+ All Categories
Transcript
Page 1: 2016-0609 SCHEMATICS 1715 W BEACH STelitedevelopments.net/wp-content/uploads/2016/09/... · 10056.9future hotel1 per key + 579.075.031 subtotal 134.2127.252 spaces required =134.2spaces

x

HOTEL 4 STORIES19215.45 SF

214'-11" 277'-0"

In & Out

CANOPY12 PUMPS

x

FUTURE SHOPS1 STORY

1490.00 SF30'-0" 49'-8"

x

FUTURE SHOPS 1STORY

1490.00 SF30'-0" 49'-8"

x

FUTURE SHOPS 1STORY

1490.00 SF30'-0" 49'-8"

x

FUTURE RESTAURANT 1 STORY4004.02 SF

52'-0" 77'-0"

1 26

x

FUTURE RESTAURANT 1 STORY4023.85 SF

85'-3" 49'-8"

1 25

x

FUTURE HOTEL 4 STORIES12201.06 SF

222'-5" 61'-8"

1 21

1 22

1 8

1 36

152

1 11

1 18 1 8

1 15 1 15

1 12

18

1 7

1 6

110

1 161 15

1 7

1 24

x

DRIVE THRU STARBUCKS2333.63 SF

76'-3" 35'-0"x

FUTURE RESTAURANT1344.00 SF

28'-0" 48'-0"x

FUTURE RESTAURANT1350.42 SF

28'-0" 48'-3"

x

FOOD MART 1 STORY3637.30 SF

78'-4" 46'-5"

N 48°58'54" E 395.84

228.00

N 20°52'07" W 668.04

S 69

°09'

01" W

42

7.32

144.

00

25'-0

"

4'-6"

7'-0

" 10'-0

"

35'-0"

25'-0

"

8'-0"

150'-0" AG BUFFER

150'

-0" A

G B

UFF

ER

75'-0

" PLA

NTI

NG

BU

FFER

15'-0

" SET

BAC

K

15'-0"

CV

SETBACK

77'-0

"18

'-0"

24'-0

"18

'-0"

24'-0"

70'-0"

N 20°52'07" W 824.98

36'-0"5'-3"54'-8"49'-8"49'-8"35'-0"85'-314"

12.00

25.00

24'-0"

234.33

7'-0"8'-0"

10'-0"

89'-0

"

32'-6

"

320'-6" 35'-0"

54'-6"40'-0"50'-0"10'-6"78'-312"

18'-0

"24

'-0"

18'-0

"6'-

0"47

'-0"

5'-6

"

18'-0

"24

'-0"

18'-0

"

5'-6"

5'-0"

8'-0

"4'-0"

52'-0"8'-0"18'-0"

>25'

24'-2"

20'-0"

R20'-0"

R14'-0"

6'-0

"

30'-0

"

170'-0"

R16'

-6"R25'-0"

25'-0"

465'-0"

8'-0

"11

'-0"

18'-0

"88

'-10"

133.

00

9'-0"11'-0"5'-0"

228.00

29.00208.00

148.

00

106.00

102.00

15.0

0

A110

SITE PLAN

PLANNING APPLICATION 3/16/15

USE PERMIT & PARCELS 08/10/15

FARM BUREAU 09/28/15

PLANNING APPLICATION1/09/16

PLANNING COMMISSION3/22/16

SHEET NUMBER:

SHEET NAME:

SET ISSUED:

.

PROJECT NUMBER:

A.P

.N.:

018

302-

03

D RAWINGS AND SPEC I F ICAT IONS

A R E I N S T R U M E N T S O F S E R V I C E

A N D A R E T H E P R O P E R T Y O F

SPECTOR CORBETT ARCHITECTS INC.

USE, ALTERAT ION, PUBL ICAT ION, OR

REPRODUCT ION OF THE DOCUMENTS

I S P R O H I B I T E D W I T H O U T T H E

E X P R E S S W R I T T E N C O N S E N T O F

SPECTOR CORBETT ARCHITECTS INC.

.

LEE

ROA

D D

EVEL

OPM

ENT

- PH

ASE

1

1715

WES

T BE

AC

H S

TREE

TW

ATS

ON

VILL

E, C

A 9

5076

1407Plot Date Jun 9 16

A

B

C

D

E

F

G

H

J

K

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

100 % SCHEMATIC DESIGN6/07/16

PARCEL 2 PARCEL 1

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

TRASHENCLOSURE

FREEWAY SIGN

PROPOSED PARCELPROPERTY LINE

LEE ROAD

W BEAC

H ST

PLAN LINE

150' AG BUFFER

PROPOSED PARCELPROPERTY LINE

TRASHENCLOSURE

PLAN LINE

DEMO EXISTINGCURB ANDSIDEWALK

TRASHENCLOSURE150' AG BUFFER

150' AG BUFFER

150' AG BUFFER

PROPOSED PARCELPROPERTY LINE

150' AG BUFFER

N

RESTAURANTS AND SHOPS PARKING

HOTEL PARKINGHOTEL PARKING HOTEL PARKING

REST

AU

RAN

T PA

RKIN

G

RESTAURANT PARKINGHOTEL PARKING

INDOOR POOL

SCALE: 1"=30'

15' 30'0 60'

8' PLANTER BLOCK WALL

PARCEL 3

PARCEL 4

PARCEL 5

PARCEL 6

REQUIRED PARKING SPACES PARKING SPACES PROVIDED

AREA USE PARKING REQUIREMENT REQUIRED SPACES STANDARD PARKING SPACES ACCESSIBLE CARS ACCESSIBLE VANS

PHASE 1 GAS STATION AND RESTAURANTS SHARED PARKING

2280.0 DRIVE THRU 1 PER 100 SF 22.8 22.8 1

1410.0 FUTURE RESTAURANT 1 PER 100 SF 14.1 13.1 1

1410.0 FUTURE RESTAURANT 1 PER 100 SF 14.1 13.1 1

3713.0 FOODMART 1 PER 200 SF 18.6 17.6 1

4004.0 FUTURE RESTAURANT 1 PER 100 SF 40.0 38.0 1 1

3560.0 GAS STATION 12 PUMPS USED FORPARKING

0.0 0.0

SUBTOTAL SUBTOTAL SUBTOTAL SUBTOTAL

SPACES REQUIRED = 109.6 SPACES PROVIDED = 111 105 2 4

REQUIRED PARKING SPACES PARKING SPACES PROVIDED

AREA USE PARKING REQUIREMENT REQUIRED SPACES STANDARD PARKING SPACES ACCESSIBLE CARS ACCESSIBLE VANS

PHASE 1 HOTEL SHARED PARKING

71197.0 HOTEL 1 PER KEY + 5 117.0 126.0 4 1

SUBTOTAL SUBTOTAL SUBTOTAL SUBTOTAL

117.0 126.0 4 1

SPACES REQUIRED = 117.0 SPACES PROVIDED = 131.0

REQUIRED PARKING SPACES PARKING SPACES PROVIDED

AREA USE PARKING REQUIREMENT REQUIRED SPACES STANDARD PARKING SPACES ACCESSIBLE CARS ACCESSIBLE VANS

PHASE 2 RESTAURANT AND SHOPS SHARED PARKING

4023.9 FUTURE RESTAURANT 1 PER 100 SF 40.2 38.2 1 1

1490.0 FUTURE SHOPS 0 TO 3,000 SF, 5 SPACES 5.0 5.0

1490.0 FUTURE SHOPS 0 TO 3,000 SF, 5 SPACES 5.0 4.0 1

1490.0 FUTURE SHOPS 0 TO 3,000 SF, 5 SPACES 5.0 5.0

10056.9 FUTURE HOTEL 1 PER KEY + 5 79.0 75.0 3 1

SUBTOTAL SUBTOTAL SUBTOTAL SUBTOTAL

134.2 127.2 5 2

SPACES REQUIRED = 134.2 SPACES PROVIDED = 132.0

TOTAL OF REQUIREDPARKING FOR ALL PARCELS=

360.8 364 = TOTAL PARKING SPACES PROVIDED

BIKE PARKING

REQUIRED USE TYPE PROVIDED

18.2 LONG TERM LOCKABLE ENCLOSURES 20

18.2 VISITORS RACKS 20

BIKE RACKBIKE LOCKER

Top Related