1.1. FIELDS OF ACTIVITIES
Construction of: Piled jetties (suspended deck structures supported on piles) Breasting and mooring dolphin systems with single or multiple piles Roll-on/Roll-off (Ro-Ro) terminal ramps Ferry terminals Steel sheet-piled walls Bored cast-in-place concrete piles (drilled shafts, drilled piers) Secant and contiguous pile walls Driven precast concrete piles Steel bearing piles (tubular steel piles and H-piles) Ground anchors Prefabricated drains (wick drains), sand drains Stone columns Jet grouted columns Micro piles Shoring systems for deep excavations Rehabilitation, refurbishment and repair of marine structures
Testing of Deep and Shallow Foundations: Static axial compressive load testing of deep foundations (ASTM D1143) Static axial tensile load testing of individual piles (ASTM D3689) Static lateral load testing of individual piles and pile groups (ASTM D3966) Instrumented pile load tests 1 High-strain dynamic testing of piles (ASTM D4945) 1 Low-strain impact integrity testing of deep foundations (ASTM D4945) 1 Ultrasonic cross-hole integrity testing of concrete deep foundations (ASTM D6760) 1 Zone load testing (ICE Specification for Ground Treatment, 1987) 1 Outsourced to specialist subcontractors (3rd party)
Engineering and Construction Management Works for: Marine structures (jetties, dolphins, quay walls) Bored cast-in-place concrete pile systems (bearing piles, secant & contiguous pile walls) Driven piles (steel sheet piles, tubular steel piles, steel H-piles, precast concrete piles) Embedded retaining walls (anchored and cantilever walls) Ground anchors (soil and rock anchors) Ground improvement (stone columns, jet grouting, dynamic compaction) Provision of experienced staff to carry out deep foundation works WPS, Static calculations
Core Engineering Disciplines: Civil Engineering Structural Engineering Geotechnical Engineering, Foundation Engineering Marine Structural Engineering Project Management, Planning, Scheduling, Budgeting, Cost Estimation Engineering Management and Consultancy Welding Engineering
1.2. OFFICE ADDRESS & CONTACT DETAILS
Deep Foundation Systems Engineering & Construction Ltd (Derin Temel Sistemleri İnşaat Mühendislik Sanayi ve Dış Ticaret Ltd Şti)
HEAD OFFICE: Yenişehir Mah. Şefika Sok. No:10 Dumankaya Flex B Blok Kat 5 Daire 134 Kurtköy, Pendik, İstanbul, 34912, Türkiye Telephone: +90 (216) 510 64 17 Facsimile: +90 (216) 510 64 17 E-mails: [email protected] [email protected] [email protected] Web page: www.derintemelsistemleri.com
DEEP FOUNDATION SYSTEMS ENGINEERING & CONSTRUCTION LTD
(DERİN TEMEL SİSTEMLERİ İNŞAAT MÜHENDİSLİK SANAYİ ve DIŞ TİCARET LİMİTED ŞİRKETİ)
2. MAJOR PROJECTS COMPLETED BY FOUNDERS
No. Project Name Location, Country Owner / Employer Contract Date of
Value (USD) Contract Completion
1 Construction of 1500 Villas Ubari, Libya Municipality of Ubari 75.000.000 1980 1984
2 Construction of 550 residential units Kosuyolu, İstanbul, Türkiye Murat Cooperative Society 25.000.000 1984 1987
3 Second Bosphorous Bridge Asian Side
Drainage Works
TEM 0-62 km, İstanbul,
Türkiye General Directorate of Highways [KGM] 12.000.000 1987 1988
4 Construction of İzmir Karşıyaka Jetty Karşıyaka, İzmir, Türkiye General Directorate of Railways, Harbors
& Airports Construction [TDI] 1.320.000 1988 1989
5 Construction of Kanlıca Jetty Kanlıca, İstanbul, Türkiye General Directorate of Railways, Harbors & Airports Construction [TDI]
225.000 1989 1990
6 Construction of Çengelköy Jetty Çengelköy, İstanbul, Türkiye
General Directorate of Railways, Harbors & Airports Construction [TDI]
610.000 1989 1990
7 Construction of Kınalıada & Burgazada
Jetties
Kınalıada & Burgazada,
İstanbul, Türkiye
General Directorate of Railways, Harbors
& Airports Construction [TDI] 1.460.000 1990 1991
8 Haydarpaşa Container Teminal,
Construction of Crane Rail Beams on Piles
Haydarpaşa, İstanbul,
Türkiye
General Directorate of Railways, Harbors
& Airports Construction [TDI] 825.000 1991 1992
9 Construction of Mudanya Jetty Mudanya, Bursa, Türkiye Municipality of Mudanya 1.290.000 1992 1993
10 Construction of Fuel Loading/Unloading Jetty (NATO)
Eastern Breakwater, Mersin, Türkiye
Ministry of Defence, NATO Infrastructure 6.620.000 1993 1995
11 Construction of Piers & Wharves for Frigates (NATO)
Gölcük, Kocaeli, Türkiye Ministry of Defence, NATO Infrastructure 12.800.000 1994 1996
12 Reconstruction of Berths 5 to 10 at East Wharves
Karachi Port, Karachi, Pakistan
Karachi Port Trust 47.998.000 1995 1999
13 Construction of Yenikapı Jetty and
Terminal Building Yenikapı, İstanbul, Türkiye
Istanbul Seabuses and Fast Ferries Inc.
[IDO] 1.970.000 1996 1997
14 Construction of Fuel Loading/Unloading Jetty (NATO)
Gölcük, Kocaeli, Türkiye Ministry of Defence, NATO Infrastructure 4.530.000 1997 1998
15
Construction of "The Grand Mosque for H. H. Sheikh
Zayed Bin Sultan The Second" Project,
Bored Piling Works
Abu Dhabi, UAE Municipality of Abu Dhabi 6.081.000 1998 1999
16
Reconstruction & Rehabilitation of Naval
Piers & Wharves Damaged After the 1999
Kocaeli Earthquake
Gölcük, Kocaeli, Türkiye Ministry of Defence & Turkish Naval Forces
8.775.000 1999 2000
17 Turkmenbashi Port Development Project, Construction Works Contract
Turkmenbashi, Turkmenistan
Turkmen Maritime & River Lines [Funded
by European Bank for Reconstruction & Development (EBRD)]
27.400.000 2000 2003
18 Installation of open-ended tubular steel piles for the Presidential Villa at Awaza
Awaza, Turkmenbashi, Turkmenistan
“TürkmenNebitGazGurluşyk” (State
Concern Turkmen Oil and Gas Construction)
527.000 2002 2002
19 Urea Production Plant - Construction of
stone columns Tejen, Turkmenistan GAP Construction Co. 546.000 2002 2003
20 Urea Production Plant - Construction of
bored piles Tejen, Turkmenistan GAP Construction Co. 590.000 2002 2003
21 Urea Production Plant - Construction of railway tracks
Tejen, Turkmenistan GAP Construction Co. 990.000 2002 2003
22 Türkmenbaşy Şäheri Ruhiýet Merkezi -
Construction of bored piles
Turkmenbashi,
Turkmenistan Asist Construction Co. 167.000 2002 2003
23 Türkmenbaşy Şäheri Ruhiýet Merkezi -
Construction of finger pier
Turkmenbashi,
Turkmenistan Asist Construction Co. 100.000 2003 2003
24 Mary Diagnostic Center - Construction of
jet grout columns Mary, Turkmenistan GAP Construction Co. 105.000 2003 2003
25 Dashoguz Diagnostic Center - Construction of jet grout columns
Dashoguz, Turkmenistan GAP Construction Co. 85.000 2003 2003
26 Yaslik Paper Factory - Construction of jet grout columns
Yaslik, Turkmenistan GAP Construction Co. 521.000 2002 2003
27 Petronas Supply Base - Quay wall repair works
Turkmenbashi, Turkmenistan
Petronas 97.000 2003 2003
28
Jumeirah Beach Residence Project,
Sectors 4 & 6 - Piling Works Contract (pile design, pile axial compression load
testing and interpretation)
Dubai, UAE
Dubai Technology Commerce and Media
Free Zone (TECOM) & Mace International Ltd
16.870.000 2003 2004
29 Kharg Island Project, Eastern & Western
Jetties, Pile Driving Works Kharg Island, Iran
Taisei Corporation & Rinkai Construction
(Japan) 390.000 2004 2004
30 Construction of Kuşadası Jetty Kuşadası, Aydın, Türkiye Ege Port 318.652 2004 2005
31
Piling Works to Rades - La Goulette Bridge (bored piles, driven precast
concrete piles, prefabricated vertical
drains, sheet piles)
Tunis, Tunisia Taisei Corporation (Japan) 5.180.000 2005 2006
32
Marmaray Project, Construction of Two
Temporary Dry Docks in Offshore
Element Fabrication Site in Tuzla
Tuzla, İstanbul, Türkiye Taisei Corporation (Japan) 5.750.000 2005 2006
33
Construction of Bulk Liquid Berth C1 for
the New Port and Fishery Harbour at Wilayat Sohar
Sohar Industrial Port, Sultanate of Oman
Ministry of Transport and Communications
20.488.500 2005 2006
34
Sohar Aluminium Smelter Project -
Supply, Installation and Testing of Bored Cast-In-Place Concrete Piles
Sohar Industrial Port,
Sultanate of Oman Bechtel & Sohar Aluminium Company 9.810.000 2006 2007
35 Construction of Liquid Cargo Terminal at
Port Muhammad Bin Qasim Karachi, Pakistan FWQ Enterprise Pvt Ltd 10.500.000 2006 2007
36
Bored Cast-In-Place Concrete Piling
Works in Berths 9 to 14 and Fishery Harbour Quay Wall
Sohar Industrial Port, Sultanate of Oman
Ministry of Transport and
Communications & Six Construct - Interbeton J.V.
4.410.000 2006 2007
PERSONAL DETAILS:
Family Name: Öncü
First Name: Mahmut Celal
Date of Birth: 23 March 1957
Place of Birth: Beykoz, İstanbul, Turkey
Nationality: Turkish
Civil Status: Married (father of one child)
EDUCATION:
IDMMA Galatasaray Engineering Faculty, 1980
Ferit İnal High School, 1975
Beykoz Junior High School, 1972
Language Skills: Turkish (native), English
Membership of professional bodies:
Union of Chambers of Engineers and Architects of Turkey, Chamber of Civil Engineers
PRESENT POSITION: Partner and Director
KEY QUALIFICATIONS:
Civil engineering.
Construction of residential buildings.
Construction of storm water drainage systems.
Management and execution of earthworks.
Construction of marine structures, jetties, dolphins, sheet pile walls.
Construction of bored cast-in-place concrete piles, secant and contiguous pile walls.
Construction of ferry terminals and ramps.
Installation of driven precast concrete piles and steel bearing piles.
Construction of shore protection/revetment systems.
Installation of wick drains and sand drains.
Construction of jet grout columns and stone columns.
Execution of full-scale static pile load testing, instrumented pile load testing.
Construction of soil and rock anchors.
Rehabilitation, refurbishment and repair of marine structures
Construction of shoring systems for deep excavations
Management and execution of dredging works.
Project Management, construction management, site supervision and management.
Construction planning and scheduling.
Cost estimation, master planning, budgeting.
Determination of construction methods and project resources based on local conditions.
Selection and scheduling of manpower and machinery, equipment & plant.
Management of project finances and cash flow.
Progress reporting.
PROFESSIONAL EXPERIENCE:
Ayson Geotknik Marine Construction Co, İstanbul,Turkey
General Menager (2007/07 – 2013/12)
STFA Marine Construction Co, Istanbul, Turkey
Project Coordinator (2006/10 – 2007/07)
Al Habtoor – STFA Soil Group LLC, Abu Dhabi, UAE
Operations Manager (2006/03 – 2006/10)
STFA Temel Pile Construction Co, Istanbul, Turkey
Assistant General Manager, Operations (2005 – 2006/03)
Project Manager, Kharg Island Jetty Project, Piling Works, Iran (2004)
Project Manager, Turkmenbashi Port Development Project, Turkmenistan (2000 – 2003)
Project Manager, Reconstruction of Gölcük Jetties, Turkey (1999)
Project Manager, Abu Dhabi Grand Mosque Project Piling Works (1998-1999)
Project Manager, Gölcük Fuel Ships Jetty Construction, Turkey (1997 – 1998)
Project Manager, Yenikapı Seabus Jetty and Terminal Building Construction, Turkey (1997)
Project Manager, Gölcük Frigate Piers Construction, Turkey (1995 – 1996)
Project Manager, Mersin Fuel Facilities Jetty Construction, Turkey (1993 – 1995)
Site Manager, Mudanya Jetty Construction, Turkey (1992)
Site Manager, Kınalı & Burgaz Jetties Construction, Istanbul, Turkey (1991)
Site Manager, Haydarpaşa Container Crane Foundation Construction, Istanbul, Turkey (1991)
Site Manager, Çengelköy Jetty Construction, Istanbul, Turkey (1989 – 1990)
Site Manager, Karşıyaka Jetty Extension & Repair, İzmir, Turkey (1988 – 1989)
Sezin Construction Co.
Site Manager, Second Bosporus Bridge, Construction of Drainage System & Auxiliary Structures, Istanbul, Turkey (1988 – 1987)
Murat Construction Cooperative
Site Manager, Construction of 550 Houses, Istanbul, Turkey (1984 – 1987)
Libaş Construction Co, Ubari, Libya
Area Representative, Construction of 1500 Houses, Ubari, Libya (1980 – 1984)
Date: 08 August 2007
Curriculum Vitae
Personal information
First name(s) / Surname(s) Fatih Öncü
Address(es) Koşuyolu Barboros mah. Veysipaşa sokak 100. Yıl sitesi E/Blok Daire/7 Üsküdar
Telephone(s) (216) 474 79 63 Mobile: (536) 863 27 10
E-mail fca1187 @hotmail.com
Nationality T.C.
Date of birth 27.10.1985
Gender Male
Occupational field Metallurji and Material Engineer /Quality Management
Persona skills and competences
Mother tongue(s) Turkish
Other language(s)
English
English Education
İstek Belde High
school
Seven Years English education
English Course St. Giles English curse finishing at Upper-lntermediate level
Education
Istanbul University Metallurgy and Material engineer ODTU International Welding Engineer
Professional Trainings
TMMOB Çevre Mühendisleri Odası İstanbul Şubesi
19-21 November.2009 ISO 9001:2008 KALİTE YÖNETİM SİSTEMİ BİLİNÇLENDİRME VE İÇ DENETÇİ EĞİTİMİ
24-26 December.2009
OHSAS 18001:2007 İŞ SAĞLIĞI VE İŞ GÜVENLİĞİ YÖNETİM SİSTEMİ BİLİNÇLENDİRME VE İÇ TETKİKÇİ
Istanbul Teknik University
02/2010 KALİTE YÖNETİCİLİĞİ SERTİFİCA PROGRAMI
Work experience
Dates
Occupation or position held
Name and address of employer
Work experience
Dates
Occupation or position held
Name and address of employer
Work experience
Dates
Occupation or position held
Name and address of employer
References
Mahmut Celal Öncü
Levent Tek
İSO 14001 ÇEVRE YÖNETİM SİSTEMİ İÇ TETKİKÇİLİK SERTİFİKASI
ISO 9001 KALİTE YÖNEYİM SİSTEMİ VE OHSAS 18001-2007 İSİG İÇ TETKİKÇİLİK SERTİFİKASI
1
03.2011 – 08.2012
Responsible of Quality Doğuş Group- Ayson Geo-technic and Marine Construction C.O/kavacık
2
01.2013 – 07.2013
Responsible of Quality Group- Ayson Geo-technic and Marine Construction C.O. Üsküdar – Ümraniye - Çekmeköy Metro Projesi
3
07.2013 – 01.2014
Project Managment Systems Group- Ayson Geo-technic and Marine Construction C.O
İzmit Körfez Geçiş Köprüsü IKG Projesi
Ayson - General Manager 0532 247 25 63
Ayson - Project Manager 0532 406 29 31
Curriculum Vitae
Personal information
First name(s) / Surname(s) Aynur Öncü
Address(es) Koşuyolu Barboros mah. Veysipaşa sokak 100. Yıl sitesi E/Blok Daire/7 Üsküdar
Telephone(s) (216) 474 79 63 Mobile: (533) 368 91 03
E-mail [email protected]
Nationality T.C.
Date of birth 23.07.1960
Gender Male
Occupational field Chemical and Matallurji Engineer
Persona skills and Competences
Mother tongue(s) Other language(s)
Education Work experience
Dates
Occupation or position held
Name and address of employer
Work experience
Dates
Occupation or position held
Name and address of employer
Turkish
English Istanbul Tecnical University Metallurgy and Chemical engineer
1
1984 – 1993
Responsible of Quality Deva İLAÇ
2
1997 – 2002
Mesur Müdür Medifarma İlaç