ENGINEERING PROJECT MANAGEMENT PROCUREMENT CONSTRUCTION * STRUCTURAL * PIPING * MECHANICAL * E&I INTEGRATION WORKS REFURBISHMENT WORKS
ABOUT US
FPSO TOPSIDE MODULES | PROCESS PACAKAGES
SunMarine Engineering is a well established engineering organization and has a strong base towards Oil & Gas related activities in both offshore and marine areas and is a strong Strength in the provision of engineering, procurement, project management and construction services with distinctive capabilities in execution of projects.
www.sunmarine.com.sg
OUR DIVISIONS
PROCESS MODULE PACAKAGES FPSO TOPSIDE MODULES * CARRY OVER WORKS * INTEGRATION WORKS * REBURISHMENT WORKS STEEL FABRICATION PIPING FABRICATION & INSTALLATION E&I WORKS
HYDRO TESTING CHEMICAL CLEANING HOT OIL FLUSHING FLANGE MANAGEMENT MECHANICAL COMPLETION COMMISSIONING 3D LASER SCANNING AUTOMATION & CONTROLS
FIELD JOINT COATING SERVICE – ONSHORE & OFFSHORE
www.sunmarine.com.sg
OUR LOCATION
30, TUAS VIEW PLACE
www.sunmarine.com.sg
OUR GLOBAL PRESENCE
BRANCHES :
Chennai Kuala lumpur Johor Bahru Batam Abu Dhabi Bangladesh Ghana
OPERATIONS:
Mumbai Vietnam Brazil
CORPORATE OFFICE:
Singapore
www.sunmarine.com.sg
CERTIFICATIONS
www.sunmarine.com.sg
www.sunmarine.com.sg
OUR SERVICES
1. FPSO | Offshore Platforms Module Integration | Installation
Carry over | Hook-up scope and completion work
2. PROCESS MODULES Design | Engineering | Fabrication | Installation
3. STEEL WORK Steel Fabrication – Platforms | Vessels | Tanks
4. PIPING PRE-FAB
Piping Pre-Fabrication facility with covered work shop (7500 Sq.Ft) with
Radiography Enclosure Bay, 40 Ft. Trailer Access, 8 Ton Over Head Crane,
Suitable for both C.S and Exotic Piping.
5. PIPING & MECHANICAL
COMPLETION
Team of Experts will lead, Guide & Execute Erection, NDT, Test Pack, Hydro-
Test & Mech. Completion
6. COMMISSIONING Mechanical | Electrical | Instrumentation
SERVICES
www.sunmarine.com.sg
YARD LOCATION Singapore
30, TUAS VIEW PLACE
FABRICATION YARD INTEGRATION YARD
www.sunmarine.com.sg
Office and Workshop Location Singapore
30, TUAS VIEW PLACE
FABRICATION YARD
INTEGRATION YARD
www.sunmarine.com.sg
Yard @ Singapore with waterfront
Open Fabrication & Assembly Area
1,250 m²
Water Depth 5 m
Waterfront Length 25 m
Ground Capacity 120 MT/m²
1 JALAN SUMULAN, FABRICATION YARD
www.sunmarine.com.sg
OFFICE FACILITIES
TUAS OFFICE FACILITIY
www.sunmarine.com.sg
WORK SHOP FACILITIES
TUAS - WORKSHOP FACILITY
Covered W/S & Fabrication
660 m²
Covered/Open Storage Area
550 m²
Office & Others 600 m²
Overhead Crane capacity
8 MT
www.sunmarine.com.sg
WORK SHOP FACILITIES
TUAS WORKSHOP – 40’ TRAILER ACCESS FOR LOADING & UNLOADING
www.sunmarine.com.sg
WORK SHOP FACILITIES
TUAS WORKSHOP – RADIOGRAPHY ENCLOSURE BAY
www.sunmarine.com.sg
WORK FORCE
WORK FORCE (SINGAPORE)
SN TRADE DIRECT WORKERS CONTRACT WORKERS
1 SUPERVISOR 18 4
2 FOREMAN 10 20
3 APPROVED WELDERS 8 35
4 PIPE FITTERS 12 35
5 TECHNICIANS (MECH./PIPING) 26 38
6 ELECTRICIAN 16 32
7 ROPE ACCESS TECHNICIAN 15 25
8 PAINTER 8 25
9 RIGGER 3 24
TOTAL 116 238
www.sunmarine.com.sg
FACILITIES
TRANSPORT FACILITIES
1 Truck 20 Ft 4
2 Truck 10 Ft 3
3 Fork Lift 3 Ton, 5 Ton and 10 Ton Each 2
4 Container Office 40 Ft 2
5 Container Office 20 Ft 4
GENERATORS | COMPRESSORS
1 Diesel Generator 200 KVA 5
2 Diesel Generator 400 KVA 4
3 Diesel Generator 600 KVA 2
4 Air Compressor 100 C.Ft, 100PSi 3
5 Air Compressor 365 C.Ft, 100PSi 3
6 Air Compressor 600 C.Ft, 100PSi 1
7 Airless Unit 2
www.sunmarine.com.sg
BOLT TORQUEING & TENSIONING EQUIPMENT
1 Hydrallic Bolt Tensioning Pump 2 15,000 PSI
2 Hydrallic Bolt Torqueing Pump 2 10,000 PSI
3 HL Tensioners 2 Sets Wide Range of Sizes
4 Hydraullic Torqueing Tools 3 Sets Square Drive Wreches
5 Hydraullic Torqueing Tools 2 Sets RSL Hex Drive Wrenches
6 Manual Torqueing Wrenches 5 Sets Wider ranges of wrenches
FLANGE FACE (SERATIONS) MACHINING
1 Flange Face Machining 2 (0 to 12")
2 Flange Face Machining 2 (6" to 40")
HYDRO-TEST | FLUSHING | CHEMICAL CLEANING
1 Hydro-Test equipment (Pump, Chart Recorder, Testing Manifolds)
5 Sets Wide Ranges
2 Water Jetting, Hydro-Jetting, Hot Oil Flushing & Chemical Cleaning
3 Sets Wide Ranges
FACILITIES
www.sunmarine.com.sg
3D LASER SCANNER
1 Leica P16 Scanner 1
2 Faro 3D Laser Scanner 1
DRILLING MACHINES
1 Bench Drilling Machine 2
2 Magnetic Drilling Machine 4
3 Radial Drilling Machine 2
4 Hand Drilling Machine (110V) 20
5 Hand Drilling Machine (230V) 15
FACILITIES
www.sunmarine.com.sg
WELDING MACHINES
1 SMAW 500A Welding Machine 25
2 GTAW 500A Welding Machine 20
3 SMAW 600A Welding Machine 25
4 FCAW 500A Welding Machine 20
5 FCAW 600A Welding Machine 25
6 GTAW 600A Welding Machine 25
7 GTAW 200A Welding Machine 25
8 SMAW 200A Welding Machine 20
9 FCAW 200A Welding Machine 20
10 400-1000A Arc Air 3
OVEN
1 50Kg Baking Oven 5
2 50Kg Holding Oven 5
3 5Kg Portable Welding Quiver 30
FACILITIES
www.sunmarine.com.sg
CHAIN BLOCK, SHACKLE & LIFTING BELTS
1 3 Ton Chain Block 30
2 3 Ton Chain Block 30
3 2 Ton Chain Block 30
4 2 Ton Chain Block 30
5 1 Ton Chain Block 30
6 1 Ton Chain Block 30
7 2 Ton Lever Block 30
8 2 Ton Lever Block 30
9 2 Ton Lever Block 1
10 1 Ton Lever Block 1
11 1 Ton Lever Block 1
FACILITIES
www.sunmarine.com.sg
OTHER MACHINERIES
1 3 Ton Vertical clip 25
2 2 Ton Vertical clip 25
3 1 Ton Vertical clip 25
4 Pipe Cutter 6
5 Plate Cutter 5
6 230 V Grinder Various diameter 30
7 110 V Grinder Various diameter 30
8 P81 Plasma Cutter 4
9 Air Winch (Wide Ranges) 4
10 Air Hammer 2
11 Distribution Board 230V-6 Way, 440V-3 Way
5
12 1/2 “-300PSi Air Hoses (100M) 10
13 3/4 “-300PSi Air Hoses (100M) 10
FACILITIES
www.sunmarine.com.sg
BLASTING & PAINTING EQUIPMENTS
1 Airless Spray Unit 5
2 Conventional Spray 10
3 Portable Sand Blasting Machine 2
4 Semi Auto Sand Blasting Unit 2
5 Coating & Wrapping Machine 2
6 Internal Shot Blasting Machine 2
7 External Shot Blasting Machine 2
8 Gunite Machine 2
FACILITIES
www.sunmarine.com.sg
PT. SUN MARINE ENGINEERING
BATAM, INDONESIA
www.sunmarine.com.sg
PROJECT MANAGER KATHIR
ORGANISATION CHART-INDONESIA
SAIFUDIN CONTRUCTION LEAD
HSE SUPERVISOR
DOCU-CONTROLLER NURUL
CHEM. CLEANING SUPERVISOR
BOLT TORQUING SUPERVISOR
E&I SUUPERVSIR
SAFETY STAFF
QA / QC LEAD SARA
DIRECTOR ARIKRISHNAN
HYDRO-TEST SUPERVISOR
TECHNICIANS TECHNICIANS TECHNICIANS TECHNICIANS TECHNICIANS
www.sunmarine.com.sg
INDONESIA WORKFORCE
WELDERS & FITTERS
1 MUHAMAD LAKONI WELDER
2 AHAMD YANI WELDER
3 ALI EFENDI WELDER
4 DARNA LELY WELDER
5 ZAHIDIN WELDER
6 HUSNI TAMRIN WELDER
7 KAMSIYONK WELDER
8 SARGANI WELDER
9 SUSANTO WELDER
10 RAHIMUDIN WELDER
11 RAHMAN MOHAMMAD ARIFUR FITTER
12 HAQ SANAUL FITTER
13 UDDIN MOHAMMAD MONIR FITTER
14 UDDIN KAMAL FITTER
15 ISLAM MOHIDUL FITTER
16 DAS JIT CHANDRA FITTER
17 ISLAM MAIDUL FITTER
18 HOSSAIN BABUL FITTER
19 HOSSAIN EMRAN FITTER
www.sunmarine.com.sg
HYDROTEST TECHNICIAN
1 IDRUS SUPERVISOR
2 WELLY TECHNICIAN
3 META ANDI ASTAMA TECHNICIAN 4 MUIZZUDDIN TECHNICIAN
5 JOKO TECHNICIAN
6 MUHAMMAD SOLEH RUSTM TECHNICIAN
CHEMICAL CLEANING TECHNICIAN
1 DONA KURNIAWAN SUPERVISOR
2 HASANI TECHNICIAN
3 MUHAMMAD HUSNI TAMRIN TECHNICIAN 4 MUSMULYADI TECHNICIAN
5 GUNADI TECHNICIAN
BOLT TORQUING TECHNICIAN 1 PRALINDUNGAN HARAHAP SUPERVISOR
2 SUHENDRA TECHNICIAN
3 SOETRISNO TECHNICIAN
4 ARIPUDIN TECHNICIAN
5 BENI AKBAR TECHNICIAN
INDONESIA WORKFORCE
www.sunmarine.com.sg
TRADE TECHNCIANS
1 IDIL FITRISYAH MECH 2 ALAMSYAH MECH 3 FADRI SAYUDIN MECH 4 DINDI ASWANDI MECH 5 FACHRUDDIN MARKER 6 M ANWAR MARKER 7 MIMIN GUNAWAN MARKER 8 SATIRI TUBING 9 PAISAL TUBING
10 SAPIT DAPILA FIBER OPTICAL 11 M ZAID FIBER OPTICAL 12 BUDI FIBER OPTICAL
INDONESIA WORKFORCE
www.sunmarine.com.sg
www.sunmarine.com.sg
www.sunmarine.com.sg
MAJOR PROJECTS
PROJECT DETAILS YEAR PROJECT VALUE REMARKS
OFFSHORE MODULE Sep 2017 – On
Going SGD. 1.2 M
PROJECT: MAERSK OIL
CLIENT: SMOP – Singapore
END USER MAERSK Oil
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT VALUE REMARKS
Module Integration Aug 2017 – On
Going SGD. 8 M
PROJECT: KOAMBO Sul FPSO
CLIENT: SAIPEM
END USER TOTAL
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT
VALUE REMARKS
OFFSHORE
INSTALLATION-Hook
Up Phase
Aug 2016 – Dec
2016 SGD. 1.2 M
Modification of Module Piping
Modification of Produced Water
Piping
PROJECT: LEWEK EMAS FPSO
CLIENT: EMAS OFFSHORE
END USER EMAS OFFSHORE
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT VALUE REMARKS
FLARE TOWER FLARE TIP
REPAIR & MODIFICATION Jan 2015 SGD. 0.8 M
70M Height Flare Tip repair and
modification using Rope Access
Personnel
Modification Fire Water Line
PROJECT: LEWEK EMAS FPSO
CLIENT: EMAS OFFSHORE
END USER EMAS OFFSHORE
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT VALUE REMARKS
ELECTRICAL &
INSTRUMENTATION Jan 2016-Mar 2017 SGD. 0.7 M
Module E & I Work Integration
Commissioning
PROJECT: GOLAR HILLI FLNG
CLIENT: Keppel Shipyard – Benoi
Yard
END USER GOLAR FLNG
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT VALUE REMARKS
COMPRESSOR
MODULE PACKAGE
Dec 2014-May
2015 SGD. 0.54 M
Structural Steel Fabrication
Piping Pre-Fab & Installation
PROJECT: CENDOR PHASE-2
CLIENT: ROS
END USER PETROFAC
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT
VALUE REMARKS
PIPING HOOK-UP
WORK Mar 2014 SGD. 100, 000 Piping Pre-Fab & Installation
PROJECT: SEADRILL EZPERANZA
CLIENT: SEADRILL
END USER SEADRILL
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT
VALUE REMARKS
PROCESS MODUEL
FAB
Aug 2013 – Dec
2013 SGD. 200, 000
Piping Pre-Fab & Installation
Structural Steel Work
E & I Work
PROJECT: FPSO ONGC CLUSTER 7
CLIENT: A0S YARD, BUMI ARMADA
END USER ONGC
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT
VALUE REMARKS
TURRET
FABRICATION
Jan 2014 – June
2015 SGD. 600, 000 Supply of Workers
PROJECT: ITHCHYS TURRET
CLIENT: SBM OFFSHORE
END USER SBM OFFSHORE
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT
VALUE REMARKS
MODULE PIPING -
MODIFICATION June 2013 SGD. 300, 000
Process Module Piping
Repair and Modification
work
PROJECT: FPSO PERAISAI KAMELIA
CLIENT: EMAS OFFSHORE
END USER EMAS OFFSHORE
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT
VALUE REMARKS
TURRET
FABRICATION
Mar 2016-Feb
2017 SGD. 500, 000
Structural Steel Work
Pipe Fab & Installation
PROJECT: FPSO LIBRA -TURRET
CLIENT: LONDON MARINE CONSULTANCY
END USER LONDON MARINE CONSULTANCY
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT
DETAILS YEAR
PROJECT
VALUE REMARKS
CARRY OVER
SCOPE
Jan 2010-
June 2012 SGD. 3.5 M
Structural | Piping | E & I
| Pickling & Passivation |
Rope Access Services
PROJECT: FPSO PSVM BP ANGOLOA
CLIENT: MODEC OFFSHORE
END USER BP
MAJOR PROJECTS
www.sunmarine.com.sg
PROJECT DETAILS YEAR PROJECT
VALUE REMARKS
ELECTRICAL &
INSTRUMENTATION
Mar 2017-
Oct 2017 SGD. 0.6 M
Module E & I Work
Integration
Commissioning
PROJECT: FPSO HELIX
CLIENT: JURONG SHIPYARD
END USER Helix Energy
MAJOR PROJECTS
www.sunmarine.com.sg
SAMPLE PROJECT EXECUTION PLAN
www.sunmarine.com.sg
PROJECT MANAGER KATHIR
PROJECT ORGANISATION CHART
CONSTRUCTION MANAGER MAHESH
LOGISTICS SUPERINTENDENT
HSE LEAD HERMAN
PRODUCTION QC
MC - QC
ADMIN JOTHI
DOCU-CONTROLLER KEENA
PUNCH LISH CO-ORDINATOR
MECHANICAL SUPERVISOR
PIPING SUPT. JEGATHISAN
ERECTION SUPT. KYAW
WELDING SUPT. NAPOLIYAN
PAINTING SUPERINTENDENT
SIVAVELU
HSE SUPERVISOR
HSE OFFICER
PROJECT ENGINEER SARAVANAN
QA / QC COORDINATOR
DINESH
QA / QC MANAGER SARAVANAN
OFF SITE MATERIAL COORDINATION TEAM
MAT’L COORDINATOR SENTHIL
PROCURMENT-ENG
SAWANINATHAN
STORE KEEPER
STR / PIPE SUPERVISOR
EIT SUPERVISOR
PUNCH LIST CO-ORDINATOR
QA DOCUMENT CONTROLLER
DIRECTOR (PROJECTS) JEYAKUMAR
BOARD OF DIRECTORS
www.sunmarine.com.sg
PRELIMINARY TENDER SCHEDULE
www.sunmarine.com.sg
PRELIMINARY TENDER SCHEDULE
www.sunmarine.com.sg
MANPOWER HISTOGRAM
Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19
Planned (Monthly) 20 40 50 60 80 100 100 100 80 60 45 35 30 0 0 0 0 0 0 0
Manhour 3520 7040 8800 10560 14080 17600 17600 17600 14080 10560 7920 6160 5280 0 0 0 0 0 0 0
Planned (cumm.) 20 60 110 170 250 350 450 550 630 690 735 770 800 800 800 800 800 800 800 800
Manhour 3520 10560 19360 29920 44000 61600 79200 96800 110880 121440 129360 135520 140800 140800 140800 140800 140800 140800 140800 140800
Actual
Structure 10 15 25 25
Mechanical 2 2 2 15
E&I 5 8 10 15
Painting 8 8 8 8
Others 2 2 2 2
Indirect 5 5 5 5
Actual (Monthly) 32 40 52 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Manhour 5632 7040 9152 12320 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Actual (cumm.) 32 72 124 194 194 194 194 194 194 194 194 194 194 194 194 194 194 194 194 194
Manhour 5632 12672 21824 34144 34144 34144 34144 34144 34144 34144 34144 34144 34144 34144 34144 34144 34144 34144 34144 34144
Project Name: EHOUSE Date: 14-May-18
20
40
50
60
80
100 100 100
80
60
45
35
30
0 0 0 0 0 0 0
32
40
52
70
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00
100
200
300
400
500
600
700
800
900
0
20
40
60
80
100
120
Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19
MANPOWER HISTOGRAMS
www.sunmarine.com.sg
DIRECT MANPOWER COMPARISION
FABRICATION YARD
Sl. No. DisciplineEhouse Project
Peak ManpowerSunMarine (A) Subcontractor (B) Overall Manpower (A+B)
1 Structure 30 25 15 40
2 Mechanical 15 20 10 30
3 E&I 25 20 15 35
4 Painting 40 15 10 25
5 Others 5 10 5 15
Project Peak Manpower 115 90 55 145
Inhouse welder availability
Structure = 10 welders
Piping = 8 welders
www.sunmarine.com.sg
ENGINEERING WORK FLOW
CLIENT DCC
DCC
PROJECT MANAGER
UPDATE REGISTER
DISCIPLINE LEADS
CLARIFICATIONS (TQ)
DISTRIBUTION
CONSTRUCTION
www.sunmarine.com.sg
ENGINEERING – CHANGE MANAGEMENT
1. DOCUMENT REGISTER * CLIENT DOCUMENT REGISTER * INTERNAL DOCUMENT REGISTER * VENDOR DOCUMENT REGISTER 2. DRAWING REGISTER * CLIENT DRAWING REGISTER * INTERNAL DRAWING REGISTER * VENDOR DOCUMENT REGISTER 3. PROJECT TQ REGISTER 4. PROJECT SITE INSTRUCTURE (SI) REGISTER 5. PROJECT HOLD REGISTER
DOCUMENT CONTROL & CHANGE MANAGEMENT
www.sunmarine.com.sg
PROCUREMENT WORK FLOW
CLIENT MTO
DCC
PROJECT MANAGER
UPDATE REGISTER
PROCUREMENT LEAD
CONSTRUCTION
UPDATE MSR
ENQUIRY / QUOTE
SUPPLIER
PO
BID EVALUATION
MATERIAL RECEIPT
MATERIALS INVOICE
www.sunmarine.com.sg
1. FREE ISSUE MATERIAL STATUS • TOTAL QTY. Vs RECEIVED QTY. • ETA
2. PROCURED MATERIAL STATUS • TOTAL QTY. Vs RECEIVED QTY. • PO & ETA
3. EQUIPMENT DELIVERY STATUS
• ROS Vs ETA
PROCUREMENT – MATERIAL STATUS REPORT
MATERIAL STATUS REPORT – WEEKLY UPDATE
www.sunmarine.com.sg
CONSTRUCTION SEQUENCE
www.sunmarine.com.sg
PROPOSED MODULE FABRICATION LAYOUT
EHOUSE MODULE
SEA
FR
ON
T
50m
25m
FABRICATION YARD : @ 1 JALAN SUMULAN
N
www.sunmarine.com.sg
MONTH
WEEK 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
BLASTING & PRIMING
Shop Blasting & Painting of Structural Materials
Structural Steel Fabrication
STRUCTURE
Structural Steel Assembly & Installation
Tertiary Steel Installation
MODULE BLASTING & PAINTING Majority of hotworks target to complete before module blasting & paining
Module Blasting & Painting
MECHANICAL
Equipment installation
Prefabrication
E&I
E&I supports installation E&I - Installation
E&I Testing
Prefabrication
HVAC & CO2 PIPING
Supports installation HVAC & CO2 piping - Installation
HVAC & CO2 system Testing
MECHANICAL COMPLETION &
PRE-COMMISSIONING Mechanical Completion
Precommissioning
MODULE LOAD OUT
Loadout
MONTH 7 MONTH 8 MONTH 9 MONTH 10 MONTH 11 MONTH 12MONTH 1 MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6
CONSTRUCTION PLAN OUTLINE
www.sunmarine.com.sg
BLASTING & PRIMING
1. STRUCTURAL STEEL
2. EQUIPMENT SUPPORTS
3. PIPE SUPPORTS
4. E&I SUPPORTS
5. HVAC DUCT SUPPORTS
BLASTING & PRIMING OF RAW MATERIALS
www.sunmarine.com.sg
PREFABRICATION OF PLATE GIRDERS
1. PLATE GIRDERS
2. PLATE T-GIRDER
PRE-FABRICATION OF PLATE GIRDERS
www.sunmarine.com.sg
ASSEMBLY OF PANCAKE
KEEL BLOCK
MAIN FRAMING – PLATE GIRDER
PANCAKE MAIN STEEL FRAMING LAYOUT – PLAN VIEW AT T.O.S. EL. + XXX.XXX
www.sunmarine.com.sg
PANCAKE DECK PLATE INSTALLATION
DECK STIFFENER
DECK PLATE
PANCAKE MAIN STEEL FRAMIG LAYOUT – PLAN VIEW AT T.O.S. EL. + XXX.XXX
www.sunmarine.com.sg
SUPER STRUCTURE INSTALLATION
MODULE SUPPORT
SUPER STRUCTURE
SUPER STRUCTURE INSTALLATION
PANCAKE STRUCTURE
KEEL BLOCK SIDE ELEVATION
www.sunmarine.com.sg
WALL PLATE INSTALLATION
WALL PLATE INSTALLATION
SIDE ELEVATION
WALL PLATE
STIFFENER
www.sunmarine.com.sg
MODULE BLASTING & PAINTING
COMPRESSOR
SAND BLASTING M/C
MODULE COVERED WITH CANVAS
www.sunmarine.com.sg
EQUIPMENT INSTALLATION
30, TUAS VIEW PLACE
1. SKIDDING METHOD
2. DIRECT LIFTING
EQUIPMENT INSTALLATION METHODS
www.sunmarine.com.sg
TERTIARY / OUTFITTING – FABRICATION & INSTALLATION
SIDE ELEVATION
ACCESS PLATFORM
CAGE LADDER
STAIRCASE
ACCESS PLATFORM
STAIRCASE
www.sunmarine.com.sg
FIRE FIGHTING SYSTEM - INSTALLATION
FIRE FIGHTING SYSTEM – CO2 / NOVEC (TBC)
www.sunmarine.com.sg
E&I INSTALLATION
www.sunmarine.com.sg
TESTING & PRECOMMISSIONING
1. E&I
2. HVAC SYSTEM
3. FIRE FIGHTING SYSTEM
TESTING & PRECOMMISSIONING
www.sunmarine.com.sg
INSULATION & PRESERVATION
30, TUAS VIEW PLACE 1. PIPING
2. E&I
3. EQUIPMENT & INSTRUMENT
PRESERVATION
1. WALL PANEL INSULATION
2. PIPING INSULATION
3. HVAC DUCTING INSULATION
INSULATION
www.sunmarine.com.sg
LOAD OUT & SEA FASTENING
30, TUAS VIEW PLACE
1. RO-RO METHOD USING SPMT
2. DIRECT LIFTING USING FLOATING CRANES
LOAD OUT METHODS
1. SAIL AWAY PRESERVATION
2. SECURING MODULE FOR TRANSPORT
SEA FASTENING
www.sunmarine.com.sg
THANK YOU
30, TUAS VIEW PLACE