PRE-FIRE PROTECTION PLAN SUBMITTAL FORM North Collier Fire Control and Rescue District Fire Prevention Bureau 6495 Taylor Road Naples, FL 34109 Phone: (239) 597-9227 PRE-FIRE PLAN REQUIREMENTS FOR CONTRACTORS North Collier Fire Control and Rescue District reviews fire protection for all structures located within its boundaries. For all new construction and renovations greater than 1,000 square feet, a Pre-Fire Protection Plan is required, and is the contractor's responsibility. Please note that failure to produce an acceptable Pre-Fire Protection Plan will result in the delay of the building’s fire compliance. Exceptions are not accommodated. This document specifies the requirements for a properly completed Pre-Fire Protection Plan. Please adhere to these guidelines when completing the form: Provide as much information as possible. If information is not known at the time of form completion, please have it available at the time of inspection. If certain items are not applicable to the project, please mark as ‘N/A’. The Contractor is required to submit an 8.5” x 11” site plan showing the entire property boundaries, paved areas, fire lanes, roadway hydrants and fire department appliances within 1,000 feet. Please utilize the Uniform Preplanning Symbols and mark all applicable items. (The Uniform Preplanning Symbols are shown on page 5 of this document. A sample site plan is shown on page 6.) The Contractor is required to submit a structural footprint (building floor plan) showing the main utility shutoffs, building entrance openings, exit stairs and locations of fire protection systems (fire department connections, sprinkler risers, post indicator valves, back flow devices, standpipes and pipes, fire pumps, emergency generators, fire alarm control panels). Please utilize the Uniform Preplanning Symbols and mark all applicable items. (The Uniform Preplanning Symbols are shown on page 5 of this document. A sample structural footprint plan is shown on page 7.) The Contractor may request assistance or preliminary review of their Pre-Fire Protection Plan fire prior to building final; however, plan will not be accepted until time of the building final. The Contractor can make last minute changes to the Pre-Fire Protection Plan at the time of the inspection and with Fire Inspector approval. Pre-fire Protection Plan submittal forms are available: 1) Via the North Collier Fire District Website (www.northcollierfire.com); 2) in person at North Collier Fire Prevention Offices, 6495 Taylor Road, Naples, FL 34109; and 3) in person from any North Collier Fire Inspector. Questions? Please contact the North Collier Fire Prevention Bureau at (239) 597-9227.
Transcript

PRE-FIRE PROTECTION PLAN SUBMITTAL FORM

North Collier Fire Control and Rescue District Fire Prevention Bureau

6495 Taylor Road Naples, FL 34109

Phone: (239) 597-9227

PRE-FIRE PLAN REQUIREMENTS FOR CONTRACTORS

North Collier Fire Control and Rescue District reviews fire protection for all structures located within its boundaries.

For all new construction and renovations greater than 1,000 square feet, a Pre-Fire Protection Plan is required, and is the contractor's responsibility. Please note that failure to produce an acceptable Pre-Fire Protection Plan will result in the delay of the building’s fire compliance. Exceptions are not accommodated. This document specifies the requirements for a properly completed Pre-Fire Protection Plan.

Please adhere to these guidelines when completing the form:

• Provide as much information as possible.

• If information is not known at the time of form completion, please have it available at the time of inspection.

• If certain items are not applicable to the project, please mark as ‘N/A’.

• The Contractor is required to submit an 8.5” x 11” site plan showing the entire property boundaries, paved areas, fire lanes, roadway hydrants and fire department appliances within 1,000 feet. Please utilize the Uniform Preplanning Symbols and mark all applicable items. (The Uniform Preplanning Symbols are shown on page 5 of this document. A sample site plan is shown on page 6.)

• The Contractor is required to submit a structural footprint (building floor plan) showing the main utility shutoffs, building entrance openings, exit stairs and locations of fire protection systems (fire department connections, sprinkler risers, post indicator valves, back flow devices, standpipes and pipes, fire pumps, emergency generators, fire alarm control panels). Please utilize the Uniform Preplanning Symbols and mark all applicable items. (The Uniform Preplanning Symbols are shown on page 5 of this document. A sample structural footprint plan is shown on page 7.)

• The Contractor may request assistance or preliminary review of their Pre-Fire Protection Plan fire prior to building final; however, plan will not be accepted until time of the building final.

• The Contractor can make last minute changes to the Pre-Fire Protection Plan at the time of the inspection and with Fire Inspector approval.

Pre-fire Protection Plan submittal forms are available: 1) Via the North Collier Fire District Website (www.northcollierfire.com); 2) in person at North Collier Fire Prevention Offices, 6495 Taylor Road, Naples, FL 34109; and 3) in person from any North Collier Fire Inspector.

Questions? Please contact the North Collier Fire Prevention Bureau at (239) 597-9227.

PRE-PLANNING FORM

Hover form fields for instructions.Date Inspector review date (District use only)

Inspector name Building name

Street Address City State ZIP

Management Information

Owner Work Cell

Property manager Work Cell

Monitoring company Work Cell

Life Safety and Occupant Considerations

Alarm panel location Hours of operation

Special Needs Occupants

Unit Unit Unit

Additional notes

Hazardous Materials

Chemical name AmountDOT Guide Book page #

Shut-off location and procedure

Additional special hazards and locations

Pre-Fire Protection Plan Submittal Form Page 2

Building Construction

Type of construction Occupancy class

Bldg sq. ft. Roof type

Ceiling type Does this building have multiple or drop ceilings? NoYes

Do you have an on-site response plan? Yes No Number of floors Units per floor

Water Supply

Primary water supply Secondary water supply

Static pressure Residual pressure Flow rate

Additional/alternative water supplies

Fire pump? Yes No Sprinkled? Yes No Needed fire flow Available fire flow

Fire pump location FDC locations

Fire flow @20 psi Main size to backflow preventer Main size at sprinkler riser

Consideration for supply apparatus placement

Pre-Fire Protection Plan Submittal Form Page 3

Truck Company Considerations

Primary aerial apparatus placement Secondary aerial apparatus placement

Forcible entry concerns

Roll up doors? Yes No How many?

Bars over openings? Yes No Window type

Magnetic locks? Yes No Roof access stairwell and locations

Air handlers? Yes No How many? Locations

Skylights? Yes No Locations

Vertical ventilation concerns

Parapet walls or false roofs? Yes No

Overhead obstructions

Additional notes

Pre-Fire Protection Plan Submittal Form Page 4

UNIFORM PREPLANNING SYMBOLS

Symbol Definition

Fire Pump

Post Indicator Valve

Backflow Preventer

Sprinkler Control

Fire Department Connection

Fire Hydrant

Draft Site

Draft Hydrant

Symbol Definition

Hose Cabinet/Connection

Diesel Tank & Capacity

Diesel Tank Shut Off

LP Tank & Capacity

LP Tank Shut Off

Gasoline Tank & Capacity

Gasoline Tank Shut Off

Natural Gas Shut Off

Symbol Definition

Keybox

Annunciator Panel

Fire Alarm Panel

Elevator

Elevator Equipment

Symbol Definition

Electric Room

Electric Disconnect

Emergency Generator

Electric Transformer

Air Conditioning Control

Symbol Definition

Stairs

Roof Access

Pressurized Smoke

Attic Access

Skylight

Symbol Definition

Hazardous Materials (Coded per NFPA 704)

Above Ground

Underground

Water Shut Off

Biohazard

Pre-Fire Protection Plan Submittal Form Page 5

PLANS & DIAGRAMS

Pre-Fire Protection Plan Submittal Form Page 6

Page 7Pre-Fire Protection Plan Submittal Form

Pre-Fire Protection Plan Submittal Form Page 8