Financing at the Local Financing at the Local LevelLevel
Choose Clean Water ConferenceJoanne Throwe
Environmental Finance Center June 4, 2013
Understanding Local Understanding Local Stormwater FinancingStormwater Financing
Making the right decisionshould be:
o Fairo Transparent o Adequate revenueo Equitable
Is there:oEnough data?oMeasurable goals?oA tracking system?oWays to create efficiencies?
06/17/13 2
Managing AssetsManaging AssetsWhen to Replace Lifecycle Costs
• Replace asset before repair costs reach catastrophic failure
• Replace too early and money wasted
• Replace too late and costs are excessive
06/17/13 3
Easy Ways to Improve Program on Easy Ways to Improve Program on a Limited Budgeta Limited Budget
• Get departments to communicate better• Centralize stormwater responsibility• Let others do some of the work for you without guilt• Work together to reduce costs, create efficiencies
4
Not Everything Has to Cost A LotNot Everything Has to Cost A Lot
06/17/13 5
Getting at True Costs is Getting at True Costs is Important Important
• True Costs for what is needed in 1 year is:
$1,638,945
• Current Operating Expenditures
$376,600
• Current Capital Expenditures
$186,250
06/17/13 6
Current* (2013)
Year 1 (2014)
Year 2 (2015)
Year 3 (2016)
Year 4 (2017)
Year 5 (2018)
$186,250 $736,250 $302,250 $352,250 $579,750 $202,250
$186,250 $766,250 $317,250 $352,250 $579,750 $202,250
$562,850 $1,638,945 $1,211,762 $1,269,125 $1,519,547 $1,165,542
Sub-Total
Capital Expen
Total Expend
Document, Track, and Record! Document, Track, and Record!
06/17/13 7
Have a Staffing PlanHave a Staffing Plan
06/17/13 8
Labor DashboardsLabor Dashboards• Total Annual Labor Cost
• Total Annual FTE
• FTE by position over time
• Cost by Position over time
• Post Construction Monitoring FTE Over Time
06/17/13 9
Budget DashboardBudget DashboardLocal Permit Revenue / Permit Fee Revenue Less Labor Costs /
Reserve for Future Monitoring
06/17/13 10
Output Flows into BudgetOutput Flows into Budget
06/17/13 11
Results of ProcessResults of Process
06/17/13 12
• Provided a basis for discussion among staff & officials
• Enabled dialogue about staff requirements in “no hire” jurisdictions
• Shed light on unforeseen costs and future staff needs
• Able to plan for reserving fee revenues
• Can serve as a tool that can educate community
Don’t be Afraid to Take RisksDon’t be Afraid to Take Risks
• Berlin, MD• Salisbury, MD• Bowie, MD• Lancaster, PA• Scranton, PA• Hampton, VA• Shenandoah Valley, VA
06/17/13 13
Public Engagement is EssentialPublic Engagement is Essential
06/17/13 14
Timing is EverythingTiming is Everything
06/17/13 15
Thank youThank you
06/17/13Footer Text 16