+ All Categories
Home > Documents > Hilti HIT-HY 200 Injectable Mortar (Post Installed Rebar ...

Hilti HIT-HY 200 Injectable Mortar (Post Installed Rebar ...

Date post: 23-Feb-2023
Category:
Upload: khangminh22
View: 0 times
Download: 0 times
Share this document with a friend
89
Hilti HIT-HY 200 Injectable Mortar (Post Installed Rebar) Submission Folder Product Information 2 Technical summary and consumption table 11 Method Statement 14 Test Reports Abstract-HY200 BS5080 Test Reports 20 Abstract 4-hour HY200 Fire Evaluation ETA – 12/0083 VOC Content Test Certificate (LEED) 32 36 67 Report Country of Origin 68 Material Safety Data Sheet 69 Job Reference 78 Recycling one ton of paper saves 17 trees and 7000 gallons of water. Please consider your environmental responsibility before using the hard copy version! Hilti (HK) 香港客戶熱線 +852 8228 8118 工程師技術支援平台 ask.hilti.com.hk 香港門市 : 大角咀洋松街1號形品星寓地下2號舖 澳門門市 : 澳門布魯塞爾街70號建興龍廣場地下W座地鋪 電郵 : [email protected] 傳真 : +852 2954 1751 澳門客戶熱線(免費) 00800 8228 8118 HIT-HY 200 Injectable Mortar (Post Installed Rebar) Page 1 of 89 Aug 2021
Transcript

Hilti HIT-HY 200 Injectable Mortar

(Post Installed Rebar) Submission Folder

Product Information 2

Technical summary and consumption table 11

Method Statement 14

Test Reports

Abstract-HY200 BS5080 Test Reports 20

Abstract 4-hour HY200 Fire Evaluation

ETA – 12/0083

VOC Content Test Certificate (LEED)

32

36

67

Report Country of Origin 68

Material Safety Data Sheet 69

Job Reference 78

Recycling one ton of paper saves 17 trees and 7000 gallons of water.

Please consider your environmental responsibility before using the hard copy version!

Hilti (HK) 香港客戶熱線+852 8228 8118

工程師技術支援平台ask.hilti.com.hk

香港門市 : 大角咀洋松街1號形品星寓地下2號舖 澳門門市 : 澳門布魯塞爾街70號建興龍廣場地下W座地鋪

電郵 : [email protected] 傳真 : +852 2954 1751

澳門客戶熱線(免費)00800 8228 8118

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 1 of 89

Aug 2021

Injectable mortar HIT-HY 200-R

APPLICATIONS● Anchoring secondary steel structures (e.g. racking, guard rails,

sound barriers)● Anchoring structural steel connections (e.g. steel columns,

beams)● Seismic strengthening / retrofitting and bracing of reinforced

concrete buildings● Substitution of misplaced / missing rebars● Anchoring safety barriers, balustrades, fire staircases● Structural splices / straight connections with post-installed rebars

ADVANTAGES● No hole cleaning required with the revolutionary new Hilti HIT-Z

anchor rod● Automatic hole cleaning with TE-CD and TE-YD drill bits in

combination with Hilti vacuum cleaners● Fulfills the requirements of the most demanding ICC-ES and

ETA C2 approvals for seismic applications● Post-installed rebars perform like cast-in connections

Technical dataMaterial composition Hybrid urethane methacrylate

adhesiveBase material condition Dry, wetTested/approved for diamonddrilling

Yes (for HIT-Z), No (for HIT-V & Rebar)

Seismic YesCompatible cartridge holder CR (Red)Additional product information Always wear eye protection and

gloves while handling

Temperature in the basematerial T [˚C]

Maximum working timetwork [min]

Minimum curing timetcure [h]

5 60 46 to 10 40 2.511 to 20 15 1.521 to 30 9 131 to 40 6 1

1) The curing time data are vaild for dry base material only. In wet base material the curing times must be doubled.

Technical dataRecommended load (kN), non-cracked concrete at 25N/mm², safety factor (γ) =3

Model Size M8 M10 M12 M16 M20

HIT-HY 200 R + HIT-Z

Tensile Load, Nrec 8.0 12.7 18.1 29.4 40.7Shear Load, Vrec 4.0 6.3 9.0 16.0 24.3

Recommended load (kN), cracked concrete at 25N/mm², safety factor (γ) =3Model Size M8 M10 M12 M16 M20

HIT-HY 200 R + HIT-Z

Tensile Load, Nrec 7.0 10.2 13.8 20.9 29.0Shear Load, Vrec 4.0 6.3 9.0 16.0 24.3

BASE MATERIALS● Concrete (cracked)● Concrete (uncracked)

Curing time

Remarks:1) All the data applies to no edge distance, spacing and other influences 2) For detail design method please refer to Fastening Technology Manual * ) HY 200 with the use of HIT-Z/HIT-Z-R has shock approved

Ordering designation Package contents Sales packquantity

Item number

1x Foil pack, 2x Mixer, 1x Mixer extension 1 pc 2045036HIT-HY 200-R 330/2/EEHIT-HY 200-R 500/2/EE 1x Foil pack, 2x Mixer, 1x Mixer extension 1 pc 2045032

*

These are abbreviated instructions which may vary according to the application.

Watch VideoOrder Now

Please visit Hilti website for the latest item numbers and related products

80x foil pack, 1x Dispenser HDE 500-A22, 1x Cartridge Holder 1 pc 3733215HY 200-R 500/2/EE + HDE A22 Dispenser

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 2 of 89

Aug 2021

ANCHORING SYSTEMS

8

8ANCHORING SYSTEMS

8

8

Dispenser HDE 500-A22

APPLICATIONS● Injection of Hilti HIT adhesive mortar for fastening anchor rods

and rebars in concrete and masonry● An addition to Hilti’s 22V cordless tool platform● Serial fastenings and/or injection in deep holes

ADVANTAGES● Dose adjustment knob for accurate and controlled dispensing● Fast, easy foil pack loading● The HDE 500-A22 can dispense up to 130 Hilti HIT adhesive

artridges (500 ml) on a single battery charge with a B22 3.3Ahbattery or 60 cartridges with a compact 1.6Ah battery

Technical dataPower source type Compact B22/2.6 or B22/5.2 battery

packDispenser type BatteryPerformance (at 20˚C) 55 sec ( RE100 500 ml)3.3 Ah Battery capacity 100 cartridges (500 ml)Dimension (L x W x H) 436 mm x 120 mm x 221 mmModes available Off / continuous / measured volume

dispensing with settings 1 to 15Dispensing volume pertrigger pull

6 ml

Ordering designation Content per can/cartridge Sales packquantity

Item number

HDE500 A22 Dispenser + CB (Standard) 1x Dispenser HDE 500-A22,1x Cartridge holder CB 1 pc 3733226HDE500 A22 Dispenser + CR (Standard) 1x Dispenser HDE 500-A22,1x Cartridge holder CR 1 pc 3733227

Battery pack B 22/5.2 Li-Ion - 1 pc 2136396Battery standard charger C 4/36-90 230V - 1 pc 2015762

Order Now

Please visit Hilti website for the latest item numbers and related products

HDE500 A22 Dispenser + CB (Premium) 1x Dispenser HDE 500-A22,1x Cartridge holder CB, 1x Battery Pack B 22/2.6 1 pc 3733228HDE500 A22 Dispenser + CR (Premium) 1x Dispenser HDE 500-A22,1x Cartridge holder CR, 1x Battery Pack B 22/2.6 1 pc 3733229HDE500 A22 Dispenser + CB (Ultimate) 110V 1x Dispenser HDE 500-A22,1x Cartridge holder CB, 1x Battery Pack B 22/2.6,

1x Battery Charger C 4/36-90 110V box1 pc 3733230

HDE500 A22 Dispenser + CR (Ultimate) 110V 1x Dispenser HDE 500-A22,1x Cartridge holder CB, 1x Battery Pack B 22/2.6, 1x Battery Charger C 4/36-90 110V box

1 pc 3733231

HDE500 A22 Dispenser + CB (Ultimate) 230V 1x Dispenser HDE 500-A22,1x Cartridge holder CB, 1x Battery Pack B 22/2.6, 1x Battery Charger C 4/36-90 230V box

1 pc 3733232

HDE500 A22 Dispenser + CR (Ultimate) 230V 1x Dispenser HDE 500-A22,1x Cartridge holder CB, 1x Battery Pack B 22/2.6, 1x Battery Charger C 4/36-90 230V box

1 pc 3733233

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 3 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 4 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 5 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 6 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 7 of 89

Aug 2021

WHAT ISHilti Technology eliminates the most load-affecting and time-consuming step in the installation process: cleaning the hole before injection of the adhesive. As a consequence, engineers can now have peace of mind because the specified application will perform on the jobsite as it has been designed in the plan.

Now you can design anchor rod and post-installed rebar connectionswith more confidence. Inadequately cleaning holes during installationcan reduce the performance of conventional chemical anchor systemssignificantly. Hilti Technology eliminates this factor almostentirely – in both cracked or uncracked concrete and with anchor rodsor post-installed rebar.

M8(10mm)

Thread rod sizeDrill hole dia.

M10(12mm)

M12(14mm)

M16(18mm)

M20(22mm)

M24(28mm)

M27(30mm)

M30(35mm)

AnchoringHIT-HY 200-R, standard drill bit and  HIT-Z Rod (zero cleaning)

HIT-HY 200-R, HIT-RE 500, HIT-RE 500-SD, Hollow Drill Bits and HAS-E Rod or HIT-V Rod (auto-cleaning) 

Y8(12mm)

Rebar sizeDrill hole dia.

Y10(14mm)

Y12(16mm)

Y16(20mm)

Y20(25mm)

Y25(32mm)

Y32(40mm)

RebarHIT-HY 200-R, HIT-RE 500, HIT-RE 500-SD, Hollow Drill Bits and rebar (auto-cleaning) 

Application Ranges

 

 

M8(10mm)

Y8(12mm)

Y10(14mm)

Y12(16mm)

Y16(20mm)

Y20(25mm)

Y25(32mm)

Y32(40mm)

Thread rod sizeDrill hole dia.

Rebar sizeDrill hole dia.

M10(12mm)

M12(14mm)

M16(18mm)

M20(22mm)

M24(28mm)

M27(30mm)

M30(35mm)

Anchoring

Rebar

HIT-HY 200-R, standard drill bit and   HIT-Z Rod (zero cleaning)

HIT-HY 200-R, HIT-RE 500, HIT-RE 500 V3, 

HIT-HY 200-R, HIT-RE 500, HIT-RE 500 V3, Hollow Drill Bits and rebar (auto-cleaning) 

HIT-HY 200-R

HIT-RE 500 V3

HILTIA small step for engineers. And a giant leap forward for your next design.

TECHNOLOGY

APPLICATIONS● Post-installed rebar connections forconcrete slab, column or

wall extensions● Heavy-duty anchoring in cracked or uncracked concrete, e.g.

for steel beams, colum

HIT-RE 100

HIT-RE100Hollow Drill Bits and HAS-E Rod, HAS-U Rod or HIT-V Rod(auto-cleaning)

HIT-RE100

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 8 of 89

Aug 2021

ANCHORING SYSTEMS

8

8

8

HIT-RE 100

HIT-RE 100

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 9 of 89

Aug 2021

HIT-HY 200-R HIT-RE 500 V3 HIT-RE 100 HIT-HY 270

HIT-Z■

HAS-U

HIS-N ■ ■ ■ ■

Setting tool TE-C

Setting tool HIS-S

Mixer HIT-RE-M ■ ■ ■ ■

Profi accessories for HIT ■ ■ ■ ■

HIT-SC ■

CR Cartridge holder ■

CB Cartridge holder ■ ■ ■

HDE Dispenser ■ ■ ■ ■TE-CD/YD Hollow drill bit ■ ■ ■VC 20/40 Vacuum cleaner

■ ■ ■

Setting tool TE-C-E/TE-Y-E

Blow-out pump ■ ■ ■ ■

Steel brush ■ ■ ■ ■

SUMMARY TABLE FOR CHEMICAL ANCHORS

■ ■ ■ ■

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 10 of 89

Aug 2021

HIT-HY 200-R Injection Adhesive with Rebar

HIT HY 200 foil pack, mixer

Cartridge holder, HIT-CR 500

Installation Details Y10 Y12 Y16 Y20 Y25 Y32

Rebar diameter (mm) [Ød] 10 12 16 20 25 32 Hole diameter (mm) [d0] 12 16 20 25 32 40 Min. Embedment Depth (mm) [h1] Min. embedment depth should be according to EN1992-1-1

Installation system (Hammer Drilling) Hollow Drill bit TE-CD12 TE-CD16 TE-YD20 TE-YD25 TE-YD30 n/a Drill bit TE-CX12 TE-CX16 TE-CX20 TE-CX25 TE-YX30 TE-YX40 Drilling system TE2 / TE7 / TE30 / TE40 TE 50 / TE60 / TE70

Remarks: 1. Actual embedment depth should be subjected to design stress.2. All the spacing and edge distance requirement should be reference to European Technical Approval

(ETA-12/0083);3. If there is a fire resistance concern, the loading should be referred to the local fire assessment

FAHY200C-2016-SBasic Testing & loading data

Y10 Y12 Y16 Y20 Y25 Y32 Ultimate mean pull-out load as per BS5080 Part 1 (kN) Test Report *See Remark 1

42.7 65.1 132.9 180.2 255.7 413.4

Yield load of rebar (kN) 39.3 56.6 100.6 157.1 245.5 402.1

Max. Testing Load (0.87 x Yield Load) 34.1 49.2 87.5 136.7 213.5 349.8

Remarks: 1. It is based on BS5080 test for non-cracked concrete with strength 30N/mm2;2. Yield strength of rebar fyk is 500N/mm2;3. Design embedment depth and loading should be subjected to design stress or

designer's decision.;4. Onsite pullout test can be carried out to verify the workmanship of the installation but should

not be served as verification of the ultimate loading. The testing load shall be subjected tothe de should not exceed the 0.87 x yield load ofrebar to avoid permanent damage to the rebar.

Features: base material: concrete Injection system with high loading capacity Two-component hybrid mortar Suitable for dry and water saturated concrete Fast curing system SAFEset system with hollow drill bit TE-CD & TE-YD Non corrosive to rebar elements

Material: Hybrid adhesive

Cartridge: Foil pack: 500ml Foil pack: 330ml (special request)

Dispenser: HDE 500-A22 and HDM 500 Cartridge holder, HIT-CR 500

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 11 of 89

Aug 2021

Setting Details

Mechanical Properties

Property Standard ValueDensity Cured Mortar EN ISO 1183-1 1.83g/cm3

Compressive Strength modulus EN ISO 604 / HN569 1900 N/mm2

Compressive Strength EN ISO 604 / HN569 7days - 110 N/mm2

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 12 of 89

Aug 2021

1. In the above table please find the quantity of mortar required for one fastening point, in ml. In this estimation, we consider 80% of the mortar is used for fastening, the rest being used for the first pull outs and waste.

2. The greyed area should not be used since it is not in accordance with the design codes requiring a depth of at least 10 drilling diameters.3. The filled volume showed in the table did not include any wastage during the installation.4. 1 trigger pull of dispenser HDE is approx. 6 ml of HY200.

To dispense 1 cartridge of 500ml HY 200 needs approx. 80 triggers.

5.6 Mortar consumption estimation for post installed rebars

25 32

32 40

40

55

10

14

12

16

16

20

20

25

10.3

12.3

14.4

16.4

18.5

20.5

22.6

24.6

26.7

28.7

30.8

32.8

34.9

36.9

39.0

41.1

46.2

51.3

56.4

61.6

66.7

71.8

77.0

82.1

87.2

92.4

97.5

102.6

123.2

143.7

164.2

184.7

205.3

256.6

307.9

328.4

13.4

16.1

18.8

21.4

24.1

26.8

29.5

32.2

34.9

37.5

40.2

42.9

45.6

48.3

50.9

53.6

60.3

67.0

73.7

80.4

87.1

93.8

100.5

107.2

113.9

120.6

127.3

134.0

160.8

187.7

214.5

241.3

268.1

335.1

402.1

428.9

20.9

25.1

29.3

33.5

37.7

41.9

46.1

50.3

54.5

58.6

62.8

67.0

71.2

75.4

79.6

83.8

94.2

104.7

115.2

125.7

136.1

146.6

157.1

167.6

178.0

188.5

199.0

209.4

251.3

293.2

335.1

377.0

418.9

523.6

628.3

670.2

32.7

39.3

45.8

52.4

58.9

65.5

72.0

78.5

85.1

91.6

98.2

104.7

111.3

117.8

124.4

130.9

147.3

163.6

180.0

196.4

212.7

229.1

245.4

261.8

278.2

294.5

310.9

327.3

392.7

458.2

523.6

589.1

654.5

818.1

981.8

1047.2

53.6

64.3

75.1

85.8

96.5

107.2

118.0

128.7

139.4

150.1

160.8

171.6

182.3

193.0

203.7

214.5

241.3

268.1

294.9

321.7

348.5

375.3

402.1

428.9

455.7

482.5

509.4

536.2

643.4

750.6

857.9

965.1

1072.3

1340.4

1608.5

1715.7

83.8

100.5

117.3

134.0

150.8

167.6

184.3

201.1

217.8

234.6

251.3

268.1

284.8

301.6

318.3

335.1

377.0

418.9

460.8

502.7

544.5

586.4

628.3

670.2

712.1

754.0

795.9

837.8

1005.3

1172.9

1340.4

1508.0

1675.5

2094.4

2513.3

2680.8

158.4

190.1

221.7

253.4

285.1

316.8

348.5

380.1

411.8

443.5

475.2

506.8

538.5

570.2

601.9

633.6

712.8

791.9

871.1

950.3

1029.5

1108.7

1187.9

1267.1

1346.3

1425.5

1504.7

1583.9

1900.7

2217.4

2534.2

2851.0

3167.8

3959.7

4751.7

5068.4

100120140160180200220240260280300320340360380400450500550600650700750800850900950100012001400160018002000250030003200

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 13 of 89

Aug 2021

Page 20 of European Technical AssessmentETA-12/0083 of 21 June 2019

English translation prepared by DIBt

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 14 of 89

Aug 2021

Page 21 of European Technical AssessmentETA-12/0083 of 21 June 2019

English translation prepared by DIBt

8.06.01-135/19 Hilti HIT-HY 200 Injectable Mortar (Post Installed Rebar) Page 14 of 61 Jun 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 15 of 89

Aug 2021

Page 22 of European Technical AssessmentETA-12/0083 of 21 June 2019

English translation prepared by DIBt

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 16 of 89

Aug 2021

Page 23 of European Technical AssessmentETA-12/0083 of 21 June 2019

English translation prepared by DIBt

HDE-500 A22

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 17 of 89

Aug 2021

Page 24 of European Technical AssessmentETA-12/0083 of 21 June 2019

English translation prepared by DIBt

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 18 of 89

Aug 2021

Page 25 of European Technical AssessmentETA-12/0083 of 21 June 2019

English translation prepared by DIBt

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 19 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 20 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 21 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 22 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 23 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 24 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 25 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 26 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 27 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 28 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 29 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 30 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 31 of 89

Aug 2021

V02@112016

Table: HY200 anchorage length under fire – Abstract from REPORT no. FAHY200C-2016-S Table 6 - 39(Hilti HIT-HY200 Injection Resin with Rebar for Post-installed Concrete Connections under Hong Kong Fire Resistance Conditions)

Maximum force in rebar in conjunction with HIT-HY 200 as a function of embedment depth for the fire resistance classes R60 to R240 (yield strength fyk = 500 N/mm2) according to Hong Kong CoP*

R60 R120 R180 R240mm mm kN mm c=20 c=25 c=45 c=45

100 4.92 1.15 0.83 0.53

110 7.74 1.59 1.07 0.66

120 11.39 2.21 1.37 0.82

130 15.03 3.09 1.78 1.03

140 18.68 4.31 2.30 1.29

150 22.33 6.01 2.98 1.61

160 25.97 8.36 3.88 2.02

170 29.62 11.58 5.05 2.54

180 33.27 15.23 6.58 3.19

190 36.92 18.87 8.57 4.03

200 39.27 22.52 11.15 5.09

210 26.17 14.45 6.44

220 29.82 18.10 8.14

230 33.46 21.75 10.28

240 37.11 25.39 12.97

250 39.27 29.04 16.30

260 32.69 19.95

270 36.34 23.60

280 39.27 27.25

290 30.89

300 34.54

310 38.19

320 39.27

Rebar anchorage

depth

Maximum Forece in the rebar (kN)

10 12 39.27

Rebar Diamete

r

Drill hole diameter

Rebar maximum

load

*The concrete cover stated on the above table matches the minimum concrete cover required by the HK CoP for Fire Safety in Buildings 2011 andthe thermo-mechanical properties adopted in this fire assessment is according to HK CoP for the Structural use of Concrete 2013.

**For the embedment length data under different concrete cover thickness condition, please contact Hilti representative to access the full report.

HK Fire Assessment

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 32 of 89

Aug 2021

V02@112016

R60 R120 R180 R240mm mm kN mm c=20 c=25 c=45 c=45

120 13.66 2.66 1.65 0.99

130 18.04 3.70 2.13 1.23

140 22.42 5.16 2.76 1.54

150 26.79 7.21 3.58 1.93

160 31.17 10.04 4.65 2.42

170 35.55 13.91 6.06 3.04

180 39.92 18.29 7.91 3.83

190 44.30 22.66 10.31 4.84

200 48.67 27.04 13.42 6.11

210 53.05 31.42 17.42 7.72

220 56.55 35.79 21.79 9.77

230 40.17 26.17 12.34

240 44.55 30.55 15.56

250 48.92 34.92 19.57

260 53.30 39.30 23.94

270 56.55 43.68 28.32

280 48.05 32.69

290 52.43 37.07

300 56.55 41.45

310 45.82

320 50.20

330 54.58

340 56.55

160 41.56 13.38 6.21 3.23

170 47.39 18.55 8.08 4.06

180 53.23 24.38 10.54 5.11

190 59.06 30.22 13.74 6.45

200 64.90 36.05 17.89 8.15

210 70.73 41.89 23.22 10.31

220 76.57 47.72 29.06 13.04

230 82.40 53.56 34.89 16.49

240 88.24 59.39 40.73 20.82

250 94.07 65.23 46.56 26.22

260 99.91 71.06 52.40 32.05

270 100.53 76.90 58.23 37.89

280 82.73 64.07 43.72

290 88.57 69.90 49.56

300 94.40 75.74 55.39

310 100.24 81.57 61.23

320 100.53 87.41 67.06

330 93.24 72.90

340 99.08 78.73

350 100.53 84.57

360 90.40

370 96.24

380 100.53

Rebar Diamete

r

Drill hole diameter

Rebar maximum

load

Rebar anchorage

depth

Maximum Forece in the rebar (kN)

16 20 100.53

12 16 56.55

**For the embedment length data under different concrete cover thickness condition, please contact Hilti representative to access the full report.

HK Fire Assessmentt

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 33 of 89

Aug 2021

HK Fire Assessmentt

V02@112016

R60 R120 R180 R240mm mm kN mm c=20 c=25 c=45 c=45

200 81.12 45.05 22.37 10.19

210 88.42 52.34 29.03 12.89

220 95.71 59.63 36.33 16.31

230 103.01 66.93 43.62 20.62

240 110.30 74.22 50.92 26.03

250 117.59 81.51 58.21 32.78

260 124.89 88.81 65.50 40.07

270 132.18 96.10 72.80 47.37

280 139.47 103.40 80.09 54.66

290 146.77 110.69 87.39 61.95

300 154.06 117.98 94.68 69.25

310 157.08 125.28 101.97 76.54

320 132.57 109.27 83.83

330 139.86 116.56 91.13

340 147.16 123.85 98.42

350 154.45 131.15 105.72

360 157.08 138.44 113.01

370 145.74 120.30

380 153.03 127.60

390 157.08 134.89

400 142.18

410 149.48

420 156.77

430 157.08

250 146.99 101.85 72.76 40.97

260 156.11 110.97 81.88 50.09

270 165.23 120.09 91.00 59.21

280 174.34 129.21 100.11 68.33

290 183.46 138.32 109.23 77.44

300 192.58 147.44 118.35 86.56

310 201.69 156.56 127.47 95.68

320 210.81 165.67 136.58 104.79

330 219.93 174.79 145.70 113.91

340 229.05 183.91 154.82 123.03

350 238.16 193.03 163.93 132.15

360 245.44 202.14 173.05 141.26

370 211.26 182.17 150.38

380 220.38 191.29 159.50

390 229.49 200.40 168.61

400 238.61 209.52 177.73

410 245.44 218.64 186.85

420 227.76 195.97

430 236.87 205.08

440 245.44 214.20

450 223.32

460 232.44

470 241.55

480 245.44

25 30 245.44

Rebar anchorage

depth

Maximum Forece in the rebar (kN)

20 25 157.08

Rebar Diamete

r

Drill hole diameter

Rebar maximum

load

**For the embedment length data under different concrete cover thickness condition, please contact Hilti representative to access the full report.

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 34 of 89

Aug 2021

HK Fire Assessment

V02@112016

R60 R120 R180 R240mm mm kN mm c=20 c=25 c=45 c=45

320 269.84 214.46 174.83 134.14

330 281.51 226.13 186.50 145.81

340 293.18 237.80 198.17 157.48

350 304.85 249.47 209.84 169.15

360 316.52 261.14 221.51 180.82

370 328.19 272.82 233.18 192.49

380 339.86 284.49 244.85 204.16

390 351.53 296.16 256.52 215.83

400 363.20 307.83 268.19 227.50

410 374.87 319.50 279.86 239.17

420 386.54 331.17 291.53 250.84

430 398.21 342.84 303.20 262.51

440 402.12 354.51 314.87 274.18

450 366.18 326.54 285.85

460 377.85 338.21 297.52

470 389.52 349.88 309.19

480 401.19 361.55 320.86

490 402.12 373.22 332.53

500 384.89 344.20

510 396.56 355.87

520 402.12 367.54

530 379.21

540 390.88

550 402.12

32 40 402.12

Rebar Diamete

r

Drill hole diameter

Rebar maximum

load

Rebar anchorage

depth

Maximum Forece in the rebar (kN)

**For the embedment length data under different concrete cover thickness condition, please contact Hilti representative to access the full report.

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 35 of 89

Aug 2021

European Technical Approval ETA-12/0083

English translation prepared by DIBt - Original version in German language

Injektionssystem Hilti HIT-HY 200-R für Bewehrungsanschlüsse Handelsbezeichnung Trade name I

njection System Hilti HIT-HY 200-R for rebar connection

Zulassungsinhaber

Holder of approval Hilti Aktiengesellschaft Business Unit Anchors 9494 Schaan

ÜRSTENTUM LIECHTENSTEIN F Zulassungsgegenstand und Verwendungszweck

Nachträglich eingemörtelter Bewehrungsanschluss mit Hilti njektionsmörtel HIT-HY 200-R I

Generic type and use of construction product

P

ost-installed rebar connection with Hilti injection mortar HIT-HY 200-R

Geltungsdauer:

Validity: vom from

6 February 2012

bis to

6 February 2017

Hilti Werke Herstellwerk

Manufacturing plant

Diese Zulassung umfasst This Approval contains

31 Seiten einschließlich 21 Anhänge 31 pages including 21 annexes

E u r o p ä i s c h e O r g a n i s a t i o n f ü r T e c h n i s c h e Z u l a s s u n g e n

E u r o p e a n O r g a n i s a t i o n f o r T e c h n i c a l A p p r o v a l s

Z4937.12 8.06.01-78/10

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 36 of 89

Aug 2021

European technical approval ETA-12/0083 English translation prepared by DIBt

Page 2 of 31 | 6 February 2012

I LEGAL BASES AND GENERAL CONDITIONS

1 This European technical approval is issued by Deutsches Institut für Bautechnik in accordance with:

- Council Directive 89/106/EEC of 21 December 1988 on the approximation of laws, regulations and administrative provisions of Member States relating to construction products1, modified by Council Directive 93/68/EEC2 and Regulation (EC) N° 1882/2003 of the European Parliament and of the Council3;

- Gesetz über das In-Verkehr-Bringen von und den freien Warenverkehr mit Bauprodukten zur Umsetzung der Richtlinie 89/106/EWG des Rates vom 21. Dezember 1988 zur Angleichung der Rechts- und Verwaltungsvorschriften der Mitgliedstaaten über Bauprodukte und anderer Rechtsakte der Europäischen Gemeinschaften (Bauproduktengesetz - BauPG) vom 28. April 19984, as amended by law of 31 October 20065;

- Common Procedural Rules for Requesting, Preparing and the Granting of European technical approvals set out in the Annex to Commission Decision 94/23/EC6;

- Guideline for European technical approval of "Metal anchors for use in concrete - Part 5: Bonded anchors", ETAG 001-05.

2 Deutsches Institut für Bautechnik is authorized to check whether the provisions of this European technical approval are met. Checking may take place in the manufacturing plant. Nevertheless, the responsibility for the conformity of the products to the European technical approval and for their fitness for the intended use remains with the holder of the European technical approval.

3 This European technical approval is not to be transferred to manufacturers or agents of manufacturers other than those indicated on page 1, or manufacturing plants other than those indicated on page 1 of this European technical approval.

4 This European technical approval may be withdrawn by Deutsches Institut für Bautechnik, in particular pursuant to information by the Commission according to Article 5(1) of Council Directive 89/106/EEC.

5 Reproduction of this European technical approval including transmission by electronic means shall be in full. However, partial reproduction can be made with the written consent of Deutsches Institut für Bautechnik. In this case partial reproduction has to be designated as such. Texts and drawings of advertising brochures shall not contradict or misuse the European technical approval.

6 The European technical approval is issued by the approval body in its official language. This version corresponds fully to the version circulated within EOTA. Translations into other languages have to be designated as such.

1 Official Journal of the European Communities L 40, 11 February 1989, p. 12

2 Official Journal of the European Communities L 220, 30 August 1993, p. 1

3 Official Journal of the European Union L 284, 31 October 2003, p. 25

4 Bundesgesetzblatt Teil I 1998, p. 812

5 Bundesgesetzblatt Teil I 2006, p. 2407, 2416

6 Official Journal of the European Communities L 17, 20 January 1994, p. 34

Z4937.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 37 of 89

Aug 2021

European technical approval ETA-12/0083 English translation prepared by DIBt

Page 3 of 31 | 6 February 2012

II SPECIFIC CONDITIONS OF THE EUROPEAN TECHNICAL APPROVAL

1 Definition of the product and intended use

1.1 Definition of the construction product The subject of this approval is the post-installed connection, by anchoring or overlap connection joint, of reinforcing bars (rebars) in existing structures made of normal weight concrete, using the Hilti injection mortar HIT-HY 200-R in accordance with the regulations for reinforced concrete construction.

Reinforcing bars made of steel with a diameter ds from 8 to 32 mm according to Annex 4 or the Hilti tension anchor HZA-R or HZA-HCR sizes 12, 16 and 20 according to Annex 6 and Hilti injection mortar HIT-HY 200-R are used for rebar connections. The steel element is placed into a drilled hole filled with injection mortar and is anchored via the bond between embedded element, injection mortar and concrete.

1.2 Intended use The rebar connection may be used in normal weight concrete of a minimum grade of C12/15 and maximum grade C50/60 according to EN 206-1:2000. It may be used in non-carbonated concrete with the allowable chloride content in concrete of 0.40% (CL 0.40) related to the cement content according to EN 206-1.

Rebar connections with reinforcing bars and tension anchor HZA-R or HZA-HCR may be used for predominantly static loads.

The fire resistance of post-installed rebar connections is not covered by this European technical approval. Fatigue, dynamic or seismic loading of post-installed rebar connections are not covered by this European technical approval.

Rebar connections may only be carried out in a manner, which is also possible with cast-in straight reinforcing bars, e.g. those in the following applications (see Annex 2):

- an overlap joint with existing reinforcement in a building component (Figures 1 and 2),

- anchoring of the reinforcement at a slab or beam support, (e.g. according to Figure 3: end support of a slab, designed simply supported, as well as an appropriate general reinforcement for restraint forces),

- anchoring of reinforcement of building components stressed primarily in compression (Figure 4),

- anchoring of reinforcement to cover the envelope line of tensile force in the bending member (Figure 5).

The post-installed rebar connections may be used in the temperature range of -40 °C to +80 °C (max short term temperature +80 °C and max long term temperature +50 °C).

This European technical approval covers anchoring in bore holes made with hammer drilling or compressed air drilling. The post-installed rebar connection may be installed in dry or wet concrete. It must not be installed in flooded holes.

Rebar connections with the tension anchor HZA-R or HZA-HCR may be used for the transmission of tensile forces in the direction of the bar axis only. The transmission of shear forces has to be ensured by appropriate measures. Examples for the application are given in Annex 3, Figure 6 to Figure 8.

Z4937.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 38 of 89

Aug 2021

European technical approval ETA-12/0083 English translation prepared by DIBt

Page 4 of 31 | 6 February 2012

- The tension anchor HZA-R made of stainless steel may be used in structures subject to dry internal conditions and also in structures subject to external atmospheric exposure (including industrial and marine environment), or exposure to permanently damp internal conditions, if no particular aggressive conditions exist. Such particular aggressive conditions are e.g. permanent, alternating immersion in seawater or the splash zone of seawater, chloride atmosphere of indoor swimming pools or atmosphere with extreme chemical pollution (e.g. in desulphurization plants or road tunnels where de-icing materials are used).

- The tension anchor HZA-HCR made of high corrosion resistant steel 1.4529 may be used in structures subject to dry internal conditions and also in structures subject to external atmospheric exposure, in permanently damp internal conditions or in other particular aggressive conditions. Such particular aggressive conditions are e.g. permanent, alternating immersion in seawater or the splash zone of seawater, chloride atmosphere of indoor swimming pools or atmosphere with chemical pollution (e.g. in desulphurization plants or road tunnels where de-icing materials are used).

The provisions made in this European technical approval are based on an assumed working life of the post-installed rebar connection of 50 years. The indications given on the working life cannot be interpreted as a guarantee given by the producer, but are to be regarded only as a means for choosing the right products in relation to the expected economically reasonable working life of the works.

2 Characteristics of the product and methods of verification

2.1 Characteristics of the product The post-installed rebar connection corresponds to the drawings and provisions given in Annexes 1 to 7. The characteristic material values, dimensions and tolerances not indicated in Annexes 1 to 7 shall correspond to the respective values laid down in the technical documentation7 of this European technical approval.

The two components of the injection mortar Hilti HIT-HY 200-R are delivered in unmixed condition in foil packs of sizes 330 ml or 500 ml according to Annex 1. Each foil pack is marked with the identifying mark "HY 200-R", with the batch number and expiry date.

The rebar shall comply with the specifications given in Annex 4. The tension anchor HZA-R and HZA-HCR shall comply with the specifications given in Annex 6. Each tension anchor with connecting thread made of stainless steel is marked with the letters "HZA-R" according to Annex 6. Each rebar anchor with connecting thread made of high corrosion resistant steel is marked with the letters "HZA-HCR" according to Annex 6.

2.2 Methods of verification The assessment of fitness of the post-installed rebar connection for the intended use in relation to the requirements for mechanical resistance and stability and safety in use in the sense of the Essential Requirements 1 and 4 has been made in accordance with the "Guideline for European technical approval of Metal Anchors for Use in Concrete", Part 1 "Anchors in general" and Part 5 "Bonded anchors" and EOTA Technical Report TR 023 "Assessment of post-installed rebar connections"8.

7 The technical documentation of this European technical approval is deposited at the Deutsches Institut für Bautechnik

and, as far as relevant for the tasks of the approved bodies involved in the attestation of conformity procedure, is handed over to the approved bodies.

8 The Technical Report TR 023 "Assessment of post-installed rebar connections" is published on EOTA website

www.EOTA.eu.

Z4937.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 39 of 89

Aug 2021

European technical approval ETA-12/0083 English translation prepared by DIBt

Page 5 of 31 | 6 February 2012

In addition to the specific clauses relating to dangerous substances contained in this European technical approval, there may be other requirements applicable to the products falling within its scope (e.g. transposed European legislation and national laws, regulations and administrative provisions). In order to meet the provisions of the Construction Products Directive, these requirements need also to be complied with, when and where they apply.

3 Evaluation and attestation of conformity and CE marking

3.1 System of attestation of conformity According to the Decision 96/582/EC of the European Commission9 system 2(i) (referred to as

System 1) of the attestation of conformity applies.

This system of attestation of conformity is defined as follows:

System 1: Certification of the conformity of the product by an approved certification body on the basis of:

(a) Tasks for the manufacturer:

(1) factory production control;

(2) further testing of samples taken at the factory by the manufacturer in accordance with a prescribed test plan;

(b) Tasks for the approved body:

(3) initial type-testing of the product;

(4) initial inspection of factory and of factory production control;

(5) continuous surveillance, assessment and approval of factory production control.

Note: Approved bodies are also referred to as "notified bodies".

3.2 Responsibilities 3.2.1 Tasks for the manufacturer 3.2.1.1 Factory production control

The manufacturer shall exercise permanent internal control of production. All the elements, requirements and provisions adopted by the manufacturer shall be documented in a systematic manner in the form of written policies and procedures, including records of results performed. This production control system shall insure that the product is in conformity with this European technical approval.

The manufacturer may only use initial/raw/constituent materials stated in the technical documentation of this European technical approval.

The factory production control shall be in accordance with the control plan which is part of the technical documentation of this European technical approval. The control plan

is laid down in

the context of the factory production control system operated by the manufacturer and deposited with Deutsches Institut für Bautechnik.10

The results of factory production control shall be recorded and evaluated in accordance with the provisions of the control plan.

9 Official Journal of the European Communities L 254 of 08.10.1996

10 The control plan is a confidential part of the European technical approval and only handed over to the approved body

involved in the procedure of attestation of conformity. See section 3.2.2.

Z4937.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 40 of 89

Aug 2021

European technical approval ETA-12/0083 English translation prepared by DIBt

Page 6 of 31 | 6 February 2012

3.2.1.2 Other tasks for the manufacturer

The manufacturer shall, on the basis of a contract, involve a body which is approved for the tasks referred to in section 3.1 in the field of anchors in order to undertake the actions laid down in section 3.2.2 For this purpose, the control plan referred to in sections 3.2.1.1 and 3.2.2 shall be handed over by the manufacturer to the approved body involved.

The manufacturer shall make a declaration of conformity, stating that the construction product is in conformity with the provisions of this European technical approval.

3.2.2 Tasks for the approved bodies The approved body shall perform the

- initial type-testing of the product,

- initial inspection of factory and of factory production control,

- continuous surveillance, assessment and approval of factory production control,

in accordance with the provisions laid down in the control plan.

The approved body shall retain the essential points of its actions referred to above and state the results obtained and conclusions drawn in a written report.

The approved certification body involved by the manufacturer shall issue an EC certificate of conformity of the product stating the conformity with the provisions of this European technical approval.

In cases where the provisions of the European technical approval and its control plan are no longer fulfilled the certification body shall withdraw the certificate of conformity and inform Deutsches Institut für Bautechnik without delay.

3.3 CE marking The CE marking shall be affixed on each packaging of the injection mortar. The letters "CE"

shall be followed by the identification number of the approved certification body, where relevant, and be accompanied by the following additional information:

- the name and address of the producer (legal entity responsible for the manufacture),

- the last two digits of the year in which the CE marking was affixed,

- the number of the EC certificate of conformity for the product,

- the number of the European technical approval,

- the number of the guideline for European technical approval.

4 Assumptions under which the fitness of the product for the intended use was favourably assessed

4.1 Manufacturing The European technical approval is issued for the product on the basis of agreed

data/information, deposited with Deutsches Institut für Bautechnik, which identifies the product that has been assessed and judged. Changes to the product or production process, which could result in this deposited data/information being incorrect, should be notified to Deutsches Institut für Bautechnik before the changes are introduced. Deutsches Institut für Bautechnik will decide whether or not such changes affect the approval and consequently the validity of the CE marking on the basis of the approval and if so whether further assessment or alterations to the approval shall be necessary.

Z4937.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 41 of 89

Aug 2021

European technical approval ETA-12/0083 English translation prepared by DIBt

Page 7 of 31 | 6 February 2012

4.2 Drafting Rebar connections must be designed in keeping with good engineering practice. Considering

the loads to be anchored, design calculations and design drawings must be produced which can be checked. At least the following items must be stated in the design drawings:

- grade of concrete strength,

- diameter, drilling technique, concrete cover, spacing and embedment depth of the rebar,

- length lv and length for markings lm on the injection extension according to Annex 16,

- Use of a drill aid for anchorages close to the edge (see Annex 10),

- kind of preparation of the joint between building component being connected including the diameter and thickness of concrete layer that has to be removed.

4.3 Design 4.3.1 General

The actual position of the reinforcement in the existing structure shall be determined on the basis of the construction documentation and taken into account when designing.

The design of post-installed rebar connections according to Annex 2 and determination of the internal section forces to be transferred in the construction joint shall be verified in accordance with EN 1992-1-1:2004. When ascertaining the tensile force in the rebar, allowance shall be made for the statically effective height of the bonded-in reinforcement.

Tension anchor HZA-R or HZA-HCR according to Annex 6 shall be designed for the welded-on reinforcement steel B500B. The length of the bonded-in shaft made of stainless steel may not be accounted as anchorage.

The verification of the immediate local force transfer to the concrete has been provided.

The verification of the transfer of the loads to be anchored to the building component shall be provided.

The spacing between post-installed rebars respectively tension anchor HZA-R or HZA-HCR shall be greater than the minimum of 5 ds and 50 mm (see Annex 5and 7).

4.3.2 Determination of the basic anchorage length The required basic anchorage length lb,rqd shall be determined in accordance with EN 1992-1-1, Section 8.4.3:

lb,rqd = (ds / 4) (σsd / fbd)

with: ds = diameter of the rebar

σsd = calculated design stress of the rebar

fbd = design value of bond strength according to Annex 8, Table 5

in consideration of the coefficient related to the quality of bond conditions and of the coefficient related to the bar diameter and of the drilling technique

4.3.3 Determination of the design anchorage length The required design anchorage length lbd shall be determined in accordance with EN 1992-1-1, Section 8.4.4:

lbd = α 1·α 2·α 3·α 4·α 5 lb,rqd ≥ lb,min

with: lb,rqd = according to section 4.3.2

α 1 = 1.0 for straight bars

α 2 = 0.7…1.0 calculated acc. to EN 1992-1-1, Table 8.2

α 3 = 1.0 because of no transverse reinforcement

α 4 = 1.0 because of no welded transverse reinforcement

Z4937.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 42 of 89

Aug 2021

European technical approval ETA-12/0083 English translation prepared by DIBt

Page 8 of 31 | 6 February 2012

α 5 = 0.7…1.0 for influence of transverse pressure acc. to EN 1992-1-1, Table 8.2

lb,min = minimum anchorage length acc. to EN 1992-1-1

= max {0.3 lb,rqd; 10ds; 100 mm} under tension

= max {0.6 lb,rqd; 10ds; 100 mm} under compression

The maximum permissible anchorage depth is given in Annex 8 in relation to the dispenser to be used.

4.3.4 Overlap joints The required design lap length l0 shall be determined in accordance with EN 1992-1-1, Section 8.7.3:

l0 = α 1·α 2·α 3·α 5·α 6 lb,rqd ≥ l0,min

with: lb,rqd = according to Section 4.3.2

α 1 = 1.0 for straight bars

α 2 = 0.7…1.0 calculated acc. to EN 1992-1-1, Table 8.2

α 3 = 1.0 because of no transverse reinforcement

α 5 = 0.7…1.0 for influence of transverse pressure acc. to EN 1992-1-1, Table 8.2

α 6 = 1.0…1.5 for influence of percentage of lapped bars relative to the total cross-section area acc. to EN 1992-1-1, Table 8.3

l0,min = minimum lap length acc. to EN 1992-1-1

= max {0.3·α 6 lb,rqd; 15ds; 200 mm}

The maximum permissible anchorage depth is given in Annex 8 in relation to the dispenser and the bar diameter to be used.

4.3.5 Embedment depth for overlap joints Overlap joint for rebars:

For calculation of the effective embedment depth of overlap joints the concrete cover at end-face of bonded-in rebar c1 shall be considered (see Annex 5, Figure 10):

lv ≥ l0 + c1

with: l0 = required lap length acc. to Section 4.3.4 and to EN 1992-1-1

c1 = concrete cover at end-face of bonded-in rebar (see Annex 5)

If the clear distance between the overlapping rebars is greater than 4 ds the lap length shall be enlarged by the difference between the clear distance and 4 ds.

Overlap joint for tension anchor HZA-R or HZA-HCR:

The effective embedment depth is the same like the lap length lv = l0 (see Annex 7, Figure 12).

The total embedment depth le.ges shall be determined as follows (see Annex 7, Figure 12):

le.ges ≥ l0 + le

with: l0 = required lap length acc. to Section 4.3.4 and to EN 1992-1-1

le = length of the smooth shaft (le > c1 see also Annex 7),

If the clear distance between overlapping rods exceeds 4 ds, the overlap length shall be increased by the difference between the actual clear distance and 4 ds.

4.3.6 Concrete cover The concrete cover required for bonded-in rebars and tension anchor HZA-R or HZA-HCR is shown in Annex 8, Table 3, in relation to the drilling method and the hole tolerance.

Z4937.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 43 of 89

Aug 2021

European technical approval ETA-12/0083 English translation prepared by DIBt

Page 9 of 31 | 6 February 2012

Furthermore the minimum concrete cover given in EN 1992-1-1, Section 4.4.1.2 shall be observed.

4.3.7 Transverse reinforcement The requirements of transverse reinforcement in the area of the post-installed rebar connection

or of the tension anchor HZA-R or HZA-HCR connection shall comply with EN 1992-1-1, Section 8.7.4.

4.3.8 Connection joint The transfer of shear forces between new concrete and existing structure shall be designed

according to EN 1992-1-1. The joints for concreting must be roughened to at least such an extent that aggregate protrude.

In case of a carbonated surface of the existing concrete structure the carbonated layer shall be removed in the area of the post-installed rebar connection with a diameter of ds + 60 mm prior to the installation of the new rebar.

The depth of concrete to be removed shall correspond to at least the minimum concrete cover for the respective environmental conditions in accordance with EN 1992-1-1.

The foregoing may be neglected if building components are new and not carbonated and if building components are in dry conditions.

4.4 Installation The fitness for use of the post-installed rebar connection can only be assumed if the rebar

respectively the tension anchor HZA-R or HZA-HCR is installed as follows:

- the installation of post-installed rebar respectively tension anchor HZA-R or HZA-HCR shall be done only by suitable trained installer and under supervision on site; the conditions under which an installer may be considered as suitable trained and the conditions for supervision on site are up to the Member States in which the installation is done,

- use of the injection system only as supplied by the manufacturer without exchanging the components of the Injection system,

- installation in accordance with the manufacturer’s specifications and drawings using the tools indicated in the technical documentation of this European technical approval,

- checks before rebar installation to ensure that the strength class of the concrete in which the post-installed rebar connection is to be placed is in the range given and is not lower than that of the concrete to which the characteristic loads apply,

- check of concrete being well compacted, e.g. without significant voids,

- check the position of the existing rebars (if the position of existing rebars is not known, it shall be determined using a rebar detector suitable for this purpose as well as on the basis of the construction documentation and then marked on the building component for the overlap joint),

- keeping the anchorage depth as specified in the design drawings,

- keeping of concrete cover and spacing as specified in the design drawings,

- positioning of the drill holes without damaging the reinforcement,

- in case of aborted drill hole the drill hole shall be filled with mortar,

- the post-installed rebar connection must not be installed in flooded holes,

- the drilling and cleaning of the hole and the installation shall be performed only with the equipment specified by the manufacturer according to the manufacturer's installation instructions (see Annexes 9 to 17), it shall be ensured that this equipment is available on site and it is used,

- during curing of the injection mortar the temperature of the building component must not be less than -10 °C and no more than +40 °C; observing the curing time given in Annex 17.

Z4937.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 44 of 89

Aug 2021

European technical approval ETA-12/0083 English translation prepared by DIBt

Page 10 of 31 | 6 February 2012

5 Recommendations concerning packaging, transport and storage

5.1 Responsibility of the manufacturer It is in the responsibility of the manufacturer to ensure that the information on the specific

conditions according to sections 1 and 2 including Annexes referred to and section 4 is given to those who are concerned. This information may be made by reproduction of the respective parts of the European technical approval. In addition all installation data shall be shown clearly on the package and/or on an enclosed instruction sheet, preferably using illustration(s).

The minimum data required are:

- drill bit diameter,

- diameter of rebar,

- admissible service temperature range,

- curing time of the injection mortar,

- Installation instructions including cleaning of the drill hole,

- reference to any special installation equipment needed,

- identification of the manufacturing batch,

All data shall be presented in a clear and explicit form.

5.2 Packaging, transport and storage The mortar foil pack shall be protected against sun radiation and shall be stored according to

the manufacture's installation instructions in dry condition at temperatures of at least +5 °C to not more than +25 °C.

Mortar foil packs with expired shelf life must no longer be used.

Georg Feistel beglaubigt: Head of Department G. Lange

Z4937.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 45 of 89

Aug 2021

Page 11 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 46 of 89

Aug 2021

Page 12 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 47 of 89

Aug 2021

Page 13 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 48 of 89

Aug 2021

Page 14 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 49 of 89

Aug 2021

Page 15 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 50 of 89

Aug 2021

Page 16 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 51 of 89

Aug 2021

Page 17 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 52 of 89

Aug 2021

Page 18 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 53 of 89

Aug 2021

Page 19 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 54 of 89

Aug 2021

Page 20 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 55 of 89

Aug 2021

Page 21 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 56 of 89

Aug 2021

Page 22 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 57 of 89

Aug 2021

Page 23 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 58 of 89

Aug 2021

Page 24 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 59 of 89

Aug 2021

Page 25 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 60 of 89

Aug 2021

Page 26 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 61 of 89

Aug 2021

Page 27 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 62 of 89

Aug 2021

Page 28 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 63 of 89

Aug 2021

Page 29 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 64 of 89

Aug 2021

Page 30 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10 HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 65 of 89

Aug 2021

Page 31 of European technical approval ETA-12/0083 on 6 February 2012 English translation prepared by DIBt

Z9400.12 8.06.01-78/10

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 66 of 89

Aug 2021

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 67 of 89

Aug 2021

Attn. : To whom it may concern

Date : 17 June 2021 Ref. : 033/AC/BL/21

Subject : Country of Origin- Hilti HIT-HY 200-R Adhesive Anchor

Dear Sir / Madam,

Enclosed please find the information of Hilti HIT-HY 200-R Adhesive Anchor.

Brand Name : Hilti

Model Name : Hilti HIT-HY 200-R Adhesive Anchor

Manufacturer : Hilti Corporation

Address of Manufacturer : FL-9494, Principality of Liechtenstein.

Supplier : Hilti (Hong Kong) Ltd

Address of Supplier : 701-704, 7/F, Tower A, Manulife Financial Centre, 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong

Country of Origin : Germany

Should you have further questions, please do not hesitate to contact our Technical Representatives, Customer Service Hotline at 8228-8118, or email us at [email protected].

Yours faithfully,

Bill Lee Product Portfolio Manager Hilti (Hong Kong) Ltd.

Hilti (Hong Kong) Ltd.

701-704 | Tower A | Manulife Financial Centre223 Wai Yip Street | Kwun Tong

Kowloon | Hong Kong

P +852-8228 8118 I F +852-2954 1751

www.hilti.com.hk

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 68 of 89

Aug 2021

HIT-HY 200-RSafety information for 2-Component-productsDate of issue: 27/09/2018 Revision date: 27/09/2018 Supersedes: 08/12/2015 Version: 3.2

27/09/2018 EN (English) 1/19

SECTION 1: Kit identification

1.1 Product identifier

Product name HIT-HY 200-R

Product code BU Anchor

1.2 Details of the supplier of the Safety information for 2-Component-products

Hilti (Hong Kong) Ltd.701-704, 7/F, Tower A, Manulife Financial Centre223 Wai Yip Street, Kwun TongKowloon - Hong KongT +852 27734 [email protected]

SECTION 2: General information

Storage Storage temperature : 5 - 25 °C

A SDS for each of these components is included. Please do not separate any component SDS from this cover page

This Kit should be handled in accordance with good laboratory practices and appropriate personal protective equipment should be used

SECTION 3:

Classification of the Product

Classification according to the United Nations GHS (Rev. 4, 2011)

Eye Irrit. 2A H319Skin Sens. 1 H317Aquatic Acute 1 H400Aquatic Chronic 1 H410

Label elements

Labelling according to the United Nations GHS (Rev. 4, 2011)

Hazard pictograms (GHS-UN)

GHS07 GHS09

Signal word (GHS-UN) WarningHazardous ingredients methacrylates, dibenzoyl peroxideHazard statements (GHS-UN) H317 - May cause an allergic skin reaction.

H319 - Causes serious eye irritation.H410 - Very toxic to aquatic life with long lasting effects.

Precautionary statements (GHS-UN) P280 - Wear eye protection, protective clothing, protective gloves.P262 - Do not get in eyes, on skin, or on clothing.P305+P351+P338 - IF IN EYES: Rinse cautiously with water for several minutes. Removecontact lenses, if present and easy to do. Continue rinsing.P302+P352 - IF ON SKIN: Wash with plenty of water.

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 69 of 89

Aug 2021

HIT-HY 200-R

Safety information for 2-Component-products

27/09/2018 EN (English) 2/19

P337+P313 - If eye irritation persists: Get medical advice/attention. P333+P313 - If skin irritation or rash occurs: Get medical advice/attention.

Additional information

2-Component-foilpack, contains:Component A: Urethane methacrylate resin, inorganic fillerComponent B: Dibenzoyl peroxide, phlegmatized

Name General description Quantity Unit Classification according to the United Nations GHS

HIT-HY 200-R, A 1 pcs Skin Sens. 1, H317 HIT-HY 200-R, B 1 pcs Org. Perox. Not classified

Eye Irrit. 2A, H319 Skin Sens. 1, H317 Aquatic Acute 1, H400 Aquatic Chronic 1, H410

SECTION 4: General advice

General advice For professional users only

SECTION 5: Safe handling advice

General measures Spilled material may present a slipping hazard Environmental precautions Prevent entry to sewers and public waters

Notify authorities if liquid enters sewers or public waters Storage conditions Keep cool. Protect from sunlight. Precautions for safe handling Wear personal protective equipment

Avoid contact with skin and eyes Wash hands and other exposed areas with mild soap and water before eating, drinking or smoking and when leaving work Provide good ventilation in process area to prevent formation of vapour

Methods for cleaning up This material and its container must be disposed of in a safe way, and as per local legislation Mechanically recover the product Store away from other materials.

For containment Collect spillage. Incompatible materials Sources of ignition

Direct sunlight Incompatible products Strong bases

Strong acids

SECTION 6: First aid measures

First-aid measures after eye contact Rinse immediately with plenty of water Remove contact lenses, if present and easy to do. Continue rinsing. Obtain medical attention if pain, blinking or redness persists

First-aid measures after ingestion Rinse mouth Drink plenty of water Get medical advice/attention. Do not induce vomiting Obtain emergency medical attention

First-aid measures after inhalation Remove person to fresh air and keep comfortable for breathing. Assure fresh air breathing Allow the victim to rest

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 70 of 89

Aug 2021

HIT-HY 200-RSafety information for 2-Component-products

27/09/2018 EN (English) 3/19

First-aid measures after skin contact Wash contaminated clothing before reuse.Wash with plenty of water/…If skin irritation or rash occurs: Get medical advice/attention.

First-aid measures general Take off immediately all contaminated clothing.Never give anything by mouth to an unconscious personIf you feel unwell, seek medical advice (show the label where possible)

Symptoms/effects after eye contact May cause severe irritationSymptoms/effects after skin contact May cause an allergic skin reaction.Other medical advice or treatment Treat symptomatically

SECTION 7: Fire fighting measures

Firefighting instructions Use water spray or fog for cooling exposed containersExercise caution when fighting any chemical firePrevent fire fighting water from entering the environment

Protection during firefighting Self-contained breathing apparatusDo not enter fire area without proper protective equipment, including respiratory protection

Hazardous decomposition products in case offire

Thermal decomposition generates :Carbon dioxideCarbon monoxide

SECTION 8: Other information

No data available

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 71 of 89

Aug 2021

HIT-HY 200-R, B Safety Data Sheet

according to the United Nations GHS (Rev. 4, 2011) Date of issue: 27/09/2018 Revision date: 27/09/2018 Supersedes: 08/12/2015

Version: 3.2

27/09/2018 EN (English) 4/19

SECTION 1: Identification of the substance/mixture and of the company/undertaking

1.1. Product identifier

Product form Mixture Product name HIT-HY 200-R, B Product code BU Anchor

1.2. Relevant identified uses of the substance or mixture and uses advised against

Use of the substance/mixture Composite mortar component for fasteners in the construction industry

1.3. Details of the supplier of the safety data sheet

Supplier Hilti (Hong Kong) Ltd. 701-704, 7/F, Tower A, Manulife Financial Centre223 Wai Yip Street, Kwun TongKowloon - Hong KongT +852 27734 [email protected]

Department issuing data specification sheet Hilti Entwicklungsgesellschaft mbH Hiltistraße 6 86916 Kaufering - Deutschland T +49 8191 906310 - F +49 8191 90176310 [email protected]

1.4. Emergency telephone number

Emergency number Schweizerisches Toxikologisches Informationszentrum – 24h Service +41 44 251 51 51 (international)+852 27734 700

SECTION 2: Hazards identification

2.1. Classification of the substance or mixture

Classification according to the United Nations GHS (Rev. 4, 2011)

Org. Perox. Not classified Eye Irrit. 2A H319 Skin Sens. 1 H317 Aquatic Acute 1 H400 Aquatic Chronic 1 H410 Full text of H statements : see section 16

2.2. Label elements

Labelling according to the United Nations GHS (Rev. 4, 2011)

Hazard pictograms (GHS-UN)

GHS07 GHS09

Signal word (GHS-UN) Warning Hazardous ingredients dibenzoyl peroxide Hazard statements (GHS-UN) H317 - May cause an allergic skin reaction.

H319 - Causes serious eye irritation. H410 - Very toxic to aquatic life with long lasting effects.

Precautionary statements (GHS-UN) P280 - Wear eye protection, protective clothing, protective gloves. P262 - Do not get in eyes, on skin, or on clothing. P305+P351+P338 - IF IN EYES: Rinse cautiously with water for several minutes. Remove contact lenses, if present and easy to do. Continue rinsing. P333+P313 - If skin irritation or rash occurs: Get medical advice, medical attention. P337+P313 - If eye irritation persists: Get medical advice, medical attention.

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 72 of 89

Aug 2021

HIT-HY 200-R, B Safety Data Sheet

according to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 5/19

P302+P352 - IF ON SKIN: Wash with plenty of water.

2.3. Other hazards

No additional information available

SECTION 3: Composition/information on ingredients

3.1. Substances

Not applicable

3.2. Mixtures

Name Product identifier % Classification according to the United Nations GHS

Quartz (SiO2) (CAS-No.) 14808-60-7 40 - 60 Not classified

Water (CAS-No.) 7732-18-5 10 - 25 Not classified

Aluminium oxide (CAS-No.) 1344-28-1 10 - 25 Not classified

dibenzoyl peroxide (CAS-No.) 94-36-0 10 - 25 Organic Peroxides, Type B, H241 Serious eye damage/eye irritation, Category 2A, H319 Skin sensitisation, Category 1, H317 Hazardous to the aquatic environment — Acute Hazard, Category 1, H400 (M=10) Hazardous to the aquatic environment — Chronic Hazard, Category 1, H410 (M=10)

Full text of H-statements: see section 16

SECTION 4: First aid measures

4.1. Description of first aid measures

First-aid measures general Take off immediately all contaminated clothing. Never give anything by mouth to an unconscious person. If you feel unwell, seek medical advice (show the label where possible).

First-aid measures after inhalation Remove person to fresh air and keep comfortable for breathing. Assure fresh air breathing. Allow the victim to rest.

First-aid measures after skin contact Wash contaminated clothing before reuse. Wash with plenty of water/…. If skin irritation or rashoccurs: Get medical advice/attention.

First-aid measures after eye contact Rinse immediately with plenty of water. Remove contact lenses, if present and easy to do. Continue rinsing. Obtain medical attention if pain, blinking or redness persists.

First-aid measures after ingestion Rinse mouth. Drink plenty of water. Get medical advice/attention. Do not induce vomiting. Obtain emergency medical attention.

4.2. Most important symptoms and effects, both acute and delayed

Symptoms/effects after skin contact May cause an allergic skin reaction. Symptoms/effects after eye contact May cause severe irritation. Potential adverse human health effects and symptoms

Based on available data, the classification criteria are not met.

4.3. Indication of any immediate medical attention and special treatment needed

Treat symptomatically.

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 73 of 89

Aug 2021

HIT-HY 200-R, BSafety Data Sheetaccording to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 6/19

SECTION 5: Firefighting measures

5.1. Extinguishing media

Suitable extinguishing media Water spray. Carbon dioxide. Dry powder. Foam. Sand.Unsuitable extinguishing media Do not use a heavy water stream.

5.2. Special hazards arising from the substance or mixture

No additional information available

5.3. Advice for firefighters

Firefighting instructions Use water spray or fog for cooling exposed containers. Exercise caution when fighting anychemical fire. Prevent fire fighting water from entering the environment.

Protection during firefighting Self-contained breathing apparatus. Do not enter fire area without proper protective equipment,including respiratory protection.

SECTION 6: Accidental release measures

6.1. Personal precautions, protective equipment and emergency procedures

General measures Spilled material may present a slipping hazard.

6.1.1.For non-emergency personnel

Emergency procedures Evacuate unnecessary personnel.

6.1.2.For emergency responders

Protective equipment Use personal protective equipment as required. Equip cleanup crew with proper protection.Emergency procedures Ventilate area.

6.2. Environmental precautions

Prevent entry to sewers and public waters. Notify authorities if liquid enters sewers or public waters.

6.3. Methods and material for containment and cleaning up

For containment Collect spillage.Methods for cleaning up This material and its container must be disposed of in a safe way, and as per local legislation.

Mechanically recover the product. Store away from other materials.Other information Dispose of materials or solid residues at an authorized site.

SECTION 7: Handling and storage

7.1. Precautions for safe handling

Precautions for safe handling Wear personal protective equipment. Avoid contact with skin and eyes. Wash hands and otherexposed areas with mild soap and water before eating, drinking or smoking and when leavingwork. Provide good ventilation in process area to prevent formation of vapour.

Hygiene measures Do not eat, drink or smoke when using this product. Always wash hands after handling theproduct. Contaminated work clothing should not be allowed out of the workplace. Washcontaminated clothing before reuse.

7.2. Conditions for safe storage, including any incompatibilities

Storage conditions Keep cool. Protect from sunlight.Incompatible products Strong bases. Strong acids.Incompatible materials Sources of ignition. Direct sunlight.Storage temperature 5 - 25 °CHeat and ignition sources Keep away from heat and direct sunlight.

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 74 of 89

Aug 2021

HIT-HY 200-R, B Safety Data Sheet

according to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 7/19

SECTION 8: Exposure controls/personal protection

8.1. Control parameters

Additional information The product has a pasty consistency. Exposure limit values for respirable dusts are not relevant for this product.

8.2. Appropriate engineering controls

Environmental exposure controls Avoid release to the environment. Consumer exposure controls Avoid contact during pregnancy/while nursing. Other information Do not eat, drink or smoke during use.

8.3. Individual protection measures, such as personal protective equipment (PPE)

Hand protection Wear protective gloves. The permeation time is not the maximum wearing time! Generally speaking, it must be reduced. Contact with either mixtures of substances or different substances may shorten the protective function’s effective duration.

Type Material Permeation Thickness (mm) Penetration

Standard

Disposable gloves Nitrile rubber (NBR)

6 (> 480 minutes) 0,12 EN 374

Eye protection Wear security glasses which protect from splashes

Type Use Characteristics Standard

Safety glasses Droplet clear EN 166, EN 170

Skin and body protection

Wear suitable protective clothing

8.4. Exposure limit values for the other components

No additional information available

SECTION 9: Physical and chemical properties

9.1. Information on basic physical and chemical properties

Physical state Solid Appearance Thixotropic paste. Colour white. Odour characteristic. Odour threshold Not determined pH No data available Relative evaporation rate (butylacetate=1) No data available Melting point No data available Freezing point No data available

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 75 of 89

Aug 2021

HIT-HY 200-R, BSafety Data Sheetaccording to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 8/19

Boiling point No data availableFlash point No data availableAuto-ignition temperature Not self-ignitingDecomposition temperature No data availableFlammability (solid, gas) Non flammable.Vapour pressure No data availableRelative vapour density at 20 °C No data availableRelative density No data availableDensity 1.9 g/ml AW 4.3.23Solubility Water: Not miscibleLog Pow No data availableViscosity, kinematic No data availableViscosity, dynamic 40 Pa.s HN-0333Explosive properties Product is not explosive.Oxidising properties No data availableExplosive limits No data available

9.2. Other information

SADT 65 °C

SECTION 10: Stability and reactivity

10.1. Reactivity

No additional information available

10.2. Chemical stability

Stable under normal conditions.

10.3. Possibility of hazardous reactions

No additional information available.

10.4. Conditions to avoid

Direct sunlight. Extremely high or low temperatures.

10.5. Incompatible materials

Strong acids. Strong bases.

10.6. Hazardous decomposition products

fume. Carbon monoxide. Carbon dioxide. Under normal conditions of storage and use, hazardous decomposition products should not be produced.

SECTION 11: Toxicological information

11.1. Information on toxicological effects

Acute toxicity (oral) Not classifiedAcute toxicity (dermal) Not classifiedAcute toxicity (inhalation) Not classified

Skin corrosion/irritation Not classifiedSerious eye damage/irritation Causes serious eye irritation.

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 76 of 89

Aug 2021

HIT-HY 200-R, B Safety Data Sheet

according to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 9/19

Respiratory or skin sensitisation May cause an allergic skin reaction. Germ cell mutagenicity Not classified Carcinogenicity Not classified

Reproductive toxicity Not classified STOT-single exposure Not classified

STOT-repeated exposure Not classified

Aspiration hazard Not classified

HIT-HY 200-R, B

Viscosity, kinematic 21052.632 mm²/s

Potential adverse human health effects and symptoms

Based on available data, the classification criteria are not met.

SECTION 12: Ecological information

12.1. Toxicity

Acute aquatic toxicity Very toxic to aquatic life. Classification procedure (Acute aquatic toxicity) Calculation method Chronic aquatic toxicity Very toxic to aquatic life with long lasting effects. Classification procedure (Chronic aquatic toxicity)

Calculation method

dibenzoyl peroxide (94-36-0)

EC50 Daphnia 1 0.11 mg/l (OECD 202: Daphnia sp. Acute Immobilisation Test, 48 h, Daphnia magna, Static system, Fresh water, Experimental value)

LC50 fish 2 0.0602 mg/l (96h; Oncorhynchus mykiss; ECHA) NOEC (acute) 0.0316 mg/l (96h; Oncorhynchus mykiss; ECHA) NOEC chronic fish < 0.001

12.2. Persistence and degradability

HIT-HY 200-R, B

Persistence and degradability Not established. dibenzoyl peroxide (94-36-0)

Persistence and degradability Readily biodegradable in water. Not established. May cause long-term adverse effects in the environment.

12.3. Bioaccumulative potential

HIT-HY 200-R, B

Bioaccumulative potential Not established. dibenzoyl peroxide (94-36-0)

Log Pow 3.71 Bioaccumulative potential Low bioaccumulation potential (Log Kow < 4).

12.4. Mobility in soil

dibenzoyl peroxide (94-36-0)

Log Pow See section 12.1 on ecotoxicology3.71

Log Koc See section 12.1 on ecotoxicology3.8 (log Koc, OECD 121: Esti mati on of the Adsorption C oefficient (Koc) on Soil and on Sewag e Sludge usi ng High Perfor mance Liquid Chr omatography (HPLC), Experi mental val ue)

Ecology - soil Adsorbs into the soil.

12.5. Other adverse effects

Ozone Not classified Other adverse effects No additional information available Other information Avoid release to the environment.

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 77 of 89

Aug 2021

HIT-HY 200-R, BSafety Data Sheetaccording to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 10/19

SECTION 13: Disposal considerations

13.1. Waste treatment methods

Regional legislation (waste) Disposal must be done according to official regulations.Product/Packaging disposal recommendations After curing, the product can be disposed of with household waste. . Full or only partially

emptied cartridges must be disposed of as special waste in accordance with official regulations.Packaging contaminated by the product : Dispose in a safe manner in accordance withlocal/national regulations.

Ecology - waste materials Avoid release to the environment.

SECTION 14: Transport information

In accordance with ADR / RID / IMDG / IATA / ADN

ADR IMDG IATA RID

14.1. UN number Not regulated Not regulated Not regulated Not regulated

14.2. UN proper shipping name Not regulated Not regulated Not regulated Not regulated

14.3. Transport hazard class(es) Not regulated Not regulated Not regulated Not regulated

14.4. Packing group Not regulated Not regulated Not regulated Not regulated

14.5. Environmental hazards Not regulated Not regulated Not regulated Not regulated

Environmentally hazardous substances derogation applies (quantity of liquids ≤ 5 litres or net mass of solids ≤ 5 kg)

No supplementary information available

14.6. Special precautions for user

- Overland transport

Special provisions (ADR) 375

- Transport by sea

Special provisions (IMDG) IMDG-Code 2.10.2.7

- Air transport

Special provisions (IATA) A197

- Rail transport

Carriage prohibited (RID) No

14.7. Transport in bulk according to Annex II of MARPOL 73/78 and the IBC Code

SECTION 15: Regulatory information

15.1. Safety, health and environmental regulations/legislation specific for the substance or mixture

No additional information available

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 78 of 89

Aug 2021

HIT-HY 200-R, B Safety Data Sheet

according to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 11/19

SECTION 16: Other information

SDS Major/Minor None Date of issue 27/09/2018 Revision date 27/09/2018 Supersedes 08/12/2015

Indication of changes: Section Changed item Change Comments

2.1 Classification (GHS-UN) Added 2.2 Hazard statements (GHS-UN) Modified 3 Composition/information on

ingredients Added

Other information None.

Full text of H-statements: H241 Heating may cause a fire or explosion. H317 May cause an allergic skin reaction. H319 Causes serious eye irritation. H400 Very toxic to aquatic life. H410 Very toxic to aquatic life with long lasting effects.

SDS_UN_Hilti

This information is based on our current knowledge and is intended to describe the product for the purposes of health, safety and environmental requirements only. It should not therefore be construed as guaranteeing any specific property of the product

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 79 of 89

Aug 2021

HIT-HY 200-R, ASafety Data Sheetaccording to the United Nations GHS (Rev. 4, 2011)Date of issue: 27/09/2018 Revision date: 10/02/2017 Supersedes: 19/09/2016

Version: 3.3

27/09/2018 EN (English) 12/19

SECTION 1: Identification of the substance/mixture and of the company/undertaking

1.1. Product identifier

Product form MixtureProduct name HIT-HY 200-R, AProduct code BU Anchor

1.2. Relevant identified uses of the substance or mixture and uses advised against

Use of the substance/mixture Composite mortar component for fasteners in the construction industry

1.3. Details of the supplier of the safety data sheet

Supplier Hilti (Hong Kong) Ltd.701-704, 7/F, Tower A, Manulife Financial Centre223 Wai Yip Street, Kwun TongKowloon - Hong KongT +852 27734 [email protected]

Department issuing data specification sheet Hilti Entwicklungsgesellschaft mbHHiltistraße 686916 Kaufering - DeutschlandT +49 8191 906310 - F +49 8191 [email protected]

1.4. Emergency telephone number

Emergency number Schweizerisches Toxikologisches Informationszentrum – 24h Service+41 44 251 51 51 (international)+852 27734 700

SECTION 2: Hazards identification

2.1. Classification of the substance or mixture

Classification according to the United Nations GHS (Rev. 4, 2011)

Skin Sens. 1 H317Full text of H statements : see section 16

2.2. Label elements

Labelling according to the United Nations GHS (Rev. 4, 2011)

Hazard pictograms (GHS-UN)

GHS07

Signal word (GHS-UN) WarningHazardous ingredients 2-Propenoic acid, 2-methyl-, 1,4-butanediyl ester; 2-Propenoic acid, 2-methyl-, monoester with

1,2-propanediolHazard statements (GHS-UN) H317 - May cause an allergic skin reaction.Precautionary statements (GHS-UN) P280 - Wear eye protection, protective clothing, protective gloves.

P262 - Do not get in eyes, on skin, or on clothing.P305+P351+P338 - IF IN EYES: Rinse cautiously with water for several minutes. Removecontact lenses, if present and easy to do. Continue rinsing.P333+P313 - If skin irritation or rash occurs: Get medical advice, medical attention.P337+P313 - If eye irritation persists: Get medical advice, medical attention.P302+P352 - IF ON SKIN: Wash with plenty of water.

2.3. Other hazards

No additional information available

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 80 of 89

Aug 2021

HIT-HY 200-R, A Safety Data Sheet

according to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 13/19

SECTION 3: Composition/information on ingredients

3.1. Substances

Not applicable

3.2. Mixtures

Name Product identifier % Classification according to the United Nations GHS

Quartz (SiO2) (CAS-No.) 14808-60-7 40 - 60 Not classified

2-Propenoic acid, 2-methyl-, 1,4-butanediyl ester (CAS-No.) 2082-81-7 10 - 25 Acute toxicity (oral) Not classified Skin sensitisation, category 1B, H317 Hazardous to the aquatic environment — Acute Hazard, Category 3, H402

Cement, alumina (CAS-No.) 65997-16-2 10 - 25 Not classified

Aluminium oxide (CAS-No.) 1344-28-1 5 - 10 Not classified

2-Propenoic acid, 2-methyl-, monoester with 1,2-propanediol (CAS-No.) 27813-02-1 5 - 10 Flammable liquids Not classified Acute toxicity (oral) Not classified Serious eye damage/eye irritation, Category 2A, H319 Skin sensitisation, Category 1, H317 Hazardous to the aquatic environment - Acute Hazard Not classified

1,1'-(p-tolylimino)dipropan-2-ol (CAS-No.) 38668-48-3 0.1 - 1 Acute toxicity (oral), Category 2, H300 Serious eye damage/eye irritation, Category 2A, H319 Hazardous to the aquatic environment — Acute Hazard, Category 3, H402 Hazardous to the aquatic environment — Chronic Hazard, Category 3, H412

Full text of H-statements: see section 16

SECTION 4: First aid measures

4.1. Description of first aid measures

First-aid measures general Take off immediately all contaminated clothing. Never give anything by mouth to an unconscious person. If you feel unwell, seek medical advice (show the label where possible).

4.2. Most important symptoms and effects, both acute and delayed

Symptoms/effects after skin contact May cause an allergic skin reaction. Symptoms/effects after eye contact May cause severe irritation. Potential adverse human health effects and symptoms

Based on available data, the classification criteria are not met.

4.3. Indication of any immediate medical attention and special treatment needed

Treat symptomatically.

SECTION 5: Firefighting measures

5.1. Extinguishing media

Suitable extinguishing media Water spray. Carbon dioxide. Dry powder. Foam. Sand. Unsuitable extinguishing media Do not use a heavy water stream.

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 81 of 89

Aug 2021

HIT-HY 200-R, A Safety Data Sheet

according to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 14/19

5.2. Special hazards arising from the substance or mixture

No additional information available

5.3. Advice for firefighters

Firefighting instructions Use water spray or fog for cooling exposed containers. Exercise caution when fighting any chemical fire. Prevent fire fighting water from entering the environment.

Protection during firefighting Self-contained breathing apparatus. Do not enter fire area without proper protective equipment, including respiratory protection.

SECTION 6: Accidental release measures

6.1. Personal precautions, protective equipment and emergency procedures

General measures Spilled material may present a slipping hazard.

6.1.1.For non-emergency personnel

Emergency procedures Evacuate unnecessary personnel.

6.1.2.For emergency responders

Emergency procedures Ventilate area.

6.2. Environmental precautions

No additional information available

6.3. Methods and material for containment and cleaning up

No additional information available

SECTION 7: Handling and storage

7.1. Precautions for safe handling

No additional information available

7.2. Conditions for safe storage, including any incompatibilities

Incompatible products Strong bases. Strong acids. Incompatible materials Sources of ignition. Direct sunlight. Heat and ignition sources Keep away from heat and direct sunlight.

SECTION 8: Exposure controls/personal protection

8.1. Control parameters

Additional information The product has a pasty consistency. Exposure limit values for respirable dusts are not relevant for this product.

8.2. Appropriate engineering controls

No additional information available

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 82 of 89

Aug 2021

HIT-HY 200-R, ASafety Data Sheetaccording to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 15/19

8.3. Individual protection measures, such as personal protective equipment (PPE)

Hand protection Wear protective gloves. The permeation timeis not the maximum wearing time! Generallyspeaking, it must be reduced. Contact witheither mixtures of substances or differentsubstances may shorten the protectivefunction’s effective duration.

Type Material Permeation Thickness (mm) Penetration

Standard

Disposable gloves Nitrile rubber(NBR)

6 (> 480 minutes) 0,12 EN 374

Eye protection Wear security glasses which protect fromsplashes

Type Use Characteristics Standard

Safety glasses Droplet clear EN 166, EN 170

Skin and bodyprotection

Wear suitable protective clothing

8.4. Exposure limit values for the other components

No additional information available

SECTION 9: Physical and chemical properties

9.1. Information on basic physical and chemical properties

Physical state SolidAppearance Thixotropic paste.Colour Light grey.Odour characteristic.Odour threshold Not determinedpH No data availableRelative evaporation rate (butylacetate=1) No data availableMelting point No data availableFreezing point No data availableBoiling point No data availableFlash point > 109 °C DIN EN ISO 1523Auto-ignition temperature Not self-ignitingDecomposition temperature No data availableFlammability (solid, gas) Non flammable.Vapour pressure No data availableRelative vapour density at 20 °C No data availableRelative density No data availableDensity 1.8 g/ml AW 4.3.23Solubility Water: Not miscibleLog Pow No data availableViscosity, kinematic No data available

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 83 of 89

Aug 2021

HIT-HY 200-R, ASafety Data Sheetaccording to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 16/19

Viscosity, dynamic 50 Pa.s HN-0333Explosive properties Product is not explosive.Oxidising properties No data availableExplosive limits No data available

9.2. Other information

No additional information available

SECTION 10: Stability and reactivity

10.1. Reactivity

No additional information available

10.2. Chemical stability

No additional information available

10.3. Possibility of hazardous reactions

No additional information available

10.4. Conditions to avoid

No additional information available

10.5. Incompatible materials

Strong acids. Strong bases.

10.6. Hazardous decomposition products

No additional information available

SECTION 11: Toxicological information

11.1. Information on toxicological effects

Acute toxicity (oral) Not classifiedAcute toxicity (dermal) Not classifiedAcute toxicity (inhalation) Not classified

1,1'-(p-tolylimino)dipropan-2-ol (38668-48-3)

LD50 oral rat 25 mg/kgLD50 dermal rat > 2000 mg/kg2-Propenoic acid, 2-methyl-, 1,4-butanediyl ester (2082-81-7)

LD50 oral rat 10066 mg/kgLD50 dermal rat > 3000 mg/kg2-Propenoic acid, 2-methyl-, monoester with 1,2-propanediol (27813-02-1)

LD50 oral rat > 5000 mg/kg (Rat; OECD 401: Acute Oral Toxicity; Literature study; >=2000 mg/kg bodyweight;Rat; Experimental value)

LD50 dermal rabbit >= 5000 mg/kg bodyweight (Rabbit; Experimental value)Skin corrosion/irritation Not classifiedSerious eye damage/irritation Not classifiedRespiratory or skin sensitisation May cause an allergic skin reaction.Germ cell mutagenicity Not classifiedCarcinogenicity Not classifiedReproductive toxicity Not classified

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 84 of 89

Aug 2021

HIT-HY 200-R, ASafety Data Sheetaccording to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 17/19

STOT-single exposure Not classifiedSTOT-repeated exposure Not classifiedAspiration hazard Not classifiedHIT-HY 200-R, A

Viscosity, kinematic 27777.778 mm²/s

Potential adverse human health effects andsymptoms

Based on available data, the classification criteria are not met.

SECTION 12: Ecological information

12.1. Toxicity

Acute aquatic toxicity Not classifiedChronic aquatic toxicity Not classified

1,1'-(p-tolylimino)dipropan-2-ol (38668-48-3)

LC50 fish 1 ≈ 17 mg/lLC50 other aquatic organisms 1 245 mg/lEC50 Daphnia 1 28.8 mg/lNOEC (acute) 57.8 mg/l2-Propenoic acid, 2-methyl-, 1,4-butanediyl ester (2082-81-7)

LC50 fish 1 32.5 mg/lLC50 other aquatic organisms 1 9.79 mg/lNOEC (acute) 7.51 mg/lNOEC (chronic) 20 mg/l2-Propenoic acid, 2-methyl-, monoester with 1,2-propanediol (27813-02-1)

LC50 fish 1 493 mg/l (48 h; Leuciscus idus; GLP)EC50 Daphnia 1 > 143 mg/l (48 h; Daphnia magna; GLP)Threshold limit algae 1 > 97.2 mg/l (72 h; Pseudokirchneriella subcapitata; GLP)Threshold limit algae 2 > 97.2 mg/l (72 h; Pseudokirchneriella subcapitata; GLP)

12.2. Persistence and degradability

HIT-HY 200-R, A

Persistence and degradability Not established.2-Propenoic acid, 2-methyl-, 1,4-butanediyl ester (2082-81-7)

Biodegradation 84 %2-Propenoic acid, 2-methyl-, monoester with 1,2-propanediol (27813-02-1)

Persistence and degradability Readily biodegradable in water.

12.3. Bioaccumulative potential

HIT-HY 200-R, A

Bioaccumulative potential Not established.1,1'-(p-tolylimino)dipropan-2-ol (38668-48-3)

BCF fish 1 ≈

Log Kow 2.12-Propenoic acid, 2-methyl-, 1,4-butanediyl ester (2082-81-7)

Log Pow 3.12-Propenoic acid, 2-methyl-, monoester with 1,2-propanediol (27813-02-1)

BCF fish 1 <= 100BCF fish 2 3.2 Quantitative structure-activity relationship (QSAR)Log Pow 0.97 (OECD 102 method)Bioaccumulative potential Low bioaccumulation potential (BCF < 500).

12.4. Mobility in soil

1,1'-(p-tolylimino)dipropan-2-ol (38668-48-3)

Log Kow See section 12.1 on ecotoxicology2.1

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 85 of 89

Aug 2021

HIT-HY 200-R, ASafety Data Sheetaccording to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 18/19

2-Propenoic acid, 2-methyl-, 1,4-butanediyl ester (2082-81-7)

Log Pow See section 12.1 on ecotoxicology3.1

2-Propenoic acid, 2-methyl-, monoester with 1,2-propanediol (27813-02-1)

Log Pow See section 12.1 on ecotoxicology0.97 (OECD 102 method)

Ecology - soil Low potential for adsorption in soil.

12.5. Other adverse effects

Ozone Not classifiedOther adverse effects No additional information availableOther information Avoid release to the environment.

SECTION 13: Disposal considerations

13.1. Waste treatment methods

Regional legislation (waste) Disposal must be done according to official regulations.Product/Packaging disposal recommendations After curing, the product can be disposed of with household waste. . Full or only partially

emptied cartridges must be disposed of as special waste in accordance with official regulations.Packaging contaminated by the product : Dispose in a safe manner in accordance withlocal/national regulations.

Ecology - waste materials Avoid release to the environment.

SECTION 14: Transport information

In accordance with ADR / RID / IMDG / IATA / ADN

ADR IMDG IATA RID

14.1. UN number Not regulated Not regulated Not regulated Not regulated

14.2. UN proper shipping name Not regulated Not regulated Not regulated Not regulated

14.3. Transport hazard class(es) Not regulated Not regulated Not regulated Not regulated

14.4. Packing group Not regulated Not regulated Not regulated Not regulated

14.5. Environmental hazards Not regulated Not regulated Not regulated Not regulated

No supplementary information available

14.6. Special precautions for user

- Overland transport

- Transport by sea

No data available

- Air transport

No data available

- Rail transport

Carriage prohibited (RID) No

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 86 of 89

Aug 2021

HIT-HY 200-R, ASafety Data Sheetaccording to the United Nations GHS (Rev. 4, 2011)

27/09/2018 EN (English) 19/19

14.7. Transport in bulk according to Annex II of MARPOL 73/78 and the IBC Code

SECTION 15: Regulatory information

15.1. Safety, health and environmental regulations/legislation specific for the substance or mixture

No additional information available

SECTION 16: Other information

SDS Major/Minor NoneDate of issue 27/09/2018Revision date 10/02/2017Supersedes 19/09/2016

Indication of changes:Section Changed item Change Comments

1.2 Recommended use Added

Other information None.

Full text of H-statements:H300 Fatal if swallowed.H317 May cause an allergic skin reaction.H319 Causes serious eye irritation.H402 Harmful to aquatic lifeH412 Harmful to aquatic life with long lasting effects.

SDS_UN_Hilti

This information is based on our current knowledge and is intended to describe the product for the purposes of health, safety and environmental requirements only. It should not therefore be construed as guaranteeing any specific property of the product

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 87 of 89

Aug 2021

Hilti HIT-HY 200 Injectable Mortar Job ReferenceYear Project Name Contractor Project type

2019 TMCLK TUNNEL DRAGAGES-BOUYGUES J.V. 10) Tunnel/Ven Build

2019 SCL 1123 EXHIBITION STATION LEIGHTON - CHINA STATE JOINT 11) Railway

2019 TKO LOHAS PARK PH7 (SITE C1) CHINA STATE CONSTRUCTION 04) Residential

2019 YIN PING RD, TAI WO PING (6542) KIN WING FOUNDATIONS LIMITED 04) Residential

2019 139-147 ARGYLE ST GAMMON ENGINEERING & CONSTRUCTION 04) Residential

2019 TKO LOHAS PARK PH9 (SITE J) GAMMON ENGINEERING & CONSTRUCTION 04) Residential

2019 SHEUNG SHING ST HO MAN TIN(11257) GAMMON ENGINEERING & CONSTRUCTION 04) Residential

2019 OCEAN PARK WATER PARK GAMMON ENGINEERING & CONSTRUCTION 03) Commercial

2019 HKIA P583 T1 ANNEX BLDG & CP4 EXT LEIGHTON CONTRACTORS (ASIA) LTD 08) Civil Building

2019 TAI WAI STATION NW RES WAH SING CONSTRUCTION ENG. LIMITED 04) Residential

2020 SCL 1123 EXHIBITION STATION LEIGHTON - CHINA STATE JOINT 11) Railway

2020 8 MUK TAI ST, KAI TAK 1L3 (6562) HIP HING CONSTRUCTION CO LTD 04) Residential

2020 YIN PING RD, TAI WO PING (6542) KIN WING FOUNDATIONS LIMITED 04) Residential

2020 7 MUK TAI ST, KAI TAK 1K3 (6565) PAUL Y. BUILDERS LIMITED 04) Residential

2020 139-147 ARGYLE ST GAMMON ENGINEERING & CONSTRUCTION 04) Residential

2020 KAI TAK AREA 1L2 (6563) GAMMON ENGINEERING & CONSTRUCTION 04) Residential

2020 TKO LOHAS PARK PH9 (SITE J) GAMMON ENGINEERING & CONSTRUCTION 04) Residential

2020 YUEN LONG STATION YLTL 510 SANFIELD (MANAGEMENT) LIMITED 04) Residential

2020 TAI WAI STATION NW RES NEW WORLD CONSTRUCTION CO LTD 04) Residential

2020 OCEAN PARK WATER PARK GAMMON ENGINEERING & CONSTRUCTION 03) Commercial

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 88 of 89

Aug 2021

Hilti HIT-HY 200 Injectable Mortar Job ReferenceYear Project Name Contractor Project type

2021 139-147 ARGYLE ST GAMMON ENGINEERING & CONSTRUCTION 04) Residential

2021 WEST KOWLOON - LYRIC THEATRE GAMMON CONSTRUCTION LIMITED 07) ASD (excl. Hospital)

2021 KAI TAK AREA 1F SITE 2, NKIL 6556 HIP HING CONSTRUCTION CO LTD 03) Commercial

2021 CHUN YAT ST & CHUN CHEONG ST AMC GAMMON CONSTRUCTION LIMITED 03) Commercial

2021 YUEN LONG STATION YLTL 510 SANFIELD (MANAGEMENT) LIMITED 04) Residential

2021 TAIKOO PLACE PH 2B HIP HING CONSTRUCTION CO LTD 03) Commercial

2021 R6 CTL KLN ROUTE-CENTRAL TUNNEL HY/2018/08 BOUYGUES TRAVAUX PUBLICS 10) Tunnel/Ven Build

2021 KAI TAK SPORTS PARK HIP HING ENGINEERING CO LTD 07) ASD (excl. Hospital)

2021 KAI TAK AREA 1L1 (6564) GAMMON ENGINEERING & CONSTRUCTION 04) Residential

2021 TAI WAI STATION NW RES NEW WORLD CONSTRUCTION CO LTD 04) Residential

HIT-HY 200 Injectable Mortar (Post Installed Rebar)

Page 89 of 89

Aug 2021


Recommended