Protection Plan of the Project during construction process to prevent
negative impacts of the Project on the environment in general and on the regional soil quality
in particular.
June
During this period, the major construction activities of the Contractor remained earthworks
(excavation, embankment...) and the bridge piles, so they did not generate substances that
can cause serious impacts to the soil quality.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
69
However, because the environment control and protection of the Contractor was not done well,
a number of outstanding issues has raised as follows:
- At stations Km116-Km117, Km117-Km118, Km119, Km126, Km127... the Contractor
did not fully comply with the instructions of the Consultant as well as the requirements
of the Project, so on a number of rainy days, soil from the Project’s area has flooded
the production areas of local people (agricultural land, forest land, aquaculture land).
This has affected the region's soil quality. However, so far, the Contractor have not yet
fully solved this problem (Ref. GET3-KEANGNAM-12-A5-594 dated June 29, 2012).
- Bentonite was not tightly controlled during the construction process in areas such as
bridges Van Phu, Ngoi Rao, Ngoi Gua, Ngoi Thia,... this has led to the bentonite
surface runoff, affecting the soil quality.
- The fuel management of the Contractor was not done well in areas such as the fuel
stations Ngoi Thia bridge, Ngoi Gua bridge, Van Phu bridge, Ngoi Rao bridge, Ngoi Lau
bridge... The Consultant found that the fuel tanks were located directly on the ground
without any device to prevent fuel leakage, which may cause traces of leaked fuel on
the ground, affecting the soil quality.
To ensure the Project's environment quality in general and the soil quality in particular, the
Consultant has asked the Contractor to solve these outstanding issues. Besides, in the weekly
site inspection, the Consultant has also frequently required the Contractor to comply with the
Method Statement as well as the Environment Control and Protection Plan of the Project
during the construction process.
4.3.6 Package A6
April
This month, the major construction item of the Contractor on site was the soilwork (clearing,
digging and leveling...), so the soil quality of the area was not affected by the construction
activities of the Contractor. Most of the construction activities of the Contractor did not create
hazardous substances.
However, the contractor's fuel management was much improved over the previous month. In
some areas such as Km172+300, Km186+200, Km155+300... the Contractor still put fuel tanks
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
70
directly on the ground without any device to prevent oil leakage. This could lead to oil leakage,
affecting the soil quality of the area. To ensure the region's environment as well as to prevent
negative impacts on the regional soil quality, the Consultant has provided the Contractor
specific guidances for the fuel management work (Ref. GET3-DOOSAN-12-A6-300). Also, in
the site inspections, the Consultant has usually required the Contractor to improve their fuel
management and to comply with the instructions of the Consultant.
May
During this period, the main construction categories of the Contractor on site is the earth work
such as site clearing, excavation work and embankment work,... They have not generated
substances that cause serious impacts to soil quality in the region. Besides, most of the
construction activities of the Contractor have been done within the limit of the project.
However, there are still some outstanding issues as follows:
- The fuel management of the Contractor has not been implemented well at some fuel
stations such as: Km186+200, Km186+720, Km171, Km155+300,… the fuel stations
have not been equipped with adequate devices to prevent oil leakage. Besides, there is
still the phenomenon of the fuel tanks put directly on the ground; this could lead to oil
leakage, affecting the regional soil quality.
- Erosion has occurred in the embankment area of the Contractor on some rainy days of
the month, and this led to the phenomenon of soil from the project’s area flooded the
production area of the local people, afftecting the soil quality in production land such as
Km156, Km176, Km172...
The Consultant has requested the Contractor to apply effective measures to thoroughly
overcome the outstanding issues. Besides, in the site inspections, the Consultant has
frequently required the Contractor to comply with the Method Statement and the Environment
Control and Protection Plan during construction to prevent the negative effects from the
project’s construction activities on the region's soil quality.
June
Through the inspection and supervision in this month, we found that the activities of
construction have not caused serious impacts to soil quality of the area, however, there are still
some outstanding problems as follows:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
71
- The fuel management of the Contractor has been improved, however, there were still
fuel tanks placed directly on the ground without any device to prevent oil leakage as in
Km186 +200, Km186+720, Km178 +200, Km155+300, Dai Viet bridge, etc.
- In the days of heavy rain, in areas under drainage construction as Km168, Km178, etc.,
the drainage pipes have not been completely constructed, which hindered the water
flow through these areas, led to the flooding in upstream drainage and erosion in the
drainage downstream, affecting soil quality production of local people.
The Consultant asked the Contractor to quickly apply the measures to resolve these
outstanding issues (mentioned in Ref. GET3-Doosan-12-A6-566 and GET3-Doosan-12-A6-
546). .
Because the rainy season began in early A6 bidding package, the Consultant has asked the
Contractor to apply measures to ensure the environment during the rainy season through
GET3- DOOSAN-12-A6-650 dated 29 June, 2012 .
This month, the Contractor continued to implement grass planting in the area of embankment
slope and cutting slope to limit the erosion, especially during the upcoming rainy season.
4.3.7 Package A7
April
In April 2012, the oil and waste oil barrels at Km202+770 keeping on the concrete (not keeping
on the ground). However the consultant always remind the contractor to using the oil barrel
and waste oil barrel in right way and keep in store area not effect to soil quality.
May
Soil quality is impacted by overflow of oil and waste oil which stored directly on the ground and
didn’t cover by anything. During time inspection date 16- May 2012 the ADB mission and
consultant showed for the contractor which place stored oil tanks and waste oil tanks not meet
project standard at Km209+800; Km202+400; Km198+400. Consultant required the contractor
to keep the oil tanks and waste oil tanks in the store and on a concrete floor to avoid effect to
surface soil lever in the letter No: Ref. GET4- GRBCC-650 and required the contractor to
overcome before 30-June- 2012.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
72
June
Soil quality is impacted by overflow of oil and waste oil which stored directly on the ground and
didn’t cover by anything. During time inspection date 16- May 2012 the ADB mission and
consultant showed for the contractor which place stored oil tanks and waste oil tanks not meet
project standard at Km209+800; Km202+400; Km198+400. Consultant required the contractor
to keep the oil tanks and waste oil tanks in the store and on a concrete floor to avoid effect to
surface soil lever in the letter No: Ref. GET4- GRBCC-650 and required the contractor to
overcome before 30-June- 2012. However until date 28-June 2012 the contractor didn’t
deploying according to ADB mission and consultant instruction.
4.3.8 Package A8
April
On April 2nd 2012, at construction works of IC17 Bridge Km233+540, some earth overflows on
the field which can effect to soil quality and crop productivity. And at Suoi Trat Bridge
Km231+889 while construction works some soil waste or earth overflows in field which can
effect to soil quality and crop productivity, so contractor are required to overcome before
citizen starting news crops.
May
Soil quality is impacted by overflow of oil and waste oil which stored directly on the ground and
didn’t cover by anything. During time inspection date 16- May 2012 the ADB mission and
consultant showed for the contractor which place stored oil tanks and waste oil tanks not meet
project standard at Km244+155; Km229+034; Km218+040. Consultant required the contractor
to keep the oil tanks and waste oil tanks in the store and on a concrete floor to avoid effect to
surface soil lever in the letter No: Ref. GET4- Vinaconex-565 and Ref. GET4- Vinaconex-566
and required the contractor to overcome before 30-June- 2012.
June
Soil quality is impacted by overflow of oil and waste oil which stored directly on the ground and
didn’t cover by anything. During time inspection date 16- June 2012 the ADB mission and
consultant showed for the contractor which place stored oil tanks and waste oil tanks not meet
project standard at Km244+155; Km229+034; Km218+040. Consultant required the contractor
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
73
to keep the oil tanks and waste oil tanks in the store and on a concrete floor to avoid effect to
surface soil lever in the letter No: Ref. GET4- Vinaconex-565 and Ref. GET4- Vinaconex-566
and required the contractor to overcome before 30-June- 2012. However, so far the contractor
didn’t overcome according to the consultant instruction.
4.4 IMPACT ON NOISE AND VIBRATION LEVELS
4.4.1 Package A1
April
During the site inspections this month there was no serious impact of noise and vibration on
local community recorded, including the sensitive areas such as Km 13+100 ~ Km 13+900. At
section Km 19+650, this time the Contractor is carrying out the drilling bored pile work and he
had already installed the fence of iron sheets surrounding the construction site in order to
minimize the spread of noise which arises from construction activities.
May
In the site inspection on May 22, together with ADB’s expert, Employer and the Contractor, we
have received grievance from local people at section Km 19+740 that the Contractor usually
carried out the construction work at night and this caused the noise pollution that impacte don
local community. The PSC has requested the Contractor to limit the work at night as well as
apply the noise mitigation measure to minimize impact of construction work of the project on
local community.
At other sensitive areas such as Km 13+100 ~ Km 13+900, Km 4+400, in the site inspections
we did not see the serious problems, which arised from construction work, impact on local
community.
June
In the site inspection on May 22, together with ADB’s expert, Employer and the Contractor, we
have received grievance from local people at section Km 19+740 that the Contractor usually
carried out the construction work at night and this caused the noise pollution that impacte don
local community. The PSC has requested the Contractor to limit the work at night as well as
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
74
apply the noise mitigation measure to minimize impact of construction work of the project on
local community.
At other sensitive areas such as Km 13+100 ~ Km 13+900, Km 4+400, in the site inspections
we didn’t see the serious problems, which arised from construction work, impact on local
community.
4.4.2 Package A2
April
This month, at sensitive areas such as Km 34+780 (close to resident area and a pagoda), Km
36+500 (close to resident area), Km 39+200 (close to resident area) there was almost none
construction work carried out so these areas were not affected by noise or vibration which
arises from construction work of project.
At other section, we also didn’t found any serious problem during site inspections.
May
This month, at sensitive areas such as Km 34+780 (close to resident area and a pagoda), Km
36+500 (close to resident area), Km 39+200 (close to resident area) there was almost none
construction work carried out so these areas were not affected by noise or vibration which
arises from construction work of project.
At other section, we also didn’t found any serious problem during site inspections.
June
In the site inspections, we perceived that there was almost none construction work at sensitive
areas such as Km 34+780 (close to resident area and a pagoda), Km 36+500 (close to
resident area), Km 39+200 (close to resident area) therefore these areas were not affected by
noise or vibration which arises from construction work of project.
At other section, we also didn’t found any serious problem during site inspections.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
75
4.4.3 Package A3
April
The results of Noise monitoring in April are shown in table 4.20.
Table 4.20: The result of Noise monitoring in Package A3 in April, 2012.
Station Monitoring Value
(dBA) Standard Value
(dBA)
Exceeded Standard
(dBA) 6.00-10.00 10.00-12.00 12.00 -18.00 6.00 - 21.00 6.00 - 21.00
Km 48+500 53 54 53 55 0 Km 55+550 68 69 69 70 0 Km 67+700 68 69 67 70 0 Km78+900 69 69 68 70 0
Recently, the noise generated from construction activities at monitoring place is still under the
allowed limitation.
The Contractor needs to control the construction activities to maintain the noise arising within
the allowed limitation.
Currently, the Contractor has not performed the construction activities during the night shift so
the noise monitoring at the night time from 18 pm to 6 am is unnecessary.
May
The results of Noise monitoring in May are shown in table 4.21.
Table 4.21: The result of Noise monitoring in Package A3 in May, 2012.
Station
Monitoring Value (dBA)
Standard Value (dBA)
Exceeded Standard
(dBA) 6.00-10.00 10.00-12.00 12.00 -
18.00 6.00 - 21.00 6.00 - 21.00
Km 48+500 55 53 54 55 0 Km 55+550 68 66 69 70 0 Km 67+700 67 68 67 70 0 Km78+900 69 69 69 70 0
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
76
Recently, the noise generated from construction activities at monitoring place is still under the
allowed limitation.
But during May, when inspection in site we received many complains from local people about
noise which arise from construction activities at Km78+900 Red river bridge, Km67+800
TL315B bridge, Km51+100, section 3… Consultant requested Contractor has to set up fence
to minimize noise and limit working time at night to avoid disturb local inhabitant’s life.
June
In june, the noise generated from construction activities at monitoring place is still under the
allowed limitation.
4.4.4 Package A4
April
The results of Noise monitoring in April are shown in table 4.21.
Table 4.22: The result of Noise monitoring in Package A4 in April, 2012.
Location Monitoring Value
(dBA) Standard
Value (dBA)
Exceeded Standard
(dBA)
Standard Value (dBA)
Exceeded Standard
(dBA) 6am-10am 10am-2pm 2pm-6pm 6am-9pm 6am-9pm 9pm–6am 9pm–6am
Km 91 + 150 45 47 46 55 0 - - Km 95 + 100 61 63 62 70 0 - - Tan Thanh batching plant 69 69 68 70 0 - -
Km 88 + 300 Km 88+500 68 69 68 70 0 - -
Km 104 + 900 Km 105 + 350 66 68 67 70 0 - -
Km 106 + 500 Km 107 + 600 67 68 69 70 0
- -
Km 106 + 800 52 54 53 55 0 - -
The analyzed results of the air environment show that: At the all monitoring areas, the
analyzed results were within the allowed standard.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
77
At Km 106+500 to Km 107+600, noise value from 6pm-6am was 60dBA over 1.09 times
compared with standard. Therefore the Contractor need to install fence to minimize noise and
avoid disturb to local people.
May
The results of Noise monitoring in May are shown in table 4.23.
The analyzed results of the air environment show that: At the all monitoring areas, the
analyzed results were within the allowed standard.
During May, Contractor started working all day (24 hours/ day) special at Km107+533 QL32C
bypass. Noise and vibration which arise from construction activities was very loud special at
night. Local people here had complaints that they could not sleep, their life were upset, their
house was impacted seriously by vibration from activities. They asked someone of
subcontractor must resolve this problem but they always ignore. Even they gave their
complaint to commune but nothing happen.
Table 4.23: The results of Noise monitoring in Package A4 in May, 2012.
Location
Monitoring Value (dBA)
Standard Value (dBA)
Exceeded Standard (dBA)
6am-10am 10am-2pm 2pm-6pm 6am-9pm 6am-9pm
Km 91 + 150 48 45 49 55 0
Km 95 + 100 67 65 68 70 0
Tan Thanh batching plant 69 67 69 70 0
Km 88 + 300 Km 88+500 68 65 67 70 0
Km 104 + 900 Km 105 + 350 69 67 70 70 0
Km 106 + 500 Km 107 + 600 66 64 67 70 0
Km 106 + 800 54 52 53 55 0
In inspection tour of ADB mission, when they interview some of these impacted households,
they warned Contractor must set up a small information board in construction sites to inform
telephone number, name of responsibility person of Contractor for anyone who want to give
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
78
complaint about safety and environmental problem can do it. It was also agreed that in no
more 24 hours, the complaints must be submitted to EPMU and to GETINSA. In agreement it’s
included that the way to inform local people about the system to submit the complaint to
contractor will be adding in information board in site. Also local and district authorities will be
informed about this system to complain.
This system must be implemented before June 30th 2012. As Consultant must check the
compliance in order to include the monitoring of this issue in monthly report for June and in the
corresponding quarterly report, Consultant establish a deadline for the compliance, before
June 23rd, 2012.
June
In june, the noise generated from construction activities at monitoring place is still under the
allowed limitation.
4.4.5 Package A5
April
Through the inspection and supervision on site this month, the Consultant found that there was
no serious impact of noise from the construction activities of the Project on the surrounding
residential areas. Most of the construction activities of the Package have been conducted
within the limits of the Project and were restricted on night time.
However, in the weekly site inspections, the Consultant has frequently required the Contractor
to comply with the requirements in the Environment Control and Protection Plan to prevent
adverse effects of noise on the surrounding areas. Besides, the Consultant has also required
the Contractor to limit night time construction activities and apply measures to reduce noise in
the factories of the Contractor located close to residential areas.
In April, 2012, the Consultant has measured noise levels in some areas with the sound meter
SC-2c.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
79
Table 4.24: The results of Noise monitoring in Package A5 in April, 2012.
No Location Date Time Noise level (dBA)
Max Min Medium 1 Km117+050 10/04/2012 2:30 P.M 49 41 45.0 2 Km118+820 10/04/2012 3:40 P.M 68 51 59.5 3 Km121+433 10/04/2012 4:20 P.M 72 52 62.0
(Source: Sound meter SC-2c)
Compare with the results of noise measurement of the Contractor in May, 2012:
Table 4.25: The results of Noise monitoring in Package A5 in April, 2012 (Contractor).
Station Site Result (dB) (average) QCVN 26:2010 Exceeding value
Working shift 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h
Km 117+050
Bao Long church 47,1 44,7 55 45 - -
- The value of noise level referred to standards applied for commerce, office, industry areas. - Noise primarily generated from the vehicles but constructional equipment
(Source: Sound meter SC-2c)
Table 4.26: Noise level measured at Km118+820 and Km121+433
Station Site Result (dB) (average) QCVN 26:2010 Exceeding value
Working shift 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h
Km 118+820
Hop Minh My bridge 61,8 53,9 70 55 - -
Km 121+433
QL37 bridge 64,2 52,2 70 55 - -
- The value of noise level referred to standards applied for commerce, office, industry areas. - Noise primarily generated from the vehicles but constructional equipment
This noise level does not exceed Vietnamese Standards QCVN 26:2010/BTNMT (Acoustics –
Noise in public and residential areas maximum permitted noise level).
The individually-recorded results are relative random because the magnitude of noise level
recorded on site is depended on the number of vehicles on the road at the time of monitoring
but activities at the construction site.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
80
May
This month, through the inspection and supervision on site, the Consultant found that the
construction activities of the Contractor have not caused serious impacts of noise and vibration
on the population area around. However, in the site inspections, the Consultant has frequently
required the Contractor to comply with the requirements in the Environment Control and
Protection Plan to prevent the adverse effects of noise on the surrounding area. Also, the
Consultant has required the Contractor to limit night time activities and apply measures to
reduce noise, especially in the factories located near the regional population such as batching
plant No. 1 (Km123), batching plant No. No. 2 (Km132), RC Pipe Culvert factory No. 2
(Km132)... In May, 2012, the Consultant has measured noise levels in some areas with the
sound meter SC-2c.
Table 4.27: Noise levels at some stations under construction in Package A5 in May, 2012.
No Location Date Time Noise level (dBA) Max Min Medium
1 Km117+050 10/05/2012 8:30 A.M 50 43 46.5 2 Km118+820 10/05/2012 10:00 A.M 69 53 61.0 3 Km121+433 10/05/2012 2:30 P.M 71 56 63.5
(Source: Sound meter SC-2c)
Compare with the results of noise measurement of the Contractor in May, 2012:
Table 4.28: Noise level measured at Km 117+050.
Station Site Result (dB) (average) QCVN 26:2010 Exceeding value
Working shift 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h
Km 117+050
Bao Long church 51,1 43,3 55 45 - -
- The value of noise level referred to standards applied for commerce, office, industry areas. - Noise primarily generated from the vehicles but constructional equipment
(Source: Sound meter SC-2c)
Table 4.29: Noise level measured at Km118+820 and Km121+433
Station Site Result (dB) (average) QCVN 26:2010 Exceeding value
Working shift 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h
Km 118+820
Hop Minh My bridge 64,8 52,1 70 55 - -
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
81
Km 121+433
QL37 bridge 61,9 53,1 70 55 - -
- The value of noise level referred to standards applied for commerce, office, industry areas. - Noise primarily generated from the vehicles but constructional equipment
(Source: Sound meter SC-2c)
This noise level does not exceed Vietnamese Standards QCVN 26:2010/BTNMT (Acoustics –
Noise in public and residential areas maximum permitted noise level).
The individually-recorded results are relative random because the magnitude of noise level
recorded on site is depended on the number of vehicles on the road at the time of monitoring
but activities at the construction site.
June
Through the inspection and supervision of the Contractor’s construction activities this month,
the Consultant found that they did not cause serious impacts related to noise and vibration in
the surrounding residential areas.
However, at the batching plant No. 1 Km123, batching plant No. 2 Km132 and RC pipe culvert
factory No. 2 Km132, which are close to residential areas, the Contractor did not fully apply
measures to reduce noise during manufacturing. The Consultant has reminded the Contractor
on this issue. In the weekly site inspections, the Consultant has also instructed the Contractor
about the construction of walls to minimize noise in the batching plants area.
Besides, in the weekly site inspections, the Consultant has also required the Contractor to limit
night time activities and apply measures to reduce noise in the construction process to prevent
negative effects of noise on surrounding areas.
In June, 2012, the Consultant has measured noise levels in some areas with the sound meter
SC-2c.
Table 4.30: Noise levels at some stations under construction of A5
No Location Date Time Noise level (dBA) Max Min Medium
1 Km117+050 19/06/2012 8:30 A.M 51 43 47.0 2 Km118+820 19/06/2012 9:40 A.M 71 52 61.5 3 Km121+433 19/06/2012 2:40 P.M 72 53 62.5
(Source: Sound meter SC-2c)
Compare with the results of noise measurement of the Contractor in May, 2012:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
82
Table 4.31: Noise level measured at Km 117+050
Station Site Result (dB) (average) QCVN 26:2010 Exceeding value
Working shift 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h
Km 117+050
Bao Long church 53,3 42,8 55 45 - -
- The value of noise level referred to standards applied for commerce, office, industry areas. - Noise primarily generated from the vehicles but constructional equipment
(Source: Sound meter SC-2c)
Table 4.32: Noise level measured at Km118+820 and Km121+433
Station Site Result (dB) (average) QCVN 26:2010 Exceeding value
Working shift 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h 6 h – 21h 21h – 6h
Km 118+820
Hop Minh My bridge 62,5 51,3 70 55 - -
Km 121+433
QL37 bridge 67,2 48,5 70 55 - -
- The value of noise level referred to standards applied for commerce, office, industry areas. - Noise primarily generated from the vehicles but constructional equipment
(Source: Sound meter SC-2c)
This noise level does not exceed Vietnamese Standards QCVN 26:2010/BTNMT (Acoustics –
Noise in public and residential areas maximum permitted noise level).
The individually-recorded results are relative random because the magnitude of noise level
recorded on site is depended on the number of vehicles on the road at the time of monitoring
but activities at the construction site.
4.4.6 Package A6
April
This month, through the inspection and supervision on site, the Consultant found that the
construction activities of the Contractor did not create serious impacts on noise and vibration
on the surrounding areas.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
83
However, at some production plants which are located close to residential areas such as
Km180, Km165, Km163... the Contractor operated at night in some days this month. However,
the Contractor has not applied measures fully to minimize noise; this could create negative
effects of noise on the residential areas surrounding the plants. The Consultant has reminded
the Contractor on these outstanding issues in the site inspections. In addition, the Consultant
has required the Contractor to limit construction and production at night, and the construction
activities of the Contractor shall comply with the limits of the Project.
In April 2012, the Consultant conducted measuring the noise level in some areas with the
sound meter SC-2c.
Table 4.33: Noise levels at some stations under construction of A6
No Location Date Time Noise level (dBA) Max Min Medium
1 Km155+360 19/04/2012 10:20 AM 59 46 52.5 2 Km159+400 19/04/2012 2:00 PM 61 43 52.0 3 Km162+800 19/04/2012 3:10 PM 72 55 63.5 4 Km165+300 19/04/2012 4:05 PM 71 51 61.0
(Source: Sound meter SC-2c)
In coming months, the Consultant will regularly test noise level in the sensitive areas and
residential areas with the sound meter SC-2c to timely detect the areas with the noise levels
over permitted TCVN in order to advise the Contractor to implement the noise minimization
measures that are appropriate in that area.
May
Through the inspection and supervision on site this month, the Consultant found that there was
no serious impact of noise and vibration from construction activities of the Contractor.
However, there are still some outstanding issues as follows:
- At the batching plant close to residential areas such as Km180, Km165, Km163, ... the
Contractor has not fully applied measures to reduce noise in the operations process at
some nights in the month; this has created adverse impacts of noise on the residential
areas surrounding the plant.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
84
- The transportation of concrete from the batching plant to the site at some stations such
as Km164 - Km165, Km156 - Km175,.... was carried out by the contractor in some night
time; this has created noise affecting the surrounding residential areas.
The Consultant has reminded the Contractor on these issues, and the Consultant has also
requested the Contractor to limit construction and production at night time as well as to comply
with the project’s limits during construction process.
In the portal of tunnel areas, during the operation of machinery, loud noises have arisen. The
Consultant has requested the Contractor to provide workers the protection and safety
equipment during the construction process.
In May 2012, the Consultant conducted measuring the noise level in some areas with the
sound meter SC-2c.
Table 4.34: Noise levels at some stations under construction of A6
No Location Date Time Noise level (dBA) Max Min Medium
1 Km155+360 14/05/2012 10:30 AM 58 49 53.5 2 Km159+400 14/05/2012 2:10 PM 60 43 51.5 3 Km162+800 14/05/2012 3:20 PM 71 58 64.5 4 Km165+300 14/05/2012 4:00 PM 72 58 65.0
(Source: Sound meter SC-2c)
In coming months, the Consultant will regularly test noise level in the sensitive areas and
residential areas with the sound meter SC-2c to timely detect the areas with the noise levels
over permitted TCVN in order to advise the Contractor to implement the noise minimization
measures that are appropriate in that area.
June
This month, through the inspection and supervision on site, Consultant found that the activities
of construction have not caused serious impact on noise and vibration to the surrounding area
of Provision Project.
However, there are still some outstanding issues as follows:
- Due to the construction of some bridges on the route, the pouring of concrete for bridge
construction items was implemented on night time, the vehicles which transported
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
85
construction materials caused noise to the residential sector at Km165, Km157, etc.
However, these effects were local only and did not last long, Consultant reminded the
Contractor on this issue, and also required the Contractor to comply with construction
measures at night time to minimize the effects on noise and vibration to the
surrounding areas.
- In the mixing region which was close to residential areas as Km180, Km165, Km163, ...
the Contractor has not fully applied measures to minimize noise during manufacturing
operations. The Consultant reminded the Contractors on this issue. In the weekly on-
site inspections, the Consultant also guided the Contractor for the construction of walls
to minimize noise in the mixing area.
In June 2012, the Consultant conducted measuring the noise level in some areas with the
sound meter SC-2c.
Table 4.35: Noise levels at some stations under construction of A6
No Location Date Time Noise level (dBA) Max Min Medium
1 Km155+360 15/06/2012 9:30 AM 60 51 55.5 2 Km159+400 15/06/2012 11:10 PM 59 47 53.0 3 Km162+800 15/06/2012 2:20 PM 72 59 65.5 4 Km165+300 15/06/2012 3:50 PM 70 58 64.0
(Source: Sound meter SC-2c)
In coming months, the Consultant will regularly test noise level in the sensitive areas and
residential areas with the sound meter SC-2c to timely detect the areas with the noise levels
over permitted TCVN in order to advise the Contractor to implement the noise minimization
measures that are appropriate in that area.
4.4.7 Package A7
April
The construction of road base operations, transportation of materials can also cause impacts
on noise and vibration but the impacts are appraised to be acceptable and in accordance with
standards noise and vibration levels.
The concrete mixing plants such as Km209 +329 of Tan Tien bridge, Km198 +400 of Xom
Danh bridge, Khe Sang bridge at Km191 +353 are located away from residential areas and
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
86
sensitive areas hence the operation of the stations did not affect on the around areas for the
level of noisy and vibration trauma. However, the consultant always reminds the contractor to
limit even forbid construction activities to create noisy and violence in the early morning,
noontime or middle night.
May
The construction of road base operations, transportation of materials can also cause impacts
on noise and vibration but the impacts are appraised to be acceptable and in accordance with
standards noise and vibration levels.
The concrete mixing plants such as Km209+329 of Tan Tien bridge, Km198+400 of Xom Danh
bridge, Khe Sang bridge at Km191+353 are located away from residential areas and sensitive
areas hence the operation of the stations did not affect on the around areas for the level of
noisy and vibration trauma. However, the consultant always reminds the contractor to limit
even forbid construction activities to create noisy and violence in the early morning, noontime
or middle night.
Result of the Contractor noise and vibration levels monitoring (carried out by Institute of
Environmental technology in April 2012) showed that construction works not effected to noise
and vibration levels
Noise measuring results are compared with QCVN 26:2010/BTNMT: National Technical
Regulation on Noise. Maximum allowable noise levels are shown in the following table:
Table 4.36: Noise measuring
Sample Noise (dBA)
Leq Lmax L50
L1 L2 L3 TB L1 L2 L3 TB L1 L2 L3 TB N01 57.2 57 57.5 57.2 75.6 74.5 76.2 75.4 52.8 50.6 52.2 51.9 N02 58.7 56.8 57.5 57.7 78.7 79.2 80.5 79.4 51.2 52.0 52.6 51.9 N03 63.4 64.2 63.2 63.6 86.1 87.2 86.7 86.7 52 53.5 52.8 52.8 N04 67.9 66.8 67.0 67.2 82.7 80.5 80.1 81.1 63.6 62.4 63.0 63.0 N05 63.4 63.6 63.0 63.3 82.8 81.7 81.5 82.0 54.4 54 53.6 54.0 N06 57.3 57.0 57.6 57.3 81.8 81.2 81.6 81.5 52.2 52.0 52.7 52.3 N07 62.4 62.8 62.0 62.4 76.3 76.8 76.0 76..4 58.7 59.0 58.5 58.7 N08 65.6 66.2 66.0 65.9 86.6 86.8 86.2 86.5 53.1 53.3 53.0 53.1 N09 63.4 63.6 63.0 63.3 82.8 81.7 81.5 82.0 54.4 54 53.6 54.0 N10 57.3 57.0 57.6 57.3 81.8 81.2 81.6 81.5 52.2 52.0 52.7 52.3 N11 59.9 60.2 61.3 60.5 85.3 86.2 85.8 85.8 51.1 52.3 52.0 51.8
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
87
Sample Noise (dBA)
Leq Lmax L50
L1 L2 L3 TB L1 L2 L3 TB L1 L2 L3 TB N12 60.6 61.2 61.0 60.9 83.5 84.3 84 83.9 55.2 53.8 53.5 54.2 N13 62 62.5 62.8 62.4 82.6 82.8 83 82.8 54.6 54.8 54.6 54.7 N14 66.6 67.0 66.5 66.7 91.6 91.8 91.4 91.6 54 56 55.8 55.3 TCVN 5949:1998 70 - -
As mentioned above, all the noise monitoring results are compared with National Technical
Regulation QCVN 26:2010/BTNMT. Most of the results are lower in compare to the prescribed
level in regulation and ranges of measured results are as follows:
Leq noise levels ranged from 57.2 dBA to 67.2 dBA. The highest value was found in Bridge
girder casting yard, Xuan Sang 2 Hamlet, Tan An Commune, Van Ban District (coordinates N:
22007,442’; E:104024,026’)
As the same as noise monitoring, the results of vibration monitoring will be compared with
QCVN 27:2010/BTNMT: National Technical Regulation on Vibration, and are described as
follows:
Table 4.37: Vibration Monitoring Results
Sample Laeq (m/s2) Lveq (m/s) Frequency
(Hz) L1 L2 L3 TB L1 L2 L3 TB V01 0.0013 0.000904 0.0009 0.001035 0.000258 0.00018 0.000179 0.000206 8Hz V02 0.000889 0.000587 0.000587 0.000688 0.000177 0.000117 0.000117 0.000137 8Hz V03 0.00173 0.00111 0.00102 0.001287 0.000345 0.00022 0.000203 0.000256 8Hz V04 0.00192 0.00198 0.00146 0.001787 0.000383 0.000394 0.000289 0.000355 8Hz V05 0.000881 0.000707 0.000552 0.000713 0.000175 0.000141 0.00011 0.000142 8Hz V06 0.00414 0.000667 0.000321 0.001709 0.0000824 0.000133 0.0000638 0.0000931 8Hz V07 0.000633 0.00074 0.000522 0.000632 0.000126 0.000147 0.000104 0.000127 8Hz V08 0.00122 0.00108 0.00101 0.001103 0.000243 0.000216 0.000202 0.000220 8Hz V09 0.000881 0.000707 0.000552 0.000713 0.000175 0.000141 0.00011 0.000142 8Hz V10 0.00414 0.000667 0.000321 0.001709 0.0000824 0.000133 0.0000638 0.0000931 8Hz V11 0.000594 0.000792 0.000496 0.000627 0.000118 0.000157 0.0000986 0.000125 8Hz V12 0.000594 0.000496 0.000492 0.000527 0.000118 0.000986 0.0000979 0.000401 8Hz V13 0.000411 0.00077 0.000615 0.000599 0.0000818 0.000153 0.000122 0.000119 8Hz V14 0.00139 0.000952 0.00118 0.001174 0.000277 0.000184 0.000235 0.000232 8Hz
TCVN 6962:2001 0.055
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
88
As a rule, the vibration acceleration should not exceed 0.055 m/s2 from 7h to 19h. According
to table 6, the average vibration values range from 0.000527 to 0.001787 m/s2 and below the
prescribed level.
Note: Locations for noise monitoring are the following:
N01: Xuan Sang 1 Primary School, Xuan Sang 1 Hamlet, Tan An Commune, Van ban District
(coordinates N: 22007,895’; E:104023,844’)
N02: Concrete mixing plant No,1, Ngam Thin Hamlet, Tan Thuong Commune, Van Ban District
(coordinates N: 22009,615’; E:104020,459’)
N03: Concrete mixing plant No,2, Dap Tran Hamlet, Tan Thuong Commune, Van Ban District
(coordinates N: 22009,249’; E:104020,751’)
N04: Bridge girder casting yard, Xuan Sang 2 Hamlet, Tan An Commune, Van Ban District
(coordinates N: 22007,442’; E:104024,026’)
N05: Equipment gathering yard, worker’s living area, Khe U Hamlet, Tan Thuong Commune,
Van Ban District (coordinates N: 22011,545’; E:104019,420’)
N06: Cam Con Primary School, Khe Mai Hamlet, Cam Con Commune, Bao Yen District
(coordinates N: 22012,167’; E:104018,523’)
N07: Cam Con Health Center, Tan Tien Commune, Bao Yen District (coordinates N:
22014,142’; E:104016,553’)
N08: Drainage casting yard No,1, Khe Quat Hamlet, Tan An Commune, Van Ban District
(coordinates N: 22008,585’; E:104022,537’)
N09: Khe U Primary School, Khe U Hamlet, Tan Thuong Commune, Van Ban District
(coordinates N: 22011,604’; E:104019,474’)
N10: Residential areas at the right side of project road, Ban Ly Hamlet, Cam Con Commune,
Bao Yen District (coordinates N: 22012,217’; E:104018,563’)
N11: Tan Thuong Secondary School, Khe Tep Hamlet, Tan Thuong Commune, Van Ban
District (coordinates N: 22011,021’; E:104020,370’)
N12: Drainage casting yard No,2, Bong 1 Hamlet, Cam Con Commune, Bao Yen District
(coordinates N: 22013,532’; E:104016,995’)
N13: Cam Con Secondary School, Hamlet 2, Cam Con Commune, Bao Yen District
(coordinates N: 22014,380’; E:104016,388’)
N14: Tan An Kinder Garden, Tan Duong Hamlet, Tan An Commune, Van Ban District
(coordinates N: 22009,511’; E:104021,960’)
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
89
Note: Locations for vibrations monitoring are the following:
V01: Xuan Sang 1 Primary School, Xuan Sang 1 Hamlet, Tan An Commune, Van ban District
(coordinates N: 22007,895’; E:104023,844’)
V02: Concrete mixing plant No,1, Ngam Thin Hamlet, Tan Thuong Commune, Van Ban District
(coordinates N: 22009,615’; E:104020,459’)
V03: Concrete mixing plant No,2, Dap Tran Hamlet, Tan Thuong Commune, Van Ban District
(coordinates N: 22009,249’; E:104020,751’)
V04: Bridge girder casting yard, Xuan Sang 2 Hamlet, Tan An Commune, Van Ban District
(coordinates N: 22007,442’; E:104024,026’)
V05: Equipment gathering yard, worker’s living area, Khe U Hamlet, Tan Thuong Commune,
Van Ban District (coordinates N: 22011,545’; E:104019,420’)
V06: Cam Con Primary School, Khe Mai Hamlet, Cam Con Commune, Bao Yen District
(coordinates N: 22012,167’; E:104018,523’)
V07: Cam Con Health Center, Tan Tien Commune, Bao Yen District (coordinates N:
22014,142’; E:104016,553’)
V08: Drainage casting yard No,1, Khe Quat Hamlet, Tan An Commune, Van Ban District
(coordinates N: 22008,585’; E:104022,537’)
V09: Khe U Primary School, Khe U Hamlet, Tan Thuong Commune, Van Ban District
(coordinates N: 22011,604’; E:104019,474’)
V10: Residential areas at the right side of project road, Ban Ly Hamlet, Cam Con Commune,
Bao Yen District (coordinates N: 22012,217’; E:104018,563’)
V11: Tan Thuong Secondary School, Khe Tep Hamlet, Tan Thuong Commune, Van Ban
District (coordinates N: 22011,021’; E:104020,370’)
V12: Drainage casting yard No,2, Bong 1 Hamlet, Cam Con Commune, Bao Yen District
(coordinates N: 22013,532’; E:104016,995’)
V13: Cam Con Secondary School, Hamlet 2, Cam Con Commune, Bao Yen District
(coordinates N: 22014,380’; E:104016,388’)
V14: Tan An Kinder Garden, Tan Duong Hamlet, Tan An Commune, Van Ban District
(coordinates N: 22009,511’; E:104021,960’)
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
90
June
The construction of road base operations, transportation of materials can also cause impacts
on noise and vibration but the impacts are appraised to be acceptable and in accordance with
standards noise and vibration levels.
The concrete mixing plants such as Km209 +329 of Tan Tien bridge, Km198 +400 of Xom
Danh bridge, Khe Sang bridge at Km191 +353 are located away from residential areas and
sensitive areas hence the operation of the stations did not affect on the around areas for the
level of noisy and vibration trauma. However, the consultant always reminds the contractor to
limit even forbid construction activities to create noisy and violence in the early morning,
noontime or middle night.
4.4.8 Package A8
April
Currently a number of constructions such as Suoi Nhu, IC 18 and Ngoi Bo Bridges did not
cause impacts on noisy and vibration because the location of construction of the bridge away
from residential areas and sensitive areas .
In addition, the construction of road base operations, transportation of materials can also
cause impacts on noise and vibration but the impacts are appraised to be acceptable and in
accordance with standards noise and vibration levels. However, the consultant always reminds
the contractor to limit even forbid construction activities to create noisy and violence in the
early morning, noontime or middle night.
May
Currently the batching plant of some bridge as: Suoi Trat Bridge, IC18 Bridge and Ngoi Bo
Bridge did not cause impacts on noisy and vibration because the location of construction of the
bridge away from residential areas and sensitive areas.
However the concrete batching plan of Suoi Nhu Km218+040 too near house of local people,
so consultant required the contractor no operation the concrete batching plan at night time to
avoid effect about noising and vibrations for citizens.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
91
In addition, the construction of road base operations, transportation of materials can also
cause impacts on noise and vibration but the impacts are appraised to be acceptable and in
accordance with standards noise and vibration levels. However, the consultant always reminds
the contractor to limit even forbid construction activities to create noisy and violence in the
early morning, noontime or middle night.
June
Currently the batching plant of some bridge as: Suoi Trat Bridge, IC18 Bridge and Ngoi Bo
Bridge did not cause impacts on noisy and vibration because the location of construction of the
bridge away from residential areas and sensitive areas.
However the concrete batching plan of Suoi Nhu Km218+040 too near house of local people,
so consultant required the contractor no operation the concrete batching plan at night time to
avoid effect about noising and vibrations for citizens.
In addition, the construction of road base operations, transportation of materials can also
cause impacts on noise and vibration but the impacts are appraised to be acceptable and in
accordance with standards noise and vibration levels. However, the consultant always reminds
the contractor to limit even forbid construction activities to create noisy and violence in the
early morning, noontime or middle night.
4.5 STREAMS AND RIVERSIDES MAINTENANCE
4.5.1 Package A1
April
In the site inspections we detected that there is no improvement at Tan Loi Bridge. The water
flow is still being blocked due to unsuitable working measures. The risk of riverside landslide is
still high, especially in the rainy season because there is no countermeasure applied. We also
found the similar status at Xuan Phuong Bridge, although the Contractor has already restarted
work in this area but he still doesn’t apply any countermeasure to prevent landslide on
riverside.
At other sections, we didn’t see serious problem during the site inspections.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
92
May
The small streams and temporary drainage maintenance on sites was well done this month.
However, at Tan Loi Bridge and Xuan Phuong Bridge, the Contractor has not taken any action
to improve the situation. Now it’s already in rainy season and after some rains, the Piers 2 and
3 of Tan Loi Bridge is being flooded, the soil in riverbed has not been removed. Beside, there
is no riverside protection measure applied so the risk of landslide on riverside is still visible.
The PSC has instructed and requested the Contractor to solve this matter but up to now, there
is no improvement.
At other sections, we didn’t see serious problem during the site inspections.
June
The small streams and temporary drainage maintenance on sites was well done this month.
However, at Tan Loi Bridge and Xuan Phuong Bridge, the Contractor has not taken any action
to improve the situation. Now it’s already in rainy season and after some rains, the Piers 2 and
3 of Tan Loi Bridge is being flooded, the soil in riverbed has not been removed. Beside, there
is no riverside protection measure applied so the risk of landslide on riverside is still visible.
The PSC has instructed and requested the Contractor to solve this matter but up to now, there
is no improvement.
At other sections, we didn’t see serious problem during the site inspections.
4.5.2 Package A2
April
During the site inspections this month we found that there is no improvement at Ben Tre
Bridge, Muong Dao Bridge and Ben Gao Bridge construction sites. The water flows are being
blocked in these areas and the Contractor has not taken any action to solve this problem.
Therefore, the PSC still maintain the measure of suspending the procedures of payment
progress of all items of these works until the Contractor implements completely requirements
of us.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
93
At Km 42+620, many times we requested the Contractor to install a temporary culvert here to
prevent flooding in sunken area until the permanent culvert to be constructed. However, up the
day there is no action of the Contractor to resolve this matter.
At other sections, we didn’t find the serious problem during the site inspection this month.
May
During the site inspections this month we found that there is no improvement at Ben Tre
Bridge, Muong Dao Bridge and Ben Gao Bridge construction sites. The water flows are being
blocked in these areas and the Contractor has not taken any action to solve this problem.
Therefore, the PSC still maintain the measure of suspending the procedures of payment
progress of all items of these works until the Contractor implements completely requirements
of us.
At Km 42+620, many times we requested the Contractor to install a temporary culvert here to
prevent flooding in sunken area until the permanent culvert to be constructed. However, up the
day there is no action of the Contractor to resolve this matter.
At other sections, we didn’t find the serious problem during the site inspection this month.
June
There is no improvement at Ben Tre Bridge, Muong Dao Bridge and Ben Gao Bridge. The
water flows are still being blocked due the the Contractor has not removed the spoil into
riverbeds despite the warnings of the Engineer.
At Km 42+620, we didn’t see any change, we many times requested the Contractor to install a
temporary culvert here to prevent flooding in sunken area until the permanent culvert to be
constructed but the Contractor doesn’t take any action to resolve this matter.
At other sections, we didn’t find the serious problem during the site inspection this month.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
94
4.5.3 Package A3
April, May and June
At present, we have not found any problem in site or complaint from local people about
streams and riversides maintenance.
4.5.4 Package A4
April
Bentonite and waste mud after drilling bore pile is always poured directly into river (Ngoi Lao
river Km97+124) in long time, pollute water resource. The Contractor doesn’t pay attention to
protect water resource. So we force to stop work here until they resolve this problem
absolutely. After warning letter of Consultant the Contractor confined bentonite in the trench
but it is not efficient. Waste mud and bentonite still overflow into river. Now they finish drilling
bore pile in this riverside but waste bentonite was not resolved absolutely. It occupied a part of
river bed. And the other riverside of Ngoi Lao, soil and stone was fallen much into this river.
We request them must continue repair it.
Beside, at Ngoi Gianh river the Contractor reported that they removed temporary pipe culvert
pipes to allow undisrupted water flow but they still does not dredge river bed to remove all solid
which was fallen from construction activities. In addition, they poured directly waste bentonite
into this river.
At TL321C bridge, waste mud and bentonite blocked the existing irrigation canal. The access
canal was blocked by mud and rubbish. It impacted to local cultivation.
The Consultant’s letter was ref. GET2-KEA-A4-5630 dated April 24th, 2012.
May
On May, at Ngoi Van bridge Km109+080, Contractor was drilling bore pile so all waste
bentonite and soil was overflowed into this river.
Bentonite and waste mud after drilling bore pile is always poured directly into river (Ngoi Lao
river Km97+124) in long time, pollute water resource. The Contractor doesn’t pay attention to
protect water resource. After warning letter of Consultant the Contractor confined bentonite in
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
95
the trench but it is not efficient. Waste mud and bentonite still overflow into river. Now they
finish drilling bore pile in this riverside but waste bentonite was not resolved absolutely. It
occupied a part of river bed. And the other riverside of Ngoi Lao, soil and stone was fallen
much into this river. We request them must continue repair it.
Beside, at Ngoi Gianh river the Contractor reported that they removed temporary pipe culvert
pipes to allow undisrupted water flow but they still does not dredge river bed to remove all solid
which was fallen from construction activities. In addition, they poured directly waste bentonite
into this river.
At TL321C bridge, waste mud and bentonite blocked the existing irrigation canal. The access
canal was blocked by mud and rubbish. It impacted to local cultivation.
Deadline is June 15th, 2012. Consultant’s warning letter is ref.GET2-KEA-A4-638 dated May
4th, 2012 and GET2-KEA-A4-680 dated June 1st, 2012.
June
At Ngoi Van bridge Km109+080, Contractor was drilling bore pile so all waste bentonite and
soil was overflowed into this river. At Dam Nang bridge, while drilling bore pile, it rained heavily
so the water level of river is very high. It spilled over sediment pond of waste bentonite.
4.5.5 Package A5
April
Through the inspection and supervision on site this month, the Consultant found that the
Contractor has carried out repairing some access roads across streams to ensure the natural
flow in areas such as Ngoi Lau bridge... At some construction locations such as Ngoi Thap
bridge, Ngoi Vien bridge, the construction activities of the Contractor have not affected the
conditions of the stream.
However, in some of the construction locations of the Contractor such as Ngoi Gua bridge,
Van Phu bridge, Ngoi Rao bridge, Ngoi Thia bridge..., the Contractor has built the access
roads across the streams or rivers, but they were not built appropriately. In additions, the
drainage pipes of the access roads can hardly satisfy the natural water flow, especially in the
days of heavy rain; this has affected the flow of streams. To address these outstanding issues,
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
96
the Consultant has also given the Contractor specific instructions (Ref. GET3-KEANGNAM-12-
A5-282 dated 11 April 2012).
Also, in the weekly site inspection, the Consultant has frequently reminded the Contractor to
comply with the Method Statement and the Environment Control and Protection Plan of the
Contractor to prevent adverse impacts on the regional irrigation sector as well as the Project’s
environment.
May
This month, through the inspection and supervision on site, the Consultant found that the
construction activities of the Contractor have affected the regional irrigation systems, namely:
- At the areas Ngoi Gua bridge, Ngoi Rao bridge, Ngoi Thia bridge... the access roads of
the Contractor through streams and river have influenced the water flow in these areas.
At Ngoi Thia bridge, riverbank erosion phenomenon has occurred.
- In the construction process at stations Km112 - Km113, Km116 - Km117, Km118 -
Km119,..., the Contractor had no appropriate measure to ensure the irrigation system
of the region. When there was heavy rain, the regional irrigation systems were affected.
The Consultant has requested the Contractor to apply measures to resolve these outstanding
issues (Ref. GET3-KEANGNAM-12-A5-392 dated May 7, 2012, GET3-KEANGNAM-12-A5-
428 dated May 15, 2012; GET3-KEANGNAM-12-A5-463 dated May 25, 2012 and GET3-
KEANGNAM-12-A5-490 dated May 31, 2012).
June
Through the inspection and supervision on site this month, the Consultant found that the
irrigation system of the area was affected by the construction activities of the Contractor in
some areas such as:
- At the bridge area Ngoi Lau bridge and Ngoi Thia bridge, the Contractor built access
roads through streams that has increased the flow speed of water through the area.
This has led to erosion and landslide of stream banks in this area.
- The access roads of the Contractor in the area Ngoi Rao bridge, Ngoi Gua brigde, Ngoi
Thia bridge, Van Phu bridge,... has interrupted the flow of water through this area.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
97
- In areas Km112-Km113, Km116-Km117, Km118-Km119... during construction process,
the Contractor did not fully applied appropriate measures to ensure the irrigation
system of the region. When there was heavy rain, the irrigation systems in the region
were affected.
The Consultant has reminded the Contractor on the outstanding issues. Besides, the
Consultant has also required the Contractor to coordinate with local authorities and local
people to quickly overcome these effects.
In the weekly site inspections, the Consultant has also required the Contractor to comply fully
with the Method Statement, the environment control and protection plan during construction to
prevent adverse impacts on the regional system irrigation.
4.5.6 Package A6
April
Through the inspection and supervision on site this month, the Consultant found that the
regional streams and rivers were not seriously affected by the construction activities of the
Contractor.
However, at the bridge area Ngoi That (Km155+971), the access road across the stream was
damaged heavily in the heavy rainy days this month. This has affected the flow of streams as
well as caused erosion of stream’s edges at this construction location. The Consultant has
reminded the Contractor on this issue in Ref GET3-DOOSAN-12-A6-360 dated 10 April, 2012.
Also, the Consultant has required the Contractor to apply appropriate measures to strengthen
the access road to prevent erosion and landslides in this area.
In some construction areas through streams and rivers such as Ngoi Rom bridge, Lang Nhay
bridge, Ngoi Nhuoc bridge, Ngoi Chac bridge, Suoi Quan bridge,... the Consultant found that
there was no serious effect from the construction activities of the Contractor's works on the
flow of streams and rivers through the areas.
To ensure the Project's environment, in the site inspections, the Consultant has frequently
reminded the Contractor to comply with the Method Statement as well as the Environmental
Control and Protection Plan of the Project to prevent adverse impacts on the regional irrigation
sectors.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
98
May
This month, through the inspection and supervision on site, the Consultant found that the
construction activities of the Contractor have not to seriously affected the conditions of streams
and river banks. However, there are still some outstanding issues as follows:
- At Suoi Quan bridge area, the access roads through the streams of the Contractor
have obstructed the flow of streams in a number of rainy days of the month.
- At the bridge area Ngoi That, the Contractors has built the access road accross the
stream, this has speeded up the flow of water through this area, leading to the stream’s
banks erosion.
The Consultant has reminded the Contractor and requested them to apply measures to
overcome these outstanding issues. In additions, in the site inspections, the Consultant has
frequently reminded the Contractor to comply with the the Method Statement and the
Environment Control and Protection Plan of the Project to prevent adverse impacts on the
regional irrigation.
June
Through the inspection and supervision in this month, the Consultant found that the activities
of construction have caused some impacts on the status of streams and rivers as follows:
- In area of Ngoi That bridge, the Contractor built the access road over stream, which
increased water flow rate through the area, led to erosion and stream bank erosion
(mentioned in Ref. DOOSAN GET3-A6-569-12-June 9, 2012).
- In areas of Ngoi Cong and Ngoi Rom bridges, the access roads which were built over
the spring prevented the flow of streams, especially on rainy days in this month.
To ensure the Project's environment as well as irrigation systems of the region, the Consultant
asked the Contractor to apply measures to resolve these outstanding issues, and consultant
frequently reminded the Contractor to comply with the Method Statement along with
environmental control and protection plans of the Project during the construction process.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
99
In addition, consultant also required the Contractor to apply measures for safety and
environment control during rainy season, and prevented erosion phenomena from occurring
(Ref. GET3-Doosan-12-A6-650 June 29, 2012).
4.5.7 Package A7
April
In April, the unsuitable material dumping at Km191+300 and Km204+581 these locations near
stream and could obstruct the stream by landside. The consultant reminded the contractor plan
grass to protect the erosion and landside into stream and to maintenance the flow rate also
water quality.
May
On May the unsuitable material dumping at Km191+300 and Km204+581 these locations near
stream and could obstruct the stream by landside. The consultant reminded the contractor plan
grass to protect the erosion and landside into stream and to maintenance the flow rate also
water quality.
June
In June, the unsuitable material dumping at Km191+300 and Km204+581 these locations near
stream and could obstruct the stream by landside. The consultant reminded the contractor plan
grass to protect the erosion and landside into stream and to maintenance the flow rate also
water quality. So until date 28-June 2012 the contractor didn’t deploying according to ADB
mission and consultant instruction.
4.5.8 Package A8
April
On April 2012, at some bridge are executing the pier near river as: Ngoi Bo Bridge, Suoi Trat,
Suoi Nhu Bridge. While construction works of Suoi Trat Bridge, the contractor maintains the
flow, streams, and riversides. However while construction works of Ngoi Bo Bridge, Suoi Nhu
Bridge, spoil of the bore pile process dumping on site and some of earth overflow into river and
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
100
stream. Therefore, it makes to obstruct flow and effect to maintenance riversides and stream.
Consultant required the contractor serious resolve and no repeat.
May
On May 2012, at some bridge are executing the pier near river as: Ngoi Bo Bridge, Suoi Trat,
Suoi Nhu Bridge. While construction works of Ngoi Bo Bridge and Suoi Nhu Bridge, the
contractor maintains the flow, streams, and riversides. However while construction works of
Suoi Trat Bridge, spoil of the bore pile process dumping on site and some of earth overflow
into river and stream. Therefore, it could to obstruct flow and effect to maintenance riversides
and stream. Consultant required the contractor serious resolve and no repeat.
June
In June 2012, at some bridges they are executing the pier near river such as: Ngoi Bo Bridge,
Suoi Trat, Suoi Nhu Bridge. While construction works of Ngoi Bo Bridge and Suoi Nhu Bridge,
the contractor maintains the flow, streams, and riversides. However while construction works
of Suoi Trat Bridge, spoil of the bore pile process dumping on site and some of earth overflow
into river and stream. Therefore, it could to obstruct flow and effect to maintenance riversides
and stream. Consultant required the contractor serious resolve and no repeat.
4.6 EROSION RISKS AND STABILITY IN SLOPES
4.6.1 Package A1
April
At Tan Loi Bridge and Xuan Phuong Bridge construction sites the status of high risk of
landslide on riversides still has not been solved. The Contractor doesn’t take any action to
implement the requirements of the PSC to apply the countermeasures in order to prevent
riversides washing away going on.
At other sections, we also recommended the Contractor to pay attention to high embankment
sections to apply the suitable measures to minimize the erosion risk and ensure the stability on
slopes.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
101
May
We did not find any improvement at Tan Loi Bridge and Xuan Phuong Bridge where the
riversides are being undermined and the risk of landslide is visible on riversides. The PSC has
instructed and requested the Contractor to solve this problema, but till now the Contractor still
has not taken any action to implement requirements of us.
At section Km 15+120 ~ Km 15+900, the surfaced runoff caused erosion on slopes of
embankment but not serious. The PSC has requested the Contractor top pay attention to this
issue to apply the appropriate method in order to protect slopes.
At some others sections with high slopes of embankment, the Contractor began grassing on
slopes such as section Km 16+000 ~ Km 17+000, section Km 22+000 ~ Km 22+400 and
section Km 25+500 ~ Km 26+000.
June
We didnt’ find any improvement at Tan Loi Bridge and Xuan Phuong Bridge where the
riversides are being undermined and the risk of landslide is visible on riversides. The PSC has
instructed and requested the Contractor to solve this problema, but till now the Contractor still
has not taken any action to implement requirements of us.
At section Km 15+120 ~ Km 15+900, the surfaced runoff caused erosion on slopes of
embankment but not serious. The PSC has requested the Contractor top pay attention to this
issue to apply the appropriate method in order to protect slopes.
At some others sections with high slopes of embankment, the Contractor began grassing on
slopes such as section Km 16+000 ~ Km 17+000, section Km 22+000 ~ Km 22+400 and
section Km 25+500 ~ Km 26+000.
4.6.2 Package A2
April
At section Km 42+200 ~ Km 42+670, the Contractor still has not applied any erosion or
sediment control measure to prevent erosion leading soil into adjacent croplands. By
observations we found that this problem is going on. Therefore, we still close the procedures of
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
102
payment progress of all items in this section until the Contractor implemented our
requirements.
At section Km 34+780 ~ Km 35+000, we also detected the risk of erosion due to the
embankment in this area is high and the Contractor also has not applied any erosion
countermeasure to prevent similar issue as in section Km 42+200 ~ Km 42+670. The PSC has
requested the Contractor to pay attention to and apply necessary measures in this section.
At other sections, during the site inspections we didn’t see any serious issue happening on
construction sites.
May
At section Km 42+200 ~ Km 42+670, the Contractor still has not applied any erosion or
sediment control measure to prevent erosion leading soil into adjacent croplands. By
observations we found that this problem is going on. Therefore, we still close the procedures of
payment progress of all items in this section until the Contractor implemented our
requirements.
At section Km 34+780 ~ Km 35+000, we also detected the risk of erosion due to the
embankment in this area is high and the Contractor also has not applied any erosion
countermeasure to prevent similar issue as in section Km 42+200 ~ Km 42+670. The PSC has
requested the Contractor to pay attention to and apply necessary measures in this section.
At other sections, during the site inspections we didn’t see any serious issue happening on
construction sites.
June
At section Km 42+200 ~ Km 42+670, the erosion still leads the soil into croplands and the
Contractor didn’t take any action to correct this problem despite the warning of the
Engineer.
We also found the similar risk at section Km 34+780 ~ Km 35+000. The PSC has instructed
the Contractor how to correct this issue and requested him to apply the countermeasure to
solve this matter; however, up to now, there is no improvement recorded.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
103
At other sections, during the site inspections we didn’t see any serious issue happening on
construction sites.
4.6.3 Package A3
April
Regarding compensation for impact households in Chi Tien commune because solid of slopes
washout into fields from July 2011, the Contractor and Chi Tien people’s committee had a
meeting on March 16th, 2012. Deadline of Contractor is March 28th, 2012 they will pay all
compensation money for Chi Tien. On middle of April Posco E&C contractor paid
compensation for Chi Tien people’s committee and requested they that when pay money for
impact households they must invite some representative of Contractor attend. Contractor had
money exchange statement.
May
During May, we have found that some cases of soil washout into field at Km58+217 TL325B
bridge. But Contractor explained that this field inside construction site’s limit. But we still
remind Contractor must careful and pay attention carry out suitable method to avoid soil
washout because we are coming the rain season.
June
At Baibang railway flyover bridge, erosion of soil appeared. At other areas, we did not detect
erosion of soil. In package A3, contractor were planting grass in section 1 and 2.
4.6.4 Package A4
April
In the construction progress, the soil environment will be affected by the earthworks that
results in erosion and landslide. Currently, there is no report or findings related to these
problems based on these points of view. However, the Consultant has warned the Contractors
to pay attention to regularly monitor and record on the issue.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
104
May
In the construction progress on May, we have found that at some location at Km103+800 and
Km104+200 soil washout a lot into fields next to site. Now it is going to rain season, so if
Contractor does not resolve this problem quickly it will impact seriously in next period.
Consultant requested Contractor must dredge all fallen soil out of this areas and give suitable
measures to prepare for coming rain season avoid effects for local cultivate.
June
We did not detect the erosion of soil.
4.6.5 Package A5
April
Because the Contractor has not fully complied with the requirements of the Project as well as
the instructions of the Consultant, so on some heavy rainy days in this month, erosion
continued to occur at some construction locations of the Contractor such as Km116-Km117,
Km117-Km119...., this has led to the situation of soil from the Project’s area flooded the
production land of local people, affecting the soil quality as well as filling some of their
aquaculture ponds.
The Consultant has requested the Contractor to resolve these outstanding issues in Ref
GET3-KEANGNAM-12-A5-213 and required them to coordinate with local people and local
authorities to solve the problems of erosion base.
The rainy season is coming soon, so in this month, the Consultant has also urgently required
the Contractor to submit the grass growing methods at the slopes to prevent erosions.
May
Because the Contractor did not fully comply with the instructions of the Consultant as well as
the requirements of the Project, some outstanding issues have occured as follows:
- On some rainy days in this month, the soil from the Project’s area followed the rain
running down to the production land areas of local people such as Km116 - Km117,
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
105
Km117 - Km118, Km119, Km126, Km127... affecting the soil quality (agricultural land,
forestry land, aquaculture land...).
- The Contractor has conducted access roads across the river at the bridge area Ngoi
Thia, but they have not complied with the Method Statement, this has led to increasing
of water flow speed through this area and the landslide of riverbanks.
The Consultant has requested the Contractor to resolve the outstanding issues in Ref. GET3-
KEANGNAM-12-A5-428 dated May 15, 2012 and GET3-KEANGNAM-12-A5-490 dated May
05, 2012. Also, the Consultant has required the Contractor to coordinate with local people and
local authorities to address thoroughly the issues relating to erosion.
June
Through the inspection and supervision of the Contractor’s construction activities this month,
the Consultant found that there are some outstanding issues as follows:
- At the bridge area Ngoi Lau bridge and Ngoi Thia bridge, the Contractor built access
roads through streams that has increased the flow speed of water through the area.
This has led to erosion and landslide of stream banks in this area.
- At stations Km116-Km117, Km117-Km118, Km119, Km126, Km127,..., on a number of
rainy days, erosion occurred; soil from the Project’s area following the rain flooded the
production areas of local people. This has affected the region's soil quality (agricultural
land, forest land, aquaculture land). However, so far, the Contractor have not yet fully
solved this problem
The Consultant has asked the Contractor to quickly apply measures to resolve these
outstanding issues (Ref. GET3-KEANGNAM-12-A5-594 dated June 29, 2012). Besides, the
Consultant has also required the Contractor to coordinate with local people and local
authorities to address thoroughly the issues related to erosion.
In addition, the Consultant has urgently required the Contractor to submit the Method
Statement for the grass growing in the slopes areas to ensure the stability in slopes and
reduce erosion, especially in the upcoming rainy season.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
106
4.6.6 Package A6
April
Through the inspection and supervision on site this month, the Consultant found that there was
no serious effect from erosion and landslides in the project area.
However, at the bridge area Ngoi That, the Contractor built access road across the stream, so
in a number of rainy days in the month, erosion happened in the stream edges (Ref. GET3-
DOOSAN-12-A6-360 dated 10 Ảpil, 2012). The Consultant requested the Contractor to resolve
this outstanding issue to ensure the Project's environment as well as to prevent erosion and
landslides occurring in the future.
At station Km176, when there was heavy rain, erosion occurred at some slopes (areas where
the Contractor have been planting grass), which has affected the stability in slopes as well as
the development of grass. To overcome this problem, the Consultant has reminded the
Contractor about this in GET3-DOOSAN-12-A6-421 dated 26 April 2012.
During this time, the Contractor continued to implement planting of grass in some slopes of the
embankment areas (Km157, Km176, Km162, ...), and the Contractor are trying to complete
this job before the rainy season to minimize erosion and landslides.
This month, the Contractor also conducted test of grass planting on the positive slopes. The
results will be tested, and the Consultant will conduct growing grass at all positive slopes in the
near future.
May
This month, through the inspection and supervision on site, Consulting found that there are
some outstanding issues as follows:
- At the bridge area Ngoi That, the Contractors has built the access road accross the
stream, this has speeded up the flow of water through this area, leading to the stream’s
banks erosion.
- In some areas the slope cutting area, the Contractor has not fully complied with the
Method Statement. Therefore, landslides has occurred such as in the area:
Km179+490 - Km1789+550, Km 157+200 - Km157+400...
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
107
The Consultant has reminded the Contractor on these issues, and the Consultant has also
required Contractor to apply effective measures to prevent erosion and landslides in the future.
This month, the Contractor has continued to implement growing grass at the embankment
slope areas such as at Km154, Km156, Km174, Km176... to limit erosion and landslides
occurred.
The test of growing grass at the cutting slopes areas have brought positive results in the
month, and the Contractor will conduct mass planting grass at all of the cutting slopes areas in
the near future to ensure the stability in slope and limit erosion occuring.
June
This month, the Contractor continued to grow grass in the area of the embankment slopes as
in Km157, Km156, Km161, Km162, Km176... and the slopes of the excavation area as in
Km154, Km165... to ensure stability of slopes as well as limit erosion and landslides. However,
by inspection and supervision on site, Consultant found that there were still some outstanding
issues as follows:
- In areas of Km179 +490 - Km179 +550, Km 157 +200 - Km157+400... slope erosion at
positive slopes occurred; however, the Contractor has not yet applied measures to
resolve these outstanding issues so far.
- In areas of Ngoi That Bridge, the Contractor built the access roads through stream,
which increased water flow rate through the area, led to erosion and stream bank
erosion (mentioned in Ref. DOOSAN GET3-A6-569-12-June 9, 2012).
To ensure environment safety of the Project, the Consultant also required the Contractor to
apply effective measures to resolve these outstanding issues.
4.6.7 Package A7
April
In April 2012, along to package A7 the contractor had planted grass and make drainage
ditches in almost slope to prevent erosion and landside and in some slope, the grass has
grown. In May, the contractor continue grass and make drainage at remain location before
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
108
raining season. Some slope which planed grass now grow up, it could prevent erosion and
landside in coming raining season.
Other, Consultant remind Contractor at position height digits and deep excavation can causing
dangerous to worker and citizens by erosion.
May
On May 2012 along to package A7 the contractor had planted grass and make drainage
ditches from Km201+000 to Km209+000 to prevent erosion and landside. In May the
contractor continue plants grass and make drainage at remain location before raining season.
Some slope which planed grass now grow up, it helped to prevent erosion and landside in
coming raining season.
Other, Consultant remind Contractor at position height digits and deep excavation can causing
dangerous to worker and citizens by erosion.
June
In June 2012 along to package A7 the contractor had planted grass and make drainage
ditches from Km201+000 to Km217+000 to prevent erosion and landside. In July the
contractor continue plants grass and make drainage at remain location before raining season.
Some slope which planed grass now grow up, it helped to prevent erosion and landside in
coming raining season.
Other, Consultant reminded Contractor at position height digits and deep excavation can
causing dangerous to worker and citizens by erosion.
4.6.8 Package A8
April
In many construction locations, the contractor had dug up the positive slope and negative
slope, but until this time has not happened problem about erosion and landslide. However,
consultant and investor also remind the contractor to quickly finish top of the drainage of slop
to ensure drainage and prevent erosion, landside when the rainy season is coming.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
109
May
Date 28- May 2012 at Km219-Km220 Because of heavy raining leading to earth from
embankment overflow into field and decrease the farm produce, so consultant made letter No:
Ref. GET4- Vinaconex- 567 required the contractor to apply the slope protection’s method and
compensate the farm produce for citizens
Date 29- May 2012 at Km230+267- Km230+660 Because of heavy raining leading to earth
from embankment overflow into 4E road, The contractor are required to clear and applying the
slope protection’s method according to technology design to avoid landside into 4E road.
June
Date 28- June 2012 at Km219-Km220 Because of heavy raining leading to earth from
embankment overflow into field and decrease the farm produce, so consultant made letter No:
Ref. GET4- Vinaconex- 567 required the contractor to apply the slope protection’s method and
compensate the farm produce for citizens
Date 29- June 2012 at Km230+267- Km230+660 Because of heavy raining leading to earth
from embankment overflow into 4E road, The contractor are required to clear and applying the
slope protection’s method according to technology design to avoid landside into 4E road.
4.7 HAZARDOUS SUBSTANCES MANAGEMENT
4.7.1 Package A1
April
During the site inspection on Mar 27 we again detected the sloppy status in oil usage and
management at Trung Kien Bridge, Tan Loi Bridge, Tam Long – Thien Ke Bridge, Km 4+700;
the oil barrels were put on ground in disorder and in lying on their side. The PSC had strongly
warned the Contractor of this issue and requested him to comply with regulations in oil usage
and management. In the site inspection on April 04 we perceived that there was improvement
at Km 4+700 and Tam Long – Thien Ke Bridge but Trung Kien Bridge and Tan Loi Bridge. At
Trung Kien Bridge and Tan Loi Bridge, the Contractor still let this issue happen that caused
leak of oil on ground. In the next site inspections we also didn’t see improvement in these
areas.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
110
At other sections, in the site inspections we didn’t detect the sign of serious leak of oil/fuel or
other substance such as bitumen, grease on site.
May
By observations, we detected that the oil leaked on ground at Trung Kien Bridge and Tan Loi
Bridge. At Ba Thien Bridge and Tam Long – Thien Ke Bridge the oil barrels were put on
ground in disorder and in lying on their side. The PSC has strongly requested the Contractor to
solve these issues, but till May 22, there was only improvement at Ba Thien and Tam Long –
Thien Ke Bridge. The PSC has seriously warned the Contractor and if in the next site
inspection we still realize that this problem is not solved we will consider deducting money.
At other sections, in the site inspections we didn’t detect the sign of serious leak of oil/fuel or
other substance such as bitumen, grease on site.
June
By observations, we detected that the oil leaked on ground at Trung Kien Bridge and Tan Loi
Bridge. At Ba Thien Bridge and Tam Long – Thien Ke Bridge the oil barrels were put on
ground in disorder and in lying on their side. The PSC has strongly requested the Contractor to
solve these issues, but till May 22, there was only improvement at Ba Thien and Tam Long –
Thien Ke Bridge. The PSC has seriously warned the Contractor and if in the next site
inspection we still realize that this problem is not solved we will consider deducting money.
At other sections, in the site inspections we didn’t detect the sign of serious leak of oil/fuel or
other substance such as bitumen, grease on site.
4.7.2 Package A2
April
At Batch Plant 2 of Lo River Bridge, during the site inspection on March 28, we detected that
the oil tank/barrels are located on ground without any leak/spillage control measure. A leak of
oil on ground was noted in this area and the PSC has requested the Contractor to immediately
to comply with regulations in oil usage and management to rearrange the oil storage as well as
remove polluted soil and disposed of it properly. Till April 18, we perceived the Contractor had
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
111
surrounded oil storage with fence and a brick berm to prevent spillage of oil; the waterproof
roof was also installed.
At other sections, we didn’t see any serious problem happening in the site inspections this
month.
May
In the site inspection on May 04, we found that the oil barrels were located on ground in
disorder and in lying on their side at section Interchange No. 6 (~Km 40+200). The PSC has
requested the Contractor to solve this issue by contructing oil storage area with level concreted
ground and waterproof roof; a berm surrounding to prevent spill-over is also required.
However, up to now, the Contractor has not implemented our requirements.
On May 21, we also found the similar status at Lo River Bridge and Ben Tre Bridge. We have
requested the Contractor to solve this issue in the same way. We will recheck these areas in
next site inspection on May 30, 2012.
At other sections, we didn’t see any serious problem happening in the site inspections this
month.
June
In the site inspection on May 04, we found that the oil barrels were located on ground in
disorder and in lying on their side at section Interchange No. 6 (~Km 40+200). The PSC has
requested the Contractor to solve this issue by contructing oil storage area with level concreted
ground and waterproof roof; a berm surrounding to prevent spill-over is also required.
However, up to now, the Contractor has not implemented our requirements.
On May 21, we also found the similar status at Lo River Bridge and Ben Tre Bridge. We have
requested the Contractor to solve this issue in the same way. We will recheck these areas in
next site inspection on May 30, 2012.
At other sections, we didn’t see any serious problem happening in the site inspections this
month.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
112
4.7.3 Package A3
April
The Consultant has detected that some big oil tanks were set up in site to satisfy construction
activities at Km76+700 (national railway flyover), Km65+540 (Ho Chi Minh IC), Km61+583,
Km62... The foundation of storage was not reinforced by concrete to avoid oil leaking or fire
risk except Km70, Km62. The Consultant required the Contractor must set up fire fighting
equipment, reinforcing foundation by concrete to ensure safety in site and avoid leaking oil.
The subcontractor clean up oil leaking on ground and reground all oil drums in a regulation
place in site but they still delay to concrete storage’s foundation. We continue push them must
concrete foundation to avoid oil spill over ground as before.
May
The Consultant has detected that some big oil tanks were set up in site to satisfy construction
activities at Km76+700 (national railway flyover), Km65+540 (Ho Chi Minh IC), Km61+583,
Km62... The foundation of storage was not reinforced by concrete to avoid oil leaking or fire
risk except Km70, Km62. At some places at IC10 oil was spill over ground. The Consultant
required the Contractor must set up fire fighting equipment, reinforcing foundation by concrete
to ensure safety in site and avoid leaking oil. The subcontractor clean up oil leaking on ground
and reground all oil drums in a regulation place in site but they still delay to concrete storage’s
foundation.
The Consultant’s letter was ref. GET2-POS-A3-1285 dated June 1st, 2012 “Require to
overcome Environmental and Safety problems in package A3.
June
The Consultant has detected that some big oil tanks were set up in site to satisfy construction
activities at Km76+700 (national railway flyover), Km65+540 (Ho Chi Minh IC), Km61+583,
Km62... The foundation of storage was not reinforced by concrete to avoid oil leaking or fire
risk except Km70, Km62.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
113
4.7.4 Package A4
April
At present, we have found that big oil tanks (tank capacity is 1100m3) was put directly on
ground or buried underground (Km92+300, Km88+760, Km107+100…) without safety method
to avoid pollute soil or prevent fire risk, such as: putting higher than flood level P=1%; minimum
distance with water resources is 500m; have safety fence around the fuel tanks and reinforce
foundation by concrete to avoid oil or fuel overflow risk. The Consultant required the Contractor
must strictly follow instruction of us regarding store fuel in site. But they still delay to do it.
May
At present, we have found that big oil tanks was put directly on ground or buried underground
(Km92+300, Km88+760, Km107+100…) without safety method to avoid pollute soil or prevent
fire risk, such as: putting higher than flood level P=1%; minimum distance with water resources
is 500m; have safety fence around the fuel tanks and reinforce foundation by concrete to avoid
oil or fuel overflow risk. The Consultant required the Contractor must strictly follow instruction
of us regarding store fuel in site. But they still delay to do it.
Deadline is June 15th, 2012. Consultant’s warning letter is ref.GET2-KEA-A4-638 dated May
4th, 2012 and GET2-KEA-A4-680 dated June 1st, 2012.
June
At present, we have found that big oil tanks was put directly on ground or buried underground
(Km92+300, Km88+760, Km99+600…) without safety method to avoid pollute soil or prevent
fire risk. The Consultant required the Contractor must strictly follow instruction of us regarding
store fuel in site. But they still delay to do it.
4.7.5 Package A5
April
Through the inspection and supervision on site this month, the Consultant found that the fuel
management activities of the Contractor have no improvement over the previous month. The
fuel management of the Contractor has been performed very poorly, as follows:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
114
- At the fuel stations such as Ngoi Gua bridge, Ngoi Thia bridge, Ngoi Rao bridge,
Km136, Ngoi Lau bridge, Van Phu bridge,... the fire fighting equipments have not been
fully supplied by the Contractor.
- At Ngoi Rao bridge, Van Phu bridge, Ngoi Thia bridge..., the Contractor has not
provided a full range of equipments to prevent oil leakage, therefore, the Consultant
has found traces of oil leakages on the ground.
- At Ngoi Gua bridge, Ngoi Thia bridge, Km136, Ngoi Lau bridge, Van Phu bridge... the
Consultant found many fuel tanks which were discriminately thrown on the ground.
This condition may cause negative impacts on the environment and safety of the Project.
Therefore, the Consultant has requested the Contractor to improve the fuel management
(mentioned in Ref. GET3-KEANGNAM-12-A5-215). Besides, the Consultant has also required
the Contractor to maintain the fuel stations in safe and clean condition.
In the future, the Consultant will continue to check the hazardous substances management of
the Contractor to remind them to promptly implement measures to ensure the safety and
environment of the Project.
May
This month, through the inspection and supervision on site, the Consultant found that the fuel
management activities of the Contractor have not been performed well; there are still some
outstanding issues as follows:
- The fire fighting equipments have not been fully provided by the Contractor in fuel
stations such as bridges Van Phu, Ngoi Rao, Ngoi Thia, Ngoi Gua ...
- During the site inspections, the Consultant has found traces of oil leaked on the ground
in some areas such as Ngoi Gua bridge, Ngoi Thia bridge, ...
- The fuel tanks were located directly on the ground in areas such as Ngoi Gua bridge,
Ngoi Thia bridge...
The Consultant has reminded the Contractor on the outstanding issues in Ref. GET3-
KEANGNAM-12-A5-444 dated May 18, 2012. At the same time, the Consultant has also
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
115
required the Contractor to improve the fuel management to prevent negative impact on the
Project’s environment.
In the future, the Consultant will continue to check the hazardous substances management of
the Contractor to remind them promptly to implement measures to ensure the Project’s safety
and environment.
June
Through the inspection and supervision on site this month, the Consultant found that the
Contractor's fuel management was not improved over the previous month; there are still some
outstanding issues as follows:
- At Van Phu bridge, Ngoi Thia bridge, Ngoi Gua bridge, Ngoi Rao bridge,... fire
preventing equipments and fuel leakage prevention equipments have not been
supplied by the Contractor at the fuel stations.
- During the site inspections, the Consultant has found that fuel tanks were
indiscriminately thrown on the ground in the locations Van Phu bridge, Ngoi Gua
bridge, Ngoi Rao bridge,...
- There are oil leakages at the fuel stations of Ngoi Thia bridge, Van Phu bridge, Ngoi
Rao bridge, Km126...
To ensure the safety and environment of the Project, the Consultant has asked the Contractor
to solve the outstanding issues. In additions, the Consultant has also required the Contractor
to improve the fuel management to prevent negative environment effects of the Project.
4.7.6 Package A6
April
Through the inspection and supervision on site this month, the Consultant found that the fuel
management of the Contractor had some improvement over the last month such as: the
Contractor has provided fire fighting equipment at some fuel stations such as Km186+200,
Km165+100, Km155+200...
However, there are still some outstanding issues as follows:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
116
- In areas Km186 +720, Km186+200, Km155+100... Many fuel tanks were directly put on
the ground.
- At the fuel stations such as Km155+100, Km165+100,... the Contractor has not
provided adequate equipments to prevent fuel leakage.
- At Km155 +100, the fuel station is still not tidy and neat.
The Consultant has reminded the Contractor on these outstanding issues. Besides, in the
weekly site inspections, the Consultant has also offered the Contractor specific guidelines for
improving the fuel management to prevent adverse impacts on the environment.
In the future, the Consultant will continue to check the hazardous substances management of
the Contractor to remind the Contractor promptly to implement measures to ensure safety and
environment of the Project.
May
This month, through the inspection and supervision on site, the Consultant found that the fuel
management activities of the Contractor had some improvements such as:
- At the fuel stations such as Km186+200, Km171... the Contractor has provided fire
fighting equipments.
- The fuel tanks have been collected to a separate area on site such as at Km186+200,
km171...
However, there are still some outstanding issues such as:
- At the fuel stations of the Contractor such as Km155+300, Km171, Km186+300, Ngoi
Hut bridge... the Contractor has not provided equipments to prevent fuel leakage. There
is still the phenomenon of the tank put directly on the ground.
- At Km155+100, Ngoi Hut bridge.... the fuel stations was not arranged in a neat
condition.
- The Contractor has not provided fire fighting equipment at the fuel station Km187+400.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
117
The Contractor has requested Consultant to address these outstanding issues (Ref. GET3-
DOOSAN-12-A6-546 dated May 31, 2012). In addition, in the weekly site inspections, the
Consultant has also offered the Contractor specific instruction to improve the fuel management
of the Contractor to prevent adverse impacts on the environment.
June
Through the inspection and supervision on site, Consultant found that the fuel management
activities of the Contractor were deployed in this month as:
- The fire prevention equipment has been provided and maintained at the fuel station as
Km186 +200, Km186+720, Km171, Km165, etc.
- The Contractor arranged fuel stationseparately in the region Km186+200, Km171...
- Installation of signs at the fuel stations the region Km186+200, Km165...
However, there were still some outstanding issues in the fuel management of the Contractor
as:
- In these on-site inspection, the Consultant found that the barrels were placed directly
on the ground as at Km155 +200, Km178+200, Km186 +720, ...
- In some areas such as Ngoi Giam bridge, Km155 +100 ... fuel station has not yet been
arranged neatly.
- At km187+400, Km184, the fire fighting equipment and warning signs have not been
provided at the fuel storage area.
To ensure safety and environment of the Project, the Consultant prompted the Contractor on
the outstanding issues, at the same time, Consultant also offered specific guidelines for the
Contractor to improve the fuel management (referred in letters of GET3-Doosan-12-A6-300).
Besides, in the on-site inspections weekly, consultant still required the Contractor to comply
with the Project safety plan along with environmental control and protection plan during the
construction process, as well as improve management of hazardous materials to ensure safety
and environment of the Project.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
118
4.7.7 Package A7
April
The hazardous substances management at the equipment repair and maintain area at
Km202+770 and Sika tanks at Concrete batching plant Km198+400 and Km209+329.
Consultant required the contractor to collect and transports the hazardous substances to
treatment area according to ECP.
May
Date 16- May 2012 consultant with ADB mission showed for the contractor the place stored oil
tanks and waste oil tanks at Km209+800; Km202+400; Km198+400 weren’t meet project
standard according to regulation into ECP, so consultant required the contractor to keep oil
tanks and waste oil tanks in stored and provide signpost fire forbidden, fire-extinguishers and a
concrete floor according to contain in the letter No: Ref. GET4- GRBCC-650 and required the
contractor to overcome before 30-June 2012.
June
Date 16- May 2012 consultant with ADB mission showed for the contractor the place stored oil
tanks and waste oil tanks at Km209+800; Km202+400; Km198+400 weren’t meet project
standard according to regulation into ECP, so consultant required the contractor to keep oil
tanks and waste oil tanks in stored and provide signpost fire forbidden, fire-extinguishers and a
concrete floor according to contain in the letter No: Ref. GET4- GRBCC-650 and required the
contractor to overcome before 30-June 2012. However until date 28-June 2012 the contractor
didn’t deploying according to ADB mission and consultant instruction.
4.7.8 Package A8
April
In April 2012, store area of oil and waste oil at Km224+500 no signpost, no fire-extinguisher
and oil tank and waste oil tank keep directly on the ground. So the contractor has violated
about hazardous substance manager, which was shown in environment control plan.
Consultant required the contractor to build the store area to keep oil and waste oil and installed
signpost and fire-extinguisher at there.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
119
May
Date 16- May 2012 consultant with ADB mission showed for the contractor the place stored oil
tanks and waste oil tanks at Km244+155; Km229+034; Km218+040 weren’t meet project
standard according to regulation into ECP, so consultant required the contractor to keep oil
tanks and waste oil tanks in stored and provide signpost fire forbidden, fire-extinguishers and a
concrete floor according to contain in the letter No: Ref. GET4- GRBCC-650 and required the
contractor to overcome before 30-June 2012.
June
Date 16- June 2012 consultant with ADB mission showed for the contractor the place stored oil
tanks and waste oil tanks at Km244+155; Km229+034; Km218+040 weren’t meet project
standard according to regulation into ECP, so consultant required the contractor to keep oil
tanks and waste oil tanks in stored and provide signpost fire forbidden, fire-extinguishers and a
concrete floor according to contain in the letter No: Ref. GET4- GRBCC-650 and required the
contractor to overcome before 30-June 2012. However, so far the contractor didn’t overcome
according to the consultant instruction.
4.8 UNSUITABLE MATERIAL DISPOSALS AND BORROW PITS
4.8.1 Package A1
April
At Underpass NH2 construction site, the direct discharge of untreated wastewater that contains sand and mud into existing irrigation canal is still going on. The Contractor doesn’t implement requirements of the Engineer to mobilize dewatering tank or gravity bag filter to remove sediment from wastewater before discharge of it. The PSC already issued a warning letter to request the Contractor to implement our requirements and if he still fails to meet requirement of us, we will consider applying the measure of money deduction.
At section Km 4+700 ~ Km 4+800 in the site inspections we perceived that almost the unsuitable material had been removed due to the Contractor.
There is no improvement recorded at abutment 1 of Trung Kien Bridge; however, on the site inspection on April 24, the Contractor promised that he will solve the problem in the next week, till May 05, 2012. We will recheck this area on May 08 for his implementation.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
120
At other sections, we did not found the serious issues during the site inspections this month.
May
In the site inspections we perceived that the Contractor already constructed a sediment basin to catch sediment from waterwater at Underpass NH2 construction site. However, this sediment basin is not enough capacity so the Engineer has requested the Contractor to supplement another beside to ensure that almost sediment will be remove from wastewater before it spills-over existing drainage. The straw bales installation at outlet of wastewater discharge area were also recommended as a effective measure to remove sand and mud from wastewater.
In the site inspection on May 08, at abutment 1 of Trung Kien Bridge, we found that the Contractor had already removed the spoil that was disposed closed to cropland. We will consider reopening the procedures of payment progress of this item if the Contractor also improves the status of tracking dirt onto public road and maintain traffic condition well.
At other sections, we didn’t found the serious issues during the site inspections this month.
June
In the site inspections we perceived that the Contractor already constructed a sediment basin to catch sediment from waterwater at Underpass NH2 construction site. However, this sediment basin is not enough capacity so the Engineer has requested the Contractor to supplement another beside to ensure that almost sediment will be remove from wastewater before it spills-over existing drainage. The straw bales installation at outlet of wastewater discharge area were also recommended as a effective measure to remove sand and mud from wastewater.
In the site inspection on May 08, at abutment 1 of Trung Kien Bridge, we found that the Contractor had already removed the spoil that was disposed closed to cropland. We will consider reopening the procedures of payment progress of this item if the Contractor also improves the status of tracking dirt onto public road and maintain traffic condition well.
At other sections, we didn’t found the serious issues during the site inspections this month.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
121
4.8.2 Package A2
April
In the site inspections, at section Interchange No. 6 we didn’t see any change in this area. The
unsuitable material is still being disposed on site where is close to croplands and local resident
area. The PSC has many times requested the Contractor to remove all this material to
approved disposal places but up to now he still has not implemented requirements of us. We
have issued a warning letter and if the Contractor still fails to meet our requirements, we will
recommend the Employer to deduct money. The next site inspection will be held on May 04,
2012.
At Ben Tre Bridge, Song Dao Bridge and Ben Gao Bridge construction site, in the site
inspections this month we still didn’t see any improvement in these areas. The Contractor
doesn’t take any action to correct the problems despite many requirements of the Engineer.
For Ben Gao Bridge, money deduction measure already applied due to the Contractor didn’t
improve the status but let it worsen.
May
At Interchange No. 6 section, the spoil is still being disposed along the site despite the warning of the Engineer. The Engineer had approved the disposal place for unsuitable material in this area and requested the Contractor to remove all this material to approved disposal place but the Contractor doesn’t comply with our requirement.
At Ben Tre Bridge, Song Dao Bridge and Ben Gao Bridge construction site, the Contractor has not taken any action to correct the problems and the spoil has not been removed from riverbeds. The PSC has many times strongly requested the Contractor to solve this matter but there is no improvement recorded in the site inspections.
June
At Interchange No. 6 section, the spoil is still being disposed along the site despite the warning of the Engineer. The Engineer had approved the disposal place for unsuitable material in this area and requested the Contractor to remove all this material to approved disposal place but the Contractor doesn’t comply with our requirement.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
122
At Ben Tre Bridge, Song Dao Bridge and Ben Gao Bridge construction site, the Contractor has not taken any action to correct the problems and the spoil has not been removed from riverbeds. The PSC has many times strongly requested the Contractor to solve this matter but there is no improvement recorded in the site inspections.
4.8.3 Package A3
April, May and June
All disposal areas of section 1 in Phu Ninh commune, section 2, section 3, section 4, section 5
and section 6 were approved to implement.
Hung Lo disposal areas were rejected from 21st January 2012.
4.8.4 Package A4
April, May and June
The Contractor submitted disposal areas record for Cam Khe (section 1, 2) district and Ha Hoa
district (section 3, 4, 5, 6). Pursuant to item 2; article 10, section 1, chapter II of Decree
59/2007/ND-CP, the Consultant approved all disposal areas for package A4 to implement. The
Contractor was addendum all information about discharging area’s co-ordinates and they will
drive stake and stretch a wire at the angles to fix the boundaries of disposal areas.
4.8.5 Package A5
April
Through the inspection and supervision on site this month, the Consultant found that there was
no adverse impact on the region's environment from the disposal areas approved by the
Consultant.
At some construction locations such as Km111, Km124, Km138.., because suitable disposal
areas have not been found, the Contractor has temporarily stored unsuitable soil in the site
and will transport it to the disposal area in the near future.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
123
This month, the Consultant has also required the Contractor to quickly complete the
procedures for disposal areas with the authorities to submit to the Consultant for consideration
and approval.
Currently, in the package A5, 14 disposal areas for the unsuitable materials were approved by
the Consultant. Some others have been submitted by the Contractor but have not yet been
approved by the Consultant due to lack of necessary permits.
In the coming months, the Consultant will continue to inspect disposal areas for unsuitable
materials to ensure the Project’s environment.
May
Currently, in the package A5, 14 disposal areas for unsuitable materials have been approved
by the Consultant, some others have been submitted but not yet been approved by the
Consultant due to lack of necessary permits.
This month, through the inspection and supervision on site, the Consultant found that there is
no serious problem from the disposal areas which were approved by Consultant.
Because the Consultant could not find a suitable location for disposal area, at a number of
locations such as Km111, Km123, Km124, Km126..., they have temporarily stored unsuitable
soil at the location which has not been approved by the Consultant. The Consultant has
requested the Contractor to remove the unsuitable soil to the appropriate disposal area. Also,
the Consultant has required the Contractor to quickly complete the document of disposal area
to submit to the Consultant for review and acceptance.
In the coming months, the Consultant will continue to inspect the disposal areas for unsuitable
materials to ensure the Project’s environment.
June
Through the inspection and supervision on site this month, the Consultant found that there was
no serious problem from the disposal areas which were approved by Consultant.
Currently, the Contractor has submitted 41 disposal areas, including 14 disposal areas
approved and 27 not yet been approved (due to incomplete documents with the authorities or
these area are located near rivers, streams...).
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
124
In the weekly site inspections, the Consultant has still regularly required the Contractor to
comply with the requirements in the environment control and protection plan as well as the
regulations related to the disposal process for unsuitable materials in the disposal areas to
ensure the Project's environment.
In the coming months, the Consultant will continue to inspect the disposal areas for unsuitable
materials to remind the Contractor promptly to resolve outstanding issues.
4.8.6 Package A6
April
Through the inspection and supervision on site this month, the Consultant found that the
disposal areas for unsuitable materials did not cause adverse effects on the regional
environment. In some disposal areas such as Km187, Km155..., the Contractor and local
people have planted trees to prevent erosion and landslides.
However, in some areas which soilworks were under construction, the Contractor has not
completed the procedures of the disposal areas with local authorities. Therefore, at some
stations such as Km161, Km184..., the Contractor has gathered unsuitable materials in areas
which have not yet been approved by the Consultant. The Consultant has reminded the
Contractor on these issues. Also, the Consultant has required the Contractor to quickly
complete the procedures for submission to the Consultant for inspection and approval.
Besides, in the weekly site inspections, the Consultant also frequently reminded and requested
the Contractor to apply measures to ensure the environment in the disposal areas to prevent
the negative effects on the environment.
Currently, there were 42 disposal areas of A6 Package which were temporary accepted by the
Consultant. Some others have been submitted to the Consultant but have not yet been
approved (because they are lack of documentation with all authorities).
In the coming months, the Consultant will continue to inspect the disposal areas for unsuitable
materials to ensure the Project’s environment.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
125
May
This month, through inspection and supervision of disposal areas, the Consultant found that
there was no negative impact from disposal areas for unsuitable materialson the environment.
In some disposal areas which have been filled full volume such as Km155, Km187, Km156, ...
local people have carried out growing plants, which contributed to ensure the region's
environment and minimize erosion and landslides occurred.
In some disposal areas such as Km161, Km165, Km167... the Contractor has not completed
the procedures for disposal areas with local authorities... so the Contractor has assembled
temporarily materials in areas which have not been approved by the Consultant. The
Consultant has requested the Contractor to quickly complete the procedures for disposal areas
to submit to the Consultant for considering and approval. At the same time, the Consultant has
also required the Contractor to transport all unsuitable materials to the areas approved.
Currently, there are 42 disposal areas of package A6 are temporarily approved by the
Consultant. Some others have been submitted by the Contractor but have not yet been
approved by the Consultant (due to incompleted documentation with all levels of government).
In the coming months, the Consultant will continue to inspect disposal areas for unsuitable
materials to ensure the project’s environment.
June
Through the inspection and supervision on site this month, Consultant found that the disposal
areas which had been approved by Consultant got no serious environmental issues. In some
disposal areas as in Km155, Km156, Km188, Km187, ... residents planted trees at disposal
areas in sufficient quantity, which contributed to keep environmental standard in the discharge
area.
Currently, the Contractor has submitted 78 Disposal areas, in which 57 disposal areas have
been approved and 21 have not been approved (due to incomplete documents of the
authorities or locate near rivers, streams, ...).
In the site inspections weekly, the Consultant still regularly required the Contractor to comply
with the requirements in the environment control and protection plan as well as the regulations
involved in the disposal process to ensure the Project environment.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
126
In the coming months, the Consultant will continue to monitor inspecting inappropriate disposal
areas to remind the Contractor promptly resolve outstanding issues related to urban disposal
areas.
4.8.7 Package A7
April
Date April 12th 2012 the contractor submitting the document of spoil area at section1
Km190+420-Km201+000 include 08 location in letter No: Ref. GRBCC/GETINSA/A7/1101, so
after checking actual conditions on site and checking document, consultant required the
contractor repair and resubmitted in next time.
On 16 April the contractor had plan grass to prevent the erosion and landside into Red river at
unsuitable material waste disposal Km191+300, Km194+486 and Km194+800. However the
contractor dumping the earth at Km209+800 and Km201+815, which serious violated the
provision contacts and can effect to water quality.
May
Date 17-May 2012 the contractor submitting the document of spoil area at section1
Km190+420-Km201+000 include 08 location in letter No: GRBCC/GETINSA/A7/1150- Version
A2, so after checking documents and actual conditions on site, consultant required the
contractor repair and resubmitted in next time.
On 29- May the contractor had plan grass to prevent the erosion and landside into Red river at
unsuitable material waste disposal at Km209+800. However the contractor dumping the earth
at Km201+815 and Km204+581, which serious violated the provision contacts and can effect
to water quality.
June
Two unsuitable material waste disposals at Km201+815 and Km204+518, these positions not
approved by local authority and consultant. Contractor was required to submitte the documents
which was approved by local authority and apply the method of slope protection avoid landside
and erosion into streams and rivers.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
127
4.8.8 Package A8
April
Also some unsuitable material disposals were approved by consultant and the contractor have
been used to gather soil organic now have stabilized (no erosion, landslides) and a number of
unsuitable materials disposal place were used to grow cassava, maize or grass as unsuitable
material waste disposal at Km240+100.
May
Also some unsuitable material disposals were approved by consultant and the contractor have
been used to gather soil organic now have stabilized (no erosion, landslides) and a number of
unsuitable materials disposal place were used to grow cassava, maize or grass as unsuitable
material waste disposal at Km240+100.
June
Also some unsuitable material disposals were approved by consultant and the contractor have
been used to gather soil organic now have stabilized (no erosion, landslides) and a number of
unsuitable materials disposal place were used to grow cassava, maize or grass as unsuitable
material waste disposal at Km240+100.
4.9 WASTE AND CLEANLINESS IN SITE
4.9.1 Package A1
April
In the site inspections, we still found that the dirt is being tracked onto public roads where the
construction sites intersect them. The Contractor also does not clean these areas to keep them
in cleanliness and sanitary condition; this issue causes dirtiness and high spread of airborne
dust in the hot windy days.
The dirty and untidy status at Tam Long – Thien Ke Bridge still has not been solved; the site is
very dirty with trash, leftover material, and debris. Therefore, we still close the procedures of
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
128
payment progress of all items of these works until the Contractor implements our
requirements.
At Interchange No.3, there was a little improvement recorded but very behindhand.
May
Having inspected the construction sites, we still realized that the dirt is being tracked onto
public roads causing dirtiness. The PSC has requested the Contractor to clean these are ato
keep it in cleanliness and sanitary condition as well as ensure the safety for road users,
however, up to the day we didn’t see him to implement requirement of us.
The dirty and untidy status is still found at Tam Long – Thien Ke and Interchange No. 3
construction site; the site is very dirty with trash, leftover material, and debris. Therefore, we
still close the procedures of payment progress of all items of these works until the Contractor
implements our requirements.
June
Having inspected the construction sites, we still realized that the dirt is being tracked onto
public roads causing dirtiness. The PSC has requested the Contractor to clean these are ato
keep it in cleanliness and sanitary condition as well as ensure the safety for road users,
however, up to the day we didn’t see him to implement requirement of us.
The dirty and untidy status is still found at Tam Long – Thien Ke and Interchange No. 3
construction site; the site is very dirty with trash, leftover material, and debris. Therefore, we
still close the procedures of payment progress of all items of these works until the Contractor
implements our requirements.
4.9.2 Package A2
April
By observations during this month we still perceived that the dirt is being tracked onto public
roads where the construction sites intersect them. The Contractor also doesn’t clean these
areas to keep them in cleanliness and sanitary condition; this issue causes dirtiness, difficulty
for travelers and high spread of airborne dust in hot windy days.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
129
There is no improvement recorded at Interchange No.6 section. The unsuitable material is still
being disposed on site where is close to croplands and local resident area. We have many
times requested the Contractor to remove all this material to approved disposal places but he
still has not implemented requirements of us. The PSC has issued a warning letter of this issue
and if the Contractor still fails to meet our requirements, we will recommend the Employer to
deduct money. The next site inspection will be held on May 04, 2012.
At Batch Plant 2 of Lo River Bridge, the dirtiness status has not been solved when we take the
site inspection on Mar 28. The PSC has strongly requested the Contractor to urgently solve
this matter by hardening the surface of entrance/exit of this area. Till April 11. In the site
inspection we found that the Contractor had already concreted a part of this area.
May
The status of tracking of dirt onto public road has not been improved. This issue caused dirtiness and high spread of airborne dust and difficulty for road users, especially in hot windy days. The PSC many times requested the Contractor to solve these problems but up to now, there is no improvement recorded.
At Interchange No. 6 section, in the site inspections we still found that the spoil has not been removed from the construction site. This problem is causing the dirtiness on site and it affected local community due to it’s disposed close to this area. The PSC has many times requested the Contractor to remove all the spoil to approved disposal places; however, up to now the Contractor still has not implemented requirement of us.
At Army III Bridge, on May 22 we detected that the Contractor has not cleaned the site after demobilizing the worker’s camp. The trash is disposed surrounding on site and causes dirtiness status here. The PSC has requested the Contractor to collect the trash and dispose of it properly. We will recheck this area in the next site inspection on May 30, 2012.
The dirty and untidy status is also found at Ben Tre Bridge. The material, debris and trash were put on ground in disorder. We have requested the Contractor to solve this matter in order to keep the site in cleanliness and tidiness condition.
June
The status of tracking of dirt onto public road has not been improved. This issue caused dirtiness and high spread of airborne dust and difficulty for road users, especially in hot windy
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
130
days. The PSC many times requested the Contractor to solve these problems but up to now, there is no improvement recorded.
At Interchange No. 6 section, in the site inspections we still found that the spoil has not been removed from the construction site. This problem is causing the dirtiness on site and it affected local community due to it’s disposed close to this area. The PSC has many times requested the Contractor to remove all the spoil to approved disposal places; however, up to now the Contractor still has not implemented requirement of us.
At Army III Bridge, on May 22 we detected that the Contractor has not cleaned the site after demobilizing the worker’s camp. The trash is disposed surrounding on site and causes dirtiness status here. The PSC has requested the Contractor to collect the trash and dispose of it properly. We will recheck this area in the next site inspection on May 30, 2012.
The dirty and untidy status is also found at Ben Tre Bridge. The material, debris and trash were put on ground in disorder. We have requested the Contractor to solve this matter in order to keep the site in cleanliness and tidiness condition.
4.9.3 Package A3
April
During April, when inspected in site we have detected that many rubbish which was thrown
every where at Km51+100, Red river bridge, IC 8…
At National railway flyover, the Contractor poured waste water contain concrete from concrete
mixing trucks into the pond which provide water for fields near by construction site. Contractor
was requested to stop pouring waste water in surface water resource next to site immediately.
If Contractor continues repeat offence we will have stronger method.
May
During May, when inspected in site we have detected that many rubbish which was thrown
every where at Km64+080, Km51+100, Red river bridge, IC 10…
Oil drum was thrown every where in site (Km64+080 Tl320B bridge, Red river bridge
Km78+400). Surface of construction site was untidy. Therefore, Consultant requested
Contractor must clean up site as rearrange surface of construction site, collect and remove
rubbish out site regular.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
131
The Consultant’s letter was ref. GET2-POS-A3-1285 dated June 1st, 2012 “Require to
overcome Environmental and Safety problems in package A3.
June
In june, when inspected in site, we have detected that many rubbish which were thrown every
where at TL315 bridge, Red river bridge… Therefore, Consultant requested Contractor to
clean up site as rearrange surface of construction site, collect and remove rubbish out site
regularly.
4.9.4 Package A4
April
It was very dirty in site. Rubbish, waste bentonite, sacks, iron scraps, drums were everywhere
in site at Km88+600 Ngoi Gianh, Ngoi Van briges and Km84+400 TL321C bridge. Beside,
unsuitable material was piled up in site. Therefore, the Contractor was requested to remove all
waste and unsuitable material out site and clean construction site regular. The Consultant’s
letter was ref. GET2-KEA-A4-5630 dated April 24th, 2012.
May
At present, it was very dirty in site. Rubbish, waste bentonite, sacks, iron scraps, drums were
everywhere in site at Km107+533 QL32C bypass, Km88+600 Ngoi Gianh, Ngoi Van briges
and Km84+400 TL321C bridge. Beside, unsuitable material was piled up in site. Therefore, the
Contractor was requested to remove all waste and unsuitable material out site and clean
construction site regular.
Deadline is June 15th, 2012. Consultant’s warning letter is ref.GET2-KEA-A4-638 dated May
4th, 2012 and GET2-KEA-A4-680 dated June 1st, 2012.
June
In june, when inspected in site, we have detected that many rubbish which were thrown every
where at QL32C bridge, Ngoi Lao bridge, Km 104+500… Therefore, Consultant requested
Contractor to clean up site as rearrange surface of construction site, collect and remove
rubbish out site regularly.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
132
4.9.5 Package A5
April
Through the inspection and supervision on site, the Consultant found that the sanitary works of
the Contractor on site has some improvement. Some of the construction locations were kept in
neat and clean condition such as Km113, Km114, Km117, Km118, Km138...
However, there are still some outstanding issues such as:
- At some construction locations such as Ngoi Gua bridge, Van Phu bridge, Ngoi Thia
bridge, Ngoi Vien bridge... the sites have not been kept in a neat conditionl the
materials were not neatly arranged.
- Bentonite was not controlled closely by the Contractor in the construction process at
some locations such as Ngoi Gua bridge, Van Phu bridge...; this has led to the
bentonite surface runoff.
- The fuel stations of the Contractor such as at Ngoi Thia bridge, Van Phu bridge, Ngoi
Gua brigde... have not been kept in a state of neat and clean. The Consultant has
found traces of oil leaked on the ground.
The Consultant has reminded the Contractor on the outstanding issues in Ref. GET3-
KEANGNAM-12-A5-361 dated 24 April, 2012). Besides, the Consultant has also frequently
requested the Contractor to conduct periodically cleaning works at all construction locations of
the Contractor to ensure the environment and safety of the Project.
May
This month, through the inspection and supervision on site, the Consultant found that some of
the construction locations of the Contractor were still kept in clean condition such as Km112,
Km114, Km116, Km117, Km118, Km147 , ... However, there are still some outstanding issues
such as:
- In bridge construction areas such as bridges Ngoi Gua, QL37, Ngoi Rao, Ngoi Thia,
Van Phu... the sites were not kept neat; the construction materials and construction
equipments were not neatly arranged.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
133
- Bentonite running on the ground at the construction sites Van Phu bridge, Ngoi Thia
bridge, Ngoi Gua bridge...
- There were traces of oil leaked on the ground at the fuel stations of the Contractor such
as Ngoi Thia bridge, Ngoi Gua bridge...
The Consultant has requested the Contractor to quickly resolve the outstanding issues in Ref.
GET3-KEANGNAM-12-A5-439 dated May 16, 2012 and -KEANGNAM-12-A5-490 dated May
31, 2012.
Besides, in the site inspections, the Consultant has also required the Contractor to regularly
carry out periodical cleaning on site at all construction locations of the Contractor to ensure the
environment and safety of the Project.
June
This month, through the inspection of conditions for workers’ camps of the Contractor, the
Consultant found that there was not much improvement in terms of workers’ camps conditions;
there are still some outstanding issues such as:
- The fire preventing equipments, trash cans, first aid kits... have not been provided by
the Contractor in many workers’ camps such as: Ngoi Thia bridge, Km120, Ngoi Gua
bridge, Ngoi Thia bridge, Ngoi Rao bridge...
- In areas of Ngoi Rao bridge, Km127, Km120... clean toilets have not been built by the
Contractor in the workers’ camps.
- Daily and periodical sanitary works have not been done at many workers’ camps.
- During the weekly site inspections, the Consultant found that waste was
indiscriminately thrown on the ground in some camps areas such as Ngoi Gua bridge,
Km120, Km112...
The Consultant has reminded the Contractor on the outstanding issues. In additions, the
Consultant has also required the Contractor to improve the conditions in living and working in
camps for the workers.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
134
In the coming months, the Consultant will continue to check the working and living conditions
in camps for workers to remind the Contractor to promptly resolve outstanding issues.
4.9.6 Package A6
April
This month, through the inspection on site, the Consultant found that the Contractor had many
improvements in sanitation work on site. At many construction location of the Contractor, the
sites were kept in neat and clean conditions such as Ngoi Hut bridge, Km161, Km165, Lang
Nhay bridge, Ngoi Nhuoc bridge, Km184, Km182...
However, there are still some outstanding issues as follows:
- At some fuel stations of the Contractor such as Km155+100, Km186+720, Km171...
many fuel tanks were put discriminately on the ground.
- At the construction locations such as Ngoi Hut bridge, Ngoi Giam bridge, Lang Lau
bridge... the materials were not arranged in neatly.
In the weekly site inspections, the Consultant has reminded the Contractor on these issues.
Also, the Consultant has required the Contractor to carry out regular cleaning at all of
construction locations and workers' camps of the Contractor to keep the construction locations
clean and neat, avoiding unfortunate accidents.
May
Through the inspection and supervision on site this month, the Consultant found that the
sanitaty work in site of the Contractor has been remained in good condition. Many construction
locations have been kept clean such as Ngoi Nhuoc bridge area, Lang Nhay bridge, Ngoi That
bridge, Km161, Km162, Km182...
However, there are still some outstanding issues as follows:
- At the fuel s of stations of the Contractor such as Km155+100, Km171... the fuel tanks
were placed directly on the ground.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
135
- The construction locations Ngoi Nhuoc bridge, Lang Lau bridge... the construction
materials were not neatly and clean arranged.
- At the construction location of the tunnel area, the Contractor has not conducted
periodical sanitation work regularly, the construction materials were not neatly
arranged.
- In some workers’ camps such as Lang Nau bridge, Lang Nhay bridge, Km167+879,
Ngoi Giam bridge... The Contractor has not provided trashess, so there is still the
phenomenon of waste thrown indiscriminately on the ground.
The Consultant has required the Contractor to solve the outstanding issues. The Consultant
has also required the Contractor to carry out periodical cleaning at all construction locations of
the Contractor and the workers’ camps to keep the construction locations clean and neat.
June
This month, through the inspection in conditions of workers’ camps, Consultant found that
there was not much improvement in terms of workers’ camps. There were still some
outstanding issues such as:
- Most of the camps for workers have not yet equipped the appropriate wastewater
systems, so the majority of wastewater from the worker camp was discharged directly
into the environment.
- At Lang Lau bridge in Km184 +057, Lang Nhay bridge in Km182+160, Km167 +879
and Ngoi Giam bridge in Km 163+126..., camps were in bad conditions with no trash,
first aid kit and clean toilets.
The Consultant reminded the Contractor on the outstanding issues; at the same time, the
Consultant also requires the Contractor to improve living and working conditions in camps for
workers.
In the coming months, the Consultant will continue to check working and living conditions in
camps for workers to remind the Contractor promptly resolve outstanding issues.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
136
4.9.7 Package A7
April
At construction works Km194+765; Km201+815 date 6- April, at Km209+329 date 16- April
and at Km195+233 date 24-April the cement package and rubbish didn’t collect and transport
to treatment area according to ECP. Consultant required the contractor to collect and transport
the waste soil to treatment area according to regulation.
May
At construction works Km195+233; Km211+565; Km209+329; Km199+131; Km201+815 date
16- May the cement package and rubbish didn’t collect and transport to treatment area
according to ECP. Consultant required the contractor to collect and transport the waste soil to
treatment area according to regulation.
June
At construction works Km195+233; Km190+420; Km194+765; Km198+400; Km209+329;
Km199+050 date 7, 13, 20- June the cement package and rubbish didn’t collect and transport
to treatment area according to ECP. Consultant required the contractor to collect and transport
the waste soil to treatment area according to regulation.
4.9.8 Package A8
April
On 13-April 2012 at construction works of Girder casting yard of Suoi Nhu bridge Km218+040;
20-April at girder casting yard of IC18 Bridge Km244+570 and 25- April at Son Hai worker’s
camp package of cement and garbage didn’t collect and transport to treatment are according
to regulation. So the contractor is reminded to collect and transport the garbage on site to
treatment area according to regulation.
May
On construction works of Km218+040 and Km244+155 date 16-May 2012 package of cement
and garbage didn’t collect and transport to treatment is according to regulation. So the
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
137
contractor is reminded to collect and transport the garbage on site to treatment area according
to regulation.
June
On construction works of Km218+040; Km224+369 date 6, 21-June 2012 package of cement
and garbage didn’t collect and transport to treatment is according to regulation. So the
contractor is reminded to collect and transport the garbage on site to treatment area according
to regulation.
4.10 BIODIVERSITY PRESERVATION
4.10.1 Package A1
April, May and June
During the site inspections this month, we didn’t find any serious impacts, which arise from
construction activities of the project, on biodiversity preservation.
4.10.2 Package A2
April
It’s noted that there is no improvement at Ben Tre Bridge, Muong Dao Bridge and Ben Gao
Bridge construction site; therefore the aquatic ecosystem probably is being impacted due to
the water flows are being blocked in these area. The PSC has many times requested the
Contractor to solve this matter but the Contractor still has not implemented requirements of us.
The PSC still closes the procedure of payment progress of all items of these works until the
Contractor implements our requirements.
May
The stastus at Ben Tre Bridge, Muong Dao Bridge and Ben Gao Bridge construction site still has not been improved; therefore the aquatic ecosystem probably is still being impacted due to the water flows are being blocked. The PSC has many times requested the Contractor to solve this matter but the Contractor still has not taken any ation to implement our requirements. The PSC still closes the procedure of payment progress of all items of these works until the Contractor implements our requirements.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
138
June
The stastus at Ben Tre Bridge, Muong Dao Bridge and Ben Gao Bridge construction site still has not been improved; therefore the aquatic ecosystem probably is still being impacted due to the water flows are being blocked. The PSC has many times requested the Contractor to solve this matter but the Contractor still has not taken any ation to implement our requirements. The PSC still closes the procedure of payment progress of all items of these works until the Contractor implements our requirements.
4.10.3 Package A3
April
According to the observed and based on the monitoring results of analysis the environmental
air quality, noise and surface water in the April, 2012 shows that ecosystems and the resident
activities of the local community people around of construction area are still normally, not
detected any bad impact from the construction activities on ecosystems and communities. Until
now, The Consultant have no report about plant, animals were died by machinery or vehicle
operations in limit of construction zone.
May and June
According to the observed and based on the monitoring results of analysis the environmental
air quality, noise and surface water in the May and June, 2012 shows that ecosystems and the
resident activities of the local community people around of construction area are still normally,
not detected any bad impact from the construction activities on ecosystems and communities.
Until now, The Consultant have no report about plant, animals were died by machinery or
vehicle operations in limit of construction zone.
4.10.4 Package A4
April
According to the observed and based on the monitoring results of analysis the environmental
air quality, noise and surface water in the April, 2012 shows that ecosystems and the resident
activities of the local community people around of construction area are still normally, not
detected any bad impact from the construction activities on ecosystems and communities. Until
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
139
now, The Consultant have no report about plant, animals were died by machinery or vehicle
operations in limit of construction zone.
May and June
According to the observed and based on the monitoring results of analysis the environmental
air quality, noise and surface water in the May and June, 2012 shows that ecosystems and the
resident activities of the local community people around of construction area are still normally,
not detected any bad impact from the construction activities on ecosystems and communities.
Until now, The Consultant have no report about plant, animals were died by machinery or
vehicle operations in limit of construction zone.
4.10.5 Package A5
April
This month, the major items of the Package are soil work and some other activities such as
bridge construction, drainage pipes, under pass box culvert... and the majority of them have
not created substances that cause serious impacts on fauna and flora of the region. Most of
the construction activities of the Contractor were conducted in the Project’s limit.
However, to ensure the region's environment, in the site inspections, the Consultant has
frequently reminded the Contractor to comply with the Method Statement, the environment
control and protection plan during construction process to prevent adverse impacts on fauna
and flora of the area.
In addition, the Consultant has also requested the Contractor not to conduct burning debris or
other materials on site to prevent the unwanted risk from fire to the fauna and flora of the area.
The Consultant has also recommended the Contractor held meetings to promote the
environmental awareness for employees about biodiversity in the process of the Project.
May
Through the inspection and supervision this month, the Consultant found that the fauna and
flora of the region have not been seriously affected by the construction activities of the
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
140
Contractor. Most of the Contractor's construction activities have been done within the limits of
the Project.
However, to ensure the region's environment, in the site inspections, the Consultant has
frequently reminded the Contractor to comply with the Method Statement, the Environment
Control and Protection Plan to protect the environment during construction, preventing adverse
impacts on regional fauna and flora.
The Consultant has also recommended the Contractor to held meetings to promote the
awareness of employees about biodiversity preservation in the Project’s construction process.
June
This month, through the inspection and supervision on site, the Consultant found that the
majority of the construction locations of the Contractor were kept in clean condition such as at
Km112, Km114, Km117, Km116, Km142...
However, there are still some outstanding issues as follows:
- At some construction locations such as Ngoi Thia bridge, Ngoi Rao bridge, Van Phu
bridge, Ngoi Gua bridge, Ngoi Lau bridge... the construction materials were not neatly
arranged.
- Trash cans have also not been provided in many areas of workers’ camps such as:
Ngoi Thia bridge, Km120, Ngoi Gua bridge, Ngoi Rao bridge... In the site inspections,
the Consultant has found waste indiscriminately thrown on the ground in camps areas
such as Km112, Km120...
- Bentonite was not controlled tighly in the construction process in areas such as Ngoi
Gua bridge, Van Phu bridge, Ngoi Thia bridge...
- There are oil leakages at the fuel stations of Ngoi Thia bridge, Van Phu bridge, Ngoi
Rao bridge, Km126...
The Consultant has reminded the Contractor on the oustanding issues. Also, the Consultant
has required the Contractor to carry out regular cleaning at all construction locations of the
Contractor and workers’ camps to keep the construction locations in clean and neat condition.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
141
4.10.6 Package A6
April
Through the inspection and supervision on site this month, the Consultant found that the
regional flora and fauna have not been seriously affected by the construction activities of the
Project. During this period, the major construction items of the package was still soilwork, and
some other items such as bridges, tunnels, irrigation drainage pipe... These construction
activities did not produce hazardous substances which may cause serious effects on the
regional environment, and most of them were done within the limits of the Project.
To ensure the region's environment and prevent adverse impacts on fauna and flora of the
region, in the weekly site inspections, the Consultant has reminded the Contractor to comply
with the Method Statement and the Environment Control and Protection Plan during the
Project’s process.
In addition, the Consultant has also frequently recommended the Contractor to hold meetings
and promotions for employees and engineers about the environment protection during
construction process.
May
This month, through the inspection and supervision on site, the Consultant found that the
construction activities of the Contractor have not caused serious impacts to the fauna and flora
of the area. The major construction items of the Contractor this month is still earth work such
as clearing site, excavation work, filling work... so they have not risen hazardous substances
affecting the regional environment.
However, to ensure the region's environment, the Consultant has frequently required the
Contractor to comply with the Method Statement and the Environment Control and Protection
Plan of the Project during construction process. Also, the Consultant has required the
Contractor not to burn any material on site to prevent unwanted fire accidents, affecting the
fauna and flora of the area.
Besides, in the weekly site inspections, the Consulting has also recommended the contractor
to held meetings and the promotions for workers and engineers on the work of environment
protection during construction process.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
142
June
This month, through the inspection and supervision on site, Consultant found that the majority
of the construction site has been kept in clean condition, as at Km151, Km165, Km190, Km184
...
However, there were still some outstanding issues as follows:
- In some areas such as Ngoi Giam bridge, Lang Lau bridge, Ngoi Don bridge and Dai
Viet bridge, the construction materials was not neatly arranged.
- In the basement construction area, the Contractor did not allocate construction
materials neatly and did not implement routine sanitation work.
- At Lang Lau bridge area in Km184 +057, Lang Nhay bridge in Km 182+160, Ngoi Giam
bridge in Km163+126, workers’ camps were in bad conditions with no trash and clean
toilets.
Consultant reminded the Contractor on the outstanding issues, and also required the
Contractor to carry out regular cleaning in all areas of construction sites and workers’ camps to
keep the construction area in clean and tidy condition.
4.10.7 Package A7
April
Up to mow site cleaning of contractor most completed, construction work of contractor along of
package from Km190+420 to Km218+040. However whiling construction work didn’t have
animal extinct or damage by construction work of contractor, this showing in monthly report of
contractor.
May
Up to mow site cleaning of contractor most completed, construction work of contractor along of
package from Km190+420 to Km218+040. However whiling construction work didn’t have
animal extinct or damage by construction work of contractor, this showing in monthly report of
contractor.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
143
June
Up to mow site cleaning of contractor most completed, construction work of contractor along of
package from Km190+420 to Km218+040. However whiling construction work didn’t have
animal extinct or damage by construction work of contractor, this showing in monthly report of
contractor.
4.10.8 Package A8
April
Up to now the activities of the Contractor didn’t cause negative effect to animal and plan and
biodiversity preservation in area as well as. However, consultant always reminded the
contractor to apply some methods to mitigate impact to environment in general and living being
particularly on the construction site.
May
Up to now the activities of the Contractor didn’t cause negative effect to animal and plan and
biodiversity preservation in area as well as. However, consultant always reminded the
contractor to apply some methods to mitigate impact to environment in general and living being
particularly on the construction site.
June
Up to now the activities of the Contractor didn’t cause negative effect to animal and plan and
biodiversity preservation in area as well as. However, consultant always reminded the
contractor to apply some methods to mitigate impact to environment in general and living being
particularly on the construction site.
4.11 WORKERS’ CAMPS CONDITIONS
4.11.1 Package A1
April
The sanitary condition at worker’s camps in Cam I Bridge, Tam Long – Thien Ke Bridge and
Underpass NH2 construction sites is improved. Trash has been collected and disposed of it
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
144
properly. However, the septic tanks are usually dirty with trash; the PSC has requested the
Contractor to often implement housekeeping work to keep these areas in cleanliness and
sanitary condition.
In the site inspections, we don’t see any improvement at Tan Loi Bridge, Bon Bridge and
Interchange No. 3; therefore, the PSC still maintain the measure of suspending the procedures
of payment progress of these works until the Contractor implements our requirements to
provide the workers with enough sanitary facilities and their living condition is ensured. At Tan
Loi Bridge and Bon Bridge, the workers aren’t provided first aid kits also and at Trung Kien
Bridge there is nothing inside first aid kit. The PSC has many times requested the Contractor
to solve this matter but up to now, there is no improvement recorded.
At box culvert Km 15+868 we found that the temporary camp is unsafe and very dirty, the PSC
has requested the Contractor to improve the condition here to ensure the good environment for
workers. We will recheck this area on next site inspection on May 03, 2012.
May
Insanitary status at worker’s camps was still found at Tan Loi Bridge, Bon Bridge and
Interchange No. 3. These areas also are not provide septic tanks. The PSC has many time
strongly requested the Contractor to solve these issue to ensure the healthy and sanitary
environment for workers; however, the Contractor doesn’t implement our requirements,
therefore, we still closet he procedures of payment progress of all ítems of these Works until
the Contractor corrects these defects.
At Underpass NH2, Cam I Bridge, Tam Long – Thien Ke Bridge and Trung Kien Bridge we still
found the dirty backhouses in site inspection on May 03 and 08. We have strongly requested
the Contractor to solve this issue. Till May 22, in the site inspection we perceived that the
Contractor has implemented our requirements to provide the sanitary septic tanks for workers
in these areas..
At box culvert Km 15+868, the poor condition of worker’s camp has not been improved.
June
Insanitary status at worker’s camps was still found at Tan Loi Bridge, Bon Bridge and
Interchange No. 3. These areas also are not provide septic tanks. The PSC has many time
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
145
strongly requested the Contractor to solve these issue to ensure the healthy and sanitary
environment for workers; however, the Contractor doesn’t implement our requirements,
therefore, we still closet he procedures of payment progress of all ítems of these Works until
the Contractor corrects these defects.
At Underpass NH2, Cam I Bridge, Tam Long – Thien Ke Bridge and Trung Kien Bridge we still
found the dirty backhouses in site inspection on May 03 and 08. We have strongly requested
the Contractor to solve this issue. Till May 22, in the site inspection we perceived that the
Contractor has implemented our requirements to provide the sanitary septic tanks for workers
in these areas..
At box culvert Km 15+868, the poor condition of worker’s camp has not been improved.
4.11.2 Package A2
April
In the site inspections we found that the sanitary condition at septic tank in Ben Gao Bridge
has not been improved. At Km 43+300, the Contractor still has not remobilized the workers for
work but this worker’s camp in this area is still dirty with trash surrounding and the septic tank
is unclean also.
At Ben Tre Bridge and Tan Dung Bridge, the Contractor also supplemented a septic tank for
workers to ensure the capacity.
At other sections, we didn’t see the serious problems during the site inspections.
May
worker’s camps at Ben Tre Bridge and Army II Bridge. The PSC has requested the Contractor to solve this issue to maintain the healthy living condition for workers; however, on May 22 we only seen improvement at Army II Bridge.
At Ben Gao Bridge we found that the trash had been collected and disposed properly but the septic tanks are still dirty and unusable. We have many times requested the Contractor to provide enough sanitation system and keep it in cleanliness condition but the Contractor has not implemented our requirements here.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
146
At other sections, we didn’t see the serious problems during the site inspections.
June
In the site inspection on May 09, 2012 we detected that the trash is being disposed surrounding worker’s camps at Ben Tre Bridge and Army II Bridge. The PSC has requested the Contractor to solve this issue to maintain the healthy living condition for workers; however, on May 22 we only seen improvement at Army II Bridge.
At Ben Gao Bridge we found that the trash had been collected and disposed properly but the septic tanks are still dirty and unusable. We have many times requested the Contractor to provide enough sanitation system and keep it in cleanliness condition but the Contractor has not implemented our requirements here.
At other sections, we didn’t see the serious problems during the site inspections.
4.11.3 Package A3
April
The subcontractor TGT cleaned up their camp: collected all rubbish, regrouped all oil drums to
regulation place far from kitchen. Although they did not concrete storage’s foundation but they
set up fire extinguisher and cleaned all oil leaking on ground. We still request Contractor must
concrete storage’s foundation to avoid oil spill over ground and maintain environmental
sanitation in every camps of package A3.
May
Almost worker’s camps along package A3 were lack of waste bins, first aid kit and fire
extinguisher. At Km78+100, we have found that many rubbish thrown in frond of camp. At
Km64+080, Contractor did not set up hygienic toilet, waste bins, first aid kit and fire
extinguisher. Consultant warned many times but Contractor still delay.
In inspection tour of ADB mission, they requested Contractor must set up hygienic toilet, waste
bins, first aid kit and fire extinguisher for each camp along package. Deadline is June 15th,
2012.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
147
The Consultant’s letter was ref. GET2-POS-A3-1285 dated June 1st, 2012 “Require to
overcome Environmental and Safety problems in package A3”.
June
Almost worker’s camps along package A3 were lack of waste bins, first aid kit and fire
extinguisher.
4.11.4 Package A4
April
Along package A4, the Contractor rented the houses of local people next to site (about 30-
40m) for worker’s camps. So their worker will use hygienic toilet, waste bins and fresh water in
those houses. But some places, the Contractor built some thatch house or camps for security
guard in site (Km107+533, Km97+124…). There are just provided fresh water for worker when
they work in site but no fire extinguisher to prevent fire risk.
Particularize at Km84+400 TL321C bridge, Contractor set up a thatch camp for worker in site,
but they did not set up hygienic toilet, waste bins, fire extinguisher and first aid box.
May
Along package A4, the Contractor rented the houses of local people next to site (about 30-
40m) for worker’s camps. So their worker will use hygienic toilet, waste bins and fresh water in
those houses. But some camps (Km101+200 Box culvert, Km87+000 Ngoi Gianh bridge…)
Contractor has just provided fresh water for worker drink but no fire extinguisher, no waste
bins, no first aid kit and have many rubbish around these camps.
Particularize at Km84+400 TL321C bridge, Contractor set up a thatch camp for worker in site,
but they did not set up hygienic toilet, waste bins, fire extinguisher, first aid box and it’s very
dirty.
Contractor was requested to provide hygienic toilet, waste bins, fire extinguisher, first aid box
and clean up all camps before June 15th, 2012. Consultant’s warning letter is ref.GET2-KEA-
A4-638 dated May 4th, 2012 and GET2-KEA-A4-680 dated June 1st, 2012.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
148
June
Along package A4, the Contractor rented the houses of local people next to site (about 30-
40m) for worker’s camps. So their worker will use hygienic toilet, waste bins and fresh water in
those houses. But some camps (Km101+200 Box culvert, Km87+000 Ngoi Gianh bridge…)
Contractor has just provided fresh water for worker drink but no fire extinguisher, no waste
bins, no first aid kit and have many rubbish around these camps.
4.11.5 Package A5
April
Through the inspection of the workers’ camps conditions this month, the Consultant found that
most of the workers’ camps were kept in good conditions (because the majority of the workers’
camps are the houses of the local population hired) such as Km142, Km111, Km120...
However, there are still some outstanding issues as follows:
- Numerous of the workers’ camps of the Contractor were not provided with fire fighting
equipments, first aid kits... such as at Km120, Km128, Ngoi Rao bridge...
- The Contractor has not built clean toilets in camps at Km120, Km127, Ngoi Rao
bridge...
The Consultant has asked the Contractor to improve the living and working conditions in all
workers’ camps. Besides, the Consultant has also required the Contractor to provide all
necessary equipments such as bins, first aid kits, fire extinguishers... in all workers’ camps.
In the coming months, the Consultant will regularly inspect the working and living conditions in
workers’ camps of the Contractor to promptly request the Contractor to carry out measures to
meet the requirements of the Project.
May
Through the inspection of the workers’ camps conditions this month, the Consultant found that
there are some outstanding issues as follows:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
149
- Many workers’ camps have not been provided sufficient fire fighting equipments, first
aid kits, trashes, such as Ngoi Thia bridge, Km120, Ngoi Gua bridge...
- The toilets have not been built by the Contractor in areas such as workers’ camps
Km120, Km127, Ngoi Gua bridge...
The Consultant has requested the Contractor to improve the living and working conditions in all
camps of the workers. Besides, the Consultant has also required the Contractor to provide all
the necessary equipments such as trashes, fire fighting equipments, first aid kits, fire
extinguishers,... in all the workers’ camps (Ref. GET3-KEANGNAM-12-A5-387 dated May 3,
2012, Ref. GET3-KEANGNAM-12-A5-437 dated May 16, 2012 and Ref. GET3-KEANGNAM-
12-A5-490 dated May 31, 2012).
In addition, at Km142, km111, Km120... the Contractor has hired houses of local people to use
as workers' camps; The camps were maintained in good conditions. However, the devices
such as first aid kits and fire extinguishers have not been provided adequately.
In the coming months, the Consultant will regularly inspect the working and living conditions in
the workers’ camps of the Contractor to promptly request the Contractor to carry out measures
to meet the project’s requirements.
June
During this period, the major construction items of the Contractor were still earthworks such as
site clearing, excavation, backfill... Therefore, they have not raised serious effects on the
regional environment. Besides, the construction activities of the Contractor were within the
limits of the Project and were not carried out in areas with rich biodiversity. Therefore, the
fauna and flora of the region have not been seriously affected by the construction activities of
the Contractor.
However, the Contractor has not applied well the measures to minimize dust during
construction process at some locations such as Km112, Km114, Km117, Km123, Km142...
This has generated dust, reduced the photosynthetic capacity of plants. However, this effect is
not serious; the Consultant has reminded the Contractor on this outstanding issue.
To ensure the region's environment, the Consultant has frequently required the Contractor to
comply with the Method Statement and the Environment Control and Protection Plan during
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
150
construction process. Also, the Consultant has asked the Contractor not to burn anything on
site to prevent unwanted fire accidents, affecting the regional fauna and flora.
The Consultant has also recommended the Contractor to held meetings to promote the
environment awareness of employees about biodiversity preservation in the process of the
Project.
4.11.6 Package A6
April
Through the inspection of conditions in workers’ camps of the Contractor in this month, the
Consultant found that most of the camps of the Contractor were maintained in good conditions
such as: Ngoi Hut bridge, Km157, 180 km, Km186+200...
However, there are still some workers’ camps which are not fully met the requirements of the
Project such as:
- At station Km187+420, Lang Nhay bridge, Ngoi Giam bridge... the clean toilets have not
been built, and fire fighting equipments, first aid kits, trashs have not been provided...
- In the area of workers' camps (Ngoi Giam bridge, Lang Nhay bridge...) garbage was
thrown discriminately on the ground.
- At most of the workers camps of the Contractor, appropriate wastewater systems have
not been developed; the majority of wastewater from the camps were discharged
directly into the environment.
To ensure the working and living conditions in camps for all workers, the Consultant has
reminded the Contractor on the outstanding issues. The Consultant has also required the
Contractor to implement effective measures to improve the conditions in camps for the
workers.
May
Through the inspections of the condition in workers’ camps of the contractor this month, the
Consultant found that the Contractor has provided first aid kits and fire extinguishers for some
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
151
camps, such as Km186+200, Km171, Km165, ... In addition, the Contractor has also built
clean toilets for workers’ camps such as at Km185, Ngoi Hut bridge...
However, there are still some outstanding issues as follows:
- Some camps are temporarily built, there are no trash can, first aid kit, fire extinguisher...
such as in the areas Lang Nau bridge Km184+057, Lang Nhay Km182+160,
Km167+879 and Ngoi Giam bridge Km163+126...
- Waste was indiscriminately thrown on the ground, not collected in camps such as at
Ngoi Giam bridge, Lang Lau bridge...
- Most of the workers’ camps of the Contractors have not yet been developed the
appropriate wastewater systems. The majority of wastewater from the workers’ camps
was discharged directly into the environment.
The Consultant has required the Contractor to improve the working and living conditions in
camps for the workers (such as in Ref. GET3-DOOSAN-12-A6-453 dated May 3, 2012, GET3-
DOOSAN-12-A6-491 dated May 15, 2012 and GET3-DOOSAN-12-A6-546 dated May 31,
2012).
In the coming months, the Consultant will continue to inspect the working and living conditions
in workers’ camps to remind the Contractor to promptly resolve the outstanding issues.
June
During this period, the major items of construction were still site clearing, excavation,
backfilling... so it did not create substances which seriously affected the environment of the
region. Besides, the construction activities were within the limitation of the Project and did not
go through extensive areas of high biodiversity. Therefore, the fauna and flora of the region
have not been seriously affected by the activities of construction.
However, because the Contractor did not apply measures to minimize dust during construction
in some areas such as Km165, Km157, Km184, Km185... it caused dust which reduced the
photosynthetic capacity of plants. However, this effect was local only and not serious. The
Consultant reminded the Contractor on these outstanding issues.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
152
To ensure the region's environment, the Consultant frequently required the Contractor to
comply with Method Statement, environment control and protection plan during construction.
At the same time, we also asked the Contractor not to burn anything in construction sites to
prevent unwanted fire accidents, which could affect fauna and flora of the area.
4.11.7 Package A7
April
Workers’ camp of Chau Que Thuong Bridge Km190+487 and Tan An Bridge Km194+765: Up
to now no rubbish bin and the toilet no provide septic tank according to Environment control
plan of the contractor. Required the contractor to provide rubbish bin and the toilet have septic
tank according to Environment control plan of the contractor.
May
At moment almost the toilet of all worker camps had provided the septic tanks, however the
worker’s camps following at Km211+565; Km209+329; Km202+400; Km198+400; Km191+353
are showed by consultant and ADB mission on 16-May is not meet project standard as:
Lacked fire- extinguisher, First kid aids, Rubbish bin. So the consultant required the contractor
to overcome according to consultant instruction in the letter No: Ref. GET4- GRBCC-650.
June
At moment almost the toilet of all worker camps had provided the septic tanks, however the
worker’s camps following at Km211+565; Km209+329; Km202+400; Km198+400; Km191+353
are showed by consultant and ADB mission on 16-June is not meet project standard as:
Lacked fire- extinguisher, First kid aids, Rubbish bin. So the consultant required the contractor
to overcome according to consultant instruction in the letter No: Ref. GET4- GRBCC-650.
However until date 28-June 2012 the contractor did not deploy according to ADB mission and
consultant instruction.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
153
4.11.8 Package A8
April
On 25-April 2012 at workers’ camp of Son Hai Bridge is building and no providing the rubbish
bin and sanitary toilet facility according to regulation in the Environmental control plan. The
consultant required the contractor to provide the rubbish bin and sanitary toilet facility before
May 15th 2012.
Addition the toilet of some workers’ camp provide septic tank according to regulation as:
workers’ camp of Da Phuc company Km244+155, workers’ camp of Truong Loc company
Km230+000, workers’ camp of Thanh An company Km228+000, workers’ camp of IC17 Bridge
Km233+540. However at these workers’ camp not provided rubbish bin according to
regulation. Consultant required the contractor to provided rubbish bin for these workers’ camp
before April 31st 2012.
May
At moment almost the toilet of all worker camps had provided the septic tanks, however the
worker’s camps following at Km244+155; Km238+265; Km218+040; Km220+993 are showed
by consultant and ADB mission on 16-May is not meet project standard as: Lacked fire-
extinguisher, First kid aids, Rubbish bin. So the consultant required the contractor to overcome
according to consultant instruction in the letter No: Ref. GET4- Vinaconex 565 and Ref. GET4-
Vinaconex 566.
June
At moment almost the toilet of all worker camps had provided the septic tanks, however the
worker’s camps following at Km244+155; Km238+265; Km218+040; Km220+993 are showed
by consultant and ADB mission on 16-June is not meet project standard as: Lacked fire-
extinguisher, First kid aids, Rubbish bin. So the consultant required the contractor to overcome
according to consultant instruction in the letter No: Ref. GET4- Vinaconex 565 and Ref. GET4-
Vinaconex 566. However, so far the contractor didn’t overcome according to the consultant
instruction.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
154
4.12 LABOUR SAFETY EQUIPMENT
4.12.1 Package A1
April
In the site inspections, the status of lack PPE at work was still noted at Underpass NH2, Kim
Anh Bridge, Bon Bridge, Tan Loi Bridge, and Interchange No. 3. The workers still didn’t use or
to be not provided enough PPE. This issue has not been improved month by month despite
the requirements of the Engineer.
At Underpass NH2, Dai Duong Bridge, Xuan Phuong Bridge, Tan Loi Bridge, Ba Thien Bridge,
Interchange No.3 and Cam I Bridge we perceived that the Contractor has not provided enough
safety scaffolds/ladders or safety net system to ensure the safety for working during carrying
out the work at height. The PSC has strongly requested the Contractor to solve this matter and
till now, the Contractor is implementing our requirements; the scaffold and safety net systems
are being supplemented to the construction sites. However, there some construction areas still
lack these facilities and we have requested the Contractor to supplement enough.
At Bon Bridge and Tan Loi Bridge, the Contractor still has not provided the workers safety work
ways to access the working areas. Besides, when the workers carried out the work at height,
there was also no safety platform provided.
May
During the site inspections we still detected some workers didn’t use enough PPE at work at
Dai Duong Bridge, Tan Loi Bridge and Trung Kien Bridge. The workers were not provided
enough PPE or didn’t use due to their unawareness. The PSC has many times strongly
requested the Contractor to provide enough PPE for workers as well as ensure that all workers
use enough PPE at work but this issue still usually happen.
We also found the lack of safety net/scaffold/ladder at Dai Duong Bridge, Ba Thien Bridge and
Interchange No.3. We have requested the Contractor to solve this problem and till May 22, in
the site inspection we perceived that the Contractor had improved the status in these area, the
safety net, scaffold had been installed. However, at Bon Bridge, we still found that the workers
used unsafe ladder to climp to piers for work at height. A serious warning was given to the
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
155
Contractor to request him to solve this issue immediately. We will recheck this area in the next
site inspection on May 29, 2012.
At girder casting yard of Tam Long – Thien Ke Bridge, unsafe electric system was detected in
the site inspection on May 22. Electric wires were installed and put on ground in disorder;
switches were not cover carefully to avoid rain-water. The PSC has requested the Contractor
to immediately resolve this issue in order to ensure the safety for workers.
June
During the site inspections we still detected some workers didn’t use enough PPE at work at
Dai Duong Bridge, Tan Loi Bridge and Trung Kien Bridge. The workers were not provided
enough PPE or didn’t use due to their unawareness. The PSC has many times strongly
requested the Contractor to provide enough PPE for workers as well as ensure that all workers
use enough PPE at work but this issue still usually happen.
We also found the lack of safety net/scaffold/ladder at Dai Duong Bridge, Ba Thien Bridge and
Interchange No.3. We have requested the Contractor to solve this problem and till May 22, in
the site inspection we perceived that the Contractor had improved the status in these area, the
safety net, scaffold had been installed. However, at Bon Bridge, we still found that the workers
used unsafe ladder to climp to piers for work at height. A serious warning was given to the
Contractor to request him to solve this issue immediately. We will recheck this area in the next
site inspection on May 29, 2012.
At girder casting yard of Tam Long – Thien Ke Bridge, unsafe electric system was detected in
the site inspection on May 22. Electric wires were installed and put on ground in disorder;
switches were not cover carefully to avoid rain-water. The PSC has requested the Contractor
to immediately resolve this issue in order to ensure the safety for workers.
4.12.2 Package A2
April
In the site inspections, the status of lack PPE (protection helmet/boot/glove/life-jacket/safety
belt) at work was still noted at Lo River Bridge, Song Dao Bridge, Ben Gao Bridge and Muong
Dao Bridge construction sites. The workers still didn’t use or to be not provided enough PPE.
This issue has not been improved month by month despite the requirements of the Engineer.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
156
At Ben Gao Bridge and Muong Dao Bridge, the work ways over the water body were not safe
enough. They’re made of small steel bars without handrail. In this site, the workers also were
not provided safety platform when carried out the work at height. We have requested the
Contractor to solve these issues to ensure the safety for workers but he still doesn’t implement
our requirements.
The lack of safety net, scaffold/ladder was noted at Army II Bridge, Army III Bridge, TL310
Bridge, Muong Dao Bridge, Ben Gao Bridge and Song Dao Bridge. The PSC has strongly
requested the Contractor to provide as well as install enough safety facilities for workers;
however, there was only improvement at Army II Bridge, Army III Bridge and TL310 Bridge. At
Muong Dao Bridge and Ben Gao Bridge, the Contractor has just supplemented the scaffold for
workers but it’s not enough and there is still no safety net installed under launched girders at
Ben Gao Bridge.
Unsafe electric system was noted at TL310 Bridge on April 11, too. The electric wires were put
on ground in disorder with connections that didn’t meet standard. This issue could cause
electric shock for workers. The PSC has requested the Contractor to immediately reinstall
electric system here and in the site inspection on April 18 we perceived that the Contractor had
implemented our requirements.
May
In the site inspections, we still found that the workers didn’t use enough PPE at work at Lo River Bridge, Muong Dao Bridge and box culvert Km 39+576. The PCS has many times requested the Contractor to tightly control this issue to ensure that all the workers use enough PPE at work but this status still usually happen on sites.
At Army II Bridge, Muong Dao Bridge and Ben Tre Bridge we found that the workers were not provided enough safety ladder/scaffold and safety net. The PSC has issued a warning letter to request the Contractor to provide and install enough safety facilities for workers in order to ensure the safety on sites. However, on May 21 and 22, in the site inspection we only perceived that the Contractor had supplemented scaffolds but safety net. We have strongly requested the Contractor to solve this issue immediately. We will recheck these areas in the next site inspection on May 30, 2012.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
157
June
In the site inspections, we still found that the workers didn’t use enough PPE at work at Lo River Bridge, Muong Dao Bridge and box culvert Km 39+576. The PCS has many times requested the Contractor to tightly control this issue to ensure that all the workers use enough PPE at work but this status still usually happen on sites.
At Army II Bridge, Muong Dao Bridge and Ben Tre Bridge we found that the workers were not provided enough safety ladder/scaffold and safety net. The PSC has issued a warning letter to request the Contractor to provide and install enough safety facilities for workers in order to ensure the safety on sites. However, on May 21 and 22, in the site inspection we only perceived that the Contractor had supplemented scaffolds but safety net. We have strongly requested the Contractor to solve this issue immediately. We will recheck these areas in the next site inspection on May 30, 2012.
4.12.3 Package A3
April
During April, when we inspected in site we have found some problems such as:
- Electric system was not safe: Interrupter was not safe, electric wire was laid on ground
(P3 Red river bridge, National railway flyover bridge, P9 Red river bridge).
- Ladder was not safe because it was not set up handrail to ensure safety. P2 Red river
bridge, Ho Chi Minh IC.
- Floor operation was not safe: no handrail, unreliable. Bai Bang bridge
- At some place, No access ladder, no scaffold, no floor operation was set up for work.
No safety handrail was set up. IC8, P3 Red river bridge
- Worker did not use safety labour. Sometime, they work dangerously at height. IC8, Bai
Bang bridge, Red river bridge
- No protective cover was set up for this machine. Xuan Thanh bridge
- Inhabitant was freely entry construction site. Km51+100
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
158
The Contractor was strongly requested to resolve all above violations. If it still repeat we will
force to stop work in site.
May
During May, when we inspected in site we have found some problems must be resolve such
as:
- The work’s camp at Km78+100 (near P3 Red river bridge), Km77+200 National railway
flyover, Km64+080 TL320B bridge, Km60+967 Bai Bang railway flyover must be supply
02 rubbish bin, fire-extinguishers and first- aid kit
- Oil tanks at Km78+400 (P5 Red river bridge), Km52 (worker’s camp of TGT
subcontractor)…must be keep in the store and on the concrete floor (not keep directly
on the ground).
- In general, worker must use PPEs such as safety hats, safety shoes, gloves, safety
goggles… when they work in site
- Along package A3, Electric system was not safe: electric wire was laid on ground, mud,
interrupter was broken, electrical junction was very dangerous, no box to put interrupter
in order to electrical insulation…
- Some access roads (Km75+400) which are damaged by project vehicles causing
difficulty to public who also use these roads, are required to repair by Contractor.
- At piers of bridges, on part K0 where preparing for launching beams or cantilever work,
worker worked at height distance 20m from ground, but the Contractor has not set up
handrails or safety barrier to ensure safety.
- Scaffold systems were not safe: set tilt, have some defect holes on the main pillar, lack
of screws…
- Operation floor systems at height, ladders were not set up handrail.
- Machines or equipments were too old, broken, or lack of protective cover…
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
159
The Contractor is strongly requested to resolve all above problems to avoid accident at work in
site. The Consultant will recheck all above items in all bridge construction sites along package
A3. If these violations are not repaired, we will force to stop work at some dangerous place.
Contractor must resolve above problems before June 15th 2012, at that time if the issue is not
resolved we will warn the related staffs.
June
Workers did not use PPEs such as safety hats, safety shoes, gloves, safety goggles… when
they work in site (Piers 5-7 of red river bridge, TL315B bridge, Bai Bang railway flyover
bridge...). There is not scaffold system at TL315B bridge.
Electric system was not safe: electric wire was laid on ground, mud, interrupter was broken,
electrical junction was very dangerous, no box to put interrupter in order to electrical insulation
(Red River bridge, Bai Bang railway flyover bridge...).
4.12.4 Package A4
April
When we checked in site, we have found that many violations such as:
- Worker did not use safety labour and they usually did not use safety belt when they
work at height. Km96+700, Km97+124 Ngoi Lao bridge, Ngoi Van bridge Km109+025.
- Electric system was not safe: interrupter box was not safe, electric wire was laid under
wet mud. Km107+533, Km84+400 TL321C, Ngoi lao bridge, Ngoi Gianh bridge
Km88+600.
- No signpost was installed at intersection between local road and construction site.
Km96+700, Km107+533.
- Deep area was not installed safety tape. Km97+124 Ngoi Lao bridge.
The Contractor was requested to resolve all above violations in site.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
160
May
When we checked in site, we have found that many violations such as:
- Worker did not use safety labour and they usually did not use safety belt when they
work at height. Km96+700, Km97+124 Ngoi Lao bridge, Ngoi Van bridge Km109+025.
- Electric system was not safe: electric wire was laid on ground, mud, interrupter was
broken, electrical junction was very dangerous, no box to put interrupter in order to
electrical insulation…( TL321C,Ngoi Lao, Ngoi Gianh and QL32C bridges).
- The work’s camp at Km84+400 TL321C bridge, Km101+200 Box culvert must be
supply 02 rubbish bins, fire-extinguishers and first- aid kit.
- Oil tanks at Km107+200 (worker’s camp of Long Giang subcontractor),
Km93+200…must be keep in the store and on the concrete floor (not keep directly on
the ground).
The Contractor was requested to resolve all above violations in site before June 15th, 2012, at
that time if the issue is not resolved we will force to stop work at some places. Consultant’s
warning letter is ref.GET2-KEA-A4-638 dated May 4th, 2012 and GET2-KEA-A4-680 dated
June 1st, 2012.
June
Workers did not use PPEs such as safety hats, safety shoes, gloves, safety goggles… when
they worked in site (Ngoi Van bridge, Km100 + 010, Km88 + 400, Km97 + 787…).
Electric system was not safe: electric wire was laid on ground, mud, interrupter was broken,
electrical junction was very dangerous, no box to put interrupter in order to electrical insulation
(Ngoi Lao bridge, QL32C bridge, Km97+124...).
4.12.5 Package A5
April
Although the Contractor has mobilized the Safety Manager position to work on site, through
the inspection and supervision on site this month, the Consultant has still found that the safety
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
161
control of Contractor has not much been improved. At many construction locations, the safety
control of the Contractor has not been done well:
- Many workers do not use fully Personal Protection Equipment (helmet, safety shoes,
etc.) when they work on the site such as: RCPC factory No.1, RCPC factory No.2;
Batching Plant No.3, Ngoi Gua bridge; Ngoi Rao bridge; Van Phu bridge, etc.
- Safety fences and safety signboards: these safety elements have not been installed
fully at many construction sites (example such as: construction site of Ngoi Gua, QL37,
Van Phu bridges, etc.; access roads Km113, Km138, Km117-Km119, etc; other
construction sites such as Irrigation box culvert Km118+202, Underpass box culvert
Km118+224, Drainage pipe culvert Km118+060, Km118+860, etc; construction sites
intersecting with public roads Km123+860, Km145+220, Km148, etc) or these safety
elements are not meeting the Project’s requirements, not ensuring safety ( Ngoi Rao
bridge, Ngoi Thia bridge, etc.).
- Safety of public: at many construction sites, local peoples entering into construction
sites without any the Contractor’s control and supervision, this situation may cause
unwanted accidents inside project areas at any time.
- First aid base: this First aid base still has not been supplied by the Contractor as the
project’s requirements.
- Fire extinguishers: the Contractor has not provided fully these equipments at workers’
camps (such as: Km120+460, Ngoi Gua bridge, etc) or fuel store areas (such as Ngoi
Rao bridge, Ngoi Thia bridge, Ngoi Gua bridge, etc).
- The Contractor’s fuel control is not well performing (regarding to the Engineer’s letter
No.GET3-KEANGNAM-12-A5-215 dated 21st Mar, 2012).
For these reasons, the Engineer issue this official warning to Safety Manager of the
Contractor, who did not fulfill his responsibility in his position
The Engineer also reminded the Contractor that safety is a very important part in the process
of project implementation. Hence, the Contractor’s safety manager must take strong and
proper actions to make the site safe and prevent unsafe working practices or other
infringements on the safety plant or the statutory regulations.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
162
In addition, the Consultant has also required the Contractor to take strong actions to improve
the safety of the Project and to resolve these outstanding issues in order to ensure the safety
of the Project in the near future.
May
Through the inspection and supervision on site this month, the Consultant found that the safety
control of the Contractor has not been done well; some outstanding issues have occurred as
follows:
- Many workers still did not fully use PPE (such as safety helmets, safety shoes, seat
belts when working on high place...) when working on site. For example: Km111, bridge
Van Phu, Km123, Km148...
- The fences and warning signs: the safety elements have still not been fully installed at
the construction locations of the Contractor (such as bridge construction areas Ngoi
Gua, Ngoi Rao, Van Phu, Ngoi Thia... and the access roads Km114, Km118, Km119,
Km138, Km142 ... and the other construction locations such as irrigation and drainage
pipe, sewer, underpass culvert...) or the safety elements do not meet the requirements
of the Project, not safety (QL37 bridge, Km119...).
- The requirements and other reminders of the Consultant about the outstanding issues
in the safety works of the Contractor (Ref. GET3-KEANGNAM-12-A5-426) have been
still paid attention by the Contractor such as: safety for people, first aid stations, fire
fighting equipment, fuel management, safety sheet, safety meetings, safety documents,
Safety Inspection report sheet...
The Consultant has given the warnings to the Contractor on these issues (Ref. GET3-
KEANGNAM-12-A5-444 dated May 18, 2012 and GET3-KEANGNAM-12-A5-490 dated May
31, 2012). In addition, the Consultant has also required the Contractor to quickly apply the
appropriate measures to resolve the outstanding issues, ensuring the safety of the project.
June
This month, through the inspection and supervision on site, the Consultant found that the
safety control of the Contractor still had no improvement; some outstanding issues remained
unresolved, such as:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
163
- During working on site, many workers did not fully use PPE such as in Ngoi Gua
bridge, Ngoi Rao bridge, Van Phu bridge, Ngoi Thia bridge, Km111, km112. More
dangerous, some workers worked on high place but without PPE such as safety belt,
safety net such as at QL 37 bridge.
- The fences and warning signs: the safety factors have not fully been installed at the
construction locations of the Contractor or the safety factors do not meet the
requirements of the Project that is not sure safety.
- Safety for people: at many construction locations, people went freely through the
construction locations without any control and monitor by the Contractor; this can lead
to unexpected accidents at any time.
- The fuel management of the Contractor was still poor in areas such as fuel stations of
Ngoi Gua bridge, Ngoi Rao bridge, Van Phu bridge...
To ensure the safety of the Project, the Consultant has asked Contractor to improve safety
structure on site and resolve the outstanding issues. Also, the Consultant has proposed EPMU
to replace the Safety Manager in Ref. GET3-GET-A5-019 dated June 21, 2012.
4.12.6 Package A6
April
Through the inspection and supervision on site this month, the Consultant found that the
Contractor has continued to conduct other activities to improve the safety on sites:
- The safety fences and warning signs have been installed at some construction
locations such as Ngoi Hut bridge, Ngoi Rom bridge, Km165...
- The Contractor has arranged personnel to check the safety site and guide traffic at
some construction locations which intersect with the public roads: Km155+300, Km157,
Ngoi That bridge...
- The Contractor has conducted watering to minimize dust on the transportation roads
such as Km157, Km184, Km186, Km184...
- The Contractor has organized meetings about safety for workers and engineers.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
164
- The Contractor has installed safety slogans on the site (Km176, Lang Nhay bridge,
Ngoi Nhuoc bridge...) to warn workers about safety in the working process.
- Many workers have fully used Personal Protection Equipment during working on site.
- The Contractor has provided fire extinguishers in some fuel stations such as
Km186+200 and workers’ camps such as Km186+100, Km171...
However, this month, there are still some outstanding issues as follows:
- At Ngoi Chac bridge, the Contractor has not provided fire fighting equipments for the
workers' camps.
- At the construction locations such as Km182, Ngoi Hut bridge, Khe Chuong bridge...
the Consultant found that there were still people going into the site area without the
control and supervision of the Contractor.
- In the tunnel construction area, some workers were not equipped with Personal
Protection Equipment in the working process (mentioned in the letter of GET3-
- At stations Km161+100, Km155+300... the construction locations are close to public
roads. However, the Contractor has not fully installed safety fences and warning signs.
- At station Km171, Km174, Km167... the Contractor has not yet fully installed safety
fences and warning signs on the access roads.
The Consultant has reminded the Contractor on the outstanding issues. Also, the Consultant
has required the Contractor to rapid adopt measures to address thoroughly the outstanding
issues, ensuring the safety of the Project.
Also, in the site inspections, the Consultant has usually required the Contractor to strictly
comply with the Method Statement and the Safety Control Plan of the Project to prevent
unexpected accidents during implementing the Project.
May
Through the inspection and supervision on site this month, the Consultant found that the
Contractor has continued to implement activities to control safety on site as follow:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
165
- Installation of safety fences and warning signs on the access roads Km184, Km165,
Ngoi Hut bridge, Ngoi Giam bridge...
- Arranging staff for regular safety inspection on site for timely remind of the problems.
- Installation of warning signs at the construction locations which intersect with the public
roads such as Km156, Km184...
- Spraying water to minimize dust in areas such as Km157, Km165, Km184, Km186...
- The workers were more aware of using of PPE when working on site.
- Fire extinguishers and first aid kits for a number of workers camps such as
Km186+200, Km171... have been provided.
However, this month, there are still some outstanding issues as follows:
- The first aid kits have not been fully provided in the workers’ camps such as Lang Nau
bridge, Lang Nhay bridge, Ngoi Giam bridge...
- At some construction locations, people still went into the site area without any
supervision and control of the Contractor.
- In the tunnel construction area, some workers were not equipped with PPE in the work
process (Ref. GET3-DOOSAN-12-A6-430).
- The safety fences and warning signs have not fully been installed at some construction
locations near the public road such as Km151, Km161, Km188...
- The safety fences have been damaged or not fully provided on the access roads such
as Km161, Km171, Km172...
The Consultant has reminded the Contractor on the outstanding issues. The Consultant has
also required the Contractor to rapidly adopt measures to address thoroughly the outstanding
issues, ensuring the safety of the Project (Ref. GET-DOOSAN-12-A6-467 dated May 9, 2012
and GET3-DOOSAN-12-A6-546 dated May 31, 2012).
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
166
Also, in the site inspections, the Consultant has usually required the Contractor to strictly
comply with the Method Statement and the Safety Control Plan of the Project to prevent
unexpected accidents during the project’s implementation process.
June
This month, through inspection and monitoring safety implementation on site, Consultant found
that the Contractor continued to apply and implement activities to control and ensure safety on
construction sites:
- Installation of safety fences and warning signs at dangerous areas such as foudation
pit of Lang Lau bridge, Lang Nhay bridge, Khe Chuong bridge, the access roads in
Km165, Km184, construction locations near public roads as Km182, Km165...
- Assignment of daily safety inspection personnel on site to promptly remind issues
which were not safe.
- The water irrigation to minimize dust in areas Km156, Km157, Km184, Km186...
- Many workers used protective gear.
- The fire extinguishers and first aid kit were equipped in the fuel station and regional
camps as Km186, Km171, Km165...
In addition, the Contractor also conducted daily exercise guide for engineers to improve their
health at Doosan office.
However, through supervision on site, Consultant found that there were some outstanding
issues as follows:
- In the area of Lang Lau bridge, Lang Nhay bridge, Ngoi Giam bridge... the Contractor
has not provided a full range of equipment such as fire extinguishers, first aid kit for
workers’ camps.
- Residental people still went to the construction area without Contractor’s control and
supervision as at Km176, Km182, Km184...
- There were till some workers who did not make full use of labor protective gear when
working on site as at Km184, tunnel construction area Km186 +200, km186+720...
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
167
- Safety fences and warning signs have not been fully installed in some of the access
roads sector as Km165, Km167, Km171, Km184, Km189...
- The fuel management was not guaranteed, there were some fuel tanks placed directly
on the ground as at Km155 +200, +200 km186, Km171...
To ensure safety of the Project, Consultant asked the Contractor to adequately address these
outstanding issues. In the on-site inspection, consultant also frequently asked the Contractor to
comply with Method Statement and safety control plan of the Project seriously to prevent
unexpected accidents during Project implementation.
4.12.7 Package A7
April
On 6-April 2012 at construction works of Xom Cam Bridge Km214+678. Workers did not wear
helmet and shoes when working on site.
On 24 April 2012 at construction works of Xom Danh Bridge Km198+400. Workers did not
wear helmet and shoes when working on site.
The consultant had reminded the contractor about this problem in the letter No: Fef. GET4-
GRBCC-613 and required the contractor to provided labour safety for all workers working on
site. In addition, remind the main contractor to inspection the subcontractor about the safety on
site.
May
On 16-May 2012 at construction works of Xom Danh Bridge Km198+400 and Tan Tien Bridge
Km209+329. Workers did not wear welder’s goggles.
The consultant had reminded the contractor about this problem in the letter No: Fef. GET4-
GRBCC-650 and required the contractor to provided labour safety for all workers working on
site. In addition, remind the main contractor to inspection the subcontractor about the safety on
site.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
168
June
At construction works of Tan Tien Bridge Km209+329 date 29-June 2012. Workers did not
wear welder’s goggles and safety belt during time working at high position.
The consultant had reminded the contractor about this problem and required the contractor to
provided labour safety for all workers working on site. In addition, remind the main contractor
to inspection the subcontractor about the safety on site.
4.12.8 Package A8
April
On April 2012 at construction works of Suoi Trat Bridge Km231+889; Lang Tra Bridge
Km220+993; IC17 Bridge Km233+540; Underpass culvert Km237+951; IC18 Bridge
Km244+570; Ngoi Bo Bridge Km238+265; Box culvert Km223+075 and Km233+540 workers
did not wear enough labour safety when working on site as clothes, shoes, safety belt and
helmet.
The consultant had reminded the contractor about this problem at letter No: Ref. GET4-
Vinaconex- 534 and required the contractor to provided labour safety for all workers working
on site. In addition, remind the main contractor to inspection the subcontractor about the
workers labour safety on site.
May
On May 2012 at construction works Km233+540; Km224+369 workers did not wear enough
labour safety when working on site as clothes, shoes, safety belt and helmet.
The consultant had reminded the contractor about this problem at letter No: Ref. GET4-
Vinaconex- 549 and required the contractor to provided labour safety for all workers working
on site. In addition, remind the main contractor to inspection the subcontractor about the
workers labour safety on site.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
169
June
In June 2012 at construction works Km231+889; Km233+540; Km227+290; Km220+794;
Km224+869 workers did not wear enough labour safety when working on site as clothes,
shoes, safety belt and helmet.
The consultant had reminded the contractor about this problem and required the contractor to
provided labour safety for all workers working on site. In addition, remind the main contractor
to inspection the subcontractor about the workers labour safety on site.
4.13 TRAFFIC CONDITIONS AND SIGNPOSTING IN ROADS
4.13.1 Package A1
April
By observations during this month we still found that the dirt is being tracked onto public roads
where the construction sites intersect them. The Contractor also doesn’t clean these areas to
keep them in cleanliness and sanitary condition; this issue causes dirtiness and high spread of
airborne dust in the hot windy days and difficulty for travelers.
At Trung Kien Bridge, in the site inspections we still didn’t see any improvement. Still there is
no signboard and lighting systems installed at this area and the public road deteriorated. The
Contractor still has not solved this issue despite the requirements of the Engineer.
At Tan Loi Bridge and section Km 0+665 we also didn’t see any change. At Tan Loi Bridge, the
Contractor complains about obstruction of local people that causes him to cannot install the
signboard, lighting systems and security fence here.
May
The status of tracking of dirt onto public roads has not been improved. The dirt is still tracked
onto public road and caused dirtiness on publica reas and difficulty for road users. The PSC
has many times requested the Contractor to solve this problem by constructing entrance and
exist tire wash and clean these areas but till now there is no improvement recorded.
At interseptions of construction sites and public roads such as Km 0+665, Trung Kien Bridge,
Tan Loi Bridge we found that the Contractor still has not installed signboard system to warn the
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
170
travelers of construction site ahead. We have requested the Contractor to install enough
signboard and lighting systems in these areas, however the Contractor has not taken any
action to implement requirement of us.
At Ba Thien Bridge, the security fence broken and this can endanger the travelers. The
Contractor promised that he will reinforce and repair this fence by June 15.
June
The status of tracking of dirt onto public roads has not been improved. The dirt is still tracked
onto public road and caused dirtiness on publica reas and difficulty for road users. The PSC
has many times requested the Contractor to solve this problem by constructing entrance and
exist tire wash and clean these areas but till now there is no improvement recorded.
At interseptions of construction sites and public roads such as Km 0+665, Trung Kien Bridge,
Tan Loi Bridge we found that the Contractor still has not installed signboard system to warn the
travelers of construction site ahead. We have requested the Contractor to install enough
signboard and lighting systems in these areas, however the Contractor has not taken any
action to implement requirement of us.
At Ba Thien Bridge, the security fence broken and this can endanger the travelers. The
Contractor promised that he will reinforce and repair this fence by June 15.
4.13.2 Package A2
April
In the site inspections we still perceived that the dirt is being tracked onto public roads where
the construction sites intersect them. The Contractor also doesn’t clean these areas to keep
them in cleanliness and sanitary condition; this issue causes dirtiness, difficulty for travelers
and high spread of airborne dust in hot windy days.
At Xuan Quang Bridge, in the site inspection on Mar 28 we found that there was no
improvement. The broken fence has not been repaired and the local children access the
dangerous area without prevention of security guard. We have strongly requested the
Contractor to immediately solve this matter to ensure the safety for local people, especially for
children. On April 04, we still didn’t any change here. The PSC already issue a warning letter
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
171
to request the Contractor solve this matter and in the site inspection on April 11, we perceived
that the Contractor had already reinstalled the fence surrounding this area.
At other sections such as Muong Noi Bridge, Km 36+500, Km 39+200 we still didn’t see the
Contractor to install the signboard as our requirements.
May
The status of tracking of dirt onto public road has not been mitigated. This matter caused dirtiness and high spread of airborne dust and difficulty for road users, especially in hot windy days. At sections of embankment, the Contractor also didn’t water the surface in dry days and this caused high spread of dust, too. The PSC many times requested the Contractor to solve these problems but up to now, there is no improvement recorded.
At Muong Noi Bridge, the Contractor still has not installed the fence and signboard system to ensure the security on site as well as to warn the travelers of construction site. The PSC has requested the Contractor to urgently solve the problem of topography to install enough signboard and lighting systems and security fence in this area but up to the day, the Contractor has not implement our requirements.
June
The status of tracking of dirt onto public road has not been mitigated. This matter caused dirtiness and high spread of airborne dust and difficulty for road users, especially in hot windy days. At sections of embankment, the Contractor also didn’t water the surface in dry days and this caused high spread of dust, too. The PSC many times requested the Contractor to solve these problems but up to now, there is no improvement recorded.
At Muong Noi Bridge, the Contractor still has not installed the fence and signboard system to ensure the security on site as well as to warn the travelers of construction site. The PSC has requested the Contractor to urgently solve the problem of topography to install enough signboard and lighting systems and security fence in this area but up to the day, the Contractor has not implement our requirements.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
172
4.13.3 Package A3
April
The existing roads were broken by construction activities at Km62+300, Km75+400 (box
culvert). It’s full of mud and has many big holes, very difficult for local traffic. The local people
complained that there were some accidents on rainy day at Km75+400 because surface of this
existing road was too bad. The Contractor does not pay attention to repair broken existing road
which was impacted by construction activities after construction process. But at location
Km75+400 the Contractor still delay.
At all intersections between local road and construction site of our project were not set up
safety signpost or traffic signal to notice for inhabitant, ex: Km60+200, Km62, Km68,
Km75+400, Km66+947… The Contractor was requested to install signpost at these location to
ensure safety traffic. But they delay to resolve this problem.
May
The existing road was broken by construction activities at Km75+400 (box culvert). It’s full of
mud and has many big holes, very difficult for local traffic. The local people complained that
there were some accidents on rainy day at Km75+400 because surface of this existing road
was too bad. The Contractor does not pay attention to repair broken existing road which was
impacted by construction activities after construction process. Consultant warned many times
but Contractor still delay. Deadline is June 15th, 2012.
The Consultant’s letter was ref. GET2-POS-A3-1285 dated June 1st, 2012.
June
The existing roads were broken by construction activities at Km62+300, Km75+400 (box
culvert). It’s full of mud and has many big holes, very difficult for local traffic. The local people
complained that there were some accidents on rainy day at Km75+400 because surface of this
existing road was too bad. The Contractor does not pay attention to repair broken existing road
which was impacted by construction activities after construction process. But at location
Km75+400 the Contractor still delay.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
173
4.13.4 Package A4
April
At all intersection between local road or national highway and project, the contractor did not set
up signpost to ensure safety for everyone there (Km107+533, Km97+124, Km93,
Km105+400…). And in these locations, dust was distributed much in the air so traffic condition
was very bad. The Consultant requested the Contractor must set up safety signpost, protected
fence, spreading water appropriately at these locations.
The Consultant’s letter was ref. GET2-KEA-A4-5630 dated April 24th, 2012.
May
At all intersection between local road or national highway and project, the contractor did not set
up signpost to ensure safety for everyone there (Km107+533, Km97+124, Km93,
Km105+400…). And in these locations, dust was distributed much in the air so traffic condition
was very bad.
From 12th May 2012, Contractor brought some signpost to sites but after that they picked up it
back their office. The Consultant requested the Contractor must set up safety signpost,
protected fence, spreading water appropriately at these locations.
Special at Nui Voi place, it’s very dangerous when construction activities will be carried out
because it is a high mountain and it lay beside existing road, Contractor was force to stop
working now and requested to submit safety method statement. Consultant requested
Contractor must set up barrier, signpost here to ensure safety for local traffic here.
June
At all intersection between local road or national highway and project, the contractor did not set
up signpost to ensure safety for everyone there (Km107+533, Km97+124, Km93,
Km105+400…). And in these locations, dust was distributed much in the air so traffic condition
was very bad.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
174
4.13.5 Package A5
April
This month, through the inspection and supervision on site, the Consultant found that the
construction activities have not affected much the traffic conditions of the area. However, there
are still some outstanding issues as follows:
- The safety warnings signs and safety fences have not been fully installed at the
construction locations intersecting with the public roads, such as: Km122, Km112,
Km123, Km145, Ngoi Rao bridge...
- In some rainy days, the access roads of the Contractor were often badly damaged such
as at Km119, Km115.. which created traffic jams.
- At Km119, Ngoi Rao bridge, Km123... the construction and transportation activities of
the Contractor have affected the quality of public roads, which made it difficult for the
traffic in these area.
- The Contractor has not arranged personnel to guide traffic and control safety at the
construction locations near public roads or intersections with public roads, such as Ngoi
Rao bridge, Ngoi Thu bridge...
To ensure the traffic and safety of the Project, the Consultant has reminded the Contractor on
these outstanding issues ( Ref. GET3-KEANGNAM-12-A5-361 dated 24 April, 2012). The
Consultant has also required the Contractor to comply with the Method Statement and the
Safety Control Plan of the Project during construction process.
This month, the Consultant has also issued instructions for the Contractor to build the access
roads cross streams consistently and to ensure safety and environment of the area (Ref.
GET3-KEANGNAM-12-A5-282 dated 11 April, 2012).
May
Through the inspection and supervision on site, the Consultant found that there are some
outstanding issues as follows:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
175
- At some construction locations which intersect with public roads such as Km123+680,
Km145+220, Km112+200, Km148, Ngoi Rao bridge,... the safety fences and warning
signs have not been fully installed. In addition, the Contractor has not arranged any
personnel to guide and control the traffic safety in these locations.
- On several rainy days, the access roads of the Contractor were badly damaged,
especially those across the streams areas such as Ngoi Gua bridge, Ngoi Rao, .... this
has affected the regional traffic.
- The construction activities of the Contractor has affected the quality of public roads in
the areas such as QL37 bridge, Hop Minh My bridge, Ngoi Rao bridge, ...
To ensure traffic and safety of the Project, in the site inspections, the Consultant has asked the
Contractor to resolve these outstanding issues. Besides, the Consultant has also required the
Contractor to comply with the the Method Statement, the Safety and Traffic Plan to ensure the
project’s traffic during construction.
June
This month, through the inspection and supervision on site, the Consultant found that there are
still some outstanding issues which have not been resolved as follows:
- The safety fences and warning signs have not been fully installed at the construction
locations near public roads such as Km148, Km 124, or the construction locations
intersecting with public roads such as QL37 bridge, Ngoi Rao bridge, Km112... The
Contractor has also not arranged any personnel to guide traffic and control safety in
these locations.
- The access roads of the Contractor were badly damaged on some rainy days such as
at Ngoi bridge, Ngoi Rao bridge, Ngoi Gua bridge... This has affected the Project's
traffic. However, the Contractor has not fixed them.
- The quality of public roads in the areas Km148, Hop Minh My bridge, Ngoi Rao
bridge... was affected by the construction activities and materials transportation of the
Contractor, but the Contractor failed to repair the damages. This has affected the traffic
areas.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
176
To ensure the traffic of the region and of the project, the Consultant has asked the Contractor
to resolve these outstanding issues. Also, in the site inspections, the Consultant has frequently
asked the Contractor to seriously comply with the Method Statement and the Traffic Ensuring
and Maintenance Plan during construction process to prevent adverse impacts on traffic.
4.13.6 Package A6
April
Through the inspection and supervision on site this month, the Contractor has continued to
repair the public roads which were affected by the construction activities and transportation of
materials such as Km175 , Km176, Km190, ... In addition, the Contractor has built access
roads across the stream such as at Km173, Km187, Km156, ... to maintain the project’s traffic.
However, there are still some outstanding issues as follows:
- The access roads of the stream at the bridge area Ngoi That (Km155+971) was
severely damaged in a number of rainy days to a month; this made the traffic can not
flow through this location (Ref. GET3-DOOSAN-12-A6-360 dated 10 April, 2012). The
Consultant has requested the Contractor to resolve these outstanding issues to ensure
the Project's traffic.
- At station Km151-Km152, there was much soil dropped on the public roads during the
transportation of construction materials of the Contractor.
- The station Km160+500 - Km160+800 intersects with the provincial road, but the safety
fences and warning signs of the Contractor have not been fully installed there.
To ensure traffic of the project and the region, the Consultant has reminded the Contractor on
the outstanding issues. The Consultant has also urgently required the Contractor to fully install
signs at the construction locations, especially those intersect with public roads to ensure the
safety of the Project during construction process.
May
This month, through the inspection and supervision on site, the Consultant found that the
Contractor has still continued to repair roads damaged by transportation and construction
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
177
activities such as at Km184, Km176... to maintain the traffic of the region and the project.
However, there are still some outstanding issues as follows:
- At stations Km151+300, Km160+600, Km174, Km172... the quality of public roads have
been affected by the construction activities and materials transportation of the
Contractor; this has made it difficult for vehicles driving through these areas.
- The warning signs and safety fences have not been fully installed at several
construction location intersecting with public roads, such as: Km160+500 -
Km160+800, Km151, Km184, Km165+350, Km176+ 860...
- Much soil dropped on the public roads during construction and materials transportation
of the Contractor such as at Km151 - Km152, Km154, Km165... when the vehicles
driving through these areas, dust was created, especially in hot and windy days.
To ensure traffic of the project and the region, the Consultant has requested the Contractor to
resolve these outstanding issues. Besides, the Consultant has also urgently required the
Contractor to fully installed signs at the construction locations, especially those intersecting
with public roads to ensure the safety of the project during construction process.
June
Through the inspection and supervision on site this month, Consultant found that the
Contractor continued to implement activities to ensure traffic of the Project as well as maintain
good traffic conditions in the region.
- Installation of warning signs and safety fences at the construction sites which were
close to public roads as Km155, Km184, Km165...
- Fix public roads damaged by construction activities and transportation, such as in
Km188, Km165...
- Water irrigation to minimize dust generated during transportation of materials on the
road as in Km156, Km157, Km184, Km186...
However, there were still some outstanding issues in the month as follows:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
178
- In areas of Km151 +300, Km160, Km161, Km174, Km155 +200... the process of
construction and materials transportation made soil up of public roads, which affected
the quality of public roads as well as created dust when vehicles ran through the area.
However, the Contractor has not adequately addressed these outstanding issues.
- The safety fences and warning signs have not been fully installed at the constructions
site which were near a public street as Km159, Km161, Km174... or the construction
locations which intersected with public roads as Km188, Km165...
To ensure the region's traffic and the Project, the Consultant asked the Contractor to resolve
these outstanding issues. In the on-site inspection, the Consultant also frequently asked the
Contractor to comply with Method Statement and traffic control plan of the Project seriously
during construction to prevent adverse impacts on traffic as well as the Project.
4.13.7 Package A7
April
On during April the contractor is transporting the material from Khe Lech quarry to construction
site, which can cause dust and corrupt on exist road. Hence, Engineer had reminded the
contractor in the letter No: Ref. GET4- GRBCC-613 and required to follow this letter content.
In addition at A1 Abutment of Xom Danh Bridge the exist road through this location very
dangerous because the mud and slip nearly deep hole. The consultant has required the
contractor to overcome by letter No: Ref. GET4-GRBCC-621, however, to 24-April the
contractor only repairs the exits road but not install the safety fence and signpost.
May
On during May the contractor is transporting the material from Khe Lech quarry to construction
site, which can cause dust and corrupt on exist road. Hence, Engineer had reminded the
contractor in the letter No: Ref. GET4- GRBCC-650 and required to follow this letter content.
In addition at A1 Abutment of Xom Danh Bridge the exits road through this location very
dangerous because the mud and slip nearly deep hole. The consultant has required the
contractor to overcome by letter No: Ref. GET4-GRBCC-650.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
179
June
During June, the contractor is transporting the material from Khe Lech quarry to construction
site, which can cause dust and corrupt on exist road. Hence, Engineer had reminded the
contractor to consequences watering and repair if any broken.
In addition at A1 Abutment of Xom Danh Bridge the exits road through this location very
dangerous because the mud and slip nearly deep hole. The consultant has required the
contractor to overcome but so far the contractor did not overcome.
4.13.8 Package A8
April
On 13 and 20- April 2012, no signpost danger and safety barrier at construction work near
citizen road at Underpass box culvert Km220+794 and Underpass box culvert Km237+951.
The consultant has required the contractor Cleary delineate the construction site, install
barricades/fence as appropriate, provide warning signs and assign personnel to ensure that
the public are prohibited from entering the construction sites, especially in areas where are
safety hazards. However, during April 2012, the contractor did not overcome according to
consultant introduction.
May
On 16- May 2012, no signpost danger and safety barrier at construction work near citizen road
at Underpass box culvert Km244+155; Km220+794. The consultant has required the
contractor Cleary delineate the construction site, install barricades/fence as appropriate,
provide warning signs and assign personnel to ensure that the public are prohibited from
entering the construction sites, especially in areas where are safety hazards. However, during
May 2012, the contractor did not overcome according to consultant introduction.
June
On 6, 14, 21- June 2012, no signpost danger and safety barrier at construction work near
citizen road at Underpass box culvert Km220+794; Km244+155; Km237+951. The consultant
has required the contractor Cleary delineate the construction site, install barricades/fence as
appropriate, provide warning signs and assign personnel to ensure that the public are
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
180
prohibited from entering the construction sites, especially in areas where are safety hazards.
However, during June 2012, the contractor did not overcome according to consultant
introduction.
4.14 SIGNPOSTING IN DANGEROUS SURFACES
4.14.1 Package A1
April
During the site inspections this month, we did not see the serious problems happened on the
construction sites. However, the PSC still recommended the Contractor to pay attention to this
issue and immediately install the signboard and fence system surrounding dangerous area to
prevent accident happening.
May
We did not see the serious problems happened on the construction sites by observation during
this month. However, we recommended the Contractor to pay attention to this issue and
immediately install the signboard and fence system surrounding dangerous area, if any, to
prevent accident happening.
June
We did not see the serious problems happened on the construction sites by observation during
this month. However, we recommended the Contractor to pay attention to this issue and
immediately install the signboard and fence system surrounding dangerous area, if any, to
prevent accident happening.
4.14.2 Package A2
April
As mentioned in item “4.14 Traffic conditions and signposting in roads” we found that there
was no improvement at Xuan Quang Bridge. The broken fence has not been repaired and the
local children access the dangerous area without prevention of security guard. We have
strongly requested the Contractor to immediately solve this matter to ensure the safety for local
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
181
people, especially for children. On April 04, we still didn’t any change here. The PSC already
issue a warning letter to request the Contractor solve this matter and in the site inspection on
April 11, we perceived that the Contractor had already reinstalled the fence surrounding this
area.
At Pier 1 of Lo River Bridge, after handing-over the land, there are some deep wells on the site
without cover or backfilling. There was also no warning signboard of this issue in this area. The
PSC has requested the Contractor to immediately cover or backfill all these well to prevent
accident happen due to someone could be fallen into. On April 26, our site inspection reported
that the Contractor has backfilled and covered all these wells. We will recheck this area in the
site inspection on May 04, 2012.
May
In the site inspection on May 22, we found that the Contractor let the children enter the site for playing. The PSC has immediately requested the Contractor to solve this matter as well as install the fence and signboard system to prevent entering of unauthorized person to the construction site, especially the children. We will recheck this area in the next site inspection on May 30, 2012.
At other sections, we didn’t found the serious problem during the site inspection; however, we recommended the Contractor to pay attention to this issue and immediately install the signboard and fence system surrounding dangerous area, if any, to prevent accident happening.
June
In the site inspection on May 22, we found that the Contractor let the children enter the site for playing. The PSC has immediately requested the Contractor to solve this matter as well as install the fence and signboard system to prevent entering of unauthorized person to the construction site, especially the children. We will recheck this area in the next site inspection on May 30, 2012.
At other sections, we didn’t found the serious problem during the site inspection; however, we recommended the Contractor to pay attention to this issue and immediately install the signboard and fence system surrounding dangerous area, if any, to prevent accident happening.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
182
4.14.3 Package A3
April
Almost dangerous place in site was stretched of safety tape around by Contractor such as
deep areas, a pit foundation at Red river bridge, Phong Chau bridge…
Beside, some construction sites which are near by residential area was set up protective fence
construction and unallowed for local people freely entry and protected construction site but the
Contractor still did not set up signpost to ensure safety such as TL323B Km51+100,
Km66+900, Km59+020….
May and June
Almost dangerous place in site was stretched of safety tape around by Contractor such as
deep areas, a pit foundation at Red river bridge, Phong Chau bridge…
Beside, some construction sites which are near by residential area was set up protective fence
construction and unallowed for local people freely entry and protected construction site but the
Contractor still did not set up signpost to ensure safety such as TL323B Km51+100,
Km66+900, Km59+020...
4.14.4 Package A4
April
In April, when inspection in site we have found that have some deep and dangerous areas
were not set up safety tape and put warning signpost to ensure safety.
At some construction sites which are near by residential area was not set up protective fence
construction and prevent local people freely entry and protected construction site at QL32C
bypass, Km106+600…
May and June
At some construction sites which are near by residential area was not set up protective fence
construction and prevent local people freely entry and protected construction site at QL32C
bypass, Km106+600…
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
183
Nui Voi place, it’s very dangerous when construction activities will be carried out because it is
a high mountain and it lay beside existing road. Now it was force to stop working. But when
Contractor work here, we request them must set up barrier, signpost here to ensure safety for
local traffic.
4.14.5 Package A5
April
Through the inspection and supervision on site, the Consultant found that there are some
outstanding issues as follows:
- The safety fences and warning signs have not been fully installed at the construction
locations of the Contractor (such as Ngoi Gua brigde, QL37 bridge, Van Phu brigde....;
the access roads Km113, Km138, Km117-Km119...; other locations such as
construction of irrigations at Km118+202, Km118+224 underpass box culvert, and
drainage pipes Km118+060, Km118+860...; construction locations intersects with
public roads Km123+860, Km145+220, Km148...).
- Safety fences and warning signs have been damaged severely in some areas such as
Km112, Km114, Km138... However, the Contractor has not repaired these safety
elements yet.
- Safety fences and warning signs have been installed in some areas by the Contractor
such as Ngoi Rao bridge, Ngoi Thia bridge... these safety elements do not meet the
requirements of the Project and not guarantee safety.
The Consultant has reminded the Contractor on these outstanding issues in Ref. GET3-
KEANGNAM-12-A5-282 dated 11 April, 2012 and GET3 GET3-KEANGNAM-12-A5-324 dated
14 April, 2012. The Consultant has also required the Contractor to quickly complete the
installation of warning signs in dangerous surfaces to alert personnel in the process of working
as well as people driving near the Project’s area to prevent unfortunate accidents.
May
This month, through the inspection and supervision on site, the Consultant found that the
fences and warning signs have not been fully installed at the construction locations of the
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
184
Contractor (such as Ngoi Gua bridge, Ngoi Rao brigde, Van Phu Bridge, Ngoi Thia bridge ...
access roads Km114, Km118, Km119, Km138, Km142... and other construction locations such
as irrigation pipe, drainage pipe, underpass culvert, ...) or the safety elements do not meet the
requirements of the Project, not safety (QL37 bridge, Km119...).
Besides, at the fuel stations of the Contractor such as Ngoi Gua bridge, Ngoi Rao bridge, Van
Phu bridge, Ngoi Thia bridge...., the Contractor has not fully installed warning signs.
The Consultant has warned the Contractor on these issues in Ref.GET3-KEANGNAM-12-A5-
409 dated May 09, 2012 and GET3-KEANGNAM-12-A5-490 dated May 31, 2012/ The
Consultant has also urgently required the Contractor are to improve the safety structures on
site and fully install safety fences, warning signs, barriers, signposts indicating dangerous
areas, especially the contractor's excavation area. Beside, the Consultant has required the
Contractor to regularly repair safety fences, safety warning sings damaged to ensure adequate
warning signals at all times.
June
Through the inspection and supervision on site this month, the Consultant found that the safety
control of the Contractor on site has still not been conducted well; At many locations, signs and
safety fences have still not been fully installed or:
- At the bridge areas Ngoi Gua bridge, Ngoi Rao brigde, Van Phu bridge, Ngoi Thia
bridge... the Contractor has not fully installed signs at the fuel stations.
- The safety fences have not fully been installed in access roads areas such as Km114,
Km115, Km117, Km118, Km119, the bridge construction locations such as Ngoi Gua
bridge, Ngoi Rao bridge, and other locations such as irrigation, drainage, underpass
culvert...
- The safety fences and signs did not meet the requirements of the Project or have been
damaged severely in the bridges area QL37, Van Phu, Ngoi Rao, Ngoi Thia...
However, the Contractor has failed to repair and improve the safety factors.
To ensure the safety of the Project, the Consultant has reminded the Contractor on the issues.
Also, the Consultant has urgently required the Contractor to fully install signs at dangerous
surfaces as well as carry out repairs the safety fences and warning signs damaged.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
185
Besides, in the site inspections, the Consultant has frequently required the Contractor to
strictly comply with the Method Statement and Safety Control Plan of the project to prevent
unexpected accidents during the project’s implementation process.
4.14.6 Package A6
April
This month, the Contractor has continued to implement the installation of safety fences in
hazardous surfaces as well as repair fences and warning signs damaged in areas such as:
Ngoi Nhuoc bridge, Lang Nhay bridge, Ngoi Hut bridge, tunnel construction site... Besides, the
Contractor has also arranged personnel to ensure the traffic and safety on site in areas such
as Ngoi That bridge, tunnel construction area...
However, there are still some outstanding issues as follows:
- The stations Km161+100, Km155+300... are close to public roads. However, the
Contractor has not fully installed safety fences and warning signs.
- At stations Km171, Km174, Km167... the Contractor has not yet fully installed safety
fences and warning signs on the access roads.
To ensure the safety of the Project, the Consultant has reminded the Contractor on these
issues. In addition, the Consultant has urgently required the Contractor to fully install signs in
dangerous surfaces as well as carry out repairing the safety fences and safety warning signs
damaged.
Besides, in the weekly site inspections, the Consultant has regularly required the Contractor to
comply with the Method Statement as well as the Safety Plan of the Project during construction
process.
May
Through the inspection and supervision on site this month, the Consultant found that some
construction locations of the Contractor have been installed safety fences and warning signs
such as Km155+300, Khe Chuong bridge, Ngoi That bridge, Ngoi Hut bridge... In addition, the
Contractor has also arranged staff to regularly inspect the safety and traffic at the construction
locations. However, there are still some outstanding issues as follows:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
186
- The warning signs and safety fences have not been fully installed at the construction
locations intersecting with public roads, such as: Km160+500 - Km160+800, Km151,
Km184, Km165+350, Km176+860...
- The safety fences have been damaged or not fully provided in the access roads such
as Km161, Km171, Km172...
- The Contractor has not fully installed warning signs and safety fences in areas such as
fuel stations Km171, Km155+300...
To ensure the safety of the Project, the Consultant has reminded the Contractor on these
issues. Also, the Consultant has urgently required the Contractor to fully installf signs in
dangerous surfaces as well as to carry out repairing safety fences and the safety warning
signs damaged.
June
This month, through the inspection and supervision on site, Consultant found that the
Contractor continued the installation of safety fences, warning signs in hazardous surfaces
such as bridge construction locations: Khe Chuong bridge, Ngoi That, Ngoi Don bridge, Dai
Viet bridge, construction locations which intersected with public roads as Km155 +200, Km165,
Km184, access roads in Km156, Km186...
In addition, the Contractor assigned the safety personnel check on the construction site every
day to remind unsafe conditions.
However, there were still some outstanding issues as follows:
- At the construction site which intersected with public roads, such as: Km160 +500 -
Km160+800, Km151, Km184, Km165 +350, Km176+860... warning signs and safety
fences have not been fully installed.
- Many fences were damaged and unsafe but has not been repaired in the access roads
in Km171, Km172, Km155... Ngoi Hut bridge, Ngoi Rom bridge.
To ensure the safety of the Project, Consultant prompted the Contractor on unsafe issues, at
the same time, Consultant required the Contractor urgently install signs in dangerous areas as
well as repair damaged safety fences and warning signs.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
187
To ensure safety of the Project, Consultant asked the Contractor adequately addressed these
outstanding issues. In the on-site inspection, consultant also frequently asked the Contractor to
comply with Method Statement and safety control plan of the Project seriously to prevent
unexpected accidents during Project implementation.
4.14.7 Package A7
April
On April 2012, some location as: Xom Danh Bridge Km198+400, Tan Thuong Bridge
Km199+860 and Ram AII Bridge Km199+050 the safety barrier and danger signpost has
installed, but almost them are not meet standard, so consultant has required the contractor to
repair all this safety barrier and signpost of this location according to regulation.
May
During the May 2012, some location as: Xom Danh Bridge Km198+400, Khe Hong Bridge
Km193+379 and Ram AII Bridge Km199+050 the safety barrier and danger signpost has
installed, but almost them are not meet standard, so consultant has required the contractor to
repair all this safety barrier and signpost of this location according to regulation.
June
During the June 2012, some location as: Xom Danh Bridge Km198+400, Khe Hong Bridge
Km193+379 and Ram AII Bridge Km199+050 the safety barrier and danger signpost has
installed, but almost them are not meet standard, so consultant has required the contractor to
repair all this safety barrier and signpost of this location according to regulation.
4.14.8 Package A8
April
On April 2012 at construction works at Box culvert Km222+487; Lang Tra Bridge Km220+993
these are not the signpost and barrier at construction works, required the contractor to install
signpost and barrier at construction works, to prevent the citizen come construction.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
188
May
On 16- May 2012 at construction works of Underpass box culvert Km244+155; Km220+794,
Girder casting yard ò Suoi Nhu Bridge Km218+040, Suoi Trat Bridge Km231+889 these are
not the signpost and barrier at construction works, required the contractor to install signpost
and barrier at construction works, to prevent the citizen come construction.
June
On 6, 14, 21- June 2012 at construction works of Underpass box culvert Km220+794;
Km244+155; Km237+951, Girder casting yard of Suoi Nhu Bridge Km218+040, Suoi Trat
Bridge Km231+889 these are not the signpost and barrier at construction works, required the
contractor to install signpost and barrier at construction works, to prevent the citizen come
construction.
4.15 ACCIDENTS DUE TO THE LACK OF SAFETY MEASURES. RESPONSIBLES
4.15.1 Package A1
April, May and June
There were no accidents recorded on sites during these months.
4.15.2 Package A2
April
A fatal accident was recorded at Lo River Bridge on Sunday morning, out of working time, in
April 22, 2012. The worker did not use life-jacket while he was on water body and he fell into
the river. The PSC has requested the Contractor to investigate the accident and submit the
report. With the information provided by the Contractor, the Engineer has prepared a specific
report, which is included in this Quarterly Report as Annex 3.
May and June
There were no accidents recorded on sites during these months.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
189
4.15.3 Package A3
April, May and June
During these months, the Consultant did not receive any report regarding accidents due to lack
of safety measures in Package A3.
During May, the Contractor has continued to implement safety control activities on site to
ensure the safety in the construction process.
4.15.4 Package A4
April, May and June
During these months, the Consultant did not receive any report regarding accidents due to lack
of safety measures in Package A4.
4.15.5 Package A5
April
This month, through the inspection and supervision on site, the Consultant found that in the
package A5 did not have any serious accident due to lack of safety measures.
However, to ensure the safety of the Project as well as to prevent unfortunate accidents, in the
weekly site inspections, the Consultant has frequently required the Contractor to comply with
the Method Statement and the Safety Plan of the Project during the construction process. Also,
the Consultant has required the Contractor to strengthen the safety structures on site and
ensure adequate warning signals at the construction locations, especially the dangerous
areas.
May
Through the inspection and supervision on site this month, the Consultant found that there was
no serious accident occurred on the range of A5 package.
However, to ensure the safety of the Project as well as to prevent unfortunate accident
happened, in the weekly site inspections, the Consultant has frequently required the
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
190
Contractor to comply with the Method Statement and the Safety Plan of the project during
construction.
In addition, the Consultant has also required the Contractor to strengthen the safety structures
on site, ensure adequate warning signals at the construction locations of the Contractor,
especially the dangerous surfaces.
The Consultant has also recommended the Contractor to regularly organize safety meetings
for employees and engineers, make promotion on the safety for pupils in schools near the
Project.
June
Through the inspection and supervision on site this month, the Consultant found that there is
no serious accident that occurs on the range of package A5.
To ensure the safety of the Project as well as to prevent the unfortunate accidents, in the
weekly site inspections, the Consultant has still regularly required the Contractor to comply
with Method Statement and Safety Control Plan of the project during the Project’s construction
process.
4.15.6 Package A6
April
This month, through the inspection and supervision on site, the Consultant found that in
package A6 there has been no serious accident due to lack of safety measures.
During this time, the Contractor had improvements in safety management at many construction
locations. Also, at many construction locations, the Contractor has fully installed warning signs
and safety fences to alert workers in the working process as well as local people driving near
the site.
In the site weekly inspections, the Consultant has still regularly required the Contractor to
comply with the Method Statement and the Safety Plan of the Project to prevent unfortunate
accidents.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
191
May
Through the inspection and supervision on site this month, the Consultant found that there was
no serious accident occurred in the A6 package due to lack of safety measures.
During this period, the Contractor has continued to implement safety control activities on site to
ensure the safety in the construction process.
In the weekly site inspections, the Consultant has still regularly required the Contractor to
comply with the Method Statement and the Safety Control Plan of the Project to prevent
unfortunate accidents.
June
This month, through the inspection and supervision on site, Consulting found that there were
not any serious accidents occurred on the A6 bidding package due to the lack of safety
measures.
However, to ensure the safety of the Project during the construction process and prevent the
tragic accident occurred, Consultant frequently required the Contractor to comply with the
Method Statement and safety plan of the Project, and frequently improve the safety
management and control of the Contractor.
4.15.7 Package A7
April, May and June
There were not any accidents due to the lack of safety measures but in some cases the
Engineer had to remind the contractor as follow:
- At Xom Danh Bridge Km198+400, Tan Thuong Bridge Km199+860 and Ram AII Bridge
Km199+050 consultants reminds the contractor about signpost and safety barrier
around deep hole; because almost this safety barrier and signpost are unvalued and
not meet standard. So the contractor is required to repair safety barrier and signpost at
this location to safety for worker and citizens.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
192
4.15.8 Package A8
There were not any accidents due to the lack of safety measures but in some cases the
Engineer had to remind the contractor as follow:
April
- Labour safety while the process of working at construction works of Suoi Trat Bridge
Km231+889; Lang Tra Bridge Km220+993; IC17 Bridge Km233+540; Underpass
culvert Km237+951; IC18 Bridge Km244+570; Ngoi Bo Bridge Km238+265; Box culvert
Km223+075 and Km233+540. Require the subcontractor to remind and propose labour
safety for workers. If any worker continues to violate the regulation, will be fired.
- Safety for gas tanks and oxy tanks, Km218+040, April 25th 2012. Required the
contractor keep Limit distance for gas tanks and oxy tanks is 3m and never transfer
together gas tanks and oxy tanks.
May
- Labour safety while the process of working at construction works of Km233+540;
Km224+369. Require the subcontractor to remind and propose labour safety for
workers. If any worker continues to violate the regulation, will be fired.
- Safety for gas tanks and oxy tanks at Km218+040; Km238+265 date 4- May 2012.
Required the contractor keep Limit distance for gas tanks and oxy tanks is 3m and
never transfer together gas tanks and oxy tanks
June
- Labour safety while the process of working at construction works of Km231+889;
Km233+540; Km227+290; Km220+794; Km224+869. Require the subcontractor to
remind and propose labour safety for workers. If any worker continues to violate the
regulation, will be fired.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
193
5 REFERENCE DOCUMENTS RELATIVE TO ENVIRONMENT, HEALTH AND SAFETY
ISSUES
5.1 PACKAGE A1
No Document reference Date Remark
1 GET1/POS/A1/1396 Mar 26, 2012 Underpass NH2: Reopen procedures of payment progress
2 GET1/POS/A1/1409 Apr 09, 2012 Report on Environmental Monitoring and Analysis – March, 2012
3 GET1/POS/A1/1426 Apr 25, 2012 Ba Thien Bridge and Interchange No. 3: Request to supplement scaffold and safety net
4 GET1/POS/A1/1427 Apr 25, 2012 Km 0+665 ~ Km 4+400: Request to water the surface of embankment
5 GET1/POS/A1/1428 Apr 25, 2012 Underpass NH2: Last warning of discharge of untreated wastewater
6 GET1/POS/A1/1429 Apr 26, 2012 Project safety on holiday
7 REF-A1-GET1-MOM-57 Mar 29, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
8 REF-A1-GET1-MOM-58 Apr 20, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
9 GET1/POS/A1/1429 Apr 26, 2012 Project safety on holiday
10 GET1/POS/A1/1440A May 11, 2012 Report on Environmental Monitoring and Analysis – April, 2012
11 REF-A1-GET1-MOM-59 May 04, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
12 REF-A1-GET1-MOM-50 May 24, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
13 GET1/POS/A1/1429 Apr 26, 2012 Project safety on holiday
14 GET1/POS/A1/1440A May 11, 2012 Report on Environmental Monitoring and Analysis – April, 2012
15 REF-A1-GET1-MOM-59 May 04, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
16 REF-A1-GET1-MOM-50 May 24, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
5.2 PACKAGE A2
No Document reference Date Remark
1 GET1/POS/A2/1228 Mar 26, 2012 Km 42+200 ~ Km 42+450: Removal Unsuitable Material
2 GET1/POS/A2/1229 Mar 26, 2012 Khang Minh section: Complaint Settlement
3 GET1/POS/A2/1243 Apr 05, 2012 Xuan Quang Bridge: Request to reinstall security fence and assign security guard on duty
4 GET1/POS/A2/1244 Apr 05, 2012 Report on Environmental Monitoring and Analysis – February, 2011
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
194
No Document reference Date Remark
5 GET1/POS/A2/1251 Apr 09, 2012 Report on Environmental Monitoring and Analysis – March, 2012
6 GET1/POS/A2/1263 Apr 13, 2012 Army II, Army III, TL310 and Ben Tre Bridges: Request to apply the safety measures
7 GET1/POS/A2/1264 Apr 13, 2012 Ben Gao Bridge: Last warning of environmental protection measures
8 GET1/POS/A2/1265 Apr 13, 2012 Batch Plant C: Money deduction
9 GET1/POS/A2/1277 Apr 23, 2012 Ben Gao Bridge: Money deduction
10 GET1/POS/A2/1278 Apr 23, 2012 Song Dao Bridge: Reopen procedure of payment progress and money deduction
11 GET1/POS/A2/1281 Apr 25, 2012 Km 42+200 ~ Km 42+450: Last warning of Unsuitable Material Removal
12 GET1/POS/A2/1285 Apr 26, 2012 Project safety on holiday
13 REF-A2-GET1-MOM-42 Mar 29, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
14 GET1/POS/A2/1285 Apr 26, 2012 Project safety on holiday
15 GET1/POS/A2/1297 May 04, 2012 Embankment sections: Last warning of dust suppression measures application
16 GET1/POS/A2/1309 May 14, 2012 Army II, Ben Gao and Lo River Bridges: Request to apply the safety measures
17 REF-A2-GET1-MOM-43 May 04, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
18 REF-A2-GET1-MOM-44 May 24, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
19 GET1/POS/A2/1285 Apr 26, 2012 Project safety on holiday
20 GET1/POS/A2/1297 May 04, 2012 Embankment sections: Last warning of dust suppression measures application
21 GET1/POS/A2/1307A May 11, 2012 Report on Environmental Monitoring and Analysis – April, 2012
22 GET1/POS/A2/1309 May 14, 2012 Army II, Ben Gao and Lo River Bridges: Request to apply the safety measures
23 REF-A2-GET1-MOM-43 May 04, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
24 REF-A2-GET1-MOM-44 May 24, 2012 Minutes of meeting between EPMU, GETINSA and POSCO
5.3 PACKAGE A3
Nº Document reference Date Remark
1 GET2-POS-A3-1193 April 16th, 2012 Approval of Environmental monitoring report on March, 2012
2 GET2-POS-A3-1204 April 24th, 2012 Request to resolve environmental and safety violation in package A3.
3 Site minutes April 17th, 2012 environmental and safety violation at Km66+300- Km67+300
4 GET2-POS-A3-1221 May 4th, 2012 Request to carry out the safety methods in bridges construction sites- package A3
5 GET2-POS-A3-1284 June 1st, 2012 Approval of Environmental monitoring report on April, 2012
6 GET2-POS-A3-1285 June 1st, 2012 Require to overcome Environmental and Safety problems in package A3”
7 GET2-POS-A3-1288 June 4th, 2012 Conclusion of meeting on safety at Red River
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
195
Nº Document reference Date Remark Bridge
8 GET2-POS-A3-1303 June 11th, 2012 Approval of Environmental monitoring report on May, 2012
9 GET2-POS-A3-1341 June 26th, 2012 New submission of Red River Bridge safety procedure for Scaffolding and working at height requested
10 GET2-EPMU2-A3-349 June 29th, 2012 Report actual situation of repairing for Environmental and safety violations in Package A3
5.4 PACKAGE A4
Nº Document reference Date Remark
1 GET2-KEA-A4-610 April 4th, 2012 Approval of Environmental monitoring report on February, 2012
2 GET2-KEA-A4-630 April 24th, 2012 Request to resolve environmental and safety violation in package A4
3 GET2-KEA-A4-631 April 24th, 2012 Request to submit new personnel for Senior environmentalist position-package A4
4 GET2-KEA-A4-622 April 16th, 2012 Reject to work with Mrs. Ha Thi Minh Chuc- package A4.
5 GET2-KEA-A4-638 May 4th, 2012 Request to repair the environmental and safety violations of package A4
6 GET2-KEA-A4-657 May 17th 2012 Request supplement Professional degree for Safety engineer- package A4
7 GET2-KEA-A4-637 May 2nd, 2012 Approval of Environmental monitoring report on March, 2012- package A4
8 GET2-KEA-A4-680 June 1st, 2012 Require to overcome Environmental and safety problems in package A4
9 GET2-KEA-A4-687 June 11th, 2012 Approval of Environmental monitoring report on April and May, 2012 – package A4
10 GET2-GET-A4-032 June 12th, 2012 Temporaty approval of Safety Engineer – package A4
11 GET2-GET-A4-033 June 12th, 2012 Temporaty approval of Senior environmentalist – package A4
12 GET2-EPMU2-A4-142 June 29th, 2012 Report actual situation of repairing for Environmental and safety violations in Package A4
5.5 PACKAGE A5
Nº Document reference Date Remark
1 GET3-KEANGNAM-12-A5-270 April 3, 2012 Approval with comments on Disposal areas for unsuitable materials
2 GET3-KEANGNAM-12-A5-290 April 6, 2012 Comment on documents of disposal areas for unsuitable material
3 GET3-KEANGNAM-12-A5-282 April 11, 2012 Reminding the Contractor on environmental and safety issues
4 GET3-KEANGNAM-12-A5-316 April 12, 2012 Approval with comments on Disposal areas for unsuitable materials
5 GET3-KEANGNAM-12-A5-324 April 14, 2012 Warning to Safety Manager of Keangnam contractor
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
196
Nº Document reference Date Remark
6 GET3-KEANGNAM-12-A5-355 April 23, 2012 Approval of Report on Environmental Monitoring for March 2012
7 GET3-KEANGNAM-12-A5-361 April 24, 2012 Reminding the Contractor on safety and environmental issues
8 GET3-KEANGNAM-12-A5-376 April 27, 201 Reminding the Contractor on ensure environment, safety and traffic during holidays
9 GET3-KEANGNAM-12-A5-377 April 27, 201 Request the Contractor to ensure environmental control and protection in accordance
10 GET3-KEANGNAM-12-A5-386 May 3, 2012 Request the Contractor to apply measures to control environment and safety at production factories
11 GET3-KEANGNAM-12-A5-387 May 3, 2012 Request the Contractor to improve the living & working conditions in the workers’ camps
12 GET3-KEANGNAM-12-A5-392 May 7, 2012 Warning to Keangnam Contractor
13 GET3-KEANGNAM-12-A5-409 May 9, 2012 Warning the Contractor on safety issues
14 GET3-KEANGNAM-12-A5-426 May 15, 2012 Notice for site check relating to environmental and safety issues
15 GET3-KEANGNAM-12-A5-428 May 15, 2012 Warning to Keangnam Contractor
16 GET3-KEANGNAM-12-A5-439 May 16, 2012 Request the Contractor to apply measures in order to ensure environment at construction site of Van Phu bridge
17 GET3-KEANGNAM-12-A5-438 May 16, 2012 Request the Contractor to apply measures in order to minimize dust during construction and material transportation
18 GET3-KEANGNAM-12-A5-437 May 16, 2012 Request the Contractor to improve the living & working conditions in the workers’ camps
19 GET3-KEANGNAM-12-A5-444 May 16, 2012 Warning to Safety Manager of Keangnam contractor
20 GET3-KEANGNAM-12-A5-463 May 25, 2012 Request the Contractor to apply measures in order to ensure environment
21 GET3-KEANGNAM-12-A5-461 May 25, 2012 Request the Contractor to apply measures in order to ensure safety
22 GET3-KEANGNAM-12-A5-463 May 25, 2012 Request the Contractor to apply measures in order to ensure environment
23 GET3-KEANGNAM-12-A5-461 May 25, 2012 Request the Contractor to apply measures in order to ensure safety
24 GET3-KEANGNAM-12-A5-489 May 31, 201 Approval of Report on Environmental Monitoring for April 2012
25 GET3-KEANGNAM-12-A5-490 May 31, 201 Require to solve Environmental and Safety problems of Package A5
26 GET3-KEANGNAM-12-A5-532 Jun 13, 201 Reminding the contractor on safety issues
27 GET3-KEANGNAM-12-A5-583 Jun 21, 201 Comment on documents of disposal areas
5.6 PACKAGE A6
Nº Document reference Date Remark
1 GET3-DOOSAN-12-A6-363 April 10, 2012 Provisional approval of the method statement for sodding at soil slope
2 GET3-DOOSAN-12-A6-360 April 10, 2012 Request the Contractor to maintain traffic and safety at Ngoi That bridge Km155+971
3 GET3-DOOSAN-12-A6-367 April 11, 2012 Approval with comments on Disposal areas for unsuitable materials
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
197
Nº Document reference Date Remark
4 GET3-DOOSAN-12-A6-372 April 12, 2012 Requirements to grassing work at cutting slope
5 GET3-DOOSAN-12-A6-393 April 19, 2012 Approval of the Method Statement of Waste water Treatment for Tunnel Work
6 GET3-DOOSAN-12-A6-387 April 19, 2012 Reminding the Contractor on safety and environmental issues
7 GET3-DOOSAN-12-A6-422 April 26, 2012 Approval with comments on Disposal areas
8 GET3-DOOSAN-12-A6-430 April 26, 2012 Reminding the Contractor on safety for tunnelling work
9 GET3-DOOSAN-12-A6-421 April 26, 2012 Reminding the Contractor on Sodding for embankment slope
10 GET3-DOOSAN-12-A6-422 April 26, 201 Approval with comments on Disposal areas
11 GET3-DOOSAN-12-A6-430 April 26, 201 Reminding the Contractor on safety for tunnelling work
12 GET3-DOOSAN-12-A6-421 April 26, 201 Reminding the Contractor on Sodding for embankment slope
13 GET3-DOOSAN-12-A6-434 April 27, 201 Reminding the Contractor on ensure environment, safety and traffic during holidays
14 GET3-DOOSAN-12-A6-435 April 27, 201 Request the Contractor to ensure environmental control and protection in accordance
15 GET3-DOOSAN-12-A6-443 April 28, 201 Approval with comments on Disposal areas
16 GET3-DOOSAN-12-A6-452 May 3, 2012 Request the Contractor to apply measures to control environment and safety at production factories
17 GET3-DOOSAN-12-A6-453 May 3, 2012 Request the Contractor to improve the living & working conditions in the workers’ camps
18 GET3-DOOSAN-12-A5-457 May 4, 2012 Warning to DOOSAN Contractor about environmental issues at construction site of the Tunnel
19 GET3-DOOSAN-12-A6-467 May 9, 2012 Warning the Contractor on safety issues
20 GET3-DOOSAN-12-A5-484 May 14, 2012 Warning the Contractor on environmental issues
21 GET3-DOOSAN-12-A6-491 May 15, 2012 Request the Contractor to improve the living & working conditions in the workers’ camps
22 GET3-DOOSAN-12-A6-530 May 25, 2012 Approval of Report on Environmental Monitoring for March 2012
23 GET3-DOOSAN-12-A6-545 May 31, 2012 Approval of Report on Environmental Monitoring for April 2012
24 GET3-DOOSAN-12-A6-546 May 31, 2012 Require to solve Environmental and Safety problems of Package A6
25 GET3-DOOSAN-12-A6-548 Jun 1, 2012 Information for Tunnel entrance card
26 GET3-DOOSAN-12-A6-558 Jun 6, 2012 Ensure safety for cutting slope areas
27 GET3-DOOSAN-12-A6-566 Jun 8, 2012 Request the Contractor to solve impacts caused
from construction activities to local residents production land and living
28 GET3-DOOSAN-12-A6-568 Jun 9, 2012 Approval with comments on Disposal areas
29 GET3-DOOSAN-12-A6-569 Jun 9, 2012 Reminding the Contractor on environmental and safety issues
30 GET3-DOOSAN-12-A6-579 Jun 12, 2012 Approval with comments on Disposal
31 GET3-DOOSAN-12-A6-586 Jun 12, 2012 Approval with comments on Disposal
32 GET3-DOOSAN-12-A6-591 Jun 13, 2012 Grass work- seeds quality certificate and material source
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
198
Nº Document reference Date Remark
33 GET3-DOOSAN-12-A6-616 Jun 21, 2012 Approval of Report on Environmental Monitoring in May 2012
34 GET3-DOOSAN-12-A6-617 Jun 21, 2012 Approval with comments on Disposal
35 GET3-DOOSAN-12-A6-633 Jun 27, 2012 Reminding the Contractor on environmental and safety issues
5.7 PACKAGE A7
Nº Document reference Date Remark
1 Ref. GET4-GRBCC-613 1-April 2012 Reminding about safety and environment –package A7
2 Ref. GET4-GRBCC-614 1- April 2012 Approve the Environment Monitoring Report at Construction Stage (phase 5- February 2012) - package A7
3 Ref. GET4-GRBCC-621 10- April 2012 Recovering of safety at Abutment A1- Xom Danh Bridge Km198+400
4 Ref. GRBCC/GETINSA/A7/1101 12- April 2012 Addition document of waste areas
5 Ref.GET4-GRBCC-33 3- May-2012 Project safety at Box culvert Km200+862
6 Ref.GET4-GRBCC-34 4- May-2012 Require to stop pours land at Km201+815 and Km209+800
7 Ref.GET4-GRBCC-39 8- May-2012 Return the document of spoil area at section1: Km190+420-Km201+000 Rev.A1
8 Ref.GET4-GRBCC-48 22- May-2012 The First times warning to Mr Trinh Van Tho- Manager Director, seaction2 of contractor A7
9 Ref.GET4-GRBCC-49 22 May-2012 Return the document of spoil area at section1: Km190+420-Km201+000 Rev.A2
10 Ref.GET4-GRBCC-50 25- May-2012 Require to overcome Environmental and Safety problems of Package A7
11 Ref.GET4-GRBCC-653 28-May 2012 Require to overcome Environmental and Safety problems of Package A7 according to ADB’s instruction
12 Ref.GET4-GRBCC-656 30-May 2012 Approved 13 of spoil area at section3: Km207+000- Km218+040 Rev.A1
13 Ref.GET4-GRBCC-660 05-June 2012
Required the contractor to addition the document, file relates to import the grass seed source and material using for protection slope of Package A7
14 Ref.GET4-GRBCC-663 12-June 2012 Approved 03 in 08 of spoil area at section1: Km190+420-Km201+000 Rev.A2
15 Ref.GET-GUA-055 12-June 2012 Health and safety conditions in Site laboratory A7 Km195+900
16 Ref.GET-GUA-057 19-June 2012
Required the contractor to addition the document relates to import the grass seed source and material using for protection slope of Package A7- second time
17 Ref.GET-EPMU-1567 25-June 2012 Grass certificates- Package A7
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
199
5.8 PACKAGE A8
Nº Document reference Date Remark
1 Ref. GET4- Vinaconex- 534 1- April 2012 Require to overcome Environmental and Safety problems of Package A8
2 Ref. GET4- Vinaconex- 538 6- April 2012 Boosting the progress and ensuring construction safety in raining season at Suoi Nhu Bridge Km218+040- Package A8
3 Ref. GET4- Vinaconex- 549 3-May-2012 Project safety while working- LAST REMINDED
4 Ref. GET4- Vinaconex- 563 23-May-2012 Reminding to contractor’s personnel and to the maintenance of access roads- Package A8
5 Ref. GET4- Vinaconex- 565 25-May-2012 Require to overcome Environmental and Safety problems of Package A8
6 Ref. GET4- Vinaconex- 566 28-May-2012 Require to overcome Environmental and Safety problems of Package A8 according to ADB’s instruction
7 Ref. GET4- Vinaconex- 567 29-May-2012 Request to overcome the consequence because of contractor’s mistake
8 Ref. GET4- Vinaconex- 566 28-May 2012 Require to overcome Environmental and Safety problems of Package A8 according to ADB’s instruction
9 Ref. GET4- Vinaconex- 567 29-May 2012 Request to overcome the consequence because of contractor’s mistakes.
10 Ref. GET4- Vinaconex- 569 8-June 2012 Require to overcome the problem at Km230+527-Km230+660
11 Ref. GET4- Vinaconex- 570 12-June 2012 Approved the Report environmental monitoring on construction stage (phase 7- May 2012) – Package A8.
12 Ref. GET4- Vinaconex- 574 18-June 2012 Project safety while working at Suoi Trat Bridge Km231+889.60- LAST REMINDED
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
200
6 ST
ATU
S O
N T
HE
ECA
P IM
PLEM
ENTA
TIO
N
6.1
CO
NTR
AC
TOR
S’ E
NVI
RO
NM
ENTA
L A
ND
SA
FETY
MA
NA
GER
S M
OB
ILIZ
ATI
ON
As
this
issu
e is
one
of t
he m
ost i
mpo
rtant
one
s fo
r th
e rig
ht im
plem
enta
tion
of th
e co
ntra
ctor
s’ E
CP
and
EC
AP
, her
e is
pre
sent
ed a
sum
mar
y
tabl
e of
the
cur
rent
ly s
ituat
ion,
upd
ated
till
July
201
2, i
n ea
ch p
acka
ge a
bout
the
mob
ilizat
ion
of c
ontra
ctor
s’ e
nviro
nmen
tal
and
safe
ty
man
ager
s. S
ome
rem
arks
are
als
o co
nsid
ered
insi
de th
e ta
ble.
It’s
not
incl
uded
the
upda
te o
nly
till t
he e
nd o
f Jun
e as
the
Clie
nt a
nd A
DB
wer
e
alre
ady
info
rmed
abo
ut th
is a
nd d
ue to
the
fact
that
whi
le th
is r
epor
t was
bei
ng p
repa
red,
som
e ne
w im
prov
emen
ts in
the
situ
atio
n ha
ppen
ed.
Und
er C
onsu
ltant
’s c
onsi
dera
tion,
the
full
com
plia
nce
with
this
item
that
now
aday
s w
e ca
n of
fer,
is e
noug
h si
gnifi
cant
to in
clud
e in
this
qua
rterly
repo
rt.
(Not
e: s
ome
man
ager
s w
ill be
eva
luat
ed b
y PS
C in
the
inco
min
g m
onth
s)
PAC
KA
GE
CU
RR
ENT
STA
TUS
POSI
TIO
N
PRO
POSE
D
APP
RO
VED
M
OB
ILIZ
ED
NAM
E R
EMA
RK
S
A1
Env
ironm
enta
l m
anag
er
Yes
In p
roce
ss
Yes
Jeon
Dae
Kyu
n P
ropo
sed
for t
empo
rary
app
rova
l
Safe
ty m
anag
er
Yes
Yes
Yes
Le D
inh
Quy
en
A2
Env
ironm
enta
l m
anag
er
Yes
In p
roce
ss
Yes
Kw
ak, K
i Jin
P
ropo
sed
for t
empo
rary
app
rova
l
Safe
ty m
anag
er
Yes
Yes
Yes
Kim
Jeo
ng H
o
A3
Env
ironm
enta
l m
anag
er
Yes
In p
roce
ss
Yes
Jo S
eung
Kw
an
Pro
pose
d fo
r tem
pora
ry a
ppro
val
Safe
ty m
anag
er
Yes
Yes
Yes
Ngu
yen
Than
h C
ong
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
201
PAC
KA
GE
CU
RR
ENT
STA
TUS
POSI
TIO
N
PRO
POSE
D
APP
RO
VED
M
OB
ILIZ
ED
NAM
E R
EMA
RK
S
A4
Env
ironm
enta
l m
anag
er
Yes
Yes
Yes
Ta H
ong
Yen
Safe
ty m
anag
er
Yes
Yes
Yes
Ngu
yen
Dan
h N
am
A5
Env
ironm
enta
l m
anag
er
Yes
Yes
Yes
Lee,
Soo
Ki
Safe
ty m
anag
er
Yes
Yes
Yes
You,
Jae
Eun
A6
Env
ironm
enta
l m
anag
er
Yes
Yes
Yes
Son
g, H
wa
Seo
Safe
ty m
anag
er
Yes
Yes
Yes
Kw
on, O
h Li
n
A7
Env
ironm
enta
l m
anag
er
Yes
Yes
Yes
Zhou
Guo
Mou
Safe
ty m
anag
er
Yes
Yes
Yes
Pha
n Li
n Fe
ng
A8
Env
ironm
enta
l m
anag
er
Yes
Yes
Yes
Tran
Van
Din
h
Safe
ty m
anag
er
Yes
Yes
Yes
Mai
Xua
n La
p
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
202
6.2
ENVI
RO
NM
ENTA
L C
OR
REC
TIVE
AC
TIO
N P
LAN
(EC
AP)
. UPD
ATE
30T
H/0
6/20
12
6.2.
1 Pa
ckag
e A
1
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Dirt
is tr
acke
d on
to
publ
ic ro
ad c
ausi
ng
dirty
and
diff
icul
ty fo
r ro
ad u
sers
at s
ectio
ns
whe
re li
nk to
pub
lic
road
s su
ch a
s U
nder
pass
QL2
, Tru
ng
Kie
n br
idge
, TL4
02
brid
ge, B
a Th
ien
brid
ge, I
.C3,
Tam
Lon
g –
Thie
n K
e br
idge
, TL
302C
II br
idge
GE
T1/P
OS
/A1/
1236
G
ET/
EP
MU
/120
4 R
EF-
A1-
GE
T1-M
OM
-57
RE
F-A
1-G
ET1
-MO
M-5
8 R
EF-
A1-
GE
T1-M
OM
-59
RE
F-A
1-G
ET1
-MO
M-6
0
Cle
an u
p th
e af
fect
ed a
rea
in re
gula
r bas
is; a
pply
the
sedi
men
t con
trol m
easu
res
to p
reve
nt tr
acki
ng o
f dirt
on
to p
ublic
road
s (c
onst
ruct
the
cons
truct
ion
site
ent
ranc
es a
nd e
xits
tire
w
ash)
Con
tract
or
June
30,
20
12
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Wor
kers
wer
e as
sign
ed to
cl
ean
affe
cted
se
ctio
ns b
ut
sect
ions
Tru
ng
Kie
n B
ridge
, B
a Th
ien
Brid
ge a
nd I.
C
3
Con
stru
ctio
n si
tes
are
dirty
and
unt
idy
at T
am
Long
– T
hien
Ke
Brid
ged
and
Inte
rcha
nge
No.
3
GE
T1/P
OS
/A1/
1285
R
EF-
A1-
GE
T1-M
OM
-57
RE
F-A
1-G
ET1
-MO
M-5
8 R
EF-
A1-
GE
T1-M
OM
-59
RE
F-A
1-G
ET1
-MO
M-6
0 O
ral r
equi
rem
ents
Rea
rran
ge th
e si
tes;
sto
re
ever
y m
ater
ial i
n its
pro
per
plac
e; c
lean
up
the
site
s an
d di
spos
e of
was
te
prop
erly
Con
tract
or
June
15,
20
12
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
I.C 3
: m
itiga
tion
mea
sure
s w
ere
appl
ied
Tam
Lon
g –
Thie
n K
e B
ridge
: m
itiga
tion
mea
sure
s ar
e be
ing
impl
emen
ted
Wor
ker’s
cam
ps a
re
dirty
with
tras
h su
rrou
ndin
g –
G
ET1
/PO
S/A
1/12
46
GE
T1/P
OS
/A1/
1296
G
ET1
/PO
S/A
1/13
96
Cle
an c
onst
ruct
ion
site
; co
llect
tras
h an
d pr
oper
ly
disp
ose
of it
; pro
vide
tras
h C
ontra
ctor
Ju
ne 1
5,
2012
Und
erpa
ss
NH
2, T
rung
K
ien
Brid
ge:
Dai
Duo
ng
Brid
ge:
Miti
gatio
n
Tan
Loi
Brid
ge:
Miti
gatio
n
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
203
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Und
erpa
ss N
H2,
Tru
ng
Kie
n B
ridge
, In
terc
hang
e N
o.3,
Tan
Lo
i Brid
ge, D
ai D
uong
B
ridge
and
Bon
Brid
ge
RE
F-A
1-G
ET1
-MO
M-5
7 R
EF-
A1-
GE
T1-M
OM
-58
RE
F-A
1-G
ET1
-MO
M-5
9 R
EF-
A1-
GE
T1-M
OM
-60
Ora
l req
uire
men
ts
bin;
per
iodi
cally
car
ry o
ut
hous
ekee
ping
wor
k in
or
der t
o ke
ep s
ites
and
wor
ker’s
cam
ps in
cl
eanl
ines
s an
d sa
nita
ry
cond
ition
Miti
gatio
n m
easu
res
wer
e ap
plie
d O
ther
s:
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
mea
sure
s w
ere
appl
ied
Tan
Loi
Brid
ge a
nd
I.C 3
: m
itiga
tion
mea
sure
are
no
t im
plem
ente
d
mea
sure
was
im
plem
ente
d B
on B
ridge
an
d I.C
3: N
o im
prov
emen
t
The
wor
ker’s
cam
ps
are
not p
rovi
ded
sept
ic
tank
s or
sep
tic ta
nks
are
too
dirty
to u
se.
This
issu
e is
ha
ppen
ing
at I.
C 3
; B
on b
ridge
; Tan
Loi
br
idge
; Und
erpa
ss N
H2
G
ET1
/PO
S/A
1/12
46
GE
T1/P
OS
/A1/
1296
G
ET1
/PO
S/A
1/13
14
RE
F-A
1-G
ET1
-MO
M-5
7 R
EF-
A1-
GE
T1-M
OM
-58
RE
F-A
1-G
ET1
-MO
M-5
9 R
EF-
A1-
GE
T1-M
OM
-60
Ora
l req
uire
men
ts
Sup
plem
ent t
he s
eptic
ta
nks
for w
orke
rs; r
epai
r an
d cl
ean
sept
ic ta
nks
to
ensu
re s
anita
ry fa
cilit
ies
bein
g pr
ovid
ed a
dequ
atel
y
Con
tract
or
June
15,
20
12
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Tan
Loi
Brid
ge a
nd I.
C
3: S
eptic
tank
w
as b
uilt
Oth
ers:
No
impr
ovem
ent
Wor
ker’s
cam
ps a
t Bon
br
idge
and
Tan
Loi
br
idge
are
not
pro
vide
d fir
st a
id k
its
G
ET1
/PO
S/A
1/12
46
GE
T1/P
OS
/A1/
1296
G
ET1
/PO
S/A
1/13
14
RE
F-A
1-G
ET1
-MO
M-5
7 R
EF-
A1-
GE
T1-M
OM
-58
RE
F-A
1-G
ET1
-MO
M-5
9 R
EF-
A1-
GE
T1-M
OM
-60
Ora
l req
uire
men
ts
Sup
plem
ent t
he fi
rst a
id k
it fo
r eve
ry w
orke
r’s c
amp
Con
tract
or
May
26,
20
12
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Firs
t-aid
kits
w
ere
prov
ided
Dom
estic
/drin
king
w
ater
is n
ot s
afe
enou
gh fo
r use
at C
am
I brid
ge, I
.C 3
, Bon
br
idge
and
Tan
Loi
br
idge
and
Und
erpa
ss
NH
2
G
ET1
/PO
S/A
1/12
46
GE
T1/P
OS
/A1/
1296
G
ET1
/PO
S/A
1/13
14
RE
F-A
1-G
ET1
-MO
M-5
7 R
EF-
A1-
GE
T1-M
OM
-58
RE
F-A
1-G
ET1
-MO
M-5
9 R
EF-
A1-
GE
T1-M
OM
-60
Pro
vide
filte
r dev
ice
to
ever
y pu
mpe
d w
ater
; pr
ovid
e bo
ttled
drin
king
w
ater
for w
orke
rs
Cov
er th
e do
mes
tic w
ater
ta
nk to
pre
vent
pol
lutio
n
Con
tract
or
May
26,
20
12
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
wer
e im
plem
ente
d
Wat
er q
ualit
y is
ser
ious
im
pact
ed a
t Tan
Loi
GE
T1/P
OS
/A1/
1313
R
EF-
A1-
GE
T1-M
OM
-57
App
ly p
rope
rly is
olat
ion
tech
niqu
e; d
redg
e riv
er a
nd
Con
tract
or
June
30,
201
2M
itiga
tion
mea
sure
s ar
e M
itiga
tion
mea
sure
s ar
e M
itiga
tion
mea
sure
s ar
e
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
204
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Brid
ge
RE
F-A
1-G
ET1
-MO
M-5
8 R
EF-
A1-
GE
T1-M
OM
-59
RE
F-A
1-G
ET1
-MO
M-6
0 O
ral r
equi
rem
ents
rem
ove
all s
poil
and
mud
to
dis
posa
l pla
ce
not
impl
emen
ted
not
impl
emen
ted
not
impl
emen
ted
Ser
ious
und
erm
inin
g an
d la
ndsl
ide
happ
en
on ri
vers
ide
at T
an L
oi
Brid
ge
G
ET1
/PO
S/A
1/13
13
GE
T1/E
PM
U1/
A1/
348
RE
F-A
1-G
ET1
-MO
M-5
7 R
EF-
A1-
GE
T1-M
OM
-59
RE
F-A
1-G
ET1
-MO
M-6
0 O
ral r
equi
rem
ents
App
ly ri
vers
ide
prot
ectio
n m
easu
res;
rein
stal
l stre
am
cros
sing
with
sui
tabl
e pi
pe
culv
erts
(tem
pora
ry b
ridge
is
reco
mm
ende
d)
Con
tract
or
June
30,
201
2
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
It’s
note
d th
at th
ere
trash
is b
urne
d on
site
s
R
EF-
A1-
GE
T1-M
OM
-57
RE
F-A
1-G
ET1
-MO
M-5
8 R
EF-
A1-
GE
T1-M
OM
-59
RE
F-A
1-G
ET1
-MO
M-6
0 O
ral r
equi
rem
ents
Pro
vide
eno
ugh
trash
bin
s to
wor
ker’s
cam
p; o
rient
w
orke
rs in
dom
estic
was
te
treat
men
t; pr
ohib
it bu
rnin
g tra
sh o
nsite
Con
tract
or
Dec
31,
201
1
Miti
gatio
n m
easu
res
wer
e ap
plie
d bu
t thi
s is
sue
usua
lly
happ
ened
Miti
gatio
n m
easu
res
wer
e ap
plie
d bu
t thi
s is
sue
usua
lly
happ
ened
Not
det
ecte
d
Unt
reat
ed w
aste
wat
er
cont
aini
ng s
and
and
mud
is d
irect
di
scha
rged
into
ex
istin
g dr
aina
ge
GE
T1/P
OS
/A1/
1428
R
EF-
A1-
GE
T1-M
OM
-57
RE
F-A
1-G
ET1
-MO
M-5
8 R
EF-
A1-
GE
T1-M
OM
-59
RE
F-A
1-G
ET1
-MO
M-6
0 O
ral r
equi
rem
ent
Con
stru
ct s
ettli
ng p
onds
w
ith e
noug
h ca
paci
ty;
loca
te s
traw
bal
es a
t ou
tlets
of s
ettli
ng p
ond
to
rem
ove
sedi
men
t fro
m
was
tew
ater
bef
ore
disc
harg
e of
it
Con
tract
or
Dec
28,
201
1
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
A s
edim
ent
basi
n w
as
cons
truct
ed
but i
t’s n
ot
enou
gh
capa
city
A s
edim
ent
basi
n w
as
cons
truct
ed b
ut
it’s
not e
noug
h ca
paci
ty;
was
tew
ater
w
as s
till
disc
harg
ed
dire
ctly
into
ex
istin
g dr
aina
ge
Hig
h sp
read
of
airb
orne
dus
t on
site
at
sect
ion
Km
0+6
65 ~
K
m 5
+000
and
In
terc
hang
e N
o. 3
G
ET1
/PO
S/A
1/14
27
RE
F-A
1-G
ET1
-MO
M-5
7 R
EF-
A1-
GE
T1-M
OM
-58
RE
F-A
1-G
ET1
-MO
M-5
9 R
EF-
A1-
GE
T1-M
OM
-60
Ora
l req
uire
men
t
Car
ryin
g ou
t wat
erin
g su
itabl
y on
sur
face
of
emba
nkm
ent s
ectio
ns
durin
g co
nstru
ctio
n w
ork
Con
tract
or
May
05,
20
12
Miti
gatio
n m
easu
re is
not
im
plem
ente
d
Wet
wea
ther
ca
used
dus
t su
ppre
ssio
n bu
t the
C
ontra
ctor
has
no
t mob
ilized
w
ater
wag
on
Not
det
ecte
d
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
205
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
to w
ater
su
rface
of
affe
cted
se
ctio
ns
durin
g ho
t w
indy
day
s
Oil
leak
s on
gro
und
at
Trun
g K
ien
Brid
ge,
Tam
Lon
g –
Thie
n Ke
B
ridge
and
Tan
Loi
B
ridge
, Km
4+7
00,
Bon
Brid
ge, I
.C 3
and
TL
302C
I Brid
ge
RE
F-A
1-G
ET1
-MO
M-5
9 R
EF-
A1-
GE
T1-M
OM
-60
Ora
l req
uire
men
t
Kee
p oi
l bar
rels
in p
rope
r pl
aces
and
in u
psid
e po
sitio
n C
ontra
ctor
M
ar 2
7,
2012
Tam
Lon
g –
Thie
n K
e B
ridge
and
Km
4+
700:
M
itiga
tion
mea
sure
s w
ere
impl
emen
ted
Oth
ers:
M
itiga
tion
mea
sure
s ar
e no
t im
plem
ente
d
Tam
Lon
g –
Thie
n K
e B
ridge
and
K
m 4
+700
: M
itiga
tion
mea
sure
s w
ere
impl
emen
ted
Oth
ers:
M
itiga
tion
mea
sure
s ar
e no
t im
plem
ente
d
Tam
Lon
g –
Thie
n K
e B
ridge
and
Km
4+
700:
M
itiga
tion
mea
sure
s w
ere
impl
emen
ted
Oth
ers:
M
itiga
tion
mea
sure
s ar
e no
t im
plem
ente
d
Ther
e is
no
fe
nce
inst
alle
d to
ens
ure
the
safe
ty a
nd s
ecur
ity a
t Ta
n Lo
i Brid
ge
G
ET1
/PO
S/A
1/12
36
GE
T1/P
OS
/A1/
1285
G
ET1
/PO
S/A
1/12
14
GE
T1/P
OS
/A1/
1277
G
ET1
/PO
S/A
1/14
29
RE
F-A
1-G
ET1
-MO
M-5
7 R
EF-
A1-
GE
T1-M
OM
-58
Ora
l req
uire
men
ts
Rei
nsta
ll th
e su
itabl
e fe
nce
to
surro
und
cons
truct
ion
site
s in
ord
er to
ens
ure
the
safe
ty
Con
tract
or
Jan
19, 2
012
Loca
l peo
ple
caus
e ob
stru
ctio
ns to
im
plem
ente
d m
itiga
tion
mea
sure
s
Loca
l peo
ple
caus
e ob
stru
ctio
ns to
im
plem
ente
d m
itiga
tion
mea
sure
s
Loca
l peo
ple
caus
e ob
stru
ctio
ns to
im
plem
ente
d m
itiga
tion
mea
sure
s
Lack
of
sign
boar
d an
d lig
htin
g sy
stem
s at
se
ctio
ns w
here
inte
rsec
t pu
blic
roa
d su
ch a
s Km
0+
665,
Tr
ung
Kie
n B
ridge
, Ta
n Lo
i B
ridge
, B
a Th
ien
Brid
ge,
G
ET1
/PO
S/A
1/12
36
GE
T1/P
OS
/A1/
1285
G
ET1
/PO
S/A
1/12
14
GE
T1/P
OS
/A1/
1429
R
EF-
A1-
GE
T1-M
OM
-57
RE
F-A
1-G
ET1
-MO
M-5
8 R
EF-
A1-
GE
T1-M
OM
-59
Inst
all
light
ing
and
sign
boar
d sy
stem
s C
ontra
ctor
Ju
ne 1
5,
2012
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
bein
g im
plem
ente
d
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
206
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
TL30
2CI B
ridge
R
EF-
A1-
GE
T1-M
OM
-60
Ora
l req
uire
men
ts
Wor
k w
ays
are
not
safe
en
ough
at
B
on
Brid
ge
and
Tan
Loi
Brid
ge
R
EF-
A1-
GE
T1-M
OM
-57
RE
F-A
1-G
ET1
-MO
M-5
8 R
EF-
A1-
GE
T1-M
OM
-59
RE
F-A
1-G
ET1
-MO
M-6
0 O
ral r
equi
rem
ents
Inst
all s
uita
ble
scaf
fold
and
la
dder
sy
stem
to
en
sure
sa
fety
for w
orke
rs
Con
tract
or
Jan
19, 2
012
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Hig
h ris
k of
col
laps
e of
w
alls
of
foun
datio
ns o
f K
im A
nh B
ridge
whi
ch
is c
lose
to a
cces
s ro
ad
RE
F-A
1-G
ET1
-MO
M-5
7 R
EF-
A1-
GE
T1-M
OM
-58
Ora
l req
uire
men
t
App
ly
slop
e pr
otec
tion
mea
sure
s by
st
eel
shee
t pi
les
or r
educ
ing
the
slop
e of
ste
eps
of fo
unda
tions
Con
tract
or
Mar
28,
20
12
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Slo
pe o
f fo
unda
tion’
s st
eeps
wer
e re
duce
d
Foun
datio
ns
has
been
ba
ckfil
led
Wor
kers
di
dn’t
use
enou
gh P
PE
at w
ork
at
kerb
pr
oduc
tion
area
; U
nder
pass
N
H2;
K
im
Anh
B
ridge
, B
on
Brid
ge; T
an L
oi B
ridge
; I.C
3; B
a Th
ien
Brid
ge;
Dai
Duo
ng B
ridge
RE
F-A
1-G
ET1
-MO
M-5
7 R
EF-
A1-
GE
T1-M
OM
-58
RE
F-A
1-G
ET1
-MO
M-5
9 R
EF-
A1-
GE
T1-M
OM
-60
Ora
l req
uire
men
ts
Tigh
tly c
ontro
l con
stru
ctio
n si
tes;
pro
vide
eno
ugh
labo
r sa
fety
eq
uipm
ent
for
wor
kers
an
d en
sure
al
l w
orke
rs
use
pers
onal
sa
fety
equ
ipm
ent
at w
ork
adeq
uate
ly
Con
tract
or
Imm
edia
te
PP
E h
as b
een
prov
ided
but
la
ck o
f con
trol
of th
e C
ontra
ctor
and
th
is is
sue
still
us
ually
ha
ppen
s
PP
E h
as b
een
prov
ided
but
la
ck o
f con
trol
of th
e C
ontra
ctor
an
d th
is is
sue
still
usua
lly
happ
ens
PP
E h
as b
een
prov
ided
but
la
ck o
f con
trol
of th
e C
ontra
ctor
and
th
is is
sue
still
us
ually
ha
ppen
s La
ck
of
safe
ty
net/s
caffo
ld a
nd la
dder
at
Und
erpa
ss N
H2,
Dai
D
uong
B
ridge
, Xu
an
Phu
ong
Brid
ge,
Tan
Loi
Brid
ge;
Ba
Thie
n B
ridge
, I.C
3, a
nd C
am
I Brid
ge
G
ET1
/PO
S/A
1/14
26
RE
F-A
1-G
ET1
-MO
M-5
7 R
EF-
A1-
GE
T1-M
OM
-58
RE
F-A
1-G
ET1
-MO
M-5
9 R
EF-
A1-
GE
T1-M
OM
-60
Ora
l req
uire
men
ts
Pro
vide
en
ough
sa
fety
fa
cilit
ies
to
ensu
res
the
safe
ty fo
r wor
kers
at w
ork
Con
tract
or
Apr
30,
201
2
Miti
gatio
n m
easu
res
are
bein
g im
plem
ente
d
Miti
gatio
n m
easu
res
wer
e ap
plie
d
Miti
gatio
n m
easu
res
wer
e w
ell
mai
nten
ance
Ele
ctric
sy
stem
is
un
safe
at
cast
ing
yard
of
Tam
Lon
g –
Thie
n K
e B
ridge
R
EF-
A1-
GE
T1-M
OM
-57
RE
F-A
1-G
ET1
-MO
M-5
8 R
EF-
A1-
GE
T1-M
OM
-59
RE
F-A
1-G
ET1
-MO
M-6
0
Rei
nsta
ll el
ectri
c sy
stem
; el
ectri
c w
ires
mus
t be
hung
up
and
all
switc
hes
mus
t be
co
ver
care
fully
an
d
Con
tract
or
May
23,
20
12
Miti
gatio
n m
easu
re is
not
im
plem
ente
d
Miti
gatio
n m
easu
re is
not
im
plem
ente
d
Miti
gatio
n m
easu
re is
ap
plie
d
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
207
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Ora
l ins
truct
ions
en
sure
th
at
it’s
safe
en
ough
for u
se
Saf
ety
fenc
e de
riora
ted
and
enda
nger
tra
vele
rs
at B
a Th
ien
Brid
ge
R
EF-
A1-
GE
T1-M
OM
-60
Ora
l req
uire
men
ts
Rep
air
and
rein
forc
e th
e fe
nce
Con
tract
or
June
15,
20
12
M
itiga
tion
mea
sure
is n
ot
impl
emen
ted
Miti
gatio
n m
easu
re is
not
im
plem
ente
d 6.
2.2
Pack
age
A2
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Hig
h ris
k of
ero
sion
an
d co
ntam
inat
ed
prod
uctiv
e so
il ha
s no
t be
en re
stor
ed a
t se
ctio
n K
m 4
2+40
0 ~
Km
42+
600
G
ET1
/PO
S/A
2/76
6 G
ET1
/PO
S/A
2/85
5 G
ET1
/PO
S/A
2/87
9 G
ET1
/PO
S/A
2/13
42
GE
T1/P
OS
/A2/
1378
R
EF-
A2-
GE
T1-M
OM
-42
RE
F-A
2-G
ET1
-MO
M-4
3 R
EF-
A2-
GE
T1-M
OM
-44
App
ly th
e su
rface
d ru
noff,
er
osio
n an
d se
dim
ent
cont
rol m
easu
res;
rest
ore
the
affe
cted
are
as
Con
tract
or
June
30,
20
12
Miti
gatio
n m
easu
res
has
not b
een
appl
ied
Miti
gatio
n m
easu
res
has
not b
een
appl
ied
Miti
gatio
n m
easu
res
has
not b
een
appl
ied
Tem
pora
ry d
rain
age
is
dem
obiliz
ed b
ut th
ere
is n
o on
e in
stal
led
to
repl
ace
Km 4
2+62
0
G
ET1
/PO
S/A
2/76
5 G
ET1
/PO
S/A
2/13
42
GE
T1/P
OS
/A2/
1378
R
EF-
A2-
GE
T1-M
OM
-42
RE
F-A
2-G
ET1
-MO
M-4
3 R
EF-
A2-
GE
T1-M
OM
-44
Rei
nsta
ll an
othe
r to
ensu
re
wat
er fl
ow in
rain
y se
ason
C
ontra
ctor
Ju
ne 2
8,
2012
Miti
gatio
n m
easu
res
has
not b
een
appl
ied
Miti
gatio
n m
easu
res
has
not b
een
appl
ied
Miti
gatio
n m
easu
res
has
not b
een
appl
ied
Dirt
is tr
acke
d on
to
publ
ic ro
ad a
nd c
ause
d hi
gh le
vel o
f airb
orne
du
st a
nd d
iffic
ulty
for
road
use
rs a
t sec
tions
G
ET1
/PO
S/A
2/10
79
GE
T1/P
OS
/A2/
1342
G
ET1
/PO
S/A
2/13
78
RE
F-A
2-G
ET1
-MO
M-4
2 R
EF-
A2-
GE
T1-M
OM
-43
Cle
an u
p th
e pu
blic
road
; A
pply
sed
imen
t con
trol
mea
sure
s to
pre
vent
tra
ckin
g of
dirt
ont
o pu
blic
ro
ad
Con
tract
or
Dec
28,
20
11
Miti
gatio
n m
easu
res
has
not b
een
appl
ied
Miti
gatio
n m
easu
res
has
not b
een
appl
ied
Miti
gatio
n m
easu
res
has
not b
een
appl
ied
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
208
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
whe
re li
nk to
pub
lic
road
s R
EF-
A2-
GE
T1-M
OM
-44
At A
rmy
II B
ridge
, Ben
Tr
e B
ridge
, Muo
ng D
ao
Brid
ge, B
en G
ao B
ridge
, se
ctio
n K
m 3
5+40
0 an
d se
ctio
n K
m 4
3+00
0, th
e w
orke
r’s c
amps
are
dirt
y w
ith tr
ash
surr
ound
ing
GE
T1/P
OS
/A2/
1342
G
ET1
/PO
S/A
2/13
78
REF
-A2-
GET
1-M
OM
-42
RE
F-A
2-G
ET1
-MO
M-4
3 R
EF-
A2-
GE
T1-M
OM
-44
Ora
l req
uire
men
ts
Cle
an c
onst
ruct
ion
site
; co
llect
tras
h an
d pr
oper
ly
disp
ose
of it
; pro
vide
tras
h bi
n; p
erio
dica
lly c
arry
out
ho
usek
eepi
ng w
ork
in o
rder
to
kee
p si
tes
and
wor
ker’s
ca
mps
in c
lean
lines
s an
d sa
nita
ry c
ondi
tion
Con
tract
or
Oct
19,
201
1
Ben
Gao
B
ridge
: M
itiga
tion
mea
sure
s w
ere
impl
emen
ted
Km
34+
500
and
Km
43
+000
: to
be
aban
done
d
Ben
Gao
B
ridge
: Wel
l m
aint
enan
ce
Km
34+
500
and
Km
43
+000
: w
orke
r’s
cam
ps w
ere
dem
obiliz
ed
Arm
y II
Brid
ge
Miti
gatio
n m
easu
res
wer
e ap
plie
d B
en T
re
Brid
ge: N
o im
prov
emen
t
Ben
Gao
B
ridge
: Wel
l m
aint
enan
ce
Arm
y II
Brid
ge
Miti
gatio
n m
easu
res
wer
e ap
plie
d B
en T
re
Brid
ge,
Muo
ng D
ao
Brid
ge: N
o im
prov
emen
t
At B
en G
ao b
ridge
, Km
35
+400
, Km
43+
000
the
wor
ker’s
cam
ps
don’
t hav
e se
ptic
tank
or
sep
tic ta
nks
are
dirty
an
d un
avai
labl
e fo
r use
RE
F-A
2-G
ET1
-MO
M-4
2 R
EF-
A2-
GE
T1-M
OM
-43
RE
F-A
2-G
ET1
-MO
M-4
4 O
ral r
equi
rem
ents
Sup
plem
ent t
he s
eptic
ta
nks
for w
orke
rs; r
epai
r an
d cl
ean
sept
ic ta
nks
to
ensu
re s
anita
ry fa
cilit
ies
bein
g pr
ovid
ed a
dequ
atel
y
Con
tract
or
Oct
19,
201
1
Ben
Gao
B
ridge
: M
itiga
tion
mea
sure
s ar
e no
t im
plem
ente
d K
m 3
4+50
0 an
d K
m
43+0
00: t
o be
ab
ando
ned
Ben
Gao
B
ridge
: M
itiga
tion
mea
sure
s ar
e no
t im
plem
ente
d K
m 3
4+50
0 an
d K
m
43+0
00:
Wor
ker’s
ca
mps
wer
e de
mob
ilized
Miti
gatio
n m
easu
res
wer
e ap
plie
d
At B
en T
re b
ridge
, the
irr
igat
ion
cana
l is
bein
g bl
ocke
d
G
ET1
/PO
S/A
2/10
35
GE
T1/P
OS
/A2/
1047
G
ET1
/PO
S/A
2/13
42
Dre
dge
the
cana
l, re
mov
e al
l mud
and
spo
il to
di
spos
al p
lace
; ens
ure
Con
tract
or
June
30,
20
12
Miti
gatio
n m
easu
res
are
not
Miti
gatio
n m
easu
res
are
not
Miti
gatio
n m
easu
res
are
not
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
209
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
GE
T1/P
OS
/A2/
1378
R
EF-
A2-
GE
T1-M
OM
-42
RE
F-A
2-G
ET1
-MO
M-4
3 R
EF-
A2-
GE
T1-M
OM
-44
Ora
l req
uire
men
ts
wat
er fl
ow
impl
emen
ted
impl
emen
ted
impl
emen
ted
Wat
er fl
ow a
re b
eing
bl
ocke
d an
d sp
oil i
s di
spos
ed in
to
wat
erco
urse
s at
Son
g D
ao B
ridge
, Muo
ng
Dao
Brid
ge a
nd B
en
Gao
Brid
ge
G
ET1
/PO
S/A
2/10
98
GE
T1/P
OS
/A2/
1176
G
ET1
/PO
S/A
2/11
90
GE
T1/P
OS
/A2/
1264
G
ET1
/PO
S/A
2/12
77
GE
T1/P
OS
/A2/
1278
G
ET1
/PO
S/A
2/13
42
GE
T1/P
OS
/A2/
1378
R
EF-
A2-
GE
T1-M
OM
-42
RE
F-A
2-G
ET1
-MO
M-4
3 R
EF-
A2-
GE
T1-M
OM
-44
App
ly c
lear
wat
er d
iver
sion
m
easu
re; d
redg
e th
e riv
ers,
re
mov
e al
l spo
il an
d m
ud to
di
spos
al p
lace
Con
tract
or
June
30,
20
12
Song
Dao
B
ridge
: R
iver
bed
has
been
dre
dged
an
d so
il w
as
rem
oved
O
ther
s: N
o im
prov
emen
t
Song
Dao
B
ridge
: R
iver
bed
has
been
dre
dged
an
d so
il w
as
rem
oved
O
ther
s: N
o im
prov
emen
t
Song
Dao
B
ridge
: R
iver
bed
has
been
dre
dged
an
d so
il w
as
rem
oved
O
ther
s: N
o im
prov
emen
t
Unt
reat
ed w
aste
wat
er
cont
aini
ng m
ud a
nd
sand
is d
irect
ly
disc
harg
ed in
to ri
ver a
t B
en G
ao B
ridge
Ora
l req
uire
men
ts
Pro
hibi
t dis
char
ge o
f un
treat
ed w
aste
wat
er in
to
any
wat
er re
sour
ce;
mob
ilize
dew
ater
ing
tank
or
grav
ity b
ag fi
lter t
o re
mov
e se
dim
ent f
rom
was
tew
ater
be
fore
dis
char
ge
Con
tract
or
Apr
18,
201
2 M
itiga
tions
are
no
t im
plem
ente
d N
ot d
etec
ted
Not
det
ecte
d
Hig
h le
vel o
f dus
t alo
ng
thro
ughw
ay
G
ET1
/PO
S/A
2/13
42
GE
T1/P
OS
/A2/
1378
R
EF-
A2-
GE
T1-M
OM
-43
RE
F-A
2-G
ET1
-MO
M-4
4 O
ral r
equi
rem
ents
Spr
ay w
ater
sui
tabl
y th
roug
hway
to m
inim
ize
spre
ad o
f dus
t C
ontra
ctor
Ju
ne 2
1,
2012
Miti
gatio
n m
easu
re is
no
t im
plem
ente
d
Miti
gatio
n m
easu
re is
not
im
plem
ente
d
Miti
gatio
n m
easu
re is
not
im
plem
ente
d
No
first
aid
kit
is
prov
ided
at s
ectio
n K
m
35+4
00 a
nd s
ectio
n Km
43
+000
M
inut
es o
f mee
ting
with
A
DB
O
ral r
equi
rem
ents
Pro
vide
firs
t aid
kits
for
ever
y w
orke
r’s c
amp
Con
tract
or
Oct
31,
201
1 W
orke
r’s
cam
ps w
ere
aban
done
d
Wor
ker’s
ca
mps
wer
e de
mob
ilized
Spo
il is
dis
pose
d on
si
tes
at s
ectio
n Km
GE
T1/P
OS
/A2/
1166
G
ET1
/PO
S/A
2/12
28
Sub
mit
disp
osal
pla
ce a
nd
rem
ove
all u
nsui
tabl
e C
ontra
ctor
Ju
ne 0
7,
2012
M
itiga
tion
mea
sure
s ar
e M
itiga
tion
mea
sure
s ar
e M
itiga
tion
mea
sure
s ar
e
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
210
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
39+5
80 ~
Km
40+
690
and
Km 4
8+40
0 G
ET1
/PO
S/A
2/12
81
GE
T1/P
OS
/A2/
1342
G
ET1
/PO
S/A
2/13
78
RE
F-A
2-G
ET1
-MO
M-4
2 R
EF-
A2-
GE
T1-M
OM
-43
RE
F-A
2-G
ET1
-MO
M-4
4
mat
eria
l fro
m s
ites
not
impl
emen
ted
not
impl
emen
ted
not
impl
emen
ted
Ther
e is
no
fenc
e in
stal
led
and
mat
eria
l is
not
cov
ered
to
prev
ent s
prea
d of
dus
t at
Bat
ch P
lant
C (K
m
39+2
00)
G
ET1
/PO
S/A
2/12
44
GE
T1/P
OS
/A2/
1265
G
ET1
/PO
S/A
2/13
42
GE
T1/P
OS
/A2/
1378
R
EF-
A2-
GE
T1-M
OM
-42
RE
F-A
2-G
ET1
-MO
M-4
3 R
EF-
A2-
GE
T1-M
OM
-44
Ora
l req
uire
men
ts
Inst
all t
he fe
nce
and
cove
r m
ater
ial t
o pr
even
t spr
ead
of d
ust
Con
tract
or
June
30,
20
12
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
re w
as
appl
ied
Ben
toni
te s
lurr
y is
di
scha
rged
into
rive
r at
Lo R
iver
Brid
ge
R
EF-
A2-
GE
T1-M
OM
-42
Ora
l req
uire
men
t
Pro
hibi
t dis
char
ge o
f any
un
suita
ble
mat
eria
l int
o w
ater
reso
urce
C
ontra
ctor
A
pr 1
1, 2
012
Sto
pped
di
scha
rge
of
bent
onite
into
w
ater
reso
urce
Com
plie
d C
ompl
ied
Site
is d
irty
with
dirt
at
Bat
ch P
lant
2 o
f Lo
Riv
er B
ridge
R
EF-
A2-
GE
T1-M
OM
-42
Ora
l req
uire
men
ts
Har
den
surfa
ce o
f en
tranc
e/ex
it of
bat
ch p
lant
C
ontra
ctor
M
ar 2
0,
2012
Miti
gatio
n m
easu
re w
as
appl
ied
Goo
d m
aint
enan
ce
Goo
d m
aint
enan
ce
Oil
leak
s on
gro
und
at
Bat
ch P
lant
2 o
f Lo
Riv
er B
ridge
Ora
l req
uire
men
ts
Con
stru
ct o
il st
orag
e w
ith
leve
l con
cret
ed g
roun
d an
d w
ater
proo
f roo
f; a
dike
su
rrou
ndin
g to
pre
vent
sp
illage
is a
lso
requ
ired
to
inst
all
Con
tract
or
Mar
30,
20
12
Miti
gatio
n m
easu
res
wer
e ap
plie
d
Goo
d m
aint
enan
ce
Goo
d m
aint
enan
ce
Hig
h ris
k of
ero
sion
th
at w
ould
lead
s so
il in
to c
ropl
and
at s
ectio
n K
m 3
4+78
0 ~
Km
35
+000
G
ET1
/PO
S/A
2/72
0 G
ET1
/PO
S/A
2/76
6 G
ET1
/PO
S/A
2/85
5 G
ET1
/PO
S/A
2/87
9 G
ET1
/PO
S/A
2/13
42
GE
T1/P
OS
/A2/
1378
R
EF-
A2-
GE
T1-M
OM
-43
App
ly s
urfa
ced
runo
ff,
eros
ion
and
sedi
men
t co
ntro
l mea
sure
s C
ontra
ctor
Ju
ne 3
0,
2012
Miti
gatio
n ar
e no
t im
plem
ente
d
Miti
gatio
n ar
e no
t im
plem
ente
d
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
211
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
RE
F-A
2-G
ET1
-MO
M-4
4
Hig
h ris
k of
leak
of o
il on
gro
und
at s
ectio
n In
terc
hang
e N
o. 6
, Lo
Riv
er B
ridge
, B
en T
re
Brid
ge a
nd T
L306
B
ridge
GE
T1/P
OS
/A2/
1371
R
EF-
A2-
GE
T1-M
OM
-43
RE
F-A
2-G
ET1
-MO
M-4
4 O
ral r
equi
rem
ents
Con
stru
ct o
il st
orag
e w
ith
leve
l con
cret
ed g
roun
d an
d w
ater
proo
f roo
f; a
berm
su
rrou
ndin
g is
als
o re
quire
d; k
eep
the
oil
barr
els
in s
tora
ge a
nd in
up
side
pos
ition
Con
tract
or
June
21,
20
12
M
itiga
tion
are
not
impl
emen
ted
Lo R
iver
B
ridge
and
B
en T
re
Brid
ge:
Miti
gatio
n m
easu
res
wer
e ap
plie
d O
ther
s: N
o im
prov
emen
t
Tras
h w
as b
urne
d on
si
te a
t Muo
ng D
ao
Brid
ge
R
EF-
A2-
GE
T1-M
OM
-43
RE
F-A
2-G
ET1
-MO
M-4
4 O
ral r
equi
rem
ents
Orie
nt w
orke
rs a
bout
do
mes
tic w
aste
trea
tmen
t an
d pr
ohib
it bu
rnin
g tra
sh
on s
ite
Con
tract
or
May
05,
20
12
M
itiga
tion
wer
e im
plem
ente
d N
ot d
etec
ted
Cem
ent-l
aden
w
aste
wat
er s
pille
d-ov
er d
rain
age
at C
BP
B
(Km
28+
500)
Ora
l req
uire
men
ts
Rem
ove
sedi
men
t in
settl
ing
pond
in re
gula
r ba
sis
and
ensu
re th
e ca
paci
ty o
f set
tling
pon
d
Con
tract
or
May
10,
20
12
M
i tiga
tion
wer
e im
plem
ente
d
Wel
l m
aint
enan
ce
Con
stru
ctio
n si
tes
are
dirty
and
unt
idy
– A
rmy
III B
ridge
; Ben
Tre
B
ridge
and
TL3
06II
Brid
ge
GE
T1/P
OS
/A2/
1342
G
ET1
/PO
S/A
2/13
71
GE
T1/P
OS
/A2/
1378
R
EF-
A2-
GE
T1-M
OM
-44
Ora
l req
uire
men
ts
Col
lect
and
dis
pose
d of
tra
sh p
rope
rly; r
earra
nge
the
site
s to
kee
p it
in
clea
nlin
ess
and
tidin
ess
cond
ition
Con
tract
or
June
20,
20
12
Arm
y III
B
ridge
: M
itiga
tion
mea
sure
s w
ere
appl
ied
Ben
Tre
B
ridge
: No
impr
ovem
ent
Arm
y III
Brid
ge:
Wel
l m
aint
enan
ce
Ben
Tre
Brid
ge
and
TL30
6II
Brid
ge:
Miti
gatio
n m
easu
res
wer
e im
plem
ente
d La
ck o
f set
tling
pon
ds
at C
PB
C (k
m 3
9+20
0)
and
CB
Ps
1 an
d 2
of
Lo R
iver
Brid
ge
R
EF-
A2-
GE
T1-M
OM
-44
GE
T1/P
OS
/A2/
1342
G
ET1
/PO
S/A
2/13
78
Ora
l req
uire
men
ts
Rem
ove
sedi
men
t in
regu
lar b
asis
to e
nsur
e th
e ca
paci
ty o
f set
tling
pon
ds
or in
stal
l oth
ers
Con
tract
or
June
01,
20
12
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Miti
gatio
n m
easu
res
wer
e im
plem
ente
d
Ben
toni
te s
lurr
y sp
illed -
over
pad
dy fi
eld
at T
L306
II B
ridge
G
ET1
/PO
S/A
2/13
71
GE
T1/P
OS
/A2/
1378
Rem
ove
all s
pille
d-ov
er
bent
onite
from
pad
dy fi
eld,
re
loca
te b
ento
nite
tank
s,
Con
tract
or
June
20,
20
12
Miti
gatio
n m
easu
res
wer
e im
plem
ente
d
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
212
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
cons
truct
sed
imen
t bas
in
and
drai
nage
to h
andl
e su
rface
d ru
noff
to s
edim
ent
basi
n
Unc
ontro
l sur
face
d ru
noff
at K
m 2
7+60
0 ca
used
ero
sion
that
le
aded
soi
l int
o ex
istin
g dr
aina
ge a
nd a
djac
ent
crop
land
and
dam
aged
th
em
GE
T1/P
OS
/A2/
1372
App
ly s
urfa
ced
runo
ff,
eros
ion
and
sedi
men
t co
ntro
l mea
sure
s; re
stor
e ex
istin
g dr
aina
ge a
nd
crop
land
s in
initi
al s
tatu
s;
cont
act l
and’
s ow
ner f
or
nego
tiatio
n to
com
pens
ate
for d
amag
ed a
sset
Con
tract
or
June
22,
20
12
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
The
wor
kers
did
n’t u
se
enou
gh P
PE
at w
ork
at
Ben
G
ao
Brid
ge,
Lo
Riv
er
Brid
ge,
Son
g D
ao B
ridge
and
Muo
ng
Dao
Brid
ge
G
ET1
/PO
S/A
2/13
42
GE
T1/P
OS
/A2/
1378
R
EF-
A2-
GE
T1-M
OM
-42
RE
F-A
2-G
ET1
-MO
M-4
3 R
EF-
A2-
GE
T1-M
OM
-44
Ora
l req
uire
men
ts
Pro
vide
en
ough
pe
rson
al
safe
ty
equi
pmen
t fo
r w
orke
rs;
ensu
re
that
al
l w
orke
rs u
se e
noug
h la
bor
safe
ty e
quip
men
t at w
ork
Con
tract
or
Dai
ly
PP
E h
as b
een
prov
ided
but
la
ck o
f con
trol
of th
e C
ontra
ctor
an
d th
is is
sue
still
usua
lly
happ
ens
PP
E h
as b
een
prov
ided
but
la
ck o
f con
trol
of th
e C
ontra
ctor
an
d th
is is
sue
still
usua
lly
happ
ens
Not
det
ecte
d
Wor
k w
ays
are
not
safe
en
ough
at
B
en
Gao
Brid
ge (w
ork
way
s ov
er
the
wat
er
body
w
ithou
t ha
ndra
il)
and
scaf
fold
is
loca
ted
on
unle
vel
and
unst
able
gr
ound
RE
F-A
2-G
ET1
-MO
M-4
2 O
ral r
equi
rem
ents
Inst
all
safe
ty
wor
k w
ays
such
as
scaf
fold
, la
dder
s,
etc.
to
en
sure
sa
fety
fo
r w
orke
rs
Con
tract
or
June
01,
20
12
Miti
gatio
n m
easu
res
are
not
impl
emen
ted
Wor
k w
ays
wer
e in
stal
led
hand
rail
Sca
ffold
was
re
loca
ted
on
leve
l and
st
able
gro
und
Ele
ctric
sy
stem
s ar
e no
t sa
fe
enou
gh
for
use
at T
L310
Brid
ge
O
ral r
equi
rem
ents
R
eins
tall
elec
tric
syst
em
and
ensu
re t
hat
they
are
sa
fe e
noug
h fo
r use
C
ontra
ctor
A
pr 1
2, 2
012
Miti
gatio
n m
easu
re w
as
appl
ied
Goo
d m
aint
enan
ce
Goo
d m
aint
enan
ce
Lack
of
safe
ty n
et a
nd
safe
ty
ladd
er/s
caffo
ld
durin
g ca
rryi
ng o
ut t
he
G
ET1
/PO
S/A
2/12
63
GE
T1/P
OS
/A2/
1309
R
EF-
A2-
GE
T1-M
OM
-43
Pro
vide
sa
fety
ne
t/lad
der/s
caffo
ld
for
wor
kers
C
ontra
ctor
M
ay 1
6,
2012
Arm
y II,
Ben
G
ao, M
uong
D
ao a
nd S
ong
Arm
y II
Brid
ge, B
en
Gao
Brid
ge,
All
stru
ctur
e w
orks
wer
e in
stal
led
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
213
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
wor
k at
hei
ght a
t Arm
y II
Brid
ge,
Arm
y III
B
ridge
, TL
310
Brid
ge,
Ben
Tre
Brid
ge,
Son
g D
ao
Brid
ge,
Muo
ng
Dao
B
ridge
an
d B
en
Gao
Brid
ge
RE
F-A
2-G
ET1
-MO
M-4
4 O
ral r
equi
rem
ents
D
ao b
ridge
s:
No
impr
ovem
ent
Oth
ers:
M
itiga
tion
mea
sure
s w
ere
impl
emen
ted
Muo
ng D
ao
Brid
ge a
nd
Son
g D
ao
Brid
ge:
Sca
ffold
s w
ere
prov
ided
but
no
t eno
ugh
safe
ty n
et
enou
gh
scaf
fold
s an
d sa
fety
net
s
Sec
urity
fen
ce b
roke
n at
Xua
n Q
uang
Brid
ge
G
ET1
/PO
S/A
2/12
43
Rei
nsta
ll se
curit
y fe
nce,
as
sign
se
curit
y gu
ard
to
cont
rol t
his
area
C
ontra
ctor
A
pr 0
9, 2
012
Miti
gatio
n m
easu
re h
as
been
app
lied
Goo
d m
aint
enan
ce
Goo
d m
aint
enan
ce
4 ab
ando
ned
wel
ls a
re
foun
d on
si
te
with
out
back
fillin
g or
cov
er
O
ral r
equi
rem
ents
B
ackf
ill or
co
ver
all
the
aban
done
d w
ells
C
ontra
ctor
A
pr 2
6, 2
012
In fo
llow
ing
The
wel
ls
wer
e fil
led
with
so
il
A fa
tal a
ccid
ent w
as
reco
rded
at L
o R
iver
B
ridge
on
Sun
day
mor
ning
, Apr
il 22
, 201
2
GE
T1/P
OS
/A2/
1352
Inve
stig
ate
the
acci
dent
, su
bmit
the
repo
rt, a
pply
the
mea
sure
s to
pre
vent
si
mila
r iss
ue
Con
tract
or
June
10,
20
12
The
repo
rt ha
s no
t bee
n su
bmitt
ed
The
repo
rt ha
s no
t bee
n su
bmitt
ed
Rep
ort w
as
subm
itted
al
read
y
Chi
ldre
n en
tere
d th
e co
nstru
ctio
n si
te fo
r pl
ayin
g at
Muo
ng D
ao
Brid
ge
RE
F-A
2-G
ET1
-MO
M-4
4 O
ral r
equi
rem
ents
Inst
all t
he fe
nce
of b
arbe
d w
ires
and
sign
boar
ds
surr
ound
ing
wor
king
are
as;
prev
ent a
cces
s of
un
auth
oriz
ed p
erso
ns to
th
e si
tes
Con
tract
or
May
28,
20
12
Fo
llow
ing
No
child
ren
dete
cted
ac
cess
ing
site
bu
t fen
ce h
as
not b
een
inst
alle
d La
ck o
f fen
ce a
nd
sign
boar
d to
con
trol
traffi
c on
pub
lic ro
ads
at M
uong
Noi
Brid
ge
R
EF-
A2-
GE
T1-M
OM
-44
Ora
l req
uire
men
ts
Res
olve
the
obst
ruct
ion
of
terr
ain
and
inst
all t
he fe
nce
and
sign
boar
d sy
stem
to
cont
rol t
he tr
affic
con
ditio
n
Con
tract
or
May
29,
20
12
Miti
gatio
n m
easu
res
are
bein
g im
plem
ente
d
Miti
gatio
n m
easu
res
wer
e ap
plie
d
Saf
ety
fenc
e su
rrou
ndin
g de
tour
ro
ad a
t TL3
06I B
ridge
br
oken
GE
T1/P
OS
/A2/
1369
R
eins
tall
new
one
and
su
pple
men
t war
ning
si
gnbo
ard
syst
em
Con
tract
or
June
18,
20
12
Miti
gatio
n m
easu
res
wer
e ap
plie
d
Lack
of s
afet
y fe
nce
and
sign
boar
d an
d
GE
T1/P
OS
/A2/
1371
In
stal
l the
saf
ety
fenc
e,
sign
boar
d an
d lig
htin
g C
ontra
ctor
Ju
ne 2
0,
2012
M
itiga
tion
mea
sure
s w
ere
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
214
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by E
ngin
eer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
light
ing
syst
em a
t TL
306I
I Brid
ge
syst
em
appl
ied
6.2.
3 Pa
ckag
e A
3
Apr
il
Prob
lem
des
crip
tion
Cau
se
Solu
tion
Req
uire
d A
ctio
n Ta
ken
(by
Engi
neer
, ref
er to
do
cum
ents
bel
ow)
Dea
dlin
e C
urre
nt S
tatu
s
Ele
ctric
sys
tem
was
not
saf
e:
Inte
rrup
tor
was
no
t sa
fe,
elec
tric
wire
w
as
laid
on
gr
ound
…P3
Red
riv
er b
ridge
, N
atio
nal r
ailw
ay f
lyov
er b
ridge
, P
9 R
ed ri
ver b
ridge
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y C
ontra
ctor
m
ust
rese
t up
el
ectri
c sy
stem
to e
nsur
e sa
fety
wor
k.
GET
2-P
OS
-A3-
1204
Im
med
iate
ly
Con
tract
or
still
dela
y to
re
solv
e it.
Ladd
er w
as n
ot s
afe
beca
use
it w
as
not
set
up
hand
rail
to
ensu
re
safe
ty.
P2
Red
riv
er
brid
ge, H
o C
hi M
inh
IC.
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y Th
e C
ontra
ctor
do
esn’
t ca
re
abou
t sa
fety
.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
imm
edia
tely
C
ontra
ctor
st
ill
dela
y to
re
solv
e it.
Floo
r op
erat
ion
was
not
saf
e:
no
hand
rail,
un
relia
ble.
Ba
i B
ang
brid
ge
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y
Con
tract
or m
ust s
et u
p th
e st
eady
floo
r op
erat
ion
for
wor
ker
wor
k at
hei
ght.
And
at
he
ight
m
ore
than
2m
th
e C
ontra
ctor
m
ust
prov
ide
scaf
fold
to
en
sure
saf
ety
wor
k.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
imm
edia
tely
C
ontra
ctor
st
ill de
lay
to
reso
lve
it.
At
som
e pl
ace,
N
o ac
cess
Th
e C
ontra
ctor
do
esn’
t C
ontra
ctor
mus
t set
up
the
stea
dy fl
oor
We
requ
este
d or
war
ned
the
imm
edia
tely
A
fter
Con
sulta
nt
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
215
Prob
lem
des
crip
tion
Cau
se
Solu
tion
Req
uire
d A
ctio
n Ta
ken
(by
Engi
neer
, ref
er to
do
cum
ents
bel
ow)
Dea
dlin
e C
urre
nt S
tatu
s
ladd
er,
no
scaf
fold
, no
flo
or
oper
atio
n w
as s
et u
p fo
r w
ork.
N
o sa
fety
han
drai
l was
set
up.
IC
8, P
3 R
ed ri
ver b
ridge
care
abo
ut s
afet
y op
erat
ion
for
wor
ker
wor
k at
hei
ght.
And
at
he
ight
m
ore
than
2m
th
e C
ontra
ctor
m
ust
prov
ide
scaf
fold
to
en
sure
saf
ety
wor
k. B
esid
e, a
ll la
dder
s m
ust b
e in
stal
l han
drai
l.
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
war
ned
in
site
, C
ontra
ctor
re
ques
ted
and
push
ed
thei
r su
bcon
tract
or
to
mak
e ha
ndra
il an
d re
info
rce
the
floor
op
erat
ion
relia
bly.
N
o sa
fety
si
gnpo
st
at
inte
rsec
tion
bettw
een
cons
truct
ion
site
and
loca
l roa
d.
Pho
ng C
hau
brid
ge
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y
Con
tract
or
has
to
inst
all
safe
ty
sign
post
at
in
ters
ectio
n be
ttwee
n co
nstru
ctio
n si
te
and
loca
l ro
ad
to
ensu
re s
afet
y.
GE
T2-P
OS
-A3-
1204
imm
edia
tely
C
ontra
ctor
st
ill de
lay
to
reso
lve
it.
Wor
ker
did
not
use
safe
ty
labo
ur.
Som
etim
e,
they
w
ork
dang
erou
sly
at h
eigh
t. IC
8, B
ai
Ban
g br
idge
, Red
rive
r brid
ge
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y.
Con
tract
or m
ust r
eque
st a
ll w
orke
rs to
us
e sa
fety
equ
ipm
ent
whe
n th
ey w
ork
in s
ite, s
peci
al a
t hei
ght.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
Imm
edia
tely
Afte
r C
onsu
ltant
w
arne
d in
si
te,
Con
tract
or
rem
inde
d th
eir
wor
ker.
No
prot
ectiv
e co
ver
was
set
up
for
this
mac
hine
. Xu
an T
hanh
br
idge
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y.
Con
tract
or
has
to
prov
ide
mac
hine
w
hich
are
fitte
d w
ith p
rote
ctiv
e co
ver t
o en
sure
saf
ety
wor
k.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
Imm
edia
tely
Afte
r C
onsu
ltant
w
arne
d in
si
te,
Con
tract
or
rem
inde
d th
eir
subc
ontra
ctor
to
se
t up
a
prot
ectiv
e co
ver
for t
his
mac
hine
.
Inha
bita
nt
was
fre
ely
entry
co
nstru
ctio
n si
te. K
m51
+100
Th
e C
ontra
ctor
do
esn’
t ca
re a
bout
saf
ety.
Con
tract
or
mus
t pr
otec
t co
nstru
ctio
n lim
it an
d en
sure
sa
fety
w
hen
you
acce
pt lo
cal p
eopl
e en
try c
onst
ruct
ion
site
.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
Imm
edia
tely
C
ontra
ctor
st
ill de
lay
to
reso
lve
it.
Oil
drum
s w
ere
put e
very
whe
re
in s
ite w
ithou
t sa
fety
mea
sure
. K
m68
+400
The
Con
tract
or
does
n’t
care
ab
out
prot
ect
envi
ronm
ent.
Con
tract
or m
ust
grou
p al
l oil
drum
s in
re
gula
tion
plac
e an
d ha
ve
safe
ty
mea
sure
to
avoi
d oi
l w
ill b
e sp
illed
over
gro
und
and
pollu
te s
oil r
esou
rce.
GET
2-P
OS
-A3-
1204
Im
med
iate
ly
Con
tract
or
still
dela
y to
re
solv
e it.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
216
Prob
lem
des
crip
tion
Cau
se
Solu
tion
Req
uire
d A
ctio
n Ta
ken
(by
Engi
neer
, ref
er to
do
cum
ents
bel
ow)
Dea
dlin
e C
urre
nt S
tatu
s
Was
te
wat
er
cont
aine
d co
ncre
te
whi
ch
was
th
row
n af
ter
was
hing
pr
oces
s,
was
th
row
n in
to t
he p
ond.
Nat
iona
l ra
ilway
flyo
ver b
ridge
The
Con
tract
or
does
n’t
care
ab
out
prot
ect
envi
ronm
ent.
Con
tract
or
mus
t st
op
imm
edia
tely
po
urin
g w
aste
w
ater
sp
ecia
l w
aste
co
ncre
ting
wat
er i
nto
pond
or
field
s ne
xt to
con
stru
ctio
n si
te.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
Imm
edia
tely
Con
tract
or
rem
inde
d th
eir
subc
ontra
ctor
st
op i
mm
edia
tely
po
urin
g w
aste
w
ater
sp
ecia
l w
aste
con
cret
ing
wat
er
into
po
nd
or fi
elds
.
All
dum
p tru
cks
wer
e no
t co
vere
d, s
oil
was
fal
len
muc
h on
ex
istin
g ro
ad.
Dus
t w
as
dist
ribut
ed
muc
h in
th
e ai
r. K
m51
+100
The
Con
tract
or
does
n’t
care
ab
out
prot
ect
envi
ronm
ent.
Con
tract
or m
ust c
lean
all
falle
n so
il on
ex
istin
g ro
ad
and
spre
ad
wat
er
appr
opria
tely
G
ET2-
PO
S-A
3-12
04
Imm
edia
tely
Afte
r w
anin
g le
tter
of
Con
sulta
nt
ref.
GET
2-P
OS
-A3-
1204
, C
ontra
ctor
st
art
spre
adin
g w
ater
fro
m
Apr
il 25
th, 2
012
Irrig
atio
n ca
nal w
as b
lock
ed b
y fa
llen
soil
and
rubb
ish.
K
m51
+100
The
Con
tract
or
does
n’t
care
ab
out
prot
ect
envi
ronm
ent.
Con
tract
or h
as to
rem
ove
all r
ubbi
sh in
si
te a
nd u
nblo
ck th
is ir
rigat
ion
cana
l
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
Imm
edia
tely
C
ontra
ctor
st
ill de
lay
to
reso
lve
it.
Rub
bish
was
muc
h in
site
. IC
8 Th
e C
ontra
ctor
do
esn’
t ca
re a
bout
env
ironm
enta
l pr
otec
tion.
Con
tract
or h
as t
o re
mov
e al
l ru
bbis
h ou
t site
eve
ryda
y.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
Imm
edia
tely
C
ontra
ctor
re
solv
ed it
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
217
May
Prob
lem
des
crip
tion
Cau
se
Solu
tion
requ
ired
Act
ion
take
n (b
y E
ngin
eer,
refe
r to
docu
men
ts b
elow
) D
eadl
ine
Cur
rent
sta
tus
Ele
ctric
sys
tem
was
not
saf
e:
elec
trica
l jun
ctio
n, in
terr
upte
r w
ere
not s
afe,
ele
ctric
wire
was
la
id o
n gr
ound
… R
ed ri
ver
brid
ge, N
atio
nal r
ailw
ay fl
yove
r br
idge
, Bai
Ban
g ra
ilway
flyo
ver.
The
Con
tract
or s
et u
p el
ectri
c sy
stem
not
wel
l.
Con
tract
or m
ust r
eset
up
elec
tric
syst
em: l
ift u
p al
l ele
ctric
al c
apes
hi
gher
than
gro
und
at le
ase
2m;
elec
trica
l jun
ctio
n, in
terr
upte
r mus
t be
ensu
re s
afet
y.
GET
2-P
OS
-A3-
1221
G
ET2-
PO
S-A
3-12
85
15th
Jun
e,
2012
.
Con
tract
or s
till
dela
y to
reso
lve
it.
Now
wat
er le
vel i
s ve
ry h
igh
so
it's
very
dan
gero
us w
hen
wor
ker w
ork
ther
e sp
ecia
l at
heig
ht. B
ut C
ontra
ctor
has
not
se
t up
safe
ty la
dder
for w
ork
at
heig
ht a
t P4
(at t
he m
iddl
e riv
erbe
d) o
f Red
rive
r brid
ge. I
n ot
her p
ier (
P5, P
6, P
7) s
caffo
ld
syst
ems
are
not s
afe.
The
Con
tract
or d
id n
ot
give
sui
tabl
e sa
fety
m
etho
ds to
car
ry o
ut w
ork
at p
ier i
n th
e m
iddl
e riv
erbe
d an
d at
hei
ght.
- Con
tract
or is
requ
este
d to
sub
mit
safe
ty m
etho
d st
atem
ent w
orki
ng a
t he
ight
on
Red
Riv
er b
ridge
. - C
onsu
ltant
and
Con
tract
or w
ill u
se a
S
afet
y ch
eckl
ist f
or a
ll ite
ms
on b
ridge
s to
sho
w o
ut w
hat’s
pro
blem
mus
t be
reso
lve
to e
nsur
e sa
fety
.
-Con
tract
or a
nd C
onsu
ltant
w
ill h
ave
a m
eetin
g an
d gi
ve
dead
line
for C
ontra
ctor
car
ry
out s
uita
ble
mea
sure
s to
en
sure
saf
ety.
-w
e ch
ecke
d ac
tual
situ
atio
n af
ter C
ontra
ctor
rein
forc
ed
scaf
fold
ing
syst
ems
in s
ite.
May
28th
, 20
12.
-Con
tract
or
subm
itted
saf
ety
met
hod
stat
emen
t w
orki
ng a
t hei
ght
on R
ed R
iver
br
idge
. -S
caffo
ldin
g w
as
rein
forc
ed b
y C
ontra
ctor
.
Floo
r ope
ratio
n w
as n
ot s
afe:
no
hand
rail,
unr
elia
ble.
Bai
Ban
g br
idge
The
Con
tract
or d
id n
ot
prov
ide
scaf
fold
s fo
r w
orki
ng a
t hei
ght.
Con
tract
or m
ust s
et u
p th
e st
eady
floo
r op
erat
ion
for w
orke
r wor
k at
hei
ght.
And
at h
eigh
t mor
e th
an 2
m th
e C
ontra
ctor
mus
t pro
vide
sca
ffold
to
ensu
re s
afet
y w
ork.
GET
2-P
OS
-A3-
1221
15th
Jun
e,
2012
.
Con
tract
or s
till
dela
y to
reso
lve
it.
At s
ome
plac
e, N
o ac
cess
la
dder
, no
scaf
fold
, no
floor
op
erat
ion
was
set
up
for w
ork.
N
o sa
fety
han
drai
l was
set
up.
IC
8, P
3 R
ed ri
ver b
ridge
The
Con
tract
or d
oesn
’t ca
re a
bout
saf
ety
Con
tract
or m
ust s
et u
p th
e st
eady
floo
r op
erat
ion
for w
orke
r wor
k at
hei
ght.
And
at h
eigh
t mor
e th
an 2
m th
e C
ontra
ctor
mus
t pro
vide
sca
ffold
to
ensu
re s
afet
y w
ork.
Bes
ide,
all
ladd
ers
mus
t be
inst
all h
andr
ail.
GET
2-P
OS
-A3-
1221
15th
Jun
e,
2012
.
Con
tract
or s
till
dela
y to
reso
lve
it.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
218
Prob
lem
des
crip
tion
Cau
se
Solu
tion
requ
ired
Act
ion
take
n (b
y E
ngin
eer,
refe
r to
docu
men
ts b
elow
) D
eadl
ine
Cur
rent
sta
tus
Wor
ker d
id n
ot u
se s
afet
y la
bour
at T
L315
B b
ridge
K
m67
+600
, TL3
20B
brid
ge
Km
64+0
80.
The
Con
tract
or d
id n
ot
cont
rol t
heir
subc
ontra
ctor
an
d w
orke
r as
wel
l.
Con
tract
or m
ust r
eque
st a
ll w
orke
rs to
us
e sa
fety
equ
ipm
ent w
hen
they
wor
k in
site
, spe
cial
at h
eigh
t.
Con
sulta
nt d
irect
ly w
arne
d in
site
. G
ET2-
PO
S-A
3-12
21
GE
T2-P
OS
-A3-
1285
Imm
edia
tely
C
ontra
ctor
re
min
ded
thei
r w
orke
r.
Fire
ext
ingu
ishe
rs, f
irst a
id k
its
wer
e no
t set
up
in w
orke
r’s
cam
ps a
t Nat
iona
l rai
lway
fly
over
, TL3
20B
brid
ge, B
ai
Ban
g ra
ilway
flyo
ver.
The
Con
tract
or d
oesn
’t ca
re a
bout
saf
ety
for t
heir
wor
ker’s
life
.
Con
tract
or m
ust p
rovi
de F
ire
extin
guis
hers
, firs
t aid
kits
for a
ll w
orke
r’s c
amps
alo
ng p
acka
ge A
3.
GET
2-P
OS
-A3-
1221
G
ET2-
PO
S-A
3-12
85
Imm
edia
tely
C
ontra
ctor
stil
l de
lay
to re
solv
e it.
Oil
drum
s w
ere
put e
very
whe
re
in s
ite w
ithou
t saf
ety
mea
sure
. K
m78
+400
, Km
52+2
00 (T
GT
wor
ker’s
cam
p)
The
Con
tract
or d
id n
ot
conc
rete
the
stor
age’
s fo
unda
tion,
did
not
set
up
fire
extin
guis
her.
Con
tract
or m
ust g
roup
all
oil d
rum
s in
re
gula
tion
plac
e an
d ha
ve s
afet
y m
easu
re to
avo
id o
il w
ill b
e sp
illed
over
gro
und
and
pollu
te s
oil r
esou
rce.
GET
2-P
OS
-A3-
1285
10
th J
une,
20
12.
Con
tract
or s
till
dela
y to
reso
lve
it.
The
conc
rete
bat
chin
g pl
ants
at
Km
78+8
00, K
m78
+100
wer
e no
t set
up
sedi
men
t con
trol
pond
to c
olle
ct w
aste
wat
er
cont
ain
conc
rete
.
The
Con
tract
or d
id n
ot
built
sed
imen
t con
trol
pond
for t
hese
con
cret
e ba
tchi
ng p
lant
s.
Con
tract
or h
as to
bui
ld s
edim
ent
cont
rol p
ond
to c
olle
ct w
aste
wat
er
cont
ains
con
cret
e at
eac
h C
oncr
ete
batc
hing
pla
nt.
GET
2-P
OS
-A3-
1285
8th
Jun
e,
2012
.
Con
tract
or s
till
dela
y to
reso
lve
it.
Loca
l peo
ple
com
plai
n m
uch
beca
use
nois
e, d
ust a
nd
vibr
atio
n fro
m c
onst
ruct
ion
activ
ities
.
Con
tract
or d
id n
ot c
arry
ou
t met
hods
to m
inim
ize
nois
e, d
ust a
nd v
ibra
tion.
Con
tract
or h
as to
bui
ld fe
nce
to
min
imiz
e no
ise,
wat
er a
ppro
pria
tely
to
min
imiz
e du
st a
nd li
mit
time
for
wor
king
at n
ight
.
GET
2-P
OS
-A3-
1285
15
th J
une,
20
12.
Con
tract
or s
till
dela
y to
reso
lve
it.
Irrig
atio
n ca
nal w
as b
lock
ed b
y fa
llen
soil
and
rubb
ish.
K
m51
+100
The
Con
tract
or d
oesn
’t ca
re a
bout
pro
tect
en
viro
nmen
t.
Con
tract
or h
as to
rem
ove
all r
ubbi
sh in
si
te a
nd u
nblo
ck th
is ir
rigat
ion
cana
l G
ET2-
PO
S-A
3-12
85
15th
Jun
e,
2012
.
Con
tract
or s
till
dela
y to
reso
lve
it.
Rub
bish
was
muc
h in
site
. W
orke
r’s c
amp
near
P3
Red
riv
er b
ridge
.
The
Con
tract
or d
oesn
’t ca
re a
bout
env
ironm
enta
l pr
otec
tion.
Con
tract
or h
as to
rem
ove
all r
ubbi
sh
out s
ite e
very
day.
G
ET2-
PO
S-A
3-12
85
Imm
edia
tely
C
ontra
ctor
re
solv
ed it
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
219
June
Prob
lem
des
crip
tion
Cau
se
Solu
tion
requ
ired
Act
ion
take
n (b
y E
ngin
eer,
refe
r to
docu
men
ts b
elow
) D
eadl
ine
Cur
rent
sta
tus
Con
tract
or h
as s
et u
p sa
fety
sc
affo
ldin
gs a
t Red
rive
r brid
ge
site
s.
S
caffo
ldin
gs a
re a
ctua
lly s
afet
y an
d re
gula
rly c
heck
ed
GE
T2-P
OS
-A3-
1288
, dat
e 20
12,J
une,
04th
G
ET2-
PO
S-A
3-13
41, d
ate
2012
, Jun
e 26
th
Afte
r ins
truct
ions
from
the
Eng
inee
r, th
e C
ontra
ctor
set
up
a c
ompl
ete
syst
em to
ch
eck
them
twic
e a
wee
k E
ngin
eer c
heck
ed a
ctua
l si
tuat
ion
afte
r Con
tract
or
rein
forc
ed s
caffo
ldin
g sy
stem
s in
site
.
5th J
une
-Con
tract
or
subm
itted
saf
ety
met
hod
stat
emen
t w
orki
ng a
t he
ight
on
Red
R
iver
brid
ge.
-Sca
ffold
ing
was
re
info
rced
by
Con
tract
or.
The
conc
rete
bat
chin
g pl
ants
at
Km
78+8
00, K
m78
+100
hav
e al
read
y se
t up
sedi
men
t con
trol
pond
to c
olle
ct w
aste
wat
er
cont
aini
ng c
oncr
ete.
At a
butm
ent 1
, sed
imen
t pon
d sh
ould
be
bet
ter p
rote
cted
from
spi
llage
s to
th
e riv
er
At a
butm
ent 2
, sed
imen
t pon
d ha
s to
in
crea
se th
e fro
nt d
ick
to in
crea
se th
e ca
paci
ty o
f the
pon
d.
GET
2-P
OS
-A3-
1285
, dat
e 20
12, J
une
01st
R
athe
r goo
d m
aint
enan
ce
Ele
ctric
sys
tem
was
not
saf
e:
elec
trica
l jun
ctio
n, in
terr
upte
rs
are
not p
rope
r, el
ectri
c w
ire w
as
laid
on
grou
nd…
Red
rive
r br
idge
, Nat
iona
l rai
lway
flyo
ver
brid
ge, B
ai B
ang
railw
ay fl
yove
r.
The
Con
tract
or d
idn’
t giv
e st
rong
inst
ruct
ions
to
subc
ontra
ctor
s
Con
tract
or m
ust r
eset
up
elec
tric
syst
em: l
ift u
p al
l ele
ctric
al c
apes
hi
gher
than
gro
und
at le
ase
2m;
elec
trica
l jun
ctio
n, in
terr
upte
r mus
t be
ensu
re s
afet
y.
GET
2-P
OS
-A3-
1285
, dat
e 20
12, J
une
01st
15th
Jul
y,
2012
.
Con
tract
or s
till
dela
y to
reso
lve
it.
Wor
ker d
id n
ot u
se s
afet
y la
bor
at T
L315
B b
ridge
Km
67+6
00,
TL32
0B b
ridge
Km
64+0
80.
The
Con
tract
or d
id n
ot
cont
rol t
heir
subc
ontra
ctor
s an
d th
e w
orke
rs d
on’t
wan
t m
any
times
to w
ear P
PE
s.
Con
tract
or m
ust r
eque
st a
ll w
orke
rs to
us
e sa
fety
equ
ipm
ent w
hen
they
wor
k in
site
, spe
cial
at h
eigh
t.
Con
sulta
nt d
irect
ly w
arne
d in
si
te a
nd s
ent l
ette
r GE
T2-
POS
-A3-
1285
, dat
e 20
12,
June
01st
Imm
edia
tely
C
ontra
ctor
re
min
ded
thei
r w
orke
r.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
220
Prob
lem
des
crip
tion
Cau
se
Solu
tion
requ
ired
Act
ion
take
n (b
y E
ngin
eer,
refe
r to
docu
men
ts b
elow
) D
eadl
ine
Cur
rent
sta
tus
Fire
ext
ingu
ishe
rs, f
irst a
id k
its
wer
e no
t set
up
in w
orke
r’s
cam
ps a
t Nat
iona
l rai
lway
fly
over
, TL3
20B
brid
ge, B
ai
Ban
g ra
ilway
flyo
ver.
The
Con
tract
or d
id n
ot
cont
rol t
heir
subc
ontra
ctor
s an
d th
e w
orke
rs d
on’t
wan
t m
any
times
to a
pply
saf
ety
mea
sure
s
Con
tract
or m
ust p
rovi
de fi
re
extin
guis
hers
, firs
t aid
kits
for a
ll w
orke
rs c
amps
alo
ng p
acka
ge A
3.
GET
2-P
OS
-A3-
1285
, dat
e 20
12, J
une
01st
Imm
edia
tely
C
ontra
ctor
stil
l de
lay
to re
solv
e it.
Oil
drum
s w
ere
put i
n si
te
with
out s
pilla
ge c
ontro
l m
easu
res.
Km
78+4
00,
Km
52+2
00 (T
GT
wor
ker’s
cam
p)
The
Con
tract
or d
id n
ot
prep
ared
a c
oncr
ete
surfa
ce to
sto
rage
the
haza
rdou
s dr
ums.
Con
tract
or m
ust g
roup
all
oil d
rum
s in
re
gula
tion
plac
e an
d ha
ve s
afet
y m
easu
re to
avo
id o
il w
ill b
e sp
illed
over
gro
und
and
pollu
te s
oil r
esou
rce.
GET
2-P
OS
-A3-
1285
, dat
e 20
12, J
une
01st
10th
Jul
y,
2012
.
Con
tract
or s
till
dela
y to
reso
lve
it.
Irrig
atio
n ca
nal w
as b
lock
ed b
y fa
llen
soil
and
rubb
ish.
K
m51
+100
The
Con
tract
or d
idn’
t car
e ab
out t
he p
rote
ctio
n of
that
ca
nal.
Con
tract
or h
as to
rem
ove
all r
ubbi
sh
in s
ite a
nd u
nblo
ck th
is ir
rigat
ion
cana
l G
ET2-
PO
S-A
3-12
85, d
ate
2012
, Jun
e 01
st
10th
Jul
y,
2012
.
Con
tract
or s
till
dela
y to
reso
lve
it.
Muc
h ru
bbis
h ke
eps
on s
ite.
Wor
ker’s
cam
p ne
ar P
3 R
ed
river
brid
ge.
The
Con
tract
or a
nd
subc
ontra
ctor
s do
n’t c
are
abou
t cle
anlin
ess.
Sub
cont
ract
ors
have
to re
mov
e al
l ru
bbis
h ou
t site
eve
ry d
ay.
GET
2-P
OS
-A3-
1285
, dat
e 20
12, J
une
01st
Imm
edia
tely
S
ubco
ntra
ctor
s ar
e cl
eani
ng
step
by
step
6.
2.4
Pack
age
A4
Apr
il
Prob
lem
des
crip
tion
Cau
se
Solu
tion
Req
uire
d A
ctio
n Ta
ken
(by
Engi
neer
, ref
er to
do
cum
ents
bel
ow)
Dea
dlin
e C
urre
nt S
tatu
s
Wor
ker
did
not
use
safe
ty
labo
ur a
nd t
hey
usua
lly d
id n
ot
use
safe
ty b
elt
whe
n th
ey w
ork
at
heig
ht.
Km96
+700
, K
m97
+124
N
goi
Lao
brid
ge,
Ngo
i Van
brid
ge K
m10
9+02
5
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y
The
Con
tract
or
mus
t pr
ovid
e sa
fety
la
bour
and
rem
ind
your
wor
ker
use
safe
ty la
bour
to e
nsur
e sa
fety
wor
k.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
Imm
edia
tely
Th
e C
ontra
ctor
co
ntro
ls
thei
r w
orke
r not
wel
l.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
221
Prob
lem
des
crip
tion
Cau
se
Solu
tion
Req
uire
d A
ctio
n Ta
ken
(by
Engi
neer
, ref
er to
do
cum
ents
bel
ow)
Dea
dlin
e C
urre
nt S
tatu
s
Ele
ctric
sys
tem
was
not
saf
e:
inte
rrup
ter
box
was
no
t sa
fe,
elec
tric
wire
was
laid
und
er w
et
mud
. K
m10
7+53
3, K
m84
+400
TL
321C
, N
goi
lao
brid
ge,
Ngo
i G
ianh
brid
ge K
m88
+600
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y C
ontra
ctor
ha
s to
re
set
up
elec
tric
syst
em to
ens
ure
safe
ty w
ork
GET
2-K
EA
-A4-
630
imm
edia
tely
Th
e C
ontra
ctor
st
ill d
elay
No
sign
post
w
as
inst
alle
d at
in
ters
ectio
n be
twee
n lo
cal r
oad
and
cons
truct
ion
site
. K
m96
+700
, Km
107+
533
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y.
Con
tract
or
has
to
inst
all
safe
ty
sign
post
to e
nsur
e sa
fety
.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
imm
edia
tely
Th
e C
ontra
ctor
st
ill d
elay
Dee
p ar
ea
was
no
t in
stal
led
safe
ty
tape
. K
m97
+124
N
goi
Lao
brid
ge
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y.
Con
tract
or h
as t
o in
stal
l sa
fety
tap
e ar
ound
dee
p ar
eas
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
imm
edia
tely
Th
e C
ontra
ctor
st
ill d
elay
Dum
p tru
cks
wer
e no
t co
vere
d so
so
il w
as
falle
n m
uch
on
exis
ting
road
. On
dry
days
dus
t w
as d
istri
bute
d a
lot
in t
he a
ir.
But
on
rain
y da
ys m
ud is
full
on
thes
e ex
istin
g ro
ads.
K
m97
+124
N
goi
Lao
brid
ge,
Km
107+
533
QL3
2C
bypa
ss,
Km
84+4
00
TL32
1C
brid
ge,
Km
88+1
00 b
ox c
ulve
rt.
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n.
Con
tract
or h
as t
o co
llect
all
mud
and
re
mov
e to
dis
posa
l are
a to
avo
id d
ust
in th
e ai
r on
dry
days
.
GET
2-K
EA
-A4-
630
Req
uest
ed t
o sp
read
wat
er
at
leas
e 3
times
/day
to
m
inim
ize
dust
.
imm
edia
tely
Afte
r C
onsu
ltant
’s
lette
r, C
ontra
ctor
st
arte
d sp
read
ing
wat
er
1 tim
e/da
y.
Ben
toni
te w
as o
verfl
owed
int
o riv
er
alth
ough
C
ontra
ctor
re
paire
d th
is
viol
atio
n.
Km
97+1
24 N
goi L
ao b
ridge
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n.
Con
tract
or m
ust
cont
inue
ove
r co
me
this
pro
blem
and
we
will
rech
eck
in s
ite
GET
2-K
EA
-A4-
630
Imm
edia
tely
Afte
r C
onsu
ltant
’s
lette
r, C
ontra
ctor
re
solv
ed
this
vi
olat
ion
but
it’s
not a
bsol
utel
y.
Mud
and
rub
bish
was
thr
own
into
acc
ess
irrig
atio
n ca
nal.
It bl
ocke
d th
is c
anal
. Km
84+4
00
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n.
Con
tract
or m
ust c
olle
ct a
ll ru
bbis
h an
d m
ud to
unb
lock
this
can
al.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
Imm
edia
tely
Th
e C
ontra
ctor
de
lay
to r
esol
ve
this
pro
blem
.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
222
Prob
lem
des
crip
tion
Cau
se
Solu
tion
Req
uire
d A
ctio
n Ta
ken
(by
Engi
neer
, ref
er to
do
cum
ents
bel
ow)
Dea
dlin
e C
urre
nt S
tatu
s
TL32
1C b
ridge
. th
ey re
solv
e vi
olat
ions
.
Uns
uita
ble
mat
eria
l w
as
not
rem
oved
out
site
. Km
107+
533
QL3
2C b
ypas
s
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n.
The
Con
tract
or
mus
t
rem
ove
all
unsu
itabl
e m
ater
ial o
ut s
ite fo
llow
EC
P
G
ET2-
KE
A-A
4-63
0 Im
med
iate
ly
Afte
r C
onsu
ltant
’s
lette
r re
f.GE
T2-
KE
A-A
4-63
0,
Con
tract
or
reso
lved
th
is
viol
atio
n bu
t it’
s no
t abs
olut
ely.
Wor
ker’s
cam
p di
d no
t se
t up
to
ilet,
fire
extin
guis
her,
first
aid
bo
x. T
L321
C K
m84
+400
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n an
d sa
fety
for
w
orke
r.
Con
tract
or h
as t
o se
t up
toi
let,
fire
extin
guis
her,
first
aid
box
whe
n yo
ur
wor
ker
lives
in
ca
mp
insi
de
cons
truct
ion
site
.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
Imm
edia
tely
Th
e C
ontra
ctor
de
lay
to r
esol
ve
this
pro
blem
.
Rub
bish
, be
nton
ite
and
sack
s w
ere
thro
wn
ever
y w
here
in
si
te.
Ngo
i G
ianh
brid
ge,
Ngo
i V
an b
ridge
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n.
Con
tract
or h
as to
col
lect
all
was
te a
nd
rem
ove
out s
ite e
very
day.
We
requ
este
d or
war
ned
the
Con
tract
or
in
site
an
d by
w
eekl
y re
port
to
requ
est
they
reso
lve
viol
atio
ns.
Imm
edia
tely
Th
e C
ontra
ctor
de
lay
to r
esol
ve
this
pro
blem
.
Ben
toni
te
was
po
ured
di
rect
ly
into
riv
er.
Spe
cial
at
Ngo
i La
o K
m97
+124
an
d N
goi
Gia
nh
Km
88+6
00,
soil,
pe
bble
an
d be
nton
ite s
till w
as n
ot r
emov
ed
abso
lute
ly, i
t occ
upie
d a
part
or
mor
e th
an h
aft
of r
iver
bed
. A
t N
goi V
an r
iver
, so
il an
d pe
bble
w
as
falle
n a
lot
into
w
ater
re
sour
ce.
The
Con
tract
or
does
n’t
care
abo
ut w
ater
res
ourc
e pr
otec
tion.
Con
tract
or
is
stro
ngly
re
ques
ted
to
dred
ge f
alle
n so
il an
d pe
bble
in
river
an
d re
mov
e it
to d
ispo
sal a
reas
. G
ET2-
KE
A-A
4-63
0 Im
med
iate
ly
The
Con
tract
or
dela
y to
res
olve
th
is
prob
lem
at
N
goi
Gia
nh
river
. A
fter
Con
sulta
nt’s
le
tter,
Con
tract
or
gave
so
me
solu
tions
to
re
solv
e th
is
viol
atio
n bu
t it’
s no
t abs
olut
ely
at
Ngo
i La
o an
d N
goi V
an ri
vers
.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
223
May
Prob
lem
des
crip
tion
Cau
se
Solu
tion
requ
ired
Act
ion
take
n (b
y E
ngin
eer,
refe
r to
docu
men
ts b
elow
) D
eadl
ine
Cur
rent
sta
tus
Wor
ker
did
not
use
safe
ty l
abou
r an
d th
ey u
sual
ly d
id n
ot u
se s
afet
y be
lt w
hen
they
w
ork
at
heig
ht.
Km
97+1
24 N
goi L
ao b
ridge
, N
goi
Gia
nh
brid
ge
Km10
9+02
5,
Km
104+
500
box
culv
ert
The
Con
tract
or
does
n’t
cont
rol t
heir
wor
ker w
ell.
The
Con
tract
or
mus
t pr
ovid
e sa
fety
la
bour
and
rem
ind
your
wor
ker
use
safe
ty la
bour
to e
nsur
e sa
fety
wor
k.
GET
2-K
EA
-A4-
638
GET
2-K
EA
-A4-
680
imm
edia
tely
Th
e C
ontra
ctor
st
ill d
elay
Ele
ctric
sy
stem
w
as
not
safe
: in
terr
upte
r bo
x w
as
not
safe
, el
ectri
c w
ire w
as l
aid
unde
r w
et
mud
. Km
107+
533,
K
m84
+400
TL
321C
, N
goi
lao
brid
ge,
Ngo
i G
ianh
brid
ge K
m88
+600
The
Con
tract
or
does
n’t
care
abo
ut s
afet
y
Con
tract
or
has
to
rese
t up
el
ectri
c sy
stem
: lif
t up
all
elec
tric
wire
hig
her
than
gro
und
at l
east
2m
; al
l ju
nctio
n an
d in
terr
upte
r mus
t res
et u
p to
ens
ure
safe
ty w
ork
GET
2-K
EA
-A4-
638
GET
2-K
EA
-A4-
680
June
15
th,
2012
Th
e C
ontra
ctor
st
ill d
elay
Wor
ker’s
cam
ps w
ere
not
set
up
fire
extin
guis
her,
was
te b
ins,
and
fir
st
aid
kit
at
Km
104+
500,
K
m84
+400
, N
goi
Gia
nh
brid
ge
Km
88+9
00
Con
tract
or d
id n
ot p
rovi
de
safe
ty e
quip
men
t for
eac
h w
orke
r cam
p.
Con
tract
or
mus
t se
t up
fir
e ex
tingu
ishe
r, w
aste
bin
s, a
nd f
irst
aid
kit f
or e
ach
wor
ker c
amp.
GET
2-K
EA
-A4-
638
GET
2-K
EA
-A4-
680
June
15
th,
2012
Th
e C
ontra
ctor
st
ill d
elay
Dum
p tru
cks
wer
e no
t cov
ered
so
soil
was
fal
len
muc
h on
exi
stin
g ro
ad.
On
dry
days
du
st
was
di
strib
uted
a lo
t in
the
air.
But
on
rain
y da
ys m
ud i
s fu
ll on
the
se
exis
ting
road
s.
Km
97+1
24
Ngo
i La
o br
idge
, Km
107+
533
QL3
2C
bypa
ss,
Km
84+4
00
TL32
1C
brid
ge, K
m88
+100
box
cul
vert.
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n.
Con
tract
or h
as t
o co
llect
all
mud
and
re
mov
e to
dis
posa
l are
a to
avo
id d
ust
in th
e ai
r on
dry
days
.
GET
2-K
EA
-A4-
638
GET
2-K
EA
-A4-
680
imm
edia
tely
Th
e C
ontra
ctor
de
lay
to r
esol
ve
this
pro
blem
.
Ben
toni
te
was
ov
erflo
wed
in
to
river
alth
ough
Con
tract
or r
epai
red
this
vio
latio
n. K
m97
+124
Ngo
i Lao
br
idge
, N
goi
Gia
nh b
ridge
, N
Goi
V
an b
ridge
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n.
Con
tract
or m
ust
cont
inue
ove
r co
me
this
pro
blem
and
we
will
rech
eck
in s
ite
GET
2-K
EA
-A4-
638
GET
2-K
EA
-A4-
680
June
15
th,
2012
The
Con
tract
or
dela
y to
res
olve
th
is p
robl
em..
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
224
Prob
lem
des
crip
tion
Cau
se
Solu
tion
requ
ired
Act
ion
take
n (b
y E
ngin
eer,
refe
r to
docu
men
ts b
elow
) D
eadl
ine
Cur
rent
sta
tus
Mud
and
rub
bish
was
thr
own
into
ac
cess
irrig
atio
n ca
nal.
It bl
ocke
d th
is
cana
l. Km
84+4
00
TL32
1C
brid
ge.
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n.
Con
tract
or m
ust c
olle
ct a
ll ru
bbis
h an
d m
ud to
unb
lock
this
can
al.
GET
2-K
EA
-A4-
638
GET
2-K
EA
-A4-
680
June
15
th,
2012
The
Con
tract
or
dela
y to
res
olve
th
is p
robl
em.
Soi
l w
as
was
hout
in
to
field
s at
K
m10
3+80
0, K
m10
4+20
0
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n.
Con
tract
or m
ust
rem
ove
all f
alle
n so
il ou
t to
disp
osal
are
as.
GET
2-K
EA
-A4-
638
GET
2-K
EA
-A4-
680
June
15
th,
2012
The
Con
tract
or
dela
y to
res
olve
th
is p
robl
em.
Wor
ker’s
cam
p di
d no
t set
up
toile
t at
TL3
21C
Km
84+4
00
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n an
d sa
fety
for
w
orke
r.
Con
tract
or h
as t
o se
t up
toi
let,
fire
extin
guis
her,
first
aid
box
whe
n yo
ur
wor
ker
lives
in
ca
mp
insi
de
cons
truct
ion
site
.
GET
2-K
EA
-A4-
638
GET
2-K
EA
-A4-
680
June
15
th,
2012
The
Con
tract
or
dela
y to
res
olve
th
is p
robl
em.
Rub
bish
, be
nton
ite
and
sack
s w
ere
thro
wn
ever
y w
here
in
site
. N
goi
Gia
nh
brid
ge,
Ngo
i V
an
brid
ge
The
Con
tract
or
does
n’t
care
abo
ut e
nviro
nmen
tal
prot
ectio
n.
Con
tract
or h
as to
col
lect
all
was
te a
nd
rem
ove
out s
ite e
very
day.
G
ET2-
KE
A-A
4-63
8 G
ET2-
KE
A-A
4-68
0 im
med
iate
ly
The
Con
tract
or
dela
y to
res
olve
th
is p
robl
em.
Ben
toni
te w
as p
oure
d di
rect
ly in
to
river
. S
peci
al
at
Ngo
i La
o K
m97
+124
an
d N
goi
Gia
nh
Km
88+6
00,
soil,
pe
bble
an
d be
nton
ite
still
was
no
t re
mov
ed
abso
lute
ly,
it oc
cupi
ed a
par
t or
m
ore
than
haf
t of
riv
er b
ed.
At
Ngo
i V
an r
iver
, so
il an
d pe
bble
w
as
falle
n a
lot
into
w
ater
re
sour
ce.
The
Con
tract
or
does
n’t
care
abo
ut w
ater
res
ourc
e pr
otec
tion.
Con
tract
or
is
stro
ngly
re
ques
ted
to
dred
ge f
alle
n so
il an
d pe
bble
in
river
an
d re
mov
e it
to d
ispo
sal a
reas
.
GET
2-K
EA
-A4-
638
GET
2-K
EA
-A4-
680
June
15
th,
2012
The
Con
tract
or
dela
y to
res
olve
th
is p
robl
em.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
225
June
Prob
lem
des
crip
tion
Cau
se
Solu
tion
requ
ired
Act
ion
take
n (b
y E
ngin
eer,
refe
r to
docu
men
ts b
elow
) D
eadl
ine
Cur
rent
sta
tus
Wor
kers
did
not
use
full
safe
ty
labo
r and
they
usu
ally
did
not
use
sa
fety
bel
t whe
n th
ey w
ork
at
heig
ht. K
m97
+124
Ngo
i Lao
br
idge
, Ngo
i Gia
nh b
ridge
K
m10
9+02
5, K
m10
4+50
0 bo
x cu
lver
t
The
Con
tract
or d
oesn
’t co
ntro
l the
ir w
orke
r wel
l.
The
Con
tract
or m
ust p
rovi
de s
afet
y la
bor a
nd fo
rce
the
wor
kers
to u
se
safe
ty la
bor t
o en
sure
saf
ety
wor
k.
Sev
eral
lette
rs w
ere
writ
ten
abou
t thi
s pr
oble
m. I
n Ju
ne:
GET
2-K
EA
-A4-
680,
dat
e 20
12, J
une
01st
imm
edia
tely
Th
e C
ontra
ctor
st
ill d
elay
Soi
l fal
ls o
n ex
istin
g ro
ads.
On
dry
days
dus
t was
dis
tribu
ted
a lo
t in
the
air.
But
on
rain
y da
ys m
ud is
fu
ll on
thes
e ex
istin
g ro
ads.
K
m97
+124
Ngo
i Lao
brid
ge,
Km
107+
533
QL3
2C b
ypas
s,
Km
84+4
00 T
L321
C b
ridge
, K
m88
+100
box
cul
vert.
Dum
p tru
cks
are
usua
lly
not c
over
ed
Truc
ks m
ust b
e al
way
s co
vere
d w
hen
trans
porti
ng s
oil.
Con
tract
or h
as to
col
lect
all
mud
and
re
mov
e to
dis
posa
l are
a to
avo
id d
ust
in th
e ai
r on
dry
days
.
GET
2-K
EA
-A4-
680,
dat
e 20
12, J
une
01st
Con
tinuo
usly
inst
ruct
ing
on
site
imm
edia
tely
Th
e C
ontra
ctor
de
lay
to re
solv
e th
is p
robl
em.
Ben
toni
te w
as o
verfl
owed
into
the
river
alth
ough
Km
97+1
24 N
goi L
ao
brid
ge, N
goi G
ianh
brid
ge, N
Goi
V
an b
ridge
Con
tract
or d
idn’
t rem
ove
the
bent
onite
fully
La
ck o
f cle
anlin
ess
and
of s
ensi
bilit
y
Con
tract
or m
ust f
inis
h to
ove
rcom
e th
is p
robl
em
Inst
ruct
ed C
ontra
ctor
by
lette
r GE
T2-K
EA
-A4-
680,
da
te 2
012,
Jun
e 01
st
Eng
inee
r will
rech
eck
imm
edia
tely
B
ento
nite
is s
till
rem
aini
ng in
to
the
river
Ele
ctric
sys
tem
was
not
saf
e:
inte
rrup
ter b
ox w
as n
ot s
afe,
el
ectri
c w
ire w
as la
id u
nder
wet
m
ud.
Km
107+
533,
Km
84+4
00
TL32
1C, N
goi L
ao b
ridge
, Ngo
i G
ianh
brid
ge K
m88
+600
The
Con
tract
or d
oesn
’t ca
re a
bout
saf
ety
Con
tract
or h
as to
rese
t up
elec
tric
syst
em: l
ift u
p al
l ele
ctric
wire
hig
her
than
gro
und
at le
ast 2
m; a
ll ju
nctio
n an
d in
terr
upte
r mus
t res
et u
p to
en
sure
saf
ety
wor
k
GET
2-K
EA
-A4-
680,
dat
e 20
12, J
une
01st
July
15th
, 20
12
The
Con
tract
or
still
del
ay
Wor
kers
cam
ps h
ave
not s
et u
p fir
e ex
tingu
ishe
r, w
aste
bin
s, a
nd
first
aid
kit
at K
m10
4+50
0,
Km
84+4
00, N
goi G
ianh
brid
ge
Con
tract
or d
id n
ot fo
rce
subc
ontra
ctor
to p
rovi
de
safe
ty e
quip
men
t for
ea
ch w
orke
r cam
p.
Con
tract
or m
ust s
et u
p fir
e ex
tingu
ishe
r, w
aste
bin
s, a
nd fi
rst a
id
kit f
or e
ach
wor
ker c
amp.
GET
2-K
EA
-A4-
680,
dat
e 20
12, J
une
01st
July
15th
, 20
12
The
Con
tract
or
still
del
ay
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
226
Prob
lem
des
crip
tion
Cau
se
Solu
tion
requ
ired
Act
ion
take
n (b
y E
ngin
eer,
refe
r to
docu
men
ts b
elow
) D
eadl
ine
Cur
rent
sta
tus
Km
88+9
00
Mud
and
rubb
ish
was
thro
wn
into
ac
cess
irrig
atio
n ca
nal.
It bl
ocke
d th
is c
anal
. Km
84+4
00 T
L321
C
brid
ge.
Lack
of s
ensi
bilit
y C
ontra
ctor
mus
t col
lect
all
rubb
ish
and
mud
to u
nblo
ck th
is c
anal
.
Req
uest
ed b
y le
tter G
ET2
-K
EA
-A4-
680,
dat
e 20
12,
June
01st
to c
lean
the
cana
l
July
15th
, 20
12
The
Con
tract
or
dela
y to
reso
lve
this
pro
blem
.
Soi
l was
was
hout
into
fiel
ds a
t K
m10
3+80
0, K
m10
4+20
0 H
eavy
rain
s pl
us a
lack
of
sens
ibili
ty
Con
tract
or m
ust r
emov
e al
l fal
len
soil
out t
o di
spos
al a
reas
. In
stru
ctin
g co
ntra
ctor
on
site
Ju
ly 1
5th,
2012
The
Con
tract
or
dela
y to
reso
lve
this
pro
blem
.
Wor
ker’s
cam
p di
d no
t set
up
toile
t at
TL3
21C
Km
84+4
00
Con
tract
or d
idn’
t for
ce
enou
gh to
sub
cont
ract
ors
abou
t hea
lthy
cond
ition
s in
cam
ps
Con
tract
or h
as to
set
up
toile
t, fir
e ex
tingu
ishe
r, fir
st a
id b
ox w
hen
your
w
orke
r liv
es in
cam
p in
side
co
nstru
ctio
n si
te.
Sev
eral
lette
rs w
ere
sent
re
ques
ting
this
mat
ter
July
15th
, 20
12
The
Con
tract
or
dela
y to
reso
lve
this
pro
blem
.
6.2.
5 Pa
ckag
e A
5
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
At s
ome
cons
truct
ion
area
s of
brid
ges
such
as
Ngo
i Gua
, Ngo
i Lau
, N
goi R
ao, V
an P
hu a
nd
Ngo
i Thi
a… th
e C
ontra
ctor
con
stru
cted
se
rvic
e ro
ads
cros
sing
8-Fe
b, 2
012
GET
3-KE
ANG
NAM
-12
-A5-
282
The
Con
tract
or m
ust:
- Com
ply
with
the
Pro
ject
’s re
quire
men
ts
as w
ell a
s E
nviro
nmen
tal C
ontro
l an
d P
rote
ctio
n - I
mpl
emen
t ful
ly th
e
Kean
gnam
Con
tract
or
30-A
pril,
12.
Ther
e ha
s
not
been
any
impr
ovem
e
Ther
e ha
s
not
been
any
impr
ovem
Ther
e ha
s
not
been
any
impr
ovem
e
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
227
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
river
s an
d st
ream
s.
How
ever
, the
se s
ervi
ce
road
s ar
e no
t sui
tabl
y co
nstru
cted
(reg
ardi
ng to
th
e E
ngin
eer’s
lette
r N
o.G
ET3
-KE
ANG
NAM
-12
-A5-
282)
.
Engi
neer
’s in
stru
ctio
ns
and
requ
irem
ents
. nt
. en
t. nt
.
Ben
toni
te h
as n
ot b
een
cont
rolle
d cl
osel
y by
the
Con
tract
or d
urin
g co
nstru
ctio
n at
Ngo
i G
ua, N
goi R
ao, V
an
Phu
, Ngo
i Thi
a br
idge
s,
etc.
9-Fe
b, 2
012
- GET
3-KE
ANG
NAM
-12
-A5-
065;
- G
ET3-
KEAN
GN
AM-
12-A
5-14
8;
- GET
3-KE
ANG
NAM
-12
-A5-
189;
- G
ET3-
KEAN
GN
AM-
12-A
5-21
2;
- GET
3-KE
ANG
NAM
-12
-A5-
361;
The
Con
tract
or m
ust:
- Con
trol c
lose
ly
bent
onite
dur
ing
cons
truct
ion
in o
rder
to
prev
ent b
ad im
pact
ion
to
the
regi
on’s
en
viro
nmen
t. - I
mpl
emen
t ful
ly
inst
ruct
ions
and
re
quire
men
ts fr
om th
e En
gine
er.
Kean
gnam
Con
tract
or
30-F
eb,
2012
Ther
e ha
s
not
been
any
impr
ovem
e
nt.
Ther
e ha
s
not
been
any
impr
ovem
ent.
The
Con
tract
or
has
not
solv
ed
abso
lute
ly
thes
e
outs
tand
ing
prob
lem
s
At K
m12
3+86
0, m
ost t
he
Con
tract
or’s
truc
ks s
till
have
not
bee
n co
vere
d w
ith c
anva
s du
ring
mat
eria
l tra
nspo
rtatio
n,
besi
des,
muc
h so
il ha
s be
en fa
llen
on th
e pu
blic
ro
ad d
urin
g m
ater
ial
trans
porta
tion,
this
20-A
pril,
201
2 G
ET3-
KEAN
GN
AM-
12-A
5-36
1
The
Con
tract
or m
ust:
- Com
ply
with
the
Pro
ject
’s re
quire
men
ts
as w
ell a
s E
nviro
nmen
tal C
ontro
l an
d P
rote
ctio
n - E
nsur
e th
at th
e w
hole
co
ntra
ctor
’s tr
ucks
will
Kean
gnam
Con
tract
or
Imm
edia
te
Not
ye
t
impl
emen
t
ed
Not
ye
t
impl
emen
t
ed
Not
ye
t
impl
emen
te
d
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
228
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
situ
atio
n is
cau
sing
im
pact
to th
e re
gion
’s
envi
ronm
ent a
nd s
afet
y.
be u
sed
fully
can
vas
durin
g m
ater
ial
trans
porta
tion.
- I
mpl
emen
t ful
ly
inst
ruct
ions
and
re
quire
men
ts fr
om th
e En
gine
er.
Alth
ough
sev
eral
tim
es
bein
g re
min
ded
by th
e En
gine
er o
n so
lvin
g th
e im
pact
cau
sed
from
the
Con
tract
or’s
con
stru
ctio
n ac
tiviti
es to
the
prod
uctio
n la
nd o
f loc
al
peop
le. H
owev
er, u
p to
no
w, t
he C
ontra
ctor
has
no
t sol
ved
abso
lute
ly
thes
e ou
tsta
ndin
g m
atte
rs (r
egar
ding
to th
e E
ngin
eer’s
lette
r, N
o.G
ET3
-KE
ANG
NAM
-12
-A5-
213)
.
2- F
eb, 2
012
- GET
3-KE
ANG
NAM
-11
-A5-
047;
- G
ET3-
KEAN
GN
AM-
11-A
5-14
5;
- GET
3-KE
ANG
NAM
-11
-A5-
224;
- G
ET3-
KEAN
GN
AM-
11-A
5-23
2;
- GET
3-KE
ANG
NAM
-11
-A5-
250;
- G
ET3-
KEAN
GN
AM-
12-A
5-21
3;
The
Con
tract
or m
ust:
- Com
ply
with
the
Pro
ject
’s re
quire
men
ts
as w
ell a
s E
nviro
nmen
tal C
ontro
l an
d P
rote
ctio
n - C
ompl
y w
ith M
etho
d S
tate
men
ts a
ppro
ved
by
the
Eng
inee
r dur
ing
proj
ect i
mpl
emen
tatio
n.
- Im
plem
ent f
ully
the
Engi
neer
’s in
stru
ctio
ns
and
requ
irem
ents
.
Kean
gnam
Con
tract
or
Imm
edia
te
The
Con
tract
or
has
not
solv
ed
abso
lute
ly
thes
e
outs
tand
in
g prob
lem
s.
The
Con
tract
or
has
not
solv
ed
abso
lute
ly
thes
e
outs
tand
in
g prob
lem
s.
The
Con
tract
or
still
has
not
solv
ed
abso
lute
ly
thes
e
outs
tand
ing
prob
lem
s.
The
Con
tract
or’s
fuel
co
ntro
l is
not w
ell
perfo
rmin
g (re
gard
ing
to
the
Eng
inee
r’s le
tter
No.
GE
T3-K
EA
NG
NA
M-
20-M
ar, 2
012
- GET
3-KE
ANG
NAM
-12
-A5-
215;
- G
ET3-
KEAN
GN
AM-
The
Con
tract
or m
ust:
- Com
ply
with
the
Pro
ject
’s re
quire
men
ts
as w
ell a
s
Kean
gnam
Con
tract
or
15-A
pr,
2012
Not
impr
oved
Not
impr
oved
Not
impr
oved
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
229
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
12-A
5-21
5 da
ted
21st
Mar
, 201
2).
E.g
. Ngo
i Rao
, Ngo
i G
ua, N
goi T
hia,
Van
Phu
br
idge
s, e
tc.
12-A
5-32
4;
- GET
3-KE
ANG
NAM
-12
-A5-
361;
Env
ironm
enta
l Con
trol
and
Pro
tect
ion
- Im
prov
e th
e C
ontra
ctor
’s fu
el c
ontro
l. - I
mpl
emen
t ful
ly
inst
ruct
ions
and
re
quire
men
ts fr
om th
e En
gine
er.
Thro
ugh
site
che
ck a
nd
insp
ectio
n, th
e E
ngin
eer
easi
ly re
cogn
ize
that
m
any
wor
kers
do
not
use
fully
Per
sona
l P
rote
ctio
n E
quip
men
t (h
elm
et, s
afet
y sh
oes,
et
c.) w
hen
they
wor
k on
th
e si
te s
uch
as: R
CP
C
fact
ory
No.
1, R
CP
C
fact
ory
No.
2; B
atch
ing
Pla
nt N
o.3,
Ngo
i Gua
br
idge
; Ngo
i Rao
brid
ge;
Van
Phu
brid
ge, e
tc.
12 –
Apr
,201
2;
24 –
Apr
, 201
2
GET
3-KE
ANG
NAM
-12
-A5-
324
The
Con
tract
or m
ust:
- Com
ply
with
Pro
ject
S
afet
y P
lan
appr
oved
by
the
Eng
inee
r dur
ing
cons
truct
ion.
- P
rovi
de fu
lly P
erso
nal
Pro
tect
ion
Equ
ipm
ents
fo
r all
wor
kers
and
en
sure
that
all
wor
kers
w
ill u
se fu
lly P
PE
dur
ing
the
who
le p
roce
ss o
f w
ork.
Kean
gnam
Con
tract
or
Dai
ly
Not
impr
oved
Not
impr
oved
Con
tract
or
is
appl
ying
mea
sure
s
in o
rder
to
cont
inue
impr
ovin
g
this
mat
ter.
Safe
ty fe
nces
and
saf
ety
sign
boar
ds: t
hese
saf
ety
elem
ents
hav
e no
t bee
n in
stal
led
fully
at m
any
cons
truct
ion
site
s (e
xam
ple
such
as:
co
nstru
ctio
n si
te o
f Ngo
i G
ua, Q
L37,
Van
Phu
br
idge
s, e
tc.;
acce
ss
12 –
Apr
,201
2;
24 –
Apr
, 201
2
- GET
3-KE
ANG
NAM
-12
-A5-
324
- G
ET3-
KEAN
GN
AM-
12-A
5-36
1
The
Con
tract
or m
ust:
- Im
plem
ent f
ully
in
stru
ctio
ns a
nd
requ
irem
ents
from
the
Engi
neer
. - I
nsta
ll sa
fety
fenc
es
and
safe
ty s
ignb
oard
s at
al
l dan
gero
us a
reas
in
Kean
gnam
Con
tract
or
Imm
edia
te
Not
impl
emen
t
ed y
et
Not
impl
emen
t
ed y
et
Not
impr
oved
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
230
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
road
s K
m11
3, K
m13
8,
Km11
7-K
m11
9, e
tc.;
othe
r con
stru
ctio
n si
tes
such
as
Irrig
atio
n bo
x cu
lver
t Km
118+
202,
U
nder
pass
box
cul
vert
Km
118+
224,
Dra
inag
e pi
pe c
ulve
rt K
m11
8+06
0,
Km
118+
860,
etc
.; co
nstru
ctio
n si
tes
inte
rsec
ting
with
pub
lic
road
s K
m12
3+86
0,
Km
145+
220,
orde
r to
keep
the
proj
ect’s
saf
ety.
Saf
ety
of p
ublic
: at m
any
cons
truct
ion
site
s, lo
cal
peop
les
ente
ring
into
co
nstru
ctio
n si
tes
with
out a
ny th
e C
ontra
ctor
’s c
ontro
l and
su
perv
isio
n, th
is
situ
atio
n m
ay c
ause
un
wan
ted
acci
dent
s in
side
pro
ject
are
as a
t an
y tim
e. E
.g. N
goi R
ao
brid
ge, K
m11
2, N
goi
Thia
brid
ge. e
tc.
12 –
Apr
,201
2
- GET
3-KE
ANG
NAM
-12
-A5-
065;
- G
ET3-
KEAN
GN
AM-
12-A
5-32
4
The
Con
tract
or m
ust:
- Com
ply
with
Pro
ject
S
afet
y P
lan
appr
oved
by
the
Eng
inee
r dur
ing
cons
truct
ion.
- I
mpl
emen
t ful
ly th
e En
gine
er’s
inst
ruct
ions
an
d re
quire
men
ts.
Kean
gnam
Con
tract
or
Dai
ly
Not
impl
emen
t
ed y
et
Not
impl
emen
t
ed y
et
Not
impl
emen
te
d ye
t
Som
e w
orke
rs’ c
amps
ha
ve n
ot b
een
built
sa
nita
ry to
ilet b
y th
e C
ontra
ctor
suc
h as
: Ngo
i G
ua, N
goi R
ao b
ridge
,
8-M
ay, 2
012;
14
-May
, 201
2
- GET
3-KE
ANG
NAM
-12
-A5-
387
- G
ET3-
KEAN
GN
AM-
The
Con
tract
or m
ust:
- San
itary
toile
ts,
suita
ble
sew
age
syst
em
mus
t be
cons
truct
ed a
t al
l wor
kers
’ cam
ps.
Kean
gnam
Con
tract
or
30-M
ay,
2012
No
chan
ges
notic
ed
No
chan
ges
notic
ed
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
231
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Km
120,
etc
. 12
-A5-
437
- I
mpr
ove
the
livin
g an
d w
orki
ng c
ondi
tion
in th
e w
hole
wor
kers
’ cam
ps
as th
e re
quire
men
ts
from
the
Proj
ect a
nd th
e En
gine
er.
Som
e w
orke
rs’ c
amps
ha
ve n
ot b
een
prov
ided
fu
lly fi
re e
xtin
guis
hers
, fir
st-a
id k
its, e
tc. b
y th
e C
ontra
ctor
suc
h as
: Ngo
i G
ua, N
goi R
ao b
ridge
, K
m12
0, e
tc.
30-A
pr, 2
012
- GET
3-KE
ANG
NAM
-12
-A5-
387;
- G
ET3-
KEAN
GN
AM-
12-A
5-43
7
Fire
ext
ingu
ishe
rs a
nd
first
-aid
kits
mus
t be
prov
ided
fully
by
the
Con
tract
or fo
r all
wor
kers
’ cam
ps.
Kean
gnam
Con
tract
or
15-M
ay,
2012
No
chan
ges
notic
ed
No
chan
ges
notic
ed
Van
Phu
brid
ge’s
ele
ctric
sy
stem
is n
ot s
afe.
Ris
k of
ele
ctric
sho
cks.
14
-May
, 201
2 G
ET3-
KEAN
GN
AM-
12-A
5-44
4
Con
tract
or m
ust:
- Re-
inst
all t
he e
lect
ric
syst
em, m
inim
izin
g an
y po
tent
ial r
isk.
- C
ompl
y w
ith P
roje
ct
Saf
ety
Pla
n ap
prov
ed b
y th
e E
ngin
eer d
urin
g co
nstru
ctio
n.
- Im
plem
ent f
ully
in
stru
ctio
ns a
nd
requ
irem
ents
from
the
Engi
neer
.
Kean
gnam
Con
tract
or
20- M
ay,
2012
Not
impr
oved
Con
tract
or
is
appl
ying
mea
sure
s
in o
rder
to
cont
inue
impr
ovin
g
this
mat
ter.
Was
te w
ater
trea
tmen
t sy
stem
for b
atch
ing
plan
ts, K
m12
3, K
m13
2,
Km14
5.
17-M
ay
- G
ET3-
KE
ANG
NAM
-12
-A5-
590.
-
GET
3-
KEAN
GN
AM-
12-A
5-38
6
The
Con
tract
or m
ust:
- Pro
vide
all
batc
hing
pl
ants
with
dr
aina
ge/c
anal
and
se
tting
pon
d(s)
with
su
ffici
ently
cap
acity
to
Kean
gnam
Con
tract
or
5-Ju
ne,
2012
The
Con
tract
or
has
inst
alle
d
The
Con
tract
or
has
inst
alle
d
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
232
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
- G
ET3-
KEAN
GN
AM-
12-A
5-49
0
- GET
3-KE
ANG
NAM
-12
-A5-
565
adeq
uate
ly tr
eat
cem
ent-l
aden
w
aste
wat
er a
nd to
en
sure
that
ther
e is
no
dire
ct d
isch
arge
of
untre
ated
was
tew
ater
. - P
rohi
bit d
ispo
sal o
f ce
men
t slu
dge
into
riv
er/w
ater
cou
rse,
ag
ricul
tura
l lan
d an
d ot
her s
ensi
tive
loca
tions
.
pond
s at
all
batc
hing
plan
ts
but
drai
nage
/c
anal
is n
ot
good
cond
ition
s
pond
s at
all
batc
hing
plan
ts
but
drai
nage
/c
anal
is
not
good
cond
ition
s
- At t
he N
goi T
hia
brid
ge
site
(Km
145+
300)
, the
su
bcon
tract
or h
as fi
led
abou
t 75
met
ers
of th
e 10
0 m
eter
wid
e riv
er to
cr
eate
tem
pora
ry a
cces
s an
d w
ork
area
s fo
r br
idge
con
stru
ctio
n. T
he
said
acc
ess
has
not
been
pro
vide
d w
ith
culv
erts
as
prev
ious
ly
requ
i red
by th
e C
onsu
ltant
As
such
, he
avy
scou
ring
and
eros
ion
of ri
ver
emba
nkm
ents
esp
ecia
lly
whe
n w
ater
leve
ls a
re
high
(rai
ny p
erio
ds).
2-Fe
b, 2
012
- GET
3-KE
ANG
NAM
-11
-A5-
282
- GET
3-KE
ANG
NAM
-12
-A5-
189;
- R
ef.G
ET3
-KE
ANG
NAM
-12
-A5-
212;
- R
ef.G
ET3
-KE
ANG
NAM
-12
-A5-
392
date
d 7th
Jun
e,
2012
; - R
ef.G
ET3
-KE
ANG
NAM
-12
-A5-
490
date
d 31
st M
ay,
2012
.
The
Con
tract
or m
ust
inst
all a
dequ
ate
num
ber
and
size
of c
ulve
rts
thro
ugho
ut th
e N
goi T
hia
brid
ge s
ite te
mpo
rary
ac
cess
.
Kean
gnam
Con
tract
or
Imm
edia
te
Ther
e ha
s
not
been
any
impr
ovem
e
nt
Not
impr
oved
Not
impr
oved
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
233
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
- Ref
.GE
T3-
KEAN
GN
AM-
12-A
5-56
5
At K
m12
3+71
4, s
uita
ble
soil
has
been
dis
pose
d in
to th
e ad
jace
nt
agric
ultu
ral l
and
and
Y C
an la
ke.
12-M
ay, 2
012
- GET
3-KE
ANG
NAM
-12
-A5-
065,
9th
Febr
uary
, 201
2.
- Ref
.GE
T3-
KEAN
GN
AM-
12-A
5-49
0, 3
1st
May
, 201
2.
- Ref
.GE
T3-
KEAN
GN
AM-
12-A
5-56
5
The
Con
tract
or m
ust:
- Rem
ove
spoi
ls a
nd
disp
ose
into
app
rove
d di
spos
al s
ites.
- E
nsur
e th
at s
poils
are
on
ly d
umpe
d to
dis
posa
l si
tes
appr
oved
by
loca
l au
thor
ities
and
the
Con
sulta
nt a
nd th
at
appr
opria
te s
tabi
lizat
ion.
Kean
gnam
Con
tract
or
5- Jun,
2012
.
Not
impl
emen
t
ed y
et
Not
impr
oved
The
Con
tract
or’s
saf
ety
cont
rol i
s no
t wel
l pe
rform
ed a
t co
nstru
ctio
n si
te o
f N
atio
nal R
oad
37 b
ridge
, Km
121+
620
26-J
un, 2
012
GET
3-KE
ANG
NAM
-12
-A5-
589
1. W
orke
rs a
re n
ot u
sing
PP
E at
wor
king
. Mor
e da
nger
ousl
y th
e w
orke
rs
wor
king
hei
ght w
ithou
t PP
E su
ch a
s: s
afet
y be
lt an
d ne
t,...
2. S
afet
y w
arni
ng
boar
ds a
re n
ot in
ef
ficie
ncy.
3.
The
saf
ety
fenc
es a
re
very
tem
pora
ry in
stal
led.
4.
The
Con
tract
or is
not
ar
rang
ing
any
pers
onne
l in
cha
rge
of c
ondu
ctin
g an
d as
surin
g tra
ffic
at
this
con
stru
ctio
n si
te.
Kean
gnam
Con
tract
or
15-J
un,
2012
Con
tract
or
is
appl
ying
mea
sure
s
in o
rder
to
cont
inue
impr
ovin
g
this
mat
ter.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
234
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Impr
oper
sto
rage
of
haza
rdou
s su
bsta
nces
su
ch a
s oi
l, fu
el a
nd
used
oil
was
not
ed a
t co
nstru
ctio
n/w
orke
rs’
cam
ps, c
onst
ruct
ion
site
, gi
rder
cas
ting
yard
s, e
tc.
Con
tain
ers
are
expo
sed
to e
lem
ents
. Lea
ks a
nd
spills
wer
e ev
iden
t. Fu
el/o
il dr
ums
wer
e of
ten
seen
lyin
g on
thei
r si
de w
hile
fuel
ta
nks/
disp
ense
rs a
re n
ot
prov
ided
with
bun
ded
impe
rmea
ble
floor
ing.
S
uch
tank
s ar
e of
ten
soon
hal
f bur
ied
in s
oil.
E.g
. Ngo
i Gua
, Ngo
i R
ao, N
goi T
hia,
Van
Phu
br
idge
s, e
tc.
17-M
ay
- KE
ANG
NA
M-
12-A
5-49
0 - G
ET3-
KEAN
GN
AM-
A5-0
80;
- GET
3-KE
ANG
NAM
-12
-A5-
215
The
Con
tract
or m
ust:
- Equ
ipm
ent
mai
nten
ance
/repa
ir of
ve
hicl
es s
houl
d be
un
derta
ken
usin
g dr
ip
pans
or o
n im
perm
eabl
e su
rface
to c
onta
in le
aks
or s
pills
. - F
uel t
ank/
disp
ense
rs
as w
ell a
s dr
ums
and
rece
ptac
les
cont
aini
ng
oil,
fuel
and
use
d oi
l sh
ould
be
kept
in ro
ofed
ar
eas
with
bun
ded/
dike
d co
ncre
te fl
oor.
Keep
dr
ums
(eve
n if
empt
y) in
up
right
pos
ition
in s
uch
stor
age
faci
lity \
. - S
orbe
nt m
ater
ials
sh
ould
be
prov
ided
in a
ll ar
eas
whe
re o
il an
d fu
el
are
used
to re
adily
cl
ean -
up s
pills
and
le
aks.
Use
d oi
l and
ha
zard
ous
was
tes
shou
ld b
e st
ored
and
di
spos
ed o
f in
a m
anne
r th
at w
ill n
ot c
ause
co
ntam
inat
ion
of th
e en
viro
nmen
t. - F
ire e
xtin
guis
hers
Kean
gnam
Con
tract
or
15-J
un,
2012
Ther
e ha
s
not
been
muc
h
impr
ovem
ent f
or th
is
wor
k.
Ther
e ha
s
not
been
muc
h
impr
ovem
e
nt
for
this
wor
k.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
235
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
shou
ld b
e av
aila
ble
at o
il an
d fu
el s
tora
ge a
nd
disp
ensi
ng a
reas
. 6.
2.6
Pack
age
A6
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Par
ty
Dea
dlin
e A
pril
May
Ju
ne
At s
tatio
n Km
151-
Km
152,
muc
h so
il ha
ve
been
falle
n on
the
publ
ic
road
dur
ing
the
Con
tract
or’s
mat
eria
l tra
nspo
rtatio
n, th
is
situ
atio
n is
cau
sing
im
pact
to th
e re
gion
’s
envi
ronm
ent a
nd tr
affic
.
18-A
pr, 2
012.
G
ET3-
DO
OSA
N-1
2-A6
-387
The
Con
tract
or m
ust:
- Com
ply
with
the
Pro
ject
’s re
quire
men
ts
as w
ell a
s E
nviro
nmen
tal C
ontro
l an
d P
rote
ctio
n - I
mpl
emen
t ful
ly
inst
ruct
ions
and
re
quire
men
ts fr
om th
e En
gine
er.
Doo
san
Con
tract
or
30-A
pr,
2012
N
ot y
et
Impr
oved
This
wor
k ha
s no
t be
en
suffi
cien
tly
impl
emen
ted
by th
e C
ontra
ctor
This
wor
k ha
s no
t be
en
suffi
cien
tly
impl
emen
ted
by th
e C
ontra
ctor
.
At N
goi C
hac
brid
ge,
cond
ition
of t
he w
orke
rs’
cam
p is
not
mee
ting
the
proj
ect’s
requ
irem
ents
, th
is w
orke
rs’ c
amp
is
cons
truct
ed in
a v
ery
poor
and
tem
pora
ry
purp
ose,
for e
xam
ple
ther
e ar
e no
t san
itary
to
ilet,
no s
uita
ble
18-A
pr, 2
012.
G
ET3-
DO
OSA
N-1
2-A6
-387
The
Con
tract
or m
ust:
- Ens
ure
that
all
wor
kers
’ cam
ps w
ill be
m
aint
aine
d in
goo
d co
nditi
on.
- Pro
vide
fully
eq
uipm
ent a
s du
stbi
ns,
first
-aid
kit,
fire
ex
tingu
ishe
rs, e
tc. F
or
the
who
le w
orke
rs’
Doo
san
Con
tract
or
30-A
pr,
2012
No
chan
ges
notic
ed
The
Con
tract
or
rem
oved
th
is
wor
ker’s
ca
mp
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
236
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Par
ty
Dea
dlin
e A
pril
May
Ju
ne
sew
age
syst
em a
nd th
e C
ontra
ctor
hav
e no
t pr
ovid
ed fu
lly e
quip
men
t as
dus
tbin
s, fi
rst -a
id k
it,
fire
extin
guis
hers
, etc
.
cam
ps.
- Im
plem
ent f
ully
the
requ
irem
ents
from
the
Pro
ject
as
wel
l as
the
Engi
neer
.
Acc
ess
road
cro
ssin
g th
e st
ream
at N
goi T
hat
brid
ge (K
m15
5+97
1) h
as
been
hea
vily
dam
aged
, th
is s
ituat
ion
is
obst
ruct
ing
the
vehi
cle
circ
ulat
ion
at th
is s
tatio
n an
d to
the
proj
ect’s
sa
fety
and
traf
fic
7-A
pr, 2
012
GET
3-D
OO
SAN
-12-
A6-3
60
The
Con
tract
or m
ust:
- Im
med
iate
ly c
arry
out
re
pair
for t
he d
amag
ed
poin
ts o
f thi
s ac
cess
ro
ad.
- con
solid
ate
bette
r thi
s ac
cess
road
to p
reve
nt
eros
ion
and
slid
ing
at
this
are
a.
- Im
plem
ent f
ully
re
quire
men
ts a
nd
inst
ruct
ions
from
the
Engi
neer
.
Doo
san
Con
tract
or
Imm
edia
tely
This
wor
k ha
s al
read
y co
mpl
eted
by
the
Con
tract
or.
The
Con
tract
or’s
saf
ety
cont
rol i
s no
t goo
d at
co
nstru
ctio
n si
te o
f the
tu
nnel
(reg
ardi
ng to
the
lette
r, N
o.G
ET3
-D
OO
SAN
-12-
A6-4
30)
25-A
pril
GET
3-D
OO
SAN
-12-
A6-4
30
The
Con
tract
or m
ust:
- Com
ply
with
Pro
ject
S
afet
y P
lan
appr
oved
by
the
Engi
neer
- C
ompl
y w
ith M
etho
d S
tate
men
ts d
urin
g th
e w
hole
pro
cess
of
cons
truct
ion.
-
Impl
emen
t ful
ly
requ
irem
ents
and
in
stru
ctio
ns fr
om th
e En
gine
er.
Doo
san
Con
tract
or
30-A
pril
Con
tract
or i
s ap
plyi
ng
mea
sure
s in
ord
er to
co
ntin
ue
impr
ovin
g th
is
mat
ter.
Con
tract
or
is a
pply
ing
mea
sure
s in
ord
er to
co
ntin
ue
impr
ovin
g th
is m
atte
r.
Con
tract
or
is a
pply
ing
mea
sure
s in
ord
er to
co
ntin
ue
impr
ovin
g th
is m
atte
r.
Som
e w
orke
rs’ c
amps
10
-May
, 201
2 - G
ET3-
The
Con
tract
or m
ust:
Doo
san
20-M
ay,
N
o N
o ch
ange
s
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
237
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Par
ty
Dea
dlin
e A
pril
May
Ju
ne
have
not
bee
n bu
ilt
sani
tary
toile
t by
the
Con
tract
or s
uch
as:
Lang
Lau
Km
182+
160;
K
m16
7+87
9; N
goi G
iam
br
idge
Km
163+
126,
etc
.
DO
OSA
N-1
2-A6
-453
-.G
ET3-
DO
OSA
N-1
2-A6
-491
- San
itary
toile
ts,
suita
ble
sew
age
syst
em
mus
t be
cons
truct
ed a
t al
l wor
kers
’ cam
ps.
- Im
prov
e th
e liv
ing
and
wor
king
con
ditio
n in
the
who
le w
orke
rs’ c
amps
as
the
requ
irem
ents
fro
m th
e Pr
ojec
t and
the
Engi
neer
.
Con
tract
or
2012
ch
ange
s no
ticed
no
ticed
Was
te w
ater
Tre
atm
ent
Sys
tem
of t
he T
unne
l (S
outh
por
tal
Km
186+
200)
hav
e be
en
heav
ily d
amag
ed, a
nd
alm
ost n
o ef
ficie
ncy
to
was
te w
ater
trea
tmen
t at
Con
stru
ctio
n si
te o
f the
tu
nnel
3-M
ay, 2
012
GET
3-D
OO
SAN
-12-
A6-4
57
The
Con
tract
or m
ust:
- Im
med
iate
ly c
arry
out
co
nstru
ctio
n of
was
te
wat
er tr
eatm
ent s
yste
m
at th
e Tu
nnel
are
as to
m
eet t
he P
roje
ct’s
re
quire
men
ts.
- Com
ply
with
the
proj
ect’s
requ
irem
ents
as
wel
l as
the
Eng
inee
r’s re
quire
men
t an
d in
stru
ctio
ns.
Doo
san
Con
tract
or
Imm
edia
te
N
ot y
et
impl
emen
ted
Was
te
wat
er
Trea
tmen
t S
yste
m o
f th
e Tu
nnel
is
bui
ldin
g by
the
Con
tract
or
The
Con
tract
or’s
co
nstru
ctio
n ac
tiviti
es
and
mat
eria
l tra
nspo
rtatio
n st
ill ar
e th
e m
ain
fact
ors
caus
ing
dust
ing
such
as:
Km
151,
K
m15
6+30
0,
Km
156+
475,
Km
161,
et
c.
12-A
pril,
201
2 G
ET3-
DO
OSA
N-1
2-A6
-484
Con
tract
or to
: - E
nsur
e th
at a
ll tru
cks
are
fully
cov
ered
with
ca
nvas
dur
ing
mat
eria
l tra
nspo
rtatio
n.
- Cle
an d
ust f
rom
road
s’
surfa
ce.
- Com
ply
with
the
Pro
ject
’s re
quire
men
ts
Doo
san
Con
tract
or
Imm
edia
te
Con
tract
or
is a
pply
ing
mea
sure
s in
ord
er to
im
prov
e th
is m
atte
r
Con
tract
or
is a
pply
ing
mea
sure
s in
ord
er to
im
prov
e th
is m
atte
r
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
238
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Par
ty
Dea
dlin
e A
pril
May
Ju
ne
as w
ell a
s E
nviro
nmen
tal C
ontro
l an
d P
rote
ctio
n
At s
ome
wor
kers
’ cam
p (L
ang
Lau
Km18
2+16
0;
Km
167+
879;
Ngo
i Gia
m
brid
ge K
m16
3+12
6),
rubb
ish
was
in
disc
rimin
atel
y th
row
n on
the
grou
nd
10-M
ay, 2
012
- GET
3-D
OO
SAN
-12-
A6-4
53
- GET
3-D
OO
SAN
-12-
A6-4
91
Con
tract
or to
: 1.
Rem
ind
all r
elat
ed
staf
f abo
ut
envi
ronm
enta
l pro
tect
ion
and
cont
rol
2. U
sual
ly c
arry
out
cl
earin
g at
the
wor
kers
’ ca
mp
area
s.
3. C
olle
ct ru
bbis
h an
d re
mov
e it
to th
e rig
ht
plac
es.
4. C
ombi
ne w
ith lo
cal
auth
oriti
es in
ord
er to
tre
at d
omes
tic w
aste
an
d pr
even
t bad
im
pact
ion
to th
e re
gion
’s
envi
ronm
ent.
Doo
san
Con
tract
or
Imm
edia
te
N
o ch
ange
s no
ticed
No
chan
ges
notic
ed
Not
eno
ugh
safe
ty
fenc
es a
nd s
ignb
oard
s at
man
y lo
catio
ns s
uch
as: b
ridge
, Up -
box
culv
erts
, dra
inag
e cu
lver
ts, i
rrig
atio
n cu
lver
ts, e
tc. t
his
situ
atio
n is
cau
sing
im
pact
to th
e pr
ojec
t’s
safe
ty.
17-M
ay, 2
012
GET
3-D
OO
SAN
-12-
A6-4
67
- Ins
tall
safe
ty fe
nces
an
d sa
fety
sig
nboa
rds
at
all d
ange
rous
are
as in
or
der t
o im
prov
e th
e pr
ojec
t’s s
afet
y.
- Ass
ign
suffi
cien
t pe
rson
nel t
o m
onito
r an
d su
perv
ise
the
wor
ks
on s
ite to
ens
ure
the
proj
ect’s
saf
ety
at
cons
truct
ion
area
s at
all
Doo
san
Con
tract
or
May
31st
20
12
Con
tract
or
is a
pply
ing
mea
sure
s in
ord
er to
co
ntin
ue
impr
ovin
g th
is m
atte
r.
Con
tract
or
is a
pply
ing
mea
sure
s in
ord
er to
co
ntin
ue
impr
ovin
g th
is m
atte
r.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
239
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Par
ty
Dea
dlin
e A
pril
May
Ju
ne
time.
- F
ully
impl
emen
t in
stru
ctio
ns a
nd
requ
irem
ents
from
the
Engi
neer
.
Wor
kers
do
not u
se
enou
gh P
erso
nal
Pro
tect
ive
Equ
ipm
ent
(PP
E) w
hen
wor
king
on
high
ly. K
m18
2, L
ang
Nha
y br
idge
17-M
ay, 2
012
- GET
3-D
OO
SAN
-12-
A6-0
87
- GET
3-D
OO
SAN
-12-
A6-4
30;
Con
tract
or to
: 1.
Rem
ind
all r
elat
ed
staf
f abo
ut th
e im
porta
nce
of w
earin
g th
e PP
E.
2. P
rovi
de P
erso
nal
Pro
tect
ive
Equ
ipm
ent f
or
all o
f the
m.
3. E
nfor
ce it
s us
e.
Doo
san
Con
tract
or
Dai
ly
Con
tract
or
is a
pply
ing
som
e of
th
e sa
id
mea
sure
s
Con
tract
or
is a
pply
ing
som
e of
the
said
m
easu
res
At K
m18
9+50
0,
Km
187+
900,
K
m17
8+20
0, W
orke
rs’
cam
ps la
ck s
anita
ry
toile
t fac
ilitie
s (w
ith
sept
ic ta
nks)
.
17-M
ay, 2
012
- GET
3-D
OO
SAN
-12-
A6-4
91
- GET
3-D
OO
SAN
-12-
A6-5
46
- GET
3-D
OO
SAN
-12-
A6-6
33
The
Con
tract
or m
ust:
- Pro
vide
san
itary
toile
ts
(wat
er s
eale
d) w
ith
sept
ic ta
nks
at a
ll w
orke
rs’ c
amps
. - E
nsur
e th
at to
ilets
and
ba
thin
g ar
eas
are
regu
lar c
lean
ed to
el
imin
ate
foul
odo
r as
wel
l as
alga
l gro
wth
s th
at m
ake
the
area
s sl
ippe
ry.
- Ins
tall
wat
er s
eale
d ce
ram
ic to
ilets
to
prev
ent o
dors
.
Doo
san
Con
tract
or
5 –J
un,
2012
- San
itary
to
ilets
fa
cilit
ies
wer
e pr
ovid
ed a
t so
me
wor
kers
’ ca
mps
(e.g
. K
m18
5+40
0)
- Som
e to
ilets
wer
e im
prov
ed
cond
ition
(e
.g.
Km
186+
800)
.
- Km
178+
200,
the
Con
tract
or
has
alre
ady
rem
oved
th
is
wor
ker’s
ca
mp.
- B
ut,
Wor
kers
’ ca
mps
stil
l la
ck s
anita
ry
toile
t fa
cilit
ies
at
Km
189+
500,
K
m18
7+90
0
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
240
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Par
ty
Dea
dlin
e A
pril
May
Ju
ne
Was
te w
ater
trea
tmen
t sy
stem
for b
atch
ing
plan
ts. K
m16
5, K
m16
2,
Km18
0, K
m18
4.
17-M
ay, 2
012
- GET
3-D
OO
SAN
-11-
A6-0
67.
- GET
3-D
OO
SAN
-12-
A6-4
52 -
GET
3-D
OO
SAN
-12-
A6-5
46
The
Con
tract
or m
ust:
- Pro
vide
all
batc
hing
pl
ants
with
dr
aina
ge/c
anal
and
se
tting
pon
d(s)
with
su
ffici
ently
cap
acity
to
adeq
uate
ly tr
eat
cem
ent -l
aden
w
aste
wat
er a
nd to
en
sure
that
ther
e is
no
dire
ct d
isch
arge
of
untre
ated
was
tew
ater
. - P
rohi
bit d
ispo
sal o
f ce
men
t slu
dge
into
riv
er/w
ater
cou
rse,
ag
ricul
tura
l lan
d an
d ot
her s
ensi
tive
loca
tions
.
Doo
san
Con
tract
or
5 –J
un,
2012
.
The
Con
tract
or
has
inst
alle
d po
nds
at a
ll ba
tchi
ng
plan
ts b
ut
drai
nage
/ca
nal i
s no
t go
od
cond
ition
s.
At K
m19
0+30
0 –
Km19
3 +43
0;
Km
188+
840
– K
m18
8+95
0;
Km
179+
490
– K
m17
9+55
0;
Km
179+
220
– K
m17
9+33
0;
Km
161+
100
– K
m16
1+20
0;
Km
157+
200
– K
m15
7+40
0;
Km
154+
020
– K
m15
4+08
0,…
Som
e
6-Ju
ne, 2
012
GET
3-D
OO
SAN
-12-
A6-5
58
The
Con
tract
or m
ust:
- Re-
chec
k al
l cut
ting
slop
e ar
eas
in o
rder
to
appl
y m
easu
res
for
slop
es p
rote
ctio
n an
d to
pr
even
t ris
ks o
f co
llaps
es fo
r ens
urin
g th
e P
roje
ct’s
saf
ety.
- U
rgen
t act
ions
mus
t be
impl
emen
ted
by th
e C
ontra
ctor
in o
rder
to
repa
ir co
llaps
es.
- Pro
mpt
ly im
plem
ent
mea
sure
s to
slo
pe
Doo
san
Con
tract
or
Imm
edia
te
Con
tract
or
is a
pply
ing
mea
sure
s in
ord
er to
co
ntin
ue
impr
ovin
g th
is m
atte
r.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
241
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Par
ty
Dea
dlin
e A
pril
May
Ju
ne
cutti
ng s
lope
s w
ere
colla
psed
, thi
s si
tuat
ion
is c
ausi
ng im
pact
to th
e P
roje
ct’s
saf
ety.
prot
ectio
n su
ch a
s: b
uild
to
p di
tch
and
to g
row
gr
ass,
etc
. - C
ompl
y w
ith M
etho
d S
tate
men
ts a
nd S
afet
y P
roje
ct P
lan
appr
oved
by
the
Eng
inee
r dur
ing
the
who
le p
roce
ss o
f co
nstru
ctio
n.
Som
e of
the
loca
l/acc
ess
road
s ar
e da
mag
ed b
y pr
ojec
t veh
icle
s ca
usin
g di
fficu
lty to
the
publ
ic
who
als
o us
e th
ese
road
s su
ch a
s: K
m17
6,
Km18
6, K
m15
1, K
m15
5,
etc.
17-M
ay, 2
012
-.GET
3-D
OO
SAN
-11-
A6-6
78
- GET
3-D
OO
SAN
-12-
A6-3
87
The
Con
tract
or m
ust
repa
ir lo
cal a
cces
s ro
ads
whi
ch h
ave
been
da
mag
ed d
ue to
pro
ject
-re
late
d ac
tiviti
es
(tran
spor
t of m
ater
ial,
etc.
)
Doo
san
Con
tract
or
5 –J
un,
2012
Con
tract
or
is a
pply
ing
mea
sure
s in
ord
er to
co
ntin
ue
impr
ovin
g th
is m
atte
r.
Km
157+
058.
Hou
ses
wer
e no
ted
at th
e fo
ot o
f a
stee
p ro
ad
emba
nkm
ent s
lope
. S
lope
failu
re c
ould
oc
cur,
espe
cial
ly d
urin
g he
avy
rain
s, th
at w
ill
likel
y bu
ry th
e ho
uses
(a
nd it
s oc
cupa
nts)
.
17-M
ay, 2
012
GET
3-D
OO
SAN
-12-
A6-5
46
The
cont
ract
or m
ust:
rem
ove
as m
uch
soil
as
poss
ible
to re
duce
the
slop
e gr
adie
nt a
nd
unde
rtake
sui
tabl
e sl
ope
stab
iliza
tion
mea
sure
s su
ch a
s be
nchi
ng,
gras
sing
, etc
. at t
he
sam
e tim
e, im
prov
e ex
istin
g dr
aina
ge to
en
sure
that
sto
rm w
ater
fro
m c
ulve
rt w
ill n
ot
caus
e flo
odin
g o
f su
rrou
ndin
g ar
eas
and
Doo
san
Con
tract
or
Imm
edia
te
N
ot y
et
prov
ided
The
Con
tract
or
has
disc
usse
d w
ith lo
cal
peop
le in
or
der t
o so
lve
this
ou
tsta
ndin
g.
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
242
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Par
ty
Dea
dlin
e A
pril
May
Ju
ne
impa
ct o
n ne
arby
ho
uses
At K
m18
9+50
0: E
lect
ric
syst
em is
uns
afe,
eve
n el
ectri
c w
ires
have
bee
n la
id d
irect
ly o
n th
e gr
ound
, thi
s si
tuat
ion
may
cau
se u
nwan
ted
elec
tric
shoc
k ac
cide
nt
at a
ny ti
me.
17-M
ay, 2
012
GET
3-D
OO
SAN
-12-
A6-5
46
The
Con
tract
or m
ust:
- Pro
vide
ele
ctric
sys
tem
at
this
sta
tion
in o
rder
to
ensu
re th
e P
roje
ct’s
sa
fety
. - C
ompl
y w
ith th
e E
ngin
eer’s
requ
irem
ents
an
d in
stru
ctio
ns re
latin
g to
this
pro
blem
.
Doo
san
Con
tract
or
5 –J
un,
2012
Ele
ctric
w
ires
syst
em
have
bee
n pr
ovid
ed a
t th
is
loca
tion
by
the
Con
tract
or
6.2.
7 Pa
ckag
e A
7
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Man
y ru
bbis
h on
site
at
Km
194+
765;
Km
201+
815;
K
m19
5+23
3; K
m20
9+32
9 6-
Apr
il
Ref
.GE
T4-
GR
BCC
-650
; R
ef.G
ET4
-G
RB
CC
-653
Req
uire
d th
e co
ntra
ctor
co
llect
s ru
bbis
h an
d tra
nspo
rts w
aste
soi
l to
was
te d
ispo
sal
GR
BCC
30
-A
pril1
2
Miti
gatin
g m
easu
res
not
impl
emen
ted
Miti
gatin
g m
easu
res
not
impl
emen
ted
Miti
gatin
g m
easu
res
not
impl
emen
ted
The
cont
ract
or d
umpi
ng
unsu
itabl
e m
ater
ial a
t som
e lo
catio
n, w
hich
not
app
rove
d by
co
nsul
tant
and
som
e of
ear
th
over
flow
s in
to ri
ver a
nd s
tream
at
Km
191+
300;
Km
194+
486;
K
m19
4+80
0 K
m20
9+80
0;
13-
Janu
ary
Ref
.GE
T4-
GR
BCC
-634
; R
ef.G
ET4
-G
RBC
C-6
48;
Ref
.GE
T4-
GR
BCC
-650
Req
uire
d co
ntra
ctor
to
mov
ed th
is e
arth
to
unsu
itabl
e w
aste
dis
posa
l, w
hich
was
app
rove
d by
co
nsul
tant
, and
pla
n gr
ass
to m
aint
ain
river
side
and
st
ream
GR
BCC
30
-A
pril1
2
The
cont
ract
or
has
plan
ted
gras
s at
K
m19
4+48
6;
Km
194+
800
date
23-A
pril
The
cont
ract
or
has
plan
ted
gras
s at
K
m20
9+80
0 da
te 2
9-M
ay
Miti
gatin
g m
easu
res
wer
e no
t im
plem
ente
d K
m19
1+30
0 an
d K
m20
1+81
5
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
243
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Km
201+
815
Labo
ur s
afet
y w
hile
the
proc
ess
of w
orki
ng a
t Km
214+
678;
K
m19
2+93
0 6-
Apr
il R
ef. G
ET4
- G
RBC
C-6
13
Req
uire
the
subc
ontra
ctor
to
rem
ind
and
prop
ose
labo
ur s
afet
y fo
r wor
kers
. If
any
wor
ker c
ontin
ues
to
viol
ate
the
regu
latio
n, w
ill
be fi
red.
GR
BCC
Im
med
iat
ely
Miti
gatin
g m
easu
res
not
impl
emen
ted
Miti
gatin
g m
easu
res
not
impl
emen
ted
Miti
gatin
g m
easu
res
not
impl
emen
ted
No
safe
ty fe
nce
arou
nd d
eep
hole
at K
m19
2+93
0;
Km
199+
050;
Km
198+
400;
K
m21
4+67
8
6-A
pril
Ref
. GE
T4-
GR
BCC
-613
The
cont
ract
or a
re re
quire
d to
inst
all t
he s
afet
y fe
nce
arou
nd d
eep
hole
, whi
ch
can
dang
er fo
r wor
ker a
nd
com
mun
ity p
eopl
e
GR
BCC
15
-Apr
il 12
Saf
ety
fenc
e ar
ound
dee
p ho
le a
t K
m19
8+40
0 w
as in
stal
led
but n
ot m
et
stan
dard
,d
ate
24-A
pril
Not
impr
oved
at
K
m19
2+93
0;
Km
199+
050;
K
m21
4+67
8
Not
im
prov
ed a
t K
m19
2+93
0;
Km
199+
050;
K
m21
4+67
8
Con
stru
ctio
n si
te m
any
mud
and
sl
ip a
t Con
cret
e ba
tchi
ng p
lan
Km
198+
400
24-A
pril
11
Rem
inde
d th
e co
ntra
ctor
th
roug
h w
eekl
y re
port
and
wee
kly
mee
ting
Req
uire
d th
e co
ntra
ctor
to
ensu
re th
e co
nstru
ctio
n si
te d
ry a
nd c
lean
G
RBC
C
30-A
pril
12
Not
impr
oved
N
ot im
prov
ed
Not
im
prov
ed
Man
y ru
bbis
h on
site
at
Km
195+
233;
Km
211+
565;
K
m19
9+13
1
7-M
ay; 1
6-M
ay
Ref
.GE
T4-
GR
BCC
-650
Req
uire
d th
e co
ntra
ctor
co
llect
s ru
bbis
h an
d tra
nspo
rts w
aste
soi
l to
was
te d
ispo
sal
GR
BCC
D
aily
M
itiga
ting
mea
sure
s no
t im
plem
ente
d
Miti
gatin
g m
easu
res
not
impl
emen
ted
Miti
gatin
g m
easu
res
not
impl
emen
ted
No
safe
ty fe
nce
arou
nd d
eep
hole
at K
m20
0+86
2 2-
May
R
ef.G
ET4
-G
RBC
C-6
33
The
cont
ract
or a
re re
quire
d to
inst
all t
he s
afet
y fe
nce
arou
nd d
eep
hole
, whi
ch
can
dang
er fo
r wor
ker a
nd
com
mun
ity p
eopl
e
GR
BCC
M
ay 1
5th
2012
Miti
gatin
g m
easu
res
not
impl
emen
ted
Miti
gatin
g m
easu
res
not
impl
emen
ted
Miti
gatin
g m
easu
res
not
impl
emen
ted
The
wor
ker c
amp
didn
’t lo
ok v
ery
sani
tary
at K
m21
1+56
5;
Km
209+
329;
Km
202+
400;
K
m19
8+40
0; K
m19
1+35
3
16-M
ay11
R
ef.G
ET4
-G
RBC
C-6
50
Req
uire
the
cont
ract
or
supp
ly ru
bbis
h bi
n, fi
re
extin
guis
her,
first
-aid
kit,
se
ptic
tank
s fo
r toi
let.
With
to
ilet h
ave
sept
ic ta
nks
GR
BCC
M
ay 3
1st
2012
Miti
gatin
g m
easu
res
not
impl
emen
ted
Miti
gatin
g m
easu
res
not
impl
emen
ted
Miti
gatin
g m
easu
res
not
impl
emen
ted
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
244
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
mus
t be
clea
n fre
quen
cies
The
batc
hing
pla
ns h
aven
’t se
dim
ent c
ontro
l pon
d at
K
m20
9+32
9; K
m19
8+40
0;
Km
194+
765
16-M
ay11
Ref
.GE
T4-
GR
BCC
-650
; R
ef.G
ET4
-G
RBC
C-6
53
Req
uire
the
cont
ract
or to
su
pply
the
sedi
men
t con
trol
pond
for e
ach
batc
hing
pl
an
GR
BCC
M
ay 3
1st
2012
The
cont
ract
or
had
supp
ly
the
Sed
imen
t co
ntro
l pon
d at
20-
June
at
Km
209+
329,
K
m19
8+40
0
Did
n’t s
uppl
y S
edim
ent
cont
rol p
ond
at
Km
194+
765
Did
n’t s
uppl
y S
edim
ent
cont
rol p
ond
at
Km
194+
765
Not
saf
ety
whi
le e
lect
ric w
eldi
ng
at K
m19
8+40
0 21
-May
R
ef.G
ET4
-G
RBC
C-6
50
Req
uire
the
cont
ract
ors
to
supp
ly th
e w
elde
r’s g
oggl
e fo
r and
all
wor
kers
mus
t be
wea
r the
wel
der’s
gog
gle
whi
ling
elec
tric
wel
ding
GR
BCC
Im
med
iat
ely
N
ot im
prov
ed
Not
im
prov
ed
Pla
ce to
kee
p oi
l tan
ks a
nd
was
te o
il ta
nks
didn
’t ac
cord
ing
to p
roje
ct s
tand
ard
at
Km
209+
800;
Km
209+
329;
K
m20
2+40
0; K
m19
8+40
0
16-M
ay
Ref
.GE
T4-
GR
BCC
-650
Req
uire
all
the
oil t
anks
an
d w
aste
oil
tank
s ke
ep in
st
ore
and
stan
d on
the
conc
rete
floo
r
GR
BCC
M
ay 3
1st
2012
Not
impr
oved
N
ot
impr
oved
Saf
ety
fenc
e ar
ound
dee
p ho
le
had
inst
alle
d bu
t not
met
st
anda
rd a
t Km
193+
379
29-M
ay
Ref
.GE
T4-
GR
BCC
-653
The
cont
ract
or a
re re
quire
d to
inst
all t
he s
afet
y fe
nce
arou
nd d
eep
hole
, whi
ch
can
dang
er fo
r wor
ker a
nd
com
mun
ity p
eopl
e
GR
BCC
Im
med
iat
ely
N
ot im
prov
ed
Not
im
prov
ed
Uns
uita
ble
mat
eria
l dum
ping
ne
ar R
iver
sid
e at
Km
204+
581
29-M
ay
Ref
.GE
T4-
GR
BCC
-653
Req
uire
the
cont
ract
or to
m
obiliz
e th
e eq
uipm
ent t
o st
abili
ty s
lope
and
pla
nt
gras
s to
pre
vent
the
eros
ion
and
land
side
in to
be
d R
iver
.
GR
BCC
15
-Jun
e-20
12
N
ot im
prov
ed
Not
im
prov
ed
Rub
bish
dum
ping
nea
r stre
am a
t K
m19
1+35
3 29
-May
R
ef.G
ET4
-G
RBC
C-6
53
Req
uire
d th
e co
ntra
ctor
to
colle
ct a
nd tr
ansf
er to
tre
atm
ent a
rea
GR
BCC
15
-Jun
e-20
12
N
ot im
prov
ed
Not
im
prov
ed
The
mai
ntai
n ar
e no
t cov
er a
t 29
-May
R
ef.G
ET4
-R
equi
red
the
cont
ract
or
GR
BCC
15
-Jun
e-
7-
June
had
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
245
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Km
193+
379
GR
BC
C-6
53
mak
e th
e co
ver f
or
mai
ntai
n ar
ea
2012
ov
erco
me
Ear
th o
verfl
ow in
to fi
elds
at
Km
191+
350
29-M
ay
Ref
.GET
4-G
RBC
C-6
53
Req
uire
d th
e co
ntra
ctor
to
appl
y th
e sl
ope
prot
ectio
n’s
met
hod
and
com
pens
ate
the
farm
pro
duce
for
citiz
ens
GR
BCC
15
-Jun
e-20
12
N
ot im
prov
ed
Not
im
prov
ed
6.2.
8 Pa
ckag
e A
8
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Man
y ru
bbis
h on
site
at G
irder
ca
stin
g ya
rd o
f Suo
i Nhu
brid
ge
Km
218+
040;
Km
244+
570
13-A
pril
Rem
inde
d th
e co
ntra
ctor
thro
ugh
wee
kly
repo
rt an
d w
eekl
y m
eetin
g
Req
uire
d th
e co
ntra
ctor
co
llect
s ru
bbis
h an
d tra
nspo
rts w
aste
soi
l to
was
te d
ispo
sal
Vin
acon
ex
30-A
pril
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
Was
tew
ater
and
was
te s
oil o
f th
e bo
re p
ile p
rogr
ess
had
colle
ct in
to s
edim
ent c
ontro
l po
nds
but s
edim
ent c
ontro
l po
nds
now
full
and
over
flow
on
grou
nds
at S
on H
a B
ridge
K
m22
4+36
9; L
ang
Tra
Brd
ige
Km
220+
993
13-A
pril
Ref
. GE
T4-
Vin
acon
ex-5
34
Req
uire
d th
e co
ntra
ctor
to
clea
n ou
t the
sed
imen
t co
ntro
l pon
ds to
pre
vent
the
was
tew
ater
and
was
te s
oil
over
flow
into
stre
ams.
Vin
acon
ex
Apr
il 15
th
2012
Had
re
clea
ning
da
te 2
5-A
pril
Had
re
clea
ning
da
te 2
5-A
pril
Had
re
clea
ning
da
te 2
5-A
pril
Dan
ger s
ignp
ost a
t co
nstru
ctio
n w
orks
cro
ss th
e ex
its ro
ads
at B
ox c
ulve
rt K
m22
0+79
4; K
m23
7+95
1
13-A
pril
and
20-
Apr
il
Ref
. GE
T4-
Vin
acon
ex-5
34
The
cont
ract
or a
re re
quire
d to
inst
all t
he s
afet
y fe
nce
arou
nd d
eep
hole
, whi
ch
can
dang
er fo
r wor
ker a
nd
com
mun
ity p
eopl
e
Vin
acon
ex
Imm
edia
tely
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
Labo
ur s
afet
y w
hile
the
proc
ess
of w
orki
ng a
t K
m22
0+99
3;
13, 2
0, 2
5-A
pril
Ref
. GE
T4-
Vin
acon
ex-5
34
Req
uire
the
subc
ontra
ctor
to
rem
ind
and
prop
ose
labo
ur s
afet
y fo
r wor
kers
. If
Vin
acon
ex
Imm
edia
tely
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
246
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
Km
231+
889;
Km
237+
951;
K
m24
4+57
0; K
m22
3+70
5;
Km
238+
265;
Km
233+
540
any
wor
ker c
ontin
ues
to
viol
ate
the
regu
latio
n, w
ill
be fi
red.
Was
te s
oil k
eep
on th
e si
te a
t K
m23
1+88
9 20
-Apr
il R
ef. G
ET4
- V
inac
onex
-534
Req
uire
d th
e co
ntra
ctor
to
trans
port
the
was
te s
oil t
o un
suita
ble
mat
eria
l was
te
disp
osal
whi
ch w
as
appr
oved
by
cons
ulta
nt
Vin
acon
ex
Apr
il 30
th
2012
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
The
Son
Hai
wor
ker’s
cam
p do
n’t h
ave
rubb
ish
bin
at
Km
227+
065
25-A
pril
Ref
. GE
T4-
Vin
acon
ex-5
34
Req
uire
d th
e co
ntra
ctor
to
inst
all t
he ru
bbis
h bi
n to
co
llect
and
tran
sfer
do
mes
tics
was
te to
tre
atm
ent a
re a
ccor
ding
to
loca
l reg
ulat
ion
Vin
acon
ex
Apr
il 30
th
2012
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
Saf
ety
for g
as ta
nks
and
oxy
tank
s at
Km
218+
040
25-A
pril
Ref
. GE
T4-
Vin
acon
ex-5
34
Lim
it di
stan
ce fo
r gas
tank
s an
d ox
y ta
nks
is 3
m a
nd
neve
r tra
nsfe
r tog
ethe
r gas
ta
nks
and
oxy
tank
s
Vin
acon
ex
Imm
edia
tely
O
verc
ome
imm
edia
tel
y
Saf
ety
for g
as ta
nks
and
oxy
tank
s at
Km
238+
265
4-M
ay
Ref
. GE
T4-
Vin
acon
ex- 5
49
Lim
it di
stan
ce fo
r gas
tank
s an
d ox
y ta
nks
is 3
m a
nd
neve
r tra
nsfe
r tog
ethe
r gas
ta
nks
and
oxy
tank
s
Vin
acon
ex
Imm
edia
tely
Ove
rcom
e im
med
iate
ly
The
cons
truct
ion
wor
ks n
ot ti
dy
and
man
y ru
bbis
h on
site
at
Km
244+
155
16-M
ay
Ref
. GE
T4-
Vin
acon
ex- 5
65;
Ref
. GE
T4-
Vin
acon
ex- 5
66
Req
uire
the
cont
ract
or to
ar
rang
e th
e co
nstru
ctio
n w
ork
and
colle
ct a
nd
clas
sific
atio
n ac
cord
ing
to
regu
latio
n
Vin
acon
ex
May
31st
20
12
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
The
wor
ker c
amp
didn
’t lo
ok
very
san
itary
at K
m24
4+15
5;
Km
238+
265;
Km
218+
040;
K
m22
0+99
3
16-M
ay
Ref
. GE
T4-
Vin
acon
ex- 5
65;
Ref
. GE
T4-
Vin
acon
ex- 5
66
Req
uire
the
cont
ract
or
supp
ly ru
bbis
h bi
n, fi
re
extin
guis
her,
first
-aid
kit,
se
ptic
tank
s fo
r toi
let.
With
to
ilet h
ave
sept
ic ta
nks
mus
t be
clea
n fre
quen
cies
Vin
acon
ex
May
31st
20
12
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
The
batc
hing
pla
ns h
aven
’t 16
-May
R
ef. G
ET4
- R
equi
re th
e co
ntra
ctor
to
Vin
acon
ex
May
31st
C
BP
s ha
ve
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
247
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
sedi
men
t con
trol p
ond
at
Km
218+
040;
Km
238+
265;
K
m23
1+88
9
Vin
acon
ex- 5
65;
Ref
. GE
T4-
Vin
acon
ex- 5
66
supp
ly th
e se
dim
ent c
ontro
l po
nd fo
r eac
h ba
tchi
ng p
lan
2012
se
dim
ent
cont
rol p
ond
at th
ese
loca
tions
, da
te 1
4-Ju
ne
Pla
ce to
kee
p oi
l tan
ks a
nd
was
te o
il ta
nks
didn
’t ac
cord
ing
to p
roje
ct s
tand
ard
at
Km
244+
155;
Km
229+
034;
K
m21
8+04
0;
16-M
ay
Ref
. GE
T4-
Vin
acon
ex- 5
65;
Ref
. GE
T4-
Vin
acon
ex- 5
66
Req
uire
all
the
oil t
anks
and
w
aste
oil
tank
s ke
ep in
st
ore
and
stan
d on
the
conc
rete
floo
r
Vin
acon
ex
May
31st
20
12
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
Uns
uita
ble
mat
eria
l dum
ping
ne
ar s
tream
at K
m23
1+88
9 16
-May
Ref
. GE
T4-
Vin
acon
ex- 5
65;
Ref
. GET
4-
Vin
acon
ex- 5
66
Req
uire
the
cont
ract
or to
m
obiliz
e th
e eq
uipm
ent t
o st
abili
ty s
lope
and
pla
nt
gras
s to
pre
vent
the
eros
ion
and
land
side
in to
stre
am.
Vin
acon
ex
May
31st
20
12
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
Not
saf
ety
at U
nder
pass
box
cu
lver
t at K
m24
4+15
5 16
-May
Ref
. GE
T4-
Vin
acon
ex- 5
65;
Ref
. GE
T4-
Vin
acon
ex- 5
66
Req
uire
the
cont
ract
or to
in
stal
l the
sig
npos
t, fe
nce
and
mak
e tre
nch
at th
at
cons
truct
ion
wor
k cr
oss
exis
t roa
d
Vin
acon
ex
May
31st
20
12
N
ot y
et
Impr
oved
N
ot y
et
Impr
oved
Era
th fr
om e
mba
nkm
ent r
oad
over
flow
into
4E
road
at
Km
230+
237-
Km
230+
660
30
-May
R
ef. G
ET4
- V
inac
onex
- 569
The
cont
ract
or a
re re
quire
d to
cle
ar a
nd a
pply
ing
the
slop
e pr
otec
tion’
s m
etho
d to
av
oid
land
side
into
4E
road
Vin
acon
ex
15-J
une
2012
Ear
th
rem
oved
ou
t of 4
E
road
dat
e 1-
June
The
cons
truct
ion
wor
ks n
ot ti
dy
and
man
y ru
bbis
h on
site
at
Km
218+
040;
Km
224+
369
6-Ju
ne
Ref
. GE
T4-
Vin
acon
ex- 5
66
Req
uire
the
cont
ract
or to
ar
rang
e th
e co
nstru
ctio
n w
ork
and
colle
ct a
nd
clas
sific
atio
n ac
cord
ing
to
regu
latio
n
Vin
acon
ex
30-J
une
2012
N
ot y
et
Impr
oved
Era
th o
verfl
ow in
to p
onds
and
la
kes
at K
m22
2+50
0;
Km
223+
000
6-Ju
ne
Ref
. GE
T4-
Vin
acon
ex- 5
67
Req
uire
d th
e co
ntra
ctor
to
appl
y th
e sl
ope
prot
ectio
n’s
met
hod
and
com
pens
ate
the
farm
pro
duce
for
Vin
acon
ex
As
soon
as
poss
ibly
N
ot y
et
Impr
oved
Loan
239
1/23
92 –
VIE
: GM
S K
unm
ing
– H
ai P
hong
Tra
nspo
rt C
orrid
or
Noi
Bai
– L
ao C
ai H
ighw
ay P
roje
ct
248
Prob
lem
des
crip
tion
and
caus
e D
ate
first
ob
serv
ed
Act
ion
by
Engi
neer
Miti
gatio
n M
easu
re
Stat
us
Rec
omm
enda
tion
Res
pons
ible
Pa
rty
Dea
dlin
e A
pril
May
Ju
ne
citiz
ens
Saf
ety
fenc
e ar
ound
dee
p ho
le
had
inst
alle
d bu
t not
met
st
anda
rd a
t Km
232+
437
21-J
une
Ref
. GE
T4-
Vin
acon
ex- 5
66
The
cont
ract
or a
re re
quire
d to
inst
all t
he s
afet
y fe
nce
arou
nd d
eep
hole
, whi
ch
can
dang
er fo
r wor
ker a
nd
com
mun
ity p
eopl
e
Vin
acon
ex
30-J
une
2012
N
ot y
et
Impr
oved
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
249
7 GRIEVANCE INTAKES. PUBLIC CONSULTATION
As Annex 2 we include some grievance intakes (public consultations), written in a form sheet by Consultant, about complaints which were expressed by local people affected by the construction works, to the environmental or social impact specialists.
As Annex 3 there is included the information about the instructions given to contractors in order to establish a “complaints communication system” for local people. Although in some packages it was already implemented, the Engineer did not receive any complaint yet.
It’s supposed that these are not the only existing complaints, but the only ones received or collected by Consultant.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
250
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
251
ANNEX 1: PHOTOGRAPHIC REPORT
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�
PACKAGE A1
� ������� �� ���������������� ���������!"#!$�!%&���*- ��<� �*�=
� ����!�� ��>��*��?���������@����@���� ����Z �� �* �� *�� ������!"#!$�!%[��������\]!=
� ����^�] *>�������?� ��������������!"#!$�!
%-_$`{{|}-_^`$$$=� ������� �� ���������������� ���������!"#
!$�!%&���� <� �*�=
� ����|��� ��������� ��� ������!"#!$�!%&�_���*�&> ��-�<� �*�=
� ����{�� �������������� �� ��������� ������!"#!$�!%&���*- ��<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!
� ����"�������� �������� � ������!"#!$�!
%&���*- ��<� �*�=� ������&���> �� ��������*���������!"#!$�!
%&���*- ��<� �*�=
� ������������� �������� � ������!"#!$�!
%&���� <� �*�=� �����$�����������_� �� ���@ �>����>�������� �*����!"#!$�!%&���� <� �*�=
� �������� �� ���������������� ���������$^#!$�!%&���*- ��<� �*�=
� �����!�� �� ���������������� ���������$^#!$�!%������>��*�\��^=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^
� �����^�� ��������*���������$^#!$�!%&���*- ��<� �*�=
� ��������� ��������� ��� ������$^#!$�!%������>��*�\��^=
� �����|�<��� � �*���� �������� � ������$^#!$�!%������>��*�\��^=
� �����{�&���> �� �������������� �*����$^#!$�!%������>��*�\��^=
� �����"�<��� � �*���� �������� � ������$^#!$�!%������>��*�\��^=
� �������&���> �� �������������� �*����$^#!$�!%&���*- ��<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�
� �������� ��������*����������$#!$�!%&���*- ��<� �*�=
� ����!$�� ��������*����������$#!$�!%&���� <� �*�=
� ����!��<��� � �*���� �������� � �������$#!$�!%&���*- ��<� �*�=
� ����!!������ � �*���� �������� � �������$#!$�!%&���� <� �*�=
� ����!^�� �� ���������������� ����������"#!$�!%&���*- ��<� �*�=
� ����!��] *>�������?� ���������������"#!$�!%-_�`"$$}-_{`$$$=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
|
� ����!|�] *>�������?� ���������������"#!$�!%������>��*�\��^=
� ����!{�] *>�������?� ���������������"#!$�!%-_�{`$$$}-_��`$$$=
� ����!"�� ��>��*��?���������@����@���� ��� �� *�� ��
����������"#!$�!%[��������\]!=
� ����!��� ��������*��������@������� �>�����������������_���*�_��������"#!$�!
%&���� <� �*�=
� ����!��� ��������*��������@������� �>�����������������_���*�_��������"#!$�!%&���*- ��<� �*�=
� ����^$��� ��������� ����������� ��� �������"#!$�!%&�_���*�&> ��-�<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{
� ����^����� _�������� ���������������!�#!$�!
%[��������\]!=� ����^!�] *>�������?� ��������������!�#!$�!
%-_$`{{|}-_^`$$$=
� ����^^��_������ �� �_���*�_�������!�#!$�!%&���*- ��<� �*�=
� ����^��&���> �� �������������� �*����!�#!$�!%�� ����*<� �*�=
� ����^|������ ��������>��������!�#!$�!%������>��*�\��^=
� ����^{���� _������ � ��� �*���������������$^#!$�!%[��������\]!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
"
� ����^"��_������ �� �_���*�_�������$^#!$�!%&���*- ��<� �*�=
� ����^���_������ �� �_���*�_�������$^#!$�!%�� ����*<� �*�=
� ����^�������� ���� ���� ������$^#!$�!%&���� <� �*�=
� �����$���������� �� ��� �* _����������$^#!$�!%&���� <� �*�=
� �������� �� �� ��������� ������$^#!$�!%&�_���*�&> ��-�<� �*�=
� �����!�� �� ���������������� ���������$�#
!$�!%<�&> ��<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�
� �����^��_������ �� �_���*�_�������$�#!$�!
%&���*- ��<� �*�=
� ��������_������ �� �_���*�_�������$�#!$�!
%<�&> ��<� �*�=
� �����|����_���? ����� �� �����$^#!$�!
%&���*- ��<� �*�=� �����{�&���> �� �������������� �*@�������
��_�����$�#!$�!%�� ����*<� �*�=
� �����"��� ��������� ����������� ��� ������!!#
!$�!%&�_���*�&> ��-�<� �*�=
� �������� ���� �� ��� �*@��>���@������!!#
!$�!%�����>���*<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�
� �������&���>@����������� ������!!#!$�!%��
����*<� �*�=� ����|$�&���>@����������� ������!!#!$�!
%&���*- ��<� �*�=
� ����|�������?���??����������������$^#!$�!
%�����>���*<� �*�=� ����|!������?�����@�������$^#!$�!%����
�>���*<� �*�=
� ����|^������?�����@�������$^#!$�!%&����
<� �*�=
� ����|�������?��?����������$^#!$�!
%<�&> ��<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$
� ����||�[���?�@���@������$^#!$�!
%&���� <� �*�=
� ����|{������ ������?��������!!#!$�!
%<�&> ��<� �*�=
� ����|"������?��?����������$^#!$�!%������>��*�
\��^=� ����|��� ����� ��>��*��?���������@����@����
������ ��*�����!�#!$�!%[��������\]!=
� ����|���_������ �� �_���*�_�������!�#!$�!
%���^=� ����{$�� ���� �� ��� �*@��>���@������!�#
!$�!%&���� <� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
� ����{�������?�����@�������!�#!$�!%[��������\]!=
� ����{!������?��������?�������������??�����@�������!�#!$�!%&���� <� �*�=
� ����{^��� ��������� ��� ������!�#!$�!%&�_���*�&> ��-�<� �*�=
� ����{��&>������?� ���*����������$|#!$�!%<��<� �*�=
� ����{|��� ������������ ��� �������$|#!$�!
%- _��><� �*�=
� ����{{������?�����@��������$|#!$�!
%- _��><� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!
� ����{"�[���?����??��������$|#!$�!
%<��<� �*�=� ����{�������?�����@��������$|#!$�!
%&���*- ��<� �*�=
� ����{���_������ �� �_���*�_���������!#!$�!%������>��*�\��^=
� ����"$��_������ �� �_���*�_���������!#!$�!%������>��*�\��^=
� ����"���_������ �� �_���*�_���������!#!$�!
%&�^$!��<� �*�=
� ����"!��� ���������������� ���������!#!$�!
%[��������\]!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^
� ����"^������� ������ ��������!#!$�!
%&���� <� �*�=
� ����"��� ��������*������������#!$�!
%������>��*�\��^=
� ����"|������?����@�����? ��������������?��� _���
��� ��������#!$�!%[��������\]!=
� ����"{������������� �� �_���*�_����������#
!$�!%&���*- ��<� �*�=
� ����""�����������_� �� ���@ �>����>�������#!$�!
%&���*- ��<� �*�=� ����"������� �������� �*�����������#!$�!
%������>��*�\��^=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
PACKAGE A2
� ��!���� �� ���������������� ���������!�#!$�!
%-_^�`!$$=
� ��!�!�<�����?�������������@ �>�����������?�����
�> ���������!�#!$�!%��������*<� �*�=
� ��!�^�<�����?��������!�#!$�!
%��������*<� �*�=
� ��!���[���?�����������!�#!$�!
%���*���<� �*�=
� ��!�|�[���?�@���@������!�#!$�!
%<�����<� �*�=
� ��!�{�[���?�����������!�#!$�!
%<�����<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�|
� ��!�"�<����?�����������@�������!�#!$�!%���*
���<� �*�=
� ��!��������?��?����������$�#!$�!%<��&��
<� �*�=
� ��!���[���?�@���@������$�#!$�!%���*���
<� �*�=
� ��!��$������?��?������������#!$�!%��_����
<� �*�=
� ��!����[���?�@���@����������?>����� �
�������� �*�>���*��?��������������#!$�!%&�^�$<� �*�=
� ��!��!�[���?����??���������#!$�!
%��_����<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�{
� ��!��^�[���?�@���@��������#!$�!
%� �������� ���<� �*�=
� ��!����<���������?��?�����@���������#!$�!
%����*���<� �*�=
� ��!��|������?�����@���������#!$�!%����*���
<� �*�=
� ��!��{�[���?�����?��_?��@������������#!$�!
%����*���<� �*�=
� �� !��"� [������� ��������� @���� ��� � !|# !$�! %��� ���<� �*�<� �*�=
�� ��!������������� �� ��� �* _����������$�#!$�!%<�����<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�"
�� ��!���������?��@ ��� �*�����������$�#!$�!
%����*���<� �*�=
�� ��!�!$�[��� �����_���� �� ��� �*� ��������� ���
���$�#!$�!%���\��{=�
� ��!�!���_������ �� �_���*�_�������$�#!$�!%���
\��{=
�� ��!�!!�� �� ���������������� ���������$�#!$�!
%-_�!`!$$=
� ��!�!^��_������ �� �_���*�_�������$�#!$�!%��
� ���<� �*�=
� ��!�!��] *>�������?� ��������������$�#!$�!
%����*�>���*>@��=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
� ��!�!|������?��@ ��� �*�����������$�#!$�!
%<��&��<� �*�=
� ��!�!{������?��@ ��� �*������������ _����� ���
���$�#!$�!%<�����<� �*�=
� ��!�!"�] *>� ���?���� ������$�#!$�!%-_^�`"�$
}-_^|`$$$=
� ��!�!��� ����� ��>��*��?���������@����@���� ���
� �������$�#!$�!%<�����<� �*�=
� ��!�!������ ��������� ���������������$�#!$�!
%-_�!`�$$}-_�!`{"$=
� ��!�^$�\���� ��*����������?���� ������������
���$�#!$�!%-_�!`{!$=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
� ��!�^���� ��������� ��@���������_�����$�#!$�!
%<��&��<� �*�=
�� ��!�^!�� �� ��� �*��������������� ����������"#
!$�!%-_^�`"�$=
�� ��!�^^�� �������?�� � ���� �������!�#!$�!
%<�����<� �*�=
�� ��!�^��&���> �� ������ _������������!�#!$�!
%����*���<� �*�=�
�� ��!�^|���������� ��� �� �� ���@ �>����>����!!#
!$�!%��_����<� �*�=
�� ��!�^{�[�� ����������� ��� ������!!#!$�!
%<��&��<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!$
� ��!�^"������?�����@�������$�#!$�!%����*
���<� �*�=
� ��!�^�������?��?����������$�#!$�!
%��� ���<� �*�=
� ��!�^�������?�����@�������$�#!$�!%[��������
��Z�������-_�$`{|$=
� ��!��$������?��?����������$�#!$�!
%<�����<� �*�=
� ��!���������?��?����������$�#!$�!
%��_���<� �*�=
� ��!��!��> ������������ �*��� ������!�#!$�!
%����*���<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!�
� ��!��^������?�����@�������!�#!$�!%����*
���<� �*�=
�� ��!����� �� ��� �*��������������� ������
���^�#!$�!%&�^${��<� �*�=
�� ��!��|��� ������������ ��� ������^�#!$�!
%&�^${��<� �*�=
�� ��!��{�<����� �����������������������������? �������^�#!$�!%&�^${��<� �*�=
�� ��!��"���������������_����������?
��� ��*�����^�#!$�!%-_�!`{!$=
�� ��!�������� ��������� � ���������������
^�#!$�!%-_�!`!$$}-_�!`{"$=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!!
�� ��!�������� ��������� � ���������������
^�#!$�!%-_�!`!$$}-_�!`{"$=�
�� ��!�|$�[��� �����_���� �� ��� �*� ������
��� ������^�#!$�!%���{=�
�� ��!�|��[��� �����_���� �� ��� �*� ������
��� ������^�#!$�!%���{=�
�� ��!�|!�[����������??�������^�#!$�!
%<�����<� �*�=
�� ��!�|^������ ��?��������������${#!$�!
%&�^${�<� �*�=
�� ��!�|��&���� �*�?� ���������� ����������
${#!$�!%&�^${��<� �*�=�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!^
�� ��!�||��_������ �� �_���*�_��������${#
!$�!%&�^${��<� �*�=
�� ��!�|{������?��@ ��� �*������������${#
!$�!%����*���<� �*�=
�� ��!�|"�[���?�@���@�������${#!$�!%����*���<� �*�=
�� ��!�|��\�@��� _�������@���Z��������
����${#!$�!%�<�!�?��� ���<� �*�=�
�� ��!�|���� �����_�@ �>����>�����${#!$�!
%����*���<� �*�=
� ��!�{$�<����� �� �� ��>��*�� ��������
? ���������^#!$�!%&�^${��<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!�
� ��!�{��] *>�������?� ����������������^#
!$�!%-_�!`!$$}-_�|`$$$=
� ��!�{!����� ��������� ��??� ���������#
!$�!%-_!"`{!$=
� ��!�{^��Z �� �*��� ��*�@�������������� �������� _����� ���������#!$�!%-_!"`{!$=
� ��!�{���������� ��� �*�������@ �>�� �
?��_�_����_����������#!$�!%-_!"`{!$=
� ��!�{|������ ��?���������������^#!$�!
%&�^${�<� �*�=
� ��!�{{������?����� ��?������ *���������
� *>� �*�����_������^#!$�!%&�^${�<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!|
� ��!�{"������?����� ��?������ *���������
� *>� �*�����_������^#!$�!%&�^${�<� �*�=
� ��!�{��[���?�@���@��������^#!$�!
%� ��{���� ���<� �*�=
� ��!�{������������_����� ������ ���@ �>
����>�����!$#!$�!%����*���<� �*�=
� ��!�"$�����������_����� ������ ���@ �>
����>�����!$#!$�!%����*���<� �*�=
� ��!�"���_������ �� ��_��_���*�_��������
!$#!$�!%����*���<� �*�=
� ��!�"!�< ��_���������*����������!$#
!$�!%����*���<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!{
� ��!�"^�� ������?��� ���� �������!$#!$�!
%������>��*�\��{=
� ��!�"���Z����������� �*���������!$#!$�!
%<���>�������-_^�`!$$=
� ��!�"|���_����� ��������������� ��?��_�����? ��������!$#!$�!%&�^${��<� �*�=
� ��!�"{������ ��?����#� *���������� *>� �*�����_@��� �������������!$#!$�!%&�^${��
<� �*�=
� ��!�""���������>�?�������� *�����������_�
����!$#!$�!%&�^${�<� �*�=
� ��!�"�������?����� ��?����#� *���������� *>� �*�����_������^#!$�!%&�^$|<� �*�=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!"
PACKAGE A3
� ��^��������������@�������?����^���� ����� �*�%����������>!��>#!$�!=
� ��^�!������� �@ ��@���� ���*��������^���� ����� �*�%����������>!��>#!$�!=
� ��^�^�������@�������?����!���� ����� �*�%����������>!��>#!$�!=
� ��^���@����@��������� ���������@> �>@���>��@��?���@��> �*�������#@���>��@� ����>�������
\�� ������ �@��?�������� �*�%����������>!��>#!$�!=
� ��^�|� ������������Z@�������?���\�� ������ �@��
?�������� �*�%��������� �|�>#!$�!=
� ��^�{������� �@ ��@���� ���*�������\�� ������ �@��?�������� �*�%��������� �|�>#!$�!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!�
� ��^�"�?���������� ��@�������?���<� <��*�� �*�
%��������� �|�>#!$�!=
� ��^�������?���� *������� �������� ������@���
��������� ��� �����������������>��*�>���� �*�%��������� �|�>#!$�!=
� ��^���� ����_�@�����������@>��� �� ��@ �>���
��?���_������-_{�`�$$%��������� �|�>#!$�!=
� ��^��$��� �@��?�����_��>���Z �� �*����
-_|�`�$$%��������� ��!�>#!$�!=
� ��^���� �� *�� �������@�����������?������� ����
���� �>-_|�`�$$%��������� ��!�>#!$�!=
� ��^��!�@������ ���������?������������%������
��� ��!�>#!$�!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
!�
� ��^��^� �>�� ����@��?������������������� ��� ��
-_|�`�$$%��������� ��!�>#!$�!=
� ��^��������������� ��@�������?���<� <��*
�� �*�%��������� ��!�>#!$�!=
� ��^��|���� *�����@��������� �������� ��
����@������������ ��� ���������������>��*�>���� �*�%��������� ��!�>#!$�!=
� ��^��{�\�������������#�����??���#��?����
������ ��?��@������%��������� ����>#!$�!=
� ��^��"������� ������_@���������*����������
� ����� �*�%��������� ����>#!$�!=
� ��^����\�������� �������@�������?���> �_��> ��
����&>��>�� �*�%��������� ����>#!$�!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^$
� ��^����\���?���>����� �@����������^���� ���
�� �*�%��������� ����>#!$�!=
� ��^�!$�@�����@������*���������>� *>�<� <��*
�� �*�%��������� ����>#!$�!=
� ��^�!������ �>@��_��> �� �����%��������� �
���>#!$�!=
� ��^�!!�@�����@������*���������>� *>����� ���
�� �*�%��������� ����>#!$�!=
� ��^�!^������� �������� �� ������?�#�!���� ���
�� �*�#��� �!{�>#!$�!
� ��^�!���Z �� �*����@�������������������� � � ��#
-_"|`�$$#��� �!{�>#!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^�
� ��^�!|��������� �> �� ��#&�^!|<�� �*�#
��� �!{�>#!$�!
� ��^�!{�@ �>��������� �����Z#-_{{`��|#���^��#
!$�!
� ��^�!"�?�������� ����������������� ����#
&�^�|<�� �*�#���^��#!$�!
� ��^�!��\�>����� �?���������� �*�#������ ���
�� �*�#���^��#!$�!
� ��^�!��\�������������?��@��� �*#����
&>��>�� �*�#������>#!$�!
� ��^�^$����������������?����#���$#������>#
!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^!
� ��^�^��� �@���� ���������*�����#���$#���
���>#!$�!
� ��^�^!�������� ���������?�������@>��>�@���
��>� *>�#�|���� ����� �*�#������>#!$�!
� ��^�^^�\��� �������?���_��>��?��@�����
@>���>��@�����>� *>�#�|���� ����� �*�#������>#!$�!
� ��^�^��� ����_�@�����������@>��� �� ��#�|
���� ����� �*�#���!���#!$�!
� ��^�^|��������� �> �� ��#�|���� ���
�� �*�#���!���#!$�!
� ��^�^{������� ������_@�������?�#�|���� ���
�� �*�#���!���#!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^^
� ��^�^"�\�?������_ � _ ���� �������@��
� ��� �����_��> ��>�� ����Z �� �*����#������ ����� �*�#���!���#!$�!
� ��^�^���������� �>@�� �?�����?@���������_�#
@���������_������^���� ����� �*�#���!���#!$�!
� ��^�^���������������@����@����?��_
��_�������> �*��������> ���� _����������>���#�^���� ����� �*�#���!���#!$�!
� ��^��$��>���� _����������>�����-_{"`"$$����������*���*����#-_{"`"$$#���!���#!$�!
� ��^����������� �����������#-�{"`"$$#
���!���#!$�!
� ��^��!�������� �����������#&�^�|<�� �*�#
���!���#!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^�
PACKAGE A4
� �������� �@���������Z �� �*�����������@��
� ��� �����_��> ��>�� ���-_�{`"$$%����>!��>#!$�!=
� ����!�������� ���������?�����������
-_�{`"$$%����������>!��>#!$�!=
� ����^�@������ ���������?�������@>���>��@�������>� *>�-_�"`�!�\*� ����� �*�%����������>!��>#
!$�!=
� ������������ ��@������?��@�� ���� ������>��*>�������������� ����> �� ���� ��-_�"`�!�\*� ���
�� �*�%����������>!��>#!$�!=
� ����|��� �@��?�����_��>���Z �� �*�����������
@��� ��� �����_��>���������-_��`�$$%����������>!��>#!$�!=
� ����{�_��������� �>@���>��@� ��������� �� *�� �������-_��`�$$%����������>!��>#!$�!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^|
� ����"�_��@�������� ����> ��������-_��`�$$
%����������>!��>#!$�!=
� ������������ ������_@�������?���-_��`�$$
%����������>!��>#!$�!=
� �������� �@���������Z �� �*�����������@��
� ��� �����_��>�����������-_�$�`$!|%����������>!��>#!$�!=
� �����$������� ������_@�������?���-_�$"`|^^%����������>!��>#!$�!=
� ��������� �@���������Z �� �*�����������@��
� ��� �����_��> ��>�� ���-_�$"`|^^%����������>!��>#!$�!=
� �����!��� �@��?��������Z �� �*�����������@��� ��� �����_��> ��>�� �-_��`�$$%��������� ���>#
!$�!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^{
� �����^�[��� �����_���� ��@�������_�������� ��
-_�$"`|^^%��������� ���>#!$�!=
� ��������� �@��?��������Z �� �*�����������@��� ��� �����_��> ��>�� �-_�$�`$!|%��������� �
��>#!$�!=
� �����|������� �@ ��@���� ������@��_��-_�$"`|^^
%��������� ����>#!$�!=� �����{���� *�����@��������� �������� ��
���@������������������������ ��� �������@��� ��� �����_��>���������-_�$"`|^^%��������� �
���>#!$�!=
� �����"������ ��@�������?���\*� ����� �*�%������
��� ����>#!$�!=
� ������������� ������_@�������?���\*� ���
�� �*�%��������� ����>#!$�!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^"
� ���������� *�����@�� ���������� �������� �����@���
��������������������� ��� ��-_�{`"$$%��������� ����>#!$�!=
� ����!$�@���������_�� ����������� ���#? ���Z� �*� �>��#? ���� ���Z&�^!��-_��`�$$%������
��� ����>#!$�!=
� ����!������ �>@��_��> �� ��\*� ����� �*�
%��������� ����>#!$�!=
� ����!!��� ����������@��?��������� ���\*� ���
� ���%��������� ����>#!$�!=
� ����!^������� ������_@���������*�����\*� ���
�� �*�%��������� ����>#!$�!=� ������������ ����������@����>��@������@>���
�� ��\*� � ��>�� �*�%��������� ����>#!$�!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^�
� ����!|��� �@��?������������Z �� �*����������@��� ��� �����_��>���������-_�$"`|^^%��������� �!|�>#
!$�!=
� ����!{����� �����_���� ��@��� ����� �� ��_�������-_�$"`|^^%��������� �!|�>#!$�!=
� ����!"��� �@��?������������Z �� �*����������@��� ��� �����_��>���������-_�$�`$$$%��������� �!|�>#
!$�!=
� ����!��_��@�������� ���\*� ���� ���%��������� �!|�>#!$�!=
� ����!��@������ ���������?���������%>��_��=��\*�
����� �*�-_�$�`$!|%��������� �!|�>#!$�!=� ����^$��� �@��?����� ���\*� ���� ���%������
��� �!|�>#!$�!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
^�
� ����^���� ���������� ���� ��@�������_����
����������# ������ ��������?� ������-_�"`�!�\*� ����� �*�%��������� �!|�>#!$�!=
� ����^!������� �@ ��@���� ���*�����-_�"`�!�\*� ����� �*�%��������� �!|�>#!$�!=
� ����^^���������@����� ����������?�������
-_�"`�!�\*� ����� �*�%��������� �!|�>#!$�!=� ����^�������� ������_@�������?�-_�"`�!�
\*� ����� �*�%��������� �!|�>#!$�!=
� ����^|�_��@��?����� �� *�� �������&�^!���� �*�
%��������� �!|�>#!$�!=� ����^{�� *�����@������������ �������� ��
���@������������������������ ��� ��-_�"`�!�\*� ����� �*�%��������� �!|�>#!$�!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$
� ����^"��� ��������������� ��_���>�?��?� ������
\*� � ��>� ���%��������� �!|�>#!$�!=� ����^��� ����_�@��������� ���*���� �������
@ �>��?���_��>��\*� � ��>� ���%��������� �!|�>#!$�!=
� ����^�������� ������_@�������?�\*� � ��>� ���
%��������� �!|�>#!$�!=� �����$������� ��@��������� ������ ���\*�
� ��>� ���%��������� �!|�>#!$�!=
� �������_��������� �>��������>��Z �� �* �� *�� ��
�������-_��`�$$&�^!���� �*�%��������� �!|�>#!$�!=� �����!��� �@��?������������Z �� �*����������@��� ��� �����_��>���������-_��`�$$&�^!��
�� �*�%��������� �!|�>#!$�!=
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
� �����^������� ������_@�������?�-_��`�$$&�^!��
�� �*�%��������� �!|�>#!$�!=
� ������������� ���@ ��@���� ���@��*�����#
��^!�������#�����>#!$�!
� �����|�������� �����������#\*� ����� �*�#���
��>#!$�!
� �����{�_��@���>��@� ���\*� ���� ���#\*�
����� �*�#�����>#!$�!
� �����"�_������� �@��?������Z �� �*�����\�
� *�����>���#-_��`"$$#�����>#!$�!
� �������_��@�������� ����> ������#-_��`�$$#
����$�>#!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!
� �������������� �����������#��_\��*�� �*�#���
�$�>#!$�!
� ����|$������� ������_@���������*�����#
-_�$"`|^^#����$�>#!$�!
� ����|��������� �����������#-_�$"`|^^#����$�>#
!$�!
� ����|!�������� �����������#-_�$�`|$$#���
���>#!$�!
� ����|^����� �>@��_��>��@���������_�#
-_�$�`|$$#������>#!$�!
� ����|��]�����@����� ��#? ���Z� �*� �>�����
? ���� �� �#-_�$�`|$$#������>#!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^
� ����||��� �@��?����� ���� ���#-_�"`�!�\�� ���
�� �*�#������>#!$�!
� ����|{�@����@��������� ���_�������?��@��
*�����#-_��`^$$��_�������> �*�����#������>#!$�!
� ����|"���� _����������>���@������_���#-_��`^$$
��_�������> �*�����#������>#!$�!
� ����|���� �@��@��>��� ���? ���#-_�$�`!$$#
������>#!$�!
� ����|���� �@��@��>��� ���? ���#-_�$^`�$$#���
���>#!$�!
� ����{$�������� �����������#\*� � ��>
�� �*�#������>#!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
� ����{��� ����_�@����������@>��� �� ��#\*�
� ��>�� �*�#������>#!$�!
� ����{!������� �����_��@�������� ��������#
&�^!���� �*�#������>#!$�!
� ����{^������� ������ ��@�������?�#&�^!��
-_��`�$$#���!|�>#!$�!
� ����{�������� ������_@�������?�#&�^!��
-_��`�$$#���!|�>#!$�!
� ����{|�� ����_�@�������*�����@ �>����� �?������
��������#&�^!��-_��`�$$#���!|�>#!$�!
� ����{{����� �>@��?��� �� �������Z���@�������
��_�#&�^!���� �*�#���!|�>#!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�|
PACKAGE A5
� ��|������������ ��� �� ��������@ �>���� �����#����>�����������>����� �������������?���� *��#
-_�!^`�{$#���>���#!$�!�
� ��|�!���?���?����������?���� *�������������
_��� �*�>�������������� ��_������\*� ����� �*�#���>���#!$�!�
� ��|�^���?���?����������?���� *�������� ��>���������� ������������������� ��� ���?��^��� �*�#
���>���#!$�!�
� ��|������������ ��� �� ����� ����������#\*�
����� �*�#���>���#!$�!�
� ��|�|�������������?�������@>��>�@������
�>�� ��#�> � �����?�#\*� ����� �*�#!��>��� �#!$�!�
� ��|�{���?���?���������?���� *��������� ��>���������� ��������?��������������� ��� ���?\*� ���
�� �*�#�������� �*��?���#!��>��� �#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�{
� ��|�"�&>��� ���������?���?������?��� �*>����
�?\*� ����� �*�#�������� �*��?���#!��>��� �#!$�!�
� ��|������������ ��� �� ��������@ �>���� �����#
����>������������� ��>����� �������������?���� *��#-_�!^`�{$#!��>��� �#!$�!�
� ��|�����?���?���������?���� *��������� ��>���������� ��������?��������������� ��� ���?\*� ���
�� �*�#�������� �*��?���#!��>��� �#!$�!�
� ��|��$���������� ��� �� ��������@ �>���� �����#
����>������������� ��>����� �������������?���� *��#-_��|`!!$#!��>��� �#!$�!�
� ��|������?���?���������?���� *��������� ��>���������� ��������?��������������� ��� ���?\*� &> ��� �*�#�������� �*��?���#!��>��� �#
!$�!�
� ��|��!���?���� *������ ��������# � ����
_��� �*�>������������?���#\*� ����� �*�#!��>��� �#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�"
� ��|��^���?���� *������ ��������# � ����
_��� �*�>������������?���#\*� ����� �*�#!��>��� �#!$�!�
� ��|���������� �@ �������_ �����?�#
��������� ��� ���?\*� ����� �*�#!��>��� �#!$�!�
� ��|��|������? ���? *>� �*#�Z���� ����������*�
������� ����� �_����>�������������� �����?�������� �*����#\*� ����� �*�#!��>��� �#!$�!�
� ��|��{����������>�������������� ���������>�*�����#��������� ��� ���?\*� &> ��� �*�#!��>��� �#
!$�!�
� ��|��"������? ���? *>� �*#�Z���� ����������*�������� ����� �_����>�������������� �����
?�������� �*����#\*� ����� �*�#!��>��� �#!$�!�
� ��|����&>������������������>���������
�������@ �>��������� �*_���� ������������� ��#-_�!^`�{$#!��>��� �#!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
� ��|����<����� ��� ��>�����������������������������>�������������� �*��������� ��#
��������� ��� ���?\*� ����� �*�#!��>��� �#!$�!�
� ��|�!$�<����� ��� ��>�����������������������������>�������������� �*��������� ��#��������� ��� ��
�?\*� ����� �*�#!��>��� �#!$�!�
� ��|�!������� ���?��� ��*�������������������
����_��� �*�>��������@����?��@��� �*�� ������#\*� ����� �*�#|�>���#!$�!�
� ��|�!!������ ���?��� ��*�������������������
����_��� �*�>��������@����?��@��� �*�� ������#\*� ����� �*�#|�>���#!$�!�
� ��|�!^��� �?��_��������� ��� ��@������?��@��
�������������������?�����������#-_��"`"^�#���>���#!$�!�
� ��|�!���� �?��_��������� ��� ��@������?��@��
����*� �������������?�����������#-_��"`�"�#���>���#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
� ��|�!|��� �?��_��������� ��� ��@������?��@��
�������������������?�����������#-_��"`�"�#���>���#!$�!�
� ��|�!{��� �?��_��������� ��� ��@������?��@��
�������������������?�����������#-_��"`"!$#���>���#!$�!�
� ��|�!"��� �?��_��������� ��� ��@������?��@��
����*� �������������?�����������#-_��"#���>���#!$�!�
� ��|�!���� �?��_��������� ��� ��@������?��@��
����*� �������������?�����������#-_��{#���>���#!$�!�
� ��|�!��<���� �� ��� � �* ����>������_#����>�
�� �*�� ��#�{�>���#!$�!
� ��|�^$�&>�����������>��������� �����
_������� ��������������������� ��#����>��� �*�� ��#�{�>���#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
|$
� ��|�^��&>������������������@������������
@ �>��������� �*_���� �������������� ��#-_��"#���>���#!$�!�
� ��|�^!�&>������������������@������������@ �>
��������� �*_���� �������������� ��#-_���#�{�>���#!$�!�
� ��|�^^��� �?��_��������� ��� ���� � �* ���
���� ������#��^"�� �*�#�{�>���#!$�!�
� ��|�^��&>������������������������_������� ��������_ � _ ����� �*��������� ��#-_�!^`{�$#
�{�>���#!$�!�
� ��|�^|����� � ���?��_�?��@������ ����*���
\*� ����� �*�-_�^$`��$#�{�>���#!$�!�
� ��|�^{��������� �������?�������%�����?
>��_��=@>���>��@������>�� ��#\*� ����� �*�#�"�>���#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
|�
� ��|�^"��������� �������?�������%�����?>��_��#��?����>���=@>���>��@������>�� ��#
����>��� �*�#�{�>���#!$�!�
� ��|�^���������� �������?�������%�����?
>��_��#��?����>���=@>���>��@������>�� ��#\*� &> ��� �*�#�"�>���#!$�!�
� ��|�^����?���?���������?���� *�������@���
��� �����������>������������������������#-_���#�{�>���#!$�!�
� ��|��$���?���?���������?���� *�������@������
�����������>������������������������#-_��{#�{�>���#!$�!�
� ��|����&>��������� _�����_���� ��>�
������������?������������?�������� �*�����#\*� &> ��� �*�#�"�>���#!$�!�
� ��|��!�&>�������������*>@��� �*� *������
��������� ��� ��-_��|`��$#!^�����#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
|!
� ��|��^�&>��Z��� ��� ��� ��@ �>> *>�����#@ �>
� ����?�� � �*���� _��������� �*�>���?���#-_���`!!$���^���#!$�!�
� ��|����&>�@������@��� �*��>� *>�@ �>��������������� ����� �_����#\�^"�� �*�#!|�>����#!$�!�
� ��|��|�&>���?���� *����������������_����� �� ��������# � ����_��� �*�>�������������� ��_����#
\�^"�� �*�#!|�>����#!$�!�
� ��|��{�&>���?���� *����������������_����� �� ��������# � ����_��� �*�>�������������� ��_����#
\�^"�� �*�#!|�>����#!$�!�
� ��|��"���������� ��_���� ��������� �*?����� �
�> �� ��#\�^"�� �*�#!|�>����#!$�!�
� ��|����&>���������������������� ��� ������ �*
������������������ �*�?��> �������> �������������@ �*��@��>����� ���������#\�^"�� �*�#
!|�>����#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
|^
� ��|����&>��������������?���?��������
� *������������ ��*�� ���������#-_���#���>����#!$�!�
� ��|�|$�&>��������������?���?��������
� *��������� �� *�� ��� ���������#-_���#���>����#!$�!�
� ��|�|���> ���������� �* ������������ ��� ���@ �>���������������������������������� � ��#
-_���#���>����#!$�!�
� ��|�|!������� ������ �*��������������� ����� �_������� �*��������� ����� ��#����>�
�� �*�#���>����#!$�!�
� ��|�|^�&>�������������Z���� �����? ���
? *>� �*������� ����� �_������?�������� �*����#\*� ����� �*�#���>����#!$�!�
� ��|�|�������� ������_ �����?�#\*� ����� �*�#
���>����#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
|�
� ��|�||���?���?�����@���>��� ����_�*��#���
����� �*��?���#��������� ��� ���?\*� ����� �*�#���>����#!$�!�
� ��|�|{�&>��������������?���?��������
� *���������[���Z�������#-_���#���>����#!$�!�
� ��|�|"���������� ��� ���?\*� &> ��� �*�#
<�����#�"�>���#!$�!�
� ��|�|��&>���>������������ _�����_���#\*�
&> ��� �*�#��&��#���>����#!$�!�
� ��|�|����������� ��� ���?\*� ����� �*�#
<�����#�"�>���#!$�!�
� ��|�{$���������������� �*���>������_ �>��� ����_�*����� �*�� ������#\*� ����� �*�#��&��#
���>����#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
||
� ��|�{����-_�!^`"��#�� ������� �>������
� ������ ����>����������*� ����������������-�������<�����#�"�>���#!$�!�
� ��|�{!�&>���>������������ _�����_����
��&��%���>����#!$�!=�
� ��|�{^����� ���?���� �����>������ _������
���>���������������������� ����� � � �����_���� ������������� ��#]��� �>���� �*��
<������
� ��|�{��&>���>������������ _�����_����
��&��%���>����#!$�!=�
� ��|�{|�<����� ������������� ������>������_���������>��� �*�� ��%-_���`�$$=�<�����
� ��|�{{���&���
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
|{
� ��|�{^�&>���>������������ _�����_���?��
�>�������������?������������\*� ����� �*��
� ��|�{����&���
� ��|�{|�&������ �>������������� �����������> �����> �*�����-_��|# �_���@ �>���������
� ��|�{{�&������ �>������������� �����������> �
����> �*�����-_�^!# �_���@ �>���������
� ��|�{"�&������ �>������������� �����������> �����> �*�����-_�!^# �_���@ �>���������
� ��|�{����������������������� ��� �� ��������
_ � _ ��������� �*_���� ��#�_��^�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
|"
PACKAGE A6
� ��{������������������ �*�>������_ �>��� ��
��_�*����\*� &>���� �*�#"�>��� �#!$�!�
� ��{�!���������� ��� �� � ����������@ �>���� �����#����>��������������?���?���������?���� *�������#-_�{$`|$$�-_�{$`�$$#���>��� �#
!$�!�
� ��{�!����� ���?���� ���������>������ _���������>���������������������� ����� � � ��#-_�{$`|$$
�-_�{$`�$$#���>��� �#!$�!�
� ��{���&> �@���������_� ������������ ���������������_�������������#\*� �>���� �*�#���>
��� �#!$�!�
� ��{�|�&>�@������ �������?�������%��*�
>��_��#*�����# =��� �*@���#��������� ��� ���?�>�������#!��>��� �#!$�!
� ��{�{�������>��������� _������?�������%��*�
��?���*�**���#*���_���=��� �*������@���#!��>��� �#!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
|�
� ��{�"�������>��������� _������?�������
%�Z�_��������?���*�**���#*���_���#*�����=��� �*������@���#!��>��� �#!$�!
� ��{���&>�@������ �������� ?�� ��@>��>�@�����> *>����>#��������� ��� ���?�>�������#!��>��� �#
!$�!
� ��{���������>��������� _������?�������
%�Z�_��������?���*�**���#*���_���=��� �*������@���#!��>��� �#!$�!
� ��{��$�&>��� ����������?���> �@�������� �*@���#��������� ��� ���?�>�������#!��>��� �#!$�!
� ��{������?���?����@�� ����������-_�"�#���>
��� �#!$�!�
� ��{��!������@������������>����������� �
��������������������?�_����_��������#-_�{�#���>��� �#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
|�
� ��{��^������@������������>����������� �
��������������������?�_����_��������#-_�{!#���>��� �#!$�!�
� ��{���������@������������>����������� �
��������������������?�_����_��������#-_�"�#���>��� �#!$�!�
� ��{��|������@������������>����������� �
��������������������?�_����_��������#-_�|�#���>��� �#!$�!�
� ��{��{���?������*���@��� ������������������� ��
� ���?\*� ��_�� �*�#���>��� �#!$�!�
� ��{��"�&�_������������� ��>���������������#
����>�������?����������#-_��{`!$$#��>���#!$�!�
� ��{��������������_� ����_��� �*?�����>�
������������� ��_����#���*\>���� �*��_��!`�{$#�$�>���#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{$
� ��{��������������_� ����_��� �*?�����>�
������������� ��_����#���*����� �*�-_���`$|"#�$�>���#!$�!�
� ��{�!$���?���?�������� *�������@������
������������� ��*�� ���������-_�"�#|�>���#!$�!�
� ��{�!�����������������?�������@>���>��@������>�� ��#[����������Z�������-_���#|�>
���#!$�!�
� ��{�!!�� �@�����������>�*�����#-_�||`^$$#
|�>���#!$�!�
� ��{�!^��� �?��_��������� ��� ��@������?��@��
������� ������#-_�|�`{�$#�������#!$�!�
� ��{�!���� �?��_��������� ��� ��@������?��@��
������� ������#-_�|"`$�$#�������#!$�!�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{�
� ��{�!|��� �?��_��������� ��� ��@������?��@��
������� ������#-_�||`!!$#�������#!$�!�
� ��{�!{��� �?��_��������� ��� ��@������?��@��
������� ������#-_�|�#�������#!$�!�
� ��{�!"���\*� &>���� �*�#������>�����������
�������������_��������������� �*�>������_#���� �*���� ����������� � �*�������_�����#��>
����#!$�!�
� ��{�!��\�� ���������*�������� ����� �_���
������ �* �� �������� �*#�_�"�`!$$������|���#!$�!�
� ��{�!��� ����Z� �*� �>��������?������*���@���
���� ������������?? ���
� ��{�^$�� ����Z� �*� �>���@������� �����-_�"��
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{!
� ��{�^��&>��� ������?���?����������������#
-_�"$`^�!#<������
� ��{�^!���&��
� ��{�^^�&>��� ������?���?����������������#
-_��{`!$$#<������
� ��{�^����&��
� ��{�^|����������������� �� ���������������
��� �����������������*��{#-_�""�
� ��{�^{����������������� �� ���������������
��� �����������������*��{#-_�|��
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{^
� ��{�^"��������������?���� �*����-_�{|�
� ��{�^���������������?�_����_�������-_�{��
� ��{�^��&����� ����� �����@> �>>���������_�*������������������������� � � ��#-_�"��
� ��{��$�&����� ����� �����@> �>>���������_�*������������������������� � � ��#-_��{�
� ��{����&����� ����� �����@> �>>���������_�*������������������������� � � ��#-_�||�
� ��{��!�&������ �>������������� �����������> �
����> �*�����-_���# �_���@ �>���������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{�
� ��{��^�&������ �>������������� �����������> �����> �*�����-_��$# �_���@ �>���������
� ��{����&������ �>������������� �����������> �
����> �*�����-_�{|# �_���@ �>���������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{|
PACKAGE A7
� ��"����������� �>��� ��#-_���`"{|#��� �{�>
!$�!� ��"�!��������� �>��� ��#-_!$�`��|#��� �{�>
!$�!
� ��"�^�&>�������������_� �*���� �����_���� ������_������ ��#@> �>��������������������������
��_��?����>����?��@� ���� �����������_#-_!$�`�$$#��� �{�>!$�!
� ��"�������������¡�@�������*>������������� ��@> ��@��� �*#-_��!`�^$#��� �{�>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{{
� ��"�|�����������¡�@�������*>������������� ��@> ��@��� �*#-_!��`{"�#��� �{�>!$�!
� ��"�{�\���?���?��������������>���#-_���`$|$#��� �{�>!$�!
� ��"�"�\���?���?��������������>���#
-_��!`�^$#��� �{�>!$�!� ��"���\���?���?��������������>���#
-_���`�$$#��� ��$�>!$�!
� ��"����������� �>��� ��#-_!$�`^!�#��� ��{�>!$�!
� ��"��$�&>�������������_� �*���� �����_���� ������_������ ��#@> �>��������������������������
��_��?����>����?��@� ���� �����������_#-_!$�`�$$#��� ��{�>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{"
� ��"������?���?��������������>�����-_���`�$$>�� ��������������_����������#��� ��{�>!$�!
� ��"��!�&>�����������>���������*���������� �����_���� ��@����� ����������������>����� �����
����� ��#-_���`��{#��� ��{�>!$�!
� ��"��^�&>�����������>������������*���������� �����_���� ��@����� ����������������>����� ��
�������� ��#-_���`�$$#��� ��{�>!$�!
� ��"������������� ��� ��_���_������� �#������������> �*�����-_���`�$$#��� �!��>!$�!
� ��"��|��������� �>��� ��#-_��|`!^^#��� �!��>!$�!
� ��"��{�&>�������������_� �*���� �����_���� ����
��_������ ��#@> �>����������������������������_��?����>����?��@� ���� �����������_#
-_!$�`�$$#��� �!��>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{�
� ��"��"�\���?���?��������������>���#
-_!$$`�{!#���!��!$�!
� ��"����\���?���?��������������>���#
-_���`$|$#���!��!$�!
� ��"������������ �>��� ��#-_��|`!^^#���"�>
!$�!
� ��"�!$�&>�������������_� �*���� �����_���� ����
��_������ ��#@> �>����������������������������_��?����>����?��@� ���� �����������_#
-_��$`�!$#���"�>!$�!
� ��"�!��&>���������� ��@�������� �����_������� �>��� ��#-_!��`!{!#����{�>!$�!
� ��"�!!�&>���������� ��@�������� �����_������� �>��� ��#-_���`�^�#����{�>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
{�
� ��"�!^����� �>�������>�@�������_��?->����*
<� �*�#-_���`^|^#����{�>!$�!� ��"�!��&>�����> �*�����>��������� _����������
����#-_!$�`^!�#����{�>!$�!
� ��"�!|�&>�����> �*�����>��������� _����������
����#-_���`�$$#����{�>!$�!
� ��"�!{�&>�� ���������@����� �������������� ��
%��������������> �*=���� ���������>�*�����#-_!$!`�$$#����{�>!$�!
� ��"�!"�&>�� ���������@����� �������������� ��%��������������> �*=���� ���������>�*�����#
-_!$�`�$$#����{�>!$�!
� ��"�!��[��� �����_���� ����_� �*����� ���� ��#-_��$`�!$#����{�>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
"$
� ��"�!��[��� �����_���� ����_� �*����� ���� ��#
-_!$�`�$$#����{�>!$�!� ��"�^$�&>�@������� ����@����>�@�������*�**�����>�@�������*�**�������?���#-_!$�`^!�#����{�>
!$�!
� ��"�^��&>�@������� ����@����>�@�������*�**����
�>�@�������*�**�������?���#-_!��`|{|#����{�>!$�!
� ��"�^!�� ����Z� �*� �>���>�� ����������������
��_��?->����*<� �*�#-_���`^|^#����{�>!$�!
� ��"�^^�[��� �����_���� ����_� �*����� ���� ��#-_!$�`��|#���!���!$�!
� ��"�^����?���?��������������>�����-_���`$|$>�� ��������������_����������#���!���!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
"�
� ��"�^|�&>���������� ��@�������� �����_������� �>��� ��#-_!$�`��|#���!���!$�!
� ��"�^{������� �@ �������?������ �������� �*�����?->��� <� �*�-_!$�`��|#���!���!$�!
� ��"�^"�&>���������� ��@�������� �����_���
���� �>��� ��#-_��|`!^^#!�����!$�!� ��"�^��&>���������� ��@�������� �����_���
���� �>��� ��#-_!$�`��|#!�����!$�!
� ��"�^����?���?��������������>�����-_��^`^"�
>�� ��������������_����������#!�����!$�!� ��"��$����� �>��_� �*���������_#-_���`^|^#
!�����!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
"!
� ��"����&>�_� ��� ������������#-_��^`^"�#!�����!$�!
� ��"��!�����>����?��@ ���? ����#-_���`^|$#!�����!$�!
� ��"��^�&>���������� ��@�������� �����_������� �>��� ��#-_���`"{|#"�����!$�!
� ��"����&>���������� ��@�������� �����_������� �>��� ��#-_��$`�!$#"�����!$�!
� ��"��|�&>�����> �*�����>��������� _��������������#-_���`"{|#"�����!$�!
� ��"��{�&>�����> �*�����>��������� _��������������#-_���`�$$#"�����!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
"^
� ��"��"�&>���������� ��@�������� �����_������� �>��� ��#-_���`�$$#�^�����#!$�!
� ��"����&>���������� ��@�������� �����_������� �>��� ��#-_���`$|$#�^�����#!$�!
� ��"����&>���������� ��@�������� �����_���
���� �>��� ��-_!$�`^!�#�^�����#!$�!
� ��"�|$�&>������ �*�����@���������*�����
������� �*#-_���`^|^#�^�����#!$�!
� ��"�|��&>�����> �*�����>��������� _����������
����#-_���`�$$#�^�����#!$�!
� ��"�|!�&>���������� ��@�������� �����_���
���� �>��� ��#-_!$"`�^{#!$�����!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
"�
� ��"�|^�[��� �����_���� ����_� �*����� ���� ��#-_!$�`��|#!$�����!$�!
� ��"�|��[��� �����_���� ����_� �*����� ���� ��#-_!$�`|��#!$�����!$�!
� ��"�||�\���?���?��������������>���#-_���`$|$#!$�����!$�!
� ��"�|{���?���?��������������>���>�� ��������������_����������#-_���`�$$#!$�����!$�!
� ��"�|"�&>�����> �*�����>����� _����������
����#-_���`�$$#!$�����!$�!
� ��"�|��&>�����> �*�����>����� _����������
����#-_!$�`^!�#!$�����!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
"|
� ��"�|����� �� ������#-_!$�`�$$#�{����!$�! � ��"�{$���� �� ������#-_!$�`�$$#!�����!$�!
� ��"�{����� �� ������#-_!$�`^!�#�{����!$�! � ��"�{!���� �� ������#-_!$�`^!�#!������!$�!
� ��"�{^�� ���������#-_���`�{!#�{����!$�!
� ��"�{��� ���������#-_���`�{!#�"�����!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
"{
� ��"�{|�<��#-_���`�$$#�{����!$�! � ��"�{{�<��#-_���`�$$#��@@ �>�>������ �*������������� _������
� ��"�{"�<��#-_���`^|^#�{����!$�!
� ��"�{��<��#-_���`^|^#������ _������
� ��"�{������������ ����@����� �#-_���`�$$#�{����!$�!
� ��"�"$����������� ����@����� �#-_���`�$$#\��
_������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
""
� ��"�"��� ����� �� � �������������������_�#-_���`�$$
� ��"�"!�&>����� �>� � �������������������_�#-_���`�$$
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
"�
PACKAGE A8
� �������������� �>��� ��#-_!��`$�$#��� ��^�>!$�!
� ����!����*��� *���������������� ��@����������>�
�Z �������#-_!!$`"��#��� ��^�>!$�!
� ����^������@�������@������ ��?�>������ ��
���*��������?��@�������_�#-_!!$`��^#��� ��^�>!$�!
� �����������@�������@������ ��?�>������ ��
���*��������?��@�������_�#-_!!�`^{�#��� ��^�>!$�!
� ����|������@�������@������ ��?�>������ �����*����>��������� ������ _������������������
��� _�����������������@?����������?��@��? ����#-_!^�`���#��� ��^�>!$�!
� ����{�����������¡�@�������*>������������� ��
@> ��@��� �*#-_!^�`���#��� ��^�>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
"�
� ����"�����������¡�@�������*>������������� ��@> ��@��� �*#-_!!$`��^#��� ��^�>!$�!
� ����������������¡�@�������*>������������� ��@> ��@��� �*#-_!^^`|�$#��� ��^�>!$�!
� �������������� �>��� ��#-_!��`|"$#��� �!$�>!$�! � �����$�������� ��������>�� ��#-_!^�`���#��� �!$�>!$�!
� ����������*��� *���������������� ��@����������>��Z �������#-_!^"`�|�#��� �!$�>!$�!
� �����!�����������¡�@�������*>������������� ��@> ��@��� �*#-_!^"`�|�#��� �!$�>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$
� �����^�����������¡�@�������*>������������� ��
@> ��@��� �*#-_!��`|"$#��� �!$�>!$�!
� �����������������¡�@�������*>������������� ��
@> ��@��� �*#-_!^�`!{|#��� �!$�>!$�!
� �����|���?���?��*�����������Z������#-_!��`$�$#
��� �!|�>!$�!
� �����{�&>����]� @���������_������>������� �>
� �#-_!!"`${|#��� �!|�>!$�!
� �����"�����������¡�@�������*>������������� ��
@> ��@��� �*#-_!!^`$"|#��� �!|�>!$�!
� �����������������¡�@�������*>������������� ��
@> ��@��� �*#-_!^�`!{|#��� �!|�>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
� �����������������¡�@�������*>������������� ��@> ��@��� �*#-_!^^`|�$#��� �!|�>!$�!
� ����!$�����������¡�@�������*>������������� ��@> ��@��� �*#-_!^^`|�$#��� �!|�>!$�!
� ����!����?���?��*�����������Z������#-_!��`$�$#�����>!$�!
� ����!!���?���?��*�����������Z������#-_!^�`!{|#�����>!$�!
� ����!^�&>����*&��<� �*�@���������_������>������� �>� �#-_!!$`��^#�����>!$�!
� ����!����������?���@> ���>���������?@��� �*#-_!!�`^{�#�����>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!
� ����!|���������?���@> ���>���������?@��� �*#
-_!^^`|�$#�����>!$�!� ����!{����*��� *���������������� ��@���������
�>��Z �������#-_!!$`"��#�����>!$�!
� ����!"�&>���������� ��@�������� �����_������� �>��� ��#-_!��`$�$#����{�>!$�!
� ����!������ �>�������>�@�������_�#-_!!�`$^�#����{�>!$�!
� ����!������ �>�������>�@�������_�#-_!^�`!{|#����{�>!$�!
� ����^$�&>�� ���������@����� �������������� ��%��������������> �*=���� ���������>�*�����#
-_!��`�||#����{�>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^
� ����^��&>�� ���������@����� �������������� ��%��������������> �*=���� ���������>�*�����#
-_!��`$�$#����{�>!$�!
� ����^!�[��� �����_���� ����_� �*���������_#-_!^�`���#����{�>!$�!
� ����^^�&>������������ �����������>���� _��������������?������> �*�����#����{�>!$�!
� ����^����������� ��@���������Z ������� ����� *�����#?�������_�������#-_!��`�||#����{�>
!$�!
� ����^|�\����?���@ �>������ �@ ��#-_!^�`!{|#����{�>!$�!
� ����^{�\����?�����-_!!$`��^#����{�>!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
� ����^"�����������¡�@�������*>������������� ��@> ��@��� �*#-_!^�`���#^$����!$�!
� ����^������������¡�@�������*>������������� ��@> ��@��� �*#-_!^^`|�$#^$����!$�!
� ����^��[��� �����_���� ����_� �*���������_#
-_!^�`���#^$����!$�!
� �����$�����>?��_�_����_�����������?��@ �����
����#-_!^$`!^"#^$����!$�!
� �������&>���������� ��@�������� �����_������� �>��� ��#-_!��`$�$#{�����!$�!
� �����!�����������¡�@�������*>������������� ��@> ��@��� �*#-_!!"`!�$#{�����!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�|
� �����^�&>�����> �*�����>��������� _��������������#-_!��`$�$#{�����!$�!
� �������&>�����> �*�����>��������� _��������������#-_!^�`!{|#{�����!$�!
� �����|�\����?�����[����������Z�������#-_!!$`"��#{�����!$�!
� �����{�[��� �����_���� ����_� �*���������_#-_!^�`���#{�����!$�!
� �����"�����>����?��@ ����������������#-_!!^`$$$#{�����!$�!
� �����������>����?��@ ����������������#-_!!!`|$$#{�����!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�{
� �������&>�����> �*�����>����� _����������
����#-_!��`$�$#�������!$�!
� ����|$�&>�����> �*�����>����� _����������
����#-_!^�`���#�������!$�!
� ����|��&>�����> �*�����>����� _����������
����#-_!^�`!{|#�������!$�!
� ����|!�����������¡�@�������*>������������� ��
@> ��@��� �*#-_!!$`"��#�������!$�!
� ����|^�����������¡�@�������*>������������� ��@> ��@��� �*#-_!!�`�{�#�������!$�!
� ����|��\����?�����[����������Z�������#-_!��`�||#�������!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�"
� ����||������������� ���������@����� ������� ���������� �*�����������������#-_!��`�||#���
����!$�!
� ����|{�����������¡�@�������*>������������� ��
@> ��@��� �*#-_!!�`�{�#!������!$�!
� ����|"�&>���������� ��@�������� �����_������� �>��� ��#-_!��`|"$#!������!$�!
� �� ��|�� &>� ��������� �� @���� ��� � �� ��� _������� �>��� ��#-_!!�`^{�#!������!$�!
� ����|��\����?�����[����������Z�������#-_!^"`�|�#!������!$�!
� ����{$���?���?��������������>���>�� ��������������_����������#-_!^!`�^"#!������!$�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
ANNEX 2: GRIEVANCE INTAKES. PUBLIC CONSULTATION
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
PACKAGE A1
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �� Location -_�`!$$
Contact Information
\�_� \�[��\��\&]�\�
������ ���� Z
��_���
]�_�������� ��!#<����� ����#*� *����^�#��_� *����&�������__���#������� ��
�*�
�>���\��
� ������� ��� ]���
�_� �
Compliant/Suggestion/Comment/Question ������ ���� �� �>� ���� �� %@>�# @>��# @>��� ��� >�@= �? ����*� ������ ����@�� -_ �`�$$� ��� �� �>� ���������� ������� �����¡� ����� @���� �� ���?��� �? �_����_��� ���� �� �� ����� ��� ������������� �*��������� ����� � � �� �> *>���_�� _�#�>��������������� �����@���� �*�����������>������� ������>��¡��������*>��_ � _ ���>������
�����**��� �>�� �>�����������>�� �������@��������*@>���@��� �*���� �� �� � _ � �>��������?� ����������#����� ������� �*�>�����������
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� !!�������
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
�]��\���&��\�
��� � ���?���?? �\����\��\&�����������&
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$
&����?�� ������ �������\&�\��[����&��\
��_����
� *�������?�>����??
Update on the case:
����� [�����
!"������! &>����������������¡��?���@���������?����?�_����_��� �����������>��� �> *>�������?� ������������� �*�>��������
$^������! &>���@����_���������������� ��@������� ����� ��> ������> �� _����>��������?����@���������
$|������! &>��� @�� ��_��� ���� ��������� �� @��� ���� �� ��� � �> � ���� ��� ��� �� �>� @��@���>�����>��������?����@���������
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �� Location -_�^`�$$
Contact Information
\�_� \�[��\&]�&][�\
������ ���� Z
��_���
]�_�������� ����*���� ���*�#����� ��__���#< �>������ ��
�*�
�>���\��
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
� ������� ��� � �>�>��
�_� � Compliant/Suggestion/Comment/Question ������ ���� �� �>� ���� �� %@>�# @>��# @>��� ��� >�@= �? ����*� ������ ����@��-_�^`�$$}-_�^`�$$��>�����������>����������������@�����>����?����?�_����_������� ��#@>��� ��������������� ��#���>�������?� ���������� ����������������**����>���>�����������_� ��� ���> ���� ����_ � _ ���>�� ���������?��_��������� ��@��������� ���������>��*>�>��� ������������ ����� � �� ��> ����� ���> �� _��
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ����
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
�]��\���&��\�
��� � ���?���?? �\����\��\&�����������&
&����?�� ������ �������\&�\��[����&��\
��_����
� *�������?�>����??
Update on the case:
����� [�����
!$������!&>��������������� ������>��_����_���@��������� ���>�� ����������� ������������>��� ��> *>�������?� ���� ������������ �>����������� ���������>�������?� ���� ����� �*��������� ��@��� _���_����� ���
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!
$^������!&>� ���������� ������� �����@���� �� ���?����? �_����_��� �� ������ �>� ������ �?���� ��� �>� �_����_��� @�� > *> ��@ �� �>� � ���� �� ��� �� ��������� �� @��� �����*���??������>�>�����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^
PACKAGE A2
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �! Location -_!"`{!$
Contact Information
\�_� \�[��\��\\���
������ ���� Z
��_���
]�_�������� �����^#]���*�����__���#&�_����*� ��� ��
�*�
|"
�>���\��
� ������� ��� � �>�>��
�_� �
Compliant/Suggestion/Comment/Question ������ ���� �� �>� ���� �� %@>�# @>��# @>��� ��� >�@= �? ����*� ������ ����@���� �� �>����������������¡���������?��������??�������_������ �>���?��� �>��� � ���_����_������� �� �������� ��� �Z �� �* ��� ��*� ��� �������� ��������� &>� ��� ��*� @�� ������ ��� �>� ��������� ������ �������������> �*�������� _����� ���
�� ������� �>� ���������� �� ����� �> � ������ ����� �* �>� ���?��� ����?? �������_������ ��������� ���� ������ �* �� � ��� �Z �� �* @���� �� @��� �� ��� ���������¥ ������� �> � ���� � � � �� ��������� ���� ������� �>���������������_�������?�������_�*��������
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� ��������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
�]��\���&��\�
��� � ���?���?? �\����\��\&�����������&
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
&����?�� ������ �������\&�\��[����&��\
��_����&>����>�� ������>� ������ ��������� �>����������� ��������� �������������������> � �����
� *�������?�>����??
Update on the case:
����� [�����
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �! Location -_^�`"�$
Contact Information
\�_� �]����\]�\�
������ ���� Z
��_���
]�_�������� ��� � ���*�#]���*�����__���#&�_����*� ��
�*�
�>���\��
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�|
� ������� ��� � �>�>��
�_� �
Compliant/Suggestion/Comment/Question ������ ���� �� �>� ���� �� %@>�# @>��# @>��� ��� >�@= �? ����*� ������ ����@��-_^�`"�$��>��������������� ������>���������� ��@�������>��� ������ _����������_���������� �����>�� �� ����������������������� �����¥��� ����>����������������¡�@�����>����?����?�_����_������� �������� ��������>�������?� ���������� �> *>���_�� _�#�>��������������� ������>���������� ��@������ *>����� ��¡�������� ���������_�������>���?������������ ����� � � ��� ��������>���� ���������
���������� �>�������������������>��� �����_���������_ � _ ���>��������?� ������������� � _ � �>���������� ��@������ *>���������� �������������� ���������
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� !!�������
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
�]��\���&��\�
��� � ���?���?? �\����\��\&�����������&
&����?�� ������ �������\&�\��[����&��\
��_���� �������*� _�#�>������������ �������������>���������� ��@��� ��> �����
� *�������?�>����??
Update on the case:
����� [�����
${������!&> �� _��>��� ������������ ����� � �� � �> ���������� �������� �����??���������������� �� @��� �? �������� ]�@����# �>� ���������� ����� �� � _ � �>� ����� �* �? � ���������� �����@>��>�������@�����_ � _ ���>��������?� ���������� ��> �����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�{
!"������! &>���@����_���������������� ��@������� ����� � �> ������> � � _����� ����������>���� ���������������� ����� � �� � ������� ����
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �! Location -_�!`�$$
Contact Information
\�_� \�[��\��\�][�\����[�&]�\� ������
���� Z
��_���
]�_�������� ����>�� ���*�#���*&> �>��__���#���*��� ��
�*�
�>���\��
� ������� ��� � �>�>��
�_� �
Compliant/Suggestion/Comment/Question ������ ���� �� �>� ���� �� %@>�# @>��# @>��� ��� >�@= �? ����*� ������ ����@��-_�!`!$$}-_�|`$$$ �>������������������ �������� �>�@���� �*��� � ���� �>����?����?�_����_������� ������� �*�>�����������>�������?� ���������� �����> *>�
�����������>������������������@������ ��������_����_������� ����_ � _ ���>��������?� �����������&>���������������_������>�����������������> �@����
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�"
�������� ���� !!�������
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
�]��\���&��\�
��� � ���?���?? �\����\��\&�����������&
&����?�� ������ �������\&�\��[����&��\
��_����&>������������� ��>�����_�� � ����>�@��������������������>�@���� �*���?����?�_����_��� ��> �������_ � _ ���>��������?� ����������
� *�������?�>����??
Update on the case:
����� [�����
!�������!&>��� ��� ���� _�����_������������� ���������� ���&>������������� ���������@�����>����?����?�_����_������� �����>��������?���� ��> ������� �> *>#����� ���� �>������������
!|������! &>� ���������� �� �� ������� @���� �>� ���?��� �? �_����_��� ���� �� �� �>� ������ �?���� ��� ��> *>#����� ������� �*>��@ �������
${������! &>���@������������� ��@������� ����� ��> ������> �� _���������@��@���>�����>��������?���� �_ � _ ���
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
PACKAGE A5
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �| Location ��������� ��� ��#-_��"
Contact Information
\�_� ������ ������ ���� ��_��� Z
]�_�������� <��]��*��__���#&������� ��� ��
�*�
|$
�>���\¦
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@�� �� �> � ����� �� %-_��"=# @>�� � �� �# _���� �� ?��_ �>� ��������� �� � �� >�� ���� ?��@�� ���������� �� ����# �> � � ���� �� � ���� �* _���� �� ���� �� �? ������� �� ���� �� @��� �� �*� ��������������� � ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� !����� ���!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �| Location ��������� ��� ��#-_��"
Contact Information
\�_� ���� �> ������ ���� ���_���
]�_�������� <��]��*��__���#&������� ��� ��
�*�
��
�>���\¦
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$$
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@���� �> � ����� �� %-_��"=# �>� ��* ���� �� *�� �������_@�� _�������� �>���������������������� ����� � � ��#��� �*�� ������#@����?��@������ ������ ����? �>������@����� _�����������������?������������
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� !����� ���!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$�
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �| Location ��������� ��� ��#-_��"
Contact Information
\�_� ������ ������ ���� ��_��� Z
]�_�������� <��]��*��__���#&������� ��� ��
�*�
|$
�>���\¦
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@�� �� �> � ����� �� %-_��"=# @>�� � �� �# _���� �� ?��_ �>� ��������� �� � �� >�� ���� ?��@�� ���������� �� ����# �> � � ���� �� � ���� �* _���� �� ���� �� �? ������� �� ���� �� @��� �� �*� ��������������� � ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$!
Portion to be filled in by the staff:
�������� ���� !����� ���!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
���>������!��!
&>����������� ���_� ���@ �>��������>�� � ������>�>�����@�����*��� �*�>���������? ����� *�� ���������_ ���>�������?��_�*������������ ���Z�����<������ �>� ? �� �*�#��������� ?���>����� �� ��@����������� ���? �>���_��� ��
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� �������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$^
�?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �| Location ��������� ��� ��#-_��"
Contact Information
\�_� ���� �> ������ ���� ���_���
]�_�������� <��]��*��__���#&������� ��� ��
�*�
��
�>���\¦
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@���� �> � ����� �� %-_��"=# �>� ��* ���� �� *�� �������_@�� _�������� �>���������������������� ����� � � ��#��� �*�� ������#@����?��@������ ������ ����? �>������@����� _�����������������?������������
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� !����� ���!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$�
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
���>������!��!
&>����������� ���_� ���@ �>��������>�� � ������>�>�����@�����*��� �*�>���������? ����� *�� ���������_ ���>�������?��_�*������������ ���Z�����<������ �>� ? �� �*�#��������� ?���>����� �� ��@����������� ���? �>���_��� ��
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �| Location ��������� ��� ��#-_���
Contact Information
\�_� ������ ������ ���� ��_��� Z
]�_�������� ]��� �>��__���#&������� ��� ��
�*�
|^
�>���\¦
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$|
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@�� �� �> � ����� �� %-_���=# @>�� � �� �# _���� �� ?��_ �>� ��������� �� � �� >�� ���� ?��@�� ���������� �� ����# �> � � ���� �� � ���� �* _���� �� ���� �� �? ������� �� ���� �� @��� �� �*� ��������������� � ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� ��������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�${
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �| Location ��������� ��� ��#-_���
Contact Information
\�_� ����>���* ������ ���� ��_��� Z
]�_�������� � �> ���� ��__���# &��� ���� ��� ��
�*�
��
�>���\¦
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@���� �> � ����� �� %-_���=# �>� ��* ���� �� *�� �������_@�� _�������� �>���������������������� ����� � � ��#��� �*�� ������#@����?��@������ ������ �����*� �������������?�����������#�> �� ���� �� ����� �* _�������*� ��������������� � ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$"
Portion to be filled in by the staff:
�������� ���� !|������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �| Location ��������� ��� ��#-_���
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$�
Contact Information
\�_� ������ ������ ���� ��_��� Z
]�_�������� ]��� �>��__���#&������� ��� ��
�*�
|^
�>���\¦
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@�� �� �> � ����� �� %-_���=# @>�� � �� �# _���� �� ?��_ �>� ��������� �� � �� >�� ���� ?��@�� ���������� �� ����# �> � � ���� �� � ���� �* _���� �� ���� �� �? ������� �� ���� �� @��� �� �*� ��������������� � ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� ��������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�$�
� *������ �? �>����??
Update on the case:
����� [�����
���>������!$�! &> ��������� �*������_�� ��>������������������������>������������
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �| Location ��������� ��� ��#-_���
Contact Information
\�_� ����>���* ������ ���� ��_��� Z
]�_�������� � �> ���� ��__���# &��� ���� ��� ��
�*�
��
�>���\¦
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@���� �> � ����� �� %-_���=# �>� ��* ���� �� *�� �������_@�� _�������� �>���������������������� ����� � � ��#��� �*�� ������#@����?��@������ ������ �����*� �������������?�����������#�> �� ���� ��
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��$
����� �* _�������*� ��������������� � ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� !|������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
���>������!$�! &> ��������� �*������_�� ��>������������������������>������������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
���
PACKAGE A6
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �{ Location ��������� ��� ��#�_�|�
Contact Information
\�_� ���� �> ������ ���� Z��_���
]�_�������� &��]����__���
�*�
^"
�>���\¦
� ������� ��� ���<� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@���� �> � ����� �� %-_�|�=#_��>�� � >������� ?����� �>����� � ���� ��� �* �>�����������¡�_���� ������������� ��� <�� ���# ���� �� �? ���� � ���� >�� ���� _������ �� �>� ����������¡� ������� _���_����� ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��!
Portion to be filled in by the staff:
�������� ���� ��������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>����>������������>����������� �� _���_�������������� � ������ �> ������ �� ��������_� ��� ��>���* ��¡���?���������?? ��<�� ���#�>�������������������������>�������������������� �����_������� ���������������>���>� ����������¡� ��������� �� ��� � � �� @ �� ��� �� _������ �� ���� �� �? ���� ������
� *������ �? �>����??
Update on the case:
����� [�����
������ ���! �&>��� ������� _�����_���?���> �������_�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��^
ATTACHED PHOTOS
Location -_�|� ���>����>#!$�!�
Description���>�� � >������� ?����� �>����� � ���� ��� �* �>�������������
_���� ������������� ���
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
���
Location -_�|� ���>��� �#!$�!�
Description �&>��� ������� _�����_���?���> �������_�
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �{ Location ��������� ��� ��#�_�{�
Contact Information
\�_� �������* ������ ���� Z��_���
]�_�������� ���*����__���#������� ��� ��
�*�
�!
�>���\¦
� ������� ��� ���<� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@�� �� �> � ����� �� %-_�{�=# @>�� � �� �# _���� �� ?��_ �>� ��������� �� � �� >�� ���� ?��@�� ���������� �� ����# �> � � ���� �� � ���� �* _���� �� ���� �� �? ������� �� ���� �� @��� �� �*� ��������������� � ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��|
�������� ���� ��������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��{
ATTACHED PHOTOS
Location -_�{� ���>��� �#!$�!�
Description�>�� ��� �#_���� ��?��_�>���������� ��� ��>������?��@�� ���
������� �� ����# �> � � ���� �� � ���� �* _���� �� ���� �� �?
������� ��������@������*� ��������������� � ���
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �{ Location ��������� ��� ��#�_�{�
Contact Information
\�_� �������* ������ ���� Z��_���
]�_�������� ���*����__���#������� ��� �� �*�
�!
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
��"
�>���\¦
� ������� ��� ���<� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@�� �� �> � ����� �� %-_�{�=# @>�� � �� �# _���� �� ?��_ �>� ��������� �� � �� >�� ���� ?��@�� ���������� �� ����# �> � � ���� �� � ���� �* _���� �� ���� �� �? ������� �� ���� �� @��� �� �*� ��������������� � ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
���
Portion to be filled in by the staff:
�������� ���� ��������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
�������!$�!
&>����������� ���_� ���@ �>��������>�� � ������>�>�����@�����*��� �*�>���������? ����� *�� ���������_ ���>�������?��_�*������������ ���Z�����<������ �>� ? �� �*�#��������� ?���>����� �� ��@����������� ���? �>���_��� ��
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
���
ATTACHED PHOTOS
Location -_�{� ���>���#!$�!�
Description&>� ������������ ��* ���� �>��� �* �� �>� � �� ��*��>�� @ �> �����
���>�� � �����������������
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �{ Location ��������� ��� ��#-_�|^`�!$
Contact Information
\�_� ���]�� ������ ���� ��_��� �
]�_�������� ��&> �>��__���#������� ��� ��
�*�
�|
�>���
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!$
\¦
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@�����> ������ ��%-_�|^`�!$=#_���� ��?��_�>���������� ��� ��>������?��@�� ���������� �� ������� �* �� �� ����# �> � � ���� �� � ���� �* _���� �� ���� �� �? ������� �� ���� �� @��� �� �*� ��������������� � ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� ��������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!�
ATTACHED PHOTOS
Location -_�|^`�!$ ���>���#!$�!�
Description����� �� ?��_ �>���������� ��� ��>������ ?��@�� ���������� ��
������� �*�� ������# �> �� ���� �� ����� �* _���� ������ ���?
������� ��������@������*� ��������������� � ���
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �{ Location ��������� ��� ��#-_�|^`�!$
Contact Information
\�_� ���]�� ������ ����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!!
��_��� �
]�_�������� ��&> �>��__���#������� ��� ��
�*�
�|
�>���\¦
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@�����> ������ ��%-_�|^`�!$=#_���� ��?��_�>���������� ��� ��>������?��@�� ���������� �� ������� �* �� �� ����# �> � � ���� �� � ���� �* _���� �� ���� �� �? ������� �� ���� �� @��� �� �*� ��������������� � ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!^
Portion to be filled in by the staff:
�������� ���� ��������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_����
&>� ��� >�� ��������� �>� ���������� �� ��_������� �> � ��_�*� ?�� �����������#� _�����������# �>����������������� �>����������� ��������� �����_������� ������������������� ��@ ����>������� ���_ �*� _��]�@����#�>����������������¡� _���_���?�����>����� ��_����?��_�>�����
� *������ �? �>����??
Update on the case:
����� [�����
�|������!$�!
&>����������� ���_� ���@ �>��������>�� � ������>�>�����@�����*��� �*�>���������? ����� *�� ���������_ ���>�������?��_�*������������ ���Z�����<������ �>� ? �� �*�#��������� ?���>����� �� ��@����������� ���? �>���_��� ��
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!�
ATTACHED PHOTOS
Location -_�|^`�!$ ���>���#!$�!�
Description����� �� ?��_ �>���������� ��� ��>������ ?��@�� ���������� ��
������� �*�� ������# �> �� ���� �� ����� �* _���� ������ ���?
������� ��������@������*� ��������������� � ���
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!|
Location -_�|^`�!$ �|�>����#!$�!�
Description&>� ������������ ��* ���� �>��� �* �� �>� � �� ��*��>�� @ �> �����
���>�� � �����������������
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �{ Location ��������� ��� ��#-_�|"
Contact Information
\�_� ���&>���* ������ ���� ��_��� �
]�_�������� &��]����__���#������� ��� ��
�*�
^|
�>���\¦
� ������� ��� ���<� ���� ��� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!{
���� *� ������ ����@�����> ������ ��%-_�|"=#&>�����������¡���������� ����� � � �����_���� ������������� �� ����� �*�����#�> �� ���� ��>������ _��������� ����� ���
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� �|�������!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����� �>&���
��� � ���?���?? ��� ���_��������� �� ����&^
&����?�� ������ ��_��� �������**��� ��
��_���� &>� ��� >�� ��������� �>� ���������� �� @���� �� ����� �>� ���?��� �?�_����_������� ����_ � _ ���>��������?� ��������������*�>���*>@��
� *������ �? �>����??
Update on the case:
����� [�����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!"
ATTACHED PHOTOS
Location -_�|" �|�>����#!$�!�
Description&>� ������������ _���� �� ����������� �� � ���� �* �����# �> �
� ���� ��>������ _��������� ����� ����@������>�������� ����
>����>
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!�
PACKAGE A7
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �" Location -_!$�`|�$
Contact Information
\�_� \*�������>&>��* ������ ���� Z��_���
]�_�������� ->�&���&��&>���*����<��
�*�
�>���\¦
� ������� ��� ����� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@���> ����������� ���>�����>����?��@ �? ������-_!$�`|�$����>������������ ����������_�
����**����>���������������_�������?���>�? �����������? ����������>#���������>������������� ����_��>������� ����� ���������� ���@>��>������ � �*
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� !����� �!$�!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�!�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����]��&���*
��� � ���?���?? ��� ���_���������� �� ���&�
&����?�� ������ ��_��� �������**��� ��
��_����
&>����>����������� �>����������� �� ����_������� ?�� �>� ? �����������? ���� �� ����># ��� ����� �>� ����� ������� ���� _��>�� �� ��� � ���� �� �������� ��� @>�� >���� �� � �*¥ >�@����# �>� ���������� �����¡� ��_��� @ �> ������� ��_����
� *������ �? �>����??
Update on the case:
����� [�����
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �" Location \���->����*<� �*�-_���`^|$
Contact Information
\�_� �>�_���&>��* ������ ���� Z��_���
]�_�������� ��§����*��&§�����¨�<©�
�*�
�>���\¦
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^$
� ������� ��� ����� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@����-_���`^|$����>?��_�_����_�����������?��@ ���? ���#
����**����>���������������_�������?���>�? �����������? ����������>#���������>������������� ����_��>������� ����� ���������� ���@>��>������ � �*
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
Portion to be filled in by the staff:
�������� ���� !�����!$�!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����]��&���*
��� � ���?���?? ��� ���_���������� �� ���&�
&����?�� ������ ��_��� �������**��� ��
��_����
&>����>����������� �>����������� �� ����_������� ?�� �>� ? �����������? ���� �� ����># ��� ����� �>� ����� ������� ���� _��>�� �� ��� � ���� �� �������� ��� @>�� >���� �� � �*¥ >�@����# �>� ���������� �����¡� ��_��� @ �> ������� ��_����
� *������ �? �>����??
Update on the case:
����� [�����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^�
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �" Location -_!��`"{�
Contact Information
\�_� \*����&> ]�� ������ ���� ��_��� Z
]�_�������� �ª�!���_�ª��<«��¬�
�*�
��
�>���\¦
� ������� ��� ����� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@����-_���`^|$����>?��_�_����_�����������?��@ �������#
����**����>���������������_�������?���>�������������? ����������>#���������>������������� ����_��>������� ����� ���������� ���@>��>������ � �*
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
�������� ���� $"�����!$�!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^!
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����]��&���*
��� � ���?���?? ��� ���_���������� �� ���&�
&����?�� ������ ��_��� �������**��� ��
��_����
&>����>������������>������������� ����_�������?���>�������������? ���� �� ����># ��� ����� �>� ����� ������� ���� _��>�� �� ��� � ���� �� �������� ��� @>�� >���� �� � �*¥ >�@����# �>� ���������� �����¡� ��_��� @ �> ������� ��_����
� *������ �? �>����??
Update on the case:
����� [�����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^^
PACKAGE A8
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �� Location -_!^�`�$$
Contact Information
\�_� &������>� �>
������ ���� Z��_���
]�_�������� ���*����� ��>��<��&>��*
�*�
�>���\¦
� ������� ��� ����� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@�� �$$_ ����� �� -_!^�`�$$ ��� ���������� �� ��������� �� @���� ��� �>� ���������� � ����������_�
����**����>�������������_� ��� ��>�?��@��������������>������������� ����_��>������� ����� ���������� ���@>��>������ � �*
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
�������� ���� !|���� �!$�!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����]��&���*
��� � ���?���?? ��� ���_���������� �� ���&�
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^�
&����?�� ������ ��_��� �������**��� ��
��_����
&>����>������������>������������� ����_�������?���>�������������? ���� �� ����># ��� ����� �>� ����� ������� ���� _��>�� �� ��� � ���� �� �������� ��� @>�� >���� �� � �*¥ >�@����# �>� ���������� �����¡� ��_��� @ �> ������� ��_����
� *������ �? �>����??
Update on the case:
����� [�����
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �� Location -_!^$`|!"�-_!^$`{{$
Contact Information
\�_� &���& �����
������ ���� Z��_���
]�_�������� ��]« �<«�&>®�*
�*�
�>���\¦
� ������� ��� ����� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@����-_!^$`|!"�-_!^$`{{$�>�����>?��_�_����_�����������?��@ �������#
����**����>���������������_�������?���>�������������? ����������>#���������>������
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^|
������� ����_��>������� ����� ���������� ���@>��>������ � �*
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ��������
�������� ���� !�����!$�!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����]��&���*
��� � ���?���?? ��� ���_���������� �� ���&�
&����?�� ������ ��_��� �������**��� ��
��_����
&>����>������������>������������� ����_�������?���>�������������? ���� �� ����># ��� ����� �>� ����� ������� ���� _��>�� �� ��� � ���� �� �������� ��� @>�� >���� �� � �*¥ >�@����# �>� ���������� �����¡� ��_��� @ �> ������� ��_����
� *������ �? �>����??
Update on the case:
����� [�����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^{
������� \� <� � ��� �� @����_�� ��_��� ���# ��**��� ���# ��__���� ��� ���� �� ��*��� �* �>� ������� _���_����� �� ��� �� �����>������� �� �������*� ������ @ �> *� ������ �� ���� �� �>� � ��_� ��� ������� �?��_�� �� �� ������ �� �� *�� � ����> @ �> ��� ?�� ���� ? ��� �� ��� ?���������>��������>������ ���������������������� �����@����>�� �?��_�� ������_� ����? ���� ��#������ �?��_���� @� � �*���� �* ¢%��\����\&���=¢ ����� ��� ��_��&>�������
Package �� Location -_!!"`${|
Contact Information
\�_� ���]� ����������__ ����
������ ���� Z��_���
]�_�������� ��]« �<«�&>®�*
�*�
�>���\¦
� ������� ��� ����� �_� �
Compliant/Suggestion/Comment/Question���������� �� �>����� �� %@>�#@>��#@>������>�@=�?���� *� ������ ����@����-_!!"`${|#�����>����?��@ ���]� & �������������������� ��@�����?�>�����������
&>�����������@������ �����������_���� ��??����� ��*�� �������_�?�����������
]�@ �� ��� @��� �� �� ����> ��� ?�� ?������� �� ������ �� ���� ��__����*� ������£�������� ����]� ����������__ ����
����������� ������������������ ����������������!��"�#����$����%���&��� �����#�������'�(����)*+"
�^"
�������� ���� �$�����!$�!
���� ����>���*> ���������¤_� �¤�_� �¤?�Z¤�>���¤�_�
\�_� �? ���?? @>����� ��� ��__������_��� ��
\*����]��&���*
��� � ���?���?? ��� ���_���������� �� ���&�
&����?�� ������ ��_��� �������**��� ��
��_����&>����>������������>�������������������>������������� ����_��>������� ����� ���������� ���@>��>������ � �*¥>�@����#�>����������������¡���_���@ �>������� ��_����
� *������ �? �>����??
Update on the case:
����� [�����
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
252
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
254
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
255
ANNEX 3: ACCIDENT IN LO RIVER BRIDGE. INCIDENTS AND COMPLAINTS INFORMATION SYSTEMS. SPECIFIC REPORT
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
ACCIDENT IN LO RIVER BRIDGE. INCIDENTS AND COMPLAINTS INFORMATION SYSTEMS
SPECIFIC REPORT �
June 2012
�Loan�2391/2392�–�VIE:�GMS�Kunming�–�Hai�Phong�Transport�Corridor�
Noi�Bai�–�Lao�Cai�Highway�Project�
CT�TR�336��
V.�EN�
�
�
�
�
�
ACCIDENT IN LO RIVER BRIDGE. INCIDENTS AND COMPLAINTS INFORMATION SYSTEMS
SPECIFIC REPORT �
�
�
�
�
Written by: Sergio Mata Gallego
Approved by: Francisco Javier de Bonifaz
�
�
GETINSA INGENIERÍA S.L.
June 2012
�
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
1
I – INCIDENT HAPPENED IN LO RIVER BRIDGE
SCOPE OF THE REPORT
This report has been prepared in order to inform the Client about the unlucky events
happened in Lo River Bridge site, Package A2, and about the actions taken by the
Consultant related with it. Also, the report has been prepared according to ADB’s request.
This information will be included in the corresponding environmental, health and safety
quarterly report for the period.
THE FACTS
On April 25 2012, the environmental specialist in site team 1 was informed by Engineer’s
staff (inspector) on site that an accident happened in Lo River Bridge, by date April 22
2012.
When this information was received, the specialist went immediately to site in order to get
the information about that accident. The inspector from Consultant explained him that the
accident happened when a worker fell from the access way to a pier, which is located over
the flow, into the water and died by drowning.
In order to increase the information, the specialist investigated among local people around
Lo River Bridge and he was informed by them that, in fact, one person died into the water
on the last Sunday morning.
Whit this information, the Engineer requested the Contractor to investigate the facts, to
extend the information and to submit to Consultant a report about these facts. The report
from Contractor is included in this report as Annex 1.
In this report, more details are given about the accident:
� Number of workers involved: one.
� Data of the worker: name, age, address.
� Time of the events: 6.00 am, out of working time.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
2
� Weather and other external circumstances: because of hard rains those days,
the level of the flow had increased significantly. Also, the ships that sail
continuously along the river generated strong waves that crashed against the
floating path.
� Personal circumstance: the worker was not wearing the obligatory life-vest at the
moment he was crossing it.
� After falling down into the water, other workers in the surroundings noticed about
it and tried to rescue him and carried out first-aid treatment but finally,
unfortunately, the accident had fatal consequences.
CONSULTANT’S CONSIDERATIONS
Once described the facts, Consultant has to include its considerations and opinions about
the events, reasons, circumstances and explanations given by Contractor. They are the
following:
� The Engineer’s environmental specialists (site team 1 and core team) had
inspected this floating access path all weeks. As it is mentioned in all the reports,
our consideration was that it was strongly installed and with a good maintenance
to be considered no dangerous.
The path has, in fact, handrails installed in both sides, as well as several safety
floats distributed along the handrails (see picture 2).
Also, it must be mentioned that the height of the path is so short from the surface
of the water in order to avoid any additional risk in case of falling (see picture 1).
� The Engineer’s environmental specialists (site team 1 and core team) had
inspected every week the general safety measures implemented on site,
checking and proving that Contractor provided to all workers with personal
protective equipment (PPE), which they use as a custom and following
instructions from Consultant and Contractor, on site (see picture 1).
� The piers are provided with safety scaffoldings, made with metal and well fixed
all the bars, and surrounded in the four sides by a net to avoid falls from the
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
3
scaffolding. On the top of the piers, a fence or a net surrounds the working
surface to avoid falls (see picture 3).
� The ladders, located in other piers or other sides to scaffoldings, are metal ones,
fixed to metal girders and are provided with a handrail (see picture 4).
� Contractor has carried out training sessions, periodically since the beginning of
the works, about safety measures to be taken by the workers and about the use
of the PPEs: obligatory, need and how to use it (see picture 5).
PHOTOGRAPHIC EVIDENCES
To clarify visually the status of Lo River Bridge site, referred to the implementation of safety
measures and facilities for workers, they are included some pictures. These pictures have
remarked the date when they were took by the Engineer’s environmental specialist, most of
them before the accident happened.
Picture 1.- All workers wear life-vest, available in all site. It can be seen, also, the slender height of the path and the handrails in both sides of it.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
4
Picture 2.- Safety floats are distributed along the access way, on the handrails.
Picture 3.- Safety scaffoldings installed in Lo River bridge site, with nets surrounding it. It can be also seen the fence installed on the top of the pier.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
5
Picture 4.- Ladders installed for the access to the top of the piers, with handrails from the bottom. The fence on the top in being installed.
Picture 5.- Training sessions were given periodically by Contractor to the workers about safety measures to be taken and the use of the PPEs.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
6
CONCLUSIONS
The conclusion for the events above mentioned, under Consultant’s consideration, are the
following:
1º Necessary safety measures to guarantee the safety conditions for workers on
site were applied in Lo River Bridge site.
2º A unexpected action from the worker, with a clear lack of precaution, happened.
3º Fortuitous adverse circumstances joined at that moment
According to these considerations, it can be asserted that the accident happened that day in Lo River Bridge was a completely unlucky accident, despite all the reasonable safety measures were implemented on site.
II – SAFETY INCIDENT REPORTING SYSTEM
According to the instructions from ADB, included in the Memorandum of Understanding
(MoU) of the last ADB Mission carried out in May 2012, the Engineer has informed to all
contractors about the decisions taken during that mission, related with the incidents
reporting system which has to be implemented in all packages.
In order to be informed in the first 24 hours after an incident related with safety happens in
site, the International Environmental Specialist has prepared a Incident Reporting Form,
which has been sent to all contractors, as well as the instructions to be followed in those
cases. This report form is included in this document as Annex 2.
III – COMPLAINTS INFORMATION AND RECEPTION SYSTEM
According to the instructions from ADB, included in the Memorandum of Understanding
(MoU) of the last ADB Mission carried out in May 2012, the Engineer has informed to all
contractors about the decisions taken during that mission, related with the complaints
information and reception system which has to be implemented in all packages. The
instructions given were the following:
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
7
- Contractors will appoint a responsible to receive all the complaints from the local
people around sites, who could be affected by the works.
- In no more than 24 hours, the complaints must be submitted to EPMU and to
GETINSA.
- The way to inform local people about the system to submit the complaints to
contractor will be by adding in all temporary signs existing on site (or in new ones
if no temporary signs in any location near houses), a new line with the name and
telephone number of the appointed responsible, detailing that he/she is the
responsible to receive complaints. Also local and district authorities will be
informed about this system to complain.
- This system must be implemented before 30th June 2012.
- As Consultant must check the compliance in order to include the monitoring of
this issue in the monthly report for June and in the corresponding quarterly
report, Engineer established a deadline for the compliance, before 23rd June
2012.
During the last week of June, site team specialists were checking the real implementation of
this measure, with the following results:
A1 A2 A3 A4 A5 A6 A7 A8
Compliance Yes Yes In phase1
No No No No No
1: Contractor in package A3 is implementing the system. Consultant has received in the
last days of June 2012 a document in which POSCO explains the procedure to
receive and communicate claims, which is basically the procedure they were
instructed to apply.
As it can be proved in the table, the system has been fully implemented only in packages
A1 and A2 (POSCO Contractor) and it’s in phase of implementing in package A3 (POSCO
Contractor).
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
8
Here are included some pictures showing some of the signs already installed on site in the
packages which have been implemented the system.
Picture 1.- Package A1. Km 19+740
Picture 2.- Package A2. Km 39+200
Engineer provided to all contractors a “complaint sheet form” to use in all cases. As Annex
3 it’s included in this report this complaint sheet form, prepared by the International
Environmental Specialist.
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
9
ANNEX 1: DOCUMENTATION FROM CONTRACTOR
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
10
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
11
ANNEX 2: INCIDENTS REPORTING FORM
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
12
PROJECT
SAFETY INCIDENT REPORTING SHEET
PACKAGE LOCATION
DATE TIME
INCIDENT DESCRIPTION
PERSONNEL/PROPERTY INVOLVED: DATA
ACTIONS TAKEN
COUNTERMEASURES PROPOSED
Safety Manager Project Manager
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
13
ANNEX 3: COMPLAINTS INFORMATION AND RECEPTION FORM
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
14
Project Noi Bai – Lao Cai welcomes complaints, suggestions, comments and queries regarding the project implementation and its stakeholders. We encourage person with grievance to provide their name and contact information to enable us to get in touch with you for clarification and feedback.
Should you choose to include your personal details but want that information to remain confidential, please inform us by writing/typing "(CONFIDENTIAL)" above you name.
Thank you.
Package Location
Contact Information
Name Gender Male Female
Home Address Age
PhoneNo
City/Province Email
Compliant/Suggestion/Comment/Question Please provide the details (who, what, where and how) of your grievance below:
How do you want us to reach you for feedback or update on your comment/grievance?
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
15
Portion to be filled in by the staff:
Date received:
Received through In person _mail _email _fax _phone _sms
Name of staff who received comment/ complaint
Position of staff
Type of Grievance
Remarks
Signature of the staff
Update on the case:
Date: Update
� �
� �
Loan 2391/2392 – VIE: GMS Kunming – Hai Phong Transport Corridor Noi Bai – Lao Cai Highway Project
257
ANNEX 4: ENVIRONMENTAL STATUS IN CONCRETE BATCHING PLANTS. SPECIFIC REPORT