Cryo-payload
Kazuhiro Yamamoto
Institute for Cosmic Ray ResearchThe University of Tokyo
KAGRA face to face meetingUniversity of Toyama, Toyama, Japan
27 August 2015
22
0. Abstract
Here, I explain
(1) Current status and next step(2) Human resources
for cryogenic payload
44
1. Introduction
4444444
3km3km
MozumiY-end Sakonishi
X-end
AtotsuCenter
Vibration isolation system (Type A), Cryocooler unit, Cryostat, Cryogenic payload
Schematic view of KAGRA interferometer
Four mirrors of arm cavity will be cooled.
Kamioka mine (Underground site)
1. Introduction
5555
14 m
Vacuum ducts
along laser beam
Vibration isolation system(room
temperature)
Clean booth
Design drawing with tunnel and cross section
Cryostat(Here is a mirror)
2nd floor
Shaft
A. Hagiwara
Outline of vibration isolation and cryostat
1. Introduction
6
Pulse tube cryocoolers
Pulse tube cryocoolers
Sapphire suspension
Sapphire mirror (About 20K)
Sapphire fiber
Schematic view of cryo-payload
Cryo-payload
77
“Sapphire monolithic lop-eared suspension”
One of the most importantparts of KAGRA : Main sapphire mirrorsare included.
All parts are made from sapphire.
Sapphire lop-eared suspension
2. Sapphire suspension
fiber break
Hydroxide Catalysis Bonding
88
Current status
2. Sapphire suspension
We investigated almost all components.
We must construct full size suspension (prototype).
999999999
All sapphire parts for full size prototype have already been delivered. Jigs for assembly is being prepared.Sapphire cylinder with flat cuts as dummy mirror
Blade spring
2. Sapphire suspension
Ears
Fibers with nail head
1010
Outline of vibration isolation and cryostat
1010101010
Pulse tube cryocoolers
Pulse tube cryocoolers
Heat link (pure Al)Heat link (pure Al)
3. Cryogenic payload
Cryo-payload
1111
Outline of cryogenic payload
1111111111
3. Cryogenic payload
Marionetta
Intermediate mass
Sapphire Mirror
Platform
Recoil mass chain(Thermal noise caused by this part is small)
1212
Outline of cryogenic payload
1212121212
3. Cryogenic payload
Marionetta
Intermediate mass
Sapphire Mirror
Platform
Recoil mass chain
GAS filer for vertical vibration isolation(Mirror chain is suspended)
1313
Outline of cryogenic payload
1313131313
3. Cryogenic payload
Marionetta
Intermediate mass
Sapphire Mirror
PlatformAlignment adjustment system
Simple system for high Q-value of sapphire suspension
1414
Outline of cryogenic payload
1414141414
3. Cryogenic payload
Marionetta
Intermediate mass
Sapphire Mirror
Platform
Recoil mass chain
Sensor and actuator (for control and damping)
151515
Current statusA. Hagiwara proceeds with CAD design drawings. Almost all parts except for platformwere designed.Design is based on discussion with VIS (9 Mar. 2015)
A. Hagiwara
Mirror
Platform
Intermediate mass
Recoil mass
3. Cryogenic payload
Marionetta
161616
Current statusA. Hagiwara proceeds with CAD design drawings. Almost all parts except for platformwere designed.
A. Hagiwara
Recoil mass for intermediate mass
Recoil mass for mirror
3. Cryogenic payload
Recoil mass for Marionetta
Next stepPrototype test of cryogenic payload Two differences from actual one
Platform does NOT include GAS filter.
17
3. Cryogenic payload
Mirror and fibers are NOT made from sapphire, but metal.
1818181818181818
Dummy mirror and ears (stainless)
220 mm
150 mm
Recoil mass Ears (stainless)
Size and weight are the same as those of KAGRA mirror.
23 kg
3. Cryogenic payload Prototype test of cryogenic payload
1919191919191919 Intermediate massMarionetta
Dummy blade spring
3. Cryogenic payload Prototype test of cryogenic payload
22
KAGRA Cryogenics Group
Toshikazu SUZUKI EO and SEO member KEK, Senior Fellow
Nobuhiro KIMURA Cryostat sub-chief KEK, Assoc. Prof.
Kazuhiro YAMAMOTO Cryo-Payload sub-chief ICRR, Project Assist. Prof.
Takayuki TOMARU Chief KEK, Assoc. Prof.
Tatsuya KUME Surveying, Alignment KEK, Assoc. Prof.
Rahul KUMAR Simulation, Payload KEK, PD
Ayako HAGIWARA CAD KEK, Technical Staff
Shinichi TERASHIMA Machining KEK, Technical Staff
Iwao MURAKAMI Welding, Assembly KEK, Technical Staff
Hiroki TANAKA Cryo-Payload, Q ICRR, Grad. Student
Takahiro MIYAMOTO Cryo-Payload ICRR, Grad. Student
Suguru TAKADA Cryogenics NIFS, Assist. Prof.
2015.Jul.25
By T. Tomaru(Revised by K. Yamamoto)
Kieran CRAIG Payload ICRR, PD
23
4. Human resources Kieran Craig (from Glasgow) starts to work as postdoc in ICRR on the 1st of August !
Ph.D. defense was on last July ! “Studies of the mechanical dissipation of thin films for mirrors in interferometric gravitational wave detectors”
24
5. Summary 1. Full size prototype at KEK and ICRR Cryogenic payload (KEK) Parts of mirror chain were assembled. Design of recoil mass chain and platform is in progress. Sapphire lop-eared suspension (ICRR) Assembly jig are being prepared.
2. Human resource Kieran Craig (Post doc) joins our team !
27
6. Summary 1. Next step (by Spring 2016) Full size prototype at KEK and ICRR 2. By Spring 2017 Development of platform (GAS filter)3. By Summer 2017 Assembly and test of sapphire suspension4. In the second half of 2017 Installation at KAGRA site5. One postdoc joins one week later. KAGRA must take care of KEK people. Otherwise, they can not work for KAGRA after 2018.
2828
Schedule
3. Sapphire suspension
By Spring 2016 : Prototype test of full size sapphire suspension at ICRR By Autumn 2016 : Procurement of sapphire partsBy Spring 2017 : Assembly and test with End sapphire mirrorsBy Summer 2017 : Assembly and test with Front sapphire mirrors By End 2017 : Installation at KAGRA site
2929
Schedule
By Spring 2016 : Prototype test of full size prototype at KEK By Spring 2017 : Development of platform (GAS filter)By End 2017 : Installation at KAGRA site
3. Cryogenic payload
31
4. Schedule
31
Full size prototype at KEK and ICRR
Assembly and test of sapphire part
Installation of cryogenic payload
Procurement of sapphire parts
Development of platform (GAS filter)
32
4. Schedule
323232
Cooling test of cryostatInstallation of Type A
Delivery of End sapphire mirrors
Delivery of Front sapphire mirrors
Installation of cryogenic payload
3434
Official schedule
iKAGRA observation : By end of 2015bKAGRA installation and commissioning : By end of 2017
5. Schedule
Current budget plan
By March 2016 : One cryogenic payloadsBy March 2017 : Three cryogenic payloads (+ spare)By end of 2017 : Commissioning of bKAGRA
Extremely short commissioning