Andhra Pradeshwater resources
7/16/2019 ANDRA Presentation1
2/30
3 major rivers
(Godavari,Krishna,Pennar)
9 interstate rivers.
28 other minor rivers.
Andhra Pradesh Water ResourcesStrengths
Total surface water available 2746 TMC
Godavary 1480 TMC
Krishna 811 TMC
Pennar 98 TMC
Other basins 357 TMC
7/16/2019 ANDRA Presentation1
3/30
MATHADIVAGU PROJECT
PEDDAVAGU (NEELWAI) PROJECT
GOLLAVAGU PROJECT
RALIVAGU PROJECT
GUNDLAKAMMA RESERVOIR SCHEME
POLAVARAM PROJECT
MUSURUMILLI RESERVOIR SCHEME
PUSHKARAM LI SCHEME
TADIPUDI LI SCHEME
ALISAGAR LIS
GUTHAPA LIS
RIVER
R
SRISAILAM
NAGARJUNASAGAR
PRAKASAM
BARRAGE
SACB
ORISSA
CHATTISGRAH
MAHARASTRA
TAMIL NADU
POLAVARAM PROJECT
PUSHKARAM LI SCHEME
TADIPUDI LI SCHEME
GUNDLAKAMMA RESERVOIR SCHEME
VAMSHDHARA PROJECT
HANDRI NIVA SUJALA SRAVANTHI
GALERU NAGARI SUJALA SRAVANTHI
KALWAKURTHY LIS
NETTEMPADU LIS
THOTAPALLI RESERVOIR SCHEME
BHIMA LISPULICHINTALA
ALISAGAR LI SCHEME
GUTHPA LI SCHEME
VELIGONDA PROJECT
MUSURIMILLI RESERVOIR SCHEME
MAJOR PROJECTSMEDIUM PROJECT
PEDDAVAGU (NEELWAI) PROJECT
MATTADIVAGU PROJECTGOLLAVAGU PROJECT
RALIVAGU PROJECT
PEDDAGEDDA RESERVOIR SCHEME
KOMARAM BHEEM PROJECT
JHANJAVATHI PROJECT
TARAKA RAMA THIRTHA SAGARAM
SRSP
NIZAM SAGAR
VELIGONDA
PROJECT
DUMMUGUDEM HE PROJECT
GLIS
YELLAMPALLYLIS
PULICHINTALA PROJECT
KLIS
HNSS
JURALA PROJECT
BHIMA LIS
THOTAPALLI BARRAGE
PEDDAGEDDARESERVOIR
TARAKARAMA THIRTHA SAGARAM
JANJAVATHI RESERVOIR
VAMSHADHARA PROJECTINCHAMPALLI PROJECT
SINGAREDDYPALLI HEP
KC CANAL
SOMASILA
PROJECT
PULIVENDULA
Br Canal
A N D H R A P R A D E S H
PENDING PROJECTS
IN KRISHNA, GODAVARI AND OTHER BASINS
Godavari
7/16/2019 ANDRA Presentation1
4/30
MATHADIVAGU PROJECT
PEDDAVAGU (NEELWAI) PROJECT
GOLLAVAGU PROJECT
RALIVAGU PROJECT
GUNDLAKAMMA RESERVOIR SCHEME
POLAVARAM PROJECT
MUSURUMILLI RESERVOIR SCHEME
PUSHKARAM LI SCHEME
TADIPUDI LI SCHEME
ALISAGAR LIS
GUTHAPA LIS
RIVER
R
SRISAILAM
NAGARJUNASAGAR
PRAKASAM
BARRAGE
SACB
ORISSA
CHATTISGRAH
MAHARASTRA
TAMIL NADU
POLAVARAM PROJECT
PUSHKARAM LI SCHEME
TADIPUDI LI SCHEME
GUNDLAKAMMA RESERVOIR SCHEME
VAMSHDHARA PROJECT
HANDRI NIVA SUJALA SRAVANTHI
GALERU NAGARI SUJALA SRAVANTHI
KALWAKURTHY LIS
NETTEMPADU LIS
THOTAPALLI RESERVOIR SCHEME
BHIMA LISPULICHINTALA
ALISAGAR LI SCHEME
GUTHPA LI SCHEME
VELIGONDA PROJECT
MUSURIMILLI RESERVOIR SCHEME
MAJOR PROJECTSMEDIUM PROJECT
PEDDAVAGU (NEELWAI) PROJECT
MATTADIVAGU PROJECTGOLLAVAGU PROJECT
RALIVAGU PROJECT
PEDDAGEDDA RESERVOIR SCHEME
KOMARAM BHEEM PROJECT
JHANJAVATHI PROJECT
TARAKA RAMA THIRTHA SAGARAM
SRSP
NIZAM SAGAR
VELIGONDA
PROJECT
DUMMUGUDEM HE PROJECT
GLIS
YELLAMPALLYLIS
PULICHINTALA PROJECT
KLIS
HNSS
JURALA PROJECT
BHIMA LIS
THOTAPALLI BARRAGE
PEDDAGEDDARESERVOIR
TARAKARAMA THIRTHA SAGARAM
JANJAVATHI RESERVOIR
VAMSHADHARA PROJECTINCHAMPALLI PROJECT
SINGAREDDYPALLI HEP
KC CANAL
SOMASILA
PROJECT
PULIVENDULA
Br Canal
PENDING PROJECTS
IN KRISHNA, GODAVARI AND OTHER BASINS
Movie - 3
Godavari
Godavary - Badhrachalam
7/16/2019 ANDRA Presentation1
5/30
MATHADIVAGU PROJECT
PEDDAVAGU (NEELWAI) PROJECT
GOLLAVAGU PROJECT
RALIVAGU PROJECT
GUNDLAKAMMA RESERVOIR SCHEME
POLAVARAM PROJECT
MUSURUMILLI RESERVOIR SCHEME
PUSHKARAM LI SCHEME
TADIPUDI LI SCHEME
ALISAGAR LIS
GUTHAPA LIS
RIVER
R
SRISAILAM
NAGARJUNASAGAR
PRAKASAM
BARRAGE
SACB
ORISSA
CHATTISGRAH
MAHARASTRA
TAMIL NADU
POLAVARAM PROJECT
PUSHKARAM LI SCHEME
TADIPUDI LI SCHEME
GUNDLAKAMMA RESERVOIR SCHEME
VAMSHDHARA PROJECT
HANDRI NIVA SUJALA SRAVANTHI
GALERU NAGARI SUJALA SRAVANTHI
KALWAKURTHY LIS
NETTEMPADU LIS
THOTAPALLI RESERVOIR SCHEME
BHIMA LISPULICHINTALA
ALISAGAR LI SCHEME
GUTHPA LI SCHEME
VELIGONDA PROJECT
MUSURIMILLI RESERVOIR SCHEME
MAJOR PROJECTSMEDIUM PROJECT
PEDDAVAGU (NEELWAI) PROJECT
MATTADIVAGU PROJECTGOLLAVAGU PROJECT
RALIVAGU PROJECT
PEDDAGEDDA RESERVOIR SCHEME
KOMARAM BHEEM PROJECT
JHANJAVATHI PROJECT
TARAKA RAMA THIRTHA SAGARAM
SRSP
NIZAM SAGAR
VELIGONDA
PROJECT
DUMMUGUDEM HE PROJECT
GLIS
YELLAMPALLYLIS
PULICHINTALA PROJECT
KLIS
HNSS
JURALA PROJECT
BHIMA LIS
THOTAPALLI BARRAGE
PEDDAGEDDARESERVOIR
TARAKARAMA THIRTHA SAGARAM
JANJAVATHI RESERVOIR
VAMSHADHARA PROJECTINCHAMPALLI PROJECT
SINGAREDDYPALLI HEP
KC CANAL
SOMASILA
PROJECT
PULIVENDULA
Br Canal
A N D H R A P R A D E S H
PENDING PROJECTS
IN KRISHNA, GODAVARI AND OTHER BASINS
Krishna
7/16/2019 ANDRA Presentation1
6/30
MATHADIVAGU PROJECT
PEDDAVAGU (NEELWAI) PROJECT
GOLLAVAGU PROJECT
RALIVAGU PROJECT
GUNDLAKAMMA RESERVOIR SCHEME
POLAVARAM PROJECT
MUSURUMILLI RESERVOIR SCHEME
PUSHKARAM LI SCHEME
TADIPUDI LI SCHEME
ALISAGAR LIS
GUTHAPA LIS
RIVER
R
SRISAILAM
NAGARJUNASAGAR
PRAKASAM
BARRAGE
SACB
ORISSA
CHATTISGRAH
MAHARASTRA
TAMIL NADU
POLAVARAM PROJECT
PUSHKARAM LI SCHEME
TADIPUDI LI SCHEME
GUNDLAKAMMA RESERVOIR SCHEME
VAMSHDHARA PROJECT
HANDRI NIVA SUJALA SRAVANTHI
GALERU NAGARI SUJALA SRAVANTHI
KALWAKURTHY LIS
NETTEMPADU LIS
THOTAPALLI RESERVOIR SCHEME
BHIMA LISPULICHINTALA
ALISAGAR LI SCHEME
GUTHPA LI SCHEME
VELIGONDA PROJECT
MUSURIMILLI RESERVOIR SCHEME
MAJOR PROJECTSMEDIUM PROJECT
PEDDAVAGU (NEELWAI) PROJECT
MATTADIVAGU PROJECTGOLLAVAGU PROJECT
RALIVAGU PROJECT
PEDDAGEDDA RESERVOIR SCHEME
KOMARAM BHEEM PROJECT
JHANJAVATHI PROJECT
TARAKA RAMA THIRTHA SAGARAM
SRSP
NIZAM SAGAR
VELIGONDA
PROJECT
DUMMUGUDEM HE PROJECT
GLIS
YELLAMPALLYLIS
PULICHINTALA PROJECT
KLIS
HNSS
JURALA PROJECT
BHIMA LIS
THOTAPALLI BARRAGE
PEDDAGEDDARESERVOIR
TARAKARAMA THIRTHA SAGARAM
JANJAVATHI RESERVOIR
VAMSHADHARA PROJECTINCHAMPALLI PROJECT
SINGAREDDYPALLI HEP
KC CANAL
SOMASILA
PROJECT
PULIVENDULA
Br Canal
A N D H R A P R A D E S H
PENDING PROJECTS
IN KRISHNA, GODAVARI AND OTHER BASINS
3 major rivers
(Godavari,Krishna,Pennar)
9 interstate rivers.
28 other minor rivers.
Pennar
7/16/2019 ANDRA Presentation1
7/30
MATHADIVAGU PROJECT
PEDDAVAGU (NEELWAI) PROJECT
GOLLAVAGU PROJECT
RALIVAGU PROJECT
GUNDLAKAMMA RESERVOIR SCHEME
POLAVARAM PROJECT
MUSURUMILLI RESERVOIR SCHEME
PUSHKARAM LI SCHEME
TADIPUDI LI SCHEME
ALISAGAR LIS
GUTHAPA LIS
RIVER
R
SRISAILAM
NAGARJUNASAGAR
PRAKASAM
BARRAGE
SACB
ORISSA
CHATTISGRAH
MAHARASTRA
TAMIL NADU
POLAVARAM PROJECT
PUSHKARAM LI SCHEME
TADIPUDI LI SCHEME
GUNDLAKAMMA RESERVOIR SCHEME
VAMSHDHARA PROJECT
HANDRI NIVA SUJALA SRAVANTHI
GALERU NAGARI SUJALA SRAVANTHI
KALWAKURTHY LIS
NETTEMPADU LIS
THOTAPALLI RESERVOIR SCHEME
BHIMA LIS
PULICHINTALA
ALISAGAR LI SCHEME
GUTHPA LI SCHEME
VELIGONDA PROJECT
MUSURIMILLI RESERVOIR SCHEME
MAJOR PROJECTSMEDIUM PROJECT
PEDDAVAGU (NEELWAI) PROJECT
MATTADIVAGU PROJECTGOLLAVAGU PROJECT
RALIVAGU PROJECT
PEDDAGEDDA RESERVOIR SCHEME
KOMARAM BHEEM PROJECT
JHANJAVATHI PROJECT
TARAKA RAMA THIRTHA SAGARAM
SRSP
NIZAM SAGAR
VELIGONDA
PROJECT
DUMMUGUDEM HE PROJECT
GLIS
YELLAMPALLYLIS
PULICHINTALA PROJECT
KLIS
HNSS
JURALA PROJECT
BHIMA LIS
THOTAPALLI BARRAGE
PEDDAGEDDARESERVOIR
TARAKARAMA THIRTHA SAGARAM
JANJAVATHI RESERVOIR
VAMSHADHARA PROJECTINCHAMPALLI PROJECT
SINGAREDDYPALLI HEP
KC CANAL
SOMASILA
PROJECT
PULIVENDULA
Br Canal
A N D H R A P R A D E S H
PENDING PROJECTS
IN KRISHNA, GODAVARI AND OTHER BASINS
7/16/2019 ANDRA Presentation1
8/30
Ground WaterResources
TMC m cum
Present utilization 450 12,749Balance available
in command areas 371 10,500in non-command areas 247 7,000
7/16/2019 ANDRA Presentation1
9/30
Water utilised
utilisation -ongoing projects
utilisation -contemplatedprojects
836
30 %
165
6 %
1764
64 %
Total water available
2765 TMC
Water Utilisation - AP State (TMC)
7/16/2019 ANDRA Presentation1
10/30
0.00kM
Singur
Nizam Sagar ProjectManjiraR
iver
SriramaSagarProject
YellampallyBarriage
InchampallyProject
GLIS
DummagudemL
I&
HEP
PolavaramBarriage
SACB,Dowalaiswaram
BAYO
F
BENGAL
1405
1717
1091
686Km
GODAVARI
RIVER
764Km
905Km
1065Km
1072Km
1312K,
1368Km
1465Km
LMD
MMDUMD 284Km
346KM
GutpaLIS
AlisagarLIS
Kadam Project Kadam CanalPranahitaRiver
IndravatiRiver
KadamR
iver
Sabari
River
700
998Km
1046Km
1268Km
920
150
70
160
230
Nasik
GODAVARI BASIN PROJECTS
RALIVAGU
GOLLAVAGU
Irrigation pipe line
NTPC pipe line
TADIPUDI LI
SCHEME
PUSHKAR
M LI
SCHEME
Sileru
95M/112.50M
312.
50/370
+492
7/16/2019 ANDRA Presentation1
11/30
NETTEMPADU
BHIMA LIFTIRRIGATION
PRIYADARSHINI
MDDL: +1033 (314.86 m)
RIVER KRISHNA
SRBC &
GNSSTGP
VELIGONDAPROJECT
SRISAILAM RESERVOIR
MDDL +510
AMRP
VGP: 43.5 TMC
TGP: 29.0 TMC
GNSS: 38.0 TMC
HNSS: 40.0 TMC
KLI: 25.0 TMC
NLI: 20.0 TMC
KSLI 5.0 TMC
TOTAL: 200..50 TMC
Q=20 TMC KALWAKUTHI
Q= 20 TMC
POTHIREDDIPADU
REGULATOR
Escape
Regulator to
Nippula Vagu
SCHEMATIC DIAGRAM SHOWING THE EXISTING & PROPOSED PROJECTS IN
NAGARJUNASAGARRESERVOIR
FRL +590
Q=30 TMCSILL=+495
FRL +885MDDL +834
Q= 25 TMCSILL: +802
FRL : +1045 (318.516m)
SILL: +1033.00
SILL:+1033
LIFT IRRIGATION
SLM FRL +875SILL + 842 TMC
Q=43.5 TMC
LIFT IRRIGATION
JURALA PROJECT
KRISHNA BASIN PLANNED ON FLOOD WATERS
NarayanapurDam
AlmattiDam
Mahabaleswar
Banakacherla Regulator
Velugodu Balancing Regulator
Potuluri Veera Bramheswara BR
Somasila Balancing Regulator
Kandaleru Balancing Regulator
848Km
1026Km
1126Km
1211Km
1311Km
BAYO
FBENGAL
1440km
Sunkesula
Barriage
TB DamTungabhadra
River
917Km
526Km
573Km
178 Km 100 Km
PulichintalaProject
Prakasam
Barriage
0.0
0Km
Koil Sagar 5TMC
RDS
778Km
BhimaRiver
1268Km
1226Km
1270Km
Musiriver
Paleru
Munneru
(KC Canal)
7/16/2019 ANDRA Presentation1
12/30
PABRMid-
Penna
Regulat
or
Mylavaram Dam
Bukkapatnam Tank
Dharmavaram Tank
Vidyaranyaswami Gudi
Project
Maddileru project
Owk Reservoir
Chennarayaswa
mi
Cheyyeru Project
(Annamayya
Project)
Somasila
Project
Sangam Anicut
Gandikota Dam
Gorakallu Reservoir
Pulivendula Br.
Canal
Chitrava
tiRiver
PENNA BASIN PROJECTS
SEA
Pedderu Reservoir
PENNA RIVER
Gudi Project
LEGEN
DEXISTING PROJECTS
MAJOR
MEDIUM
PROPOSED
PROJECTSMAJOR
MEDIUM
UNDER CONSTRUCTION
Srisailam Reservoir
Banakacherl
a
Regulator
Escape Channel
TB
Dam
AP Karnataka Boarder
(105.437Km)
189.50 Km
HLC
Nellore Anicut
GNSS
Mylavaram North
Canal
Mylavaram South
Canal
Lingala Canal
7/16/2019 ANDRA Presentation1
13/30
Water Storage in m3/cap
Source : Palmieri, The World Bank (2000)
4
3 207
746
1,287
1,400
2
,486
3,255
4,7
29
6,150
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Ethiopia
India
SouthAfrica
Thailand
Laos
China
Brazil
Australia
NorthAmerica
On mouse click get the graph
Water Storage in m3/cap
7/16/2019 ANDRA Presentation1
14/30
Existing projects
Major Irrigation
22 othersSriram sagar
7/16/2019 ANDRA Presentation1
15/30
Existing projectsMedium irrigationprojects80 nos
Minor irrigationprojects 536 nos
O i j t
7/16/2019 ANDRA Presentation1
16/30
On going projects
Andhra Region
1 Vamsadhara Project 492.82
2 Thotapalli 313.87
3 Peddagadda Reservior 52.73
4 Tarakarama Thirthasagaram 181.50
5 Janjhavathi Project 57.39
6 Polavaram Right Main canal 1773.71
Polavaram Head works (ISP) 1117.30
Polavaram Left Main canal 1583.34
7/16/2019 ANDRA Presentation1
17/30
7 Venkatanagaram Pumping Station 85.57
8 Musaramalli 118.72
9 Pushkaram LI Scheme 356.66
10 Tadipudi LI Scheme 302.65
11 Bhupathipalem Head Works 67.18
12 Pulichintala 268.87
13 Gundlakamma Reservoir 245.77
On going projects
Andhra Region
7/16/2019 ANDRA Presentation1
18/30
7 Venkatanagaram Pumping Station 85.57
8 Musaramalli 118.72
9 Pushkaram LI Scheme 356.66
10 Tadipudi LI Scheme 302.65
11 Bhupathipalem Head Works 67.18
12 Pulichintala 268.87
13 Gundlakamma Reservoir 245.77
On going projects
Andhra Region
7/16/2019 ANDRA Presentation1
19/30
Telengana region
1 Sri Padasagar LI Scheme 2244.77
2 J Chokka Rao LI Scheme 2851.07
3 SRSP Stage-II 427.37
4 Flood Flow Canal 1396.00
5 Alisagar LI Scheme 175.87
6 Lendi Interstate Project 6.621 (Paid to Maharastra
7 Guthpa LI Scheme 153.46
7/16/2019 ANDRA Presentation1
20/30
8 Choutapalli Hanumantha Reddy LI Schene 50.65
9 Srisaillam Left Bank Tunnel 1925.00
10 Mahatma Gandhi LI Project (Kalwakurthy) 2702.67
11 Koilsagar 175.32
12 Rajiv LI Scheme (Bhima), Pebbair 1417.92
13 Jawahar LI Scheme (Nettampadu 1294.31
14 AMR Project (Low Level Canal) 2160.63
Telengana region
7/16/2019 ANDRA Presentation1
21/30
Medium Irrigation Project
15 Kinnerasani Reservoir Scheme 32.54
16 Palemvagu 47.94
17 Modikuntavagu 118.95
18 MIP Circle (Bellampally)
Gollavagu 53.60
Ralivagu 28.00
Telengana region
7/16/2019 ANDRA Presentation1
22/30
Medium Irrigation Project
Neelwai 58.95
Peddavagu at Jagannathpur 118.90
Komaram bheem 220.00
Mathadivagu 37.80
GRAND TOTAL 17,691.73
Telengana region
7/16/2019 ANDRA Presentation1
23/30
Rayalaseema Region
1 Telugu Ganga Project - Kadapa 432.72
2 Chitravati Balancing Reservoir
Right Canal(Lingala Canal) 148.05
3 Pulivendula Branch Canal 137.30
4 Telugu Ganga Project - Nandyal 188.304
5 GNSS, Kadapa 830.65
6 GNSS - FFC 225.19
7 Mylavaram Modernisation 0
7/16/2019 ANDRA Presentation1
24/30
8 Owk Reservoir 45.45
9 Sri Narasimharaya Sagar
(Gorakallu Balancing Reservoir) 448.20
10 Guru Raghavendra 436.13
11 PABR - Stage II 348.90
12 Veligallu 72.900
13 HNSS 918.171
Grand Total 4,231.97
Rayalaseema Region
7/16/2019 ANDRA Presentation1
25/30
LIFT IRRIGATION SCHEMES
Sl. No. Name of the Project Power required Lift height
(MW) (m)
1 Alisagar 25.48 60
2 Gutpa 18 68.99
3 Bhima 96 128
4 JLIS (Nettampadu) 119 100
5 Koilsagar 30 118
6 MGLIS (Kalwakurthy) 450 298
7 J. Chokka Rao LI Scheme
(GLIS) Phase-I 52 238
Phase-II 120.5 532
7/16/2019 ANDRA Presentation1
26/30
LIFT IRRIGATION SCHEMES
Sl. No. Name of the Project Power required Lift height
(MW) (m)
8 Rajiv Sagar (Dummugudem) 188.5 228
9 Sripadasagar (Yellampally)-NTPC 9 50Stage-II, Phase-I 137 346
10 HNSS - Phase-I 146 262
11 Guru Raghavendra LIS 3.72 -
12 Tadipudi LI Scheme 28 27
13 Pushkara LI Scheme 30 107
TOTAL 1463.2 MW
7/16/2019 ANDRA Presentation1
27/30
Ayacut details - AP state ( acres)
Irrigated Area
Jalayagnam
Contemplated
Balance to beirrigated
..
1,61,15,55641 %
1,29,60,73433 %
65,71,74417 %
33,23,7509 % Culturable area
3,89,71,784
7/16/2019 ANDRA Presentation1
28/30
Ayacut details - Telangana Region ( acres)
Irrigated Area
Jalayagnam
Contemplated
Balance to beirrigated
..
76,74,109
44 %
42,29,744
24 %
31,15,449
18 %
24,83,365
14 % Culturable area
1,75,02,667
7/16/2019 ANDRA Presentation1
29/30
Ayacut details - Andhra Region ( acres)
Irrigated Area
Jalayagnam
Contemplated
Balance to beirrigated
..
23,04,196
20 %
70,34,58661 %
17,46,691
15 %
4,88,4184 %
Culturable area
1,15,73,891
7/16/2019 ANDRA Presentation1
30/30
Ayacut details - Andhra Region ( acres)
Irrigated Area
Jalayagnam
Contemplated
Balance to beirrigated
..
23,04,196
20 %
70,34,58661 %
17,46,691
15 %
4,88,4184 %
Culturable area
1,15,73,891