AREVA –SmartGrids in the practice
Santiago, November 27th, 2008
Ricardo HeringAUTOMATION NMS – Latin America Director
> Title of presentation - Date - References3 3
Source: AREVA
NorthAmerica 39%
60%
Brazil67%
South Africa
58%
Australia/NZ
Africa/Middle East 39%
71%
India
Asia/Pacific
18%
7%
Europe
22%
A significant share of world electricity flowsis managed by AREVA
22%
Central & South America
> Title of presentation - Date - References4 4
�Virginia Power (Dominion) - 1991
� 4,200 Buses; 2,000 Contingencies; Solve every 15 Minutes
�Midwest ISO Case -
� >35,000 Buses; 12,000 Contingencies: 10 Seconds
Increasing need to efficiently manage additional da ta
Explosion of size in Network Models
200620052004200320022001200019991998199719961995199419931992199119901989
1, 200 buses(Original EMP
Test Model)
4, 200 buses
2, 000 buses 8, 000 buses
3, 000 buses
1, 400 buses
BPA6, 000 buses
(WECC161 KV & Above)
8, 000 buses(reduced ECAR)
3, 000 buses
5, 000 buses
11, 000 buses(PPSE Bus Branch
Replaced by detailedBreaker for MISO Area)
5, 000 busesTransmission
32, 000 buses
23, 000 buses Mar 05
(US Eastern InterconnectBreaker Model 73, 000 buses)
42, 000 buses
2, 500 buses Dec 04(42, 000 buses
used for FAT/SAT)
1,5 M feedersDistribution
> Title of presentation - Date - References5 5
New customer needs
�Reliability and quality:
� Ensure security of supply, reliability of the netwo rk and quality of the electricity delivered
�Environmental concerns:
� Clean energy and very low environmental impact
�Energy and economic efficiency:
� Starting from a given quantity of energy and from e xisting assets, deliver the maximum of electricity to the e nd-user
�Market efficiency:
� Set up tools and processes to fully enable energy m arkets
Smart grid, intelligent substation, monitoring
Dispatch centres
Networks
Substation level
Process levelMonitoring
Smart Grid
Intelligent substation
> Title of presentation - Date - References7 7
AREVA T&D case studyReliability and Quality
�AEP: USA
�NGC: China
�HVDCice™: Canada
�STATCOM: USA
> Title of presentation - Date - References8 8
AEP� AEP System
� HQ: Columbus, OH
� > 5 million Customers
� Appr. 20,000 Employees
� Total Revenue (2006) = $12.6 billion
� Total Assets (2006) = $38 billion
� Business
� No1 Ranking TSO in USA 765 KV: 39,000 miles network
� Serves about 10 percent of the electricity demand in the Eastern Interconnection
� Serves 11 states
� 36,000 megawatts generating capacity
� Type of Solution provided
� e-terravision - Solution for Preventing Blackouts through Enhanced Situational Awareness
� e-terra transmission - Fast and reliable Network Analysis
� Combines advanced visualization techniques with expert knowledge of power systems dynamics and behavior under stress
e-terravision : (Corporate Executive Office)
e-terravision : (Corporate Executive Office)
e-terravision : (Analysts Workstations)
e-terravision : (Analysts Workstations)
e-terravision for Situation Awarenesse-terravision for Situation Awareness
AEP Project is a SmartGrid Building Block because…………………. It fully accommodates a variety of generation options
> Title of presentation - Date - References9 9
North China Grid (NCG) Project:� Customer description:
� 1 of 6 Regional Grid Operators in China
� 120 GW Installaed Gen Capcity
� 500KV: 17,000 KM
� 220KV: 43,000 KM
� Directly controls Beijing area (OLYMPICS)
� Customer Need:� Real-time Situation Awareness with e-
terraVision in the Generalize Grid Security Framework
� Advanced decision support tools to guide operators with re-dispatch actions to alleviate security violations
� Type of Solution provided:� Visualization for secure grid operation
� Decision Suppot for electricity reform
� PMUs data fed into the EMS visualization
NCG
� Project History:� NCG faces world-class system-operation challenges
� AREVA operate at leading VLPGO customers (e.g. PJM, MIS O)
� Success factors:� Visionay & knowledgeable project team from NCG & AREVA
� AREVA’s robust and extensible solutions
� Ready for the Beijing Olympics
� Example of partnership with a Utility (NCG: 300GW i nstalled capacity)
Maintain GRID SECURITY in scheduling generation contracts)
Maintain GRID SECURITY in scheduling generation contracts)
NCG Project is a SmartGrid Building Block because…………………. it Ensures the reliability of electrical energy supply
Visualization for PMU-based Wide Area Security
Visualization for PMU-based Wide Area Security
> Title of presentation - Date - References10 10
AREVA T&D case studyEnvironment
�EDP: Portugal
�SVC – Exel Energy
> Title of presentation - Date - References11 11
EDP Renováveis
�Customer:
� EDP Renováveis is now the 4 th largest Wind Energy Producer in the World, growing to become the 3 rd largest.
�Customer Need:
� To connect 48 Wind Parks (1000 Turbines) with 2 central dispatch centres (one main + back up)
�Solution:
� e-terra Platform to control & manage the wind farm
6
RTU RTU RTU RTU RTU RTU
MP_I
Sistema de Telecondução e Gestão dos Activos dos Parques EólicosArquitectura
PE ÁvilaPE Ojos AlbosPE Villa Castin
Villamiel
PE Lagos
PE La Cabaña
PortaChuelo
PE Sotonera
PT
SIT_I
ICCP ICCP
DCC_TR(Lisboa)
ECC_TR(Régua)
ICCP ICCP
PE Alto do Talefe PE Cabeço Rainha PE Cadafaz PE Fonte da Mesa PE Fonte da Quelha PE Padrela PE Pena Suar PE Serra do Barroso PE Vila Nova
4-10 Mbit
7x1500 kW
1x1500 kW
1 MET
1 SE ?
17x600 kW
3x2000 kW
2 MET
1 SE
17x600 kW
2 MET
1 SE
17x600 kW
2 MET
1 SE
7x1500 kW
1x1500 kW
1 MET
1 SE ?
5x1500 kW
1 MET
1 SE
20x500 kW
3x2000 kW
2 MET
1 SE
9x2000 kW
1 MET
1 SE
10x2000 kW
3x2000 kW
1 MET
1 SE
Sistema de Despacho e Programação da Trading Sistema de Informação
de Trading Ibérico
Sistema de Modelos de Previsão de Produção Ibérica de Parques Eólicos
RTU RTU RTU
59x660 kW
3 MET
1 SE
RTU
22x660 kW
2 MET
RTU
33x1500 kW
1 MET
1 SE
12x1650 kW
1 MET
1 SE
RTU
53x850 kW
1 MET
1 SE
RTU
49x850 kW1 MET
1 SE
RTU
21x850 kW
1 MET
18x660 kW
1 MET
RTU
22x660 kW
1 MET
1 SE
RTU
RTU
PE Açor
10x2000 kW
1 MET
1 SE
PE Acebo
27x660 kW2 MET
1 SE
RTU
PE Alagoa de Cima
9x1500 kW
1 MET
1 SE
RTU
PE La Cuesta
12x660 kW
1 MET
1 SE
RTU
22x660 kW
1 MET
RTU
PE Cruz Hierro PE Cruz Hierro (Ampliação)
4x1650 kW
RTU
ES
Villaruebo
19x850 kW
1 SE
RTU
El Gramal
44x850 kW1
MET
PE Arlanzon PE Leluza
Casarejo
Altos del Voltoya
El Palo
Testos2006
Serra d’El Rei2005
Madrinha2006
Pedras Lavradas/ Serra de Alvoaça
2006
Barlavento Algarvio2006
Abogalheira2005
PE Las Lomillas
RTU
EDP WAN HC WAN
Centro de Processamento de Dados
34 Mbit
(Sacavém-Oviedo)
CT Porto (Alternativo)
Rede SCADA
laser-jet
Switch
UPS
laser-cor
POP219'’
POP1
19'’
Firewall
CT Oviedo (Principal)
Rede SCADA
Firewall
Switch
SCADA
laser-jet laser-corPOP2
19'’
POP1
19'’
GPS
Gateway
Gateway
SCADA
Tape
ARQUIVO
Servidor de
Arquivo OSI PI Servidor de BackupServidor web Rede Corporativa
Storage
26
Curiscao y Pumar (Curiscao + Baos y Pumar)
2005
Hoya Gonzalo 2006
La Dehesica2006
IDER2006
Munera I2007
San Roque2007
Sierra del Carondio2007
Medinaceli2007
Munera II2008
Burgos Este2008
Avila Oeste2007
Agreda
Cerros de Radona
Rincon
Campanar io
Fuentes
Fuente Vain
El Paramo
El Nogal
Collad illo
Cabeza Mesa
Ampliacion Sierra del Cortado
LAN Ethernet
100 Mbit/s
TCP/IP
LAN Ethernet
100 Mbit/s
TCP/IP
Nota: 11 PE actuaisNo Futuro: 10 PE (6 novos + 4 extensões)
Extensões em 2005
NOVOS:
2 PE em 2005
4 PE em 2006
Nota: 13 (15) PE actuais
No Futuro: 26 PE
NOVOS:
1 PE em 20053 PE em 2006
5 PE em 2007
2 PE em 2008
...
EDP Renováveis project is a SmartGrid Building Block because…………
it is a significant contributor to preserving our environment
> Title of presentation - Date - References12 12
AREVA T&D CASE STUDYEnergy & economic efficiency
�Energinet: Denmark
�Sasaram HVDC: India
> Title of presentation - Date - References13 13
A Smart Grid Project today
� Energinet.dk (ENDK)
� State owned company, merger between East TSO, West TSO and Gas TSO
� Operates and natural gas storage facilities
� Danish networks
� Elec 1,180 Km of HV lines / 400kV 150kV and 132kV networks / 186 S/s
� Installed capacity: 14 GW / 8GW thermal / 3,8 GW Wind / 2,2GGW CHP
� Gas Network 800Km of Pipelines 60 substations
� Project target:
� Replacement of 3 existing transmission control systems with a single system
� CC1, in Erritsoe: Primary EMS, Back up GMS
� CC2, in Egtved: Primary GMS, Back up EMS
Smart Dispatch
Generation PortfolioManagement
including renewable
Full Integration of pricing and demand /supply principles to
manage the grid
Smart demand response
management
Energinet.dk is a SmartGrid Building Block because…………………. It fully accommodates a variety of generation options
> Title of presentation - Date - References14 14
Key Smart Grid Features
Distributed generation
telemetered values
Field telemetry
Power Balance Calculations
Conventional generationtelemetered
values
DGM
Wind and CHP aggregate generation of each PBRConfiguration
file
Distributed generation
telemetered values
Field telemetry
Power Balance Calculations
Conventional generationtelemetered
values
DGM
Wind and CHP aggregate generation of each PBRConfiguration
file
GAS Management System Integration
Power Balance
Offline Simulation
Distributed Generation Management
� Integration of GMS (SIMONE) to e-terra platform
� Development of specific applications: pigtracking, gas retroactive historic reconstruction
� Input: Power schedules from PBR, HVDC stations and Tie-lines
� Output: Delta between committed and measured production of each market player (PBR).
� Input: Power, load and outage schedules, DACF from neighboring TSOs
� Output: automatically produce a set of future network states (one-day horizon, 15mn steps)
� Estimates the production of non-measureddistributed generation units: wind turbines and CHP. Used by several critical network analysisapplications as well as by PB.
> Title of presentation - Date - References15 15
AREVA T&D case studyMarket efficiency
�PJM: USA
> Title of presentation - Date - References16 16
PJM Project
� Customer description:
� PJM operates the world’s largest competitive wholes ale electricity market
� Serves about 51 million people
� Dispatches 164,905 MW over 56,250 miles of transmission lines from 1271 Generation Sorces
� 450 Participants, 1271 Generation Units, 164.9 GW
� More than $42 Billions of Annual billing
� Customer Need
� High Volume Data Processing
� Fully Configurable Business Rules
� No code develoment for new market settlement rules
� Load Response Run Group to be configured for PJM Smart Grid Demand Response initiative
� Customer Need
� AREVA e-terra settlement offers scalable architectu re to meet growing data volume needs driven by:
� PJM market evolution
� PJM Smart Grid / Demand Response initiative
� High scalability
� Support for Parallel executions
PJM Territory Served
CSP(Curtailment Service Providers)
MDSP (Meter Data Service Providers)
LSE(Load Serving Entity)
EDC(Electric Distribution Company)
Smart Meter/Gateway
Smart Meter/Gateway
Smart Meter/Gateway
HANHome Area
Network
Member Generation & Merchant
Companies
PJM Market
Application
PJM e-Suit Applications for Market Participant Interface
Bussiness Rules
Fully Configurable
AREVA e-terra settlement
High Volume & Performance Calculation
OutputResults
Input ProcessingMulti-Threaded to meet AMI needs
Run # 1
Run #2
Run # 3
PJM Financial
Application
CREDITS, INVOICES, REPORTS
OTHERS
AREVA
SIEMENS
CSP(Curtailment Service Providers)
MDSP (Meter Data Service Providers)
LSE(Load Serving Entity)
EDC(Electric Distribution Company)
Smart Meter/Gateway
Smart Meter/Gateway
Smart Meter/Gateway
HANHome Area
Network
Member Generation & Merchant
Companies
CSP(Curtailment Service Providers)
MDSP (Meter Data Service Providers)
LSE(Load Serving Entity)
EDC(Electric Distribution Company)
Smart Meter/Gateway
Smart Meter/Gateway
Smart Meter/Gateway
Smart Meter/Gateway
Smart Meter/Gateway
Smart Meter/Gateway
HANHome Area
Network
HANHome Area
Network
Member Generation & Merchant
Companies
PJM Market
Application
PJM e-Suit Applications for Market Participant Interface
Bussiness Rules
Fully Configurable
AREVA e-terra settlement
High Volume & Performance Calculation
OutputResults
Input ProcessingMulti-Threaded to meet AMI needs
Run # 1
Run #2
Run # 3
PJM Financial
Application
CREDITS, INVOICES, REPORTS
OTHERS
AREVA
SIEMENS
PJM Market
Application
PJM e-Suit Applications for Market Participant Interface
Bussiness Rules
Fully Configurable
AREVA e-terra settlement
High Volume & Performance Calculation
OutputResults
Input ProcessingMulti-Threaded to meet AMI needs
Run # 1
Run #2
Run # 3
PJM Financial
Application
CREDITS, INVOICES, REPORTS
OTHERS
AREVA
SIEMENS
PJM project is a SmartGrid Building Block because………
it Ensures the reliability of electrical energy supply