STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1
CE/C/I-JP Dy. CE/C/I-JP
1. Dy. CE /C/ GC/NWR/ 2014/T-48R
Construction of toe wall, Pitching on high bank, Road works, construction of Over Head water Tank at Jhunjhunu&Chirawa and other misc. works from Jhunjhunu (incl.) to Loharu (incl.) required for successful commissioning of the Jhunjhunu-Loharu section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project.
Open
tender
17.01.15 Single
Packet
system
17.02.15 05 - - Yes 38/ NWR/Dy.
CE/C-GC/JP
/2015-16/JP-
SIKR-CUR &
SIKR-LHU dt.
10.06.15.
M/s Jai Mata Di
Energy Systams,
V. P. O. - Narodara,
Teh. - Laxmangarh,
Distt.- Sikar (Raj)
323.78 10.09.15
Ext.
30.9.16
18.4.15 30.9.16 Final
variation
sanctioned
& bill will
be passed
on 1st
week of
Nov.
2. Dy. CE /C/ GC/ NWR/ 2014/T-51R
Construction of 44 Nos. of Type –II quarters (8 Nos. at Nua Railway Station, 18 Nos. at Jhunjhunu Railway Station & 18 Nos. at Chirawa Railway Station) and other related works in connection with Gauge conversion of Sikar- Loharu section
Open
tender
23.3.15 Single
Packet
system
23.4.15 06 - - - 41/ NWR/Dy.
CE/C-GC/JP
/2014-15/JP-
SIKR-CUR &
SIKR-LHU dt.
23.10.15.
M/s V. K.
Construction Co.,
2 D 37, Jawahar
Nagar,
Shri Ganganagar -
335001
926.07 30.04.17
Ext.
30.10.17
05.09.2015
3. NWR/S&C/T-60
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications on cess along the track in Sikar - Churu section and at temporary ballast depot at Laxmangarh Sikar station & Rashidpur Khori Halt station on Sikar - Churu section and Loading in Railway Hoppers in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open
tender
29.6.15 Two bid
system
19.8.15 04 1.
M/s YSCC
NKA (JV)
299/8 Alwar
Road Bya
pass,
Sohna,
Disstt.
Gurgoa.
01 (One)
M/s YSCC
NKA (JV)
299/8 Alwar
Road Bya
pass,
Sohna,
Disstt.
Gurgoa
Yes NWR/S&C/CA
/ 146, dt.
15.12.2015.
M/S J.K.Construction
Co., New market,
Naya bazar Nokha,
Bikaner Raj
1456.15 18.4.2017
Ext.
31.8.17
28.10.2015 Final
variation
with
finance.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2
4. NWR/SC/JP-RGS-CHURU/CIVIL-101140502
Dismantling of existing MG track, Laying and linking of Broad gauge main line, looplines / Sidings including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Zone-I (Km. 0.00 to Km. 48.70), including Sikar, Laxmangarh Sikar & Fatehpur shekhawati yards in Sikar -Churu section in connection with Jaipur-Sikar- Loharu & Sikar - Churu Gauge conversion project.
Open
tender
28.8.15 Single
Packet
system
30.9.15 05 - - - 42/ NWR/Dy.
CE/C-GC/JP
/2014-15/JP-
SIKR-CUR &
SIKR-LHU dt.
26.12.15.
M/s ISC Project Pvt.
Ltd.,
“S-2,” The Meropole,
Adjacent to INOX,
Bund Garden Road,
Pune – 411 001
948.07 08.5.2017
Ext.
31.10.17
12.11.15
5. NWR/SC/JP-RGS-CHURU/CIVIL-101140505
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines / Sidings including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials
and other ancillary works in Zone-II (Km. 48.70 to Km. 90.46), including Ramgarh shekhawati, Bissau & Churu yards in Sikar -Churu section in connection with Jaipur-Sikar- Loharu & Sikar - Churu Gauge conversion project.
Open
tender
15.9.15 Single
Packet
system
19.10.15 02 - - - 45/ NWR/Dy.
CE/C-GC/JP
/2015-16/JP-
SIKR-CUR &
SIKR-LHU dt.
22.02.16.
M/s
BhanwarLalBijarnia,
Village -Rajpura,
Post- Prewari, Teh-
Nawa, Distt.- Nagaur
808.49 11.5.2017
31.12.17
20.11.15
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3
6. NWR/SC/JP-RGS-Churu/Civil-101141101
Earth work in filling and cutting in bank for making BG formation, supplying and laying Blanketing material on new bank/diversion, Construction of station building, Platforms, trolley refuses, ballast wall, construction of Over Head water Tank at Fatehpur shekhawati & Lachhmangarh sikar stations, Fabrication & erection of Platform shelters /Small shelters and other misc. works from Sikar (incl.) to Churu (incl.) in connection with SIKR-CUR Gauge Conversion.
Open
tender
10.8.15 Two bid
system
15.9.15 06 Yes NWR/S&C/CA
/ 151, dt.
15.02.2016.
M/s Prem Fabricators
Plot No. 426, Near
Jyoti Power,
B/H Steel Town,
Moriya
Changodar,Ahmedaba
d.
2472.03 10.06.17
Ext.
15.12.17
11.12.15
7. DY. CE/C/GC/NWR/2015/T-55
Flash Butt Welding of 52Kg. / 60Kg. New/SH rails at depot / site using Mobile Flash Butt Welding Plant in Jaipur –Sikar - Churu section in connection with Jaipur – Sikar –
Loharu & Sikar – Churu GC project.
Open
tender
29.6.15 Single
Packet
system
20.08.15 03 - - - 46/ NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR &
SIKR-LHU dt.
22.09.2016.
M/s Navketan Pvt.
Ltd., 1 A. J. C. Bose
Road, Kolkata – 700
020.
814.56 22.12.17 25.5.2016
8. NWR/SC/JP-SIKR-CHURU/Civil/10130001003
Construction of Road under Bridge / Limited Height Sub-Way in lieu of 24 Nos. level crossing in Sikar-DundlodMukandgarh Section & 16 Nos. level crossing and 4 Nos. Balancing culverts in Sikar – Laxmangarh Sikar Section.
Open
tender
21.11.15 Two bid
system
23.12.15 06 01 M/s
GurukrupaK
alyan JV
2A,2nd
Floor,Navna
th Soc-2,
B/H,
Shradhadee
p Soc, Nr.
Sharda
School,
Singanpor-
Causway
Road,
Surat-
395004.
Yes NWR/S&C/
CA/153, Dt.
15.6.2016
M/s AE-MHK (JV)
First Floor, Divine
India Building, Near
R.T.O Office, By Pass
Road, Post-Savgadh
(Panpur),
Himmatnagar-383001
Dist. S.K. (Gujarat).
6363.98 22.3.2018 1.5.2016
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
4
9. NWR/SC/JP-SIKR-CHURU/Civil/10130001004
Construction of Road under Bridge / Limited Height Sub-Way in lieu of 33 Nos. level crossing and 4 Nos. of Bridges along with 7 Nos Balancing culverts in Laxmangarh Sikar - Churu Section.
Open
tender
21.11.15 Two bid
system
23.12.15 03 - - Yes NWR/S&C/
CA/154, Dt.
23.6.2016
M/s Supreme - Modi
(JV) 9, Leela
Mansion,
Raj Bhawan Road,
Civil Line - Jaipur
302006
5876.06 22.3.2018 24.3.16
10. NWR/SC/JP-RGS-Churu/Civil-101141806
Construction of 60 nos staff quarters in Sikar-Churu section, Construction of running room at CUR, construction of PF & PF shelters & extension of FOB, RCC OH tank and other miscellaneous Civil work at Sikar, Civil works related to L-xings and related Electric works in Sikar-Churu section and other ancillary works in connection with SIKR-CUR Gauge Conversion project.
Open
tender
26.2.16 Two bid
system
30.3.16 04 01 M/s
Rajendra
Singh
Bhamboo
Infra Pvt.
Ltd. 108,
First Floor,
Neel kanth,
Neelkanth
Building ,
Gandhipath,
Vaishali
Nagar,
Jaipur
yes NWR/S&C/
CA/159, Dt.
28.9.2016
M/s Gurukrupa
Enterprises,
2A,2nd Floor,Navnath
Soc-2
B/H,
ShradhadeepSoc,
Nr. Sharda School,
Singanpor-Causway
Road, Surat
1948.67 15.9.2017 18.7.16
11. NWR/SC/JP-RGS-Churu/Civil-101140507
Providing in situ Glued joints of G-3 (L) type as per RDSO drawings for 60 kg & 52 kg rails with all fittings etc complete in Jaipur - Sikar - Churu section in connection with Jaipur - Sikar - Loharu & Sikar - Churu Gauge Conversion project.
Open
tender
18.5.16 Single
Packet
system
22.06.16 05 01 M/s
Diamond
Steel
Industries,
Plot No.
879,
Sector-16,
Faridabad
Yes 48/ NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR &
SIKR-LHU dt.
11.01.2017.
M/s Creative
Engineers,
F/189, Road No. 5,
Indraprastha
Industrial Area,
Kota
160.21 Lacks 14.3.2019 18.10.16
12. NWR/SC/JP-RGS-Churu/Civil-101140508
Welding of Rail Joints by SKV process in Jaipur- Sikar & Sikar-Churu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open
tender
10.6.16 Single
Packet
system
14.07.16 02 - - Yes 49/ NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR &
SIKR-LHU dt.
11.01.2017.
M/s OberoiThermit
Pvt., Ltd. Plot No.3,
Sector 8B, IIE,
Sidcul, Haridwar -
249403
349.73 Lacks 18.10.18 26.12.16
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
5
DY. CE/C/II-JP
13. NWR/SC/JP-RGS-Churu/ Civil-101141612
Balance / left over works of Construction of 60 nos staff quarters in Jaipur-Sikar-Churu section, Construction of running room at Churu, construction of PF & PF shelters & extension of FOB, RCC OH tank and other miscellaneous Civil work at Sikar, Civil works related to L-xings works in Sikar-Churu section and other ancillary works in connection with Jaipur-SIKR-CUR Gauge Conversion project.
Open
tender
25.7.17 Two
Packet
system
28.817 02 01 M/s AIEN
MEREN
ENTERPRIS
ES-
DIMAPUR,
N. S.T.
Colony,
Circular
Road,
Dimapur
Yes Under
preparation
with HQ
M/S V. K.
CONSTRUCTION
COMPANY-
SRIGANGANAGAR, 2-
D-37, Jawahar Nagar,
Sriganganagar
2185.03 11.7.18 15.10.17
1 NWR/
S&C/FL
Shed/T/
1
Fabrication & erection of
structural steel covering
shed at Phulera.
Open
tender
5.9.2014 One bid
system
10.10.2014 2 2 - Yes NWR/S&C/FL
Shed/CA/01
dated
20.3.2015
M/s M.H. Khanusiya
Himmatnagar (Guj.)
7.17 Cr 17.12.14 1.1.2015 30.12.16 Work
completed.
2 NWR/
S&C/JP-
SIKR/T/
7
Supplying & stacking 65
mm gauge stone
ballast…. JP-SIKR
section.
Open
tender
2.9.2015 Two packet
system
14.10.2015 7 4 3 Yes Dy
CE/C/II/CA/N
WR/S&C/JP-
SIKR/T/7/01
Dated
17.3.2016
M/s MFL-Sidharth-
Parikshit Chandra
Das (JV) Gurgaon.
9.84 Cr. 1.12.15 1.1.2016 29.12.17 Work in
progress.
3 NWR/
S&C/JP-
SIKR/T/
10
Construction of major &
Minor Bridges in C/w GC
of JP-SIKR section.
Open
tender
-
Two packet
system
18.8.2015
13 7 6 Yes, NWR/S&C/CA
/152 dated
25.2.2016
M/s Sona Builders,
Unjha (Guj.)
37.14 Cr. 17.11.15 1.12.15 16.11.17 Work in
progress .
4 NWR/
S&C/JP-
SIKR/T/
11
Earth work in
embankment cutting etc.
and construction
/alteration of service
building JP-SIKR section.
Open
tender
Two packet
system
25.8.2015
14 7 7 Yes NWR/S&C/CA
/150 dated
29.1.2016-
M/s Jandu
Construction
Company, Hisar.
34.18 Cr. 17.11.15 25.11.15 16.11.17 Work in
progress .
5 NWR/
SC/JP-
RGS-
Churu/
Civil-
102141
001
Construction of LHS Sub
way (LHS)/RUB---LC (52
nos) between JP-SIKR
section.
Open
tender
Two packet
system
9.12.15 9 6 3 Yes NWR/S&C/CA
/151 dated
01.7.2016
M/s SGCCL-MMPL (JV)
Jaipur.
68.65
Cr.
23.3.16 1.4.16 22.3.18 Work in
progress .
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
6
Dy. CE/C/III-JP
Dy. CE/C/IV-JP
6 NWR/
SC/JP-
RGS-
Churu/
Civil-
102140
801
Dismantling of existing of
MG track, Laying and
Linking of BG main line---
---Jaipur to Sikar GC
work
Open
tender
Two packet
system
- 8 5 3 Yes NWR/S&C/CA
/161 dated
19.10.2016
M/s KIEL-BLB (JV),
Jaipur
26.21 Cr 8.8.2016 8.8.2016 15.12.17 Work in
progress .
7 NWR/
SC/JP
/Civil-
102160
601R
Construction of PF,FOB PF
shelter ----JP Yard
remodeling & JP-SIKR GC.
Open
tender
Two packet
system
-26.7.2016 6 5 4 Yes NWR/SC/JP
/Civil-
102160601R/
01 date
11.11.2016
M/s Sanjeev Brothers
Jaipur
18.48 Cr 30.9.16 30.9.16 6.6.2018 Work in
progress
1 NWR/S&
C/LHS/
RE-FL-
Madar/T/
1
Construction of road
under bridges / limited
height subways (35 Nos)
in Rewari–Phulera( RPC)
section
Open
tender
Two
packet
system
- Yes NWR/S&C/C
A/143 dated
08.7.2015
M/s S.B. Poonia Const.
Co. (JV), Hissar.
51.06 Crore. 28.4.17 5.5.2015 28.12.17 Work in
progress.
2 NWR/
S&C/LHS
/RE-FL-
Madar/T/
2
Construction of road
under bridges / limited
height subways (32 Nos)
in Rewari – Phulera(
RPC) section
Open
tender
Two
packet
system
- Yes NWR/S&C/C
A/144 dated
16.7.2015
M/s S.B. Poonia Const.
Co. (JV), Hissar.
43.74 Crore. 28.4.17 10.5.15 28.12.17 Work in
progress.
3 NWR/SC/
MD-FL-
RGS/Civil
-
1039980
1
Residual composite work
for Construction of 118
Nos Staff quarters
between RE-RGS-FL
section.
Open
tender
Two
packet
system
- Yes NWR/SC/MD
-FL-
RGS/Civil-
10399801/C
A/03 dated
21.11.2016
M/s Sammer Const.
Co. 15/65 West
Punjabi Bagh New
Delhi
11.41 Cr. 21.6.2017 28.6.16 21.6.17 Work in
progress
4 Construction of Club
House at Jagatpura
Jaipur
Open
tender
Two
packet
system
- Yes NWR/S&C/C
A/168 dated
8.5.2017
M/s P.K.Jain Jaipur 19.00 Cr. 16.2.18 1.3.17 16.2.18 Work in
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
7
CE/C/II-JP
Dy. CE/C/I-UDZ
1. Tender No.NWR/SC/JP/ Civil-102990301
RGS Detour in
connection with DFCCIL
work- Construction of
Viaduct (157x18.30m),
Major (5x18.30m &
3x18.30) and Minor
Bridges, earth work in
bank/cutting including
Blanketing material,
Track works for Broad
Gauge line, Supplying &
putting ballast in track,
Transportation of P.
Way materials and
other ancillary works in
Ringus- in connection
with RGS Detour.
Open
tender
6.3.2016 Two bid
system
12.4.2016 9 7 - Yes NWR/S&C/
CA/158
Dated
9.9.2016
M/s AT PLT MHK (JV)
First Floor, Divine
India Building, Nr.
RTO Office, By Pass
Road, Himatnagar-
383001, Dist- S.K.
(Gujrat)
108.92 Cr 23.6.18 20.7.16 23.6.18 Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
8
1 UDZ-
HMT/
GC/EW/T
/4
Construction of Minor
bridges & earthwork
form Km. 207/0 to
250/0 in connection
with UDZ-HMT section
GC Project .
Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/
CA/113 dtd.
21.10.11
M/s Rahee-Triveni
(J/V), Kolkatta
2286.41
Lakhs
07.02.13
30.11.13
31.07.14
31.03.15
31.12.15
30.06.16
30.12.16
31.07.17
31.10.17
23.08.11 Work in
Progress
2 UDZ-HMT/
GC/MB/T-
13-R-1
Substructures of major
bridges from Udaipur
to Dungarpur.
Open 13.11.14 Two bid
system
17.12.14 05 02 Yes NWR/S&C/
CA/ 142 dtd.
30.06.15
M/s Murali Krishna Const. Co, Hyderabad
6814.86
Lakhs
23.04.17
31.12.17
09.05.15 Work in
progress
3 UDZ-HMT/
GC/EW/T-
20
Construction of Minor
bridges & earthwork
from Km. 121/0
to160/0 in c/w UDZ-
HMT section GC
Project
Open 08.05.15 Two bid
system
12.06.15 03 02 01 Yes NWR/S&C/
CA/ 145 dtd.
23.11.2015
M/S M.G.
Contractors, Pvt., Ltd., Panchkula
6402.75
Lakhs
13.03.17
30.06.17
31.12.17
28.09.15 Work in
Progress
4 NWR/SC/
UDZ-HMT/
(GC)/Civil-
20414112
2
Extension of existing sick
line, and other ancillary
works at Udaipur
Open 13.09.15 Single 19.10.15 06 06 0 Yes Dy.
CE/C/UDZ/C
A/32 dated
10.03.16
M/s Prem
Fabricators,
Ahmedabad-382110
565.12
Lakhs
31.12.16
15.04.17
30.06.17
30.09.17
15.02.16 Work in
Progress
5 NWR/SC/ UDZ-HMT (GC)/Civil-204140627
Construction of station
buildings, S&T
structures, and
ancillary works in
connection with UDZ-
HMT GC project
Open 05.04.16 Two bid
system
11.05.16 01 01 0 Yes NWR/S&C/
CA/ 162 dtd.
24.10.16
M/s Jainsons
Construction Co. JV,
Jodhpur
5933.53
Lakhs
01.02.18 14.09.16 Work in
Progress
6 NWR/SC/
UDZ-HMT
(GC)/Civil-
20414042
6
Supply & stacking 50
mm stone track ballast
in UDZ-HMT section
Open 06.0216 Two bid
system
16.03.16 04 02 02 Yes Dy.
CE/C/UDZ/C
A/34 dated
20.10.17
M/s Choyash Infra
Solution Joint
Venture Pvt., Ltd.,
Dungarpur
1345.41
Lakhs
30.06.18 10.09.16 Work in
Progress
7 NWR/SC/ UDZ-HMT
(GC)/Civil-204141129
Transportation of PSC
sleepers from sleeper
factory to site in UDZ-
HMT section
Open 05.06.16 Single
packet
19.07.16 04 04 04 No Dy.
CE/C/UDZ/C
A/35 dated
24.12.2016
M/s J.K Construction Co., New Market
Nokha
267.84
Lakhs
24.04.17
25.12.17
19.04.17 Work in
Progress
8 NWR/SC/ UDZ-HMT (GC)/Civil-204140128
Balance work of
construction, minor
bridges and earth work
in UDZ-HMT section.
Open 30.05.16 Two bid
system
05.07.16 02 02 0 Yes NWR/S&C/
CA/ 163 dtd.
08.12.1016
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
4526.41
Lakhs
30.08.18 15.09.16 Work in
Progress
9 NWR/SC/ UDZ-HMT (GC)/Civil-204140124
Construction of minor
bridges and earth work
in cutting and filling
between Umra and
Open 02.06.16 Two bid
system
12.07.16 05 02 03 Yes NWR/S&C/
CA/ 164 dtd.
08.12.2016
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
6980.98
Lakhs
11.09.18 01.10.16 Work in
Progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
9
Zawar stations in
connection with UDZ-
HMT GC Project
10 NWR/SC/ Construction/Civil-20430001030
Construction of 49 Nos.
Road Under Bridges
and 8 Nos. Road Over
Bridges in UDZ-HMT
section
Open 14.09.16 Two bid
system
18.10.16 04 03 01 Yes NWR/S&C/
CA/ 166 dtd.
14.03.2017
M/s Rachana - MI
(JV), Ahmedabad-
(Gujarat).
6623.63
Lakhs
22.12.18 01.01.17 Work in
progress
11 NWR/SC/ UDZ-HMT (GC)/Civil-20414033
4
Constriction of Super
structure of 32 Nos
Major bridge in UDZ-
HMT section
Open 04.12.16 Two bid
system
11.01.17 04 04 0 Yes NWR/S&C/
CA/
1697dtd.
09.04.17
M/s Rachana - MI
(JV), Ahmedabad-
(Gujarat).
5674.62
Lakhs
26.02.19 08.03.17 Work in
progress
12 NWR/SC/ UDZ-HMT (GC)/Civil-204140533
Providing in situ Glued
joints of G-3 (L) type
in UDZ-HMT section
Open 20.10.16 Single
Packet
07.12.16 05 05 0 Yes Dy. CE/C/
UDZ/CA/41
dated
16.05.2017
M/s. Tirupati Metal
Fabricators,
Faridabad
148.97
Lakhs
15.02.19 Work yet to
start
13 TNWR/SC/ UDZ-HMT (GC)/Civil-204140535
Supply of stone Ballast
in UDZ-HMT section
Open 21.12.20 Single
Packet
25.01.17 06 06 0 Yes Dy. CE/C/
UDZ/CA/26
dated
26.05.2017
M/s. B. B.
Construction,
Khurja-Distt.
Bulandshahr
801.13
Lakhs
02.09.18 24.03.17 Work in
progress
14 T. NWR/SC/UDZ-HMT(GC)/Civil-204141137
Carrying out
Geotechnical
investigation in UDZ-
HMT section
Open 29.12.16 Single
Packet
08.02.17 03 03 0 Yes NWR/S&C/
CA/ 169 dtd.
112.05.17
M/s JP Surveys &
Consultants,Chennai-
40
41.05
Lakhs
13.08.17 --- Work in
progress
15 T. NWR/SC/UDZ-HMT(GC)/Civil-204140538
Flash butt welding of
Rails in UDZ-HMT
section
Open 31.12.16 Single
Packet
08.03.17 02 02 0 Yes Dy. CE/C/
UDZ/CA/49
dated
28.10.17
M/s ITC, Kanpur 648.34
Lakhs
30.11.18 --- Work in
progress
16 NWR/SC/ UDZ-HMT (GC)/Civil-205140539
Laying and linking of
track in UDZ-HMT
section.
Open 31.12.16 Single
Packet
10.02.17 02 02 0 Yes Dy. CE/C/
UDZ/CA/40
dated
17.04.17
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
861.39
Lakhs
02.03.18 28.03.17 Work in
progress
17 NWR/SC/ UDZ-HMT (GC)/Civil-204140839
Laying and linking of
track in UDZ-HMT
section. from Km 160
to Km 225 In UDZ-HMT
section
Open 29.12.16 Two
packet
02.02.17 04 04 0 Yes - M/s BLB--SNCC JV, ,
Jodhpur (Raj)-
342001
1128.55
Lakhs
02.04.19 16.05.17 Work in
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
10
Dy. CE/C/II-UDZ
1. ender No. NWR/SC/AII-COR-UDZ/Civil-204141902
Tender No. NWR/SC/AII-COR-UDZ/Civil-204141902 – Earth work in bank/cutting including blanketing material, construction strengthening, rebuilding, extension of Major bridges, Minor bridges ……..and other ancillary works, in Mavli (incl)- Barisadri (incl) section in connection with Mavli Junction to Barisadri to Barisadri GC Project.
Open 19.02.16 Two bid
20.04.16 13 Nos. 5 NIL YES Contract agreement No. NWR/S&C/CA/160 dated 30.09.2016
M/s Gurukrupa Kalyan JV 2A, 2nd Floor, Navnath Sec-2, B/H, Shradhadeep Society, Nr. Sharda School, Singanpore-Causway Road
Rs. 137.40 Cr
15.06.18 01.07.16 In progress.
Work terminated on 25.09.2017
2. T. No. NWR/SC/AII-COR-UDZ/Civil-304140803-R
Flash Butt Welding of 60Kg / 52Kg New / SH Rails at Depot / Site using Mobile Flash Butt Welding Plant in Mavli – Bari Sadri section in connection with Mavli–Badi Sadri gauge conversion project
Open 10.10.16 single bid
25.11.16 2 Nos. 01 No 01 No Yes Acceptance letter No.UDZ/MVJ-BI/GC/Welding/T-3R Dated 20.02.17
M/s Railtech Infraventure Pvt.Ltd., 147/91-A Old Bairahana, Allahabad-211003 (UP)
Rs.03.93 Cr
19.08.18 Yet to start
18 T.NO.UDZ-HMT-GC-MB-T-43-R
Fabrication,
transporting assembling
and erection of
superstructures
Open 19.07.17 Two
packet
24.08.17 03 02 01 Yes - M/s Dynemic
Engineers Infratrack
Pvt.,Ltd., Kota
1510.59
Lakhs
16.03.19 - Work in
progress
19 T.NO.UDZ-HMT-GC-BLDG/T-44
Construction of staff
Quarters & SSE/
C/P.Way office in UDZ-
HMt section
Open 09.06.17 Single 12.07.17 03 03 0 Yes Dy. CE/C/
UDZ/CA/46
dated
20.09.17
-
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
392.18
Lakhs
31.01.18 - Work in
progress
20 T.NO.UDZ-HMT-GC-Civil/T-47
Earth work and minor
bridges between UDZ-
Umra in UDZ-HMT
section
Open 18.08.17 Single 20.09.17 02 02 0 Yes M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
890.55
Lakhs
10.06.18 - Work in
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11
Dy. CE/C/Dungarpur
Dy. CE/C/BNSW
1. Dy.CE/C/
UDZ/DNR
P-
RTM/FLS/
2011/T/1
Carrying out final
location of survey &
….other preliminary
activities in connection
with new BG line
between DNRP-RTM via
Banswara
Open 1/6/11 &
30/6/11
(NIT & First
corrig.)
Single 15-07-
2011
10 NA NA Yes NWR/S&C/
CA/114 Dt.
27-02-12
M/s S.M.Consultants,
Bhubneswar
4.99 Cr
Excl. 1st 0.60
Cr.
13/11/12
Extended
up to
30.06.2017
14/11/2011 -
Work in
progress
2. Dy.
CE/C/DN
RP/ RTM-
DNRP/EW
/ NL/T-8
E/W in cutting and
filling for formation &
all other ancillary works
etc. from Km. 0.00 to
Km. 17.00 between
Dungarpur-Nawa Gaon
station in c/with DNRP-
RTM New BG Rail Line
Project.
Open 23-01-2013 Two
Packet
06-03-
2013
15 5 10 Yes NWR/S&C/
CA/129
Dt. 31-10-
13
Accepted
on
10.07.13
M/s Nayak
Infrastructure Pvt.
Ltd., Guwahati
56.74 Cr.
Ex.SCA
8.05 Cr.
09-07-15
Further
extended
upto
09.07.2017
06-11-2013 - Work in
progress.
3. T. No.
Dy. CE/C/
DNRP/
RTM-
DNRP/MB
/NL/T/ 10
– Const. of minor
bridges, RUB & other
ancillary works etc.
from Km. 0.00 to 17.00
bet. Dungarpur to
Nawa Gaon stations in
c/with DNRP-RTM New
BG Rail Line Project.
Open 10-09-2013 Two
Packet
23-10-
2013
8 6 2 Yes NWR/S&C/
CA/137 Dt.
30-06-
2014
accepted
on
04.04.2014
M/s Gannon Dunkerley & Co. Ltd., Ahmedabad
38.06 Crore 03-04-2016
Further
Extended
upto
31.03.18
14.11.2014 - Work in
progress.
4 T. No.
UDZ-
HMT/GC/E
W/T-3R
UDZ-HMT GC PROJ.
Construction of Minor
bridges & earthwork
from Km. 270/0 to
320/0 in connection
with UDZ-HMT section
GC Project
Open 08.05.15 Two bid
system
12.06.15 06 01 05 Yes NWR/S&C/
CA/148
dated
12.01.2016
Accepted
on
20.10.15
M/s Royal Infra
Engineering Pvt. Ltd., Surat
2706.07 19.04.17 27.11.15 Work in
Progress
5 NWR/SC/
UDZ-
HMT/GC/Ci
vil/204140
532
Flash Butt welding of
60 Kg/52 Kg. New / SH
Rails at Depot/ Site
using Mobile Flash Butt
Welding Plant in DNRP-
HMT Section.
Open Single
Packet
23.11.16 02 01 01 Yes Under
execution M/s Railtech
Infraventure Pvt. Ltd. 147/91-A, Old Bairahana Allahabad – 211003 (UP)
531.70 Lakhs 21.08.2018 --- -- Work to be
started.
6 NWR/SC/
UDZ-
HMT/GC/Ci
vil/205140
541
Dismantling of existing
MG track, laying and
linking of BG ML, LL
etc. bet. Km. 270.00 to
Km. 320.00 in c/with
DNRP-HMT Section.
Open - Single 01.02.2017 04 Nos. 1 1 Yes Under
execution M/s Bhanwar Lal Bijarnia, Vill. Rajpura, Post Prewari, Tehsil Nawa, Distt. Nagaur (Raj.)
890.85 Lakhs 27.02.2018 --- -- Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
12
1. Dy. CE/C/BNSW/DNR
P-RTM/NL/
T/7
Construction of Minor bridges, Road under bridges & other ancillary works etc. from Km. 106.00 to 123.00 between Banswara and Arbhit Khatumbi station in c/with Banswara New
BG Rail Link Project.
Open - 30.10.13 - - - Yes NWR/S&C/ CA/138 Dt. 25/08/2014
M/s Gannon Dunkerley & Co. Ltd., 301-303, Prshna Arcade, 3rd Floor, Opp. Doctor House, Near Parimal Crossing, GG Road, Ahmedabad.
Rs. 3716.07 Lakhs
03.04.2016 Work is in progress.
2. Dy. CE/C/BNSW/NL/ RTM-
DNRP/T/4
Earthwork in cutting and filling for formation as per BG standard profile & all other ancillary works i.e. roofing wall, drains, toe walls, A one pitching etc. from Km. 106 to Km. 123.00 bet. Banswara & Arbhit Khatambi station in c/with Ratlam-Dungarpur via Banswara New BG Line Project.
Open 21.01.13 - - - Yes NWR/S&C/CA/130 Dt. 01/11/2013
M/s AMRIL-ESSCON (JV) ‘ SAIKRUPA’ D.No. 8.3.833, Plot No. 37 & 38 Phase-I, Kamalgiri Colony, Hyderabad.
Rs. 6219.53 Lakhs
25.07.2015 - - Progress held up due to non available of land.
DY. CE/C/RTM
1 Dy.CE/C/BNSW/ DNRP-RTM/NL/T-9
Construction of Office Accommodation for Dy.CE/C/RTM & Officers Rest House at Ratlam in c/w Construction of New BG Line between DNRP-RTM via
Banswara.
Open 23.10.13 Single 12.12.13 3 Nos. - - Yes Dy.CE/C/RTM/CA/02 dt.21.04.14
M/S Kirti Contractors & Engineers, 168, Samta Parisar, Ratlam (MP)
Rs. 124.14 Lacs
09.09.14 Extension given up 31.12.2016
11.03.2014 Work is in progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
13
2 Dy.CE/C/RTM/ DNRP-RTM/NL/
T-2
Construction of minor bridges,Road under bridges (RUB) & other ancillary works from
142.85 to 163.00 km between Chotti Sarvan -Shivgarh stations in c/w Construction of DNRP-RTM via Banswara.New BG Rail line project
Open 16.06.2014 Two bid 23.07.14 5 Nos. 01No 04(four) Yes NWR/S&C/CA/141 dated 16.03.2015
M/S Gannon Dunkerley & Co.Ltd. 301-303,Prema Acrcade,3rd Floor,
Opp Doctor House, Near Parimal Crossing,C.G.Road,Ahemdabad-380006
Rs.42.89 Cr 17.12.2016 10.08.2015 Work is in progress.
3 Dy.CE/C/RTM/ DNRP-RTM/NL/T-3
Earth work in cutting and filling for formation as per BG standard profile, Construction of RCC box type bridges and all other ancillary works i.e. retaining wall, drain, toe wall, stone pitching etc from Km.142.85 to 163.00 km between Chotti Sarwan & Shivgarh stations in connection with Ratlam - Dungarpur via Banswara New BG line project.
Open 26.03.15 Two bid 05.05.2015 06(six) 04(four) 02(two) Yes NWR/S&C/CA/147 dated 21.12.2015
MMS Infratech Pvt.Ltd.,New Anjar-370110(Gujarat)
Rs. 53.66 Cr. 06.09.2017 15.10.2015 Work is in progress.
4 Dy.CE/C/RTM/ DNRP-RTM/NL/T-5
Earthwork in cutting and filling for formation as per B.G. standard profile and all other ancillary works i.e. retaining wall, drain, toe wall, stone pitching etc. from Km 163.00 to
184.600 & Ratlam connectivity between Chandra Berda & Ratlam stations in connection with Ratlam-Dungarpur via Banswara new BG line project.
Open 11.05.2015 Two bid 24.06.2015 05(Five) 02(two) 03(three) Yes NWR/S&C/CA/149 dated 29.01.2016
M/S Mehta Saiyyed(JV) 104, LIC Colony, Vaishali Nagar Ajmer(Raj) Pin 30 5001
Rs. 58.71 Cr. 05.11.2017 07.11.2015 Work is in progress.
CE/C/III-JP
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
14
Dy. CE/C/I-Ajmer
1 AII/BNGM-RAS/NL/T/11 R2
Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P-way materials, construction of station building & platform and other ancillary works between Bangurgram and Ras stations in connection with Bangurgram-Ras New Broad Gauge Line Project.
Open 05.10.12 Single 09.11.12 1 Nos. - - Yes Dy. CE(C)/AII/BNGM-RAS/CA/85 dated 20/11/2013
M/s. Bhanwar Lal Bijarnia, Village-Rajpura, Tehsil-Nawa, District-Nagaur (Raj.)
667.49 Lakhs
17/09/2013, 28/02/2014, 31/05/2014, 30/09/2014, 31/01/2015, 31/05/2015, 30/10/2015 & 31/12/2015
02/09/13 - Work completed. Final variation under preparation.
2 AII/Const./DFCCI
L/T/3-R2
Shifting of track between Madar &
Durai stations & shifting MG yard at Marwar Jn. i.c.w. DFC.
Open 17.04.13 Two Bid 02.04.13 4 Nos. 1 No. 1 No. Yes NWR/S&C/CA/60 dated
26/12/2013
M/s. Ravi Infra build Pvt. Ltd., 95, Hiran
Magri, Sector-11, Udaipur
3216.99 Lakhs
04/02/2015, 30/04/2016,
31/12/2016 & 30/06/2018
14/12/13 - Work held up for
want of dispute free land.
3 AII/Const./DFCCIL/T/6
Construction of station building & staff quarters in c/w shifting of utilities for DFCCIL.
Open 10.01.13 Two Bid 15.02.13 9 Nos. 5 Nos. 5 Nos. Yes NWR/S&C/CA/61 dated 27/12/2013
M/s. Rama Construction company, H-240, Ashok Vihar Phase-I New Delhi
4117.03 Lakhs
05/03/2015, 31/12/2015, 30/06/2016, 31/12/2016, 30/06/2017 & 31/12/2017
15/09/13 - Work under progress.
4 AII/Const./LHS/T/3
Providing Limited Height Subways in lieu of existing Level
Crossings between Madar & Haripur stations of Madar - Marwar Section in connection with elimination of existing level crossing gates.
Open 10.06.13 Two Bid 17.07.13 01 Nos. - - Yes NWR/S&C/CA/64 dated 20/02/2014
M/s. Lall Construction Co. AA-105, Shalimar
Bagh, Delhi-110088
4577.17 Lakhs
15/12/2015, 31/03/2017 & 31/10/2017
18/02/14 - Work under progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
15
5 AII/Const./Loco/Mod/T/7
Improvement to drainage system in Loco Workshop by the construction of
drain using mostly pre-cast RCC units including launching. Work also includes construction of traverser path and other ancillary works in connection with Modernisation of Loco Workshop, Ajmer
Open 21/10/14 Two Bid 26/11/14 07 (Seven)
04 (Four) 1.0 JCC Infra Projects Pvt. Ltd.,
761/30, Aklank House, Tikam Ganj, Ajmer (Raj.) 2.0 Bharat Spun Pipe & Construction Company, 43, Industrial Area, Jhotwara, Jaipur-302012 3.0 M/s. B. L. Infra Projects Pvt. Ltd., B-8/6, Sector-3, Rohini, New Delhi -110085. 4.0 M/s. Satish & Amit Infra Structure 2/108, Royal Green, Near Sirsi Mod, Post office Sirsi, Jaipur.
Yes NWR/S&C/ CA/70 dated 29/07/2015
Prem Fabricator's, 426, Near Jyoti Power, Behind Steel Town, Moriya,
Chandgodar, Ahmedabad-382110
1326.88 Lakhs
04/02/2016, 30/06/2016, 30/08/2016, 31/10/2016 &
15/12/2016
17/02/15 - Work completed, final variation
under HQ technical evaluation.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
16
6 AII/Const./C&W/Mod./T/6
Improvement to drainage system in C&W Workshop by the construction of
drain using mostly pre-cast RCC units including launching. Work also includes construction of traverser path and other ancillary works in connection with Modernisation of C&W Workshop, Ajmer
Open 23/10/14 Two Bid 26/11/14 06 (Six) 04 (Four) 1.0 Varaha Infra Limited, Umesh
Smriti-6, Jalam Vilas Scheme, Poata B. Road, Jodhpur (Raj.)-342006. 2.0 Bharat Spun Pipe & Construction Company, 43, Industrial Area, Jhotwara, Jaipur-302012. 3.0 JCC Infra Projects Pvt. Ltd., 761/30, Aklank House, Tikam Ganj, Ajmer (Raj.) 4.0 M/s. Raj Kumar Gupta Contractors, III-J/59, Nehru Nagar, Ghaziabad-201001.
Yes Dy. CE(C)/AII/CA/91 dated 30/07/2015
Prem Fabricator's, 426, Near Jyoti Power, Behind Steel Town, Moriya,
Chandgodar, Ahmedabad-382110
948.74 Lakhs
21/01/2016, 31/12/2016, 30/06/2017 & 31/10/2017
04/02/15 - Work in progress.
7 NWR/SC/AII-
BNGM/Civil - 308151801
Earth work in bank/cutting
including Blanketing material, Construction of Major/Minor Bridges, Construction of Quarters, S&T structures & Miscellaneous structures, Dismantling of existing Buildings, Platforms & Steel structures etc., .... in connection with Ajmer-Bangurgram BG Doubling project.
Open 02/03/16 Double packet
12/04/2016
06 (Six) 02 (Two) M/s. Rajendra
Singh Bhamboo Infra Pvt. Ltd. 108, First Floor, Neel Kanth Building, Gandhi Path, Vaishali Nagar, Jaipur – 302021 and M/s. Balajee-Modi (JV), 9, Leela Mension, Raj Bhawan Road, Civil Lines, Jaipur-
Yes NWR/S&C/CA/74 dated
30/08/2016
M/s. Shivakriti-Shri Mohangarh (JV), 7th
Floor, Ajmer Puliya, Jaipur-302006
11337.76 Lakh
23/06/2018 20/07/16 - Work in progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
17
302006 Jaipur-302006
8 NWR/SC/Bangurgram-Guriya-Patch/Civil-308151801
Earth work in bank/cutting including Blanketing materials, Construction of Major/Minor Bridges, Construction of Quarters, S&T structures & Miscellaneous structures, dismantling of existing buildings, platforms & steel structures etc., ... in connection with Bangurgram - Guriya BG Doubling project.
Open 28/06/16 Double packet
10/08/2016
05 (Five) 01 (One) VPRPL-RBIPL "Guriya" (JV) H-1, First Floor Shivalik Complex, Near Gol Building, Sardarpura, Jodhpur (Rajasthan) 342001
Yes NWR/S&C/CA/76 dated 24/01/2017
M/s. H.S. Mehta Infra – JCC Infra Projects (JV), 761/30, Aklank House, Tikam Ganj Ajmer – 305001
16161.54 Lakh
10/11/2018 20/11/16 - Work in progress.
9 NWR/SC/MD-/Civil-308421801
Providing pit line with or without catwalk, washing apron, overhead water tank, extension of existing bridges, extension of existing shed, construction of service buildings and dismantling of existing track, laying & linking of new track & turnouts etc. in Madar yard in connection with shifting of coach maintenance facility from Ajmer to Madar project
Open 29/04/16 Double packet
28/06/16 7 (Seven) 2 (One) M/s. Ali Mohd. Abdul Mazid, Near Jama Masjid, Mohalla Vyaparian, Bikaner-334001 (Rajasthan) Varindera Constructions Limited, 408-409, Suneja Tower-I, District Cenre,
Janakpuri, New Delhi.
Yes NWR/S&C/CA/75 dated 29/09/2016
M/s. M. H. Khanusiya, First Floor, Divine India Building, Near RTO office, By Pass Road, Post-Savgadh, (Panpur) Himmatnagar-383001 Dist.-S.K. (Gajarat)
2643.75 Lakh
06/09/2017 & 31/01/2018
15/09/16 - Work in progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
18
Dy. CE/C/II-Ajmer
1 AII/Const.
/LHS/T/2
Construction of Limited
Height Subway in lieu
of existing LC No. 58,
60, 61, 62, 64, 65, 66,
67, 68, 69, 71, 72 &
73(13 Nos) between
stations Marwar to Rani
of Marwar-Palanpur
Section in connection
with elimination of level
crossing gates.
Open 21.02.2013 Single 28.03.2013 01 Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
NIL Yes
NWR/S&C/CA/5
8 dated
18/11/2013
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
1790.49 Lakhs
31/12/2014,
30/09/2015,
30/09/2016,
30/09/2016,
31/12/2016,
31/05/2017 &
30/11/2017
14/09/2013 - Work
Completed.
2
AII/GRI-
MJ/BGD/T
/1
Earthwork in
embankment for
cutting & filling,
Blanketing for bank,
Addition, alteration and
construction of S&T
structures, Pass.
Platform, Platform
Shelters, station
Building, staff Quarters,
water Huts, toilets,
Hand Pumps, FOBs,
TMC Rest house etc.
between Guriya–
Marwar Jn. stations
(both excl.) and Officer
Rest House at Mawar
Jn. Station in
connection with Guriya-
Marwar Jn. BG Patch
Doubling Project.
Open 30.08.12 Single 16.10.12 07 Nos.
1st Lowest
M/s. Braham
Prakash Modi,
74
Sudarshanpur
a, Industrial
Area,
Baisgodam,
Jaipur-06
NIL Yes
NWR/S&C/CA/5
1 dated
14/03/2013
M/s. Braham Prakash
Modi, 74
Sudarshanpura,
Industrial Area,
Baisgodam, Jaipur-06
3541.71 Lacs.
30/09/2014,
30/04/2015,
31/07/2015,
30/10/2015,
31/12/2015,
30/04/2016,
30/06/2016,
31/12/2016,
31/03/2017 &
30/06/2017
31/12/2012 30/06/17 Work
completed.
3
AII/GRI-
MJ/BGD/T
/2
Construction of
Important/Major
Bridges including
earthwork, blanketing
on the approaches
between stations
Guriya to Marwar
Junction with
Railway’s/Contractor’s
design & drawing in
connection with Guriya-
Marwar Junction BG
Patch Doubling Project.
Open 21.01.2013 Single 26.02.2013 06 Nos.
1st Lowest
M/s.PNC
Infratech
Ltd.-Jain
Construction
Company
(JV) 761/30,
Aklank
House, Near
Mal Godown,
Tikam Ganj,
Ajmer
NIL Yes
NWR/S&C/CA/6
2 dated
06/01/2014
M/s. PNC Infratech
Ltd.-Jain Construction
Company (JV) 761/30,
Aklank House, Near
Mal Godown, Tikam
Ganj, Ajmer
3240.43 Lakhs
28/01/2015,
31/12/2015,
30/09/2016,
31/12/2016,
15/02/2017 &
31/07/2017
06/12/2013 - Work
completed.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
19
4 AII/Const.
/FLS/T/1
Marking out of center
line, taking levels
including all details,
Carrying out Geotech
investigation, designing
of foundation and sub –
structures / super
structure of Minor /
Major bridges/LHS,
preparation of land
plans & proposal,
Preparation of L-section
& yard plans etc. &
submitting detailed
working drawings in
connection with
Bangurgram to Guriya
& Marwar to Rani
Doubling projects and
Various shifting of
utility works of DFCCIL
& LHS works between
Kishangarh & Palanpur
stations.
Open 17.09.2012 Single 09.11.2012 03 Nos.
2nd Lowest
M/s. S. M.
Consultants,
Plot No.-130,
S.M. Tower,
Mancheswar
Industrial
Estate,
Rasulgarh,
Bhubneshwar
(Odisha)
M/s. BPC
India, Nataraj
Bhawan,
P.O.Khamarch
andi, P.S.
Haripal, Dist.-
Hooghly, West
Bengal
Yes
NWR/S&C/CA/5
7 dated
07/11/2013
M/s. S. M.
Consultants, Plot No.-
130, S.M. Tower,
Mancheswar Industrial
Estate, Rasulgarh,
Bhubneshwar (Odisha)
183.38 Lakhs
06/07/2013,
30/11/2013,
31/03/2014,
31/10/2014,30/0
4/2015,
31/08/2015,
31/12/2015,
30/04/2016,
31/08/2016 &
30/04/2017
02/02/2013 - Work under
progress
5 AII/Const/
FBW/T/1
Flash butt Welding of
60/52 Kg.
New/SH,(72/90 UTS )
Rail joints by using
mobile flash butt
welding plant in
connection with various
sanctioned works of
Ajmer unit of
construction
organization.
Open 11.10.2012 Single 19.11.2012 01 No.
1st Lowest
M/s. The
India Thermit
Corpn. Ltd.,
84/22, Fazal
Ganj,
Kanpur-
208012.
NIL Yes
Dy.
CE(C)/AII/FBW/
CA/85 dated
21/10/2013
M/s. The India Thermit
Corpn. Ltd., 84/22,
Fazal Ganj, Kanpur-
208012
699.04 Lakhs
18/03/2015,
18/03/2016,
18/03/2017 &
18/03/2018
13/11/2013 - Work in
progress
6 AII/Const.
/LHS/T/4
Providing Limited
Height Subway (17
Nos.) in lieu of existing
level crossings between
Haripur & Marwar Jn.
stations of Ajmer -
Marwar Jn. section in
connection with
elimination of existing
level crossing gates.
Open 11.07.14 Two packet
system 13.08.2014 07 Nos.
1st Lowest
M/s. PNC
Infratech
Ltd.-JCC
Infraprojects
Pvt. Ltd. (JV)
761/30,
Aklank
House, Near
Mal Godown,
Tikam Ganj,
Ajmer
04 (Four) Yes
NWR/S&C/CA/6
8 Dt. 09-03-
2015
M/s. PNC Infratech
Ltd.-JCC Infraprojects
Pvt. Ltd. (JV) 761/30,
Aklank House, Near
Mal Godown, Tikam
Ganj, Ajmer
3529.60
Lakhs
18/05/2016 &
30/06/2017 11/09/2015 -
Work under
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
20
7 AII/Const.
/LHS/T/5
Providing Limited
Height Subways (19
Nos.) in lieu of existing
level crossings between
Rani & Keshavganj
stations of Marwar Jn. –
Palanpur section in
connection with
elimination of existing
level crossing gates.
Open 21.02.2013 Two packet
system 13.08.2014 04Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
03 (Three) Yes
NWR/S&C/CA/6
6 Dt. 27-02-
2015
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
Rs.3908.17
Lacs
18/05/2016,
13/03/2017 &
31/12/2017
03/12/2014 - Work under
progress
8 AII/Const.
/LHS/T/6
Providing Limited
Height Subways in lieu
of existing level
crossings between
Swaroopganj &
Palanpur stations of
Marwar Jn. - Palanpur
section in connection
with elimination of
existing level crossing
gates.
Open 21.02.2013 Two packet
system 13.08.2014 04 Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
03 (Three) Yes
NWR/S&C/CA/6
7 dated
27/02/2015
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
Rs.3873.36
Lacs.
18/05/2016,
31/03/2017 &
31/03/2018
18/12/2014 - Work under
progress
9
AII/GRI-
MJ/BGD/T
/6
Construction of Minor
Bridges including other
ancillary work between
station Guriya
(excluding) - Marwar
Jn. (excluding) in
connection with Guriya
- Marwar Junction BG
patch doubling project.
Open 07/07/2014 Two packet
system 13/08/2014 04 Nos. 1.0 (One)
1.0 M/s.
Ashish
Construction
Co.- SP
Infracon (JV)
211, Shivam
Complex, Opp.
Hetarth Party
Plot, Science
City Road,
Sola,
Ahmedabad -
380061.
Yes
NWR/S&C/CA/6
9 dated
09/03/2015.
M/s. JCC InfraProjects
Pvt. Ltd., 761/30,
"Aklank House", Tikam
Ganj, Ajmer (Raj.).
2169.63 Lakhs
29/02/2016,
30/06/2016,
31/12/2016,
31/07/2017 &
31/12/2017
01/03/2015 - Work under
progress.
10
AII/GRI-
MJ/BGD/T
/8-R
Dismantling of existing
BG track, laying and
linking of Broad gauge
main line, loop lines
including points and
crossings at various
yards, spreading of
ballast, tamping of
track, transportation of
P-Way materials and
other ancillary works
between Guriya –
Marwar Jn. Section in
connection with Guriya
- Marwar Jn. BG Patch
Doubling Project.
Open 28/07/2015 Single packet
system 31/08/2015 5 Nos. 1.0 (One)
1.0 JCC Infra
Projects Pvt.
Ltd., 761/30,
Aklank House,
Tikam Ganj,
Ajmer
No -
M/s. Jhawar Sales
Corporation, Rani
Bazar, Bikaner-
334001 (Raj.)
Rs. 976.32
Lakhs
28/05/2017 &
31/07/2017 - 30/06/17
Work
completed.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
21
11
AII/MJ-
RN/BGD/T
/1
Earth work in
bank/cutting including
Blanketing material,
Construction of
Important/Major/Minor
Bridges, Construction of
Quarters, S&T
structures &
Miscellaneous
structures on stations
and in section,
Dismantling of various
Buildings, Platforms &
Steel structures etc,
Track works for Broad
Gauge line, Supplying &
putting ballast in track,
Transportation of P.
Way materials and
other ancillary works in
Marwar Junction to Rani
section in connection
with Marwar Jn.-Rani
(both including) BG
Patch Doubling project.
Open 09/08/2015 Two packet
system 06/10/2015 13 Nos. 7.0 (Seven)
1.0 M/s.
Gawar –
Lakhlan (JV)
402, Diamond
Tower, Purani
Chungi, Ajmer
Road,
Jaipur2.0 M/s.
Kalindee –
Paras JV, 2nd
Floor Building
No. 9 A, Cyber
City, DLF
Phase – III,
Gurgaon –
1220023.0
M/s. Ravi - HG
(JV) 95, Hiran
Magri, Sector-
11, Udaipur –
3130024.0
M/s. Gannon
Dunkerley &
Co. Ltd. 301-
303, Prerna
Arcade, Opp.
Doctor House,
Near parimal
Crossing, C.G.
Road,
Ahmedabad-
3800065.0
M/s. VRC – SIL
(JV), 16, Opp.
Metro Pillar
No. 190,
Paschim Vihar
Extension,
Rohtak Road,
Delhi
1100636.0
M/s. BPL-BCPL
(JV) Ekta
House, Nr.
Shripath
Apartment,
Jalaram-II,
University
Road, Rajkot –
360007
Yes
NWR/S&C/CA/7
1 dated
22/02/2016
M/s. VPRPL – RBIPL
(JV) H-1, first Floor
Shivalik Complex,
Near Gol Building,
Sardarpura, Jodhpur
(Raj.) – 342001
15262.94 Lakh 29/12/2017 25/02/2016 - Work under
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
22
12
NWR/SC/
Guriya-
Marwar/Ci
vil-
30915110
9
Miscellaneous works
between Guriya to
Marwar Jn. doubling
project.
Open 20/09/2016 Single packet
system 24/10/2016 04 Nos. 04 (Four) NIL Yes
Dy.CE(C)/AII/C
onst./GRI-
MJ/CA/4 dated
30/03/2017
M/s K.B. Enterprises,
2, Matra Chhaya,
Opp. Chambal Power
House, Hawa Sarak,
Jaipur-302006
Rs.814.54
Lakhs
20/05/2017 &
19/08/2017 03/12/2016 -
Work under
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
23
CE/C/IV-JP
Dy. CE/C/I-Jodhpur
11.. TT..NNoo.. JJUU//
CCOONNSSTT//
1155//22001111--1122
AAcccceepptteedd
oonn––
1177..0099..1122
WWoorrkk ooff rreemmooddeelliinngg ooff
JJUU yyaarrdd iinncclluuddiinngg aallll
wwoorrkk rreellaatteedd ttoo PP..
wwaayy,, AATT wweellddiinngg
OOppeenn 2255..0033..1122 SSiinnggllee 2266..0044..1122 0044 SShh..GGiirrddhhaarrii
RRaamm SS//oo SShh..
SSaajjjjaann RRaamm,,
JJooddhhppuurr
MM//ss PP..CC..
SShhaarrmmaa,,
NNooiiddaa ((UU..PP..))
LL--11 DDyy..CCEE//CC//
JJUU//0033//22001122--
1133,, ddttdd..
1133..1122..1122
SShh..GGiirrddhhaarrii RRaamm SS//oo
SShh.. SSaajjjjaann RRaamm,,
JJOODDHHPPUURR
113322..0022 1166..0066..1133
3311..1100..1133
3300..0044..1144
3311..1122..1144
2288..0022..1155
2200..0033..1155
3311..1122..1155
3311..1122..1166
1155..0099..1166
1111..1111..1122 WWoorrkk
pphhyyssiiccaallllyy
ccoommpplleetteedd &&
ffiinnaall bbiillll
uunnddeerr
pprroocceessss..
--
22.. TT..NNoo..JJUU//
CCoonnsstt..//TT--
0044//22001122--
1133//GGAADD
CCaarrrryyiinngg oouutt
GGeeootteecchhnniiccaall
iinnvveessttiiggaattiioonn ffoorr RROOBB
oonn LLCC NNoo..2211 && LLCC
NNoo..6611
OOppeenn tteennddeerr 1100..1100..1122 SSiinnggllee 0088..1111..1122 0044 MM//ss CC..SS..
EEnnggiinneeeerrss &&
CCoonnssuullttaannttss,,
SShhaakkaarrppuurr,,
DDEELLHHII –– 111100
009922
11MM//ss SSttrreennggtthh
EEnnggiinneeeerriinngg
SSeerrvviicceess PPvvtt..
LLttdd..,, JJaaiippuurr
22.. MM//ss
AARRKKIITTEECCHHNNOO
CCoonnssuullttaannttss ,,
BBhhuubbaanneesswwaarr
LL--22 DDyy..CCEE//CC//
JJUU//..6633..//22001133
--1144,, ddttdd..
2299..001144..22001144
MM//ss CC..SS.. EEnnggiinneeeerrss &&
CCoonnssuullttaannttss,,
SShhaakkaarrppuurr,, DDEELLHHII ––
111100 009922
1188..8877 2288..0044..1133
3300..1111..1133
3311..0033..1144
3300..0066..1144
3311..1122..1144
3300..0066..1155
3311..1122..1155
3311..0077..1166
0077..0022..1133 -- WWoorrkk ddeellaayyeedd
dduuee ttoo mmaatttteerr
nnoott ffiinnaalliizzaattiioonn
ooff RROOBB 6611 bbyy
SSttaattee GGoovvtt
aanndd nnooww ffiinnaall
bbiillll uunnddeerr
pprroocceessss
33.. TT..NNoo..JJUU//CCOO
NNSSTT..//TT--0088
//22001122--
1133//GGAADD--
PPrreeppaarraattiioonn ooff GGAADD aanndd
SSooiill TTeessttiinngg ffoorr RRUUBBss
iinn vvaarriioouuss sseeccttiioonnss ooff
JJUU ddiivviissiioonn
OOppeenn tteennddeerr 0077..1122..1122 SSiinnggllee 1100..0011..1133 0033 MM//ss TThheemmee
EEnnggiinneeeerriinngg
SSeerrvviicceess PPvvtt..
LLttdd..,, BB--2244,,
JJaaiippuurr
11.. MM//ss MM..KK..
SSooiill TTeessttiinngg
LLaabboorraattoorryy,,
AAhhmmeeddaabbaadd
22.. MM//ss
EEnnggiinneeeerr''ss
AAssssoocciiaatteess,,
RRaattaannaaddaa,, ,,JJUU
LL--11 DDyy..CCEE//CC//
JJUU//1100//22001133--
1144//GGAADD,, ddttdd..
1199..1100..1133..
MM//ss TThheemmee
EEnnggiinneeeerriinngg SSeerrvviicceess
PPvvtt.. LLttdd..,, JJaaiippuurr
2200..1199 0066..0077..1133
3300..1111..1133
3311..0033..1144
3300..0044..1144
3311..0088..1144
3300..1100..1144
3311..1122..1144
2288..0022..1155
3300..0066..1155
3311..1100..1155
3311..0033..1166
3300..0099..1166
3311..0033..1177
3300..0066..1177
1155..0044..1133 WWoorrkk iinn
pprrooggrreessss
WWoorrkk ddeellaayyeedd
dduuee ttoo NNOOCC ooff
vvaarriioouuss LLCCss
wweerree nnoott
rreecceeiivveedd ffrroomm
DDiivvnn..
44.. JJUU//CCoonnsstt..//
TT--1188//1133--1144//
RROOBB//CC--
2211//NNAACC
CCoonnssttrruuccttiioonn ooff
ccoommpplleettee RROOBB ((22 llaannee))
iinnccll..aapppprrooaacchheess iinn lliieeuu
ooff eexxiissttiinngg LLCC NNoo..CC--2211
oonn MMTTDD--FFLL sseecc aatt NNAACC
ssttaattiioonn
OOppeenn tteennddeerr 0088..1111..1133 TTwwoo ppaacckkeett
ssyysstteemm
1133..1122..1133 0099 NNooss.. 0066 NNooss..
11.. VViisshhnnuu
PPrraakkaasshh RR
PPuunnggaalliiaa
22.. RRaacchhaannaa
CCoonnsstt..
CCoo..
33.. PPrraavveeeenn
GGuullaattii
IInnffrraa--
ssttrruuccttuurree
ss PPvvtt..
LLttdd..
44.. SSoonnaa
0033 NNooss..
11.. SShhrreeee
GGaauuttaamm
CCoonnssttrruuccttiioo
nn CCoo.. LLttdd..,,
22.. MM//ss MMaaaann
RRaannaa ((JJVV)),,
33.. MM//ss DDRRAA--
BBSSPP
CCoonnssttrruuccttiioo
nn ((JJVV)),,
LL--11
NNWWRR//SS&&CC//CCAA
--6655,, ddttdd..
2200..1100..22001144
MM//ss VViisshhnnuu PPrraakkaasshh RR
PPuunngglliiaa LLiimmiitteedd,, HH--11
FFiirrsstt FFlloooorr SShhiivvaalliikk
CCoommpplleexx,, NNeeaarr GGooll
BBuuiillddiinngg,, SSaarrddaarrppuurraa,,
JJooddhhppuurr
1188..8888 CCrr.. 0033..0077..1166
3300..0099..1166
1155..1122..1166
1155..0011..1177
3311..0011..1177
0088..0077..1144 WWoorrkk
ccoommpplleetteedd
&& RROOBB
ccoommmmiissssiioonn
eedd bbyy
HHoonn’’bbllee
MMooSSRR oonn
1100..0022..1177
FFiinnaall bbiillll
ppaasssseedd oonn
2211..0088..1177
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
24
BBuuiillddeerrss,,
55.. RRaakkeesshh
CCoonnsstt..
CCoo..
66.. MM//ss JJaaiinn
CCoonnsstt..
CCoo..
55.. TT..NNoo.. JJUU//
CCoonnsstt..//
TT--0066RR//
22001144--
1155//LLHHSS
RRUUBBss iinn lliieeuu ooff LLCCss,, iinn
sseeccttiioonn ooff MMTTDD--BBKKNN ((0044
NNooss..)),, MMTTDD BByyee PPaassss
((0011 NNoo..)) && MMTTDD--FFLL ((0011
NNoo..)) oonn JJUU ddiivviissiioonn
OOppeenn
TTeennddeerr
0055..1111..1144 SSiinnggllee
TTeennddeerr
0099..1122..1144 0044 NNooss.. MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
CC--117711
KKaannttaa
KKhhaattuurriiaa
CCoolloonnyy,,
BBiikkaanneerr
-- LL--11 DDyy..CCEE//CC//
JJUU//1133//22001144--
1155//LLHHSS,, ddttdd..
1188..0044..22001155..
MM//ss SShhrreeee KKaarrnnii
TTrraaddeerrss,,
CC--117711 KKaannttaa KKhhaattuurriiaa
CCoolloonnyy,,
BBiikkaanneerr
662244..1155 llaaccss.. 2277..0044..1166
3311..0088..1166
1177..0044..1155 WWoorrkk
ccoommpplleetteedd
WWoorrkk
pphhyyssiiccaallllyy
ccoommpplleetteedd,,
ffiinnaall vvaarriiaattiioonn
ssuubbmmiitttteedd ttoo
HHQQ ffoorr aaddmm..
aapppprroovvaall
66.. JJUU//CCoonnsstt..//TT--
2222//1144--
1155//SSttdd..IIIIRR//
MMTTDD--BBKKNN
AAllll CCiivviill && PP..WWaayy wwoorrkk
cc//wwiitthh SSttdd--IIII wwoorrkk iinn
MMTTDD--BBKKNN && RRKKBB--PPLLCC
sseecc
OOppeenn
TTeennddeerr
2211..1111..1144 SSiinnggllee
TTeennddeerr
2233..1122..1144 0022 NNooss.. MM//ss BBhhaannwwaarr
LLaall BBiijjaarrnniiaa,,
VViillllaaggee--
RRaajjppuurraa,,
PPoosstt--
PPrreewwaarrii,,
TTeehhssiill-- NNaawwaa,,
DDiisstttt..
NNaaggoouurr
((RRaajjaasstthhaann))
MM//ss JJaaii MMaattaa
DDee EEnneerrggyy
SSyysstteemm,,
LLaaxxmmaannggaarrhh
ssiikkaarr
LL--11 DDyy..CCEE//CC//
JJUU//1144//22001155--
1166//SSttdd--IIIIRR,,
ddttdd..
1111..0066..1155..
MM//ss BBhhaannwwaarr LLaall
BBiijjaarrnniiaa,,
VViillllaaggee--RRaajjppuurraa,, PPoosstt--
PPrreewwaarrii,,
TTeehhssiill-- NNaawwaa,, DDiisstttt..
NNaaggoouurr
((RRaajjaasstthhaann))
771155..8800 llaaccss.. 0033..1100..1166
3311..0033..1177
3311..0088..1177
1100..0044..1155 WWoorrkk iinn
pprrooggrreessss
--
77.. JJUU//CCoonnsstt..//77
44--WW--
2266//22001155--
1166//SSttdd..IIIIRR//
RRKKBB--PPLLCC
SSuuppppllyyiinngg aanndd ssttaacckkiinngg
ooff 2200880000 ccuumm SSttoonnee
bbaallllaasstt ffoorr SSttdd..IIIIRR wwoorrkk
iinn RRKKBB--PPLLCC sseeccttiioonn
OOppeenn
TTeennddeerr
0055..0066..1155 SSiinnggllee
TTeennddeerr
1100..0077..1155 0044 NNooss.. MM//ss JJ..KK..
CCoonnsstt..CCoo..
NNookkhhaa,,
•• AA..KK.. GGuuppttaa
&& CCoo..,, ,,
DDEELLHHII
•• MM//ss
HHaannuummaann
CCoonnssttrruuccttii
oonn CCoo..,,
NNookkhhaa
•• MM//ss SShhrreeee
SShhyyaamm
EEnnggiinneeeerriinn
gg CCoo,,
CChhuurruu
LL--11 DDyy..CCEE//CC//
JJUU//1199// 22001155--
1166//SSttdd..IIIIRR//
RRKKBB--PPLLCC,,
ddttdd..
3300..0011..1166
MM//ss JJ..KK.. CCoonnssttrruuccttiioonn
CCoo..,,
NNeeww MMaarrkkeett,, NNookkhhaa,,
DDiissttrriicctt –– BBiikkaanneerr
114422..8844 llaaccss.. 1100..0055..1166
3311..0077..1166
1155..1111..1166
..0099..22001155 WWoorrkk
ccoommpplleetteedd
FFiinnaall bbiillll
uunnddeerr
pprroocceessss
88.. JJUU//CCoonnsstt..//
TT--2277//22001155--
1166//SSttdd..IIIIRR//
RRKKBB--PPLLCC
AAllll CCiivviill && PP..WWaayy wwoorrkk
cc//wwiitthh SSttdd--IIII wwoorrkk iinn
RRKKBB--PPLLCC sseecc
OOppeenn
TTeennddeerr
1111..0066..1155 SSiinnggllee 1155..0077..1155 0011 NNoo.. MM//ss BBhhaannwwaarr
LLaall BBiijjaarrnniiaa,,
VViillllaaggee--
RRaajjppuurraa,,
PPoosstt--
PPrreewwaarrii,,
TTeehhssiill-- NNaawwaa,,
DDiisstttt..
NNaaggoouurr
-- LL--11 DDyy..CCEE//CC//
JJUU//1188// 22001155--
1166//SSttdd..IIIIRR,,
ddttdd..
0066..0011..1166
MM//ss BBhhaannwwaarr LLaall
BBiijjaarrnniiaa,,
VViillllaaggee--RRaajjppuurraa,, PPoosstt--
PPrreewwaarrii,,
TTeehhssiill-- NNaawwaa,, DDiisstttt..
NNaaggoouurr
((RRaajjaasstthhaann))
667799..8844 llaaccss.. 1155..0033..1177
0088//22001177
1188..0099..1155 WWoorrkk iinn
pprrooggrreessss
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
25
((RRaajjaasstthhaann))
99.. JJUU//CCoonnsstt..//TT--
2255//22001155--
1166//SSttdd IIIIRR
PPrroovviiddiinngg ““IINN SSIITTUU””
GGlluueedd IInnssuullaatteedd JJooiinnttss
ooff GG--33 ((LL)) ttyyppee ffoorr 5522
kkgg//6600 kkgg rraaiillss iinn cc//ww
SSttddIIIIRR wwoorrkk iinn MMTTDD--
BBKKNN && RRKKBB--PPLLCC sseeccttiioonn..
OOppeenn
TTeennddeerr
0055..0066..1155 SSiinnggllee 1100..0077..1155 0033 MM//ss TTiirruuppaattii
MMeettaall
FFaabbrriiccaattoorrss,,
11443333 SSeeccttoorr
1166,,
FFaarriiddaabbaadd--
112211000022
((HHaarryyaannaa))
•• DDyynnaammiicc
EEnnggiinneeeerrssKK
oottaa..
•• CCrreeaattiivvee
EEnnggiinneeeerrss
KKoottaa --
LL--11 DDyy..CCEE//CC//
JJUU//1177// 22001155--
1166//SSttdd..IIIIRR,,
ddttdd.. 0066..0011--
22001166
MM//ss TTiirruuppaattii MMeettaall
FFaabbrriiccaattoorrss,,
11443333 SSeeccttoorr 1166,,
FFaarriiddaabbaadd--112211000022
((HHaarryyaannaa))
332200..0011 llaaccss.. 3311..0033..1188 1177..1122..1155 WWoorrkk iinn
pprrooggrreessss
--
1100.. NNWWRR//SSCC//MMTT
DD--
DDEEMMUU//CCiivviill--
331100116611880011
CCoonnssttrruuccttiioonn ooff aallll CCiivviill
WWoorrkkss aanndd aallll aalllliieedd
wwoorrkk ffoorr DDEEMMUU
mmaaiinntteennaannccee ffaacciilliittiieess
aatt MMeerrttaa RRooaadd
OOppeenn tteennddeerr 3311..0077..1155 SSiinnggllee 0044..0099..1155 0088 ((EEiigghhtt)) •• MM//ss KKaalluu
RRaamm
CCoonnttrraaccttoorr
JJooddhhppuurr
((JJVV))
•• MM//ss
SSppaacceecchhee
mm
KKeerraarraamm
AAmmiitt ((JJVV))
JJooddhhppuurr..
•• MM//ss PPMMPP
IInnffrraatteecchh
PPvvtt LLttdd
SSoollee AADDII..
•• MM//ss
BBhhaarraatt
SSuunn PPiippee
&& CCoonnsstt..
CCoo.. JJaaiippuurr..
•• MM//ss MM..HH..
KKhhaannuussiiyyaa,,
HHiimmmmaatt
nnaaggaarr
•• MM//ss SShhrreeee
HHaarrsshhaa
CCoonnsstt
SSaannjjeeeevv
BBrrootthheerrss
((JJVV)) JJaaiippuurr
•• MM//ss TT..SS..RR..
MMaannuusshhrreeee
((JJVV))
HHyyddeerraabbaadd
LL--11 DDyy..CCEE//CC//
JJUU//______//
22001155--
1166//DDEEMMUU,,
ddttdd.. ..............1155
MM//ss PPrreemm FFaabbrriiccaattoorrss,,
MMoorriiyyaa,, CChhaannggooddaarr,,
AAhhmmeeddaabbaadd
1166..4477 CCrr.. 0066..0066..1177
3311..0088..1177
1111..1122..1155 WWoorrkk iiss iinn
pprrooggrreessss
1111.. NNWWRR//SSCC//RRKK
BB--JJSSMM//CCiivviill--
33110033000000110000
44
LLNN--MMJJ sseecc.. --RRUUBBss iinn
lliieeuu ooff LLCCss ((1122 NNooss LLCCss
uunnddeerr PPiinnkk BBooookk iitteemm
NNoo.. 9933 ooff 22001155--1166))
OOppeenn tteennddeerr 0099..1122..1155 SSiinnggllee 1122..0011..1166 0077 ((SSeevveenn)) •• MM//ss
RRaacchhaannaa--
SSNNCCCC JJVV
•• MM//ss JJaayy
JJaawwaann
CCoonnsstt.. CCoo
•• MM//ss SSaattiisshh
KKeerraa RRaamm
AAmmiitt
•• MM//ss
MMoohhaannllaall
MMaannaaggaannllaa
ll KKaakkrreecchhaa
•• MM//ss JJCCCC
IInnffrraa
•• MM//ss MM..HH..
KKhhaannuussiiyyaa
•• MM//ss RRaammaa
KKiisshhaann
•• MM//ss
RRaacchhaannaa--
SSNNCCCC JJVV
•• MM//ss JJaayy
JJaawwaann
CCoonnsstt.. CCoo
•• MM//ss SSaattiisshh
KKeerraa RRaamm
AAmmiitt
•• MM//ss
MMoohhaannllaall
MMaannaaggaannllaall
KKaakkrreecchhaa
•• MM//ss JJCCCC
IInnffrraa
•• MM//ss RRaammaa
KKiisshhaann
LL--11 DDyy..CCEE//CC//
JJUU//2233// 22001166--
1177//LLHHSS// LLNN--
MMJJ,, ddttdd..
1122..0077..1166
MM//ss MM..HH..KKhhaannuussiiyyaa,,
HHiimmaannttnnaaggaarr--338833000011
DDiisstt-- SS..KK..((GGuujjrraatt))
1122..7711 CCrr.. 0011..1111..1177 1122..0055..1166 WWoorrkk iiss iinn
pprrooggrreessss
1122.. NNWWRR//SSCC//JJUU// PPPPRR--BBAARRAA sseecc-- RRUUBBss iinn OOppeenn tteennddeerr 0099..1122..1155 TTwwoo ppaacckkeett 1122..0011..1166 0077 ((SSeevveenn)) •• MM//ss SShhrreeee •• MM//ss RRaakkeesshh
LL--11 NNWWRR//SS&&CC//CCAA MM//ss SShhrreeee KKaarrnnii 2211..1199 CCrr.. 0011..1111..1177 1166..0055..1166 WWoorrkk FFiinnaall bbiillll
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
26
CCiivviill ––
33110033000000110000
55
lliieeuu ooff LLCCss ((2222 NNooss.. LLCCss
uunnddeerr PPiinnkk BBooookk iitteemm
NNoo.. 110033 ooff 22001155--1166))
ssyysstteemm KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss
RRaakkeesshh
CCoonnssttrruuccttii
oonn CCoo.. JJVV
RRaajjkkoott
•• MM//ss
DDRRAAIIPPLL ––
XXTTPPLL JJ..VV..
AAhhmmeeddaabbaa
dd
•• MM//ss
RRaacchhaannaa ––
BBhhaannwwaarr
LLaall
BBiijjaarrnniiaa JJVV
NNaaggoouurr
•• MM//ss JJCCCC
IInnffrraapprroojjee
ccttss PPrriivvaattee
LLiimmiitteedd,,
AAjjmmeerr
•• MM//ss MMHHKK
RRPPPPLL ((JJVV))
HHiimmaattnnaaggaa
rr
•• MM//ss PPCCCC ––
HHaarriittaa
CCoonnssttrruuccttii
oonn
CCoommppaannyy
((JJVV)) HHiissaarr
CCoonnssttrruuccttiioo
nn CCoo.. JJVV
RRaajjkkoott
•• MM//ss DDRRAAIIPPLL
–– XXTTPPLL JJ..VV..
AAhhmmeeddaabbaadd
•• MM//ss
RRaacchhaannaa ––
BBhhaannwwaarr
LLaall BBiijjaarrnniiaa
JJVV NNaaggoouurr
•• MM//ss JJCCCC
IInnffrraapprroojjeecctt
ss PPrriivvaattee
LLiimmiitteedd,,
AAjjmmeerr
•• MM//ss MMHHKK
RRPPPPLL ((JJVV))
HHiimmaattnnaaggaarr
•• MM//ss PPCCCC ––
HHaarriittaa
CCoonnssttrruuccttiioo
nn CCoommppaannyy
((JJVV)) HHiissaarr
//7722//22001166--
1177//LLHHSS,, ddttdd
0066..0077..1166
TTrraaddeerrss,, BBiikkaanneerr
((RRaajjaasstthhaann)) 333344000011
ccoommpplleetteedd uunnddeerr
pprreeppaarraattiioonn
1133.. NNWWRR//SSCC//MMTT
DD--
BBKKNN//CCIIVVIILL--
33110033000000110000
22--RR
MMTTDD--BBKKNN sseeccttiioonn-- RRUUBB
iinn lliieeuu ooff LLCCss,, ((1166 NNooss..
ooff LLCCss uunnddeerr PPiinnkk BBooookk
iitteemm NNoo.. 9977 && 110044 ooff
22001166--1177))
OOppeenn tteennddeerr 1177..0077..1166 TTwwoo ppaacckkeett
ssyysstteemm
1199..0088..1166 0044 ((FFoouurr)) •• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss MM..HH..
KKhhaannuussiiyy
aa,,
HHiimmaattnnaagg
aarr
•• MM//ss JJMMEESS
–– MMGGCC
((JJVV))
VV..PP..OO.. ––
NNaarrooddaarraa
•• MM//ss PPCCCC
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss JJMMEESS
–– MMGGCC
((JJVV)) VV..PP..OO..
–– NNaarrooddaarraa
•• MM//ss PPCCCC ––
HHaarriittaa
CCoonnssttrruuccttii
oonn CCoo..
((JJVV)),, HHiissaarr
LL--11 -- MM//ss MM..HH.. KKhhaannuussiiyyaa,,
HHiimmaattnnaaggaarr
11882233..4455 0066..0044..1188 1100..0011..1177 WWoorrkk iinn
pprrooggrreessss
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
27
–– HHaarriittaa
CCoonnssttrruuccttii
oonn CCoo..
((JJVV)),,
HHiissaarr
1144.. NWR/SC/RK
B-JSM/Civil-
3103000100
3-R
RRKKBB--JJSSMM sseeccttiioonn-- RRUUBB
iinn lliieeuu ooff LLCCss,, (20 Nos.
LCs under Pink Book
item No. 98 & 108 of
2016-17).
OOppeenn tteennddeerr 0033..0088..1166 TTwwoo ppaacckkeett
ssyysstteemm
0066..0099..1166 0044 ((FFoouurr)) •• MM//ss
RRaacchhaannaa
–– SSNNCCCC
JJVV,,
JJooddhhppuurr..
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss MM..HH..
KKhhaannuussiiyy
aa,,
SSuunnsshhiinnee
IInnffrraassttuucctt
hheerr ((JJVV)),,
HHiimmaattnnaagg
aarr
•• MM//ss SSBB ––
JJaaggttaajjii
((JJVV)),, NNeeww
DDeellhhii ––
111100001188
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss MM..HH..
KKhhaannuussiiyyaa,,
SSuunnsshhiinnee
IInnffrraassttuucctthh
eerr ((JJVV)),,
HHiimmaattnnaaggaa
rr
•• MM//ss SSBB ––
JJaaggttaajjii
((JJVV)),, NNeeww
DDeellhhii ––
111100001188
LL--11 MM//ss RRaacchhaannaa –– SSNNCCCC
JJVV,, JJooddhhppuurr
22116622..3344 1133..0055..1188 1155..0011..1177 WWoorrkk iinn
pprrooggrreessss
1155.. 4103000010
06
NNWWRR//SSCC//RRUUBB//CCiivviill--
441100330000000011000066 ––
BBaarrmmeerr--MMuunnaabbaaoo
sseeccttiioonn -- RRooaadd uunnddeerr
bbrriiddggeess iinn lliieeuu ooff LLeevveell
CCrroossssiinnggss ((0077 NNoo.. LLCCss
uunnddeerr PPBB iitteemm NNoo..110000
ooff 22001166--1177))
OOppeenn tteennddeerr 0066..1111..22001166 SSiinnggllee 0088..1122..1166 0044 ((FFoouurr)) •• MM//ss
JJaaggttaajjii
IInnffrraassttrruucc
ttuurree,, JJGG--
IIIIII//7733--AA,,
VViikkaassppuurrii,,
NNeeww DDeellhhii
111100001188
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss MM..HH..
KKhhaannuussiiyyaa,,
HHiimmaattnnaaggaa
rr
•• MM//ss
BBhhaannwwaarrllaall
VViillll--
RRaajjppuurraa,,
PPoosstt
PPrreewwaarrii,,
DDiisstttt..
NNaaggoouurr
LL--11 -- MM//ss JJaaggttaajjii
IInnffrraassttrruuccttuurree,, JJGG--
IIIIII//7733--AA,, VViikkaassppuurrii,,
NNeeww DDeellhhii 111100001188
887755..7777 0022--0099--1188 -- -- NNOOCC ffrroomm
aarrmmyy iiss ssttiillll
aawwaaiitteedd..
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
28
1166.. NWR/SC/RU
B/Civil-
4103000100
7
NWR/SC/RUB/Civil-
41030001007 samdari-
BBaarrmmeerr sseeccttiioonn -- RRooaadd
uunnddeerr bbrriiddggeess iinn lliieeuu ooff
LLeevveell CCrroossssiinnggss ((1133 NNoo..
LLCCss uunnddeerr PPBB iitteemm NNoo..
7733 ooff 22001166--1177 && 0044 NNoo..
LLCCss uunnddeerr PPBB iitteemm NNoo..
110000 ooff 22001166--1177))
OOppeenn tteennddeerr 0066..1111..22001166 TTwwoo ppaacckkeett
ssyysstteemm
0088..1122..1166 0044 •• MM//ss MM..HH..
KKhhaannuussiiyy
aa,,
HHiimmaattnnaagg
aarr
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss JJMMEESS
–– MMGGCC
((JJVV))
VV..PP..OO.. ––
NNaarrooddaarraa
•• MM//SS
RRaammaakkiisshh
aann AAsshhookk
kkuummaarr
((JJVV)) 220055,,
SSaarrddaarrppuurr
aa JJUU..
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
••
LL--11 NWR/SC/RUB
/Civil-
4103000100
7
MM//SS RRaammaa kkiisshhaann
AAsshhookk kkuummaarr ((JJVV)) 220055,,
SSaarrddaarrppuurraa JJUU..
22224411..3333 0066..1100..22001188 NNOOCC ffrroomm
aarrmmyy iiss ssttiillll
aawwaaiitteedd..
1177.. NWR/SC/RO
B/Civil-
4103000090
86
NWR/SC/ROB/Civil-
410300009086
construction of
complete ROB including
Approaches in lieu of
existing LC No. C- 56 at
JM: 77/2-3 and C- 109
at KM: 145/9 – 146/0
on SMR-BLDI section
OOppeenn tteennddeerr TTwwoo ppaacckkeett
ssyysstteemm
1100..0033..1177 0088 •• MM//ss MM..HH..
KKhhaannuussiiyy
aa,,
HHiimmaattnnaagg
aarr
•• MM//ss
RRaacchhaannaa
AAnnkklleesshhww
aarr
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• LLaall CCoonnsstt..
CCoommppaannyy
•• MM//SS SSoonnaa
BBuuiillddeerrss--
RRCC PPaatteell
JJVV
MMeehhssaannaa
•• RRaavvii iinnffrraa
bbuuiilldd
pprroojjeeccttss
PPvvtt.. LLttdd..
UUddaaiippuurr
•• RRaaddhhee
aassssoocciiaattee
ss
MMeehhssaannaa
•• VVPPRRPPLL--
RRBBIIPPLL
SSaammddaarrii
JJVV
•• MM//ss SShhrreeee
KKaarrnnii
TTrraaddeerrss,,
BBiikkaanneerr
•• MM//ss
RRaacchhaannaa
AAnnkklleesshhwwaa
rr
•• VVPPRRPPLL--
RRBBIIPPLL
SSaammddaarrii JJVV
•• RRaaddhhee
aassssoocciiaatteess
MMeehhssaannaa
LL--11 - •• MM//SS SSoonnaa BBuuiillddeerrss--
RRCC PPaatteell JJVV
MMeehhssaannaa
33669999..1144 0044..0077..1199 -- -- --
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
29
Dy. CE/C/II-JU
1. NWR/SC/Th
aiyat/Civil-310111802
Construction of all Civil
work & all other misc.
works between Thaiyat
Hamira – Sanu new BG
line project (56.250
kms.).
Open
temder
11.09.15 Two packet
17.11.15 07 M/s SCC JV
PMP
Infratech, A-
Block, A-104,
Ganesh
Meridian,
Ahmedabad
4 Nos
M/s DRD MI
JV
M/s Bhaniyana
Const. JV
M/S Apex
Termic PVT
(JV)
M/S Ravi-HG
(JV)
L-1 NWR/SC
/CA/73 dt.
17.08.16
M/s SCC JV PMP
Infratech, A-Block, A-
104, Ganesh Meridian,
Ahmedabad
11733.94 22.03.18 27.04.16 Work in
progress
2. NWR/SC/Thiyat/Civil-319110604
Work of modification of
existing rooms for office
set up at Jaisalmer
under Dy.CE(C)-II/
Jodhpur’s unit
Open
tender
04.03.16 Single 12.04.16 02 M/s B.S.
Construction
s,2-A, LGF,
Rishabh
Corporate
Tower,
Karkardoom
Cummunity
Centre, New
Delhi-110092
01
M/s
S.D.Builders
Jaisalmer
L-1
Dy.CE/C/
JU/CA/02,
dtd.
25.08.16
MM//ss BB..SS..
CCoonnssttrruuccttiioonnss,,22--AA,,
LLGGFF,, RRiisshhaabbhh
CCoorrppoorraattee TToowweerr,,
KKaarrkkaarrddoooomm
CCuummmmuunniittyy CCeennttrree,,
NNeeww DDeellhhii
105.50 2266..0022..1177
3300..0099..1177
3300..1111..1177
08.07.16 Work in
progress,
-
3. NWR/SC/Thi
yat/Civil-319110507-R
Providing “IN SITU”
Glued Insulated Joint in
c/w. Thaiyat Hamira–
Sanu new BG line
project & Marwar Jn.-
Rani section in MJ-Rani
BG Patch Doubling
project
Open
tender
27.1216 Singal 02.02.17 5 M/s Creative
Engineers, F-
189, Road
No. 5,
Indraprasth
lnd Area,
Kota (Raj.)
324005
1.M/sDyna
mic
Engineers
2 M/s
Kushal
Engineering
3 .M/s
Tirupati
Metal
Fabricators
4. M/s
Diamond
Steel Ind.
L-1 Dy.CE/C/
JU/CA04/
dtd.
18.08.17
M/s Creative
Engineers, F-189,
Road No. 5,
Indraprasth lnd Area,
Kota (Raj.) 324005
173.15 30.05.19 - - -
4. NWR/SC/
FL-DNA
/Civil-
41015200
1
Construction of
Doubling work
between Phulera –
Degana (108.75
Kms.) on Phulera-
Degana Railway line.
EPC 13.12.16 EPC 02.08.17 5 M/s Punj
Lloyd
Limited,
Plot No.78,
Institution
al Area,
Sector-32,
Gurgaon
PIN-
1. M/s
IRCON
Internationa
l Limited,
NEW DELHI
2.
Jaiprakash
Associates
Limited,
L-1 NWR/S7C/
CA/80
dt.28.8.17
M/s Punj Lloyd
Limited,
Plot No.78,
Institutional Area,
Sector-32, Gurgaon
PIN-122003 Haryana
477.50
Cr.
13.03.20 26.9.17 (
Appointed
date)
Work
awarded on
09.08.2017
. Survey
work under
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
30
122003
Haryana
NOIDA
3. Larsen &
Toubro
Limited
MUMBAI
4. AFCONS
INFRASTRU
CTURE
LIMITED
MUMBAI
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
31
Dy. CE/C/BKN
1 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR
Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.
Open tender
17.09.311 single 17.10.11 2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
Yes 173-NWR/Dy CE/C-I/BKN Dt 09.03.2012
M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat
Rs 534.82 lakhs
01.06.12 05.01.12 30.06.16 Contract terminated.on 10.06.2016. Final variation in process.
2 Const/BKN/06 (R)/2011-12/BKN-SDLP-RTGH-SRDR
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh -
Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project
Open tender
20.01.12 single 22.02.12 2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
Yes 178-NWR/Dy CE/C-I/BKN Dt 18.08.2012
M/S Shree Nahar Construction Co., A-328, Shastri Nagar , Jodhpur -342003
Rs 531.61 lakhs
25.12.12 24.05.12 05.06.17 Final variation under process.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
32
3 Const/BKN/09(R)/2011-12/BKN-
SDLP-RTGH-SRDR Dt 13.01.2012.
Construction and modification of station buildings, platform, platform shelter level
crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project
Open tender
20.01.12 single 28.03.12 04 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 177-NWR/Dy CE/C-II/BKN Dt
07.08.12.
M/S Maheshwari Construction Co Bikaner Road, Nokha(Bikaner)
Rs 647.31 lakhs
03.03.13 06.07.12 31.07.16 Final bill passed on 16.10.2017
4 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2012
Supplying and stacking 14000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion project
Open tender
26.05.12 single 27.06.12 05 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 20/NWR/Dy CE/C/BKN/2012-13/SRPR-SGNR Dated 19.10.2012
M/S R.K.Infrastructure, 407, Pink Tower, Tonk Road, Jaipur
Rs137.94 lakhs
28.12.12 07.09.12 31.03.14 Contract terminated. Final variation in process.
5 Tender No. NWR/SC/Sadulpur-Bikaner/Civil-412140107 Dated 29.10.2015
Earthwork in cutting and filling, Construction of minor Bridges/ Road under Bridges, Limited Height Subway in lieu of LC No 8, toe wall, pitching, Rooms for S & T structure at takeoff point and other ancillary works from takeoff point on Ratangarh- Bikaner section to Km 1/500, in Ratangarh to Sardarshahar section in connection with Ratangarh- Sardarshahar gauge conversion project
Open tender
02.11.15 Two packet
04.12.15 07 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 31/NWR/Dy CE/C/BKN/2015-16 Dated 31.03.2016
M/S BPL-MCPL (JV), A/9, Kumud Apartment, Near Amco Bank, Off. C.G.Road, Navrangpura, Ahmedabad-380009
Rs 1084.47 lakhs
01.11.16 25.02.16 15.08.17 Final bill under technical check.
6 Tender No. NWR/SC/BNW/Civi
l-412161111 dated 02.01.16
Earthwork in embankment, construction of minor bridge & S & T
structure, supplying of stone ballast and linking of track and other ancillary works in connection with “Provision of Bhiwani Bye Pass Railway line.
Open tender
06.01.16 single 10.02.16 05 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 32/NWR/Dy CE/C/BKN/2016-17
Dated 30.08.2016
M/S Shree Shyam Engineering Co.,29, Poonia Colony, Churu (Rajasthan)
Rs 136.08 lakhs
01.11.16 02.05.16 30.09.17 work is in progess.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
33
7 Tender No. NWR/SC/EI at
BNW, STD & LGH/2016-17/Civil-412160503 dated 05.07.2016
Providing in Situ Glued Insulated Joints of G-3 (L) type for 52 kg/60 kg rails as per RDSO
drawing No. T-671/T-2572 and confirming to the specfication as per instructions contained in Manual for Glued insulated rails joints in connection with EI works at Bhiwani and Satrod and RRI work at Lalgarh and at any other location in the jursidiction of Bikaner Construction unit.
Open tender
08.07.16 single 10.08.16 04 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes PG yet to be submitted.
M/S Tirupati Metal Fabricators, 1433, Sector -16, Faridabad
(Haryana)-121002
Rs 102.58 lakhs
23.04.17 24.09.16 23.03.18 work is in progess.
8 Tender No. NWR/SC/Sadulpur-Bikaner/ 2016-17/ Civil - 4121401
02 dated 22.07.2016
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, stone pitching etc. and other miscellaneous works between
Ratangarh Junction cabin km 0.00 at km 329/6-7 on Ratangarh – Bikaner section) to Sardarshahar (including) km 46/750 in connection with Ratangarh- Sardarshahar gauge conversion project.
Open tender
24.07.16 single 29.08.16 04 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes PG yet to be submitted.
M/S Gurukrupa Enterprises, 2A,2nd Floor, Navnath Soc.2,B/H, Shradhadeep Soc.,Sharda School Road , Singanpor-Causway
Road, Surat-395004
Rs 784.49 lakhs
27.03.17 15.10.16 15.11.17 work is in progess.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
34
CE/C/HQ-JP
Dy. CE/C/DO
1 DO/GG
C/NL/1
8
Construction of Broad Gauge
Formation & Minor Bridges
from Chainage 41000.00 to
45000.00 between Dausa
and Lalsot in connection
with Dausa- Gangapur City
New Broad Gauge line
project.
Open t
ender
Single packet
system
14/1
1/2
007 Yes NWR/S&C/CA/97
dated
03/03/2008
M/s Atlanta-
ARSS (JV)
Bhubneshwar
(Orissa)
17.95 Crore 30/07/09
extended
upto
30/06/2014
14/03/08 - Work short
closed vide
HQ’s letter
dated
18/06/2014.
Final
measurement
s under
process
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
35
2 DO/GG
C/NL/2
1
Construction of BG
formation and Minor Bridge
from chanaige 45000 to
60000 bet. Lalsot and
Gangapur City in connection
with DO-GGC New B G line
Project O
pen
tender
24/0
9/2
007
Single Packet
system
02/1
1/2
007 3 Yes NWR/S&C/CA/95
dated
18/02/2008
M/s. ARSS
Infrastructure
Projects
Limited,
Bhubaneshwa
r
8.41
Crores
20/03/09
Extended
upto
30/06/15
15/03/08 - Contract has
been short
closed. Final
bill under
process
3 DO/GG
C/NL/2
2
Construction of BG
formation and Minor Bridge
from chanaige 60000to
75000 bet. Lalsot and
Gangapur City in connection
with DO-GGC New B G line
Project
O
pen t
ender
24/0
9/2
007 Single Packet
system
02/1
1/2
007 3 Yes Dy.
CE/C/I/JP/CA/17
dated
29/02/2008
M/s. ARSS
Infrastructure
Projects
Limited,
Bhubaneshwa
r
6.71 Crores 10/03/09
Extended
upto
30/06/2014
10/03/08 - Final variation
has been
vetted and
sanctioned.
Final bill
being
submitted to
A/c shortly.
4 DO/GG
C/NL/3
1
Construction of ROBs across
Railway track at chainage
37034,83925 & 37925 and
drainage over pass at
chainage 36960 & 37520
between salempura to
Udaikalan station
inconnection with Dausa-
Gangapurcity new BG line
project Open t
ender
Single packet
system
16/0
2/2
010
11 - - Yes NWR/S&C/CA/10
5 dated
22/11/2010
M/s Shree
Ram Kripa
Construction
Jaipur
13.44 Crore 29/02/2012.
Extended up
to
30/04/2016
- - Work
completed.
Final bill
under
process.
5 DO/GG
C/NL/3
0
Construction of single line
13 standard straight
alignment tunnel in soil and
rock including cut and cover
portion between chainage
38/720 to 40/840 including
side drain and other
approaches of tunnel
between Didwana- Lalsot
Railway station in
connection with Dausa-
Gangapurcity new BG line
project. Open t
ender
Single packet
system
27/0
7/2
009
12 - - Yes NWR/S&C/CA/10
6 dated
29/12/10
M/s Valecha-
Transtonelstr
oey (J/V)
Mumbai
53.02 Crore 27/09/2012.
Extended
upto
31/12/2015
- - Work
terminated on
07/07/2015.
Final bill is
under
technical
check..
6 DO/GG
C/NL/4
0
Laying and linking of BG
track and transportation of
P.Way material, PSC
sleepers etc between Dausa-
Deedwana section in
connection with Dausa-
Gangapurcity new BG line
project. Open t
ender
28/0
3/2
011
Single packet
system
18/0
5/2
011
6 - - Yes
Dy.CE/C/DO/CA/
56 dated
18/10/11
M/s Goel
Brothers Rail
Infra Pvt.
Ltd., Bareilly.
5.66 Crore 01/08/2012.
Extended
upto
31/10/2014
13/09/11 Work under
disputes.
7 DO/GG
C/NL/1
0(R&C)
R
Construction of broad gauge
formation from chainage
15000 to 28000 in
connection with Dausa
Gangapurcity new line
project(Risk & cost tender). Open t
ender
Single packet
system
11/0
1/2
013
2
- - Yes Dy.CE/C/DO/CA/
68 dated
16/04/13
M/s MCD Pvt.
Ltd., &
Aastha
Construction
Co.(JV),
Jaipur
3.30 Crore 05/07/13
Extended
upto
15/10/2014
08/04/2013 - Completed.
Final
measurement
s under
process.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
36
8 DO/GG
C/NL/6
0R
Construction of minor
bridges from chainage 00 to
30000 between Dausa-
Lalsot in connection with
Dausa- Gangapurcity new
BG line project open t
ender
Single packet
system
20/1
1/2
013
3 - - yes Dy.CE/C/DO/CA/
74 dated
14/03/2014
M/s Shree
Ram Kripa
Constructions
, Jaipur
Rs.4.74 Crore 10/06/2014
Extended
upto
31/12/2015
26/12/2014 Work
completed.
Final
measurement
s under
process.
9 DO/GG
C/NL/5
3
Construction of 3 nos Low
Over Pass at LC No. 4, 26 &
27 on Dausa- Gangapurcity
secton
Open t
ender
Two packet
system
06/0
9/1
3
4 - - Yes NWR/S&C/CA/13
6 dated
03/06/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.10.44 Crore 08/04/15
extended
upto
28/02/2017
- - Work in
progress.
10 DO/GG
C/NL/5
6
Construction of Road Over
Bridge at LC No. 5B on
Dausa- Gangapurcity
section
Open t
ender
Two packet
system
06/0
9/1
3
6 - - Yes NWR/S&C/CA/13
4 dated
16/05/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.13.43 Crore 12/07/15
extended
upto
30/05/2017
- - Work
completed.
Final variation
under
approval with
HQ.
11 DO/GG
C/NL/5
7
Construction of Road Over
Bridge at LC No. 24B on
Dausa- Gangapurcity
section
Open t
ender
Two packet
system
06/0
9/1
3
4 - - Yes NWR/S&C/CA/13
5 dated
19/05/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.13.75 Crore 09/07/15
Extended
upto
31/03/2017
- - Agreement
executed.
Work held up
for want of
funds and
approval of
MoRTH
12 AWR-
BKI/Do
ubling/
T/2
Earthwork in bank/cutting
including blanketing
material, construction of
major/minor bridges
including drop/curtain
walls, LHS, construction
S&T structures, platform
walls, PF shelters, FOB,
water huts, Staff quarters
etc. supply of stone ballast
and dismantling of existing
BG track, laying and linking
of Broad gauge main line,
loop lines including points
and crossings of various
yards spreading of ballast,
tamping of track
transportation of P. Way
material and other ancillary
works between Alwar-
Bandikui section in
connection with AWR-BKI
Doubling project.
Open
Two packet
system
21/0
3/2
016
8 6 2 Yes
NWR/S&C/CA/15
7 dated
05/09/2016
M/s NG
Project Ltd.-
M/s. Deem
Construction
Co. Pvt. Ltd
(JV), Jaipur
Rs.118.24
Crore 17/05/18 - -
Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
37
13 NWR/S
C/DO-
GGC/C
IVIL/5
14110
468
Supplying and stacking
machine crushed stone
ballast in stacks as per
Railway’s specifications
between Dausa &
Gangapurcity stations in
connection with Dausa-
Gangapurcity new line
project
open
Two packet
system
31/0
8/1
6
2 - 2 Yes
Dy.
CE/C/DOCA/81
dated
23/12/2016
M/s J.K.
Construction
Co., Nokha,
Distt Bikaner
Rs.14.33
Crore 06/04/18 - -
Work in
progress
14 NWR/S
C/DO-
GGC/C
IVIL/5
14111
804
Construction of balance work of single line BG standard straight alignment tunnel in soil and rock
including cut & cover portion, side drains, protection works on approaches of tunnel and other ancillary works from chainage 38600 to 40900 between Didwana & Lalsot Railway stations in connection with Dausa- Gangapurcity new BG line project
Open
Two Packet
system
20/0
6/2
016
5 3 2 Yes
NWR/S&C/CA.16
5 dated
01/02/17
M/s TCL-UTM
JV, Gurgoan Rs.54.46 Crore 22/03/18 - -
Work in
progress
15 NWR/S
C/LHS/
CIVIL/
51430
00100
1
Construction of kimited Height sub-way (08 nos) in lieu of level crossings in Dausa- Gangapurcity new line section in connection with elimination of level crossings O
pen
Two Packet
system
07/0
9/2
016
8 5 3 Yes
Dy. CE/
C/DO/CA/86
dated 10/03/17
M/s JMES-
KDC-
JPIS(JV),
Beawar,
Ajmer
Rs.10.00 Crore 04/02/2018 - - Work in
progress
16 NWR/S
C/DO-
GGC/C
IVIL/5
14110
201
Misc. balance works like finishing work of quarters, station buildings, platforms and construction of LHS providing platform covering, cess repairing, circulating area etc. between Dausa & Deedwana stations in connection with Dausa- Gangapurcity new line project
Open
Two Packet
System
13/1
0/2
016
7 5 2 Yes
Dy. CE/
C/DO/CA/83
dated 28/01/17
M/s. MCDPL-
Sunrise Infra
Project (JV),
Ajmer Road,
Jaipur
Rs.9.70 Crore
15/05/17
Extended
upto
30/09/2017
- - Work in
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF NOVEMBER, 2017
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
38
For CAO/C/JP
17 NWR/S
C/Alwa
r-
Bandik
ui/Civil
/51415
0803-
R
Flash butt welding of 60/ 53kg New/SH (72/90UTS) Rail joints by using mobile flash butt welding plant in connection with Alwar- Bandikui and Dausa- Gangapurcity new line project.
Open t
ender
Two packet
system
28/1
0/2
016
1 1 0 Yes
Dy. CE/
C/DO/CA/85
dated 06/03/17
M/s Railtech
Infraventure
Pvt. Ltd.
Allahabad
Rs.11.15 Crore 15/05/2018 - - Work in
progress
18 NWR/S
C/DO-
GGC/C
IVIL/5
14110
869-R
Balance work of laying & linking of Broad Gauge main line loop lines including points & crossings in yards,
spreading of ballast, tamping of track transportation of P-Way material and other ancillary works between Dausa- Gangapurcity new line project
Open
Single packet
system
23/1
1/2
016
- - - Yes
Dy. CE/
C/DO/CA/84
dated 17/02/17
M/s P.C.
Sharma,
Noida.
Rs.3.93 Crore
05/06/17
Extended
upto
31/07/17
- - Work in
progress
19 NWR/S
C/DO-
GGC/C
IVIL/5
14110
170
Balance earthwork and blanketing work including side drain, trolley refuges pitching diversion road etc. from chainage 67400 to 92670 between Piplai village and Gangapurcity in connection with Dausa- Gangapurcity new line project
Open
Two packet
system
17/0
4/2
017
2 1 1 Yes
M/s. KB-Shiv
Om (JV),
New Delhi.
Rs.13.60
Crore 20/06/18 - -
Work in
progress