outdoor roller blindsWW 9627
INSTALLATION GUIDE ONLY
Custom madeAwnings
and Blinds
a)strap lockdown b)clip lockdown c)stainless steel wire guide d)100mm side channeland slide lock bottom rail
The tensioned vertical drop blind is the most versatile product in our range.
- Choose between our two bottom rails
ŸThe standard 38mm galvanised in a fabric pocket or upgrade to the premium
teardrop that is designed to become a feature of the blind rather than to be
hidden.
- Next, choose from the three different lockdowns options
ŸEither strap and buckles, stainless steel clips or the popular stainless steel wire guide.
- Another option, which completely encloses an outdoor living area
ŸIs to choose the heavy-duty 100mm side channels that incorporates our solid
bottom rail and stainless steel slide locks.
ŸHooding can be added to both protect the fabric and improve aesthetics.
General
Tools required
Tape Measure
Spirit Level
DrillPower or Battery
ScrewdriversFlat headPhillips Head
Allen KeysSize Required dependson fixing option chosen
SpannerSize Required dependson fixing option chosen
VERTICAL AWNING
Before starting you will need;
An assistant Step Ladder Drill BitsMasonry maybe required
Pencil
Chalk Line
Installation Guide only
The Outdoor Roller blind is the most versatile product in our range.
OUTDOOR ROLLER BLINDSInstallation Guide only
General
VERTICAL AWNING
Installation of your Awning
ŸWhen unpacking your awning, take care to protect the awning from accidental
damage or soiling.
ŸDo not drop or drag the awning on the ground.
ŸWhen removing the protective wrapping from the awning, do not use a knife or
box cutter to the wrapping as you could accidentally slice into your awning
fabric.
ŸYour awning has been shipped to you fully assembled but it is important to follow
this instruction manual to securely fasten the mounting brackets to your home and
install the awning.
ŸPlease read these instructions completely before installing your Vertical awning.
ŸYou will need an assistant(s) for installation.
ŸLeft and Right references are as you are facing the house.
ŸYou have been provided with the proper brackets, gearbox screws, nuts and bolts
for pivot pin and plate for mounting the awning, but you will need to provide the
drill and bits (and additional fixings if required) once determining the fixing
surface. (See previous page for tools required).
Step One
i)
ii)
Measure up from the mounting location starting on the left side and make a mark at the desired mounting location, then the right side (Dia 1/i).
Using a chalk line string, snap a level line the width of the awning.
mark ateach end
Step Two
i) mounting position and mark (Dia 2/i) clearly the holes for drilling (work with one bracket at a time).
ii) Check for level positioning with the spirit level of the brackets, a minor adjustment of the brackets may be required.
Hold the bracket in the required
(Dia 1/i)
(Dia 2/i)
left to right
For Strap & Buckle Lockdown or Clip System LockdownNote: Refer to Wire Guide Installation and Side Channel for Installation instructionsseparate
Installation Guide only
Installation of your Blind• When unpacking your blind, take care to protect the blind from accidental damage or soiling.• Do not drop or drag the blind on the ground.• When removing the protective wrapping from the blind, do not use a knife or box cutter on the wrapping as you could accidentally slice into your blind fabric.• Your blind has been shipped to you fully assembled but it is important to follow this instruction manual to securely fasten the mounting brackets to your home and install the blind.• Please read these instructions completely before installing your Roller Blind.• You will need an assistant(s) for installation.• Left and Right references are as you are facing the house.• You have been provided with the proper brackets, gearbox screws, nuts and bolts for pivot pin and plate for mounting the blind, but you will need to provide the drill and bits (and additional fixings if required) once determining the fixing surface. (See previous page for tools required).
Using a chalk line string, snap alevel line the width of the blind.
OUTDOOR ROLLER BLINDSInstallation Guide only
VERTICAL AWNING
Step Three
i)the awning two turns and insert the square drive end into the gearbox (Dia 3/i).
ii) Once the end drive is fitted, the pivot pin can now be inserted into the idler and attach to the brackets (Dia 3/ii).
iii) Secure awning into place (Dia 3/ii).
With the brackets installed, unwind
(Dia 3/i) (Dia 3/ii)
Step Four
i)place, secure the pivot pin into plate by pushing the “R” clip in through the front and back holes in the plate (Dia 4/i).
With the awning now held in
(Dia 4/i)
push theR clip in
Step Five
i)the position required for fixing the bottom rail to the ground/wall at each end of the awning and secure clip (or strap and buckle) to base anchor (Dia 5/i).
END
Wind the vertical awning down to
(Dia 5/i)
As an example, we have shown a round bottom rail with stainless steel clip
(Dia 4/i)
(Dia 3/iii)
Installation Guide only
the blind two turns and insert thesquare drive end into the gearbox(Dia 3/i).
Secure blind into place (Dia 3/ii).
With the blind now held in
Wind the blind down to
each end of the blind and
OUTDOOR ROLLER BLINDSInstallation Guide only
VERTICAL AWNING
Step One to Four
Follow instructions One to Four of Strap and Buckle Lockdown or Clip Lockdown Systems
For Wire Guide Lockdown SystemNote: Refer to Strap and Clip Systems and Side Channel for Installation instructionsseparate
stainless steel wire guide
Additional Tools
Electric Angle Grinder Grinding Discs
Step Five
i) Install the Bottom “L” Brackets:
For L Bracket Installation, ensure that there is enough clearance from the bottom (Dia C5/i).
NOTE: Align the brackets so that the stainless steel cables hang vertically and parallel to each other.
If using a masonry drill bit make sure the drill is set to the hammer setting.
(Dia C5/i)
Electrical Tape
Note:
ŸLevel Mounting is critical for the correct operation of this awning system (always use a spirit level).
ŸAlways use the correct mounting screws or bolts for mounting to the desired application ie. Gyprock, Timber, Masonry, Steel or Aluminium.
ŸFor brick or rendered surfaces, make sure drilling is no closer than 25mm from edge of surfaces as the brick or render my chip or break out.
ŸThe most important procedure installing these awnings, is to be sure that the correct anchorage method has been used so that the mounting area (ie walls or eaves) is able to support the weight of the awning and its operation.
Pliers
Installation Guide only
The most important procedure installing these blinds, is to be sure that thecorrect anchorage method has been used so that the mounting area (ie wallsor eaves) is able to support the weight of the blind and its operation.
Level Mounting is critical for the correct operation of this blind system (alwaysuse a spirit level).
OUTDOOR ROLLER BLINDSInstallation Guide only
VERTICAL AWNING
Step Six
Cut on an angle
(Dia C6/i)
Step Seven
i) The stainless steel cable is suppliedlonger than required.
If trimming of the cable is required, use an angle grinder and small cutting disc. Wrap the area with electrical tape before cutting this will help prevent any fraying of the cable (Dia C6/i).
Cut the cable at an angle, this gives a leading edge.
i)
ii) Measure from the top of the bracket to just below the bottom L bracket (Dia C7/i)
Determine the length of the cable.
mea
sure
as
show
n
(Dia C7/i)
Step Eight
Attaching the cable:
Note: Attach the wire guide cable BEFORE installing the awning into place (as you will need to use the angle grinder to trim excess cable).
a) Remove the nut, push the cable through t h e t o p a s shown as far into the bush as possible.
b) Secure bush i n t o t h e L bracket, attach and tighten nut. Then secure bush by t ighten ing with allen key.
c) Next thread cable through the wire guide ( t h e s e a r e a t t a c h e d t o each end of the bottom rail).
d) Take off the wire guide top bush with allen key from the top bracket and pull apart, thread the cable through the hole as shown and clip back together matching grooves.
e) To re-attach to the top bracket use an allen key and secure top bush take care not to tighten too much this is the final process).
Installation Guide only
blind into
OUTDOOR ROLLER BLINDSInstallation Guide only
VERTICAL AWNING
Step Nine
i) Trim off any excess cable with angle grinder. Leaving 3-4mm cable exposed for final tightening.
ii) Repeat Step Eight for other side.
iii) Using pliers hold the cable firmly and pull tightly then with allen key secure bush tightly onto bracket.
End
(Dia C9)
For Side Channel Installation(Face Fix, Reveal Fit and Recess Fit)
Note: Refer to Wire Guide, Clip and Strap for Installation instructionsseparate
Step One to Four
Follow instructions One to Four of Strap and Buckle Lockdown or Clip Lockdown Systems
Step Five
i) Using a chalk string line mark a straight line (ensure the line is square to the awning, this is critical) from under the top bracket down to the full length of the side channel. Repeat for the other side.
ii) On the first side channel starting approx 30mm down from the top mark the first drill hole then in increments of 500mm approx.
iii) Drill a 12.5mm hole on the front of the side channel, then drill a 7mm hole directly through on the back of the channel (Dia D5/iii)
WALL MOUNTED FACE FIX
LEFTFRONTVIEW
Dia D5/i
12.5mmhole at thefront
7mm holeat the back
12.5mm
7mm
Front on view
50
0m
m a
ppro
x5
00
mm
appro
x
Side Channel
Side Channel
12.5mmhole at thefront
7mm holeat the back
Additional Tools
Wall plugs may be ncessary
Installation Guide onlyVERTICAL AWNING
Step Six
i) Attach the side channels to wall using the appropriate drill and bits depending on the surface.
ii) Drill and fasten the top hole first then ensure the side channel is sitting square check with a spirit level.
iv) Drill and fasten remaining screws. Repeat for other side.
Step Seven
i) Gently slide the awning into the side channel ensure that the awning slides freely in the channels.
END
(Dia D6/i)
(Dia D7/i)
FOR POST AND REVEAL MOUNTED
Step One
i) You will need to determine the mounting process for the top bracket
Post Mounted (Dis E1/i) - suited for free standing posts ie around verandah areas, not always suited depending on the size of the awning as only part of the bracket is actually used.
Reveal Mounted (Dis E1/ii) - suited for under verandah areas and window frames
(Dia E1/ii)(Dia E1/i)
Reveal FitPost Mount
Looking up atthe bracket
Installation Guide only
OUTDOOR ROLLER BLINDSInstallation Guide only
FOR POST AND REVEAL MOUNTED
STEP ONE You will need to determine the mounting process for the top bracket Post Mounted (Dis E1/i) - suited for free standing posts ie around verandah areas, not always suited depending on the size of the blind as only
part of the bracket is actually used.
Reveal Mounted (Dis E1/ii) - suited for under verandah areas and window frames
For Side Channel Installation(Reveal Fit and Recess Fit only)
Note: Refer to Wire Guide, Clip and Strap for separate Installation Instructions
VERTICAL AWNING
Step One to Four
Follow instructions One to Four of Strap and Buckle Lockdown or Clip Lockdown Systems
Step Five
i) Using a chalk string line mark a straight line (ensure the line is square to the awning, this is critical) from under the top bracket down to the full length of the side channel. Repeat for the other side.
ii) On the first side channel starting approx 30mm down from the top mark the first drill hole then in increments of 500mm approx.
iii) Drill a 12.5mm hole on the front of the side channel, then drill a 7mm hole directly through on the back of the channel as shown(Dia E5/i).
Step Six
i) Attach the side channels to surface using the appropriate drill and bits depending on the surface.
ii) Drill and fasten the top hole first then ensure the side channel is sitting square check with a spirit level.
iv) Drill and fasten remaining screws. Repeat for other side.
Side Channel
12.5mmhole at thefront
7mm holeat the back
Dia E5/i
Reveal Fit
Side Channel
12.5mmhole at thefront
7mm holeat the back
Post Mount
Dia E5/i
Reveal FitPost Mount
Step Seven
i) Gently slide the awning into the side channel ensure that the awning slides freely in the channels.
END
Installation Guide only
OUTDOOR ROLLER BLINDSInstallation Guide only
Post Mount Only
Screw
Screw
Rivet
Rivet
Reveal Fit Only
Post Mount Only Reveal Fit Only
Steps for Side-channeled blinds1. Using a chalk string line mark a straight line (ensure
the line is square to the Blind, this is critical) from under the top bracket down to the full length of the side channel. Repeat for the other side.
2. On the first U-Channel, starting approx 30mm down from the top mark the first drill hole then in increments of 500mm approx.
3. Drill and secure the U-channel onto the post or reveal ready for the side channel to slot into it.
4. Repeat for the other side.
5. Slide the side channel into the U-channel rebate on both sides but do not secure into place at this time
6. Unroll blind fabric two turns off top tube, slide lock- bar onto bottom of blind and centralise between side tabs, carefully guide lock-bar and fabric into the top of the side guide channels using the side fabric tabs to start them into the guide slots in the channel.
7. Remove the ‘R’ clip and idler pin from the guide channel headstock and slide the idler pin into the open end of the top roller tube, align the square drive end to slide into the square drive hole of the gearbox, then align the idler end pin to drop down the slot of opposite headstock to engage the idler carriage, re-install the ‘R’ clip to retain top tube
8. Unroll the blind using the crank handle to full drop (ensure sides of blind material retained in guide slots), spirit level side guide channels (allow 3-5mm tolerance for material, ie: not too tight), then evenly space fixings thru the side channels into the guided channels to retain in place. Note: normally the side fixing is drilled thru the groove on the side of the wall channels aligning with the rivets in the guide channels.
9. Lower the lock-bar fully onto floor and test the lock engages. Note: Sometimes with uneven floors you may need to enlarge or re-drill the locking bar holes inside the guide channels.
10. Once the lock-bar has engaged, lightly tension the blind using the crank handle, then install the top blind stops inside the left and right guide channels using the supplied nylon blocks- rivet thru the channel into the nylon block in the pre-drilled holes just below the headstocks. (Be careful not to damage blind material)
11. Release tension from the blind by unrolling using the crank handle; unlock lower lock-bar, then wind the blind to the top – the lock-bar should stop against the nylon top stops, Note: never over-tension your blind using the crank handle- just lightly tension.
12. Once this has been completed, your blind is ready for use.
VERTICAL AWNING
Step One to Four
Follow instructions One to Four of Strap and Buckle Lockdown or Clip Lockdown Systems
Step Five
i) Using a chalk string line mark a straight line (ensure the line is square to the awning, this is critical) from under the top bracket down to the full length of the side channel. Repeat for the other side.
ii) On the first side channel starting approx 30mm down from the top mark the first drill hole then in increments of 500mm approx.
iii) Drill a 12.5mm hole on the front of the side channel, then drill a 7mm hole directly through on the back of the channel as shown(Dia E5/i).
Step Six
i) Attach the side channels to surface using the appropriate drill and bits depending on the surface.
ii) Drill and fasten the top hole first then ensure the side channel is sitting square check with a spirit level.
iv) Drill and fasten remaining screws. Repeat for other side.
Side Channel
12.5mmhole at thefront
7mm holeat the back
Dia E5/i
Reveal Fit
Side Channel
12.5mmhole at thefront
7mm holeat the back
Post Mount
Dia E5/i
Reveal FitPost Mount
Step Seven
i) Gently slide the awning into the side channel ensure that the awning slides freely in the channels.
END
Installation Guide only
VERTICAL AWNING
Option B
Shows reveal mount
Option A
Shows post mount
Installation Guide onlyOUTDOOR ROLLER BLINDSInstallation Instructions
General care and maintenance of your Sunline Vertical Awning
ŸPrior to operating the Sunline awning, be sure that no objects or persons can come in contact with it as it opens and closes. Keep children away from any moving parts of the awning as it operates. Failure to do so could result in personal injury.
ŸNever attempt to hang items from any part of the awning, except those accessories that are supplied by the manufacturer.
ŸNever attempt to repair or disassemble any part of the awning without following replacement part procedures supplied by the manufacturer. Trying to do so without proper instructions could result in personal injury.
ŸIt is normal for the fabric to form waves or wrinkles at the hemmed edges as the awning rolls up. This is because the fabric layer is double only along the edges.
ŸNever use a barbeque grill, any type of patio heater or fireplace near your Sunline awning. Doing so could result in the fabric burning or melting and could result in personal injury.
ŸIf it is necessary to roll the awning up wet, be sure to extend it out to dry when the weather is better.
ŸWhile the awning fabric itself won’t mildew, mildew can form on the dust and dirt allowed to accumulate on the fabric.
ŸIf the fabric is rolled up and stored when wet, the moisture will promote the formation of mildew.
ŸDo not use caustic cleaners.
ŸGently remove the dust from the dry awning fabric using a vacuum cleaner with a brush attachment.
ŸThen clean with spraying of luke warm water and a mild soap while gently brushing. Rinse thoroughly with clean water to remove any soap residue.
ŸCleaning the awning regularly with mild soap and water will extend the life of the fabric.
WARNING:
PROTECTING THE FABRIC FROM MILDEW
CLEANING THE FABRIC
Care and Maintenance InstructionsVERTICAL AWNINGOUTDOOR ROLLER BLINDSCare and Maintenance Instructions
Windoware Outdoor Roller Blind
Prior to operating the Windoware blind, be sure that no objects or persons can come incontact with it as it opens and closes. Keep children away from any moving parts ofthe blind as it operates. Failure to do so could result in personal injury.Never attempt to hang items from any part of the blind, except those accessoriesthat are supplied by the manufacturer.Never attempt to repair or disassemble any part of the blind without followingreplacement part procedures supplied by the manufacturer. Trying to do so withoutproper instructions could result in personal injury.It is normal for the fabric to form waves or wrinkles at the hemmed edges as theblind rolls up. This is because the fabric layer is double only along the edges.Never use a barbeque grill, any type of patio heater or fireplace near your Windowareblind. Doing so could result in the fabric burning or melting and could result inpersonal injury.
If it is necessary to roll the blind up wet, be sure to extend it out to dry when theweather is better.While the blind fabric itself won’t support mildew, mildew can form on the dust and dirtallowed to accumulate on the fabric.If the fabric is rolled up and stored when wet, the moisture will promote the formationof mildew.
Do not use caustic cleaners.
Gently remove the dust from the dry blind fabric using a vacuum cleaner with abrush attachment.
Then clean with spraying of luke warm water and a mild soap while gently brushing.Rinse thoroughly with clean water to remove any soap residue.
Cleaning the blind regularly with mild soap and water will extend the life of thefabric.
• Important - in strong winds the blinds should be rolled up and not left down
OUTDOOR ROLLER BLINDS WITH SIDE CHANNELSInstallation Instructions
Prior to operating the Windoware blind, be sure that no objects or persons can come incontact with it as it opens and closes. Keep children away from any moving parts ofthe blind as it operates. Failure to do so could result in personal injury.Never attempt to hang items from any part of the blind, except those accessoriesthat are supplied by the manufacturer.Never attempt to repair or disassemble any part of the blind without followingreplacement part procedures supplied by the manufacturer. Trying to do so withoutproper instructions could result in personal injury.It is normal for the fabric to form waves or wrinkles at the hemmed edges as theblind rolls up. This is because the fabric layer is double only along the edges.Never use a barbeque grill, any type of patio heater or fireplace near your Windowareblind. Doing so could result in the fabric burning or melting and could result inpersonal injury.
If it is necessary to roll the blind up wet, be sure to extend it out to dry when theweather is better.While the blind fabric itself won’t support mildew, mildew can form on the dust and dirtallowed to accumulate on the fabric.If the fabric is rolled up and stored when wet, the moisture will promote the formationof mildew.
Do not use caustic cleaners.
Gently remove the dust from the dry blind fabric using a vacuum cleaner with abrush attachment.
Then clean with spraying of luke warm water and a mild soap while gently brushing.Rinse thoroughly with clean water to remove any soap residue.
Cleaning the blind regularly with mild soap and water will extend the life of thefabric.
Included in your Packaging• 2 x Blind side guide channels with gearbox headstock and idler• 2 x Side channels for mounting guide channels• Lower lock-bar with key• Blind fabric rolled on top mounting tube• 1 x Crank handle• 1 x Fitting hardware (top stops and rivets, selection of fittings screws)
Tools RequiredBattery drill/driver, 4mm drill bit, #2 square driver, Spirit level, Tape measure, Rivet gun
To Start:Carefully unwrap package (use no knife)Remove side channels, drill/screw through back face to mount upright in frame (spirit level to plum) where required.
Install left and right guide channels respectively into the wall channels, headstock to the top facing inwards.
Unroll blind fabric two turns off top tube, slide lock-bar onto bottom of blind and centralise between side tabs, carefully guide lock-bar and fabric into the top of the side guide channels using the side fabric tabs to start them into the guide slots in the channel.
Remove the ‘R’ clip and idler pin from the guide channel headstock and slide the idler pin into the open end of the top roller tube, align the square drive end to slide into the square drive hole of the gearbox, then align the idler end pin to drop down the slot of opposite headstock to engage the idler carriage, re-install the ‘R’ clip to retain top tube.
Unroll the blind using the crank handle to full drop (ensure sides of blind material, ie: not in guide slots), spirit level side guide channels (allow 3-5mm tolerance for material, ie: not too tight), then evenly space fixings through the side channels into the guided channels to retain in place. Note: normally the side fixing is drilled through the groove on the side of the wall channels aligning with the rivets in the guide channels.
Lower the lock-bar fully onto floor and test the lock engages. Note: Sometimes with uneven floors you may need to enlarge or re-drill the locking bar holes inside the guide channels.
Once the lock-bar has engaged, lightly tension the blind using the crank handle then install the top blind stops inside the left and right guide channels using the supplied nylon blocks rivet through the channel into the nylon block in the pre-drilled holes just below the headstock. (Be careful not to damage blind material)
Release tension from the blind by unrolling using the crank handle; unlock lower lock-bar, then wind the blind to the top - the lock-bar should stop against the nylon top stops, Note:never over-tension your blind using the crank handle- just lightly tension.
Once this has been completed, your blind is ready for use.
OUTDOOR ROLLER BLINDS WITH SIDE CHANNELSInstallation Instructions