Hethel Engineering Centre
Chapman Way, Hethel
Norwich, Norfolk UK
NR14 8FB
Tel: +44 (0) 1953 859 133
BUSINESS INTRODUCTION
Hethel Engineering Centre
Chapman Way, Hethel
Norwich, Norfolk UK
NR14 8FB
Tel: +44 (0) 1953 859 133
3
Description Automation conveyor based system for up to 10 different products
• Auto End of Line final test (up to 10 individual product variations on this line)
• Auto Laser Mark of 2D barcode (contains product data, lot and date information)
• RFID Tag for part location and product identification at each assembly stage
• Auto Visual Inspection
• Auto Pack
Control System PLC with PC based data acquisition
Lead time 6 months
Cycle Time 10s
Volume 2M+ components / year
Location China
INDUSTRIAL AUTOMATION
4
Description Automatic Assembly machine for safety critical automotive airbag sensor (3 rotary dial based systems with conveyor feed or product between dials). System Incorporates, component loading via bowl feed, mechanical fitment of plastic components, handling & assembly of springs and toroid magnets. Control System PLC
Lead time 12 months
Cycle Time 3.0s
Volume 7.5M+ components / year
Location Mexico
INDUSTRIAL AUTOMATION
5
Description Automation machine to ultrasonically displace PBT plastic material over pins Control System PLC Lead time 12 weeks Cycle Time 3.0s Volume 7.5M + components / year Location Mexico
INDUSTRIAL AUTOMATION
6
Description Low Pressure Over Moulding equipment Manual Load, Automatic mould rotary based low pressure mould system for mould protection of SAFETY CRITICAL automotive seat belt buckle sensors Control System PLC
Lead time 8 weeks
Cycle Time Product/Shot size specific, 10-30s typical
Volume 1.5M + components / year
Location Mexico, China and Slovenia
INDUSTRIAL AUTOMATION
7
Description Automation to resistance weld a reed switch to lead frame in 4 places Control System PLC
Lead time 6 months
Cycle Time 3.0s
Volume 7.5M + components / year
Location Mexico
INDUSTRIAL AUTOMATION
8
Description Manual Load Rotary Table Automatic test, vision & laser mark EOL test system
Control System PLC with PIC based data acquisition
Lead time 10 weeks
Cycle Time 10s
Volume 1.5M+ components / year
Location Romania
MANUFACTURING & TEST EQUIPMENT
9
Description 4 Station Test System for testing small engine fuel injector components (Burn In / Stroke Test / Flow Test / Oil Prime with post test laser mark station) Control System PLC, with RFID for traceability and data storage for each component
Lead time 3 months
Cycle Time 60s
Volume Customer proprietary information
Location UK
MANUFACTURING & TEST EQUIPMENT
10
Description Customized test unit to integrate into Automatic Conveyor based test system Control System PIC based data acquisition integrated to PLC
Lead time 10 Weeks
Cycle Time 10s
Volume 2M+ components / year
Location China
MANUFACTURING & TEST EQUIPMENT
11 Flexible multi-functional test systems adaptable to clients requirements
Description MTIPC Manual Load, Automatic test systems functional mechanical tests, electrical tests, vision systems, positive mark, reject marking/disposition system and data collection options available Control System PLC with PIC based data acquisition
Lead time 8 weeks
Cycle Time Product specific, 10-20s typical
Volume > 1.0M components / year
Location Mexico, China, USA, Romania and Slovenia
1
2
3
5
DISPLAY AIR FEED CONNECTION UMBILICAL CORD CONNECTION
FUSED & FILTERED MAINS SUPPLY VENTILATION 1 2
4 5
3
4
1
MANUFACTURING & TEST EQUIPMENT
12 Bespoke robust manufacturing equipment with in-built limit control
Description Machine to automatically screw bottle cap onto empty bottle (Bottle used for liquid sampling) Control System PLC
Lead time 6 weeks
Cycle Time 10s
Volume 100k per year
Location UK
MANUFACTURING & TEST EQUIPMENT
13 Bespoke robust manufacturing equipment
Description Machine to automatically close safety latch on automotive connectors Control System PLC
Lead time 4 weeks
Cycle Time 12s
Volume 250k per year
Location Romania
MANUFACTURING & TEST EQUIPMENT
14
Description Turntable, to aid operator in manoeuvring product for assembly of complex parts Control System N/A
Lead time 4 weeks
Cycle Time Product Specific
Volume Product Specific
Location Various
MANUFACTURING & TEST EQUIPMENT