+ All Categories
Home > Documents > Untitled - Major Projects (nsw.gov.au)

Untitled - Major Projects (nsw.gov.au)

Date post: 02-Mar-2023
Category:
Upload: khangminh22
View: 1 times
Download: 0 times
Share this document with a friend
177
Transcript

Thank You for Y

our Business

Aboriginal A

rchaeology Service

INC

: 1400988 P

O B

ox 6283 Rouse H

ill NS

W 2155

Mobile: 0490 126 040

Em

ail: [email protected]

17

th August 2017

Attention: Shezani N

asoordeen G

ML H

eritage – Anglican Schools C

orporation R

eference: 15-0448A

Registration for A

boriginal comm

unity consultation at Lot 130 DP1138775 and Lot

14 DP1120290 R

ouse Hill N

SW – A

boriginal Heritage Im

pact Permit (A

HIP)

Aboriginal A

rchaeology Service is seeking involvem

ent in all consultation meetings and

fieldwork for the above-m

entioned project, as we are registered traditional ow

ners of the area. A

AS

imm

ediate family has lived in the area from

1897 and retains local and oral history on behalf of its first nation people. W

e have no objection to our information being

provided to the Office of E

nvironment and H

eritage and the Local Aboriginal Land

Council.

AA

S can assist w

ith input that can be incorporated into a written assessm

ent of cultural values of the area. W

e are also able to provide fit staff to assist with w

ork that may

involve physical labour. We can provide our schedule of rates and copies of relevant

certificates of currency for business insurances on request.

All correspondence should be em

ailed to AA

S.info@

bigpond.com and. The area is an

important part of our culture and valued by our fam

ily.

Yours truly

A

ndrew W

illiams

6 Septem

ber 2017

Mr K

evin Cavanagh

Deerubbin Local A

boriginal Land Council

PO

BO

X 40

PE

NR

ITH

BC

NS

W 2751

Our R

ef: 15-0448Alalc2

Re: R

ouse H

ill An

glican C

ollege R

edevelopment —

Notification of

Ab

orig

inal R

egistration

for C

om

mu

nity Con

sultatio

n

Dear M

r Cavanagh,

The abovem

entioned project is a State S

ignificant Developm

ent project (SS

D).

The

project application

number

is S

SD

8006.

The

State

Environm

ental

Assessm

ent Requirem

ents for SS

D 8006, stipulate that the project m

ust follow

the NS

W state A

boriginal heritage processes as described:

As an A

HIP

is not required for this approvals pathway under P

art 4 of the

Environm

ent Planning and A

ssessment A

ct (EP

A) 1979, the assessm

ent will

follow the S

EA

Rs for S

SD

8006, which m

irrors the NS

W A

boriginal heritage policies.

Therefore, in accordance w

ith Section 4.1.6 of the A

boriginal cultural heritage

consultation requirements for proponents 2010, I w

rite to inform you of those

Aboriginal people and organisations that have registered an interest in being

consulted regarding the Rouse H

ill Anglican C

ollege Masterplan project. T

he

registered parties are listed in the attached table.

Invitations to register an interest by A

boriginal people with cultural know

ledge

relevant to the project area were sent 11 A

ugust 2017 and a notification was

also placed in a local newspaper on 3 A

ugust 2017. Registration closed on the

25 August 2017.

Yours sincerely

GM

L Heritag

e Pty Ltd

Sh

ezani Nasoo

rdeen

C

onsultan

t

Attach

ments:

• R

ecord of names of each A

boriginal registrant for the Rouse H

ill Anglican C

ollege Masterplan

project

• C

opy of A

boriginal registration records

6 Septem

ber 2017

Susan H

arrison

Senior T

eam Leader P

lanning G

reater Sydne

y Branch

Regional O

perations

Office of E

nvironment and H

eritage

PO

Box 644

Parram

atta NS

W 2124

Our R

ef: 15-0448Aoehc2

Re: R

ouse H

ill An

glican C

ollege M

asterplan —

Notification

of Ab

origin

al R

egistration

for C

omm

unity C

onsu

ltation

Dear M

s Harrison,

The

abovementioned

project is

a S

tate S

ignificant D

evelopment

project (S

SD

). The project application num

ber is SS

D 8006. T

he State E

nvironmental

Assessm

ent R

equirements

for S

SD

8006,

stipulate that

the project

must

follow the N

SW

state Aboriginal heritage processes as described:

As an A

HIP

is not required for this approvals pathway under P

art 4 of the E

nvironment P

lanning and Assessm

ent Act (E

PA

) 1979, the assessment w

ill

follow the S

EA

Rs for S

SD

8006, which m

irrors the NS

W A

boriginal heritage

policies.

Therefore, in accordance w

ith Section 4.1.6 of the A

boriginal cultural heritage

consultation requirements for proponents 2010, I w

rite to inform you of those

Aboriginal people and organisations that have registered an interest in being

consulted regarding the Rouse H

ill Anglican C

ollege Masterplan project. T

he registered parties are listed in the attached table.

Invitations to register an interest by A

boriginal people with cultural know

ledge

relevant to the project area were sent 11 A

ugust 2017 and a notification was

also placed in a local newspaper on 3 A

ugust 2017. Registration closed on

the 25 August 2017.

Yours sincerely

GM

L Heritag

e Pty Ltd

Sh

ezani Nasoo

rdeen

C

onsultan

t

Attach

ments:

• R

ecord of names of each A

boriginal registrant for the Rouse H

ill Anglican C

ollege Masterplan

project

• C

opy of A

boriginal registration records

Reg

istered A

bo

rigin

al Parties (R

AP

s) for th

e Ro

use H

ill An

glican

Co

llege M

asterplan

P

roject

Hi S

hezani, Please see attached letter in reply to the A

boriginal Cultural H

eritage Assessm

ent and Aboriginal T

echnical R

eport for the proposed redevelopment of R

ouse Hill A

nglican College, in R

ouse Hill.

Look forw

ard to working w

ith you on this project. K

ind Regards,

Anna

On W

ed, Sep 6, 2017 at 10:19 AM

, Nasoordeen, Shezani <

shezanin@gm

l.com.au>

wrote:

Dear M

r Workm

an,

I apologise, it appears we m

istakenly did not send the project methodology to your group. Please find a

link below. If you like, you can provide com

ment on the project m

ethodology by phone.

Darug L

and Observations

15-0448Ac1

Subject: Rouse H

ill Anglican C

ollege (RH

AC

) Redevelopm

ent—P

rovision of Project M

ethodology.

Thank you for your registration to be a part of the proposed R

ouse Hill A

nglican College

Redevelopm

ent—A

boriginal Cultural H

eritage Assessm

ent project. Following the closing of the

registration period, I write to provide you w

ith updated project information and the proposed project

methodology for undertaking the cultural heritage assessm

ent of these properties.

Initially, the due diligence assessment, first undertaken in 2015 identified that an A

boriginal Heritage

Impact Perm

it (AH

IP) under Section 90 of the National Parks and W

ildlife Act (N

PW) 1974 w

as required. H

owever, since that assessm

ent the project has become a S

tate Significant D

evelopment. A

s an AH

IP is

not required for this approvals pathway under Part 4 of the E

nvironment Planning and A

ssessment A

ct (E

PA) 1979, the assessm

ent must adhere to the State E

nvironmental A

ssessment R

equirements (SE

AR

s) stipulated for this project application num

ber: SSD 8006—

Rouse H

ill Anglican C

ollege Redevelopm

ent.

The SE

AR

s for SSD 8006 involve the follow

ing:

Address A

boriginal Heritage in accordance w

ith the Guide to investigating, assessing and reporting on

Aboriginal C

ultural Heritage in N

SW (O

EH

, 2011) and Aboriginal C

ultural Heritage C

onsultation R

equirements for Proponents 2010. (SSD

8006, SEA

Rs, 2 N

ovember 2016).

Therefore, A

boriginal comm

unity consultation following these guidelines is now

for the purposes of obtaining SSD

approval for the redevelopment, not an A

HIP

.

Please follow the follow

ing link to access the project methodology docum

ent which presents inform

ation regarding the proposed developm

ent of RH

AC

, current Aboriginal heritage m

anagement recom

mendations

and the proposed methodology for the cultural heritage assessm

ent.

https://spaces.hightail.com/receive/et64U

ptR1d

As part of the cultural heritage assessm

ent (Stage 3 of consultation, following the stipulated cultural

heritage requirements for A

boriginal comm

unity consultation), a field survey, followed by archaeological

test excavation, under the OE

H C

ode of Practice, will be undertaken after the review

of the m

ethodology. The field survey m

ethodology is outlined below, if you have any com

ments or feedback on

this methodology, please provide them

in writing or by phone by 2 O

ctober 2017.

Following the field survey and test excavation, an A

rchaeological Technical R

eport (AT

R) and A

boriginal C

ultural Values A

ssessment R

eport (AC

HA

R) w

ill be prepared. You w

ill be provided these reports, and afforded an opportunity to com

ment, in line w

ith Stage 4 of the consultation requirements.

Input Sought from R

egistered Aboriginal P

arties

GM

L seeks com

ment and input from

the Registered A

boriginal Parties (RA

Ps) on the following:

• proposed project methodology;

• field survey methodology;

• current Aboriginal heritage m

anagement recom

mendations; and

• culturally appropriate information regarding A

boriginal cultural or social values associated with the

study area.

Please provide any comm

ents in writing, by em

ail to:

Shezani N

asoordeen shezanin@gm

l.com.au

372 Elizabeth Street,

Surry Hills, N

SW 2010

Alternatively com

ment m

ay be made by phone, to Shezani on 9319 4811.

Yours sincerely

GM

L H

eritage Pty Ltd

Shezani N

asoordeen, MA

Consultant, A

rchaeologist

Sh

ezani N

asoo

rdeen

| Co

nsu

ltant

GM

L H

eritage

#replysig

I have reviewed the proposed project m

ethodology and field survey methodology.

I am satisfied and seek to endorse the m

ethodology’s

Thank Y

ou

Steven H

ickey RA

P

Widescope Indigenous G

roup

15-0448Ac1

Sub

ject: Rou

se Hill A

ng

lican Co

llege (R

HA

C) R

edevelopm

ent—P

rovision of Pro

ject Metho

dology.

Dear S

teven,

Thank you for your registration to be a part of the proposed R

ouse Hill A

nglican College R

edevelopment—

Aboriginal

Cultural H

eritage Assessm

ent project. Follow

ing the closing of the registration period, I write to provide you w

ith updated project inform

ation and the proposed project methodolog

y for undertaking the cultural heritage assessment of these

properties.

Initiall y, the due diligence assessment, first undertaken in 2015 identified that an A

boriginal Heritage Im

pact Perm

it(A

HIP

) under Section 90 of the N

ational Parks and W

ildlife Act (N

PW

) 1974 was re quired. H

owever, since that

assessment the project has becom

e a State S

ignificant Developm

ent. As an A

HIP

is not required for this approvals

pathway under P

art 4 of the Environm

ent Planning and A

ssessment A

ct (EP

A) 1979, the assessm

ent must adhere to

the State E

nvironmental A

ssessment R

equirements (S

EA

Rs) stipulated for this project application num

ber: SS

D 8006—

Rouse H

ill Anglican C

ollege Redevelopm

ent.

The S

EA

Rs for S

SD

8006 involve the following:

Therefore, A

boriginal comm

unity consultation following these guidelines is now

for the purposes of obtaining SS

D

approval for the redevelopment, not an A

HIP

.

Please follow

the followin g link to access the project m

ethodology docum

ent which presents inform

ation regarding the

proposed development of R

HA

C, current A

boriginal heritage managem

ent recomm

endations and the proposed

methodology for the cultural heritage assessm

ent.

https://spaces.hightail.com/receive/et64U

ptR1d

As part of the cultural heritage

assessment (S

tage 3 of consultation, follow

ing the stipulated cultural heritage

requirements for A

boriginal comm

unity consultation), a field survey, followed b

y archaeological test excavation, under the O

EH

Code of P

ractice, will be undertaken after the review

of the methodology. T

he field survey m

ethodology is

outlined below, if you have any com

ments or feedback on this m

ethodology, please provide them

in writing or by phone

by 2 Octo

ber 2017.

Follow

ing the field survey and test excavation, an Archaeological T

echnical Report (A

TR

) and Aboriginal C

ultural Values

Assessm

ent Report (A

CH

AR

) will be prepared. Y

ou will be provided these reports, and afforded an opportunity to

comm

ent, in line with S

tage 4 of the consultation requirements.

Inp

ut S

ou

gh

t from

Reg

istered A

bo

rigin

al Parties

GM

L seeks comm

ent and input from the R

egistered Aboriginal P

arties (RA

Ps) on the follow

ing:

• proposed project m

ethodology;

• field surve

y methodolog

y;

• current A

boriginal heritage managem

ent recomm

endations; and

• culturally appropriate inform

ation regarding Aboriginal cultural or social values associated w

ith the study area.

Please provide any com

ments in w

riting, by email to:

Shezani N

asoordeen shezanin@gm

l.com.au

372 Elizabeth S

treet,

Surry H

ills, NS

W 2010

Alternatively com

ment m

ay be made by phone, to S

hezani on 9319 4811.

Yours sincerely

GM

L Heritag

e Pty Ltd

Sh

ezani Nasoo

rdeen, M

A

Con

sultant, A

rchaeolog

ist

Jod

i Cam

eron

| Co

nsu

ltant

GM

L H

eritage

#replysig

4 Decem

ber 2017

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r William

s,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

eport (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the A

CH

AR

/AT

R.

In accordance with the O

EH

’s 2010 re quirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet S

UR

RY

HILLS

NS

W 2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Rane C

onsulting

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r William

s,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Am

anda Hickey C

ultural Services

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

s Hickey,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Biam

anga

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Storer,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

A1 Indigenous S

ervices

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

s Hickey,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Gunjeew

ong Cultural H

eritage Aboriginal C

orporation

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

s Carroll T

urrise,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Darug T

ribal Aboriginal C

orporation

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Reilly,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Darug Land O

bservations

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Workm

an,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Darug A

boriginal Land Care

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Dyer,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Goobah D

evelopments

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Sm

ith,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Tocom

wall

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Franks,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Darug C

ustodian Aboriginal C

orporation

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

s Coplin,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Muragadi H

eritage Indigenous Corporation

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear Jesse Johnson,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Murra B

idgee Mullangari

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Johnson,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Murram

arang

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

s Sm

ith,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Khan,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

eport (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the A

CH

AR

/AT

R.

In accordance with the O

EH

’s 2010 re quirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet S

UR

RY

HILLS

NS

W 2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Widescope Indigenous G

roup

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Hickey,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

e port (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated durin g the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

Darug A

boriginal Cultural H

eritage Assessm

ents

Unit 9, 6 C

hapman A

venue C

hatswood N

SW

2067

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment

Rep

ort and A

rchaeo

logical T

echnical R

eport

Dear M

s Everingham

,

Please

find enclosed

the draft

combined

Aboriginal

Cultural

Heritage

Assessm

ent Report and A

rchaeological Technical R

eport (AC

HA

R/A

TR

) for

Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments.

This report details the results of the program

of test excavation undertaken at

7 W

orcester R

d, R

ouse H

ill in

October

to support

the S

tate S

ignificant

Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

.

Due

to no

artefacts being

recovered during

test excavation

we

have

recomm

ended that an SS

D approval should be sought from

the Departm

ent of

Planning

and E

nvironment

(DoP

E)

to im

pact the

AH

IMS

site

45-5-3920 (Isolated find w

hich could not be relocated during the site survey) as a result

of the

proposed R

HA

C

redevelopment

project, w

ithout further

need for

archaeological investigation. The results of the test excavation are detailed in

Section 2 of the A

CH

AR

/AT

R.

In accordance

with

the O

EH

’s 2010

requirements

for consultation

all

Registered A

boriginal Parties are provided w

ith 28 days to review the final

draft AC

HA

R/A

TR

. As this includes the C

hristmas period, G

ML has extended

this review period to 42 days. C

ould you please review this report and provide

any comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au Level 6, 372 E

lizabeth Street

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

4 Decem

ber 2017

78 Forbes S

treet E

mu P

lains NS

W 2750

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment

Rep

ort and A

rchaeo

logical T

echnical R

eport

Dear M

r Khan,

Please

find enclosed

the draft

combined

Aboriginal

Cultural

Heritage

Assessm

ent Report and A

rchaeological Technical R

eport (AC

HA

R/A

TR

) for

Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments.

This report details the results of the program

of test excavation undertaken at

7 W

orcester R

d, R

ouse H

ill in

October

to support

the S

tate S

ignificant

Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

.

Due

to no

artefacts being

recovered during

test excavation

we

have

recomm

ended that an SS

D approval should be sought from

the Departm

ent of

Planning

and E

nvironment

(DoP

E)

to im

pact the

AH

IMS

site

45-5-3920 (Isolated find w

hich could not be relocated during the site survey) as a result

of the

proposed R

HA

C

redevelopment

project, w

ithout further

need for

archaeological investigation. The results of the test excavation are detailed in

Section 2 of the A

CH

AR

/AT

R.

In accordance

with

the O

EH

’s 2010

requirements

for consultation

all

Registered A

boriginal Parties are provided w

ith 28 days to review the final

draft AC

HA

R/A

TR

. As this includes the C

hristmas period, G

ML has extended

this review period to 42 days. C

ould you please review this report and provide

any comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au Level 6, 372 E

lizabeth Street

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

DARUG CU

STODIAN

ABO

RIGINAL

CORPO

RATION

PO

BOX 81 W

INDSO

R 2756 PHO

NE: 0245775181 FAX: 0245775098

MO

BILE: 0415770163 Leanne Watson

0414962766 Justine Coplin EM

AIL: mulgokiw

[email protected]

/ [email protected]

.au

Attention: GML

Subject: Rouse Hill Anglican College—Aboriginal Cultural Heritage Assessm

ent Report and Archaeological Technical Report

Dear Jodi

We have received and review

ed the Rouse Hill Anglican College—Aboriginal Cultural

Heritage Assessment Report and Archaeological Technical Report–.The report and findings

are very inclusive and informative, docum

ented to a high standard. Surrounding this area are m

any highly significant sites. Although there is not a major finding of artefacts here this

area is still important for the inform

ation that we have collected here to assess the bigger

picture and add information to our overall studies of how

Darug people moved, lived and

survived in this landscape.

We support the findings and recom

mendations in this report.

Please contact us with all further enquiries on the above contacts.

Regards

Justine Coplin

4 Decem

ber 2017

Darug A

boriginal Land Care

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Dyer,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

eport (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find

which could not be relocated during the site survey) as a result of the proposed R

HA

C redevelopm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the A

CH

AR

/AT

R.

In accordance with the O

EH

’s 2010 re quirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet S

UR

RY

HILLS

NS

W 2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

Jod

i Cam

eron

| Co

nsu

ltant

GM

L H

eritage

#replysig

Darug A

boriginal Land care

U

ncle Des D

yer

18

a Perigee C

lose D

oonside N

SW 2

76

7

AB

N 71 301 006 047

Jodi Cam

eron A

rchaeologist G

M L H

eritage Level 6, 372 Elizabeth Street Surry H

ills 2010 N

SW

Re: R

ouse Hill, A

nglican College .

Dear, Tyler,

The Darug A

boriginal Land care/ Uncle D

es Dyer, has no objections to the planned

development.

We have read your report and agree w

ith the recomm

endations. W

e ask that all artefacts be reburied on site out of harm's w

ay, that any rock cravens, and scared tree be preserved, w

ere possible. T

he Darug A

boriginal Land care have and always w

ill holds all land specific social, spiritual and cultural values to our organisation. W

e are Traditional Ow

ner, our mem

bers have lived on Darug land for m

ost of their lives and w

orked in the area. We have been doing C

ultural Heritage A

ssessments for over 20

years and still do today. R

espectfully yours, U

ncle Des D

yer D

arug Elder D

arug Aboriginal Land Care

Mobile 0408 360 814

Ryan Johnson | M

urra B

idg

ee Mu

llang

ari

A

boriginal Corporation C

ultural Heritage

A: P

O B

ox 246, Seven H

ills, NS

W, 2147

E: m

urrabidgeemullangari@

yahoo.com.au

ICN

: 8112 N

ote: Privileged/C

onfidential information m

ay be contained in this message and m

ay be subject to legal privilege. A

ccess to this e-mail by anyone other than the intended is unauthorised. If you are not the intended recipient (or

responsible for delivery of the message to such person), you m

ay not use, copy, distribute or deliver to anyone this

message (or an

y part of its contents ) or take any action in reliance on it. In such case, you should destroy this m

essage, and notify us imm

ediately. If you have received this email in error, please notify us im

mediately by e-m

ail or telephone and delete the e-m

ail from any com

puter. If you or your emplo

yer does not consent to internet e-mail

messages of this kind, please notify us im

mediately. A

ll reasonable precautions have been taken to ensure no viruses are present in this e-m

ail. As our com

pany cannot accept responsibility for any loss or damage arising from

the use of this e-m

ail or attachments w

e recomm

end that you subject these to your virus checking procedures prior to use. The

views, opinions, conclusions and other inform

ations expressed in this electronic mail are not given or endorsed by the

company unless otherw

ise indicated by an authorized representative independent of this m

essage.

4 Decem

ber 2017

Murra B

idgee Mullangari

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r Johnson,

Please follow

the below link to the draft com

bined Abori ginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

eport (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his re port details the results of the program

of test excavation undertaken at 7 Worcester R

d, Rouse H

ill in October to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find w

hich could not be relocated during the site survey) as a result of the proposed RH

AC

redevelopment project, w

ithout

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Abori ginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

Jod

i Cam

eron

| Co

nsu

ltant

GM

L H

eritage

029318 7579

02 9319 4811w

ww

.gm

l.com

.au

#replysig

DA

RU

G L

AN

D

OB

SE

RV

AT

ION

S P

TY

LT

D

AB

N 2

7 6

02 7

65 4

53

_____________________________________________________________________ E

ma

il: d

ar

ug

la

nd

ob

se

rv

at

ion

s@

gm

ail

.co

m

PO

BO

X 2

00

6 B

EN

DA

LO

NG

NS

W 2

76

1

Mo

bil

e: 0

41

3 6

87

27

9

11th January, 2018

Jodi Cam

eron G

ML H

eritage Pty Ltd Level 6, 372 Elizabeth Street SU

RR

Y H

ILLS NSW

2010 D

ear Jodi, R

E:

RO

USE

HIL

L A

NG

LIC

AN

CO

LL

EG

E R

ED

EV

EL

OPM

EN

T

A

boriginal Cultural H

eritage Assessm

ent & A

rchaeological Technical Report

Darug Land O

bservations Pty Ltd has reviewed the draft A

boriginal Cultural H

eritage A

ssessment and the A

rchaeological Technical Report, and supports the m

ethodology for the proposed redevelopm

ent of the Rouse H

ill Anglican C

ollege at Lot 14 DP

1120290 and Lot 130 DP 1138775 at the intersection of R

ouse Road and W

orcester R

oad, in Rouse H

ill. In addition, w

e support the recomm

endation that an SSD approval to be sought from

the D

epartment of Planning and Environm

ent to impact the A

HIM

S site 45-5-3920 due to no artefacts being recovered during test excavations at the R

ouse Hill A

nglican C

ollege site. Furtherm

ore, Darug Land O

bservations Pty Ltd would be involved in the m

onitoring of the topsoil rem

oval and/or any other form of w

orks to be carried out on the site. Y

ours sincerely,

Jamie W

orkman

U

ncle Gordon W

orkman

Darug Land O

bservations Pty Ltd

Darug Elder

4 Decem

ber 2017

Rane C

onsulting

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

r William

s,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

eport (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

hisre port details the results of the program

of test excavation undertaken at 7 Worcester R

d, Rouse H

ill in October to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5-3920 (Isolated find w

hich could not be relocated during the site surve y) as a result of the proposed RH

AC

redevelopment project, w

ithout

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010

02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

Jod

i Cam

eron

| Co

nsu

ltant

GM

L H

eritage

029318 7579

02 9319 4811w

ww

.gm

l.com

.au

#replysig

Jod

i Cam

eron

| Co

nsu

ltant

GM

L H

eritage

Level 6 372 Elizabeth St, Surry Hills NSW 2010

T Direct: 029318 7579 | T Reception: 02 9319 4811 |w

ww

.gm

l.com

.au

The information contained in this e-mail message and any attached files may be confidential and may contain copyright material of GML Heritage

Pty Ltd or third parties. Any unauthorised use, disclosure or copying of this e-mail and/or its attachments is prohibited. If you have received this e-mail in error please notify the sender immediately by return e-mail and delete all copies of the m

essage and attachments. Before opening or using attachments, please check them for viruses or defects. Our liability is limited to resupplying the e-mail and attached files. Content and views expressed in this e-mail may be those of the sender, and are not necessarily endorsed by GML Heritage Pty Ltd. Please think before you print.

mailto:cheriecarroll68@

yahoo.com

jodic@gm

l.com.au

mailto:jodic@

gml.com

.au

[email protected]

4 Decem

ber 2017

Gunjeew

ong Cultural H

eritage Aboriginal C

orporation

Our R

ef: 15-0448A

Re: R

ouse Hill A

ng

lican Colleg

e—A

bo

riginal Cu

ltural H

eritage A

ssessment R

eport and Archaeo

logical T

echnical R

eport

Dear M

s Carroll T

urrise,

Please follow

the below link to the draft com

bined Aboriginal C

ultural Heritage A

ssessment R

eport and Archaeological

Technical R

eport (AC

HA

R/A

TR

) for Rouse H

ill Anglican C

ollege (RH

AC

) project for your review and com

ments. T

his

report details the results of the program of test excavation undertaken at 7 W

orcester Rd, R

ouse Hill in O

ctober to

support the State S

ignificant Developm

ent Application (S

SD

A) for the redevelopm

ent of RH

AC

. The below

link will

remain active until 31 January 2018.

https://spaces.hightail.com/receive/M

O1E

y856jP

Due to no artefacts being recovered during test excavation w

e have recomm

ended that an SS

D approval should be

sought from the D

epartment of P

lanning and Environm

ent (DoP

E) to im

pact the AH

IMS

site 45-5- 3920 (Isolated find

which could not be relocated during the site survey) as a result of the proposed R

HA

C redevelo pm

ent project, without

further need for archaeological investigation. The results of the test excavation are detailed in S

ection 2 of the

AC

HA

R/A

TR

.

In accordance with the O

EH

’s 2010 requirements for consultation all R

egistered Aboriginal P

arties are provided with 28

days to review the final draft A

CH

AR

/AT

R. A

s this includes the Christm

as period, GM

L has extended this review period

to 42 days. C

ould you please review this report and provide an

y comm

ents by 15 January 2018.

jodic@gm

l.com.au or shezanin@

gml.com

.au

Level 6, 372 Elizabeth S

treet

SU

RR

Y H

ILLS N

SW

2010 02 9319 4811

Yours sincerely

GM

L Heritag

e Pty Ltd

Jodi C

amero

n

Heritag

e Co

nsultant

Jod

i Cam

eron

| Co

nsu

ltant

GM

L H

eritage

Level 6 372 Elizabeth St, Surry Hills NSW 2010

T Direct: 029318 7579 | T Reception: 02 9319 4811 |w

ww

.gm

l.com

.au

The information contained in this e-mail message and any attached files may be confidential and may contain copyright material of GML Heritage Pty parties. Any unauthorised use, disclosure or copying of this e-mail and/or its attachments is prohibited. If you have received this e-mail in error please notifyimmediately by return e-mail and delete all copies of the message and attachments. Before opening or using attachments, please check them for virusesOur liability is limited to resupplying the e-mail and attached files. Content and views expressed in this e-mail may be those of the sender, and are not endorsed by GML Heritage Pty Ltd. Please think before you print. #replysig

Jod

i Cam

eron

|Co

nsu

ltant

GM

L H

eritage

Level 6 372 Elizabeth St, Surry HillsNSW 2010

T Direct: 02 9318 7579 | T Reception: 02 93194811 | www.gm

l.com.au

The information contained in this e-mail message and any attached files may be confidential and may contain copyright material of GML Heritage Ptyparties. Any unauthorised use, disclosure or copying of this e-mail and/or its attachments is prohibited. If you have received this e-mail in error please notifimmediately by return e-mail and delete all copies of the message and attachments. Before opening or using attachments, please check them for viruseOur liability is limited to resupplying the e-mail and attached files. Content and views expressed in this e-mail may be those of the sender, and are noendorsed by GML Heritage Pty Ltd. Please think before you print. #replysig