1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page1
5. Acceptance test
Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page2
5. Acceptance test
1. Site type D
RFCG900 2/2/2G1800 2/2/2
RFCU2100 1/1/1
APM30HIBBS200D
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page3
RTN 900
900
900
1800
1800
1800
2100
2100
2100
2. Site type DU Inline
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page4
3. Site type DU Stacked
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page5
MRFU
MRFU
MRFU
2100
2100
2100
4. Site type DF Inline
RRU U2100
MRRU GU900
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page6
5. Site type DF Stacked
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page7
6. Site type DR Inline
APM30HRFCGU900
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
MRFU
MRFU
MRFU
7. Site type DR Stacked
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
MRFU
MRFU
MRFU
7. Antenna Wiring - Site type D
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
8. Antenna Wiring - Site type DF
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
8. Antenna Wiring - Site type DF
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
8. Antenna Wiring - Site type DF
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
9. Antenna Wiring - Site type DU
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
10. Antenna Wiring - Site type DR
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
11. BBU configuration
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
11. BBU configuration MRFU
slot 0/1/2WRFU
slot 3/4/5
U2100
U900
G900
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
U2100
U900
G900
11. BBU configuration
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page19
5. Acceptance test
1. Cabinets
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. Advanced Power Module (APM30H)2. Outdoor Radio Frequency Cabinet (RFC)3. Battery Cabinet (IBBS200D)
APM30H RFC IBBS200D
2. APM30H
No. ModuleOptional/
MandatoryDescription
1 Fan box Mandatory
The fan box is configured with the fan, Hert Power Monitoring
Interface unit (HPMI), and Central Monitoring Unit type A (CMUA).
It is used to dissipate heat in the cabinet.
2 SLPU MandatoryThe Signal Lightning Protection Unit (SLPU) is installed in the top 1 U
space of the cabinet
3 PSU MandatoryThe power supply unit (PSU) converts 220 V AC power into -48V DC
power.
4 EPS subrack MandatoryThe EPS provides functions of AC and DC power distribution for the
cabinet.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
5 BBU3900 MandatoryThe BBU3900 processes the baseband signals and enables
interaction between the base station and the BSC or RNC.
6 EMUA Optional
The Environment Monitoring Unit (EMUA) monitors the internal
environment of the cabinet and reports related alarms.
The EMUA must be configured when 16 Boolean alarm inputs are
required. It is installed in the 1 U space below the BBU.
7 PMU Mandatory
The Power Monitoring Unit (PMU) provides the functions of power
system and battery management, power monitoring, and alarm
reporting.
8 Heater Optional A heater is an optional component.
9 SOU Optional It transfers AC power supply to the customer equipment.
3. RFC
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
No. ModuleOptional/
MandatoryDescription
1 DCDU-01 MandatoryThe Direct Current Distribution Unit-01 (DCDU-01) is a DC power distribution
unit supplying power to each component in the RFC.
2 Fan box Mandatory
The fan box is configured with the fan and CMUA. The fan dissipates heat in the
cabinet, and the CMUA provides the functions of the temperature control,
Boolean alarm detection.
3 RFU Mandatory
Radio Frequency Unit, performs the functions such as modulation and
demodulation between baseband signals and RF signals, data processing, and
signal combination and division.
3. IBBS200D
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
No. ModuleOptional/
MandatoryDescription
1 Fan MandatoryThe FAN is installed on the front door of the cabinet, dissipating
heat in the cabinet.
2 CMUA MandatoryThe CMUA provides the functions of the temperature control,
Boolean alarm detection.
3
Power
distribution
box
Mandatory
The power distribution box is installed on the upper right of the
cabinet, transferring and distributing power to the fan and to the
batteries.
4. BBUParameter Counter
Dimensions (width x height x depth)
442 mm (19 inch) x 86 mm (2U) x 310 mm
Weight ≤ 12 kg
Working environment The BBU is used for indoor applications or is put in an outdoor cabinet.
Working voltage -48V DC (-38.4V DC – -57V DC)
Module Name Description
FAN Fan (mandatory)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
UPEU Power board. One UPEU is required.
UEIU Universal EMU (optional)
UTRP Universal transmission processing unit (optional)
WMPT Main control board of the UMTS system.
Mandatory in the UMTS mode.
WBBP Baseband board of the UMTS system. Mandatory
in the UMTS mode.
GTMU Main control board of the GSM system.
Mandatory in the GSM mode.
UBRI Universal baseband radio interface board that
provides extended optical or electrical CPRI
4. BBU - GTMU
Label Connector Type Description
CPRI0 to CPRI5 SFP connector Ports for the communication between the BBU and the RF module. It supports the input and
output of the optical or electrical signals.
ETH RJ-45 connector Used for local maintenance and commissioning.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
ETH RJ-45 connector Used for local maintenance and commissioning.
FE0 RJ-45 connector Reserved for connecting the BBU to a routing device in the equipment room through the
Ethernet cable to transmit network information.
FE1 DLC connector Reserved for connecting the BBU to a routing device in the equipment room through the
optical cable to transmit network information.
USB USB connector Reserved for software upgrade performed automatically from a USB disk.
TST USB connector Providing the reference clock for the tester
E1/T1 DB26 female connector Used for input and output of four E1/T1 signals between the GTMU and the UELP or the
BSC.
4. BBU - WMPT
Label Connector Type Description
E1/T1 DB26 connector E1 port
FE0 RJ-45 connector FE electrical port
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
FE0 RJ-45 connector FE electrical port
FE1 SFP connector FE optical port
GPS SMA connector Connected to the GPS antenna
ETH RJ-45 connector Used for commissioning
USB USB connector USB loading port
TST USB connector USB commissioning port
RST - Hardware reset button
4. BBU - WBBP
Lable Connector Type Rate
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Lable Connector Type Rate
CPRI0 to
CPRI2
SFP connector The data transmission rate between the CPRI port and the RFU is 1.25 Gbit/s.
4. BBU - UPEU
Port Connector Type
Description
MON0 RJ-45
connector
Provides the input and output of the externally
collected environment monitoring signals in the
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
connector collected environment monitoring signals in the
format of the RS485 frame for the GTMU or WMPT
MON1 RJ-45
connector
Provides the input and output of the externally
collected environment monitoring signals in the
format of the RS485 frame for the GTMU or WMPT
EXT-ALM0 RJ-45
connector
Transmits the externally collected environment
monitoring signals in the format of the dry contact
signals for the GTMU or WMPT.
EXT-ALM1 RJ-45
connector
Transmits the externally collected environment
monitoring signals in the format of the dry contact
signals for the GTMU.
PWR 7W2 connector � Leads the –48 V DC input (UPEA).
� Leads the +24 V DC input (UPEB).
4. BBU - PMU
Port Function
RS232/RS422 port Communicates with the upper-level unit. The upper-
level unit is determined by actual requirements, for
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
level unit is determined by actual requirements, for
example, the BBU.
Battery control switch The power-on and power-off operations are controlled
through the ON and OFF buttons.
The battery is connected if the ON button is held down
for 5 to 10 seconds.
The battery is disconnected if the OFF button is held
down for 5 to 10 seconds.
Power supply test port –48 V and 0 V test ports, through which a multimeter
can test the power supply voltage.
COM port Connects to the external signal transfer board.
Backplane port Connects to the backplane.
5. RFU
Port Label Connector Type Description
Port for transceiving
RF signals
ANT_RXB DIN connector Connecting to the antenna
system
ANT_TX/RXA DIN connector
CPRI port CPRI0 SFP female connector Connecting to the BBU, or the
upper-level MRFU during the
cascading
CPRI1 SFP female connector Connecting to the lower-level
MRFU during the cascading
Module Description
MTRU Multi Band Radio Filter Unit (GU900)
WTRU WCDMA Band Radio Filter Unit (U2100)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
MRFU during the cascading
Interconnection port for
RF RX signals
RX_INB QMA female connector Input port for diversity receive
RX_OUTA QMA female connector Output port for main receive
Power supply socket PWR 3V3 power socket Feeding power
Monitoring port MON RJ-45 connector Port for monitoring and
maintenance
6. RRU
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
RRU 3804 (U2100)
MRRU 3809 (GU900)
Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page32
5. Acceptance test
Installation Tools
Hammer drill (with bit 14) Vacuum cleaner
Rubber hammer
ESD gloves
Heat gun
Flat-head screwdriver
(M3~M6)
Wire stripper
Phillips screwdriver
(M3~M6)
Crimping pliers
1. Tools
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. 33
5mm
M3~M6
Multimeter
Guarded blade utility knife
Wire stripper
Wire cutter Adjustable wrench
(with the diameter of at least 32 mm)
Measuring tape
Level
Marking pen
(with the diameter of no more than 10 mm)
Combination wrench(21mm~21mm) for pole installation
(17mm~17mm) for wall installation
Torque wrench
Crimping pliers
Torque screwdriver
2. DU Site Install Procedure
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
2. Installation Clearance Requirements
480mm>300mm
>60mm
>300mm
30mm
Cabinet
600mm 600mm30mm
600mm
Cabinet Cabinet
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
>800mm
Maximum 100°
2. Installing Base Measurement
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. According to the engineering drawing and installation clearance requirements, determine the position for installing a cabinet.
2. On the concrete pad, mark holes to determine the installation position of the base.3. After marking all the holes, use the measuring tape to check whether the distances
between the holes are accurate.
2. Installing Base Drilling hole
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. Use a hammer drill with bit 16 to drill holes at the anchor points, and ensure that the depth of each hole ranges from 52 mm to 60 mm.
2. Use a vacuum cleaner to clear the dust inside and around the holes. If the inter-hole spacing is too wide or too narrow, locate and drill holes again.
3. Slightly tighten the expansion bolt, and then put the expansion bolt assembly into the hole vertically.
4. Use a rubber mallet to hammer the expansion bolt until the expansion tube is buried into the hole, and then tighten the bolt.
5. Remove the bolt, spring washer, and flat washer counterclockwise.
2. Installing Base Install the expansion bolts
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Align the base, and then install the bolt with the spring washer and flat washer
2. Installing Base Level the base
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Use a level to check the base level. If the base is not level, use adjusting pads to adjust the base level
2. Installing Base Tighten the expansion bolts
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Use a torque wrench to tighten the bolts with the tightening torque of 45 N·m
2. Installing Base Remove the front panel of the base
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Loosen the three screws on the front cover plate of the base, and then remove the front cover plate
2. Installing Base Remove the baffle plates
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Remove the baffle plate from either side of the base.
3. Installing Cabinet APM30H / IBBS
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. Lift the cabinet onto the base, and then gently push the cabinet to align the cabinet with the base.
2. Use four M12x30 bolts to secure the cabinet on the base.
3. Installing Cabinet RFC
Installation block on the base
Installation block in the cabinet
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. Fix the mounting block on the base. 2. Lift the RFC cabinet onto the base, and then gently push the RFC cabinet
to align the cabinet with the base.
3. Installing Cabinet RFC
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Use two M12x30 bolts to secure the cabinet on the base
3. Installing Cabinet stacked cabinet
Remove the plastic screws (x4) from the top of the lower cabinet.
Remove the cover plates (×2) from the top of the lower cabinet.
Stack the cabinets, and attach the cabinets with the bolts(×4).
Gasket with an oblong hole
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
M12x30 Blot (x4)
To ensure the waterproof performance of the cabinet, keep well the cover plates for the round hole of the cabinet.
Gasket with an oblong hole
Cover plate
4. Earth Grounding the Cabinets
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
When installing the equi-potential cable, keep the crimping tube of the OT terminal in the direction
4. Earth Grounding the Cabinets Inline Mode
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Connect the other end of the PGND cable to the external grounding copper bar
4. Earth Grounding the Cabinets Inline Mode
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Connect the other end of the PGND cable to the external grounding copper bar
4. Earth Grounding the Cabinets Stacked Mode
APM30HAPM30H
Grounding bar
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
RFCRFC
PGND cable (16 mm2)
Equipotential cable (16 mm2)
Grounding busbar
5. Installing the Cable Outlet Module for the Cabinet
RFC
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
You must lead the cables through the cable outlet modules at both sides of the bottom of the cabinet for effective sealing during the cable installation.
5. Installing the Cable Outlet Module for the Cabinet
TMC11H
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
There is a cable outlet module at both left and right sides of each TMC11H cabinet or IBBS200D/IBS200T or AMP30H.
5. Installing the Cable Outlet Module for the Cabinet
Lead the cable through the cable hole that matches the cross-sectional area of the cable in order that the sealing is effective.
Install the cable according to the size of the cable hole (The following takes the seal modules in RFC as an example).
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Seal the idle holes with rubber caps
Tighten the screw.
6. Replacing the Fuse Remove the extraction tool
When certain power equipment, which has high current requirements, is connected to a DC output port on the EPS subrack, the fuse on the port need to be replaced if it cannot meet the high-current requirement.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. Wear an ESD wrist strap or a pair of ESD gloves.2. Take the extraction tool out of the mounting ear on the right side of the EPS subrack.
6. Replacing the Fuse
EPS
EPS
Align the bulge on the extraction tool with the hole on the fuse
Fuse
Fuse
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
EPS
Remove the fuse by using the extraction tool
Insert a new fuse
7. Installing cables General Cabling Requirements
The cables must be bound as follows:1. Different types of cables must be separately routed and cannot be entangled. 2. The cables must be bound tightly and neatly. The sheaths of the cables must not be
damaged. 3. The cable ties must face the same direction, and those at the same horizontal line must
be in a straight line. Extra length of cable ties must be cut. 4. Labels or nameplates must be attached to the cables after they are installed.
The cables must be routed as follows:1. Different types of cables must be separately routed with a minimum space of 30 mm
(1.18 in.) between every two cables.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
(1.18 in.) between every two cables. 2. Different types of cables must be installed in an untangled and orderly fashion. 3. Different types of cables must be routed in parallel or separated by special objects.
7. Installing cables Special Cabling Requirements
Cabling requirements for power cables are as follows:1. -48 V power cables must be bound together. 2. Power cables, transmission cables, and signal cables are routed separately. 3. Power cables must be installed in the position specified in engineering design
documents. 4. If the length of power cables is insufficient, replace the cables rather than adding
connectors or soldering joints to lengthen the cables.
Cabling requirements for PGND cables are as follows: 1. PGND cables for the base station must be connected to the same ground bar. 2. Fuses or switches must not be installed on the PGND cables.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
2. Fuses or switches must not be installed on the PGND cables. 3. All the metal parts in the housing of the equipment must be reliably connected to the
ground terminal.
Cabling requirements for optical fibers are as follows: 1. Do not stretch, step on, or place heavy objects on optical fibers. Keep the fibers away
from sharp objects. 2. When optical fibers are routed, the extra length of the fibers must be coiled around
special devices, such as a fiber coiler. 3. When coiling optical fibers, apply even strength. Do not bend the fibers with force. 4. Vacant optical connectors must be covered with dustproof caps.
7. Installing the Input Power Cable for the APM30H
Prepare the input power cable for the APM30H.
1. Cut the cable to the required length based on the actual cable route.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. Cut the cable to the required length based on the actual cable route. 2. Add OT terminals to both ends of the cable.
7. Installing the Input Power Cable for the APM30H
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. Use a Phillips screwdriver to remove the upper and lower screws from the AC baffle plate, and then remove the AC baffle plate.
2. Use a Phillips screwdriver to remove the screw from the protecting hood for the AC input wiring terminals, and then open the protecting hood.
3. Route the cable into the cabinet along the left side and connect each wire of the power cable to the corresponding terminal. 4. Reinstall the protecting hood for the AC input wiring terminals. 5. Reinstall the AC baffle plate. 6. Route the cable and then use cable ties to bind the cable. 7. Run each cable that leaves the cabinet in the PVC corrugated pipe, and then tie the pipe to the cable hole in the cabinet.
7. Installing the Input Power Cable for the APM30H
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
8. Installing the Power Cable between APM30H and RFC
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
8. Installing the Power Cable between APM30H and RFC
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
8. Installing the Power Cable between APM30H and RFC
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. One end connects the 120 connector. 2. The other end connects the DCDU-01/INPUT/RTN(+) & NEG(-) interface in the RFC cabinet.
9. Installing Power Cables Between the APM30H and the IBBS200D
1. Link the power series 120 connector at one end of the power cable for the batteries to the power supply terminal on the right in the APM30H, and then respectively link the OT terminals on the red and black wires at the other end to the RTN(+) and NEG(-) wiring terminals near the BTA label on the top of the power distribution box in the IBBS200D near the APM30H.
2. Install the power cable for the cascaded batteries if the configuration proportion of APM30Hs and IBBS200Ds is 1:2.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
of APM30Hs and IBBS200Ds is 1:2. Respectively link the OT terminals on the red and black wires at both ends of the power cable for the cascaded batteries to the RTN(+) and NEG (-) wiring terminals near the BTA label at the bottom of the power distribution box in the two IBBS200Ds.
9. Installing Power Cables Between the APM30H and the IBBS200D For FAN
1. Link the easy power receptacle (pressfit type) connector at one end of the power cable for the fan in the IBBS200D to the DC output terminal labeled LOAD3 on the right of the EPS subrack in the APM30H, and then link the OT terminals on the black and blue wires at the other end to the RTN(+) and NEG(-) wiring terminals near the TEC/FAN label on the top of the power distribution box in the IBBS200D near the APM30H.
2. Install the power cable for the cascaded fans in the IBBS200Ds if the
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
fans in the IBBS200Ds if the configuration proportion of APM30Hs and IBBS200Ds is 1:2. Respectively link the OT terminals on the red and black wires at both ends of the power cable for the cascaded fans in the IBBS200Ds to the RTN(+) and NEG(-) wiring terminals near the TEC/FAN label at the bottom of the power distribution box in the two IBBS200Ds.
9. Installing Power Cables Between the APM30H and the IBBS200D
For heating film1. Link the OT terminals on the brown and
blue wires at one end of the power cable for the heating film in the IBBS200D to the L2 and N2 terminals in the junction box on the left of the APM30H, and then respectively link the OT terminals on the brown and blue wires at the other end to the L and N wiring terminals in the junction box for the heating film on the left of the IBBS200D near the APM30H.
2. Install the power cable for the heating film in a second IBBS200D if the configuration proportion of APM30Hs
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
configuration proportion of APM30Hs and IBBS200Ds is 1:2. Respectively link the OT terminals on the brown and blue wires at one end of the power cable for the heating film in the IBBS200D to the L1 and N1 terminals in the junction box on the left of the APM30H, and then respectively link the OT terminals on the brown and blue wires at the other end to the L and N wiring terminals in the junction box for the heating film on the left of the second IBBS200D.
9. Installing Power Cables Between the APM30H and the IBBS200D Stacked Mode
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
9. Installing Power Cables Between the APM30H and the IBBS200D Stacked Mode
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
9. Installing Power Cables Between the APM30H and the IBBS200D Stacked Mode
The power box of the heating film
� Prevent the wires from exposing out of the power box of the heating film.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
� Must route the power cables for the heating films in the IBBS200Ds into the power box of the heating film from the top down.
The power box of the heating film
10. Installing transmission Cables
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
11. Installing Signaling Cables
If a BTS3900A is configured with 1 IBBS200D/IBBS200T + 1 APM30H + 1 RFC, two monitoring signal cables are required, that is, CMUA-BBU monitoring signal cable (RFC) and the CMUA cascaded monitoring signal cable (IBBS-APM30H).
Install the CMUA-BBU monitoring signal cable (RFC)1. One end connects the MON0 interface on
the UPEU board in APM30H BBU. 2. The other end connects the COM_IN
interface on the CMUA board in the fan box
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
interface on the CMUA board in the fan box of RFC.
11. Installing Signaling Cables
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Install the CMUA cascaded monitoring signal cable (IBBS-APM30H)1. One end connects the COM_485 interface on the PMU module in the expanded APM30H. 2. The other end connects the COM_IN interface on the CMUA board on the expanded
IBBS200D/IBBS200T.
11. Installing Signaling Cables
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Install the CMUA-BBU monitoring signal cables in APM30H.1. One end connects the COM_IN interface on the CUMA board. 2. The other end connects the MON1 interface on the UPEU board of BBU.
12. Installing RF Jumper
1. Link the DIN connector of the jumper to the ANT port on the panel of the RFU.
2. Use a 32 mm torque wrench to fix the two DIN connectors from bottom to top. Ensure that the tightening torque reaches 25 N·m to 35 N·m.
3. Lead RF jumpers through corresponding cable holes, and then install the cable outlet module on the bottom of the
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
module on the bottom of the cabinet.
4. Use rubber caps to seal the idle cable holes in the cable outlet module.
5. Insert the metal piece, and then tighten the screw.
13. Installing CPRI cables
When the cabinet is delivered with boards, the CPRI cables inside the cabinet are installed at delivery. The CPRI cables between the cabinets must be installed on site.
1. Remove the dustproof bag from the connector at each end of the CPRI cable.
2. Insert the SFP connector at one end of the CPRI cable into the CPRI port on the board panel of the BBU.
3. Route the other end of the CPRI cable out of the cabinet along the
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
cable out of the cabinet along the RF cable through the cable hole on the left of the APM30H, and then route the CPRI cable into the RF cabinet. Then, route the CPRI cable to the corresponding RFU.
4. Insert the SFP connector at the other end of the CPRI cable into the CPRI0 port on the RFU panel.
13. Installing CPRI cables
Slot 0~2 MRFU Slot 3~5 WRFU
BBU RFU
CPRI0 WBBP Slot 3 (U2100 S1) <---------> CPRI0 WRFU Slot3
CPRI1 WBBP Slot 3 (U2100 S2) <---------> CPRI0 WRFU Slot4
CPRI2 WBBP Slot 3 (U2100 S3) <---------> CPRI0 WRFU Slot5
CPRI0 WBBP Slot 2 (U900 S1) <---------> CPRI1 MRFU Slot0
CPRI1 WBBP Slot 2 (U900 S2) <---------> CPRI1 MRFU Slot1
CPRI2 WBBP Slot 2 (U900 S3) <---------> CPRI1 MRFU Slot2
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
CPRI2 WBBP Slot 2 (U900 S3) <---------> CPRI1 MRFU Slot2
CPRI0 WBBP Slot 5&6 (G900 S1) <---------> CPRI0 MRFU Slot0
CPRI2 WBBP Slot 5&6 (G900 S2) <---------> CPRI0 MRFU Slot1
CPRI4 WBBP Slot 5&6 (G900 S3) <---------> CPRI0 MRFU Slot2
14. Installing the Batteries and Related Cables
EPS
� During the installation of the batteries, use insulated tools such as wrenches and screwdrivers, and do not reversely connect the positive and negative poles. Otherwise, the batteries may burn, and the operations may cause human injuries.
� Before installing the batteries, set the battery MCB labeled BAT to OFF to disconnect the equipment from the battery.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Install the batteries from bottom to top and from left to right.
Battery MCB labeled BAT
14. Installing the Batteries and Related Cables Securing the baffle plate
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. Loosen the three screws on the baffle plate. 2. Move the baffle plate upward until it touches the screws. 3. Tighten the screws to secure the baffle plate until the tightening torque reaches 1.2
N·m (10.62 lbf·in.).
14. Installing the Batteries and Related Cables power cable for the batteries
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1. Remove the protecting hood from the electrical pole of the battery. 2. Install the series connection copper bar on the electrical poles of neighboring battery cells. 3. Install the cables for the batteries. The red cable is the power cable for the positive pole,
and the black cable is the power cable for the negative pole.
15. Installing the PMU & PSU checking DIP switch
If one PMU is configured, bit 1 and bit 2 of the DIP switch is set to ON and the other bits are set to OFF.If two PMUs are configured and two monitoring signals of the PMUs are connected to the
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
If two PMUs are configured and two monitoring signals of the PMUs are connected to the MON0 or MON1 port on the UPEU/UEIU panel on the BBU, the settings of the DIP switch on the first PMU is the same as that when a single PMU is configured; bit 3 of the DIP switch on the second PMU is set to ON, and the other bits are set to OFF.If one monitoring signal is connected to the MON0 port and the other signal is connected to the MON1 port, the settings of the DIP switches on the PMUs can be the same. For details, see the settings of a single PMU.
15. Installing the PMU & PSU
Installing PSUsInstalling a PMUOne power cabinet can only be configured with one PMU.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
16. Installing RRU (3908 DC)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
On a metal pole On a wallOn an angle steelOn a U-steel
16. Installing RRU (3908 DC)
63mm
~
80mm
50 mm to 100 mm
30 m
m to 5
0 m
m
The following figure describes the specifications for the metal pole, angle steel, and U-steel where the RRU is installed.
U-steel
60 mm to 114 mm(The recommended value is 80 mm.)
Metal pole
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
The brackets cannot be combined when the RRUs are installed on the wall.
16. Installing RRU (3908 DC)
≥300 mm ≥600 mm ≥600 mm 100 mm 400 mm 400 mm
≥300 mm 200 mm
a bRecommended Horizontal Spacing for Two RRUs Installed in Parallel
Minimum Horizontal Spacing for Two RRUs Installed in Parallel
c dRecommended Vertical Spacing for Two RRUs Installed in Parallel
Minimum Vertical Spacing for Two RRUs Installed in Parallel
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
≥500 mm
≥500 mm
300 mm
300 mm
16. Installing RRU (3908 DC) Preparing the Installation
Dual-nut bolt
Auxiliary bracket Cover plate Attachment plate
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Main bracket
Main and auxiliary brackets for the RRU
Front Back
16. Installing RRU (3908 DC) Installing a Single RRU on a Metal Pole
1. Install the main bracket.
When installing the main bracket, ensure that the contact piece on the bracket is fixed.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1200mm~1600mm
16. Installing RRU (3908 DC) Installing a Single RRU on a Metal Pole
Fasten the two dual-nut bolt assemblies alternatively. After the brackets are secure, use a tape to measure the spacing between the main bracket and the auxiliary bracket at the two
2. Use an adjustable wrench to tighten the nut until the fastening torque is 40 N·m. In this way, the
main and auxiliary brackets are secured on the pole.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
40N•m between the main bracket and the auxiliary bracket at the two sides and ensure that the spacing is the same.
16. Installing RRU (3908 DC) Installing a Single RRU on a Metal Pole
3. Install the RRU on the main bracket. When you hear click sound,
you can infer that the RRU is in position.
Click
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
16. Installing RRU (3908 DC) Installing Two RRUs Back-To-Back on a Metal Pole
1. Install an RRU
2. Install the main fixture for another RRU.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
16. Installing RRU (3908 DC) Installing Two RRUs Back-To-Back on a Metal Pole
M6X16
3. Reinstall the attachment plate and cover plate on the second RRU by
interchanging their positions.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
5N•m
16. Installing RRU (3908 DC) Installing Two RRUs Back-To-Back on a Metal Pole
In standard mode
In reverse mode4. Install the second RRU on the main bracket.
Ensure that the cabling cavities of the two RRUs face the same direction when installing the RRUs.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Cabling cavity
RRUs.
16. Installing RRU (3908 DC) Installing Multiple RRUs in Centralized Mode
5N•m
M6X16
1. Relocate the attachment plate.
3. Install the second main fixture.2. Fit the tabs on the attachment plate of the
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
3. Install the second main fixture.2. Fit the tabs on the attachment plate of the
RRU into the anchor slots on the main fixture.
16. Installing RRU (3908 DC) Installing Multiple RRUs in Centralized Mode
4. Fit the tabs on the attachment plate of
the second RRU into the anchor slots on
the second main fixture.
5. Install the third RRU.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
16. Installing RRU (3908 DC) Installing RRU on the wall
1. Place the auxiliary bracket at the installation position. Use a level to check that the
auxiliary bracket is placed horizontally. Then, mark the anchor points by using a
marking pen.
128 mm
126.5 mm
Auxiliary bracket
126.5 mm
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
1200 mm~1600 mm
RRU
16. Installing RRU (3908 DC) Installing RRU on the wall
2. Drill holes at the anchor points and then install the expansion bolt
assemblies.
Ø14
90°55 mm to 60 mm
M10x65 bolt
Spring washer 10
Plastic tube
Flat washer 10
Expansion tube
Do not hammer the bolt entirely into the wall. Instead, leave 20 mm to 30 mm of the bolt outside the wall.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
After the expansion bolt is removed, dispose of the plastic tube.
20 mm to 30 mm
the wall.
16. Installing RRU (3908 DC) Installing RRU on the wall
3. Fit the auxiliary bracket on the expansion bolts
downward, and then tighten the bolts by using a combination wrench 17 mm.
4. Install the main bracket.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
30N•m
M10
Arrows are upwards
16. Installing RRU (3908 DC) Installing RRU on the wall
5. Install the RRU.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
16. Installing RRU (3908 DC) Cable Connections of Multiple RRUs
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
This figure shows only the CPRI optical cable connections. For details on the connections of other cables, see the cable connections for a single RRU.
16. Installing RRU (3908 DC) Cable Connections of Multiple RRUs
a Opening the Cover Plate of the RRU Cabling Cavity
1. Use a Phillips screwdriver to unfasten the screw for protecting the cabling cavity.
2. Open the cover for the cabling cavity by lifting the handle on the cover.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
M4
Screw for protecting the cabling cavity
16. Installing RRU (3908 DC) Cable Connections of Multiple RRUs
b The Cabling Cavity of the RRU
Cover plate ofthe cabling cavity
Cabling cavity
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Cable trough for the power cable
Cable trough for the optical cable
Waterproof filler
Cabling cavity
Reference for makingthe power cable
Cable trough for the optical cable
cable clip
16. Installing RRU (3908 DC) Cable Connections of Multiple RRUs
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
16. Installing RRU (3908 DC) Cable Connections of Multiple RRUs
DC RRU power cable
CPRI optical cable
Metal Shielding layer (25 mm) PGND cable
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page103
5. Acceptance test
1. LMT connection
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
2. Log into NodeB
User Name: adminPassword: NodeB
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
3. Main Window
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
4. Query alarm
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
5. Query bar code
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
6. Query OM channel
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
7.Software upgrade
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
8.Download Configuration file
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page112
5. Acceptance test
www.huawei.com
Thank Youwww.huawei.com