PHOTOGRAPHY REPORTASSET INTEGRITY MANAGEMENT DEPARTMENT
REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE:
Pre-Cleaning Inspection After-Cleaning Inspection Others:
AIM-6 Form Rev. Oct 2011
Item: 10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906
x Piping External VI
Piping External VI NIL 13/04/2012
Findings:
Item:
Findings:
Overview of overhead piping from top C-1901
10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906
Surface rust on welding joints and reinforcement pad due to poor painting surface preparation
PHOTOGRAPHY REPORTASSET INTEGRITY MANAGEMENT DEPARTMENT
REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE:
Pre-Cleaning Inspection After-Cleaning Inspection Others:
AIM-6 Form Rev. Oct 2011
Item: 10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906
x Piping External VI
PS-19001-15202R-PP NIL 13/04/2012
BA
Findings:
Item:
Findings:
Painting damage and rusted on elbow pipe and welding joints
10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906
Painting damage /scratches and rusted on elbow and straight pipe
B
PHOTOGRAPHY REPORTASSET INTEGRITY MANAGEMENT DEPARTMENT
REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE:
Pre-Cleaning Inspection After-Cleaning Inspection Others:
AIM-6 Form Rev. Oct 2011
Item: 10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906
x Piping External VI
PS-19001-15202R-PP NIL 13/04/2012
Findings:
Item:
Findings:
Painting damage and rusted on welding and HAZ area of pipe support to run pipe
10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906
Painting damage and rusted on elbow pipe and welding joints
PHOTOGRAPHY REPORTASSET INTEGRITY MANAGEMENT DEPARTMENT
REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE:
Pre-Cleaning Inspection After-Cleaning Inspection Others:
AIM-6 Form Rev. Oct 2011
Item: 10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906
x Piping External VI
PS-19001-15202R-PP NIL 13/04/2012
6” pipe
8” x 6” reducerA
B
Findings:
Item:
Findings:
Painting damage and rusted on welding and HAZ area of pipe support to run pipe
10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906
Closer view of painting failure and rusted on welding joints and on pipe and fitting body.
A
PHOTOGRAPHY REPORTASSET INTEGRITY MANAGEMENT DEPARTMENT
REPORT NO: EQPT. TAG: PMT/PMD/PMA: DATE:
Pre-Cleaning Inspection After-Cleaning Inspection Others:
AIM-6 Form Rev. Oct 2011
Item:
X
PS-19001-15202R-PP NIL 13/04/2012
Piping External VI
10” PS19001-15202R-PP OVERHEAD PIPING FROM C-1901 TO AFC E-1906
B
REVIEWED APPROVED
(NAME, STAMP, SIGNATURE) (NAME, STAMP, SIGNATURE)
I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT REPORT
OF MY INSPECTION,
(NAME, STAMP, SIGNATURE):
DATE :
PREPARED BY:
Findings:
13th April 2012
Tengku Jasbi
Closer view of painting failure and rusted on welding joints and on pipe and fitting body.