Format No

Client : National Highway Authority of India

Independent Engineer :

Concessionaire : Hampi Expressways Privvate Limited

EPC Contractor : Larsen & Toubro Limited

BLENDING OF COARSE AGGREGATES

Test Method : IS :383 Table-2

IS Sieve (mm) 20 mm 12.50 mm

40.00 100.00 100.0

20.00 90.40 100.0

10.00 0.80 76.60

4.75 0.00 0.00

IS Sieve (mm)Blending Proportion in % Achieved Gradation

50 50 100

40.00 50.00 50.00 100.00

20.00 45.20 50.00 95.20

10.00 0.40 38.30 38.70

4.75 0.00 0.00 0.00

Remarks :

EPC Contractors Representative Concessionarie Representative

Name : Name :

Sign: Sign:

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

1.00 10.00 100.000

10

20

30

40

50

60

70

80

90

100

110COARSE AGGREGATE BLENDING

Lower Limit. Upper Limits Centre Limit Achiev ed Gradation

IS Sieve in mm

% of Passing

Date : Date :

HCRPL/T/14A

BLENDING OF COARSE AGGREGATES

Test Method : IS :383 Table-2

Specification Limit

100 100.0 100.0 100.0

95-100 95.0 100.0 97.5

25 - 55 25.0 55.0 40.0

0 - 10 0.0 10.0 5.0

IE Representative

Name :

Sign:

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

1.00 10.00 100.000

10

20

30

40

50

60

70

80

90

100

110COARSE AGGREGATE BLENDING

Lower Limit. Upper Limits Centre Limit Achiev ed Gradation

IS Sieve in mm

% of Passing

Date :

Format No

Client : National Highway Authority of India

Independent Engineer :

Concessionaire : Hampi Expressways Privvate Limited

EPC Contractor : Larsen & Toubro Limited

BLENDING OF COARSE AGGREGATES

Test Method : IS :383 Table-2

IS Sieve (mm) C Agg F Agg

40.00 100.00 100.0

20.00 95.20 100.0

4.75 0.00 96.50

0.600 0.00 33.30

0.150 0.00 0.20

IS Sieve (mm)Blending Proportion in % Achieved Gradation

60 40 100

40.00 60.00 40.00 100.00

20.00 57.12 40.00 97.12

4.75 0.00 38.60 38.60

0.600 0.00 13.32 13.32

0.150 0.00 0.08 0.08

Remarks :

EPC Contractors Representative Concessionarie Representative

Name : Name :

Sign: Sign:

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

0.10 1.00 10.00 100.000

102030405060708090

100110

ALL IN AGGREGATE BLENDING

Lower Limit. Upper Limits Centre Limit Achiev ed Limit

IS Sieve in mm

% of Passing

Date : Date :

HCRPL/T/14B

BLENDING OF COARSE AGGREGATES

Test Method : IS :383 Table-2

Specification Limit

100 100.0 100.0 100.0

95-100 95.0 100.0 97.5

30-50 30.0 50.0 40.0

10-35 10.0 35.0 22.5

0-6 0.0 6.0 3.0

IE Representative

Name :

Sign:

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

0.10 1.00 10.00 100.000

102030405060708090

100110

ALL IN AGGREGATE BLENDING

Lower Limit. Upper Limits Centre Limit Achiev ed Limit

IS Sieve in mm

% of Passing

Date :

Client : National Highway Authority of India

Independent Engineer :

Concessionaire : Hampi Expressways Privvate Limited

EPC Contractor : Larsen & Toubro Limited

CONCRETE MIX DESIGN (As per IS : 10262 - 2009)

M15 PCC

Trial Mix No. : 1R

A. DESIGN STIPULATION:

1. Grade of Concrete : M 15

2. Characteristic Strength @ 28 days : 15 Mpa

3. Target Mean Strength : 25 Mpa (MoRT&H Table:1700-5)

4. Nominal Maximum Size of Agg. : 20 mm

5. Workability in terms of Slump@ Pouring Point : 25 mm (MoRT&H Table:1700-4)

6. Exposure Condition : Moderate

7. Method of Concrete Placing : Direct

8. Degree of Quality Control : Very Good

8. As per MORT&H (Section 1703)

Minimum Cement content : 240 kg/Cum. for PCC (IS:456-2000,Table-5)

Maximum Water Cement Ratio : 0.5 for PCC (MoRT&H Table:1700-2,Note-iii)

B. SOURCE OF MATERIAL:

Cement : ACC OPC 43Grade

: Goura Crusher -Kopal

Fine aggregate -River sand : Koppal - Nala

Admixture : SikaPlast4261 NS

Water : L&T Camp - Near Batching plant,

1. Cement type / Brand : OPC 43 Grade/ACC

2. Specific Gravity of materials

a. Cement : 3.15

b. N Sand : 2.670 (Zone-1)

c. Coarse Aggregates- 20.0mm : 2.690

12.5mm : 2.690

d. Admixture : 1.21

3. Water Absorption of materials

a. N Sand : 2.20%

b. Coarse Aggregates- 20mm : 0.20%

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

Coarse Aggregates

C. TEST DATA FOR MATERIAL:

12.5mm: 0.30%

D. MIX DESIGN CALCULATION

Water : 135 Kg/Cum.

Cement content : 270 Kg/Cum.

Free Water Cement Ratio : 0.50

Coarse Aggregates (%) : 60%

Fine Aggregates (%) : 40%

Coarse Agg Proportion (20mm) : 50%

Coarse Agg Proportion (10mm) : 50%

Chemical Admixture : 1.2 Kg/Cum. Dosage :

a) Volume of Concrete

b) Volume of Cement = (Mass of Cement / Sp. Gr. of Cement) x (1 / 1000)

c) Volume of Water = (Mass of Water / Sp. Gr. of Water) x (1 / 1000)

d) Volume of Admixture = (Mass of Admixture / Sp. Gr. of Admixture) x (1 / 1000)

e) Volume of All in aggregates = {a - (b + c + d )}

f) Vol of Coarse Aggregate = e x Proportion of Coarse Agg

g) Vol of Fine Aggregate = e x Proportion of Fine Agg

h) Mass of 20mm Aggregate = f x Proportion of 20 mm xSp. Gr. of 20 mm x 1000

i) Mass of 12.5mm Aggregate = f x Proportion of 12.5 mm x Sp. Gr. of 12.5mm x 1000

l) Mass of R Sand = g x Sp. Gr. of R sand x 1000

F. MIX DESIGN FOR UNIT WEIGHT OF CONCRETE :-

Description of Materials

Cement 270

Water 135

Fine Aggregate(Natural Sand) 831

20mm aggregates 628

12.5mm aggregates 628

Chemical Admixture 1.22

G .WORKABILITY OF CONCRETE (Slump)

Duration (Minutes) Batch No-1 Batch No-2

Initial 80 90

30min 65 75

60min 55 65

90min 35 45

120min 25 25

=

=

E. CALCULATION OF MIX DESIGN :-

Weight per 1m3. of Concrete (Agg. in SSD Condition), Kg

Concrete Mix Temperature (0C) 27.50C

Ambient Temperature (0C) 28.80C

EPC Contractors Representative Concessionarie Representative

Name : Name :

Sign : Sign:

Date : Date :

: National Highway Authority of India

: Hampi Expressways Privvate Limited

CONCRETE MIX DESIGN (As per IS : 10262 - 2009)

M15 PCC

Date : 10.02.2016

A. DESIGN STIPULATION:

Mpa (MoRT&H Table:1700-5)

mm (MoRT&H Table:1700-4)

kg/Cum. for PCC (IS:456-2000,Table-5)

(MoRT&H Table:1700-2,Note-iii)

B. SOURCE OF MATERIAL:

(Conforming to IS 8112)

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

D. MIX DESIGN CALCULATION

0.45% by wt of Cement Content

= 1.00

= 0.086

= 0.135

= 0.001

= 0.778

= 0.467

= 0.311

= 627.8 Kg

= 627.8 Kg

= 830.9 Kg

F. MIX DESIGN FOR UNIT WEIGHT OF CONCRETE :-

270 9.43

156.4 5.46

812.6 28.39

626.6 21.89

626.0 21.87

1.22 0.042

G .WORKABILITY OF CONCRETE (Slump)

Batch No-2 Average Remarks

90 85

75 70

65 60

45 40

25 25

m3

m3

m3

m3

m3

m3

m3

Weight per 1m3. of Concrete

(Agg. in Dry Condition), Kg

Weight per 0.03645m3. of Concrete

(Agg. in Dry Condition), Kg

IE Representative

Name :

Sign:

Date :

Client : National Highway Authority of India

Independent Engineer :

Concessionaire : Hampi Expressways Privvate Limited

EPC Contractor : Larsen & Toubro Limited

CONCRETE MIX DESIGN (As per IS : 10262 - 2009)

M20 PCC

Trial Mix No. : 2R

A. DESIGN STIPULATION:

1. Grade of Concrete : M 20

2. Characteristic Strength @ 28 days : 20 Mpa

3. Target Mean Strength : 30 Mpa (MoRT&H Table:1700-5)

4. Nominal Maximum Size of Agg. : 20 mm

5. Workability in terms of Slump@ Pouring Point : 25 mm (MoRT&H Table:1700-4)

6. Exposure Condition : Moderate

7. Method of Concrete Placing : Direct

8. Degree of Quality Control : Very Good

8. As per MORT&H (Section 1703)

Minimum Cement content : 250 kg/Cum. for PCC (IS:456-2000,Table-5)

Maximum Water Cement Ratio : 0.5 for PCC (MoRT&H Table:1700-2,Note-iii)

B. SOURCE OF MATERIAL:

Cement : ACC OPC 43Grade

: Goura Crusher -Kopal

Fine aggregate -River sand : Koppal - Nala

Admixture : SikaPlast4261 NS

Water : L&T Camp - Near Batching plant,

1. Cement type / Brand : OPC 43 Grade/ACC

2. Specific Gravity of materials

a. Cement : 3.15

b. N Sand : 2.670

c. Coarse Aggregates- 20mm : 2.690

12.5mm : 2.690

d. Admixture : 1.21

3. Water Absorption of materials

a. N Sand : 2.20%

b. Coarse Aggregates- 20mm : 0.20%

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

Coarse Aggregates

C. TEST DATA FOR MATERIAL:

12.5mm: 0.30%

D. MIX DESIGN CALCULATION

Water : 160 Kg/Cum.

Cement content : 320 Kg/Cum.

Free Water Cement Ratio : 0.50

Coarse Aggregates (%) : 60%

Fine Aggregates (%) : 40%

Coarse Agg Proportion (20mm) : 50%

Coarse Agg Proportion (10mm) : 50%

Chemical Admixture : 1.5 Kg/Cum. Dosage :

a) Volume of Concrete

b) Volume of Cement = (Mass of Cement / Sp. Gr. of Cement) x (1 / 1000)

c) Volume of Water = (Mass of Water / Sp. Gr. of Water) x (1 / 1000)

d) Volume of Admixture = (Mass of Admixture / Sp. Gr. of Admixture) x (1 / 1000)

e) Volume of All in aggregates = {a - (b + c + d )}

f) Vol of Coarse Aggregate = e x Proportion of Coarse Agg

g) Vol of Fine Aggregate = e x Proportion of Fine Agg

h) Mass of 20mm Aggregate = f x Proportion of 20 mm xSp. Gr. of 20 mm x 1000

i) Mass of 12.5mm Aggregate = f x Proportion of 12.5 mm x Sp. Gr. of 12.5mm x 1000

l) Mass of R Sand = g x Sp. Gr. of R sand x 1000

F. MIX DESIGN FOR UNIT WEIGHT OF CONCRETE :-

Description of Materials

Cement 320

Water 160

Fine Aggregate(Natural Sand) 787

20mm aggregates 595

12.5mm aggregates 595

Chemical Admixture 1.54

G .WORKABILITY OF CONCRETE (Slump)

Duration (Minutes) Batch No-1 Batch No-2

Initial 90 80

30min 70 70

60min 60 50

90min 40 40

120min 30 20

=

=

E. CALCULATION OF MIX DESIGN :-

Weight per 1m3. of Concrete (Agg. in SSD Condition), Kg

Concrete Mix Temperature (0C) 28.0C

Ambient Temperature (0C) 31.0C

EPC Contractors Representative Concessionarie Representative

Name : Name :

Sign : Sign:

Date : Date :

: National Highway Authority of India

: Hampi Expressways Privvate Limited

CONCRETE MIX DESIGN (As per IS : 10262 - 2009)

M20 PCC

Date : 10.02.2016

A. DESIGN STIPULATION:

Mpa (MoRT&H Table:1700-5)

mm (MoRT&H Table:1700-4)

kg/Cum. for PCC (IS:456-2000,Table-5)

(MoRT&H Table:1700-2,Note-iii)

B. SOURCE OF MATERIAL:

(Conforming to IS 8112)

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

D. MIX DESIGN CALCULATION

0.48% by wt of Cement Content

= 1.00

= 0.102

= 0.160

= 0.001

= 0.737

= 0.442

= 0.295

= 594.8 Kg

= 594.8 Kg

= 787.1 Kg

F. MIX DESIGN FOR UNIT WEIGHT OF CONCRETE :-

320 11.18

180.3 6.30

769.8 26.89

593.6 20.73

593.0 20.71

1.54 0.054

G .WORKABILITY OF CONCRETE (Slump)

Batch No-2 Average Remarks

80 85

70 70

50 55

40 40

20 25

m3

m3

m3

m3

m3

m3

m3

Weight per 1m3. of Concrete

(Agg. in Dry Condition), Kg

Weight per 0.03645m3. of Concrete

(Agg. in Dry Condition), Kg

IE Representative

Name :

Sign:

Date :

Client : National Highway Authority of India

Independent Engineer :

Concessionaire : Hampi Expressways Privvate Limited

EPC Contractor : Larsen & Toubro Limited

CONCRETE MIX DESIGN (As per IS : 10262 - 2009)

M25 PCC

Trial Mix No. : 3R

A. DESIGN STIPULATION:

1. Grade of Concrete : M 25

2. Characteristic Strength @ 28 days : 25 Mpa

3. Target Mean Strength : 36 Mpa (MoRT&H Table:1700-5)

4. Nominal Maximum Size of Agg. : 20 mm

5. Workability in terms of Slump@ Pouring Point : 25 mm (MoRT&H Table:1700-4)

6. Exposure Condition : Moderate

7. Method of Concrete Placing : Direct

8. Degree of Quality Control : Very Good

8. As per MORT&H (Section 1703)

Minimum Cement content : 250 kg/Cum. for PCC (IS:456-2000,Table-5)

Maximum Water Cement Ratio : 0.5 for PCC (MoRT&H Table:1700-2,Note-iii)

B. SOURCE OF MATERIAL:

Cement : ACC OPC 43Grade

: Goura Crusher -Kopal

Fine aggregate -River sand : Koppal - Nala

Admixture : SikaPlast4261 NS

Water : L&T Camp - Near Batching plant,

1. Cement type / Brand : OPC 43 Grade/ACC

2. Specific Gravity of materials

a. Cement : 3.15

b. N Sand : 2.670 (Zone-1)

c. Coarse Aggregates- 20mm : 2.690

12.5mm : 2.690

d. Admixture : 1.21

3. Water Absorption of materials

a. N Sand : 2.20%

b. Coarse Aggregates- 20mm : 0.20%

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

Coarse Aggregates

C. TEST DATA FOR MATERIAL:

12.5mm: 0.30%

D. MIX DESIGN CALCULATION

Water : 175 Kg/Cum.

Cement content : 350 Kg/Cum.

Free Water Cement Ratio : 0.50

Coarse Aggregates (%) : 60%

Fine Aggregates (%) : 40%

Coarse Agg Proportion (20mm) : 50%

Coarse Agg Proportion (10mm) : 50%

Chemical Admixture : 1.7 Kg/Cum. Dosage :

a) Volume of Concrete

b) Volume of Cement = (Mass of Cement / Sp. Gr. of Cement) x (1 / 1000)

c) Volume of Water = (Mass of Water / Sp. Gr. of Water) x (1 / 1000)

d) Volume of Admixture = (Mass of Admixture / Sp. Gr. of Admixture) x (1 / 1000)

e) Volume of All in aggregates = {a - (b + c + d )}

f) Vol of Coarse Aggregate = e x Proportion of Coarse Agg

g) Vol of Fine Aggregate = e x Proportion of Fine Agg

h) Mass of 20mm Aggregate = f x Proportion of 20 mm xSp. Gr. of 20 mm x 1000

i) Mass of 12.5mm Aggregate = f x Proportion of 12.5 mm x Sp. Gr. of 12.5mm x 1000

l) Mass of R Sand = g x Sp. Gr. of R sand x 1000

F. MIX DESIGN FOR UNIT WEIGHT OF CONCRETE :-

Description of Materials

Cement 350

Water 175

Fine Aggregate(Natural Sand) 761

20mm aggregates 575

12.5mm aggregates 575

Chemical Admixture 1.68

G .WORKABILITY OF CONCRETE (Slump)

Duration (Minutes) Batch No-1 Batch No-2

Initial 85 95

30min 60 70

60min 50 50

90min 35 45

120min 25 25

=

=

E. CALCULATION OF MIX DESIGN :-

Weight per 1m3. of Concrete (Agg. in SSD Condition), Kg

Concrete Mix Temperature (0C) 27.50C

Ambient Temperature (0C) 29.50C

EPC Contractors Representative Concessionarie Representative

Name : Name :

Sign : Sign:

Date : Date :

: National Highway Authority of India

: Hampi Expressways Privvate Limited

CONCRETE MIX DESIGN (As per IS : 10262 - 2009)

M25 PCC

Date : 26.02.2016

A. DESIGN STIPULATION:

Mpa (MoRT&H Table:1700-5)

mm (MoRT&H Table:1700-4)

kg/Cum. for PCC (IS:456-2000,Table-5)

(MoRT&H Table:1700-2,Note-iii)

B. SOURCE OF MATERIAL:

(Conforming to IS 8112)

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

D. MIX DESIGN CALCULATION

0.48% by wt of Cement Content

= 1.00

= 0.111

= 0.175

= 0.001

= 0.713

= 0.428

= 0.285

= 575.4 Kg

= 575.4 Kg

= 761.5 Kg

F. MIX DESIGN FOR UNIT WEIGHT OF CONCRETE :-

350 12.23

194.6 6.80

744.7 26.01

574.2 20.06

573.7 20.04

1.68 0.059

G .WORKABILITY OF CONCRETE (Slump)

Batch No-2 Average Remarks

95 90

70 65

50 50

45 40

25 25

m3

m3

m3

m3

m3

m3

m3

Weight per 1m3. of Concrete

(Agg. in Dry Condition), Kg

Weight per 0.03645m3. of Concrete

(Agg. in Dry Condition), Kg

IE Representative

Name :

Sign:

Date :

Client : National Highway Authority of India

Independent Engineer :

Concessionaire : Hampi Expressways Privvate Limited

EPC Contractor : Larsen & Toubro Limited

Source of Material :

Source of Cement : ACC OPC 43 Grade

Source of Water : Near Concrete Batching Plant Bore Holes

Source of Coarse Aggregate : Goura Crusher - Koppal Aggregates

Source of Fine Aggregate (R Sand) : Koppal - Nala

Source of Chemical Admixture : SikaPlast -4261 NS

SUMMARY OF CONCRETE MIX DESIGN TRAILS

Sl.No Trial No Date of Trial

Coarse Agg (kg) Achieved Slump (mm)

N'S

and

20.0

mm

12.5

mm

Init

ial

30 M

in

60 M

in

1 M15 PCC 1R 10.02.16 270 135 831 628 628 1.22 0.45% 0.50 85 70 60

2 M20 PCC 2R 10.02.16 320 160 787 595 595 1.54 0.48% 0.50 85 70 55

3 M25 PCC 3R 10.02.16 350 175 761 575 575 1.68 0.48% 0.50 90 65 50

EPC Contractors Representative Concessionarie Representative

Name : Name :

Sign : Sign:

Date : Date :

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

Grade of Concrete

Cement (kg)

Water (kg)

Admix (Kg)

Admix (%)

W/C Ratio

Source of Material :

Trial Summary No: 1R

SUMMARY OF CONCRETE MIX DESIGN TRAILS

Achieved Slump (mm)

Remarks

90 M

in

120

Min

7 D

ays

28 D

ays

40 25 Awaiting Trial Mix

40 25 Awaiting Trial Mix

40 25 Awaiting Trial Mix

IE Representative

Name :

Sign:

Date :

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

Compressive Strength (N/mm2)

Client : National Highway Authority of India

Independent Engineer :

Concessionaire : Hampi Expressways Privvate Limited

EPC Contractor : Larsen & Toubro Limited

CONCRETE MIX DESIGN REPORT

SOURCE OF MATERIALS

CEMENT : ACC- OPC 43 GRADE.

WATER : BORE WELL @ BASE CAMP

FINE AGGREGATES (NATURAL SAND) : KOPPAL NALA

COARSE AGGREGATES : GOURA CRUSHER-KOPPAL

CHEMICAL ADMIXTURE :SIKA PLAST 4261 NS

Submitted by

Larsen & Toubro Limited

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

Larsen & Toubro Limited

CONCRETE MIX DESIGN REPORT

SOURCE OF MATERIALS

Submitted by

Larsen & Toubro Limited

Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.

Larsen & Toubro Limited