+ All Categories
Transcript
Page 1: ARA-KOTINGA ROAD EXTENT WORK ARA-KOTINGAsolwaywhitford.co.nz/assets/Stage-1-asbuilds/20150901-Stormwater... · vertical plumming: foif dzj2 laser plummit members of: joins sheet 3

LOT 504

LOT 1

LOT 27

LOT 28

LOT 29

LOT 30

LOT 31

LOT 32

LOT 33

LOT 34

LOT 501

U

n

f

o

r

m

e

d

L

e

g

a

l

R

o

a

d

ARA-KOTINGA

(Formed Legal Road)

A

R

A

-

K

O

T

I

N

G

A

LOT 10

P:\DEMPSEY WOOD (55)\001 SURVEY WORX -PROJECTS\ARA KOTINGA 932\ASB\NZTM\20150901 STORMWATER ASBUILTS - STAGE 1 - TEXT BIG.DWG

FILE PATH:

DATUM (MSL) AUCKLAND 1946

LEVELS ARE IN TERMS OF LANDS AND SURVEY

BEARING AND COORDINATE DATUM IS

NEW ZEALAND TRANSVERSE MERCATOR PROJECTION

mobile +64 021 824 084

office +64 09 948 6491

www.surveyworx.co.nz

6 Aranui Road, Sylvia Park, Auckland, NZ

........ of .........

DRAWING No REVISION

TITLE

PROJECT

CLIENT

NOTES:

APPROVED

REVISION

CHECKED

APPROVED

CHANGES

SURVEYED

DESIGNED

DRAWN

CHECKED DATE

DATE

SCALE (A1)

This document and the copyright in this document remain the

property of SURVEY WORX. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of SURVEY WORX.

COPYRIGHT:

SHEET

(A3)

14.07.2015

LK

14.07.2015SWX

ORIGINAL ISSUE MC 15.07.150

1:1250

55-932-605-08

1:2500

SPINNAKER BAY LID

SOLWAY

285 ARA - KOTINGA

SITE ASBUILT

STAGE 1

LOCATION PLAN

11 1

SURVEY EQUIPMENT USED:

INSTRUMENT: TRIMBLE ROBOTIC S8 1"

GPS: TRIMBLE R6/R8 SYSTEMS

PRECISE LEVELLING: TRIMBLE DiNi Series 0.3mm DIGITAL

VERTICAL PLUMMING: FOIF DZJ2 LASER PLUMMIT

MEMBERS OF:

JOINS SHEET 3

JOINS SHEET 2

JOINS SHEET 1

JOINS SHEET 4

ARA-KOTINGA ROAD

AR

A-K

OT

IN

GA

RO

AD

UPDATED PLAN MC 24.08.151

JOINS SHEET 5

JOINS SHEET 6

JOINS SHEET 7

E

X

T

E

N

T

W

O

R

K

E

X

T

E

N

T

W

O

R

K

Page 2: ARA-KOTINGA ROAD EXTENT WORK ARA-KOTINGAsolwaywhitford.co.nz/assets/Stage-1-asbuilds/20150901-Stormwater... · vertical plumming: foif dzj2 laser plummit members of: joins sheet 3

LOT 1

P:\DEMPSEY WOOD (55)\001 SURVEY WORX -PROJECTS\ARA KOTINGA 932\ASB\NZTM\20150901 STORMWATER ASBUILTS - STAGE 1 - TEXT BIG.DWG

FILE PATH:

DATUM (MSL) AUCKLAND 1946

LEVELS ARE IN TERMS OF LANDS AND SURVEY

BEARING AND COORDINATE DATUM IS

NEW ZEALAND TRANSVERSE MERCATOR PROJECTION

mobile +64 021 824 084

office +64 09 948 6491

www.surveyworx.co.nz

6 Aranui Road, Sylvia Park, Auckland, NZ

........ of .........

DRAWING No REVISION

TITLE

PROJECT

CLIENT

NOTES:

APPROVED

REVISION

CHECKED

APPROVED

CHANGES

SURVEYED

DESIGNED

DRAWN

CHECKED DATE

DATE

SCALE (A1)

This document and the copyright in this document remain the

property of SURVEY WORX. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of SURVEY WORX.

COPYRIGHT:

SHEET

(A3)

14.07.2015

LK

14.07.2015SWX

ORIGINAL ISSUE MC 15.07.150

1:250

55-932-605-08

1:500

SPINNAKER BAY LID

SOLWAY

285 ARA - KOTINGA

SITE ASBUILT

STAGE 1

71 1

SURVEY EQUIPMENT USED:

INSTRUMENT: TRIMBLE ROBOTIC S8 1"

GPS: TRIMBLE R6/R8 SYSTEMS

PRECISE LEVELLING: TRIMBLE DiNi Series 0.3mm DIGITAL

VERTICAL PLUMMING: FOIF DZJ2 LASER PLUMMIT

MEMBERS OF:

JO

IN

S S

HE

ET

5

JOINS SHEET 6

UPDATED PLAN MC 24.08.151

JOINS SHEET 2

Page 3: ARA-KOTINGA ROAD EXTENT WORK ARA-KOTINGAsolwaywhitford.co.nz/assets/Stage-1-asbuilds/20150901-Stormwater... · vertical plumming: foif dzj2 laser plummit members of: joins sheet 3

P:\DEMPSEY WOOD (55)\001 SURVEY WORX -PROJECTS\ARA KOTINGA 932\ASB\NZTM\20150901 STORMWATER ASBUILTS - STAGE 1 - TEXT BIG.DWG

FILE PATH:

DATUM (MSL) AUCKLAND 1946

LEVELS ARE IN TERMS OF LANDS AND SURVEY

BEARING AND COORDINATE DATUM IS

NEW ZEALAND TRANSVERSE MERCATOR PROJECTION

mobile +64 021 824 084

office +64 09 948 6491

www.surveyworx.co.nz

6 Aranui Road, Sylvia Park, Auckland, NZ

........ of .........

DRAWING No REVISION

TITLE

PROJECT

CLIENT

NOTES:

APPROVED

REVISION

CHECKED

APPROVED

CHANGES

SURVEYED

DESIGNED

DRAWN

CHECKED DATE

DATE

SCALE (A1)

This document and the copyright in this document remain the

property of SURVEY WORX. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of SURVEY WORX.

COPYRIGHT:

SHEET

(A3)

14.07.2015

LK

14.07.2015SWX

ORIGINAL ISSUE MC 15.07.150

1:250

55-932-605-08

1:500

SPINNAKER BAY LID

SOLWAY

285 ARA - KOTINGA

SITE ASBUILT

STAGE 1

72 1

SURVEY EQUIPMENT USED:

INSTRUMENT: TRIMBLE ROBOTIC S8 1"

GPS: TRIMBLE R6/R8 SYSTEMS

PRECISE LEVELLING: TRIMBLE DiNi Series 0.3mm DIGITAL

VERTICAL PLUMMING: FOIF DZJ2 LASER PLUMMIT

MEMBERS OF:

JOINS SHEET 3

UPDATED PLAN MC 24.08.151

JOINS SHEET 1

JO

IN

S S

HE

ET

4

Page 4: ARA-KOTINGA ROAD EXTENT WORK ARA-KOTINGAsolwaywhitford.co.nz/assets/Stage-1-asbuilds/20150901-Stormwater... · vertical plumming: foif dzj2 laser plummit members of: joins sheet 3

ARA-KOTINGA ROAD

ARA-KOTINGA

(Formed Legal Road)

P:\DEMPSEY WOOD (55)\001 SURVEY WORX -PROJECTS\ARA KOTINGA 932\ASB\NZTM\20150901 STORMWATER ASBUILTS - STAGE 1 - TEXT BIG.DWG

FILE PATH:

DATUM (MSL) AUCKLAND 1946

LEVELS ARE IN TERMS OF LANDS AND SURVEY

BEARING AND COORDINATE DATUM IS

NEW ZEALAND TRANSVERSE MERCATOR PROJECTION

mobile +64 021 824 084

office +64 09 948 6491

www.surveyworx.co.nz

6 Aranui Road, Sylvia Park, Auckland, NZ

........ of .........

DRAWING No REVISION

TITLE

PROJECT

CLIENT

NOTES:

APPROVED

REVISION

CHECKED

APPROVED

CHANGES

SURVEYED

DESIGNED

DRAWN

CHECKED DATE

DATE

SCALE (A1)

This document and the copyright in this document remain the

property of SURVEY WORX. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of SURVEY WORX.

COPYRIGHT:

SHEET

(A3)

14.07.2015

LK

14.07.2015SWX

ORIGINAL ISSUE MC 15.07.150

1:250

55-932-605-08

1:500

SPINNAKER BAY LID

SOLWAY

285 ARA - KOTINGA

SITE ASBUILT

STAGE 1

73 1

SURVEY EQUIPMENT USED:

INSTRUMENT: TRIMBLE ROBOTIC S8 1"

GPS: TRIMBLE R6/R8 SYSTEMS

PRECISE LEVELLING: TRIMBLE DiNi Series 0.3mm DIGITAL

VERTICAL PLUMMING: FOIF DZJ2 LASER PLUMMIT

MEMBERS OF:

JOINS SHEET 2

UPDATED PLAN MC 24.08.151

Page 5: ARA-KOTINGA ROAD EXTENT WORK ARA-KOTINGAsolwaywhitford.co.nz/assets/Stage-1-asbuilds/20150901-Stormwater... · vertical plumming: foif dzj2 laser plummit members of: joins sheet 3

AR

A-K

OT

IN

GA

RO

AD

LOT 31

P:\DEMPSEY WOOD (55)\001 SURVEY WORX -PROJECTS\ARA KOTINGA 932\ASB\NZTM\20150901 STORMWATER ASBUILTS - STAGE 1 - TEXT BIG.DWG

FILE PATH:

DATUM (MSL) AUCKLAND 1946

LEVELS ARE IN TERMS OF LANDS AND SURVEY

BEARING AND COORDINATE DATUM IS

NEW ZEALAND TRANSVERSE MERCATOR PROJECTION

mobile +64 021 824 084

office +64 09 948 6491

www.surveyworx.co.nz

6 Aranui Road, Sylvia Park, Auckland, NZ

........ of .........

DRAWING No REVISION

TITLE

PROJECT

CLIENT

NOTES:

APPROVED

REVISION

CHECKED

APPROVED

CHANGES

SURVEYED

DESIGNED

DRAWN

CHECKED DATE

DATE

SCALE (A1)

This document and the copyright in this document remain the

property of SURVEY WORX. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of SURVEY WORX.

COPYRIGHT:

SHEET

(A3)

14.07.2015

LK

14.07.2015SWX

ORIGINAL ISSUE MC 15.07.150

1:250

55-932-605-08

1:500

SPINNAKER BAY LID

SOLWAY

285 ARA - KOTINGA

SITE ASBUILT

STAGE 1

74 1

SURVEY EQUIPMENT USED:

INSTRUMENT: TRIMBLE ROBOTIC S8 1"

GPS: TRIMBLE R6/R8 SYSTEMS

PRECISE LEVELLING: TRIMBLE DiNi Series 0.3mm DIGITAL

VERTICAL PLUMMING: FOIF DZJ2 LASER PLUMMIT

MEMBERS OF:

JO

IN

S S

HE

ET

2

JOINS SHEET 5

UPDATED PLAN MC 24.08.151

Page 6: ARA-KOTINGA ROAD EXTENT WORK ARA-KOTINGAsolwaywhitford.co.nz/assets/Stage-1-asbuilds/20150901-Stormwater... · vertical plumming: foif dzj2 laser plummit members of: joins sheet 3

LOT 1

P:\DEMPSEY WOOD (55)\001 SURVEY WORX -PROJECTS\ARA KOTINGA 932\ASB\NZTM\20150901 STORMWATER ASBUILTS - STAGE 1 - TEXT BIG.DWG

FILE PATH:

DATUM (MSL) AUCKLAND 1946

LEVELS ARE IN TERMS OF LANDS AND SURVEY

BEARING AND COORDINATE DATUM IS

NEW ZEALAND TRANSVERSE MERCATOR PROJECTION

mobile +64 021 824 084

office +64 09 948 6491

www.surveyworx.co.nz

6 Aranui Road, Sylvia Park, Auckland, NZ

........ of .........

DRAWING No REVISION

TITLE

PROJECT

CLIENT

NOTES:

APPROVED

REVISION

CHECKED

APPROVED

CHANGES

SURVEYED

DESIGNED

DRAWN

CHECKED DATE

DATE

SCALE (A1)

This document and the copyright in this document remain the

property of SURVEY WORX. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of SURVEY WORX.

COPYRIGHT:

SHEET

(A3)

14.07.2015

LK

14.07.2015SWX

ORIGINAL ISSUE MC 15.07.150

1:250

55-932-605-08

1:500

SPINNAKER BAY LID

SOLWAY

285 ARA - KOTINGA

SITE ASBUILT

STAGE 1

75 1

SURVEY EQUIPMENT USED:

INSTRUMENT: TRIMBLE ROBOTIC S8 1"

GPS: TRIMBLE R6/R8 SYSTEMS

PRECISE LEVELLING: TRIMBLE DiNi Series 0.3mm DIGITAL

VERTICAL PLUMMING: FOIF DZJ2 LASER PLUMMIT

MEMBERS OF:

JOINS SHEET 4

JOINS SHEET 6

UPDATED PLAN MC 24.08.151

JO

IN

S S

HE

ET

1

Page 7: ARA-KOTINGA ROAD EXTENT WORK ARA-KOTINGAsolwaywhitford.co.nz/assets/Stage-1-asbuilds/20150901-Stormwater... · vertical plumming: foif dzj2 laser plummit members of: joins sheet 3

LOT 29

U

n

f

o

r

m

e

d

L

e

g

a

l

R

o

a

d

P:\DEMPSEY WOOD (55)\001 SURVEY WORX -PROJECTS\ARA KOTINGA 932\ASB\NZTM\20150901 STORMWATER ASBUILTS - STAGE 1 - TEXT BIG.DWG

FILE PATH:

DATUM (MSL) AUCKLAND 1946

LEVELS ARE IN TERMS OF LANDS AND SURVEY

BEARING AND COORDINATE DATUM IS

NEW ZEALAND TRANSVERSE MERCATOR PROJECTION

mobile +64 021 824 084

office +64 09 948 6491

www.surveyworx.co.nz

6 Aranui Road, Sylvia Park, Auckland, NZ

........ of .........

DRAWING No REVISION

TITLE

PROJECT

CLIENT

NOTES:

APPROVED

REVISION

CHECKED

APPROVED

CHANGES

SURVEYED

DESIGNED

DRAWN

CHECKED DATE

DATE

SCALE (A1)

This document and the copyright in this document remain the

property of SURVEY WORX. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of SURVEY WORX.

COPYRIGHT:

SHEET

(A3)

14.07.2015

LK

14.07.2015SWX

ORIGINAL ISSUE MC 15.07.150

1:250

55-932-605-08

1:500

SPINNAKER BAY LID

SOLWAY

285 ARA - KOTINGA

SITE ASBUILT

STAGE 1

76 1

SURVEY EQUIPMENT USED:

INSTRUMENT: TRIMBLE ROBOTIC S8 1"

GPS: TRIMBLE R6/R8 SYSTEMS

PRECISE LEVELLING: TRIMBLE DiNi Series 0.3mm DIGITAL

VERTICAL PLUMMING: FOIF DZJ2 LASER PLUMMIT

MEMBERS OF:

JOINS SHEET 5

UPDATED PLAN MC 24.08.151

JOINS SHEET 7

Page 8: ARA-KOTINGA ROAD EXTENT WORK ARA-KOTINGAsolwaywhitford.co.nz/assets/Stage-1-asbuilds/20150901-Stormwater... · vertical plumming: foif dzj2 laser plummit members of: joins sheet 3

LOT 27

LOT 28

U

n

f

o

r

m

e

d

L

e

g

a

l

R

o

a

d

P:\DEMPSEY WOOD (55)\001 SURVEY WORX -PROJECTS\ARA KOTINGA 932\ASB\NZTM\20150901 STORMWATER ASBUILTS - STAGE 1 - TEXT BIG.DWG

FILE PATH:

DATUM (MSL) AUCKLAND 1946

LEVELS ARE IN TERMS OF LANDS AND SURVEY

BEARING AND COORDINATE DATUM IS

NEW ZEALAND TRANSVERSE MERCATOR PROJECTION

mobile +64 021 824 084

office +64 09 948 6491

www.surveyworx.co.nz

6 Aranui Road, Sylvia Park, Auckland, NZ

........ of .........

DRAWING No REVISION

TITLE

PROJECT

CLIENT

NOTES:

APPROVED

REVISION

CHECKED

APPROVED

CHANGES

SURVEYED

DESIGNED

DRAWN

CHECKED DATE

DATE

SCALE (A1)

This document and the copyright in this document remain the

property of SURVEY WORX. The contents of this document

may not be reproduced either in whole or in part by any means

whatsoever without the prior written consent of SURVEY WORX.

COPYRIGHT:

SHEET

(A3)

14.07.2015

LK

14.07.2015SWX

ORIGINAL ISSUE MC 15.07.150

1:250

55-932-605-08

1:500

SPINNAKER BAY LID

SOLWAY

285 ARA - KOTINGA

SITE ASBUILT

STAGE 1

77 1

SURVEY EQUIPMENT USED:

INSTRUMENT: TRIMBLE ROBOTIC S8 1"

GPS: TRIMBLE R6/R8 SYSTEMS

PRECISE LEVELLING: TRIMBLE DiNi Series 0.3mm DIGITAL

VERTICAL PLUMMING: FOIF DZJ2 LASER PLUMMIT

MEMBERS OF:

UPDATED PLAN MC 24.08.151

JOINS SHEET 6


Top Related