+ All Categories

Download - BV 4th AMR

Transcript
Page 1: BV 4th AMR

© - Copyright 2015 Bureau Veritas – All rights reserved

Move Forward with Confidence

Wilfred Phay

Director, Rail

25 July 2016

Page 2: BV 4th AMR

2 © - Copyright 2015 Bureau Veritas – All rights reserved

Bureau Veritas – 4th Annual Malaysia Rail 2016

Move Forward with Confidence

Page 3: BV 4th AMR

3 © - Copyright 2015 Bureau Veritas – All rights reserved

An extensive geographic footprint

Africa, Middle East, Eastern Europe

9,000 260

Asia, Pacific

23,000 410

Europe

14,400 400

Americas

20,100 330

66,500 employees

1,400 offices and laboratories in 140 countries

Page 4: BV 4th AMR

4 © - Copyright 2015 Bureau Veritas – All rights reserved

Bureau Veritas accreditations

Page 5: BV 4th AMR

5 © - Copyright 2015 Bureau Veritas – All rights reserved

A strong expertise built on robust references - samples

Page 6: BV 4th AMR

6 © - Copyright 2015 Bureau Veritas – All rights reserved

A strong expertise built on robust references - samples

Page 7: BV 4th AMR

7 © - Copyright 2015 Bureau Veritas – All rights reserved

Clients - samples

Page 8: BV 4th AMR

8 © - Copyright 2015 Bureau Veritas – All rights reserved

Clients - samples

Page 9: BV 4th AMR

9 © - Copyright 2015 Bureau Veritas – All rights reserved

Clients - samples

Page 10: BV 4th AMR

10 © - Copyright 2015 Bureau Veritas – All rights reserved

Our customers .. not exhaustive

Page 11: BV 4th AMR

11 © - Copyright 2015 Bureau Veritas – All rights reserved

Vision - examples • “To become the commuters’ choice in public transportation”

• “Becoming the most reliable world class partner for railway systems and

turnkey light rail E&M systems”

• “To provide safe, efficient, affordable, customer-focused and environmentally

sustainable integrated transportation solutions”

Mission - examples • “To provide a safe, reliable, efficient and comfortable journey for our

commuters”

• “To contribute in improving people productivity & mobility through delivering

reliable & safe railway systems”

• “To continuously innovate and stay up to date in terms of technological

advancement and to achieve the best possible standards of safety in train

operations at all times.”

Move Forward with Confidence

Page 12: BV 4th AMR

12 © - Copyright 2015 Bureau Veritas – All rights reserved

THE RISK

…………………………………………………………………………..

A risk of not getting it right!

Move Forward with Confidence

OSHA ?

Page 13: BV 4th AMR

13 © - Copyright 2015 Bureau Veritas – All rights reserved

THE RISK

…………………………………………………………………………..

A risk of not getting it right!

Move Forward with Confidence

…. deeply regrets that the failure to apply

a vital safety procedure led to the tragic

accident," the press release said.

…. has taken immediate steps to ensure

stricter enforcement of procedures,

strengthened system ownership and

control across levels and work teams, and

tightened supervision within teams to

prevent a recurrence, it added.

Page 14: BV 4th AMR

14 © - Copyright 2015 Bureau Veritas – All rights reserved

THE RISK

…………………………………………………………………………..

A risk of not getting it right!

Move Forward with Confidence

…. rail disruptions caused by power and

trackside faults more than doubled in the

last five years…..

But surely the system should not be

designed to allow a singular flaw to

propagate into multi-line failure. A design

that allows that is simply a bad design,

period.

RAM;

hazard

analysis?

Page 15: BV 4th AMR

15 © - Copyright 2015 Bureau Veritas – All rights reserved

THE RISK

…………………………………………………………………………..

A risk of not getting it right!

Move Forward with Confidence

“Between the start of the year and Sept 13,

114 trains have derailed, or 11 every

month on average, compared with 89

derailments in the whole of last year.”

“…second derailment on the same route

in a month…due to the deteriorated

condition of a bend in the tracks…”

Asset management;

hazard analysis?

Page 16: BV 4th AMR

16 © - Copyright 2015 Bureau Veritas – All rights reserved

Move Forward with Confidence

Cardinal Principle

Conform to regulation

1

Reduce risks

2

Increase performance

3

Requirements

verification and

traceability matrix; …

validation plan; development test;

qualification test; software

integration test; operational -

readiness test; carousel tests; trial

runs; …

Independent safety

assessment; Safety

Case; …

Process audits; RCM; Asset

Management; certifications; ….

System assurance

plan; Risk

management plan;

EMC; HF; …

Page 17: BV 4th AMR

17 © - Copyright 2015 Bureau Veritas – All rights reserved

Move Forward with Confidence

Verification provides

assurance that "you

designed it right, and

you built it right"

Validation provides

assurance that "you

built the right thing".

Verification & Validation process

Page 18: BV 4th AMR

18 © - Copyright 2015 Bureau Veritas – All rights reserved

Move Forward with Confidence

Page 19: BV 4th AMR

19 © - Copyright 2015 Bureau Veritas – All rights reserved

Move Forward with Confidence

Procurement services (vendor

audits, shop inspection, expediting)

Supplier Technical Assessment

Product Conformity Assessment (CE

Marking, ASME, IBR, etc.)

Manufacturer design review

International Railway Industry

Standard (IRIS) Certification

EN 15085 welding certification

Shop inspection (constr. material)

Quality Assurance / Quality Control

Site inspection / works monitoring

Site safety supervision

Training services

Asset Integrity Management

Entities in Charge of Maintenance (ECM)

certification

HSQE management system

Non Destructive Testing (NDT) ; ShafTest

Safety audits – hazard log; process;

contractor works, etc.

OSHA of rules and procedures

Independent incident investigation

Reliability-Centred Maintenance

Trainings/workshops

Independent Checking Engineer (ICE)

Contract Checking Engineer (CCE)

Design review against applicable

standards

Fire safety studies (tunnel & buildings)

PD & DSC Risk studies

Independent Safety Assessment (ISA); Safety Case

Project/Construction management

Technical Specification for Interoperability (TSI) certification; TPED / RID certification

National regulation assessment

Safety Integrity Level (SIL) certification

Reliability, Availability, Maintainability, Safety (RAMS) studies

Project Delivery & DSC Risk studies

ROLLING STOCK / SYSTEMS

INFRASTRUCTURE

Design Operation Procurement

Construction

Page 20: BV 4th AMR

20 © - Copyright 2015 Bureau Veritas – All rights reserved

Move Forward with Confidence

Are You Moving Forward with Confidence ?

Page 21: BV 4th AMR

21 © - Copyright 2015 Bureau Veritas – All rights reserved

Move Forward with Confidence

Page 22: BV 4th AMR

22 © - Copyright 2015 Bureau Veritas – All rights reserved

Move Forward with Confidence

Page 23: BV 4th AMR

23 © - Copyright 2015 Bureau Veritas – All rights reserved

Move Forward with Confidence

Page 24: BV 4th AMR

24 © - Copyright 2015 Bureau Veritas – All rights reserved

Thank You


Top Related