8/4/2019 2227 2G report
1/26
New Site Integration Report
Written by Engineer's NameApproved by Manager's Name
New Site Integration Report
Region: UPPER
BSC:
Site: 2227
Huawei BSS6000 Radio System
Ericsson/Huawei Core
Etislat Misr 2011
RAN/OPT/OC/Reports/IR_Rev1.0 26/1
8/4/2019 2227 2G report
2/26
8/4/2019 2227 2G report
3/26
New Site Integration Report
Written by Engineer's NameApproved by Manager's Name
Abstract
This is site integration report, all site's parameters, KPIs, DTresults are illustrated in order to justify the final decision whetherthe site is accepted or rejected
Site Data Verification
The following table is the site's data as configured in the OMC
and verified in the field
FromDatabase
From Field
Address QNA_Alum_StdQNA_Alum_Std
Long 31.53539 31.53539
Lat26.00844 26.00844
BSC
Site Code UPP2227P2 UPP2227P2
Site Name QNA_Alum_Std QNA_Alum_Std
On-AIR
Date
2GLAC/RAC
3GLAC/RAC/S
AC
RAN/OPT/OC/Reports/IR_Rev1.0 26/3
8/4/2019 2227 2G report
4/26
New Site Integration Report
Written by Engineer's NameApproved by Manager's Name
Table 1 Site Data
The following table shows the radio parameters as stated in theplanned database, and as verified in field
Sector TechnologyParamete
r DB Actual
Sector 1
GSM/UL
CI 22271 22271
BSIC 11 11
Height
Antenna
TypeAzimuth 60 60
Tilt
BCCH 1002 1002
TCH2 984 984
TCH3 1019 1019
TCH4 1021 1021
DCS/OL CI 22271 22271
BSIC 11 11
Height
Antenna
TypeAzimuth 60 60
Tilt
TCH3 517 517
TCH4 522 522
TCH5 529 529
TCH6 535 535
RAN/OPT/OC/Reports/IR_Rev1.0 26/4
8/4/2019 2227 2G report
5/26
New Site Integration Report
Written by Engineer's NameApproved by Manager's Name
3G
CISC
HBA
AntennaType
Azimuth
RAN/OPT/OC/Reports/IR_Rev1.0 26/5
8/4/2019 2227 2G report
6/26
New Site Integration Report
Written by Engineer's NameApproved by Manager's Name
Sector Technology Parameter DB Actual
Sector 2
GSM/UL
CI 22272 22272
BSIC 11 11
Height
AntennaType
Azimuth 140 140
Tilt
BCCH 975 975
TCH2 977 977TCH3 981 981
TCH4 1011 1011
DCS/OL
CI 22272 22272
BSIC 11 11
Height
AntennaType
Azimuth 140 140
Tilt
TCH3 513 513
TCH4 521 521
TCH5 523 523
TCH6 531 531
3G
CI
SC
HBA
AntennaType
Azimuth
Tilt
RAN/OPT/OC/Reports/IR_Rev1.0 26/6
8/4/2019 2227 2G report
7/26
New Site Integration Report
Written by Engineer's NameApproved by Manager's Name
RAN/OPT/OC/Reports/IR_Rev1.0 26/7
Sector Technology Parameter DB Actual
Sector3
GSM/UL
CI 22273 22273
BSIC 11 11
Height
AntennaType
Azimuth 230 230
Tilt
BCCH 986 986
TCH2 988 988
TCH3 992 992TCH4 996 996
TCH5 998 998
TCH6 1010 1010
DCS/OL
CI 22273 22273
BSIC 11 11
Height
AntennaType
Azimuth 230 230
TiltTCH7 515 515
TCH8 519 519
TCH9 525 525
TCH10 528 528
3G
CI
SC
AntennaType
Azimuth
Tilt
8/4/2019 2227 2G report
8/26
New Site Integration Report
Written by Engineer's NameApproved by Manager's Name
Sector Technology Parameter DB Actual
Sector 4
GSM/UL
CI 22274 22274
BSIC 11 11
Height
AntennaType
Azimuth 315 315
Tilt
BCCH 1017 1017TCH2 994 994
TCH3 1000 1000
TCH4 1004 1004
TCH5 1006 1006
TCH6 1014 1014
DCS/OL
CI 22274 22274
BSIC 11 11
Height
Antenna
TypeAzimuth 315 315
Tilt
TCH7 512 512
TCH8 527 527
TCH9 530 530
TCH10 530 530
TCH11 533 533
TCH12 536 536
3G
CI
SC
HBA
AntennaType
Azimuth
Tilt
RAN/OPT/OC/Reports/IR_Rev1.0 26/8
8/4/2019 2227 2G report
9/26
New Site Integration Report
Written by Engineer's NameApproved by Manager's Name
KPIs
In this section the main KPIs are listed for the last three days
1.1 2G KPIs
The following table illustrates the 2G KPIs as per the last three days
KPI Threshold Values
S1 S2 S3 S4
Call Drop Rate (Average) 2% or less
Call Setup Success Rate (Peak) 90% or more
Handover Success Rate(Average)
85% or more
TCH Traffic (Total)3 Erlang or
more
S1 S2 S3 S4
TCH Setup Blocking Rate (Peak) 3% or less
SDCCH Traffic (Total)1 Erlang or
more
SDCCH Blocking Rate (Peak) 2% or less
Table 2 2G KPIs table
RAN/OPT/OC/Reports/IR_Rev1.0 26/9
8/4/2019 2227 2G report
10/26
New Site Integration Report
Written by Engineer's NameApproved by Manager's Name
Primary Tests
1.2 2G Time Slot Tests
The following table shows the silent call test resultsSecto
rFreq
0 1 2 3 4 5 6 7
Sector1
BCCH101
3O O O
TCH2101
5O O O
TCH3101
7O O O
TCH4102
1O O O
TCH5100
1O O O
TCH6100
8O O O
TCH7101
0O O O
TCH8102
3O O O
Sector2
BCCH 980 O O O
TCH2 982 O O OTCH3 992 O O O
TCH4100
0O O O
TCH5100
2O O O
TCH6100
6O O O
TCH7 512 O O OTCH8 514 O O OTCH9 516 O O O
TCH10 518 O O O
Sector3
BCCH 976 O O OTCH2 978 O O OTCH3 998 O O O
TCH4100
4O O O
TCH5 520 O O OTCH6 522 O O OTCH7 524 O O O
RAN/OPT/OC/Reports/IR_Rev1.0 26/10
8/4/2019 2227 2G report
11/26
New Site Integration Report
Written by Engineer's NameApproved by Manager's Name
Sector
Freq0 1 2 3 4 5 6 7
TCH8 526 O O O
Sector4
BCCH 984 O O OTCH2 986 O O OTCH3 988 O O OTCH4 990 O O OTCH5 994 O O OTCH6 996 O O OTCH7 513 O O OTCH8 515 O O O
TCH9 528 O O OTCH10 530 O O OTCH11 533 O O OTCH12 535 O O O
Table 3 2G TS Checks, O:OK, N:Silent, blank are not tested
1.3 2G TRX Tests
FreqLevel & quality at
TA < 1Level & quality at 1