KAERI/TR - 2117/2002
Design and Manufacturing of Non-Instrumented Capsule
for Advanced PWR Fuel Pellet Irradiation Test in HANARO
2002. 4.
DISCLAIMER
Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.
SUMMARY
This project is preparing to irradiation test of the developed large grain UO?
fuel pellet in HANARO for pursuit fuel safety and high bum-up in "Advanced LWR
Fuel Technology Development Project" as a part Nuclear Mid and Long-term R&D
Program. On the basis test rod is performed the nuclei property and preliminary
fuel performance analysis, test rod and non-instrumented capsule are designed and
manufactured for irradiation test in HANARO. This non-instrumented irradiation
capsule of Advanced PWR Fuel pellet was referred the non-instrumented capsule for
an irradiation test of simulated DUPIC fuel in HANARO(DUP1C Rig-001) and
18-element HANARO fuel, was designed to ensure the integrity and the endurance of
non-instrumented capsule during the long term(2.5 years) irradiation. To irradiate the
UOZ pellets up to the burn-up 70 MWD/kgU, need the time about 60 months and
ensure the integrity of non-instrumented capsule for 30 months until replace the new
capsule. This non-instrumented irradiation capsule was designed to remotely assemble
and disassemble in hot cell. This non-instrumented capsule made to satisfy with the
design drawing and the QA condition in precision manufacturing company.
This report describes the manufacturing of the non-instrumented irradiation
capsule for the developed large grain UO2 fuel pellet. And, this report will be based
to develope the non-instrumented capsule for the more long term irradiation in
HANARO.
.. 9 e-. ..................................................................................................................... I I
... SUMMARY .......................................................................................................... 111
ii 9-2) ................................................................................................................. vii I L 1
I ~ + X \ ............................................................................................................. vii
XI] 1 %L A] E ................................................................................................... 1
xj] 2 %L 74 9 7 ~ "1 ..................................................................................... 7) . 9 ) G : q 92gL ..............................................................................................
"11 3 %k 9.1 41 yd yz<.,55 ...................................................................... 4 . q~fl 7 ) 9 9 . Z$L ..........................................................................................
3.1 a+L+- 4%. &?j~{] &+A)%+ yqIg7Je gj7;11 ........................... 3.2 7) 4) 74 +! 41 ........................................................................................
71 . S)L+L 4 9 S%$Jx+] 7174) 7Jz ..................................................... 4 . a<=L$- +&]&2~]) ? Z A ~ A ] % - ~ - ?4]xp, 391 7]4]3 7JE ................ q- . a<=g-g- ?.Jq&gA]] &+qg-g- +A]xJ7J$q %I+ o,Fg.'d ................. z) . 7 8 8 G]+jA]% 411x3 ..............................................................
3.3 q g j s a+qg-g- ?;q]Qq$q ................................................. 7) . ALT4 7 x-l A]
L+ . "J.&)ex.xd A]] ...........................................................................................
c+ . S)iFFJ",F "d qj-2.1 ...................................................................................... E) . A1 fdg "d 341 ........................................................................................
1) .", g- 9 8)g-q-+-;.",l .........................................................................
3) .A ]@+ ++uJ-7~ ............................................................................... 4) +gx) s+* ...................................................................................
D\ . &:E% .................................................................................... 1) . A J q k Z . 3 .......................................................................................
.................................................................................. 0 L A O
2) .i%J--+;;",l X] X] ...................................................................................
7
9
9
10
10
11
13
13
13
14
14
15
15
15
. iv .
2) s\g &z. 3 ....................................................................................... 3) "41 ";1 &E+ ...................................................................................
4) A ] % % + S A = + 18
xj] 4 %L p.. $ x]]x,F ................................................................................. 19
4.1 %$jZ.+ dg&%z]] ZA\A]%-$+ ? ~ J ~ X J ~ J + xj]z) 19
7) . ?J*A)%J .................................................................................................. 19
Lf . +95-71* .................................................................................................. 19
17
17
...........................................................................
...........................
-7
4 . $3 H > g .................................................................................................. 23
1) qs% -$$xd H ! q ............................................................................... 23
2) EB -$+3 .............................................................................................. 23
3) Tig $3 .............................................................................................. 24
24 Z) . Anodize 31 i?] .......................................................................................... u\ . 74 A\ ......................................................................................................
1) 3 ] f % A \ 2 e]EiGA\ ..................................................................... 2) $% 7;d A\ ............................................................................................. 3) +pgG A) .............................................................................................
tj\ . ";A] gq qj 3 ....................................................................... A\ . q g x ] ] %k A{(EMR) 2 XI] ;?rlF(AS-built)% 5 ..................................
4.2 +PI]xJ3J$q ke1~1qj 44 ................................................................. 7\ . "&qfJs\ q-g+J% ................................................................................ Lf . 4% +g$% ........................................................................................ lq- . L#=+g $3 ............................................................................................
4.3 +74]xJ3J+q 3% 9 ................................................................... 7 ) . A ] g + G * X ] l 3% ................................................................................ Lf . 77415L7Jg 3% .................................................................................... q . 3% q. ............................................................................................
. E% A] q-$A)SJ .................................................................................... D) . $ + 3 f l E % A ] T q A \ % b ..........................................................................
. z g 2 p %A\BJqj .................................................................................... A\ . 01 A p q y j A] 24 E] A\qjb ...........................................................................
4.4 +PI ]XJyJ$q k 4 7 ] 9 4 A \ ...................................................................
24
24
24
25
25
25
31
31
31
32
32
32
34
35
35
36
36
37
37
................................................................................................. 41 5 %L 3 E 38
- v -
39 XbF 3 g q ..................................................................................................................
9 % ................................................. 1 . ,g%d&%24] z+qq+ +41?p$+ €$ 41
2. 7 1 s ~ l H J A j 86 ........................................................................................................ ........................................................................................................ 3. ?UHA]HJAj 99
4. Z]$XI] $LxiLAj(~iviR) fsrL+z+ .................................................................. 80
- vi -
29 3.1 . SgS!?] $!-%%q 12 q2aA! .............................................. 3% 3.2 . *$kq-T7$j%j] 755 .............................................................. 1% 3.3 . ~ $ k ~ ~ ~ 2 { ] ( T o p Elid Plate) t z r ................................................ 1 % 3.4 . Sl-eXg k{](Boottom End Plate) +&€ ......................................... 1. 3.5 . f%)q*q 3 sLZ]](Bottom Guide Assembly) qi'gx ....................... 3% 3.6 . . ,e 2 i%BT@Jpper Lower Housing) -5 ................... 3% 3.7 . . 2 81.e %e~)7)l(Upper and bwr End plug) -5 ................. 2% 3-8 J?7j]%k?J$C qq 551% 4 9 ........................................................... 3% 4.1 . 7)68f.jZ!3 9% .......................................................... 2% 4-2 . ~ ~ ] + ) - ? ~ ~ Q =%+ 217 .................................................................. 1% 4-3 . zg .2 A ] % % a%%]] ...................................................................... 3% 4-4 . 3% a4-q +7l ]XJYJ$ .................................................................. 1% 4-5 . yA]zJ?J$ k9-1 ?$x;!7]2A]g+ Handling Tool .......................
8
1 1
12
12
13
14
14
16
19
33
34
36
37
. vii .
Tip & Central Rod 1 Zry-4 Ti201 : 943.27 mm Bottom Guide Assembly 1 ZW-4
Bottom Guide Spring Inconel X-750 4 3 : 02.3 mm Collar STS 304 (Sb3? Tig gz) Bushing zw-4
1 STS 304 1 AL 6061 : 58.3 mm
- 5 -
No.
7
- 6 -
tll 2- (7. B 81 d ) 2% Y Z 3 +3 a s
SI3 : 56 mm, %MI : 2.5mm, 301: 722 AL 6061 Outer Tube 1
4. s)e?!-4/ 3 341 (Bottom Guide Assembly)
q. A1 3 .% 3 941 (Bottom Guide Assembly)
1) 9 iS)+-;$(Upper and Lower Housing)
- 13 -
(1) central rod (2) bottom guide assembly
(3) bottom guide spring (4) bushing (5) collar
2% 4-1. 7)2@33 e a ] % k y J e +%
- 19 -
(6) Outer tube
(7) Support tube
top guide, grapple head lock, grapple head, clamping nut & washer
(9) dummy fuel rod elements, housng supports, housing nut & washer
3% 4-1. 7[%-8)5_% ?31x iy8% +-%(7Il%)
- 20 -
(10) fuel rod cot ding block
~
( 1 1 ) lower housing
~
(13) top end plate & cover
( 1 2) upper housing
(14) bottom end plate & cover
(15) top guide spring assembly (1 6) hafnium tube
3% 4-1. 713qS.q +741%+”$? ?%(AI*)
- 21 -
Bottom guide assembly
- - Central rod and tip /I-- -
Hafnium tube EB
Top guide spring assembly
Collar -
TIG
TIG -
2) EB 8%
- 23 -
Bottom Guide (#02)
Bottom Guide A m .
(#02)
Bottom Guind Spring(#O3)
Bottom End Plate (#06)
Bottom End Plate Cover
W 7 )
- 26 -
10
_.
1 1
3 01 a 3
3$!!31hl q ;g F 1YI
12
-
13
-
14
HI 72 Jlexl 98xl(As-built) 2 2 167.724 167.72 2: g $50.6 50.6 qg
0,90,180,270 YES qg $50.6 50.6 qg
qs - 15 15
15
16 -
17
- Lower Support
Tube (#09)
Lower Housing ($10)
Upper Housing
( # I 1)
Housing Support Rod
(# 12)
Coaling Block
(#m
TOP End plate
(#22)
- Top End Plate
Cover (#23)
- 27 -
Top Guide Spring Assembly
a3 u s
Grapple Head 19 Lock
(#26)
@50.6f0.01 50.59 +E (046 f 0.0 1 46 qQ
Middle Support Tube (#32)
22
Hafnium Tube (#33A)
Hafnium Tube (#33B)
45.94 45.94 1
1 Sal I 0.3f0.02 I 0.305 I qg I 50.01
049.4f0.0 1 49.40
0.6f0.02 a3 050.6f0.01 50.60
u 3 049.4f0.01 49.40
- 28 -
3. 4-3 Bottom Guide & Central Rod+!-41 Z!€ ~liil.3.
.? 3 XI(As-built)
0.5mm/lOOOmm 0.5
@8.0*0.0 1 8.05
qs! 2 .6.8
qgj! 3 6.6
-- --
i
1
qg
* Q i .q Q 1
Bottom Guide
Bottom Guide Arm 1
-
Bottom Guide Arm 2
-
Bottom Guide Arm 3
-
- 29 -
t . e MI Y 01 It 52 XI 5t 5 It? 31 P X I
.I. Bottom Guide Arm a Lower End P la tes9 E GO1 Fully Contactlt !dk7t?
G 2 XI(As-built)
4. Top Guide Spring Assembly31 X t 8 S H I 4 P E t k 7 t ?
4. zg qq pJaga2
1. Bottom Guide A m 9 T i p 3 Lower Endlate "dSS34 H U
Guide Arm No.
# 1
I. Guide Tube011 Uti3 Gauge Test 223
Contact (I?
Yes
1. LockingRJnlocking Test Z 3
#3
1. Spring back Performance : auto bound-back( 3qAI B)
Yes
9 7 9.2 7 m m 979.1
#2 Yes
Yes
2.5 - 3.5mm 1 3.2
azo19 Yes
Test 223
Rebounding Test
- 30 -
- bottom guide spring+ bushing, bottom end plate 9 bottom end plate covers 2141ll central rod ?E%d%311 ~'134. 014 central rod AJ+ll 3, 71% BJski$ % X ] E ] ~ O ~ @E+.
- out t u b e s central rod 2E%%ol] 71l4.
- top end plate4 top end plate cove r s 35%*+ centra] rod
- 34 -
- top guide3 318q.
- top guide spring assembly3 top end plate AJeoll n l 3 q .
- grapple head41 grapple head clamping nut spring washer91 clamping n u t s z%@+. 014 clamping nutoj] %& g o ) set screwst E% q5.e e?! 34.
- 35 -
16. AigiiL, "iL'$&€ 4% UO? &g%]]q E A ) A ] g % q@ o;l]H] %"A", HAN-RR-CR-900-00-082, KAERI, 2000. 1 1.
17. ;Idq* 91 ",g%&g%I] 2 A ) A l q j - g - +74]7&$@q &zg+q.YiL A i ",KAERI/TR- 1930/0 1, 200 1. IO.
18. D.H.Kim, et. "Design of Spring in Non-instrumented Capsule for the HANARO
Irradiation Test of Advanced UOz Fuel", 2001 +741$X)qq3], 2001. 10.
19. O ] + q 4, S)Lfl E ~ ) A ] g q $ S A 1 2 , KAERI/CM-044/95, Qq$xkq $IF&, 1996.
20. J.S.Ryu, "Vibration Test and Endurance Test for HANARO 18-Element Fuel
Assembly", KAERI/TR-I 3 1 1 /99, 1999.
21. a$L-$$ 4sJ&%%I] k 9 1 A 1 g - g - F A ] % y J + X l ] ~ J i ! - Z ~ ~ ( E M R ) " , FA-KA-0103
01, 2001. 5 .
22. 4$L-g- ,gq&%*]] kq E A ) A ] q j - g - +4]2p$$ xq g q%I]? jZpj@' ,
APFCAP-AP-02-01 , Rev.0, 2002. 2.
- 40 -
KOREA ATOMIC ENERGY RESEARCH INSTITUTE
2- ~ 4 - 4 9 $ Q 5 3 7 f l ~ l J 2 @-$$
OlF-05K-01 FUEL TEST a$ %!A15
Irradiation Capsule Development & Utilization
Title : (4f$M441 3Yp]g$- +A]%g+)
Ai%! : ( w 9xt : 2001. 1 1 . 19.
0. HAN-IC(CA)-DW-O1F-05K-01-000A 1. HAN-IC(CA)-DW-01 F-05K-01-001 2. HAN-IC(CA>DW-O1F-O5K-O1-002 3. HAN-IC(CA>D W-0 1 F-05K-0 1-003 4. HAN-IC(CA)-DW-0 1 F-OSK-Ol-OW 5. H AN-IC( C A)-D W-0 1 F-05K-0 1 -005 6. HAN-IC(CA)-DW-01 F-05K-01-006 7. HAN-IC(CA)-DW-Ol F-05K-01-007 8. HAN-IC(CA)-DW-OlF-05K-O1-008 9. HAN-IC(CA)-DW-01 F-05K-01-009
10. HAN-IC(CA>D W-0 1 F-O5K-0 1-0 I O A / B 11. HAN-IC(CA)-DW-OlF-05K-O1-01 lA/B 12. HAN-IC(CA)-DW-OlF-O5K-01-012 13. HAN-IC(CA)-DW-OIF-05K-01-013 14. HAN-IC(CA)-D W-0 1 F-05K-0 1-0 14 15. HAN-IC(CA)-DW-OlF-05K-O1-015 16. ~AN-iC(CA)-IjW-O!F-C5K-01-016 17. HAN-IC(CA)-DW-OlF-05K-O1-017 18. HAN-IC(CA)-DW-0 1 F-05K-01-0 18 19. HAN-IC(CA)-DW-0 1F-05K-01-019 20. HAN-IC(CA>DW-OlF-O5K-Ol-O20A/B 2 1. HAN-IC(CA)-D W-0 1 F-05K-0 1-02 1
22. HAN-IC(CA)-DW-01 F-O5K-01-022 23. HAN-IC(CA>DW-01 F-05K-01-023 24. HAN-IC(CA>DW-OlF-OSK-O1-024 25. HAN-IC(CA>D W-0 1 F-O5K-0 1-025 26. HAN-IC(CA)-DW-OlF-05K-Ol-O26 27. HAN-lC(CA)-DW-01 F-05K-01-027 28. HAN-IC(CA>DW-O 1 F-05K-01-028 29. HAN-IC(CA)-DW-01 F-05K-01-029 30. HAN-IC(CA)-DW-OlF-05K-O1-030 31. HAN-IC(CA)-DW-O1F-05K-01-03 1
32. HAN-IC(CA>DW-OlF-O5K-01-032 33. HXN-IC(CA>DW-0 1F-05K-01-033 34. HAN-IC(CA)-DW-OlF-O5K-01-034 35. HAN-IC(CA)-DW-01 F-O5K-01-035 36. HAN-IC(CA)-DW-0 1 F-05K-01-036 37. HAN-IC(CA>DW-01 F-05K-01-037
: Capsule Assembly : Rod Tip & Central Rod : Bottom Guide Assembly : Bottom Guide Spring : Collar : Bushing : Bottom End Plate : Bottom End Plate Cover : Outer Tube : Lower Support Tube : Lower Housing : Upper Housing : Housing Support Rod : Housing Nut : Fuel Rod Tube : Fuel Rod Bottom End Cap : Fcel Rod Top End Cap : Fuel Rod Plenum Spring : Fuel Pellet : Fuel Pellet Spacer : Fuel Rod Cooling Block : Upper Support Tube : Top End Plate : Top End Plate Cover : Top Guide : Top Guide Spring Assembly : Grapple Head Lock : Grapple Head : Grapple Head Clamping Nut : Grapple Head Clamping Washer : Fuel Rod Hold-down Spring : Housing Nut Spring Washer : Middle Support Tube : Hafnium Tube : Guide Tube : Housing Support Rod Handling Tool : Housing Nut Handling Tool : Grapple Head Clamping Nut Handling Tool
- 43 -
0'
90' 270'
SECTION 'A-A' SECTION 'D-D' SECTION 'C-C' -- SECTION 'E-E'
01 F-05K-01 FUEL TEST CAPSULE
- -
SECTION 'E-E'
BOTTOM
OXIDIZE: INSIDE SURFACE ONLY
NOTE
1 . MATERIAL : ZIRCALOY-4 ASTM B351-85 GR R60804 OX I D I ZE BORE TO KAER I /CM-044/95
KOREA ATOMIC ENERGY RESEARCH INSTITUTE
TECHNICAL SPECIFIC AT1 ON
Document No. : APFCAP-TS-01-01
Rev. No. : 0
Date : 2001. 11. 8
Sign at u re Organization Date - Name -
Approved by :
APFCAP.TS.01.01, R e v . 0
1 . 0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
-+4-
%%% $q ...............................................................................................
+$-gzGazj .........................................................................................
41 S A a .........................................................................................
...............................................................................................
+ A 1 9 6 ...............................................................................................
41 4 ....................................................................................................
L 0 ) 4 3 9 Xj3.i. ................................................................................ 8
* - q % A ] % ........................................................................................ 9
3 9 1 : + ? 7 s l ~ ? j list ................................................................................. 10
APFCAP-TS-01-01, Rev. 0
1.1.2 Oxidation
Bottom Guide4 Bushing4 49 q q q l 4814 6.29s Oxidation+
+?!! OFq.
1.1.3 Anodizing
Anodizing3 $33 q%SS O \ d H S ) - @d; 1) Support Tube(Lower, Middle, Upper)
2) Out Tube
3) Top & Bottom End Plate Cover
4) Fuel Rod Cooling Block
APFCAP-TS-01-01, Rev. 0
2) +g-3=;3g qgiq- 24. - Coolant flow rate
0OPOH $3 : 12.4 kg/s
- Outlet pressure : 209 kPa
- inlet temperature : 35 "C
- Outlet temperature : 45 'c
- 5 -
APFCAP-TS-01-01, Rev. 0
1) HAN-K(CA>DW-0lF-O5K-0l-CKll :
2) HAN-lC(CA>DW-OlF-OlK-0l-W2 3) HAN-IC(CA>DW-0lF-0lK-01403 : 4) HAN-IC(CA>DW-OlF-OlK-OlW :
5) HAN-IC(CA>DW-01F-OlK-01-005 : 6) HAN-IC(CA>DW-0lF-OlK-01~ : 7) HAN-IC(CA>DW-01F-01K-01-007 8) HAN-IC(CA>DW-OlF-OlK-Ql-W8 :
9) HAN-IC(CA>DW-0lF-0lK-Ol-W : 10) HAN-IC(CA>DW-O1F-01K-01-010A%B : 11) HAN-IC(CA>DW-01F-01K-O1-01lA&B :
12) HAN-IC(CA)-DW-OlF-O 1 K-01-012 :
13) HAN-IC(CA>DW-01 F-0 1K-0 1-013 14) HAN-IC(CA)-DW-01 F-0 1 K-0 1-0 14 1 5) HAN-IC(CA>DW-OIF-Ol K-01-015 : 16) HAN-IC(CA>DW-OlF-OlK-01-016 17) HAN-IC(CA>DW-OI F-01 K-01-0 17 18) HAN-IC(CA>DW-01F-01K-01-018 :
19) HAN-Ic(cA)-DW-OI F-01 K-01-019 20) HAN-IC(CA>DW-0lF-OlK~l~O~ :
2 1) HAN-IC(CA)-DW-Ol F-0 1 K-01-021 :
22) HAN-IC(CA>DW-0lF-0lK-Ol-(m :
23) HAN-IC(CA>DW-01F-OlK-01-023 :
24) HAN-IC(CA>DW-OlF-OlK-01-024 :
25) HAN-IC(CA)-DW-OlF-OlK-O 1-025
26) HAN-IC(CA>DW-0IF-0lK-01426 :
27) HAN-IC(CA>DW-OlF-OlK-01-027 28) HAN-IC(CA>DW-OlF-OlK-01-028 :
29) HAN-IC(CA>DW-0lF-OlK-Ol-CQ9 :
30) HAN-IC(CA>DW-OlF-01K-01-030 :
31) HAN-IC(CA)DW-OlF-01K-01-031 :
32) HAN-IC(CA>DW-OIF-01K-01-032 :
33) HAN-IC(CA)DW-OlF-Ol K-Ol-O33A&B :
Rod ‘Iip and Central Rod Details Bottom Guide Assembly Details Bottom Guide Spring Details Collar Details Bushing Details Boffom End Plate Details Bottom End Plate Cover Details Out Tube Details Lower Support Tube Details Lower Housing Details Upper Housing Details Housing Support Rod Details Housing Nut Detail Fuel Rod Tube Detail Fuel Rod End Cap Bottom Details Fuel Rod End Cap Top Details Fuel Rod Pienum Spring Details Fuel Pellet(Mock-up) Details Fuel Pellet Spacer Details Fuel Rod Cooling Block Details Upper Support Tube Details Top End Plate Details Top End Plate Cover Details Top Guide Details Top Guide Spring Assembly Details Grapple Head Lock Details Grapple Head Details Grapple Head Clamping Nut Details w e I-kad awng sping W& Details Fuel Rod Holddown Spring Details Housing Nut SWg Washer -1s
Middle Support Tube Details Hafiium Tube Details
34) HAN-IC(CA>DW-OlF-OIK-01-034 35) HAN-IC(CA>DW-OlF-0lK-01-035 36) HAN-IC(CA>DW-OlF-OlK-01-036 37) HAN-IC(CA>DW-01F-01K-Ol-037 3s) HAN-IC(CA>DW-01F-01K-OT-O1-015-1 : Fuel Rod Assembly(M0ckup) Details
: Guide Tube Details : Housing Support Rod Handling Tool : Housing Nut Handling Tool : Grapple Head Clamping Nut Handling Tool
- 10 -
? OH AI ",' (PURCHASING SPECIFICATION)
BM 3 B(Docu.No.) : IHZ!CdS(Rev. No.) : 2 A(Date) : \dvanced PWR Fuel APFCAP-PS-0 1-01 '01. 11. 8.
Capsule
Document No. :: APFCAP-PS-01-01 Rev. : 0 Date : '01. 11. 8
Name Organization Date - Signature
S A E! %(Docu.No.) : KAERl APFCAP-PS-01-01
1) Rod tip & Central Rod 2) Bottom Guide Assembly 3) Bottom Guide Spring 4) Collar 5) Bushing 6 ) Lower End Plate 7) Lower End Plate Cover 8) Out Tube 9) Lower Support Tube
10- 1) Lower Housing 10- 2) Upper Housing 10- 3) Housing Support Rod 10- 4) Housing Nut 10- 5 ) Housing Nut Spring Washer 10- 6 ) Fuel Rod Tube 10- 7) Fuel Rod End Cap Bottom 10- 8) Fuel Rod End Cap Top 10- 9) Fuel Rod Plenum Spring 10- 0) Fuel Pellet(Mock-up) 10-1 1) Fuel Pellet Spacer 10-12) Fuel Rod Cooling Block 10-13) Fuel Rod Holddown Spring 10-14) Hafnium Tube 10- 15) Fuel Rod(Mock-up)
11) Upper Support Tube 12) Top End Plate 13) Top End Plate Cover 14) Top Guide 15) Top Guide Spring Assembly 16) Grapple Head Lock 17) Grapple Head 18) Grapple Head Clamping Nut 19) Grapple Head Clamping Spring Washer 20) Middle Support Tube 21) Guide Tube 22) Housing Support Rod Handling Tool 23) Housing Nut Handling Tool 2-1) Grapple Head Clamping Nut Handling Tool
IO) Test Fuel Rod -4ssernbly
II 0 I XI (Page) JHXdP!Z(Rev. No.) : 1l Z(Date) : 0 '01. 11. 8.
Advanced pWR Fuel Capsule 81 %(Subject) : B+ZS &!2&3Xil keuI ZAtAlEE
?24l2 2 W U I 3 II1~7DHAI!3A
EM E! B(Docu.No.) : KAERI APFCAP-PS-01-0 1 0
lHZ3!?!B(Rev. No.) :
1.1.2 Oxidation
Bottom G u i d e 4 Bushingq dl 5l-+q 41 KAERI/CM-O44/9Sq 4 3\41 Gi5l-q ”?- Ad 4%\A- l4 ’ l @E) Oxidation% q*J 34.
I211 0 I XI (Page) L2‘ Amate) : ‘01. 11. 8.
1.1.3 Anodizing
Anodizing%- +%%& O l - q q 24 1 ) Support Tubepower, Middle, Upper)
2) Out Tube
3) Top & :Bottom End Plate Cover
4) Fuel Rod Cooling Block
KAERI Advanced pWR
Fuel Capsule
3 OH AI A1 (PURCHASING SPECIFICATION)
rttl 01 Xl(Page) SM3!(Docu.No.) : lHXdP!S(Rev. No.) : M Xt(Date) :
AI %(Subject) : 39S=8 &!S&ZIT.il kU ZAIAIBS APFCAP-PS-0 1 -0 1 0 ‘01. 11. 8.
? A I 3 2!S 52 @U2 7s XlI~?UHAI!ZtH
SAl P! S(I)ocu.No.) : lHZ!P!!(Rev. No.) : KAERI APFCA P-PS-0 1-0 1 0
6.1. Zircaloy-4
MI 01 XI (Page) 9 Xt(Date) : '01. 11. 8.
Tin Iron Chromium Total Fe+C:r Oxygen
q q z ) (94 pprn)
Alum i nu m E3oron Cadmium Carbon Cobalt Copper Hafnium Hydrogen Magnesium Manganese Molybdenum Nickel Nitrogen Silicon Tungsten Ilranium
1.20 - 1.70 0.18 - 0.24 0.07 - 0.13 0.28 - 0.37 0.09 - 0.16
75 0.5 0.5 270 20 50 100 25 20 50 50 70 80 120 100 3.5
KAERI A d v a ~ ~ ~ d P W R
Fuel Capsule
6.2.1 q-$-fF;? 1) Plate : ASTM B209-88, 6061-T6 or equivalent 2) Tube : ASTM B210-88, 6061-T6 or equivalent 3) Bar : ASTM B211-88, 6061-T6 or equivalent
9 OH AI M (PURCHASING SPECIFICATION)
HI 0 I XI (Page) ZMYS(Docu.No.) : lHS!E!ZZ(Rev. No.) : k! A@ate) :
UI %(Subject) : 3+ZS fi$i!&QWI kLH ZAtAI2 iS ? A I 2 ZJG 52 P!U3 F S UI~E,'3DHAI%JdM
APFCAP-PS-0 1-01 0 '01. 11. 8.
6.2.2 @%LE+/ (34 wt%) Silicon Iron Copper Manganese Magnesium Chromium Zinc Titanium 7)Et%*, qql
%HI Aluminum
?! $703. 42.0 ksi
0.40 - 0.8
0.15 - 0.40
0.8 - 1.2 0.04 - 0.35
0.7
0.15
0.25 0.15 0.05 0.15 +I 4
f$87&€ 348 35.0 ksi 10 Yo
04 Q7\%+ d7J715-P
k4-q
6.3 Inconel
59-85 kdm' 24-64 k g h d 50-30 %
73-106 k g h d 56-88 kgmd 30-10 %
56-7 I kghd 21-36 kdd 55-35 %
6.3.1 3$-+7? : AMs 5665
6.3.2 wt%) Ni(+Co) Cr Fe C Mn S Si c u
72.0 01~2 14.0 - 17.0 6.00 - 10.00 0.15 o]z \
0.015 o]s\ 0.50 01%\ 0.50 01%)
1.00 018\
~~P!!!(Docu.No.) : KAERI APFCAP-PS-0 1-0 1
6.4 316L Sta.inless Steel
nll0 I XI (Page) '01. 11. 8.
IHSYE(Rev. No.) : 0
3 A(Date) :
I 6.4.1 34j-34 : ASTM SA312-TP316L and A276-TP316L
6.4.2 q$!EAJ (eq wt%) C: Mn P S Si N i C: r h b
6.4.3 7) 4) +)d (min)
0.035 013)
0.040 o]S\ 0.030 01%)
0.075 01%)
10.0-15.0 16.0-18.0 2.0-3.0
2.0 01%)
r ? O O ksi 1 25.0 ksi I 35 Yo I 6.5 Hafnium
6.5.1 q+?fq : ASTM B737 R1
95.0 01AJ-
0.028 - 0.031 0.24-0.30 253ppm - 325ppm 19ppm - 25ppm 1 Oppm 01 81 lOppm 01%) 5ppm 01 4-
Zkl P! Z(Docu.No.) : APFCAP-PS-0 1-0 1
7.4. Zircaloy-4 7)$- A]
Ell 0 I XI (Page) IHXdP!E(Rev. No.) : 0
KAERI Advanced PWR
Fuel Capsule
SM % B(Docu.No.) : 3H xd !2! Z(Rev. No.) : APFCAP-PS-O 1-0 1 0
WI 0 I XI (Page) U Xt@ate) : '01. 11. 8.
+ % Y I
Bottom guide assembly
Central rod and tip
Hahiurn tube
-Hd %?I
EB
EB
EB
Top guide spring assembly
Collor
TIG
TIG
KAERl Advanced PWR
Fuel Capsule
? OH AI 3 (PURCHASING SPECIFICATION)
Ell 0 I XI (Page) E M E! B(Docu.No.) : IHZ!P!!d(Rev. No.) : 2 U(Date) : APFCAP-PS-01-0 1 0 ‘01. 1 1 . 8.
9 a i AI s AI (PURCHASING SPECIFICATION)
Ell 0 I Xi (Page) EM 3 Z(Docu.No.) : 7H 3 P! E(Rev. No.) : !z! Xt(Date) : KAERl APFCAP-PS-0 1-0 1 0 '01. 11. 8.
k b n c e d PWR AI %(Subject) : 33Z8 g%&SXil l rLH ZAtAlaS Fuel Capsule
'I'itlc : Q u a l i t y Assurance Requirements for Nuclear
Safe ty- re la ted Items and Services(Qua1i ty Class Q and TI
I'repared by :
Reviewed by :
Approved by :
HAN ARC) Utilization & Iksearch Center Korea Atomic Energy Research InsCituCe
Quality Assurance Requirements for HAN-RS-DD-SP-%-003 Rev.0, 1 /13 Nuclear Safety-related Items and Services
TABLE OF CONTENTS
Quality Assurance Requirements for HAN-RS-DD-SP-99-003 Rev.0, 2 /13 Nuclear Safety-related Items and Services
Q u a l i t y Assurance Requirements for Nuclear Saf ety-related Items and Services (Qua l i ty Class Q and T)
1 . 0 PURPOSE
T h i s spec i f ica t ion es tab l i shes minimum q u a l i t y assurance requirements which s h a l l be met by suppl ie rs of nuclear safety-related items and s e r v i c e s t h a t a r e c l a s s i f i e d a s Q u a l i t y Class "Q" or"T" by Safety Analysis Report. I t d e f i n e s QA Program c r i t e r i a , qual i ty planning requirements, and g e n e r a l adminis t ra t ive requirements, applicable t o t h e performance of: t h e c o n t r a c t f o r the safety-related items.
2 .0 APPLICABILITY
2 . 1 T h i s s p e c i f i c a t i o n s h a l l apply when required by t h e purchase order (PO), product s p e c i f i c a t i o n or other procurement documents issued by KAERI. I n t h e even t of a c o n f l i c t between the PO, prcjduct s p e c i f i c a t i o n and t h e requirements defiried herein, t h e order of p r i o r i t y s h a l l be the PO, p r o d u c t s p e c i f i c a t i o n , product documents and this spec i f ica t ion .
2.2 The impleinentaion by suppl ier of Quality Assurance Program i n compliance with the Korean Atomic Law(MOST order No.90-3), USNRC 10 CFR !50 Appendix B, ANSI/ASME: NQA-1, or KEPIC QAP each as concerned, is considered as meeting t h e requirements of t h i s Specification.
3.0 Q u a l i t y Assurance Program C r i t e r i a
3.1 A Q u a l i t y assurance program includes a s a minimum the procedures r e q u i r e d for meeting t h e requirements specif ied i n the following t a b l e inasmuch a s t h e y are app l i cab le by the suppl ier . The applicable QA requirements should be de f ined i n t h e procurement documents under consideration of work scope t o be contracted.
Quality Assurance Requirements for HAN-RS-DD-SP-99-003 Rev.0, 3 /13 Nuclear Safety-related Items and Services
I -__ -. - -.
' Appl i cab l i ty , i : Q-cl+- fzcX&- C r i t e r i a ?-
3.2 The Suppl ie r ' s QA program sha l l apply t o a l l qua l i ty - re la ted a c t i v i t i e s ( e . g.,
design, purchasing, manufacturing, handling, inspecting, storing, packaging, shipping, documenting, etc.) and s h a l l comply with t h e c r i t e r i a below as app l i cab le t o the type of item or service t o be provided.
3 .2 .1 C r i t e r i a f o r I tems\Services(Excluding Material) Under ASME B8PV Code Sec t ion III Rules or KEPIC MN requirements(e.g., pumps, valves , vessels , tanks, component supports, piping systems, parts, appurtenances, e t c . 1
3 . 2 . 1 . 1 The Supplier s h a l l have a QA program complying with the requirements of Ar t i c l e NCA-4000 of the ASME BLPV Code Section III. cur ren t e d i t i o n , or MNA-4000 of KEPIC.
3.2.1.2 The supplier shall have a Cert i f icate of Authorization i ssued by ASME o r
KEA(Korea E l e c t r i c Association). The C e r t i f i c a t e of Authorizat ion s h a l l
include the scope of work t o b e performed for KAERI.
Quality Assurance Requirements for HAN-RS-DD-SP-99-003 Rev.0, 4 /13 Nuclear Safety-related Items and Services
--
3 . 2 . 2 C r i t e r i a fo r Mat.erials Under ASME BIPV Code Sect ion 111 Rules o r KEPIC requirements(e. g . , forgings, plate, bar, cas t ings , tubing, f i t t ings, bo l t ing , welding and brazing materials, etc. 1
3 . 2 . 2 . 1 The supplier(Materia1 Manufacturer or Material Suppl ier) shall have a QA
program complying with t h e requirements of NCA-3800 of t h e ASME S e c t i o n 111, curren t ed i t i on o r MNA-3800 of KEPIC. For small mater ia l products , t h e
exceptions to f u l l QA program requirements given i n Code Paragraphs NX-26101 or MNX-2610 may be used wi th procurement document issued by KAERI.
3.2.2.2 The Suppl ier s h a l l have a Qua l i ty Systems Certif icate(QSC1 issued by ASME
o r KEA ver i fy ing the adequacy of the Supplier 's q u a l i t y system program or ident i f ; ica t ion and ve r i f i ca t ion program, a s appl icable . The Supplier's QSC s h a l l include the scope of work t o be performed for KAERI. As a n a l t e r n a t i v e t o having a QSC issued by ASME or KEA, the Supplier s h a l l be surveyed. qua l i f i ed and audi ted by KRERI.
3.2.3 C r i t e r i a fo r Noxi-Code Items(e. g . , 1E instrumentation and controls. nuclear f u e l , nonpressure retaining mechanical equipment, etc. 1
3 . 2 . 3 . 1 The Supplier shall comply with the QA requirements or para. 3.1 of t h i s spec i f i ca t ion .
3 .2 .4 C r i t e r i a f o r se rv ices(e . g. , design, NDE, computer software, machining, c a l i b r a t i o n , etc:. 1
3.2.4.1 The Suppl ier s h a l l comply with the requirements of para. 3 . 0 of t h i s spec i f i ca t ions .
3.2.4.2 The following port ions of para. 3.1 of t h i s specification g e n e r a l l y apply t o the t yp ica l services noted.
DesigWComputer Software - 1, 2, 3, 6, 11, 15, 16, 17 and 18
NDE - 1, 2, 5, 6, 9, 15, 16 and 17
Testing/Equipment Qual i f ica t ion Services - 1, 2, 5, 6, 10, 11, 12, 14, 15,
Quality Assurance Requirements for HAN-RS-DD-SP-99-003 Rev.0, 5 /13 Nuclear Safety-related Items and Services
16, and 17
Machining Services - 1, 2, 5, 6, 8 10, 12, 13, 14, 15, 16 and 17
Fabrication Services Including Welding - 1, 2, 4 t h r u 18
3.2.5 C r i t e r i a f o r commercial grade Items.
3.2.5.1 Commercial Grade Item - An item satisfying (a), (b), and (c) below: (a ) not subject t o design or specification requirements tha t are unique t o
nuclear f a c i l i t i e s ; (b) used i n applications o ther than nuclear f a c i l i t i e s ; (c) is to be ordered from the manufacturer/supplier on the basis of
specif icat ions set forth i n the manufacturer's published product description(for example; catalog).
3.2.5.2 Where the design u t i l i z e s commercial grade items, the fol lowing requirements, as an acceptable alternative, can be u t i l i z e d for preparing t h e procurement documents. ( a ) The item t o be purchased should be ident i f ied i n the approved design
output document or drawings. Rn a l te rna te commercial grade i t e m may be accepted, provided the KAERI design organization provides ver i f icat ion t h a t the alternate item w i l l perform the in tended function and w i l l meet design requirements.
(b) Source evaluation and selection, where determined t o be necessary by t h e KAERI based on complexity and importance to safety, shall be carr ied out i n accordance with the KAERI's QA Procedures,
(c) Commercial grade items s h a l l be ident i f ied i n t h e purchase o r d e r or specif icat ion by the Manufacturer' s published product descr ipt ion ( f o r example. catalog number 1.
(d) One o r a combination of the following methods s h a l l be u t i l i z e d to provide reasonable assurance that the item meets the acceptance c r i t e r i a specified i n t h e procurement documents. (1) special t e s t ( s ) or inspection(s) o r both; (2) commercial grade survey of the Supplier; ( 3 ) srxrce ver i f icat ion; (4 1 acceptable Supplier/item Performance records.
(e) Prior t o acceptance of a commercial grade item, the KAERI s h a l l
Quality Assurance Requirements for HAN-RS-DD-SP-99-003 Rev.0, 6 /13 Nuclear Safety-re'lated Items and Services
ver i fy that,; (1:) No dama,ge was sustained during shipment,
(2.) the item has s a t i s f i e d the specified acceptance c r i t e r i a , (3:) specified documentation, a s applicable t o t h e item, was received
and acceptable.
4.0 QUALITY ASSURANCE REQUIREMENTS
4 . 1 General
4.1.1 Throughout the period of execution of the contract, t h e suppl ier s h a l l have i n e f f e c t a QA program which meets the requirements of t h i s s p e c i f i c a t i o n .
4.1.2 The Suppl.ier's QA, program s h a l l be planned, documented and executed through w r i t t e n pol ic ies , procedures and/or instructions a s re levant and a p p r o p r i a t e to t h e work to be perforaed.
4.1.3
5.0
5.1
5.1.1
5 . 2
5.2.1
The Suppl ier ' s QA program documentation and implementation thereof a r e s u b j e c t to review and ver i f ica t ion by KAERI prior to and d u r i n g the
execution of the work.
QUALI'iT INSPECTIiON REQUIREMENTS
INITIAL QUALITY INSPECTION PLANNING
The suppl ier , during t h e e a r l i e s t pract ical phase of contract performance, s h a l l c:onduct ia complete review of t h e requirements i n the PO and any related documents to understand and make timely provision f o r the s p e c i a l cont ro ls , processes, test equipments, f ixtures , tooling and skills required f o r assuring item o r service quali ty.
INSPECTION AND TEST PLAN( ITP)
When required by the PO, t h e Supplier s h a l l prepare an appropr ia te ITP s u i t a b l e for each item. The ITP is a summary of manufacturing opera t ions ,
inspect ions, tests, hold points, and witness points t o be performed during
Quality Assurance Requirements for HAN-KS-DD-SP-Y9-W3 Rev.0, 7 /13 Nuclear Safety-related Itenis and Services
t h e manufacturing of the items. The Exhibit 1 is a suggested format of t h e ITP.
5.2.2 Contents of the ITP
ITP s h a l l include, a s a minimum, the following:
Designation and ident i f icat ion of the major s t ructures , p a r t s , subassemblies o r systems of the equipment t o be supplied.
Procurement of p a r t s covered by a specification.
Receiving inspection of procured material.
Manufacturing, inspection, testing and special process o p e r a t i o n s performed on these par t s during and a f t e r fabr icat ion.
Manufacturing. inspection, testing and special process o p e r a t i o n s performed on subassemblies composed of these p a r t s , i f any.
Inspection or test operations performed during s i te e r e c t i o n ( i f applicable). Tests, inspections and examinations performed on sys tems assembled i n manufacturing f a c i l i t i e s .
Packaging operations.
Review of manufacturing quali ty records.
ITP s h a l l be submitted t o KAERI QA for review and approval and incorporation of qual i ty surveillance points selected by KAERI. Submi t ta l s h a l l be made a s required by the contract but a t least three (3) weeks pr ior t o re lease for fabrication. KAERI approval or 'conditional approval i s required pr ior t o the Supplier beginning fabricat ion unless release f o r
selected a c t i v i t i e s is provided.
Notif icat ion regarding quality surveillance points s h a l l be a s fol lows.
Quality Assllrance Requirements for HAN-RS-UD-SP-99-003 Rev.0, 8 113 Nuclear Safety-related Itenis and Services
1. Witness Point - KAERI QA s h a l l be noti f ied a t l e a s t two working days pr ior t o t h e performance of the t e s t , inspection, or process. Hork
s h a l l not be delayed i f t h e KAERI QA representative has not arrived a t
the appointed time. Supplier is required t o show evidence of no ti f ica t ion.
2. Hold. Point -- KAERI QA s h a l l be notified a t l e a s t three working days pr ior t o the anticipated point. The operation s h a l l not be performed u n t i l the KAERI representative i s present unless KAERI waives t h e hold point i n writing.
5.3 Revision to an ITP s h a l l be submitted t o KAERI QA for acceptance prior to incorporation of the revision.
6.0 ADMINISTRATIVE REQUIREMENTS
6.1 KAERI FIJRNISHED MATERIAL
Material furnished by KAERI shall be reviewed i n advance by t h e Supplier
upon r e c e i p t for proper quantity, conditions and qua l i ty requirements. The Supplier s h a l l not i fy KAERI immediately of any discrepancies noted. I t is t h e Suppl ier ' s responsibi l i ty to preserve the condition of KAERI f u r n i s h e d mater ia l through adequate storage and handling a f t e r i t has been r e c e i v e d and t o maintain traceability to documentation furnished with the material,
a s required.
6.2 TECHNICAL CHANGE REQUEST
The Supplier may request changes t o contract technical requirements using
a "Technical Change Request"(TCR1 form provided by the Supplier. The TCR s h a l l be completed and submitted to t h e KAekI with adequate backgrcund information f o r evaluation. If a change is approved ag a permanent change
or a l te red design, the Supplier is required t o ref leet the chahge i n the applicable drawings or other affected technical dkuments t h a t a r e t h e
responsibi l i ty of Supplier.
Quality Assurance Requirements for HAN-RS-LID-SP-93-003 Rev.0, 9 /13 Nuclear Safety-related Items and Services
6 . 3 NONCONFORMAXCES(PRI0R TO DELIVERY 1
The Supplier s h a l l submit t o KAERI for review and concurrence a l l nonconf ormances t o Contract/W requirements. Nonconformance Report s h a l l be submitted using a form provided by the supplier.
The Supplier i s required t o submit adequate information for eva lua t ion and, when applicable, a recommended correct ive ac t ion and the b a s i s for t h a t recommendation. A l l such documentation s h a l l be forwarded t o KAERI. The Supplier shal l not ship an item u n t i l t he Nonconformance Report h a s been disposit ioned and accepted by KAERI.
6.4 CORRECTIVE ACTION REQUEST
When a deficiency is discovered during the implementation of t h e Supp l i e r ' s w a l i t y program, or other def ic iencies which may degrade t h e product qua l i t y , a "Corrective Action Report" may be issued by KAERI to i d e n t i f y and document the problem.
6.5 RIGHT OF ACCESS
During the performance of the contract, KAERI shall, w i t h proper n o t i f i c a t i o n , have the r igh t t o inspect, evaluate and audi t the Supplier's facil i t ies and a c t i v i t i e s and those of any sub-tier s u p p l i e r s . QA
inspections, surveil lances or audits performed by KAERI shall i n no way r e l i eve the Supplier of any of its responsibi l i t ies under the PO.
6.6 SUB-TIER SUPPLIER
The Supplier s h a l l e i t he r maintain documentation for the eva lua t ion and acceptance of sub-tier suppl ier ' s QA program or use KAERI approved supp l i e r s only. When sub-tier suppliers a r e used, a l l applicable t e c h n i c a l and qua l i ty requirements imposed on the PO must be transmitted t o the sub-tier suppliers.
Quality Assurance Requirements for HAN- HS -DD-SP-99-003 Rev.0, 10/13 Nuclear Safety-related Items and Serviccs
6.7 QA RECORDS RETENTION
6.7.1 The Supplier s h a l l produce and retain the records i n a manner which i s consis tent w i t t i applicable codes, standards, specif icat ions and PO requirements. These records shal l be maintained in an a p p r o p r i a t e environmental conditions to prevent loss through deterioration, p i l f e r a g e , or mishandling.
6.7.2 QA records tha t a r e required t o be shipped with the i t e n w i l l be i d e n t i f i e d i n the PO. QA records tha t a re not required t o be shipped by t h e S u p p l i e r but are specif ied by the PO or specifications, s h a l l be retained by t h e Supplier f o r periods t h a t are consistent with the Supplier QA record re ten t ion program. QA records shall not be destroyed prior to t h e r e q u i r e d re ten t ion period without writ ten approval from KAERI.
6.8 DOCUMENT SUBMI TTPLS
When required by the Po, the Supplier s h a l l submit docurnents f o r KAERI's approval or infornation using a form provided by t h e Supplier.
6.9 CERTIFICATION OF ITEM/SERVICE The Supplier s h a l l a t t e s t t o having supplied itemlservice to KAERI i n compliance with a l l applicable requirements by issuance of a C e r t i f i c a t e of Conformance t h a t includes the following:
The c e r t i f i c a t e sha l l identify the purchased service, m a t e r i a l o r equipment, such as by t h e KAERI W number.
The c e r t i f i c a t e s h a l l ident i fy the spec i f ic procurement reqwirements m e t by the purchased itemhervice such a s codes, standards, and o t h e r specif icat ions. T h i s may be accomplished by including a list of t h e spec i f ic requirements including procurement s p e c i f i c a t i o n s and
drawings. The procurement requirements ident i f ied s h a l l i n c l u d e any approved changes, waivers, or deviations applicable to t h e s u b j e c t i temkervice.
The c e r t i f i c a t e shall ident i fy the QA Manual including r e v i s i o n and
da te or the ASME c e r t i f i c a t e number and expiration da te used t o
Quality Assurance Requirements for HAN-RS-IID-SP-%-03 Rev.0, 1 L43 Nuclear Safety-related Items and Services
furnish t h e i temhervice. a s applicable.
(4 ) The c e r t i f i c a t e s h a l l be signed or otherwise authenticated by a person
who is responsible for the quali ty assurance function and whose
function and posit ion are described i n t h e Supplier 's q u a l i t y assurance program.
This c e r t i f i c a t e s h a l l be completed prior t o KAERI's re lease for shipment of the item or acceptance of the service.
Quality Assurance Kequirements for HAN-HS-DD-SP-99-003 Rev.0, 12/13 Nuclear Safety-related Itenis and Services
-- --
Exhibit 1
UPPLIER: INSPECTION AND TEST PLAN
I ITP m.: __
I m m.: iPM OF
Rev. 00 - Initial Issue Rev. 01 - Revised to include witness and hold points
Quality Assurance Requirements for HAN-RS-DD-SP-%-W Rev.0, 13/13 Nuclear Safety-related Items and Services
Exhibit 1 (Continued)
WPLIER :
'INE ' OPERATION DECRIPIION 1 REF. WC. NO. NO. j ! __ -I--
- I I Procurement of materid j o r p a r t s
i Receiving inspection of I material or parts
1 Fabricate or assemhle 1 3 : material or parts i n to ,
! ' subassemblies
i I
I subassemblies
I ' Assemble subassenblies 1 i n t o thesysten
- Inprocess inspection of
I _ _ _ _ ~ _ _ -
-1
6 i System acceptance test I
I
7 I Final inspection 1
I I I I 8 t Package I
I
1 Review of nanufacturing i quality records
.. .i ! - .- .
I
- __c_ --___ '
I I 1
I
i w NO.: 1 PAGE 2 OF 2
-TtLj- I I
T=i=-=- I
--I I ..I
T---- 4
-7 I
__I
I -- I
LEGBI!: H = BILD POINT W = WITNESS WINT
C O N T E N T S
1 . CERTIFICATE OF COiWL I ANCE
2. DOCUhiENT LIST
3. AS-BUILT DRAWING
4. MANUFACTURING PROCEDURE
1. CERTIFICATE OF COMPLIANCE
Equi pmen t I . D No : Name : 4Hxd%?”,’3lA)
1. \Ye hereby certify that the item listed above, has been manufactured in compliance with requirements included in the other and its cons t it uent document .
2. A1 I the deviation to contractual requirements(if any) have been resolved and approved by the Buyer.
3. ‘The Encl of Manuf actur ing Report has been reviewed and founcl in compl iance with the order requirements.
4. The items covered herein is approved and released for delivery. subject to Buyers shipment authorization.
Tit le : QA DEPARTMENT MANAGER
Signature : 4 6 Date 2002. 2. 18
2. DOCUMENT LIST
DOCUMENT J.,lST
SELLER : w?-4363 SPEC. / P.0 NO APFCAP-TS-01-01
The follo\ving.docttments are required by this specification nnd shall be supplied by the seller to indicate cotniicl1;incc These documents shall be placed in a water-proof wrapping and included inslde the container w i t h the equipment or parts. I f more then one container is requircd for the shipment, thc container holding thc documents shall bc plaitit)! iniirkcd document list inside
REV.0
I INSPECTION & I .P NO. : DPI-FAP-020101
Sheet 1 of 2 TEST PLAN CH -"rS+!
I
Contract No. No
APFCAP-TS-01-01
Equ i pmen t s . Par t s or Component 13
Appl icable
Document
~~
W i tness/Hold Point Report
No. /Date No.
- 1
L i s t of Operations lema r k KAER I DTL KAER I
Q.A
"r" 2
-
3
C u t t i n g
I EkE 7IAl7tS
( M i I I inQ.Turning. Gr i ndi nQ)
4 H I W
OX I DAT I ON
(GUIDE DETAIL) 5
-
6
OX I OAT I ON 3 W I W
7IZl7tS ( M i I I inQ,Turning) W I W
7
-
8
-
H
E. B WELD I NG (GU I DE. CENTRALROD
3ODT I P t COLLAR+ PIN 1
We I d i ng
Record w
Con t r ac t No,
INSPECTION & 1 A N n
Tech. Spec.
_I
I .P NO. DPI-FAP-020101
Sheet 2 of 2 - No.
APFCAP-TS-01-01
Equ i pmen t s . Par t s or Components
-
No.
- 9
10
11
12
13
14
15
L i s t o f Operat ions
ANOO I Z I NG
A p p l icable Document
ANOD I Z I NGZ!
WitnesdHold Point
DTL
H
KAERl KAERl Repor t
No. /Date Remark
I No I 1 2 3 4 . 5 6 7 8 9
I N n I Afl - ,
ROD TIP 1 ZIRCALOY-4 a1,4 BOTTOM GUIDE 1 ZIRCALOY-4 #2,3 6OTTOM GUIDE SPRING . 1 STS304 #8 COLLAR 1 STS304 #10 BUSHING 1 ZIRCALOY-4 $1 LOWER END PLATE 1 STS304 # 6 LOWER END PLATE COVER 1 AL6061 8210 #5 OUTTUBE: 1 AL6061 8210 # 5 LOWSUPPORTTUBE . 1 AL6061 8210 #5
I i o ]LOWER HOUSING I I 1 -
2 (STS304 I #6 I
I 14
pP 18
UPPER HOUSING 2 STS304 # 6 HOUSl NG SUPPORT ROD 6 STS316 H 7 HOUSING NUT 6 STS304 #10 ELEMENT TUBE 6 ZIRCALOY-4 - *Ei ELEMENT END CAP BOTTOM 6 ZIRCALOY-4 #k 1 ELEMENT END CAP TOP 6 ZIRCALOY-4 #1 ELEMENT SPRING 6 SSTS304 or INCONEEX75 #12 FUEL ELEMENT 30 LEADor Pb h=l
-kl -
C d S INTERNATIOt (AL
S u l t e 8 - 8 .ESS 135 E a s t 5 4 t h S t .
New Y o r k , NY 10022 N T I O N OF: Purchasing A ~ e n t .
EGARO TO YOUR HASE ORDER N O . : NO.:
RIPTION: NS I ONS: I F I C A T I O N S : .
SH I PPEO: T I TY SH1 PPEO : HT SHIPPED: S OROER NO. :
N O . : '0.:
sc 930506/03 2 Z i i c o n i urn-4 B a i 5 t o c k -984' ~ i a . x 39.37' L (+Lrj ASTM 8351-85'and P u r c h a s e Order A u g u s t 11,1993 . R e f . P.L.:: 17 p c s . 120.4 Ibs. 1 0 5 0 2
2 3 4 4 6 6 Q Z r 4 1 6 7 1 8
- R E P O R T FOLLOWS:
r i a l Condition: A n n e a l e d a n d c e n t e r l e s s G r o u n d .
3WELEDY NE WAH CHANG ALBANY
r CHEMISTRY COMPOSITION: I N PERCENT ? n t S p e c . 1 2 3 4
1.20-1.70 1.49 1.54 1.54 1 . 5 0 0.16-0.24 0.21 0.22 0.22 0.22
. 0.07-0.13 3.10 6 . 1 1 0 . 1 1 0 . 1 1 ' @.,28-0.37 0 . 3 1 - _ - 0.33 0.33 0.33
. . . B A L A N C E
;Urd IMPURITIES: I N PPM 7 6 - 4 7
0 . 5 <o. 2
0.5 KO. 2 20 <lo
25 c 3
- 20 < l o
5 0 < l o 8 0 2 8 70 <3 5
3.5 c1 . o 100 < 5 0
270 1 4 7
5 0 <2 5
I ' ' 100 6 4
5 0 <2 5
900-1600 1320 120 88
4 6 <o * 2
1 4 7 eo. 2 <lo <2 5 <3 6 0
< I 0 <2 5 <10 23
<3 5 1 2 9 0
9 8 <1 . o
< 5 0
4 6 5 1 do. 2 < 0 . 2 ' 1 5 6 141 eo. 2 <o .2 <I 0 <lo <2 5 <2 5 <3 4 6 3 6 3
<t 0 <lo < 2 5 .--_ <2 5 <I 0 .<lo <2 0 <2 0 <3 5 <3 5
1320 1280 100 110
x1 .0 <1 .o <5 0 <s 0
5 k 1 . 5 3 0 . 2 3 0.1'1 0 . 3 4
41 (0.2 146
<o . 2 <lo <2 5 <3 58
<lo <2 5
. <10 25
<3 5 1300 100
<1 .o <5 0
.
* P a g e 2 0 1 . 2
T T E L E D Y NE WAH CHANG ALBANY
:T C H E M I S T R Y : I N PF'M n t S p e c . M a x . 1 2
2 5 7 7 8 0 <:2 0 3 7
9 0 0 - 1 6 0 0 1 2 8 0 1 2 8 0
0
iEMPERATURE T E N S I L E TEST: RESULTS ASTM E 8
S p e c . M i n . : L o n a . $ 1 L o n g . e 2 e STR, P s ' i : 6 0 0 0 0 7 7 1 0 0 7 7 4 0 0 S t r e n u t h ( 0 . 2 % O f l s e t ) , p s i : . 3 5 0 0 0 5 5 6 0 0 5 2 4 0 0
1 4 2 4 2 6 ~ t f o n I n 2 '
" " O N T E S T : RESULTS *, .: 5 9 5 5 - 1 2 L
' : ASTM G 2 ,
o r e : L P - C T - 8 ' R e v . . (3'- t e r s : 3 d a y s f 7 5 0 ° i ~ / 1 5 0 0 p s i
-
M a x . W t . G a i n 2 2 r n a f d m z V i s u a l A p p e a r a n c e
1 6 A c c e p t . . n o v i s i b l e c o r r o s i o n d e l e c t s . 1 6 A c c o p t . , n o v i s l b l e c o r r o s i o n d e f e c t s .
dGF\APH I C T E S T : R E S l J L T S a n $ u 6 f s e s a m p l e e l o r l a p s , v o i d s , c r a c k s a n d o t h e r in ter -n_ - i l d e f e c t s . s: A c c e p t a b l e
IED B Y : T o n y N e l s o n , P r o d u c t A s s u r a n c e D e p t . :
30.15.Pl-2 2 1 . 2 5
' - , T I .I;.-......:. . 1
C S INTERNATIONAL RESS 135 East 54th s t .
.. S u l t e 8 - 8
; N T I O N O f : P u r c h a s l n o Agent N e w York, N Y 10022 . k
AEGARO TO Y O u i 3
P a a e 1 0 1 . 2
?VTELEDYNE WAH CHANG ALBANY
CHASE OROER N O . : ,SC 930506/03 u N O . : 1 CR I PT ION: C,NS I O N S : 1 . 4 1 7 ' Ola. x 39.37' ( J 1 6 ) cIFICATIONS:
z SHIPPED: R 2 - r P . .I>- J T I T Y SHIPPED: 23 p c s . ;HT SHIPPED: 3 3 9 . 5 Ibs. 3s OROEA NO.: 1 8 5 0 r N O . : 2346300 f r 4
2 ircon-l~um~'4 8ar;s . t o ck
ASTM 8 3 5 1 - 8 5 a n d Purchase Order Aua. 4 , 1993 - - . -.
N O . : 16717 4
{ :T REPORT FOLLOWS:
' r i a l C o n d i t i o n : Annealed a n d centerless a r o u n d . . ..
,T CHEMISTRY COMPOSITION: IN PERCENT ) e n t S p e c . 2 3 4 5 1
1.61 1 . 2 0 - 1 - 70 1 . 5 8 1.63 1.65 1.64 Q.18-0.24 0.21 3.21 0.22 0.22 G.22
J : 0.28-0.37 0.32 - _ 0.32 0.33 0 . 3 4 0.33 0.07-0.13 0.11 0.11 0.11 0.11 0.11 : t
B A L A N C E -4
MUM IMPURITIES: I N PPM 75 - 43
0.5 K O . 2 270 140 0.5 <o. 2 20 < t o 5 0 < 2 5
<3 25 76 100
20 < I 0 50 . < 2 5 5 0 ( 1 0
70 <3 5
3.5 < I . o
25
900-1600 1360 97 120
100 < 5 0
80
3 8 . 4 0 <o .2 <o. 2 143 143
<o. 2 <o. 2 (1 0 <lo <2 5 <2 5 <3 - <3 6 8 7 0'
< l 0 < l o < 2 5 <2 5 < t o e10 21 22
<3 5 <3 5 1260 1280
9 6 9 8 <1 . o <1 . o
< 5 0 <5 0
$2 ,
J
4 i C0.2
1 4 2 <o. 2 <10 <2 5 <3 68
<lo -.. <2 5
' < l o 23
<3 5 1280
9 8 <1 . o <5 0
38 <o . 2 144
<o * 2 < t o <2 5 <3 6 5
<10 < 2 5 < t o 29
<3 5 1350
9 6 <1 . o
<5 0
!
P a a a 2 o f 2 3PTELEDYNE
WAH CHANG ALBANY P.O. e o x 4ao
I c T C H E M I S T R Y : I N PPM n t S p e c . M a x . 1 2 1
2 5 8 6 8 0 2 1 2 6
900-1600 1 3 0 0 1310
J
'EMPERATURE ' T E N S I L E T E S T : RESULTS r - ASTM E8
1.e S T R , P s I : 6 0 0 0 0 77600
a t l o n I n 2' 14 2 4
S p e c . M i n . : L o n g . $ 1 .
S t r e n g t h ( 0 . 2 % O f f s e t ) , P s i : 35000 siioo
" ' O N T E S T : R E S U L T S -.: 5967-11 . - d : ASTM G 2 d u r e : L P - C Y - 8 . Rev: 03, e t e r s : 3 d a y s 1 7 5 O a F / ~ 5 0 o p s I
8, -
3
- M a x . W t . G a i n
22 mo/drng 16 16
L o n g . $ 2
2 4 - 78000 50800
L
V i s u a l A p p e a r a n c e A c c e p ' t . , n o v l s l b l e c o r r o s i o n d o f e c t s . A c c e p t . , n O v i s i b l e c o r r o s i o n d e f e c t s .
3 R A P H I C TEST: RESULTS ' a n s . y a , r t e samp I e l e tar l a p s , v o i d s , c r a c k s a n d o t h c r i n f e r n . a I d e f e c t s . :s: A c c e p t a b l a . .
:IED B Y : T o n y N e l s o n , P r o d u c t A s s u r a n c e O e p t . :
30.15.Pl-2
/ *
I
2 7 23
C b S INTERNATIONAL
S u i t e 8 - 8 lRESS 135 E a s t 5 4 t h S I .
.. N e w Y o r k , NY 1 0 0 2 2 . \
2 t t T 1 0 N OF: P u r c h a s l n o A g e n t
P a g o 1 o f . 2
3'VTELEDYNE WAH CHANG ALBANY
REGARD TO Y O U R CHASE O R D E R N O . : M NO.: CR I P T l O N : ENSIONS: C I F i CAT1 O N S : E : ' E S H I P P E D : NT I T Y S H I PPEO : GHT S H I P P E D : ES ORDER N O . : TI'NO.: S NO.:
sc 930506/03 4 Zirconium-4 8 a r s t o c k
ASTM 8 3 5 1 - 8 5 a n d P u r c h a s e O r d e r S e p t . 7 , 1 9 9 3 R e / . P . L . z 5 0 p c t . 1 3 . 2 l b s . 1850 2339560 2 1 4
1 6 7 2 0
.189 - ' D i a . x 3 9 . 3 7 ' ( C . 8 )
zsr REPORT 'FOLLOWS:
o r . a l C o n d i t i o n : A n n e a l e d a n d c e n t e r l e s s a r o u n d .
3r CHEMISTRY COMPOSITION: I N PERCENT n e n t S p e c . 1 2
1 . 2 0 - 1 . 7 0 1 . 5 2 1 . 5 4 0 . 1 6 - 0 . 2 4 0 . 2 2 0 . 2 3 0.07-0.13 0.11 .I 0.12 0.28-5.37 d . 3 3 .- 0.34
B A L
d i - i . - ' - I
'MUM I M P U R I T I E S : I N PPM 7 5 - 38
270 141 0 . 5 <o. 2
' 0 . 5 <o. 2 2 0 <lo 5 0 <2'5 25 <3
:! 2 0 < t o 50 . < 2 5
i _ *
5 0 < l o 00 <20
900-1600 1 2 8 0 120 93 3.5. < 1 .OR 3 . 5 c1 .OR 100 < 5 0
t o o 7 1
7 0 4 6
I . . --
4 0 <o. 2
1 4 5 <o . 2
< l o (2 5
3 75
<to <2 5 < l o
3 0 4 4
1 3 1 0 96
<I. OR <l .OR <s 0
3 . 4 1.54 1 . 5 3 0.23 0.22 0 . 1 2 0 . 1 1 0.34 0.33
A N C E
b
38 36 <o . 2 <o. 2
1 5 2 135 <o . 2 <o . 2 <lo (1 0 <2 5 <2 5
3 c3 6 4 72
<lo < l o c 2 5 --.. <25 < t o ' < l o 35 3 3 43 40
1310 1320 97 93
< 1 . o <1 . o
@ . . 1
a s e O r d o r N o . : SC 9 3 0 6 0 8 1 ~ 3
g o . : 4 'Io. : 233958Q 2 1 4 . o . : 1 6 7 2 0
ardor N O . : 1 8 5 0
:T C H E M I S T R Y : I N PPM 1 t S p e c . M a x . 1 2
2 5 . 15 16 6 0 33 27
900-1600 1250 1260
P a o o 2 o f 2 3TTELEDYNE
WAH CHANG ALBANY P.O. mx 4.83
AUAW. QI3tl-Ollb
f5031 920-4211 TM IS101 67s-0973 -
, EMPERATURE TENS I L E T E S T : R E S U L T S ASTM E8
S p e c . M l n . : L o n o . n'l l e S T R , PSI: 6 0 0 0 0 7 7 9 0 0 S t r e n g t h (0.2% O f f s e t ) , PSI: 35000 6'0 7 0 0
~ t i o n i n 2 ' 1 4 2 0
; I O N TEST: RESULTS
1: ASTM G 2 l u r e : 'LP-CT-t3.'Rev. '0 ~ t e r s : 3 d a ~ s / 7 5 0 ~ ~ F / 1 5 0 0 p s l
' 1 : 699Z-9 c
- M a x . W t . G a I n
2 2 rng/ldma 1 8 17
L o n g . $ 2 7 9 7 0 0 6 6 1 0 0
1 8
J
. .
V i s u a l A p p e a r a n c e ! A c c e p t . , n o v l s l b l e c o r r o s i o n d e f e c t s . A c c e p t . , n o v i s i b l o c o r r o s i o n d e f e c t s .
0
3RAPH IC T E S T : RESIJLTS s amp I o a n 9.0 I S O
e f o r l a p s , v o l d s , c r a c k s a n d o t h e r 1nte . i .na I d e f e c t s . s : A c c c p t a b l e
I E O B Y : T o n y N e l s o n , P r o d u c t A s s u r a n c e D o p t . :
30.15.Pl-2 0 8 . 0 2
3 c s INTERNATIONAL IORESS 135 Ea s t 54th St.
S u i t e 6 - 8 . N e w Y o f k , NY 10022
. . ’ !
,NTION OF: P u r c h a s i n a A g e n t
! RSGARO TO YOUR
:SCR I P T I ON : MENS I ONS: ECIFICATIONS: TE : Tc‘ SEIPPEO:
I G H T SHIPPED: LES O A O E A NO.: AT NO.:
Y O . :
ANrtrY S H I P P E O :
.. L .‘EST REPORT FOL
t e r I a 1 Condl t I o n :
Z i r c o c
ASTM 8 A u g u s t R e f . P
*315‘ ium-4 B a r s t o c k Ola. x 35.83’ L 351-85 a n d P u r c h a
. L . c 3 1 , 1993
100 P C S . 66.7 l b s . 1850 233956Q 214 16719
LOWS :
A n n e a l e d a n d c e n t e r l e s s
P a i a 1 o f 2 4ITTELEDYNE
WAH CHANG ALBANY
r: 1 s e Order
- .e.....
G r o u n d .
;OT CHEMISTRY COMPOSITION: IN PERCENT ? m e n t S p e c . 2 3 4 1
1.20-1.70 1.52 1.54 1.54 1.53 0 . 1 8 - 0 . 2 4 0.. 22 0.23 0.23 0.22 0.07-0. 13 0‘. 1 1 .o. 1 2 0.12 0.11 i
. : 0 . 2 e - o - 3 Z . * : & . & 3 3 -3.2: 0.35 0.23
. . . ‘ 2 . 0 A L A N C E
IMUM IMPURITIES: I N 75 -
0.5 270 0.5 2 0 5 0 25
100 I - 20
5 0 5 0 8 0 7 0
900-1600 120 3.5 3.5 100
4 .
- . . . . ..... .._ .-- .
I .- . .f :? ..
PPM 38
<o. 2 147
<o. 2
< 2 5 <3 71
( 1 0 < 2 5 < t o <2 0 46
1280 93
(1 .OR < I . O R C5 0
< l 0
40 <o. 2 145
<o . 2 < l o <2 5
3 75
< l o < 2 5 <10 30 4 4
1 3 1 0 96
< 1 .OR < l .OR <5 0
r a s o Ordor N o . : S C 030606/Q3 ; O r d e r N o . : 1 8 5 0 ' " 0 . : 3 . .o . : 2 3 3 B 5 6 Q 2 1 4
No. : 1 6 7 1 9
ICT C H E M I S T R Y : I N PPM ~n t S p eat. M a x . 1 2
"2 5 9 7 80 <2 0 22
900- 16 00 1 2 5 0 1260
J
P a a o 2 0 1 ' 2
9TTELEDYNE WAH CHANG ALBANY
' E M P E R A T U R E ' T E N S I L E T E S T : RESULTS A : A S f M E 8
S p o c . M i n . : L o n g . e 1 . l e S T R . P s i : 6 0 0 0 0 . 8 P S O O
S t r e n g t h ( 0 . 2 % O f l s e t ) , Psi: 3 5 0 0 0 6 0 6 0 0 a t t o n i n 2 ' . 1 4 23
. - -- 'ON TEST: RESULT'S .. .
0 . : 5 9 7 4 - 1 4 - d : ASTM G2 d u r e : L P - C T - 8 .Rev ' . 0:i. e t e r s : 3 days/TSO"F/1500psi -
M a x . W t . G a i n e 2 2 rnaifdrn3 V l s u a l A p p e a r a n c e
: 1 4 A c c e p t . , n o v l s l b l e c o r r o s l o n d e f e c t s . 13 A c c e p t . , n o v l s i b l e c o r r o s l o n d e f e c t s .
L o n g . e2 82900
. 69300 22
5.
'GRAPH I C T E S T : R E S U L T S r a n f vpe r s e s amo I 0
n e { f o r l a p s , v o i d a s , c r a c k s a n d o t h e r i n t e r - n a l d e f e c t s . t s : A c c e p t a b l e
FIE0 B Y : T o n y N o l s a l n , P r o d u c t Assurance O o p t . :
.30.15.P1-2
. 0 1 . 2 9
Iv
I
..
I!
I ..
..
.... I C
-! s ! #
, C \ I
f i D C
.E .. : .. k I: . f-
... r
. e. -1
.-
!
._I
: . ..:. .
I-
-
$.) ...
.. ..
0'
I.
= .7
W
c.
I 0.
CJ ..
_
.... ..
I .. :- . -.
- .. .. .. .... .
a
* .. :.s .. ... .. I.<
.-'
.: - .. ..
- I- .. .. .: ._
-
1
.. ..
.. f
.!
i .i
=I
-.
.I
-.
-. .
.
--
...
.* .
...... ,
.. ......... .
*.
J
.. ...........
-...../.. :
......... .
.
..
. ... *
*7
:-.*.:.. .........
... .': -. .
... .-
..
.... ..-. ..
..
~
. .
. ........
...... .-.- ... -.
.. -
..
..
............
..
.
.
v)
. _. .-
-, - .%
cr, . '.
.y
..
-. - ., . .: * -
- .'! ...
.; '1
'E
'. ..
-..
................ ....
.-:.*. .......
*. .
..
..
.
..
..
.......
- .. _
.
..
..
..
; .. ._..__
1' * G188S f i lRE & STEiL COIWPANY, INC. .
N. Great South~lest pkvw, &and Pralrie, Texas 760%. Tel. (214)302-0230 T Fax (214) 602-15f7
To: G I B B S KIRE h STEEL C / O URITED !;PRINC
Oato Shlpped 2.-11-9(5 .
07 1 Be - M o
- c o -021 T a . d . - , cu .Ol
7 -05 1 Y
Zn * a.005 .
. - N2. Sn . 4.
- f-0- 7 . 3 7 -, Pb
-001
.12
15 .83 Ti- 2.60
72.40
k . 8 7 '
AI - .ba AFTER HEAT T R U T @ 1200' FOR 4HRSt TENSILE STRENGTH 799 - .I10 Slronglh 219.ai36
St(cnglh 196.434 Y . < - - .kwoll Hardnoss RC4 3
rgalion 'f6 In 2" 2.0
scrib+$'and swqrn belore ;mo this 1: ________-____ 32-8 ___._ . .
- Nolary Public
._ ;OURCE INDUSTRIAL ALLOYS
WIRE h S T E E G . . INC. .
Nu-Tech i4'. 0. No ---?-e---
.. ... . . . , . .. . . .. - .. -._. . . . . . . . -. .
..Jk .................................. ................... ..~ ............
I
h I
.................................. ................................................................................... ................................... .....I - ............. ................................................................................................................................................ .. .8 ............
-.- - I
sd xz'o
i .-- -- =pal. eYvP uu szz423 J Arlaru- ;rq% €bQx =nl
1 I ---..
.................................. ................................................................................... ................................... .....I - ............. ................................................................................................................................................ .. .8 ............
-.- - I
sd xz'o
i .-- -- =pal. eYvP uu szz423 J Arlaru- ;rq% €bQx =nl
1 I ---..
I 1-7
...... .I ........ ........I ............
....... M-.o. .......... i
n 2,a
...... b9-0
Waf . .-.- ----- -.- - 4)
I ............................... .............................. ... . I.. .... ...I ........ ..I. I.
....................
....................... ............................................................... ....... IUI it^ G6.i 1') LQ-.o I
cm
~- .
............
.......... m x 9um
w we3 *' . ---,
..............
........
......
BON DE LIVRAlSON/ DELIVERY NOTE Duplicata
REGLEMENT : Per virement bancaire ii : CREDIT LYONNAIS Centre d'affaires La Defense - Tour Credit Lyoonais Place de la Pyramide - 92081 PARIS La Defense Crdex 10 Compte no 30002 00559 0000402100 X 88 CODE SWIFF : CRLY FRPP *D..O...~...--.rr........................O........
EXPORT LICENCE : FRO1018877
INCOTEAM : FCA LPO
TRANSPORT : AIR SHIPMENT
PRODUCT DESCRIPTION : Hafnium plates 1.05 +/-0.06 x 250 + 101-0 x 160mm i 101-0 ,Specification ; analyse chimique
Page : 1
USlNE IPLANT
VENDEUR I SELLER INCOTERM TRANSPORT No COMMANDE
RUGLES
G. DE LA VILLEMARQUE
(CIF') PORT PAYE, ASSURANCE TRANSPORT AIR 5070097
Adresse Livraison I Del. Address :
KAERl 750 Duckjin-Dong Yusung-Ku Taejon KOREA
Adresse Fncturarion I Billinq Address : NIREF Chanye 4 dated May 3. 200 1 Adresse Commande I Purch. Address :
BON DE LlVRAlSON I DELIVERY NOT
- KOREA KOREA 6010097lRGI 1
I u-E EM i C O N ARTICLE I MSGNATION I REF. I PROOUCT
aumnrr uvm
a n SHIPPED
RESTE A LEVRER
BALANCE I UNITE DE
STOCKAGE
STMX UNIT
EON DE LIVRAISC" DELIVERY NOTE Duplicata
Page: 2
Adresse Livraison / Del. Address : KAERl USINE / P U N T RUGLES
VMDEUR I SELLER G. DE LA VILLEMARO.UE 150 Duckjin-Dong INCOTERM KIP) PORT PAYE, ASSURANCE yusung-~" TRANSPORT TRANSPORT AIR No COMMANOE 5010097
NIREF Change 4 dared May 3, 2001
Taejon KOREA
Adresse Facturation I Billinq Address : Adresse Commande I Purch. Address :
VlAEF LT 2001.56
EON D LlVRAlSON I DELIVERY NOT
50100971RGI 1 KOREA KOREA
p -
BE CAREFUL - the shipment of both orders : Hafnium plates (Rwgles) and Zircaloy 4 bars (Ugine) must be dons at the same time (air flight in Roissy COG).
Shipment information :
- Place of products grouping tagether : Kamino Roissy Handling {PIC LPOl Zone de frbt n05 80timent Sogaris Pone 12 95700 ROISSY COG &!lex
OUANTITE - U N I E ?
UVREE STQCUACE
~
RESTE A UVAER
CUilANCE
...
Cornpsgnie Europdenne du Zirconluni Ce;:us Direction Cornrnerciale 91, rue Alb&R Carnus F-49460 hlontrsuil-JuigclB F-445fiO - Paitnio?d F-3SS60 - Jlrrle Ti>!. : +33 (0) 2 4 1 21 34 00 Fax : 4 3 (0 ) 2 41 21 34 93 Siege social : Tour Frarnalo3nc! - La DCtcnsc 6 - 920W Paris La Defsnse Cedcx - Francc TCI. : -33 (0) 1 47 95 :4 1: .Fax : -33 (0) 1 17 96 i8 71 S0Cli:d a%yme -vc.::. ,!,",*,,.C i. ;...: =,;,i :ior., rC:r:,::-'i
8.P. G2 R o ~ t e de Nant6s - B.P. 21
761. : ~ 3 3 (0; 2 40 64 03 00 FPX : 4.33 (0) 2 40 27 56 22
291, route du Marais
TCI. : +33 (01 4 76 68 56 56 f a x : 733 (0) 4 76 68 56 :4
:;:pi';:l cc 6 :(I$ OSC E.,rSs. 071 500 763 ii.3,S hSrr!trre. APE 274 6 . TVA FS 33 071 j33 753 \z.l.; ''4 ,..:,., c ,.* ... I .<. y. e,,!>,,w.<a': I I; ib r: 2: r.k.tw -3 pl . 'p 'L! j '
.' a
ANALYSIS AND INSPECTION CERTlflCATlON
- .. ELEMENTS (?6) HF j 95 I > 95 I 95 I 0 0.028 I 0.03 1 0.032 i Zr 0.24 I 0.30 I 0.25
- IMPURITIES (ppm) I AI < 10 I < 10 f < 10 c 21 25 19
HEAT NR : 272 383 ALLOY: HAFNIUM
C+N c o
I I 31 48 34
< 5 < 5 I (.5
. PROOUTCT ULTRASONIC INSPECTION ?RESULT ; ACCEPTABLE
Cr t 10 c u c 10 Fe 2 53 H 4
Mg 10 Mn < 10 Mo < 5 N I O Nb < 30
CERTIFIED BY : G. BUNEL
< 10 I O .c 10 c 10 284 325 5 < 3
< 10 < 10 10 10
e 5 e 5 23 15
< 30 30 Ni c 10 I I C < 10
25 <25- ~~ 25 Si - Sn e 3 0 30 230
Ta < 50 < 50 c 50 Ti < 10 12 < 10 U 1.5 < 1.5 < 1.5 V I O 10 10 w c 10 .c 10 10
~ ~- - ~
... .
L_- --A-
i
'< ..
_----
+I :I-,+ F
/ L ...... --.
! ::. 2.; :It :I I : .,, L. -.- C.
........_.... . .............. ----
.x
.... - _._ ...... - .......... I. .- .. -. ... b ... -..-- .. -. ......
7 _...--- .
............................. __ .... ___ .___._ ---. . -- -- .......... .------ - . I : [J;:CC!:ICI I I I! i .7.
......... ................. ___ .. __._.__...____..__.___-. C----. -.---.- I
. I iZ::c:~io:.-i
.. .- -.
'P. I ... i I gu
;.. ._.__.._ ._. ........ -._-. .. ......- --.---.I.---..---(---.--- .----- .
- .
. . : *- , ::., ..... . . .. L . .. l l , : . . . i..(;<,:- f * > i ) f':-(m.?c; 1::::1 J
f ) cl,.; :::,:,I *.?' 1.1 ;.! *: 1.\1 c. I>:,.: 2 _._, _ _ _ ;c%-x. L . . r.Y? -_ - .-.. 1.: .: , a
. ._ ........... ._.___ .__._ .... - . --. - --. .. - -...---- - - . --- ' ; ---- L I l'a::*:l ._. ... __- ....... :. . -
.. _,____________ _. __._ --.------ -------.-.
. I . . I - i::!','! z l . ' l I . I : I I I ! . i ~
I ,.;:.*.;:I I . . , - a ; . . :.:La _. ....._.. ..____.... .............._..... - - --.-.--.-.-
,.. I . . I . . 1 .. . _.,.__. ............ .__...._____ ._ .....-... . - .
. . .. a . ' ... I . . . . . c
5,::*.:: _._ .................. ...__ __... ... ._.___...-...- ..-......-
__._.__..___.___.--.- --- .............. -2: .J-. ;. . I __--.---.- .-- P . , I :', I 71 1::
!
CERTIFICATION
METHOD
RADIOGRAPHIC
ULTRASONIC
MAGNETIC PARTICLE
LIQUID PENETRANT
- SIT-Q-LIII 0004 Certification No.
LEVEL
m m m m
' WNew ORecertified This is to certify that
P T T n T TAT ~ usui, IIY 1w
has successfully completed to qualification requirements and was examined in accordance with
SEIS - C - 701 ( Rev. 3 >, Procedure for Qualification & Certification of NDE Personnel, of
SHIN HAN SIT Co., Ltd. which meets the requirements of SNT-TC-lA, (1996) Edition
and is hereby certified for the following Metb.od(s), and Level.
EXPIRE DATE
JUN. 25. 2005
JUN. 25. 2005
JUN. 25. 2005
JUN. 25. 2005
Date Certified by Date
President-SHIN NAN SIT Co., Ltd. Qualified by Levcl Ill Examiner
-
CERTIFICATION
LEVEL
This is to certify that
EXPIRE DATE
0 Certification No. =New ORecertified
SON, SUNG-HO has successfully completed to qualification reqdirements and was examined in accordance with
SHQS-&I-C701 ( Rev. 4 1, Procedure for Qualification & Certification of NDE Personnel, of SHIN HAN SIT Co., Ltd. which meets the requirements of SNT-TC-lA, (1996) Edition
#and is hereby certified for the following Method(s), and Level.
METHOD
RADIOGRAPHIC
ULTRASONIC
MAGNETIC PARTICLE
LIQUID PENETRANT
Qualified by Level IIJ Examiner
Date
II II II
SEP. 25. 2003
SEP. 25. 2003
SEP. 25. 2003
SEP. 25. 2003
- ~~
Certified by President-SHIN HAN SIT Co., Ltd.
Date
RADIOGRAPHIC EXAMINATION REPORT
page 1 of 2
F q q A ] + l 3 s rH854 SHIN H A I
TEL: (C61)831- SPS-DW-RT-020216- 1 -‘)-.--
1. %q 43qEB E q ~ . ) g g 2. +%-da 3. rY!t?!tla OlF-0%-01-001, 002,
4. % A t % MATERIAL
ITEM. 9 41 *a 52 PART NO. DMWI;\’G No. OEdl), 003 CENTRAL ROD Sl
a. M A E R : TOSHIBA b. MAKER :
I CURIE: WA
f. DISTANCE(FFD1
MAT‘L ID
j. DEVELOPPI” CONDITION 20 C 5 MIN
90 I C M OINCH
N/A N/A
1 I SPOT SIZE : 2X2rnrn I I SIZE:
g. ANGLE(APPROXI3lATE) 0’ ,90’ , 120’ ,240’
GSOURCE SIDE UFLM SED k. DENSITY
DEGREE
IS tXGLE ODUJBLE
I C. FILM TYPE & BRAND: FUJI 50 / 3gx12” (TYPE I ) I d. SCREEN : BFRONT HBACK OLEAD OFLUORESCENT
e. THCHNIQUE /SINGLE ODOUBLE
h. PENETRAMETER
i. EXPOSURE TIhIE m!IL B S T M mShE COTHER
24 -.30 SeC.
7. ORDER 8. OTHER 1 N/A I N/A
6. SPEC SHS-C-301DW- 1
9. SHOOTING SKETCH
jECETCH ATTACHE
- 10. REMARKS
S. 13. SON 3.394 OPERATOR LEVEL - 2002. 02. 15.
RECEIVED BY: I N T E R P R E T E R S. 13. SON I I . APPROVED BY I. HL CHOI - ’ m LEVEL -
I LEVEL -
SHS-C-401-01(1) SHIh’HAN S I T CO., LTD A4(210 x 297mm)
RADIOGRAPHIC EXAMINATION REPORT gt A I +j 2) At 2 2 A i
page 2 of 2
rHBS4
SPS-DLV- RT-0202 16- 1
FLLhI SIZE
Film Identification No.
1% x 12" NONE TOP GUIDE SPRNG A
B H.4FMJM TUBE 270 1
2 ~
3 s/D I 4
CENTRAL ROD A 1 2
3 CENTRAL RODB 1
2
3 BOTTOM GUIDE 0 O 1
2 BOTTOhl GUJDE 120 ' 1
2
BOTTOM GUIDE 240 ' 1
2 % x 12" NONE
SHS-C-401-02( 1) I 'I' CO., LTD
REPORT O F LIQUID PENETRANT EXAMINATION ",u %{I fi 7 +J AI !i! 2 A4
*?!?!!a
01F-05K-01-001
DWG NO. €Y!gS I Surface ConditionfY!!yq /MaterialzH3
OlF-05K-01-001 AS WELDED. AS MACHINED Penetrant 3 931
15 min
Developing Time F!!arAl a 15 min
Removal Technique
Developer %!y?ttl
Remover 4 .il a1
$24 6 5 1 1 NO RECORDABLE INDICATION 1
Identificatim No. Interpretation '+it1 Reject I R1-3
SPS-DW-PT-0202 16-4 Report No. J i L Z A j @ d
1 of 1
Step No. h d 9 3 N/A
Penetrant Type 5%-
Visible Dye 0 Fluorescent Surface Temperature EF!S€
18 C'
Local Heating T+:7)%
0 Yes No
Remaris
SHIX"H4N S I T CO., LTD
REPORT OF LIQUID PENETRANT EXAMINATION ji{l a E,c A,c AI 9 2 A4
DM’G NO. E@$& 01F-OX-01-003,
Penetrant 941
KYUKG DO / DYE CHECK P2 Developer
K W G DO / DYE CHECK D4 Remover 41 .jj
K W N G DO / DYE CHECK R1-3
I BOTTOM GUIDE ASSEMBLY I Surface Condition;BYl+!d /Material;”rl3
AS WELDED. AS MACHINED Dwell Time dP17l
15 min
Developing Time qY”1 d 15 min
Removal Technique
0 Water .Solvent
SHS-C-304 A
Examined by 4 Tl 4
s ?.l 4- Approved by
Date of Examination
2002. 02. 15. S. H. SON
I. K. CHOI (,,hl /- ‘ Level 0 Third Party Inspector + ? l a A \ ? l 0 ANI / AI
Report No. sL.sl4?.!n SPS-DW-PT-0202IG- 1
TravellerPCD No. Rev. Sa5 4 9 4
N/A
Step No. k?!?!iln
N/A Penetrant Type %!!.4l 5%
E Visible Dye 0 Fluorescent Surface Temperature &€
-
Loca! Heating 3:87lP 0 Yes No
SHS-C-303-01(1) S H W S I T CO., LTD Ad210 x297mm)
REPORT OF LIQUID PENETRANT EXAMINATION 2!! $41 3 AI 9 2 A{
P/Q No.(’SA-l NO.) gqjqgg z A } A ] q + 7747$73$ N/A Project Name ?+I91
Item Name 4+% Procedure/Cods Rev. No. % X i A j / f t 7$
SHS -C-304 A
I TOP GUIDE SPRIKG.
DLYG NO. €%%& Surface ConditionXY!%EH /Material4 ?A AS WELDED, AS MACHIh’ED 01F-05K-01-025( 1)
Penetrant ;8’ Fa1 Dwell Time
KYUKG DO / DYE C H E C B 15 min Developer Developing Time d KMII\’G DO / DYE CHECK D4 15 min
Remover 4 ;ill Removal Technique Kk’UNG DO / DYE CHECK 0 Water .Solvent
R1-3
Owner/CustomerF+f/Z ?
48%-4 TravellerRCD Xo. Rev. S0.E 4 S G
N/A -
Step No.
N/A Penetrant Type %!Fa1 5%
Visible Dye 0 Fluorescent Surface Temperature ZY!S€
ia c‘ Local Heating qFi’14 0 Yes No
SHS-C-m-01 (I) SH” s I T CO., LTD
Identification No.
*93!a __ . 01F-05K-01-025(1)
Accept Reject Interpi-eta ti0 n Remarks
94 gfa4 8 4 el 3L
V NO RECORDABLE INDICATION
REPORT OF LIQUID PENETRANT EXAMINATION q 41 xa T E E ' g A ) El s g z A {
K Y W G DO / DYE CHECK 15 min Remover 41 4 211 i Removal Technique
K W N G DO / DYE CHECI< i 0 Water .Solvent
I Developer F!%Hl 18 C'
Local Heating 3-?7\'?2
0 Yes I No
Developing Time 934b I Surface Temperature EF!S€
Examined by A1 %I 4
Date of Examination II
2002. 02. 15. S. H. SON
G'
1 Rejectl- Interpretation I Remarks
"1 iL __ 932 ?i 4 NO RECORDABLE INDICATION
9 9 *I Chick List
Bottom Guide
* 3 01 10.5 10.1 P#P
LHB !?Si 21 2gt YES Bffl
Bushing LH z! UI 8.10 8.1 (#OS)
Bottom End. Plate (#06)
1
lottom End Plate Cover (#Oi')
50.9
4.99
YES
722
55.99
YES
Q 50.9
0.90,180,270 I 722 I 6 56 I .'/
I T.B
Lower Support Tube (#io<))
167.724 167.72
nla Q 50.6 50.6
Z! 2 234 0,90,180.270 YES
Q 50.6 50.6
15 15
support tube hole
LH 3 $ 6.0 6.03
Lower Housing (# 1 0) Q 6.4 6.39 "Yy
YES 0.90.1 80,270 ~~
YES 10A.lOB
49 43 Fna
support tube hole
LH a
Q 49.0
15 15
@ 6.0 6
Upper Housing (# I 1) gs=
hole LHZ! 6.41 @ 6.4
YES 0.90.1 80,270
10A.lOB YES
(0 8.0 @ 6.0 *
229 AO.Al20.A240
7.98
Housing Support Rod
(#I 2)
5.99 229 YES
BO.B120,8240 YES
- Bottom Guide & Central Rod Check List
71 w i q3 irl 3i 4 O.Smm/lOOOmrn 0.5 .Acp
P(lf
43 3 @ 6.6f 0.01 6.6 4'p
I .
tj 8.0f 0.01 8.05 tj 6.8f 0.01 6.8 fib P
B
z1
Bottom Guide
Bottom Guide
Bottom Guide
Bottom Guide
I 979.27mm I 979.1 i i
Bottom Guide Arm 1
Bottom Guide Arm 2
Bottom Guide Arm 3
~~~~
4. Bottom Guide Arm 21 Lower End Platentq BqOl Fully Contact71 4 t 7 1 ? YES NO , REMARKS
0 0 0
YES NO REMARKS
- 0
71 3iil 2.5 - 3.5mm
*Xi 10 21 REMARKS
3.2
YES
0
01. Flow Tubeoll q3 Gauge Test 34 YES I NO 1 REMARKS 1
NO REMARKS
YES
0 NO REMARKS
YES NO REMARKS 1
INS PECK) R
- . INSPECTION REPORT @
LECEIPT Pi0 :G02-02-0001 i
1
2
3
4 5 6
7
8
9
10
I - 1 EA PAGE
ACTUAL DIMENSIONS DWG. or SPEC.
3.1 f 0.1 +O
+O 6.6 -0.1
13.2 -0.2
CD 6.575 f
GJ s.0 5 0
@ 6.5 k 0
72.77 f
82.77 f
943.28
6.4
REMARK
REVIEWED I APPROVED
TEMPERAT 20 “C
HUMID1TY:SO %
1 OF 1
I N S P E C T I O N D A T A
Weight(rod tip + guide + color) : 392.97 g
I APPROVED BY KAERI I v -
2M-2-11- 12A(9609:) @ DAEWOO TELECOM LTD.
INSPECTION REPORT
CLIENT
DATE INSPECTED
DATE INSPECTOR
BY
INSPECTOR 1 REVIEWED I APPROVED
KAERI MODEL $ ~ ~ ~ . S Z ~ ) * ] ~ ~ ~ 7 l ] ~ ~ ' , $
2002.2.07 ITEM NO HAN-IC-DW-O1F-05K-01-002
2002.2.07 ITEM GUIDE
IN HOO PARK QUANTITY 1EA
INSPE. I TEMPERAT: 20 "C
PAGE
CONDITION HUMIDITY: 50 % + 1 OF 1
NO
1
2
3
4 5
6
7
8
9
10
11
12
13
14
15
I N S P E C T I O N D A T A
ACTUAL DIMENSIONS REMARK DWG. or SPEC. 1
0 11.4 '8' 11.39
8.15
36.5 36.55
63.5 63.5
+ I< 0 8.1 -ll"d.txJ
1l.S 11.8
22.0 22.0
0 59.0 f 0.1 59.00
0 25.4 ? 0.01 25.4
0 4.8 4.81
0 34.0f 0.01 34.00 32.50
(0 32.52 0.01
UJ 35.52 0.01 3550
2.8 2.80 1.30 1.3
0.6 0.60
\
- APPROVED BY KAERI - DATE 2003 , z . )
INSPECTION REPORT .ECEIPT NO : G01-04-0003
40
1
2
3
4 5
y T NSPECTED 20022.07 ITEM
NO
I N S P E C T I O N D A T A
ACTUAL DIMENSIONS DWG. or SPEC.
f ai
f 0.1
Q, 11.9
@ 16.5
@ 2.30
62 k 0.5
i .2 Kgf /m m
REMARK
I GUIDE SPRING
TEMPERAT. 20 “C
HUMID1TY:SO %
APPROVED BY KGRI I I I I ”
QM-2-11-12A(9609) DAEWOO TELECOM LTD.
I INSPECTOR I REVIEWED I APPROVED
APPROVED BY KAERI
INSPECTION REPORT RECElPT NO : G02-02-0004
* %
qilAwv
CLlENT RECEIPT
INSPECTED
I BY
HAN-IC-D W-01 F-G5K-0 1-004
2002.2.07 COLOR ~ ~
IN HOO PARK QUANTITY 1 J X
I N S P E C T I O N D A T A
INSPE
CONDITION
PAGE
TEMPERAT 20 "C
HUMID1TY:SO %
1 OF 1
REMARK
INSPECTOR REVIEWED APPROVED I BY I BY I BY
MODEL +! ~ ~ ~ S Z A \ A ) ~ ~ ~ I ; ] X d . ~ ~ f r
HAN-IC-DW-O1F-05K-01-005
ITEM BUSHING
1 EA
INSPECTION REPORT .ECEI€T NO : G02-02-0005
INSPE TEMPERAT: 20 "c CONDITION HUMIDITY: 50 %
PAGE 1 OF 1
40
1
2
3
I N S P E C T I O N D A T A
ACTUAL DIMENSIONS REMARK DWG. or SPEC.
0 16.9 f:
0 8.1 f 13.05
0 12.65 :
REMARK
APPROVED BY KAERI
lM-2-1 l-lZA(9609) DAEWOO TELECOM LTD.
INSPECTOR BY
REVIEWED APPROVED BY BY
TEMPERAT: 20 "C
INSPECTION REPORT RECEIPT NO : G02-02-0006
CLIENT KAERI MODEL 4 % 4 T ! S Z A ) A l % -8-Y 4) 374 8
2002.2.07 ITEM NO HAN-IC-DW-O1F-05K-01-006 DATE
DATE INSPECXED 2002.2.07 ITEM LOWER END PLATE
HUMIDITY:50 %
@j i1-1 li!LJ
INSPE
CONDITION
INSPECTOR BY IN HOO PARK QUANTITY 1 EA PAGE 1 OF 1
NO
1
2
3
4
5
6
7
8
9
10
I N S P E C T I O N D A T A
ACTUAL DIMENSIONS REMARK DWG. or SPEC. 1
@ 55 k 0.01 54.99 +O
@ 53.2 -0.02 53.19
(P 17.0 f 0.05 17.00
30 * 0.01 29.99 -
15 f 0.01 15.01
@ 12.7 f 0.01 12.70
(P 45.2 -0.02 45.19 +O
6.0 5 0.01 5.99
5.0 * 0.01 5.01
@ 47 * 0.01 46.99
END REPORT
REMARK
APPROVED BY KAERI (I
INSPECTION REPORT
MODEL
ITEM
4 qq$SZA\A]?$l%J+A1%9!52
HAN-IC-DW-Ol F-OSK-01-007
LOWER END PLATE COVER
1 EA
INSPECTOR BY
I 1 O F 1
INSPE.
CON D l l l ON
PAGE! ~-
REVIEWED APPROVED -TT-z- TEMPERAT: 20 "C
HUMIDITY:50 %
REMARK
Weight : 39.42 g
APPROVED BY KAERI
QM-2-11- lZA(9609) DAEWOO TELECOM LTD.
CLIENT
DATE NSPECTED
DATE NSPECToR
BY
Weight : 800.38 g
KAERI MODEL +! ~ ~ ~ S E ~ ~ ~ ] ~ + + A ] ~ ~ , $ 1 i - i ~ ~ ~ . TEMPERAT: 20 "C
2002.2.07 ITEM NO HAN-IC-DW-O1F-05K-01-008 CONDITION HUMIDITY: 50 %
2002.2.07 ITEM OUT TUBE
1EA PAGE 1 OF 1 IN HOO PARK QUANTI"
(0
1
2
3
ACTUAL DIMENSIONS REMARK DWG. or SPEC. 1
@ 51 k 0.02 5 1.02
Q 56 55.99
722 722
END REPORT
1 I I I I I
APPROVED BY KAERI DATE 2662 -2.9
INSPECTION REPORT RECEIPT NO : G02-02-0009
REVIEWED APPROVED *
REMARK
Weight : 149.70g
TEMPERAT 20 "C
HUMIDITY:50 %
1 OF 1
- MODEL % ~ $ S E A ) 4 % 9 ~ 7 4 % 9 4 9 INSPE
HAN-IC-DW-01 F a K - 0 1-009 CONDITION - LOWER SUPPORT TUBE -
PAGE - I N S P E C T I O N D A T A
4k w L' QM-2-11-12A(960Sl) db DAEWOO TELECOM LTD.
INSPECTOR REVIEWED APPROVED BY
@ 429 - INSPECTION REPORT
RECEIPT NO : G02-02-0010 I
CLIENT RECEIPT
INSPECTED
I BY
W R I MODEL 9 4 ?!!=33)Al %-Y 41 %yd$ INSPE
2002.2.07 ITEM NO HAN-1C-DW-01F-05K-01-0010A CONDITION
20022.07 ITEM LOWER HOUSING
IN HOO PARK QUANTITY 1 EA PAGE
I N S P E C T I O N D A T A
TEMPERAT 20 "C
HUMIDITY:50 70
1 OF 1
REMARK
Weight : 112.17 g
INSPECTION REPORT
10
1
2
3
4
5
6
7
ECEIPT NO : G02-02!-0010/1
LOWER HOUSING
REMARK DWG. or SPEC.
8.4
0 8.1 f 0.01
0 8.2 k 0.01
0 8.4 f 0.01
0 50.6 & (3.01
0 28.65 i 0.01
2.1
REMARK
- INSPECI-OR
I BY
INSPE.
CONDITION
I - 1 EA PAGE
- I N S P E C T I O N D A T A
REVIEWED APPROVED
TEMPERAT. 20 "C
HUMIDITY:50 %
1 OF 1
7 APPROVED BY KAEEU lm $3 '
db DAEWOO TELECOM LTD. 1 ?!P
&4-2-11-12A(9609:)
INSPECTION REPORT
INSPECTOR BY
LECEIPT NO : G02-02-0011
MODEL
REVIEWED APPROVED BY BY
3 9 4 9 S 3 A P l 'gl QY 741 "d-jJ+
HAN-IGD W-01 F-05K-01-0011 A
UPPER HOUSING
Kl
1
2
3
4
5
6
7
1EA
ACTUAL DIMENSIONS REMARK DWG. or SPEC.
1
3.0 3.0
0 6.0 f 0.01 6.05
0 6.4 f 0.01 6.41
@ 11.1 f 0.01 11.09
@ 49.0 ? 0.01 49.00
8.4 f 0.05 8.44
0 28.65 +_ 0.01 28.64
END REPORT
PAGE 1 OF 1
I N S P E C T I O N D A T A
\
DAEWOO TELECOM LTD.
APPROVED BY KAERI
>M-2- 1 1 - 12A( 9609)
INSPECTOR 1 2 - INSPECTION REPORT
RECEIPT NO : G02-02-0011/1
MODEL ~ ~ ~ S Z A ~ ~ 1 ~ $ ? ~ ] % 7 d f r
NO HAN-1C-DW-01F-O5K-01-OOllB
ITEM UPPER HOUSING DATE
&zS I ,J$$ &% - INSPE
CONDITION -
1 E A
REVIEWED 1 APPROVED
- PAGE
-
~~ ~~
TEMPERAT 20 "C
NO
1
2
3
4 5
6
7
HUMIDITY:50 %
DWG. or SPEC.
3.0
(0 6.0 f (
@ 6.4 f (
0 11.1 f
0 49.0 f
8.4 f 0.
@ 28.65 :
1 OF 1
REMARK
Weight : 100.17 g
QM-2-11-12A(9609) D A W 0 0 TELECOM LTD.
CLIENT
DATE INSPECTED
DATE INSPEmoR
BY
INSPECTOR REVIEWED BY BY
KAERI MODEL $ % 4 ~ k 3 A ) A 1 % - ! $ ? 7 - l ] % ~ ~ $
2002.2.07 ITEM NO HAN-IC-DW-O1F-OX-01-0012
2002.2.07 ITEM HOUSING SUPPORT ROD
IN HOO PARK QUANTITY 6 EA +
REMARK
Weight : 444.34 g (6)
INSPECTOR REVIEWED APPROVED LlTl-Ti
c DATE %- - APPROVED BY KAERI
INSPECTION REPORT LECEIPT NO : G02-02-0013
;Loo> -2.3
CLIENT RECEIPT
DATE NSPECTED
DATE NSPECTOR
BY
2002.:2.07 I I'TEM NO I HAN-IC-DW-01F-05K-01-0013
2002.:2.07 HOUSING NUT
6 EA
I/ I
INSPE. TEMPERAT: 20 "C
CONDITION HUMIDITY: 50 % -4-4 PAGE I 1 OF 1 -1 --
I N S P E C T I O N D A T A
ACTUAL DIMENSIONS DWG. or SPEC.
@ 6.4 * 0.05
@ 11.0 f 0.05
REMARK
Weight : 38.24 g (6:)
INSPECTOR REVIEWED APPROVED BY BY BY
1 - &i \ ? Vj) /a INSPECTION REPORT
RECEIPT NO : G02-02-0014
CLIENT KAERI MODEL +! ~ ~ ~ 9 3 3 ) ~ ] ~ + + ~ 7 4 ] ~ ~ , $ INSPE. TEMPERAT: 20 "C
2002.2.07 ITEM NO HAN-IC-DW-OlF-05K-01-0014 C O N D I ~ O N HUMIDITY. 50 % DATE
INSPECTED DATE 2002.2.07 ITEM ELEMENT TUBE
INSPECTOR IN HOO PARK QUANTITY 6 EA PAGE 1 OF 1 BY
I N S P E C T I O N D A T A
ACTUAL DIMENSIONS REMARK NO DWG. or SPEC. 1 2 3 4 5 6
1 @ 8.36 f 0.005 8-36 8.36 8.36 8.36 8.36 8.36
2 @ 9.50 f 0.005 9S0 9.50 9-50 9.50 9.50 950
160.01 159.99 160.01 159.99 159.99 160.01
END REPORT
160 k 0.01 3
- ~
REMARK I Weight : 616.98 g (6) I s'?!%s : 14+15+16+17+18+19(4) 7711
INSPECTOR I RY
INSPECTION REPORT tECElF'T NO : G02-0:2-0015
MODEL 3 % ~ ~ Z . Z ~ ) A 1 % ~ - ~ ~ ~ ~ $
NO HAN-IC-DW-01 F-05K-01-0015
ITEM ELEMENT ENDCAP BOTTOM
6 EA
:,-ti\* $3 -
INSPE
CONDITION -
- PAGE
-
VO(DWG.orSPEC.
I- @ 6.35 f 0.01
1 ! 2 1 @ 7.8 f 0.01
2.0 f 0.01 3 1
I-
== I- REMARK
Weight : 6.5 g
TEMPERAT 20 OC
HUM1DITY:SO %
1 OF 1
ACTUAL DIMENSIONS
APPROVED BY KI4ERI ' . D A W 0 0 TELECOM LTD.
-1 %M -2-7 2M-2-11-12A(9609)
INSPECTION IEaEPORT ECEIPT NO : G02-02-0016
CLIENT KAERI MODEL 3 9 $ S E A \ A1 id QJf 41 7&J$
2002.2.07 ITEM NO HAN-IC-DW-01F-OSK-01-0016 DATE
DATE
BY
NSPECTED 2002.2.07 ITEM ELEMENT ENDCAP TOP
‘SPECTOR IN HOO PARK QUANTITY 6 EA
Weight : 6.46 g
INSPECXOR REVIEWED APPROVEC BY BY BY
c (3 &@ /@ INSPE. TEMPERAT 20 C
CoNDi-noN HUMIDITY: 50 %
PAGE 1 OF 1
APPROVED BY KAERI \ z 4k w -&) D*TEi >-2-24
INSPECTION REPORT RECEIPT NO : G02-02-0017
MODEL +! 9 $ S Z A F A ] ?&? 41
HAN-IC-DW-01F-05K-01-0017
ITEM ELEMENT SPRING
6EA
INSPECTOR I REVIEWED I APPROVED
-+ PAGE
Weight : 4.90 g
DAEWOO TELECOM LTD.
INSPECTOR 1 BY
KAERI MODEL
2002.2.07 ITEM NO
2002.2.07 ITEM
IN HOO PARK QUANTITY
et !$J:\t.J
INSPECTION REPORT LECEIPT NO : G02-02-0018
I
4 9 4 '?!SZA)A1 TI -%? 41 INSPE
HAN-IC-DW-01F-05K-01-0018 CONDITION
FUEL ELEMENT
6EA PAGE
CLI EN" RECEIPT
Kl
1
2
DATE [NSPECTOR
BY
REMARK ACTUAL DIMENSIONS
1 2 3 4 5 6 DWG. or SPEC.
U) 8.192 f 0.002 8.19 8.19 8.19 8.19 8.19
0 9.83 f 0.01 9.83 9.84 9.84 9.83 9.84 9.84
END REPORT
REMARK
DATE \
APPROVED BY KAERI
REVIEWED APPROVED TTT
2602 -2 .J
I
TEMPERAT 20 "C
H U M I D I W 5 0 %
1 OF 1
I N S P E C T I O N D A T A
INSPECTION REPORT LECEIPT NO : (302-021-0019
g j i d s g k E A i A ) 3 %yA]%Ta+
HAN-IC-DW-01F-05K-01-0019
2002.;!.07 ITEM FUEL ELEMENT SPACER
6EA
CLIENT RECEIPT
DATE NSPECTED
DATE NSPECTOR
BY
I
INSPE. TEMPERAT 20 "c
CONDITION HUMIDITY: 50 %
PAGE 1 OF 1
DWG. or SPEC. ~~
0 8.19 f 0.01
5.0 f 0.01
- - REMARK
Weight : 1.00 g
APPROVED BY KkERi
>M-2- 1 1 - 1 2A( 9609) DAEWOO TELECOM LTD
NSPECTOR BY
KAERI MODEL
2002.2.07 ITEM NO
LEVIEWED APPROVED
3 9 $ i i Z A k A ] i%l -$Y 41 %?!I$ HAN-IC-DW-OlF-OSK-01-0020A
INSPECTION REPORT XECEIPT NO : G02-02-0020
2002.2.07
IN HOO PARK
CLIENT RECEIPT
DATE INSPECTED ~
ITEM COOLING BLOCK
QUANTITY 1EA BY
NO
1
2
3
4
5 6
ACTUAL DIMENSIONS REMARK DWG. or SPEC. 1
0 8.3 f 0.1 8.3 1
0 37.0 & 0.01 37.0
49.0 0 49.0 & 0.01
0 8.30 k 0.01 8.3 1
~ --
I 330.7 f 0.01 180.71
0 11 f 0.01 11.00
END REPORT
REMARK
\ - DATE APPROVED BY KAERI
INSPE
3 . o o z . L f
:ONDITION
PAGE
TEMPERAT 20 "C
HUMID1TY:SO %
1 OF 1
INSPECTION REPORT ,,r+ i@,J
ECEIPT NO : G02-C)2-0020/1
MODEL 4 % ~ $ S Z A ) A 1 ~ - % ? f l ? & 2 l $
HAN-IC-DW-OlF-05K-01-0020B
ITEM COOLING BLOCK
1 EA
- INSPE:.
CONDITION -
- PAGE
I
TEMPERAT: 20 "C
10
1
2
3
4
5
6
HUMIDITY:50 %
I N S P E C T I O N D A T A ACTUAL DIMENSIONS
DWG. or SPEC.
(0 8.3 It (
(0 37.0 f
(0 49.0 f
(0 8.30 f
180.7 f (
Q 1 1 f O
I I I I I i REMARK
1 OF 1
~~
APPROVED BY K A E R I
DAEWOO TELECOM LTD. QM-2-11-12A(9609)
INSPECTOR
INSPECTION REPORT RECEIPT NO : G02-02-0021
REVIEWED 1 APPROVED
CLIENT RECEIPT
INSPECTED
KAERI MODEL 3 % gSE4A] %v 4) g T J $
2002.2.07 ITEM NO HAN-IC-DW-01F-05K-01-0021
2002.2.07 ITEM UPPER SUPPORT TUBE
IN HOO PARK QUANTITY I E A I BY
/ I
~NSPE TEMPERAT: 20 "C
CONDITION HUMIDITY: SO %
PAGE 1 OF 1
NO
1
2
3
A W A L DIMENSIONS REMARK DWG. or SPEC. 1
50.59
46.00
8.19
+O @ 50.6-0.05
@ 46 f 0.05
8.2 k 0.01 ---- -~
Weight : 76.11 g
86.42
END
4 86.414f 0.05
REMARK
REPORT
I APPROVED BY KAEFU 5
DATE 3002. 2 - 3
INSPECTION REPORT ECElPT NO : G02-02:-0022
MODEL 4 ~1$$EiZ~)A]%8Y7l1?&!lfr
HAN-IC-DW-01F-OX-01-0022
ITEM TOP END PLATE
1 EA
APPROVED BY KAERI
IM-2-1 1-1 2A(9609) db DAEWOO TELECOM LTD.
INSPECTOR REVIEWED APPROVED BY BY BY
INSPE, TEMPERAT 20 "C
CONDITION HUMIDITY: 50 %
PAGE 1 OF 1
INSPECTION REPORT XECEIPT NO : G02-02-0023
CLIENT KAERI MODEL g!aZA) .A\ %y 41 ”d.j”$
2002.2.07 ITEM NO HAN-IC-DW-O1F-05K-01-0023 DATE
DATE
BY
INSPEaED 2002.2.07 lTEM TOP END PLATE COVER
xNSPECToR IN HOO PARK QUANTITY 1 EA
I
INSPECTOR REVIEWED APPROVEC BY BY BY
?+.-. & # * iNSpE TEMPERAT 20 c
CoNDinoN HUMIDITY: 50 Oio
PAGE 1 OF 1
I & DAEWOO TELECOM LTD.
APPROVED BY KAERI
QM-2-11-12A(9609)
INSPECTOR 1 - 2 - INSPECTION. REPORT
RECEIPT NO : G02-0;!-0024 p-7 7&J
MODEL 4 @ A 1 qq ? ! _ h B ) - A ) %? %?&$ iNsPE
HAN-IC-DW-OlF-OSK-01-0024 C@NDITIQh
ITEM TOP GUIDE - 1 EA PAGE
REVIEWED I APPROVED
TEMPERAT: 20 "C
H U M I D I W S O %
1 OF 1
I REMARK I Weight : 86.83 g
I I S S P E ~ O R I REVIEWED I APPROVED
MODEL 3 '&ZE:A)A] 88 741 %yJ=$
ITEM NO HAN-IC-DW-OlF-05K-01-0025
ITEM TOP GUIDE SPRING
1EA QUANTITY
INSPECTION REPORT RECEIPT NO : G02-02-0025
/ I
~NSPE TEMPERAT 20 O C
CONDiTlON HUMIDITY: 50 %
PAGE 1 OF 1
CLIENT 'RECEIPT
DATE INSPECTED
DATE INSPECTOR
BY
APPROVED BY KAERI
KAERI
\
qJ* d \ - q 3
~~
2002.2.07
2002.2.07
IN HOO PARK
REMARK
Weight : 63.04 g
INSPECTOR BY
INSPECTION REPORT ks2 q\ 3 LECEIPT NO G02-02-0026
MODEL @ % 1 $ S Z ~ ~ A 1 ~ + + 7 i ] ? J + ' ' f r INSPE
HAN-IC-DW-OlF-05K-01-0026 CONDITION
ITEM GRAPPLE HEAD LOCK
1 EA PAGE:
APPROVED BY KAERI
ZM-2-11-12A(9609) DAEWOO TELECOM LTD.
REVIEWED APPROVED BY BY -
TEMPERAT: 20 "C
HUMIDITY: 50 %
1 OF 1
40
1
2
3
4
5
6
I N S P E C T I O N D A T A
DWG. or SPEC.
@ 25 f 0.01
fR 15.9 j: 0.01
4.99 f 0.01
31 f 0.01
6.60 * 0.01 @ 8.2 f 0.01
REMARK
INSPECTION REPORT RECEIPT NO : G02-02-0027
CLIENT KAERI MODEL 4 % 4 ‘?!SZA)A] % %Y 741 ?$a$ 2002.2.07 ITEM NO HAN-IGDW-O1F-05K-01-0027 DATE
DATE
BY
INSPECTED 2002.2.07 ITEM GRAPPLE HEAD
INSPECTOR IN HOO PARK QUANTITY 1E.A
DAW00 TELECOM LTD.
APPROVED BY KAERI
QM-2-11-12A(9609)
INSPEflOR REVIEWED APPROVED BY BY BY
:@ 42, INSPE TEMPERAT 20 c
C O N D I ~ O N HUMIDITY: 50 ?4
PAGE 1 OF 1
NO
1
2
3
4
ACTUAL DIMENSIONS REMARK DWG. or SPEC. 1 -I
6.60 f 0.01 6.59
0 8.2 f 0.01 8.19
10.05 10
67 f 0.01 66.99
-
END REPORT
INSPECTION REPORT LECEIPT NO : G02-02-0028
MODEL 4 ~ ~ F ! S 3 3 ) A 1 % ~ ~ i 4 l 3 f ~ 2 k ?
HAN-IC-DW-OlF-05K-01-0028
ITEM GRAPPLE HEAD CLAMPING NUT
1EA
REVIEWED I APPROVED INSPECTOR BY -
- INSPE:.
CONDITION - -
PAGE
TEMPERAT: 20 O C
HUMID1TY:SO %
1 OF 1 ~ _ _ ~ ~~ ~
I N S P E C T I O N D A T A
ACTUAL DIMENSIONS
REMARK Weight : 17.48 g
I D A m b o a i . > . g DAEWOO TELECOM LTD.
APPROVED BY KAERI I >M-2-11-12A(9609)
CLIENT
DATE INSPECTED
DATE INSPEmoR
BY
REMARK
Weight : 1.80 g
KAERI MODEL 3 ~ ~ ~ S Z A ~ A ] ~ $ ~ ? l ] ~ ~ ~ $ lNSpE TEMPERAT 20 "C
2002.2.07 ITEM NO HAN-IC-DW-01F-05K-01-0029 c o N D i n o N HUMIDITY: 50 %
2002.2.07 ITEM GRAPPLE HEAD CLAMPING WASHER
IN HOO PARK QUANTITY 1 EA PAGE 1 OF 1
1
DAEWOO TELECOM LTD. APPROVED BY KAERI
QM-2-11-12A(9609)
NO
1
2
3
4
I N S P E C T I O N D A T A
DWG. or SPEC. ACTUAL DIMENSIONS REMARK
1
(0 8.4 8.4
(0 16.0 16.1
4 .O 4.0
2.0 2.0
END REFORT
I
INSPECTION RIEPORT RECEIPT NO : G02-02-0030
CLIENT RECEIPT
DATE INSPECTED
BY
MODEL + ! ~ ~ ' & F i Z ~ ) ~ 1 ~ - $ j ~ 7 4 1 ~ ~ J $
HAN-IC-DW-01F-OSK-01-0030
ITEM FUEL ROD HOLD-DOWN SPRING
6EA PAGE
NO DWG. or SPEfC.
- __I
1 10 f 0.5
2
3
4
(0 8 f 0.05
(0 10.8 * 0.05
@ 1.4
-
REMARK
Weight : 9.60 g (6)
2n/\ ' I APPROVEDBYKPlERI I dA QM-2-11-12A(9609) DAEWOO TELECOM LTD. ( " V
INSPECTION REPORT tECEIPT NO : G02-02-003 1
CLIENT KAERI MODEL $ % 4 $%ZS)A\ %! -%+ ?&a 4
2002.2.07 ITEM NO HAN-IC-DW-OlF-05K-01-0031 DATE
DATE
BY
INSPECTED 2002.2.07 ITEM HOUSING NUT SPRING WASHER
[NSPECToR IN HOO PARK QUANTITY 1EA
REVIEWED APPROVED 7 INSPECTOR BY
p &$
lNSPE
CONDtnON
PAGE
~
TEMPERAT. 20 C
HUMIDITY:50 %
DATE \ QJA w 43 ' APPROVED BY KAERI
1 OF 1
3 0 0 > . 2.8
REMARK
Weight : 5.61 g(6)
-OR I REVIEWED I APPROVED
INSPECTION REPORT IECEIFT NO :G02-02-0032
&- A, .E$
1 EA PAGB
I N S P E C T I O N D A T A
ACTUAL DIMENSIONS REMARK
REMARK
Weight : 32.44 g
\
#ib DAEWOO TELECOM LTD. 4 31 ' APPROVED BY KAERI 1
QM-2-11-12A(9609:)
INSPECTION REPORT RECEIPT NO : G02-02-0033
CLIENT KAERI MODEL ~ ~ d l ~ 3 % 3 5 A ) ~ 1 ~ ~ ~ 4 ] ~ g f r
2002.2.07 ITEM NO HAN-IC-DW-01F-05K-01-0033A DATE
DATE
BY
INSPECTED 2002.2.07 ITEM HAFNIUM TUBE
INSPEaoR IN HOO PARK QUANTITY 1 EA
REMARK
Weight : 246.11 g
INSPECTOR REVIEWED APPROVED BY BY BY
~8 INSPE TEMPERAT: 20 "C
CoNDinoN HUMIDITY: 50 %
PAGE 1 OF 1
& DANVOO TELECOM LTD
APPROVED BY KAERI
QM-2-11-12A(9609)
INSPECTOR BY
_. _ _ - "SPECTED
DATE
REVIEWED APPROVED T-T-Z
2002.2.07 ITEM FUEL TEST CAPSULE ASS'Y
INSPECTION REPORT LECEIPT NO : G02-02-0035
CLIENT I KAERl I 1 2002.2.07 DATE
I I 1
NSPECToR BY I IN HOO PARK [QUANTITY1 1 SET
DWG. or SPEC.
979.27
82.77
180.7 f 0.01
134.5
REMARK
Weight :
INSPE.
CONDITION
PAGE
TEMPERAT 20 "C ~
HUMIDITY:50 %
1 OF 1
I N S P E C T I O N D A T A
ACTUAL DIMENSIONS I REMARK
DAEWOO TELECOM LTD
U P R O V E D BY KAERl
B4-2-11-12A(9609) .
I NSPECI'OR BY -
ECEIPT NO : G02-0:2-0034 -@
INSPECTION REPORT
~ ~~~ ~
2002.2.07 ITEM NO -4 2002.2.07 ITEM
CLIENT RECEI€T HAN-IC-DW-OlF-05K-01-00G CONDITION
- GUIDE TUBE DATE
NSPECI'OR BY 1 SET PAGE
REVIEWED I APPROVED
TEMPERAT 20 "C
HUM1DITY:SO %
1 OF 1
ACTUAL DIMENSIONS REMARK DWG. or SPEC.
@ 57.20 k 0.02
0 59.5-0.02
240.0
@ 60.5
@ 70 f 0.05
3216.25 ---
2440.7 f 0.3
25.0
0 16.4 0.01 16.40 f END REPORT
REMARK I
- & DAEWOO TELECOM LTD..
APPROVED BY KAERI
QM-2-11- 12A(9609)
PROJECT
REVISIONS
DWG. No. G V x DATE REVISIONS REMARK IC-DW--CAP-OlF-05K-00A 0 2002.1.04 ' KAERl ZJS BEq 4 Y IC-DW-CAP-0 1 F-05K-00 1 0 I 7002.1.04 KAERI ZJ9. I E q OIY iC- OW-CAP-01 F-05K-002 0 2002.1.04 KAERI ZJS I E q 971
it-DW-CAP-OiF-O5K-003 I 0 2002.i.04 KAERi I€ %E4 4 Y IC-DW-CAP-01F-05K-004 I 0 12002.1.04 K A E R l 8 1 YEN 44 IC-DW-CAP-OlF-05K-005 ! 0 2002.1.04 KAERl Z J I 4 E q El71
IC-DW-CAP-01 F-05K-006 1 0 2002.1.04 KAERI Y Z IEo( 4Y IC-DW-CAP-01F-05K-007 1 0 ' 2002.1.04 KAERI I 3 2 4?.!q 44 IC-DW-CAP-01 F-05K-008 I 0 I2002.1.04 KAERI iyP 4Zol 4 Y __- IC-DW-CAP-01F-05K-009 1 0 ! 2GO2.1.04 KAERl Ztlz 4 E q 3 Y IC-OW-CAP-01F-05K-01OA ' 0 2002.1.04 KAERIZJP 4Eq 4J1
. IC-UW-CAP-OlF-05K-OlOB j 0 ' 2002.1.04 K A E R l 8 1 I E q 4 Y IC-DW-CAP-OlF-05K-OllA i 0 , 2002.1.04i KAERIZJS SEW OIY
IC-DW-CAP-01F-05K-012 1 0 ' 2002.1.04I KAERl ZIP I E o l I Y IC-DW-CAP-OlF-05K-OllB i 0 iOO2.1.04; KAERl ZJZ 41Eq OIY
(01F-05K-01 FUEL TEST CAPSULE)
Ic~~W:CAP-OlF-05K-013 0 2302.1.0$1 KAERI I 3 4EW 014
2002.
t L IL-DW-CAP-01F-05K-014 : 0 -2OOZ.l.04; KAERI ZJL 4 E q 0171
1%-OW-CAP-OlF-05K-015 0 2002.1.04: KAERl ZJE 4Eol O I Y IC-DW-CAP-01F-05K-016 ! 0 : 2002.1.04/ KAERl YE 4Eo( 44 IC-DW-CAP-O1F-05K-017 ! 0 '2002.1.0i: KAERI 8Z 4 E q OIY
1 IC-DW-CAP-01F-05K-018 1-0 ; i002.1.041 KAERI ZJZ 4Eo( 0lY .~IC--DW-CAP~-OlF-O5K-019 j .--E- j 2002.1.041 KAERl ZJJr 424 014 . IC-DW--CAP-Olr-O5K-O20A -- ----- --- I -- 0 : 2002.1.04! KAERl B P 4Zol EIJ1 , IC-DW-CAP-01F-05K-0208 I 0 ' 2002.1.04/ KAERI 81 3i?q 471
, IC-DW-CAP-OlF-05K-021 ! C I2002.1.041 W R l OJr 4 E q 471 , !C-DW-CAP-OlF-OSK-022 1 0 , 2002.1.041 KAERl ZJZ 4Eol OIY ! IC-OW-CAP-01F-05K-023 i 0 ; 2002.1.041 KAERl 4 Z q 4 Y \.~C,:D&-CAP-OlF-O5K-O24 0 i 2002.1.041 K N R l ZIE 4 Z q 51'1 I
i
j I ,
I ! I
i
I I
I
BIBLIOGRAPHIC INFORMATION SHEET I Performing Org.
Report No. Sponsoring Org.
Report No. Standard Report No. lNIS Subject Code
KAERIRR-2 1 1712002 I I I I
Taejeon
Design and Manufacturing of Non-Instrumented Capsule Title/Subtitle ! for Advanced PWR Fuel Pellet Irradiation Test in HANARO
Publisher KAERl Publication Date 2002
Project Manager and DeDartment
Ill. & Tab.
Researcher and Department
Yes( 0 ), No ( ) Size A4
Publication Place
Page 1 369 p.
I
Classified Open: 0 ), Restricted( ), __ Class Document Report Type Technical Report
Performing Org. Contract No.
4bstract (1 5-20 Lines)
This project is preparing to irradiation test of the developed large grain UOZ fuel pellet in lANARO for pursuit fuel safety and high bum-up in "Advanced LWR Fuel Technology )evelopment Project" as a part Nuclear Mid and Long-term R&D Program. On the basis est rod is performed the nuclei property and preliminary fuel performance analysis, test rod nd non-instrumented capsule are designed and manufactured for irradiation test in IANARO. This non-instrumented irradiation capsule of Advanced PWR Fuel pellet was eferred the non-instrumented capsule for an irradiation test of simulated DUPIC fuel in IANARqDUPIC Rig-001) and IS-element HANARO fbel, was designed to ensure the ntegrity and the endurance of non-instrumented capsule during the long term(2.5 years) radiation. To irradiate the UO2 pellets up to the burn-up 70 MWDkgU, need the time bout 60 months and ensure the integrity of non-instrumented capsule for 30 months until eplace the new capsule. This non-instrumented irradiation capsule will be based to levelope the non-instrumented capsule for the more long term irradiation in HANARO.
Note I
D.H.Kim(Fuel Manufacturing Technology Development Team) I
Subject Keywords (About 10 words)
HANARO, Irradiation test, Large grain U02 pellet, Non-instrumented
capsule, Assembling/disassembling, High bumup, Advaced PWR fuel