11
Status of the National Status of the National Infrastructure Development for Infrastructure Development for
Nuclear Power in VietnamNuclear Power in Vietnam
Prepared by: Dr. Hoang Anh Prepared by: Dr. Hoang Anh TuanTuan
VIETNAM ATOMIC ENERGY VIETNAM ATOMIC ENERGY COMMISSIONCOMMISSION
Technical Meeting / Workshop on Evaluation Methodology for Nuclear Power Infrastructure
Development Vienna, 10-12 December 2008
22
ContentsContents
• Introduction of the nuclear Introduction of the nuclear power program of Vietnampower program of Vietnam
• Status of the National Status of the National Infrastructure Development for Infrastructure Development for Nuclear Power in VietnamNuclear Power in Vietnam
• Remark and ConclusionRemark and Conclusion
33
Overview of Vietnam Electricity Overview of Vietnam Electricity SystemSystem
• Population: ~ 84 millionPopulation: ~ 84 million
• GDP: 722 USD/capGDP: 722 USD/cap
• Commercial energy Commercial energy
consumption: 250 consumption: 250
kgOE/cap.annkgOE/cap.ann
• Electricity consumption: 540 Electricity consumption: 540
kwh/cap.annkwh/cap.ann• Energy Elasticity Energy Elasticity 1.561.56
• Electricity ElasticityElectricity Elasticity 2.02.0
44
TOTALTOTAL 3131 12,22112,221 100.00100.00
HYDROHYDRO 1313 4,4604,460 36.536.5
TYPETYPE NUMBENUMBERR
Of PPsOf PPs
CAPACITYCAPACITY
(MW)(MW)%TOTAL%TOTAL
COALCOAL 33 1,5451,545 12.612.6
GAS&OIGAS&OILL
77 3,3993,399 27.827.8
DIESELDIESEL NANA 245245 2.12.1
IPPIPP 88 2,5722,572 21.021.0
Hydropower, 36.5%
Coal, 12.6%
Gas/Oil, 27.8%
Diesel, 2.0%
IPP, 21.0%
55
Pha
LaiUong Bi
Hai Phong
Ninh BinhThanh Hoa
ChemHa Dong
Ha TinhVinh
Dong Hoi
Yaly Vinh Son
Plei KuQuy Nhon
SongHinh
Thac Mo
Da Nhim
Bao LocTri An
Ba
Ria
Tra
NocRach GiaCai Lay
Phu Lam
THAILAND
LAO PDR
CHINA
CAMBODIA Krong Buk
Dinh
Mai Dong
Hoc Mon
GHI CHU
500kV Lines (existing)220kV Lines (existing)
Substation 500kV exist.Substation 220kV exist.HPPs exist.TPPs exist.
Nho Quan
Di Linh
Phu MyNha Be
Thuong Tin
Quang Ninh
D.Nai3&4
Nhon Trach
Song May
500kV Line (~2010)
Sub. 500kV (- 2010)
500kV Line (~2020)
Sub. 500kV (- 2020)
Son LaSoc Son
Nha Trang
Nuclear PP
Nam Theun 2
Ban Sok
Lai Chau
HOA BINH
Viet Tri
Quang Tri
Da Nang
Doc Soi
Sam Bor
Tan Dinh
O Mon
Thac Ba
66
Introduction of the nuclear power Introduction of the nuclear power preparation of Vietnam (1)preparation of Vietnam (1)
• Establishment of the governmental steering Establishment of the governmental steering committee led by Minister of Industry and committee led by Minister of Industry and Trade for development of nuclear power in Trade for development of nuclear power in Vietnam on 5Vietnam on 5thth March 2002 March 2002 (like NEPIO).(like NEPIO).
• Establishment of the Agency for Radiation Establishment of the Agency for Radiation Protection and Nuclear Safety Control Protection and Nuclear Safety Control (VARANSAC now named VARANS) on 19(VARANSAC now named VARANS) on 19thth May 2003.May 2003.
• On 3On 3rdrd January 2006, the Prime Minister January 2006, the Prime Minister approved the Long-term Strategy for approved the Long-term Strategy for Peaceful Utilization of Atomic Energy up to Peaceful Utilization of Atomic Energy up to 2020.2020.
77
Introduction of the nuclear power Introduction of the nuclear power preparation of Vietnam (2)preparation of Vietnam (2)• On 23 July 2007, the Prime Minister approved the Master On 23 July 2007, the Prime Minister approved the Master
Plan for Implementation of the Long-term Strategy, Plan for Implementation of the Long-term Strategy, covering all activities related to development of nuclear infrastructures and capabilities for future self-reliance of NP technology.
• Soon later the Intra-Ministerial Steering Committee led Soon later the Intra-Ministerial Steering Committee led by Deputy Minister of MOST has been set up for direction by Deputy Minister of MOST has been set up for direction and reporting to the Government of the Mater Plan and reporting to the Government of the Mater Plan implementation implementation (like NEPIO).(like NEPIO).
• The Pre-FS for the 1st NPP in Vietnam and the VI The Pre-FS for the 1st NPP in Vietnam and the VI Electricity Development Plan up to 2025 have been Electricity Development Plan up to 2025 have been approved by the Government, showing the planned approved by the Government, showing the planned nuclear power will reach to 4,000 MW in 2025.nuclear power will reach to 4,000 MW in 2025.
• Atomic Energy Law was approved by the National Atomic Energy Law was approved by the National Assembly on the 3Assembly on the 3rdrd June 2008. June 2008.
88
Status of the National Status of the National Infrastructure Development for Infrastructure Development for
Nuclear Power in VietnamNuclear Power in Vietnam
99
Milestones indentified for Vietnam Milestones indentified for Vietnam NP ProgramNP Program
• Following the IAEA guide, 3 milestones are:Following the IAEA guide, 3 milestones are:
– Milestone 1:Milestone 1: December 2008December 2008 – Ready to make – Ready to make knowledgeable commitment to a nuclear program.knowledgeable commitment to a nuclear program.
• By Beginning of 2009, the Government will By Beginning of 2009, the Government will submit the Pre-FS report of the 1submit the Pre-FS report of the 1stst NPP to the NPP to the National Assembly for approval and decision to National Assembly for approval and decision to be made for conducting the FS project for be made for conducting the FS project for Ninhthuan NPP of 4,000MWe.Ninhthuan NPP of 4,000MWe.
1010
– Milestone 2:Milestone 2: 12/201212/2012 - Ready to invite bids - Ready to invite bids for the first NPP.for the first NPP.
– Milestone 3:Milestone 3: 12/202012/2020 – Ready to commission – Ready to commission and operate the first nuclear power plant.and operate the first nuclear power plant.
Vietnam’s preparation for the 1Vietnam’s preparation for the 1stst NPP is NPP is close to the Milestone 1:close to the Milestone 1: Ready to make a Ready to make a knowledgeable commitment to a nuclear knowledgeable commitment to a nuclear program.program.
Milestones indentified for Vietnam Milestones indentified for Vietnam NP ProgramNP Program
1111
VAEC’s project (Introduction)VAEC’s project (Introduction)
• Title: Title: Self-Assessment of Vietnam Self-Assessment of Vietnam Nuclear Infrastructure StatusNuclear Infrastructure Status
• Time to implement: 12/2007 – 12/2008Time to implement: 12/2007 – 12/2008
• Objective: To assess the current status of Objective: To assess the current status of development of the national infrastructure development of the national infrastructure against the conditions recommended in against the conditions recommended in the IAEA document “Milestones in the the IAEA document “Milestones in the development of a national infrastructure development of a national infrastructure for nuclear power”, and to propose for nuclear power”, and to propose measures for further development.measures for further development.
1212
VAEC’s project (Scope)VAEC’s project (Scope)
• Scope of assessment: 19 elements.Scope of assessment: 19 elements.– National positionNational position– Nuclear safetyNuclear safety– ManagementManagement– Funding and financingFunding and financing– Legislative frameworkLegislative framework– SafeguardsSafeguards– Regulatory frameworkRegulatory framework– Radiation protectionRadiation protection
1313
– Electrical gridElectrical grid– Human resources developmentHuman resources development– Stakeholder involvementStakeholder involvement– Site and supporting facilitiesSite and supporting facilities– Environmental protectionEnvironmental protection– Emergency planningEmergency planning– Security and physical protectionSecurity and physical protection– Nuclear fuel cycleNuclear fuel cycle– Radioactive wasteRadioactive waste– Industrial involvementIndustrial involvement– ProcurementProcurement
VAEC’s project (Scope cont.)VAEC’s project (Scope cont.)
1414
VAEC’s project (Team members.)VAEC’s project (Team members.)
• Team of assessors Team of assessors (17 people, 5 (17 people, 5 institutions):institutions):
– Team leader: Team leader: Dr. Hoang Anh Tuan, Director of Dr. Hoang Anh Tuan, Director of Planning and R&D Management - VAECPlanning and R&D Management - VAEC
– Key members:Key members:•Dr. Vuong Huu Tan, Chairman of VAECDr. Vuong Huu Tan, Chairman of VAEC
•Dr. Le Van Hong, Deputy Chairman of VAECDr. Le Van Hong, Deputy Chairman of VAEC
•Dr. Hoang Van Got, Director of Technological Dr. Hoang Van Got, Director of Technological Research Center , National Research Institute Research Center , National Research Institute of Mechanical Engineering (MOIT).of Mechanical Engineering (MOIT).
•Dr. Hoang Van Dung , Deputy Director of Dr. Hoang Van Dung , Deputy Director of Institute of Energy (EVN, MOIT).Institute of Energy (EVN, MOIT).
1515
VAEC’s project (Team members)VAEC’s project (Team members)
• Dr. Hoang Van Thong, Director of Institute of Dr. Hoang Van Thong, Director of Institute of Building Structures – MOC.Building Structures – MOC.
• Mr. Nguyen Anh Tuan, Director of Power system Mr. Nguyen Anh Tuan, Director of Power system department , Institute of Energy, EVN.department , Institute of Energy, EVN.
• Mr. Phan Ngoc Tuyen, Thermal Power Plant and Mr. Phan Ngoc Tuyen, Thermal Power Plant and Environment Department, Institute of Energy, Environment Department, Institute of Energy, EVN.EVN.
• Ms. Tiet Minh Tuyet, Energy Economics Ms. Tiet Minh Tuyet, Energy Economics Department, Institute of Energy, EVN.Department, Institute of Energy, EVN.
• Dr. Than Van Lien, Deputy Director of the Dr. Than Van Lien, Deputy Director of the Institute for Technology of Radioactive and Rare Institute for Technology of Radioactive and Rare Elements (ITRRE), VAEC.Elements (ITRRE), VAEC.
• Dr. Nguyen Ba Tien, Director of Radioactive Dr. Nguyen Ba Tien, Director of Radioactive Waste Treatment Center, ITRRE.Waste Treatment Center, ITRRE.
1616
• Mr. Vu Dang Ninh, VAECMr. Vu Dang Ninh, VAEC• Mr. Le Doan Phac, Director of International Mr. Le Doan Phac, Director of International
Cooperation Dept., VAEC.Cooperation Dept., VAEC.• Dr. Nguyen Viet Hung, Deputy Director of Dr. Nguyen Viet Hung, Deputy Director of
International Cooperation Dept., VAECInternational Cooperation Dept., VAEC• Dr. Luu Tam Bat, Director of Chemical Dr. Luu Tam Bat, Director of Chemical
Department, MODDepartment, MOD• Mr. Vuong Thu Bac, Institute for Nuclear Science Mr. Vuong Thu Bac, Institute for Nuclear Science
and Techniques, VAEC.and Techniques, VAEC.• Mr. Vu Manh Khoi, Institute for Nuclear Science Mr. Vu Manh Khoi, Institute for Nuclear Science
and Techniques, VAEC.and Techniques, VAEC.
VAEC’s project (Team members)VAEC’s project (Team members)
1717
VAEC’s project (Results)VAEC’s project (Results)1.1. National position: National position status meets National position: National position status meets
the conditions of the Milestone 1. the conditions of the Milestone 1. 2.2. Nuclear safety: A good awareness and knowledge Nuclear safety: A good awareness and knowledge
of nuclear safety. However, we need to fof nuclear safety. However, we need to focus on ocus on establishing nuclear safety capability and safety establishing nuclear safety capability and safety culture.culture.
3.3. Management: It meets the conditions of the Management: It meets the conditions of the Milestone 1, however we need to iMilestone 1, however we need to improve mprove management capability.management capability.
4. Funding and financing: need to establish strategies 4. Funding and financing: need to establish strategies for funding and financing: for funding and financing:
- Nuclear power infrastructure- Nuclear power infrastructure - 1- 1stst NPP construction NPP construction
- Long term handling radioactive waste and plant - Long term handling radioactive waste and plant decommissioning.decommissioning.- Security and safeguards arrangements.- Security and safeguards arrangements.
1818
VAEC’s project (Results)VAEC’s project (Results)
5. Legislative framework: Atomic Law has been approved. It is 5. Legislative framework: Atomic Law has been approved. It is required to develop and promulgate required under-law required to develop and promulgate required under-law legal documents including NPP standards. legal documents including NPP standards. MOIT: Preparing MOIT: Preparing Guide for Nuclear Power. MOST: Preparing General Guide Guide for Nuclear Power. MOST: Preparing General Guide for Atomic Energy Law.for Atomic Energy Law.
6. Safeguards: Defined and stated in the Atomic Energy Law. 6. Safeguards: Defined and stated in the Atomic Energy Law. Needs to further implement and enforce of safeguards Needs to further implement and enforce of safeguards legislation.legislation.
7. Regulatory framework: The regulatory body has been 7. Regulatory framework: The regulatory body has been established. Already clear recognition of the needs for a established. Already clear recognition of the needs for a regulatory framework strengthening.regulatory framework strengthening.
8. Radiation protection: Facility and manpower established. 8. Radiation protection: Facility and manpower established. Considered IAEA’s basic safety standards.Considered IAEA’s basic safety standards.
9. Grid: National Electrical grid requirements considered.9. Grid: National Electrical grid requirements considered.
1919
2006 - 2010
500kV 19942003 - 2005
After 2010->2020
DA NANGPLEIKU
TAN DINH
HA TINH
HOA BINH
DOC SOI
NHO QUAN
THUONG TIN
QUANG NINH
SOC SONSON LA
O MON
PHU MY
NPP
LAI CHAU
PHU LAM
2020
VAEC’s project (Results)VAEC’s project (Results)10.Human resources development: HRD framework is being 10.Human resources development: HRD framework is being
developed by ministries. A draft of HRD for the 1developed by ministries. A draft of HRD for the 1stst NPP of NPP of 2,000MW has been submitted to the Government. The 2,000MW has been submitted to the Government. The MET is responsible: Intra-Ministerial Working Group has MET is responsible: Intra-Ministerial Working Group has been setup.been setup.
11.Stakeholder involvement: VAEC and EVN conduct 11.Stakeholder involvement: VAEC and EVN conduct continues public information activities. PI roles have been continues public information activities. PI roles have been stated in the Atomic Energy Law. A Plan for PI will be stated in the Atomic Energy Law. A Plan for PI will be developed and implemented by Stakeholders, including developed and implemented by Stakeholders, including VARANS. VARANS.
12. Site and supporting facilities: possible sites have been 12. Site and supporting facilities: possible sites have been identified. Two potential sites for the first two NPPs identified. Two potential sites for the first two NPPs (Ninhthuan 1 and Ninhthuan 2) have been selected and (Ninhthuan 1 and Ninhthuan 2) have been selected and futher investigation will be conducted during FS project.futher investigation will be conducted during FS project.
13. Environmental protection: Environmental issues 13. Environmental protection: Environmental issues primarily analyzed. Further thoroughly investigated will be primarily analyzed. Further thoroughly investigated will be conducted during FS project.conducted during FS project.
2121
VAEC’s project (Results)VAEC’s project (Results)14. Emergency planning: The Ministry of Defense is in 14. Emergency planning: The Ministry of Defense is in
charged of EP in co-operation with related charged of EP in co-operation with related stakeholders as stated in the Master Plan; Plan to stakeholders as stated in the Master Plan; Plan to develop of Emergency Response capability is being develop of Emergency Response capability is being prepared and to be submitted to the Government.prepared and to be submitted to the Government.
15. Security and physical protection: The Master Plan 15. Security and physical protection: The Master Plan stated that the Ministry of Security is in charged of stated that the Ministry of Security is in charged of S&PP in co-operation with related stakeholders. Plan S&PP in co-operation with related stakeholders. Plan to develop of S&PP is being prepared and to be to develop of S&PP is being prepared and to be submitted to the Government.submitted to the Government.
16. Nuclear fuel cycle: Awareness of nuclear fuel cycle 16. Nuclear fuel cycle: Awareness of nuclear fuel cycle issues. Main policy nuclear fuel cycle issues has been issues. Main policy nuclear fuel cycle issues has been identified in the Strategy and Master Plan for Peaceful identified in the Strategy and Master Plan for Peaceful Utilization of Atomic Energy to 2020. Needs for long-Utilization of Atomic Energy to 2020. Needs for long-term spent fuel storage to be considered in detail.term spent fuel storage to be considered in detail.
2222
VAEC’s project (Results)VAEC’s project (Results)
17. Radioactive waste:17. Radioactive waste:- The burdens of radioactive waste from nuclear - The burdens of radioactive waste from nuclear power plants recognized.power plants recognized.- Current capabilities for waste disposal reviewed.- Current capabilities for waste disposal reviewed.
- Conducting sitting for long-term low and medium - Conducting sitting for long-term low and medium radioactive waste disposal.radioactive waste disposal.
18. Industrial involvement: strict application of quality 18. Industrial involvement: strict application of quality programs for nuclear equipments and services programs for nuclear equipments and services recognized.recognized.
19. Procurement: Turn-key approach for the 119. Procurement: Turn-key approach for the 1stst NPP has NPP has been determined in the Strategy and Master Plan for been determined in the Strategy and Master Plan for Peaceful Utilization of Atomic Energy to 2020. Main Peaceful Utilization of Atomic Energy to 2020. Main requirements associated with purchasing nuclear requirements associated with purchasing nuclear equipments and services are recognized by the equipments and services are recognized by the utility. Staffs and procedures are not well prepared.utility. Staffs and procedures are not well prepared.
2323
VAEC’s project (Result)VAEC’s project (Result)
TTTT ContentContent Assessment to Milestone Assessment to Milestone 1 1
conditionsconditions
Further AttentionFurther Attention
11 National National positionposition
GoodGood
22 Nuclear safetyNuclear safety MediumMedium Focus on establishing nuclear Focus on establishing nuclear safety capability and safety capability and safety culturesafety culture
33 ManagemeManagementnt
MediumMedium Improve management ability Improve management ability (NEPIO, …)(NEPIO, …)
44 Funding Funding and and financinfinancingg
Medium/LowMedium/Low
55 Legislative Legislative frameworkframework
MediumMedium Continue to develop Decree, Continue to develop Decree, Circular ...Circular ...
66 SafeguardsSafeguards GoodGood
77 Regulatory Regulatory frameworkframework
MediumMedium Identifying responsibility Identifying responsibility clearly and improve clearly and improve
regulatory framework regulatory framework abilityability
88 Radiation Radiation protectionprotection
MediumMedium Development of Standards, Development of Standards, Facility and HR Facility and HR
99 GridGrid MediumMedium Evaluation of NPPs and grid Evaluation of NPPs and grid interactioninteraction
2424
VAEC’s project (Result)VAEC’s project (Result)No.No. ContentContent Assessment to Assessment to
Milestone 1 Milestone 1 conditionsconditions
Further AttentionFurther Attention
1010 Human Human resources resources developmendevelopmentt
Good/MediumGood/Medium To early implement To early implement HRD plan with HRD plan with fundingfunding
1111 Stakeholder Stakeholder InvolvementInvolvement
MediumMedium Identifying the role, Identifying the role, action planaction plan
1212 Site and Site and supporting supporting facilitiesfacilities
MediumMedium Two sites for two Two sites for two NPPs have to be NPPs have to be finally decided.finally decided.
1313 Environmental Environmental protectionprotection
MediumMedium Monitoring system Monitoring system to be establishedto be established
1414 Emergency Emergency planningplanning
MediumMedium National plan to be National plan to be aprovedaproved
1515 Security and Security and physical physical protectionprotection
MediumMedium National plan to be National plan to be aproved by the aproved by the GovernmentGovernment
2525
VAEC’s project (Result)VAEC’s project (Result)NoNo..
ContentContent Assessment Assessment to Milestone to Milestone
1 1 conditionsconditions
Further AttentionFurther Attention
1616 Nuclear fuel Nuclear fuel cyclecycle
MediumMedium Fuel cycle strategy Fuel cycle strategy decided and decided and spent fuel spent fuel
managementmanagement
1717 Radioactive wasteRadioactive waste MediumMedium Further sitting for Further sitting for waste disposalwaste disposal
1818 Industrial Industrial involvement involvement (manufacturin(manufacturing)g)
LowLow Focus on HRD, Focus on HRD, technology technology
accumulationaccumulation
1919 ProcurementProcurement LowLow Consistent policies Consistent policies for nuclear for nuclear
procurement procurement taken.taken.
2020 Industrial Industrial involvement involvement (construction)(construction)
GoodGood Local participation Local participation indentified in bids indentified in bids invitesinvites
2626
RemarksRemarks
• Current status of the national nuclear infrastructure Current status of the national nuclear infrastructure is assessed briefly. Vietnam is now approach to the is assessed briefly. Vietnam is now approach to the Milestone 1 Milestone 1 (Phase 1 will be completed by the (Phase 1 will be completed by the end of 2012).end of 2012).
• Next step, we will conduct the following activities Next step, we will conduct the following activities with the help of the IAEA:with the help of the IAEA:– To re-conduct self-assessment based on the IAEA To re-conduct self-assessment based on the IAEA
methodology and indicators.methodology and indicators.– To identify areas and issues required further To identify areas and issues required further
actions.actions.– To prepare a national action plan to address these To prepare a national action plan to address these
areas and issues: This action plan will be reflected areas and issues: This action plan will be reflected in the revised Master Plan, especially for the period in the revised Master Plan, especially for the period of 2009-2012 of 2009-2012 (Phase 2 before the Milestone (Phase 2 before the Milestone 2).2).
– To establish and implement The IAEA TC To establish and implement The IAEA TC project on Nuclear Power Infrastructure project on Nuclear Power Infrastructure Development for the period of 2009-2012.Development for the period of 2009-2012.
2727
Conclusion (1)Conclusion (1)• Vietnamese Government has made a Vietnamese Government has made a
strong commitment on development of strong commitment on development of nuclear power with the important goal for nuclear power with the important goal for building the first nuclear power plant in building the first nuclear power plant in Vietnam and putting it into safe and Vietnam and putting it into safe and effective operation in the year 2020.effective operation in the year 2020.
• There are 12 years left for preparation of There are 12 years left for preparation of all national infrastructure elements all national infrastructure elements required for nuclear power plant being required for nuclear power plant being constructed and commissioned timely, constructed and commissioned timely, safely, securely and efficiently. It requests safely, securely and efficiently. It requests big efforts and strong commitment from big efforts and strong commitment from relevant national organizations and a close relevant national organizations and a close international cooperation with the IAEA international cooperation with the IAEA and other countries.and other countries.
2828
Conclusion (2)Conclusion (2)
• We highly appreciate the fruitful We highly appreciate the fruitful assistance from the IAEA so far to Vietnam assistance from the IAEA so far to Vietnam and we do hope to continue receiving and we do hope to continue receiving more assistances from the IAEA in more assistances from the IAEA in development of a national infrastructure development of a national infrastructure for nuclear power in Vietnam in coming for nuclear power in Vietnam in coming years.years.
2929
Thank you for your Thank you for your attention!attention!