17
th August 2017
Attention: Shezani N
asoordeen G
ML H
eritage – Anglican Schools C
orporation R
eference: 15-0448A
Registration for A
boriginal comm
unity consultation at Lot 130 DP1138775 and Lot
14 DP1120290 R
ouse Hill N
SW – A
boriginal Heritage Im
pact Permit (A
HIP)
Aboriginal A
rchaeology Service is seeking involvem
ent in all consultation meetings and
fieldwork for the above-m
entioned project, as we are registered traditional ow
ners of the area. A
AS
imm
ediate family has lived in the area from
1897 and retains local and oral history on behalf of its first nation people. W
e have no objection to our information being
provided to the Office of E
nvironment and H
eritage and the Local Aboriginal Land
Council.
AA
S can assist w
ith input that can be incorporated into a written assessm
ent of cultural values of the area. W
e are also able to provide fit staff to assist with w
ork that may
involve physical labour. We can provide our schedule of rates and copies of relevant
certificates of currency for business insurances on request.
All correspondence should be em
ailed to AA
S.info@
bigpond.com and. The area is an
important part of our culture and valued by our fam
ily.
Yours truly
A
ndrew W
illiams
6 Septem
ber 2017
Mr K
evin Cavanagh
Deerubbin Local A
boriginal Land Council
PO
BO
X 40
PE
NR
ITH
BC
NS
W 2751
Our R
ef: 15-0448Alalc2
Re: R
ouse H
ill An
glican C
ollege R
edevelopment —
Notification of
Ab
orig
inal R
egistration
for C
om
mu
nity Con
sultatio
n
Dear M
r Cavanagh,
The abovem
entioned project is a State S
ignificant Developm
ent project (SS
D).
The
project application
number
is S
SD
8006.
The
State
Environm
ental
Assessm
ent Requirem
ents for SS
D 8006, stipulate that the project m
ust follow
the NS
W state A
boriginal heritage processes as described:
As an A
HIP
is not required for this approvals pathway under P
art 4 of the
Environm
ent Planning and A
ssessment A
ct (EP
A) 1979, the assessm
ent will
follow the S
EA
Rs for S
SD
8006, which m
irrors the NS
W A
boriginal heritage policies.
Therefore, in accordance w
ith Section 4.1.6 of the A
boriginal cultural heritage
consultation requirements for proponents 2010, I w
rite to inform you of those
Aboriginal people and organisations that have registered an interest in being
consulted regarding the Rouse H
ill Anglican C
ollege Masterplan project. T
he
registered parties are listed in the attached table.
Invitations to register an interest by A
boriginal people with cultural know
ledge
relevant to the project area were sent 11 A
ugust 2017 and a notification was
also placed in a local newspaper on 3 A
ugust 2017. Registration closed on the
25 August 2017.
Yours sincerely
GM
L Heritag
e Pty Ltd
Sh
ezani Nasoo
rdeen
C
onsultan
t
Attach
ments:
• R
ecord of names of each A
boriginal registrant for the Rouse H
ill Anglican C
ollege Masterplan
project
• C
opy of A
boriginal registration records
6 Septem
ber 2017
Susan H
arrison
Senior T
eam Leader P
lanning G
reater Sydne
y Branch
Regional O
perations
Office of E
nvironment and H
eritage
PO
Box 644
Parram
atta NS
W 2124
Our R
ef: 15-0448Aoehc2
Re: R
ouse H
ill An
glican C
ollege M
asterplan —
Notification
of Ab
origin
al R
egistration
for C
omm
unity C
onsu
ltation
Dear M
s Harrison,
The
abovementioned
project is
a S
tate S
ignificant D
evelopment
project (S
SD
). The project application num
ber is SS
D 8006. T
he State E
nvironmental
Assessm
ent R
equirements
for S
SD
8006,
stipulate that
the project
must
follow the N
SW
state Aboriginal heritage processes as described:
As an A
HIP
is not required for this approvals pathway under P
art 4 of the E
nvironment P
lanning and Assessm
ent Act (E
PA
) 1979, the assessment w
ill
follow the S
EA
Rs for S
SD
8006, which m
irrors the NS
W A
boriginal heritage
policies.
Therefore, in accordance w
ith Section 4.1.6 of the A
boriginal cultural heritage
consultation requirements for proponents 2010, I w
rite to inform you of those
Aboriginal people and organisations that have registered an interest in being
consulted regarding the Rouse H
ill Anglican C
ollege Masterplan project. T
he registered parties are listed in the attached table.
Invitations to register an interest by A
boriginal people with cultural know
ledge
relevant to the project area were sent 11 A
ugust 2017 and a notification was
also placed in a local newspaper on 3 A
ugust 2017. Registration closed on
the 25 August 2017.
Yours sincerely
GM
L Heritag
e Pty Ltd
Sh
ezani Nasoo
rdeen
C
onsultan
t
Attach
ments:
• R
ecord of names of each A
boriginal registrant for the Rouse H
ill Anglican C
ollege Masterplan
project
• C
opy of A
boriginal registration records
Reg
istered A
bo
rigin
al Parties (R
AP
s) for th
e Ro
use H
ill An
glican
Co
llege M
asterplan
P
roject
Hi S
hezani, Please see attached letter in reply to the A
boriginal Cultural H
eritage Assessm
ent and Aboriginal T
echnical R
eport for the proposed redevelopment of R
ouse Hill A
nglican College, in R
ouse Hill.
Look forw
ard to working w
ith you on this project. K
ind Regards,
Anna
On W
ed, Sep 6, 2017 at 10:19 AM
, Nasoordeen, Shezani <
shezanin@gm
l.com.au>
wrote:
Dear M
r Workm
an,
I apologise, it appears we m
istakenly did not send the project methodology to your group. Please find a
link below. If you like, you can provide com
ment on the project m
ethodology by phone.
Darug L
and Observations
15-0448Ac1
Subject: Rouse H
ill Anglican C
ollege (RH
AC
) Redevelopm
ent—P
rovision of Project M
ethodology.
Thank you for your registration to be a part of the proposed R
ouse Hill A
nglican College
Redevelopm
ent—A
boriginal Cultural H
eritage Assessm
ent project. Following the closing of the
registration period, I write to provide you w
ith updated project information and the proposed project
methodology for undertaking the cultural heritage assessm
ent of these properties.
Initially, the due diligence assessment, first undertaken in 2015 identified that an A
boriginal Heritage
Impact Perm
it (AH
IP) under Section 90 of the National Parks and W
ildlife Act (N
PW) 1974 w
as required. H
owever, since that assessm
ent the project has become a S
tate Significant D
evelopment. A
s an AH
IP is
not required for this approvals pathway under Part 4 of the E
nvironment Planning and A
ssessment A
ct (E
PA) 1979, the assessm
ent must adhere to the State E
nvironmental A
ssessment R
equirements (SE
AR
s) stipulated for this project application num
ber: SSD 8006—
Rouse H
ill Anglican C
ollege Redevelopm
ent.
The SE
AR
s for SSD 8006 involve the follow
ing:
Address A
boriginal Heritage in accordance w
ith the Guide to investigating, assessing and reporting on
Aboriginal C
ultural Heritage in N
SW (O
EH
, 2011) and Aboriginal C
ultural Heritage C
onsultation R
equirements for Proponents 2010. (SSD
8006, SEA
Rs, 2 N
ovember 2016).
Therefore, A
boriginal comm
unity consultation following these guidelines is now
for the purposes of obtaining SSD
approval for the redevelopment, not an A
HIP
.
Please follow the follow
ing link to access the project methodology docum
ent which presents inform
ation regarding the proposed developm
ent of RH
AC
, current Aboriginal heritage m
anagement recom
mendations
and the proposed methodology for the cultural heritage assessm
ent.
https://spaces.hightail.com/receive/et64U
ptR1d
As part of the cultural heritage assessm
ent (Stage 3 of consultation, following the stipulated cultural
heritage requirements for A
boriginal comm
unity consultation), a field survey, followed by archaeological
test excavation, under the OE
H C
ode of Practice, will be undertaken after the review
of the m
ethodology. The field survey m
ethodology is outlined below, if you have any com
ments or feedback on
this methodology, please provide them
in writing or by phone by 2 O
ctober 2017.
Following the field survey and test excavation, an A
rchaeological Technical R
eport (AT
R) and A
boriginal C
ultural Values A
ssessment R
eport (AC
HA
R) w
ill be prepared. You w
ill be provided these reports, and afforded an opportunity to com
ment, in line w
ith Stage 4 of the consultation requirements.
Input Sought from R
egistered Aboriginal P
arties
GM
L seeks com
ment and input from
the Registered A
boriginal Parties (RA
Ps) on the following:
• proposed project methodology;
• field survey methodology;
• current Aboriginal heritage m
anagement recom
mendations; and
• culturally appropriate information regarding A
boriginal cultural or social values associated with the
study area.
Please provide any comm
ents in writing, by em
ail to:
Shezani N
asoordeen shezanin@gm
l.com.au
372 Elizabeth Street,
Surry Hills, N
SW 2010
Alternatively com
ment m
ay be made by phone, to Shezani on 9319 4811.
Yours sincerely
GM
L H
eritage Pty Ltd
Shezani N
asoordeen, MA
Consultant, A
rchaeologist
Sh
ezani N
asoo
rdeen
| Co
nsu
ltant
GM
L H
eritage
#replysig
I have reviewed the proposed project m
ethodology and field survey methodology.
I am satisfied and seek to endorse the m
ethodology’s
Thank Y
ou
Steven H
ickey RA
P
Widescope Indigenous G
roup
15-0448Ac1
Sub
ject: Rou
se Hill A
ng
lican Co
llege (R
HA
C) R
edevelopm
ent—P
rovision of Pro
ject Metho
dology.
Dear S
teven,
Thank you for your registration to be a part of the proposed R
ouse Hill A
nglican College R
edevelopment—
Aboriginal
Cultural H
eritage Assessm
ent project. Follow
ing the closing of the registration period, I write to provide you w
ith updated project inform
ation and the proposed project methodolog
y for undertaking the cultural heritage assessment of these
properties.
Initiall y, the due diligence assessment, first undertaken in 2015 identified that an A
boriginal Heritage Im
pact Perm
it(A
HIP
) under Section 90 of the N
ational Parks and W
ildlife Act (N
PW
) 1974 was re quired. H
owever, since that
assessment the project has becom
e a State S
ignificant Developm
ent. As an A
HIP
is not required for this approvals
pathway under P
art 4 of the Environm
ent Planning and A
ssessment A
ct (EP
A) 1979, the assessm
ent must adhere to
the State E
nvironmental A
ssessment R
equirements (S
EA
Rs) stipulated for this project application num
ber: SS
D 8006—
Rouse H
ill Anglican C
ollege Redevelopm
ent.
The S
EA
Rs for S
SD
8006 involve the following:
Therefore, A
boriginal comm
unity consultation following these guidelines is now
for the purposes of obtaining SS
D
approval for the redevelopment, not an A
HIP
.
Please follow
the followin g link to access the project m
ethodology docum
ent which presents inform
ation regarding the
proposed development of R
HA
C, current A
boriginal heritage managem
ent recomm
endations and the proposed
methodology for the cultural heritage assessm
ent.
https://spaces.hightail.com/receive/et64U
ptR1d
As part of the cultural heritage
assessment (S
tage 3 of consultation, follow
ing the stipulated cultural heritage
requirements for A
boriginal comm
unity consultation), a field survey, followed b
y archaeological test excavation, under the O
EH
Code of P
ractice, will be undertaken after the review
of the methodology. T
he field survey m
ethodology is
outlined below, if you have any com
ments or feedback on this m
ethodology, please provide them
in writing or by phone
by 2 Octo
ber 2017.
Follow
ing the field survey and test excavation, an Archaeological T
echnical Report (A
TR
) and Aboriginal C
ultural Values
Assessm
ent Report (A
CH
AR
) will be prepared. Y
ou will be provided these reports, and afforded an opportunity to
comm
ent, in line with S
tage 4 of the consultation requirements.
Inp
ut S
ou
gh
t from
Reg
istered A
bo
rigin
al Parties
GM
L seeks comm
ent and input from the R
egistered Aboriginal P
arties (RA
Ps) on the follow
ing:
• proposed project m
ethodology;
• field surve
y methodolog
y;
• current A
boriginal heritage managem
ent recomm
endations; and
• culturally appropriate inform
ation regarding Aboriginal cultural or social values associated w
ith the study area.
Please provide any com
ments in w
riting, by email to:
Shezani N
asoordeen shezanin@gm
l.com.au
372 Elizabeth S
treet,
Surry H
ills, NS
W 2010
Alternatively com
ment m
ay be made by phone, to S
hezani on 9319 4811.
Yours sincerely
GM
L Heritag
e Pty Ltd
Sh
ezani Nasoo
rdeen, M
A
Con
sultant, A
rchaeolog
ist
Jod
i Cam
eron
| Co
nsu
ltant
GM
L H
eritage
4 Decem
ber 2017
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r William
s,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
eport (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the A
CH
AR
/AT
R.
In accordance with the O
EH
’s 2010 re quirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet S
UR
RY
HILLS
NS
W 2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Rane C
onsulting
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r William
s,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Am
anda Hickey C
ultural Services
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
s Hickey,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Biam
anga
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Storer,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
A1 Indigenous S
ervices
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
s Hickey,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Gunjeew
ong Cultural H
eritage Aboriginal C
orporation
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
s Carroll T
urrise,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Darug T
ribal Aboriginal C
orporation
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Reilly,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Darug Land O
bservations
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Workm
an,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Darug A
boriginal Land Care
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Dyer,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Goobah D
evelopments
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Sm
ith,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Tocom
wall
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Franks,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Darug C
ustodian Aboriginal C
orporation
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
s Coplin,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Muragadi H
eritage Indigenous Corporation
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear Jesse Johnson,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Murra B
idgee Mullangari
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Johnson,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Murram
arang
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
s Sm
ith,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Khan,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
eport (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the A
CH
AR
/AT
R.
In accordance with the O
EH
’s 2010 re quirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet S
UR
RY
HILLS
NS
W 2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Widescope Indigenous G
roup
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Hickey,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
e port (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated durin g the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
Darug A
boriginal Cultural H
eritage Assessm
ents
Unit 9, 6 C
hapman A
venue C
hatswood N
SW
2067
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment
Rep
ort and A
rchaeo
logical T
echnical R
eport
Dear M
s Everingham
,
Please
find enclosed
the draft
combined
Aboriginal
Cultural
Heritage
Assessm
ent Report and A
rchaeological Technical R
eport (AC
HA
R/A
TR
) for
Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments.
This report details the results of the program
of test excavation undertaken at
7 W
orcester R
d, R
ouse H
ill in
October
to support
the S
tate S
ignificant
Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
.
Due
to no
artefacts being
recovered during
test excavation
we
have
recomm
ended that an SS
D approval should be sought from
the Departm
ent of
Planning
and E
nvironment
(DoP
E)
to im
pact the
AH
IMS
site
45-5-3920 (Isolated find w
hich could not be relocated during the site survey) as a result
of the
proposed R
HA
C
redevelopment
project, w
ithout further
need for
archaeological investigation. The results of the test excavation are detailed in
Section 2 of the A
CH
AR
/AT
R.
In accordance
with
the O
EH
’s 2010
requirements
for consultation
all
Registered A
boriginal Parties are provided w
ith 28 days to review the final
draft AC
HA
R/A
TR
. As this includes the C
hristmas period, G
ML has extended
this review period to 42 days. C
ould you please review this report and provide
any comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au Level 6, 372 E
lizabeth Street
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
4 Decem
ber 2017
78 Forbes S
treet E
mu P
lains NS
W 2750
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment
Rep
ort and A
rchaeo
logical T
echnical R
eport
Dear M
r Khan,
Please
find enclosed
the draft
combined
Aboriginal
Cultural
Heritage
Assessm
ent Report and A
rchaeological Technical R
eport (AC
HA
R/A
TR
) for
Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments.
This report details the results of the program
of test excavation undertaken at
7 W
orcester R
d, R
ouse H
ill in
October
to support
the S
tate S
ignificant
Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
.
Due
to no
artefacts being
recovered during
test excavation
we
have
recomm
ended that an SS
D approval should be sought from
the Departm
ent of
Planning
and E
nvironment
(DoP
E)
to im
pact the
AH
IMS
site
45-5-3920 (Isolated find w
hich could not be relocated during the site survey) as a result
of the
proposed R
HA
C
redevelopment
project, w
ithout further
need for
archaeological investigation. The results of the test excavation are detailed in
Section 2 of the A
CH
AR
/AT
R.
In accordance
with
the O
EH
’s 2010
requirements
for consultation
all
Registered A
boriginal Parties are provided w
ith 28 days to review the final
draft AC
HA
R/A
TR
. As this includes the C
hristmas period, G
ML has extended
this review period to 42 days. C
ould you please review this report and provide
any comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au Level 6, 372 E
lizabeth Street
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
DARUG CU
STODIAN
ABO
RIGINAL
CORPO
RATION
PO
BOX 81 W
INDSO
R 2756 PHO
NE: 0245775181 FAX: 0245775098
MO
BILE: 0415770163 Leanne Watson
0414962766 Justine Coplin EM
AIL: mulgokiw
.au
Attention: GML
Subject: Rouse Hill Anglican College—Aboriginal Cultural Heritage Assessm
ent Report and Archaeological Technical Report
Dear Jodi
We have received and review
ed the Rouse Hill Anglican College—Aboriginal Cultural
Heritage Assessment Report and Archaeological Technical Report–.The report and findings
are very inclusive and informative, docum
ented to a high standard. Surrounding this area are m
any highly significant sites. Although there is not a major finding of artefacts here this
area is still important for the inform
ation that we have collected here to assess the bigger
picture and add information to our overall studies of how
Darug people moved, lived and
survived in this landscape.
We support the findings and recom
mendations in this report.
Please contact us with all further enquiries on the above contacts.
Regards
Justine Coplin
4 Decem
ber 2017
Darug A
boriginal Land Care
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Dyer,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
eport (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find
which could not be relocated during the site survey) as a result of the proposed R
HA
C redevelopm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the A
CH
AR
/AT
R.
In accordance with the O
EH
’s 2010 re quirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet S
UR
RY
HILLS
NS
W 2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Darug A
boriginal Land care
U
ncle Des D
yer
18
a Perigee C
lose D
oonside N
SW 2
76
7
AB
N 71 301 006 047
Jodi Cam
eron A
rchaeologist G
M L H
eritage Level 6, 372 Elizabeth Street Surry H
ills 2010 N
SW
Re: R
ouse Hill, A
nglican College .
Dear, Tyler,
The Darug A
boriginal Land care/ Uncle D
es Dyer, has no objections to the planned
development.
We have read your report and agree w
ith the recomm
endations. W
e ask that all artefacts be reburied on site out of harm's w
ay, that any rock cravens, and scared tree be preserved, w
ere possible. T
he Darug A
boriginal Land care have and always w
ill holds all land specific social, spiritual and cultural values to our organisation. W
e are Traditional Ow
ner, our mem
bers have lived on Darug land for m
ost of their lives and w
orked in the area. We have been doing C
ultural Heritage A
ssessments for over 20
years and still do today. R
espectfully yours, U
ncle Des D
yer D
arug Elder D
arug Aboriginal Land Care
Mobile 0408 360 814
Ryan Johnson | M
urra B
idg
ee Mu
llang
ari
A
boriginal Corporation C
ultural Heritage
A: P
O B
ox 246, Seven H
ills, NS
W, 2147
E: m
urrabidgeemullangari@
yahoo.com.au
ICN
: 8112 N
ote: Privileged/C
onfidential information m
ay be contained in this message and m
ay be subject to legal privilege. A
ccess to this e-mail by anyone other than the intended is unauthorised. If you are not the intended recipient (or
responsible for delivery of the message to such person), you m
ay not use, copy, distribute or deliver to anyone this
message (or an
y part of its contents ) or take any action in reliance on it. In such case, you should destroy this m
essage, and notify us imm
ediately. If you have received this email in error, please notify us im
mediately by e-m
ail or telephone and delete the e-m
ail from any com
puter. If you or your emplo
yer does not consent to internet e-mail
messages of this kind, please notify us im
mediately. A
ll reasonable precautions have been taken to ensure no viruses are present in this e-m
ail. As our com
pany cannot accept responsibility for any loss or damage arising from
the use of this e-m
ail or attachments w
e recomm
end that you subject these to your virus checking procedures prior to use. The
views, opinions, conclusions and other inform
ations expressed in this electronic mail are not given or endorsed by the
company unless otherw
ise indicated by an authorized representative independent of this m
essage.
4 Decem
ber 2017
Murra B
idgee Mullangari
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r Johnson,
Please follow
the below link to the draft com
bined Abori ginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
eport (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his re port details the results of the program
of test excavation undertaken at 7 Worcester R
d, Rouse H
ill in October to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find w
hich could not be relocated during the site survey) as a result of the proposed RH
AC
redevelopment project, w
ithout
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Abori ginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
Jod
i Cam
eron
| Co
nsu
ltant
GM
L H
eritage
029318 7579
02 9319 4811w
ww
.gm
l.com
.au
DA
RU
G L
AN
D
OB
SE
RV
AT
ION
S P
TY
LT
D
AB
N 2
7 6
02 7
65 4
53
_____________________________________________________________________ E
ma
il: d
ar
ug
la
nd
ob
se
rv
at
ion
s@
gm
ail
.co
m
PO
BO
X 2
00
6 B
EN
DA
LO
NG
NS
W 2
76
1
Mo
bil
e: 0
41
3 6
87
27
9
11th January, 2018
Jodi Cam
eron G
ML H
eritage Pty Ltd Level 6, 372 Elizabeth Street SU
RR
Y H
ILLS NSW
2010 D
ear Jodi, R
E:
RO
USE
HIL
L A
NG
LIC
AN
CO
LL
EG
E R
ED
EV
EL
OPM
EN
T
A
boriginal Cultural H
eritage Assessm
ent & A
rchaeological Technical Report
Darug Land O
bservations Pty Ltd has reviewed the draft A
boriginal Cultural H
eritage A
ssessment and the A
rchaeological Technical Report, and supports the m
ethodology for the proposed redevelopm
ent of the Rouse H
ill Anglican C
ollege at Lot 14 DP
1120290 and Lot 130 DP 1138775 at the intersection of R
ouse Road and W
orcester R
oad, in Rouse H
ill. In addition, w
e support the recomm
endation that an SSD approval to be sought from
the D
epartment of Planning and Environm
ent to impact the A
HIM
S site 45-5-3920 due to no artefacts being recovered during test excavations at the R
ouse Hill A
nglican C
ollege site. Furtherm
ore, Darug Land O
bservations Pty Ltd would be involved in the m
onitoring of the topsoil rem
oval and/or any other form of w
orks to be carried out on the site. Y
ours sincerely,
Jamie W
orkman
U
ncle Gordon W
orkman
Darug Land O
bservations Pty Ltd
Darug Elder
4 Decem
ber 2017
Rane C
onsulting
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
r William
s,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
eport (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
hisre port details the results of the program
of test excavation undertaken at 7 Worcester R
d, Rouse H
ill in October to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5-3920 (Isolated find w
hich could not be relocated during the site surve y) as a result of the proposed RH
AC
redevelopment project, w
ithout
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010
02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
Jod
i Cam
eron
| Co
nsu
ltant
GM
L H
eritage
029318 7579
02 9319 4811w
ww
.gm
l.com
.au
#replysig
Jod
i Cam
eron
| Co
nsu
ltant
GM
L H
eritage
Level 6 372 Elizabeth St, Surry Hills NSW 2010
T Direct: 029318 7579 | T Reception: 02 9319 4811 |w
ww
.gm
l.com
.au
The information contained in this e-mail message and any attached files may be confidential and may contain copyright material of GML Heritage
Pty Ltd or third parties. Any unauthorised use, disclosure or copying of this e-mail and/or its attachments is prohibited. If you have received this e-mail in error please notify the sender immediately by return e-mail and delete all copies of the m
essage and attachments. Before opening or using attachments, please check them for viruses or defects. Our liability is limited to resupplying the e-mail and attached files. Content and views expressed in this e-mail may be those of the sender, and are not necessarily endorsed by GML Heritage Pty Ltd. Please think before you print.
mailto:cheriecarroll68@
yahoo.com
jodic@gm
l.com.au
mailto:jodic@
gml.com
.au
4 Decem
ber 2017
Gunjeew
ong Cultural H
eritage Aboriginal C
orporation
Our R
ef: 15-0448A
Re: R
ouse Hill A
ng
lican Colleg
e—A
bo
riginal Cu
ltural H
eritage A
ssessment R
eport and Archaeo
logical T
echnical R
eport
Dear M
s Carroll T
urrise,
Please follow
the below link to the draft com
bined Aboriginal C
ultural Heritage A
ssessment R
eport and Archaeological
Technical R
eport (AC
HA
R/A
TR
) for Rouse H
ill Anglican C
ollege (RH
AC
) project for your review and com
ments. T
his
report details the results of the program of test excavation undertaken at 7 W
orcester Rd, R
ouse Hill in O
ctober to
support the State S
ignificant Developm
ent Application (S
SD
A) for the redevelopm
ent of RH
AC
. The below
link will
remain active until 31 January 2018.
https://spaces.hightail.com/receive/M
O1E
y856jP
Due to no artefacts being recovered during test excavation w
e have recomm
ended that an SS
D approval should be
sought from the D
epartment of P
lanning and Environm
ent (DoP
E) to im
pact the AH
IMS
site 45-5- 3920 (Isolated find
which could not be relocated during the site survey) as a result of the proposed R
HA
C redevelo pm
ent project, without
further need for archaeological investigation. The results of the test excavation are detailed in S
ection 2 of the
AC
HA
R/A
TR
.
In accordance with the O
EH
’s 2010 requirements for consultation all R
egistered Aboriginal P
arties are provided with 28
days to review the final draft A
CH
AR
/AT
R. A
s this includes the Christm
as period, GM
L has extended this review period
to 42 days. C
ould you please review this report and provide an
y comm
ents by 15 January 2018.
jodic@gm
l.com.au or shezanin@
gml.com
.au
Level 6, 372 Elizabeth S
treet
SU
RR
Y H
ILLS N
SW
2010 02 9319 4811
Yours sincerely
GM
L Heritag
e Pty Ltd
Jodi C
amero
n
Heritag
e Co
nsultant
Jod
i Cam
eron
| Co
nsu
ltant
GM
L H
eritage
Level 6 372 Elizabeth St, Surry Hills NSW 2010
T Direct: 029318 7579 | T Reception: 02 9319 4811 |w
ww
.gm
l.com
.au
The information contained in this e-mail message and any attached files may be confidential and may contain copyright material of GML Heritage Pty parties. Any unauthorised use, disclosure or copying of this e-mail and/or its attachments is prohibited. If you have received this e-mail in error please notifyimmediately by return e-mail and delete all copies of the message and attachments. Before opening or using attachments, please check them for virusesOur liability is limited to resupplying the e-mail and attached files. Content and views expressed in this e-mail may be those of the sender, and are not endorsed by GML Heritage Pty Ltd. Please think before you print. #replysig
Jod
i Cam
eron
|Co
nsu
ltant
GM
L H
eritage
Level 6 372 Elizabeth St, Surry HillsNSW 2010
T Direct: 02 9318 7579 | T Reception: 02 93194811 | www.gm
l.com.au
The information contained in this e-mail message and any attached files may be confidential and may contain copyright material of GML Heritage Ptyparties. Any unauthorised use, disclosure or copying of this e-mail and/or its attachments is prohibited. If you have received this e-mail in error please notifimmediately by return e-mail and delete all copies of the message and attachments. Before opening or using attachments, please check them for viruseOur liability is limited to resupplying the e-mail and attached files. Content and views expressed in this e-mail may be those of the sender, and are noendorsed by GML Heritage Pty Ltd. Please think before you print. #replysig