STRUCTURE STILT + 4 FLOORS
FLOOR PLATE 2075 SQ.FT
NO OF FLOORS 4
EXTEND OF LAND 2.02 GROUNDS
UDS 59 %
BUILDING DIMENSION 72`.4” X 24`.6”
PROJECT DETAILS
STRUCTURE
❖ RCC framed structure with RC foundations confirming to BIS
❖ Anti-termite treatment as per BIS for the complete building.
❖ 8” thick AAC Blocks for the outer wall.
❖ 4’’ thick AAC Blocks for all internal partition wall.
WALL FINISHES
❖ Cement plaster white cement primer for all internal walls.
❖ External walls to be finished with structural gazing as per architect design
❖ The toilet walls finished with Joint free tiles
CEILING
❖ Common area ceiling areas will be finished with cement /Gypsum plaster.
Office space ceiling area will be finished with MYK Laticrete / Asian putty
FLOOR FINISHES
❖ Internal office space flooring would be finished with Double charged vitrified
tiles with matching skirting.
❖ Lobby and staircase areas will be finished with granite as per architect
design.
❖ Car park areas will be finished with 1ft X 1ft heavy duty vitrified tiles
❖ Columns in the car park will be provided with rubberized edge protection.
❖ Driveway will be finished with PCC Granolithic Flooring/interlocking paver
Blocks.
WINDOWS
❖ As per the Design of the Architect.
TOILET DOORS
❖ Water proof flush door with laminated finish
TOILETS
❖ Kohler wall hung European Water closets
ELECTRICAL
❖ Concealed insulated copper multi-strand wires in all circuits with a
distribution board having MCB`s will be provided
❖ Switches & Sockets of Legrand / Anchor
LIGHTINING ARRESTER
❖ Will be provided as per the design of the electrical consultant
LIFT
❖ The building will be served by a 10 passenger lift with automatic door
and ARD (automatic Rescue Device) of Schindler/Johnson or
equivalent make.
POWER SUPPLY & GENERATOR
❖ 3 Phase EB Power Supply with 100% Generator Back –Up with Individual meter
would be provided.
SECURITY
❖ CCTV provision in the common areas in the stilt and terrace area level
COMMON TOILET
❖ Common Toilet for drivers in the stilt level to be provided.
COMPOUND WALL
❖ 5 feet high compound wall on all sides of the plot.
LANDSCAPING
❖ Landscaping as per architects design.
SUMP
❖ One Underground RCC sump of adequate capacity for metro water.
BOREWELL
❖ One Bore well of required depth would be provided.
RAIN WATER HARVESTING
❖ As per the requirements of CMWSSB
EXTRA WORK
❖ If any additional work is required to be carried out or extra fittings are to be
provided, the same will be executed at extra cost after the Allottee approves
the estimate for extras and pay the extra cost in Advance.
CONSTRUCTION START DATE 14TH APRIL 2017
CURRENT STATUSFOUNDATION WORK IN
PROGRESS
COMPLETION DATE OCTOBER 2018
TIME LINE
MEMBER OF CERTIFIED OUR EDUCATIONAL
INITIATIVE
VELLORE
OUR C.S.R
INITIATIVE
VELLORE
A division of the Hong Kong based Newry Group
Newry Properties Private Limited
WE CARE… WE PROMISE… WE DELIVER…
For any further clarifications please
feel free to contact us at
75500 84343
www.newry.co.in
[email protected] No19, B – Block,
2nd Avenue
Annanagar East,
Chennai – 600 102
4343 9494