BAHÍA DE BIZKAIA GAS LNG TERMINAL

GASTECH 2005

Guillermo González Avila / Juan Manuel Pérez Garmendia

14/03/05

Page 2: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

2

LIST OF CONTENTS

• INTRODUCTION

• PROJECT MILESTONES

• LNG REGASIFICATION PLANT

• CONCLUSION

Page 3: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

3

INTRODUCTION

The Project involved the construction, commissioning, and Commercial Operations of two companies:

BAHIA DE BIZKAIA GAS (BBG):LNG Regasification Plant and associated Maritime

Terminal, 7 bcm

BAHIA DE BIZKAIA ELECTRICIDAD (BBE):800 MWh Combined Cycle Power Plant

Page 4: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

4

Both companies are owned by an equal partnership of four leading companies in the energy sector:

INTRODUCTION

Page 5: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

PROJECT MILESTONES

•BBE-BBG were created in April 1998

•Commencement of construction:

BBE: March 2001

BBG: December 2000

•Start-upBBE: November 2002 (first tests)

BBG: August 2003 (first ship)

•Commencement of Commercial OperationsBBE: November 2003BBG: December 2003

•Total investment: 656BBE: 338 MILLION€BBG: 318 MILLION€

Page 6: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

OVERVIEW OF FACILITIES

Page 7: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

NATURAL GAS GATEWAYS

Page 8: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

BAHIA DE BIZKAIA LOCATION

Page 9: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

BAHIA DE BIZKAIA SITE LOCATION

Located in the town of Zierbena (Bizkaia)

230.000 m2 at the Port of Bilbao: 150.000 m2 for BBG facilities and 80.000 m2 for BBE facilities

Page 10: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

BAHIA DE BIZKAIA SITE

Page 11: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

11

BBG REGASIFICATION PLANT

BRIEF TECHNICAL DESCRIPTION

Page 12: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

BBG LAYOUT

Torch

Sea Waterfrom BBE

Sea WaterVaporisers 5 bar

BBE 45 bar

GdE 72 bar

Sea Watercollection basin

Submerged CombustionVaporisers

PA 1021 x 133.000

LiquifierFA 101

Secondary Pumps

PA 101 A/B2 x 2.00.000

Truck Loading

Px101 A/B/C

Px102

FB 101

PrimaryPumps

PrimaryPumps

FB 102

B.O. Compressor

GB 103.A

Page 13: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

BBG REGASIFICATION PLANT

Regasification Plant capacity: •Send-out rate: 800.000 Nm3/h NG•Annual send-out capacity: 7 bcm

Dispatch:•133.000 Nnm3/h to the Power Plant (BBE) at 36 barg•the remainder to the gas network at 72 barg

Storage capacity:•300.000 m3 LNG (2 tanks with a capacity of 150.000 m3 each)

Future expansion of the plant:•Send-out rate up to 1.200.000. Nm3/h NG•A third tank of 150.000 m3 LNG

Page 14: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

14

BBG REGASIFICATION PLANT

• Main components:– Maritime Terminal

• Jetty

• LNG unloading system

– Storage system• Tanks

– Process Unit• LNG send-out system

• Vaporizers

• Boil-off recovery system

• Gas Metering Station

• Road tankers loading (trucks)

• Auxiliary Systems

Page 15: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

15

BBG REGASIFICATION PLANT

• Maritime Terminal (1):

– Able to provide berthing for LNG carriers ranging from 70.000 m3 to 145.000 m3

– Main mooring components

• Mooring dolphins (concrete caissons): 2 for berthing, 6 for mooring, plus one for spillage recovery

• Main operations platform

• Gangways

• Defenses

• Fast release hooks

• Mooring rope tightness monitoring system

• Carrier approach monitoring system

Page 16: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

16

BBG TERMINAL AERIAL VIEW

Page 17: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

17

BBG TERMINAL AERIAL VIEW

Page 18: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

18

BBG REGASIFICATION PLANT

• Maritime Terminal (2):

– LNG unloading system:• Articulated unloading arms:

– 3 for LNG, 1 for boil-off

– Unloading capacity:12.000m3/h (LNG)

• Connection to Plant:

– 1 line 42” wide, 1 line 6” wide (LNG)

– 1 line 30” wide (Boil-off)

• Spillage gathering pit

• Emergency Shutdown System (ESD)

• Fire-fighting system

• Unloading operations control room

Page 19: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

19

BBG UNLOADING ARMS

Page 20: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

20

BBG REGASIFICATION PLANT

• STORAGE SYSTEM:– Two 150.000 m3 full-containment storage tanks– Operating pressure: 200 - 250 mbar g– External dimensions:77m diameter; 52m high

• LNG SEND-OUT SYSTEM:– LOW PRESSSURE (primary) PUMPS:

• Pump the LNG from the tanks to the high pressure pumps• 2X265 m3/h + 2X485 m3/h, per tank

– HIGH PRESSURE (secondary) PUMPS:• Discharge the LNG at 80 bar to the vaporizers• 4 x 256 m3/h + 3 x 385 m3/h

– RECONDENSER.• Compressed boil-off is condensed into the LNG stream

Page 21: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

21

BBG-STORAGE TANKS

Page 22: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

22

BBG REGASIFICATION PLANT

VAPORIZERS:

LNG is gasified in the vaporizers

• Seawater vaporizers: 4x200.000 Nm3/h

– Using warm sea water from the condenser of the Power plant

– 25.000 m3/h sea water

• Submerged combustion vaporizer. 1x200.000 Nm3/h

– Backup unit in the event the seawater vaporizers are out of service

BOIL-OFF RECOVERY SISTEM:– Boil-off gas produces in the tanks is sent to the compressor and then

to the recondenser

– 2 compressors

Page 23: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

23

BBG SEAWATER VAPORIZERS

Page 24: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

24

BBG SUBMERGED COMBUSTION VAPORIZER

Page 25: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

25

BBG BOIL-OFF COMPRESSORS

Page 26: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

26

BBG ROAD TANKER LOADING BAY

Page 27: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

27

SHIPPING PROCEDURES

LNG carriers must undergo a process aimed at ensuring theirsuitability and compatibility with BBG Terminal prior to berthing in it.Such process comprises the following steps:

•Information Exchange: The Terminal sends out to the LNG carrierOwner company a document containing a “General Description of the Terminal”, while the Owner or Shipping Agent must in turn provide the Terminal with the proposed general arrangement and vessel questionnaire form.

•Compatibility Study: BBG compatibility questionnaire (based onrecommendations from both SIGTTO and OCIMF) sets the operationaland safety criteria for operating at the Terminal.

•Issuance of the document “Procedures for the mooring of LNG carriers at the Port of Bilbao”, which describes the required maneouvres to enter the port, berth, unload and exit the port area in safe conditions.

Page 28: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

28

SHIPPING PROCEDURES

• Attainment of Vetting Certificate (issued by Repsol Vetting so far)

• Issuance to LNG carrier of “BBG Operations Procedures”, which include the

“Ship/Shore Safety Checklist”, a “Pre-meeting Agenda”, emergency

procedures, details of the ESD system and other relevant details for berthing,

unloading and unberthing operations.

Upon completion and compliance with the aforementioned step, clearance to

berth is granted, and unloading operations are allowed to commence.

Page 29: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

29

TERMINAL SAFETY FEATURES

BBG Terminal has been fitted with state-of-the-art safety features whichinclude, amongst others, the following:

• Distance and speed control panels for approaching and berthing

operations

• Alarm and blockade against excessive displacement of carrier during

unloading operations (disconnection of unloading arms and automatic

closure of connecting valves between the Terminal and the carrier)

• Fast-release hooks for emergency unberthing

• ESD (Emergency Shutdown System)

• Spill tray fitted to hold as far as 131m3

• Evacuation to Flare of all relief valves in the unloading area

Page 30: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

30

CONCLUSION

A total number of 48 LNG carriers have moored at BBG Terminal from commissioning (August 8th, 2003) up to December 31st, 2004.

ORIGIN OF LNG: NIGERIA 70%ARGELIA 20% MISC. 10%

2003 2004 YTD 31.12.04

NUMBER OF CARRIERS UNLOADED 11 37 48

UNLOADED LNG (106 m3) 1,3 4,39 5,69

PRODUCTION (GWH) 7.300 29.816 37.116

Page 31: BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH … Conferences/2005/SDS...1 BAHÍA DE BIZKAIA GAS LNG TERMINAL GASTECH 2005 Guillermo González Avila / Juan Manuel Pérez Garmendia 14/03/05

31

CONCLUSION

It is worth mentioning that no safety incidents have taken place atall in the berthing and unloading operations of the 48 LNG carriers mentioned above.

The only circumstance worth mentioning was a longer stay thanexpected at the Terminal on account of adverse weatherconditions in the case of the very last carrier of the year 2004.

Credit for such level of accomplishment in safety standards can be granted both to the specific characteristics of the Port ofBilbao, as well as to the strict safety requirements set by BBG Operations Procedures, which are rigorously enforced withoutexception.