Using Load Bank Solutions to Optimize Data Center Commissioning
comrent.com 888.881.7118
Why test with load banks? Datacenteroperatorswhoproperlyleverageloadbanktechnologyduringdata-centercommissioningcanvalidatetheirelectricalandmechanicalinfrastructureperformance,isolateandcorrectissuesbeforeproduction,qualifyforLEEDcertification,acceleratecommissioning,andreducetheiroveralldatacentercommissioningcosts.
Conductingloadbanktestingallowsdatacenterengineersandfacilitymanagerstominimizethelikelihoodofcostlypost-deploymentconfigurationchanges.Loadbanktestingalsovalidatesroomdesign,equipmentplacement,aswellastheoveralleffectivenessofcooling-systemsandpower-distributioninfrastructure.
Partnering with a Load Bank ProviderThroughpartnershipwithaloadbankpartner,criticalfacilitiesmanagersandengineerscanidentifypotentialproblemsearlyintheprocess.Thatway,theycanavoiddelaysaswellascostoverrunsduringcommissioningandoperationaldowntimepost-deployment.
Furthermore,fullsystemintegrationtestingofcriticalsystemsduringcommissioningestablishesanaccuratebaselineforongoingoperationalperformanceandisavaluablesalesandmarketingtoolindiscussionswithfuturetenants.
Read on to discover the benefits of load bank testing your data center.
Introduction: Why are load banks critical for my data center?
Your Load Bank Partner
Youshouldchoosealoadbankpartnerthatwillnevermakeyoufeellikeyouarealoneintheprocess.Aconsultantshouldalwaysbeknowledgeable,experienced,andavailabletoworkwithyou,side-by-side,toensureyouarehavingthebestandmostefficientexperiencepossible.
ComRent Load Bank Solutions 1
comrent.com 888.881.7118
• Load bank technology provides accuracy, efficiency and safety in commissioning Thedemandforhigherserverdensityhassubstantiallyincreasedthecomplexityofdatacenterdesignandimplementation.Certaincomponents,likehighserverthermaloutput,hot-aisle/coldaislerackpositioning,andcomplexcoolingmechanisms,increasethedifficultyofdatacentersimulationmakingitexponentiallymorecriticalfordatacenteroperatorstoimplementaloadbanktestingstrategy.Precisesimulationoftheoperationalcharacteristicsofproductionserversrequirestechnologythatpreciselymimicstheactualelectricalload,heatgeneration,airflow,andphysicaldimensionsofserverracks.
• Customizing a solution tailored fit for your needs Unfortunately,traditionalsimple“suitcase”loadbanksareoftennotabletosimulateairflowproperly,resultinginthefailuretopredicthotspotsinproductiondeployments.However,havingacustomizedplatformofrackmountedloadbanksthatcanvaryelectricalload,heatandairflowandsimulate“blackstart”andmaximumoperatingconditionsisessentialtoprecisedata-centersimulation.
ComRent Load Bank Solutions 2
Benefits of Data Center Load Bank Testing
• Limit overall cost Leveragingtheproperload-banksolutionalsoensuresthatthecommissioningprocessitselfoccurswithinbudget.Laborisbyfarthelargestsinglelineitemduringthedatacentercommissioningprocess.TheabilitytomanageWi-Fi-enabledloadbankswithWindowsandAndroiddeviceseliminatestheneedtophysicallymovearoundthedatacentertomanuallyadjustloadstepsandfanspeedsinordertocompletetests.Inaddition,fortestingtheemergencydieselgenerators,medium-voltageloadbanksreducerequiredcablingbyafactoroffifteenandreducesetuptimebyafactoroffive,furtherdecreasinglaborcostswhilecreatingfewerpointsoffailure.
• Keep an eye on your analytics and monitoring for optimal accuracy and efficiency Newpower-qualitymonitorshaveimprovedcapabilitiestocollectadatasetmorerichthanwhatcouldbeachievedjustafewyearsago-measurementscanbetakenattherack,aisleorroomlevelfromindefinitecollectionpoints.Inadditiontoaccuracyandefficiency,loadbanksolutionsmustnotjeopardizethesafetyoftheelectricalandcoolingsystemstheytest.Toavoiddisasterduringcommissioning,itisessentialtoleveragesystemsthatprovidewrong-voltagedetection,power-supplyshutdown,andthermaloverloadprotection.
comrent.com 888.881.7118
Additional Benefits of Load Bank Testing
Long-term Benefits of Structured Room Validation TestingAlthoughloadbank,cableandswitchgearrentalisnotinexpensive,thesecostsareeclipsedbythecapitalsavedthroughtheavoidanceofexpensiveproblemspost-deployment.That’swhyidentifyingproblemsduringthecommissioningphaseprovidestheopportunitytofixissuesbeforeafacilitygoesintooperation.
EvenifanenterprisereducesbyjustafewpercentagepointsitstotalITlaborcostsoverthelifespanofatypicaldata-center,thenloadbanktestingwillprovidepositivereturnoninvestment.Itisalwayslessexpensivetofixaproblembeforedata-centeroperationsbeginthanafterserversareputintoproduction.Peaceofmindisavaluablethingtoconsider,especiallywhenitcomestomaintainingyourreputationwithyourclients.
Beyondtheobviousadvantageofensuringoperationalsuccessofanewlyconstructeddatacenterviavalidationofsystemdesignandperformance,loadbanktestingiscriticaltosuccessinotherareas,including:
• Documenting thermal and electrical load requirements» Reassuresclientsofprotectionagainstuninterruptedservicebyconfirmingthat
equipmentmeetsalltestspecifications(e.g.,validationofbackup-generatorandUPSperformance)
» ProvidestheabilitytooptimizerackplacementorHVACsettingstooptimizefacilityenergyefficiencyperformance
» Reducestechnicalandfinancialriskoffuturedatacenterupgradesorexpansions
• Ensuring accuracy of budgetary data» Validatescapitalexpenditure(CAPEX)budgetbyconfirmingthatequipment
meetsalltestspecifications» Confirmspowerandcoolingrequirementsforincorporationintooperating
expense(OPEX)budget» Reducesfinancialrisktoclients–reducingthelikelihoodofunbudgetedcost
increases
• Simplifying compliance with regulatory requirements» Providesintegratedcommissioningplantofulfillrequirementsofcontactaward/
negotiationprocess» Ensurescompliancewithlocal,stateandfederalenvironmentalregulations–
vitaltoconstructionpermits
• Leadership in Energy and Environmental Design (LEED) certification» AssistsclientsinattainingLEEDcertification» Demonstratescommitmenttoenvironmentalstewardship–
generatingfavorablepublicity» Demonstratescommitmenttoenvironmentalstewardship–
generatingfavorablepublicity» Ensuringcoordinationandcommunicationamongcommissioningagentsand
general,electricalandmechanicalcontractors
ComRent Load Bank Solutions 3
comrent.com 888.881.7118
Determining Which System Type is the Right Fit for Your Facitility
ComRent Load Bank Solutions 4
• Load Banks for UPS SystemsInaddition,loadbankscanbeusedtotestthebehaviorofUPSsystemsduringasimulatedpoweroutage.LinkableloadbanksforUPStesting(ofteninthe400Kwrange)areavailablethatcanbeusedtotestresistiveandreactiveloadsatavarietyofpowerfactors(PFs).BatterystringscanbetestedusingDCloadbanks.
• Power Distribution TechnologiesNotonlymustpowergenerationbetested,butalsopowerdistribution.Newsystemsareavailablethataccommodatepowerdistributionunittestinginavarietyoflocations,includingundertheraisedfloortrack,inaremotepowerpanelorinanoverheadbustrack.Newbustrackadaptersallowforfastersetupandshortercableruns.
• Testing in Unique EnvironmentsManydatacenterfacilitiesrequirea‘pindrop’quietworkingenvironment.Luckily,therearehighlyattractivealternativestotraditionalair-cooledunitsavailablethatconsideryouruniquesituation.Forexample,watercooledloadbanksareonealternativethatisquiet,butalsoallowsforindoorinstallationsincontrolledenvironmentsversusoutdoorswhereunitsareexposedtotheelements.
Besidesbeingcompletelyinaudible,thesesystemsarehighlycompact,virtuallymaintenancefree,andidealforinstallationinbuildingsincentral-cityareas,industrialparksorofficecomplexeswhereanoutdoorair-cooledunitwouldbearchitecturallyobtrusiveorimpossibletoinstallduetospaceornoiserestrictions.
• Real-Time ReportingSimilarly,advancesinpowermonitortechnologyofferanalogousflexibilityandoptimization.Themostmodernpowermonitorsprovidemechanismsforsimplelinkagetoavarietyofreal-timereportingsystemsandoftencontainanumberofadvancedfeatureslikeharmonics,currentsummationandtemperature/humidityreadings.
• Advanced Cooling SystemsThetestingofcoolingsystemsisjustascriticalasthatofpowersystems.ItisessentialtoensuretheCRAC’scapacitytoprovideoptimalthermalconditions(constanttemperaturesandhumiditylevels)athighserverloads.Testingsystemsmustbeusedthatmeasureroomairflow(incubic-feetperminute)androomtemperaturechange(“deltaT”)inavarietyofroomconfigurationsandcontainerenvironments.
Read on to learn more about the latest in monitoring technologies and cooling systems.
Therearevariousstate-of-the-artloadbanktestingsystemsforalltypesofinfrastructure.Duringdatacentercommissioning,you’llneedtopayspecialattentiontotheperformanceofthefollowingtypesofsupportinginfrastructure:
• Back-Up Generators• UPS Systems• Automatic Transfer Switches• Power Distribution Units (PDUs)• Computer Room Air Conditioning
(CRAC) systems• Server Containers and Layouts
Testing Equipment Available:Generally,themoreadvancedtheloadbanktechnology,themoreaccuratethetestingresults,andthemoremoneythatcanbesavedinlaborduringthecommissioningprocess,whichiswhyit’simportanttobecomefamiliarwiththelatestdevelopmentsintestingequipmentforalltypesofdatacenterinfrastructure.Hereareafewofthem:
• Medium-Voltage Emergency Diesel GeneratorsFordatacentersdeployingmedium-voltageemergencydieselgenerators(arelativelycommonoccurrencetoday),commissioninglaborcostscanbereducedthroughtheuseoftransportablemedium-voltage(13.8kv)loadbanksthatdonotrequireseparatetransformers.
Systemsarecommonlyavailablethatdissipatefivemegawattsandarelinkableforloadsupto100megawatts.Setuprequiresasmallernumberofmedium-voltagecables(asfewasoneperphase)–drasticallyreducingset-uptime.
comrent.com 888.881.7118
Optimizing Your Data Center for Optimal PerformanceMostdatacenterthermalissues–suchashotspotsorovercooling–stemfrompoorairflowmanagement.Asubstantialamountofcoldairdoesnotreachtheserverduetobypassandrecirculationairflow.Beingabletolocateandeliminatethecoldairwasteattheservercanleadtoanenergyefficientdatacenter.Todosorequireseffectiveenvironmentalmonitoring.
Manydatacenterengineersuseinfraredguns,wirelesssensors,DCIMorBASsystemstomeasureoverallperformanceoftheirdatacenter’stemperatureandairflow.Howeverthesesystemstypicallyrequiresignificantinvestment,installationtime,andbackendmanagement,orsacrificeaccuracyforaquick,cheapsnapshot.
Luckily,ComRentusesinnovativeandcost-effectivetools,suchastheAUDIT-BUDDY™portableenvironmentalmonitoringsystem,thatcanpinpointanddiagnosethermalissuesattheserver,rackandaisleleveltoprovideturn-keydatacentercommissioningandsolutions.
Whenoptimizingyourdatacenter,partnerwithaloadbanksolutionsproviderwhousesproducts,liketheAUDIT-BUDDY™system,thatallowformoreprecisemeasurementofyourdatacenter’sperformanceandoveralltemperatureataminimalcost.
ComRent Load Bank Solutions 5
AUDIT-BUDDY™
• Portabletemperatureandhumiditymonitor
• Spotcheckairqualityanddiagnoserack-levelcoolinginefficiencies
• Recordsreal-timeandlongtermscanswithouttouchingtheserverracks
• Operationalrightofthebox;noinstallorimpactoninfrastructure
• ReadandanalyzedatadirectlyinMSExcel
Developing a Structured Commissioning PlanForadatacentertorunatoptimalcapacity,developingastructuredcommissioningplanthatconsiderstheeffectofloadbanktechnologyiscritical.
Regardlessofthetypeofloadbanktestingsystemsincorporatedintoadatacenter’scommissioningprocess,itisessentialtodevelopagranular,comprehensivetestingblueprintthatanticipatesfuturecomputationaldemandsontheserverinfrastructure.
When should load testing occur?Loadbanktestplanningshouldoccurasearlyintheoverallprojecttimelineaspossible,becauseloadbanktestingpromotesaniterativedesignmodel:Testspecificationsthatarenotvalidatedinitiallycanbereferredbacktoengineersforredesignandoptimization.Thisproactive,structuredapproachidentifiesproblemsbeforethefacilitybecomesoperational,ensuringthattheITinfrastructureisabletoperformatcapacityupondeployment.
An integrated commissioning plan supports a thorough risk assessment that focuses on:
• Verifyingsystempower-consumptionandthermalperformancepriortoproductionusingasimulatedoperatingenvironment
• IdentifyingpathtowardLEEDcertification• Collectionofdatatosupportfutureexpansions/upgrades• Reducingfinancialandtechnicalrisksofre-engineering
comrent.com 888.881.7118
A Case Study Example of Reactive vs Proactive Data Center Commissioning
Note: In the following comparative analysis of approaches to load bank testing, the names of two actual companies performing data center construction are changed to “Enterprise A” and “Enterprise B”.
ComRent Load Bank Solutions 6
Enterprise A EnterpriseAwaiteduntilitsdatacenterconstructionprojectwasnearcompletiontofinalizetheloadbanktestingplan.Engineersfailedtoadequatelyplanfortotalloadrequirements,equipmentplacementandcablesruns.Whentheequipmentarrived,theloadbanksdidnotfitinthefreightelevatorandhadtoberelocatedoutside.
Asaresult,thecablerunswereshortandtheschedulewasdelayed.Itrainedonthedaythetestwasscheduledtobeginandasindoorloadbanksdon’tfunctionwellintherain,theschedulewasdelayedagain.ItwasalsoassumedthatunforeseendeficienciescouldbeaddressedasITequipmentwasactuallybeingdeployed,sothetestdidnotfullyvalidatehot-aisle/coldaislelayoutandCRACperformance.
Asaresult,therewerenumerouscostlydatacenterconfigurationchangesanddelaysinraisedfloordelivery.Torecover,acomprehensiveandexpensiveinitiativeinvolvingelectricalandmechanicalcontractorswasrequiredtorectifynumerouselectricalandmechanicalperformanceissues.
Intheend,thelackofcoordinationbetweenthedesignfirm,generalcontractor,electricalcontractor,mechanicalcontractorandcommissioningagentresultedinaprojectthatwasoverbudgetanddeliveredbehindschedule.
Enterprise B EnterpriseBstarteddevelopingthecommissioningplanalmostayearbeforecommissioningwasscheduledtostart.Withtheinvolvementofthedeveloper,theGeneralContractorworkedwiththeElectricalContractor,themechanicalcontractor,thecommissioningagentaswellastheloadbanksuppliertodevelopanintegratedcommissioningplan.
Asthespecificationswerereviewed,itwasdeterminedthattherewasarequirementforalevelofhotaisle/coldaisletestinggranularityforwhichtherewasnoavailablesolution.Whatwasneededwasarackmountedserversimulatorthatsimplydidnotexist.TherewerealsointegratedsystemstestsinvolvingthegeneratorplantandUPSthatrequiredmultipleloadbanksolutionsandtestcoordination.
However,becausethecommissioningplanwasdiscussedanddevelopedveryearlyintheconstructionprocess,therewastimetodevelopandbuildasolutionthatmetthestringentcommissioningspecificationsthedeveloperrequiredaswellasdevelopacoordinatedtestingschedulethatenabledthefacilitytobecommissionedasatotalsystemvs.independentanddisparatecomponents.
comrent.com 888.881.7118
ComRent Load Bank Solutions 7
ApproAch EntErprisE A - rEActivE EntErprisE B - proActivE
Planning Thecommissioningplanfinalizedlateinconstructionprocessandloadbanksprocuredatthelastminute.
CommissioningplancoordinatedwithGC,EC,MC,Cxandloadbankvendormonthsbeforestartofcommissioning.
Commissioning RulebyMurphy.SignificantProblemsResultinginScheduleDelaysandcostoverruns.Multipleindependentsystemtests.
Integratedsystemscommissioningplanwithsimulationofthermal&electricalloadstovalidatedesignspecs&operationalperformance.
Schedule Numeroustechnicalissuesidentifiedpost-delivery,requiringexpensiveretrofits.Deliverydelayed.
Highlyreliabledatacentercompletedontime.
Financial Projectoverbudget.Revenuemodelnotachieved. Provendatacenterdeliveredwithinontime,onbudget.Revenuemodelachieved.
ConclusionDevelopingacomprehensivecommissioningplanearlyinthedesignandconstructionphasehelpsensurethatallcommissioningspecificationsareadequatelyplannedforandmet.Employingadvancedloadbanktestingequipmentandpartneringwitharespectedequipment/servicesproviderisessentialtoreducingoveralldata-centercommissioningcosts.Byvalidatingsystemdesignandperformancebeforeproduction,loadbanktestingensurestheoperationalsuccessofanewlyconstructeddatacenterandreducesthelikelihoodofcostlypost-productiondatacenterreconfigurations.
SummaryThisproactiveapproachenabledEnterpriseBtofullyvalidatedesignspecificationsandoperationalperformanceoftheentirefacilityasasystem,beforethefacilitywasoperational.Simulationofdatacenteroperationalthermalandelectricalloadsrevealedseveralissuesthatwereabletobecosteffectivelycorrectedwhilestayingwithininitialscheduleandbudget.
comrent.com 888.881.7118
Purchasing vs Renting
Althoughloadbanksystemscanbepurchased,itisoftenmorecosteffectivetorentthesystemsinstead,asthesystemsaretypicallyusedonlyonce(duringcommissioning).Inadditiontothesignificantinitialcapitalexpenditure,loadbanksmustbeserviced,maintainedandstored.Thereisalsotheaddedcostoflogisticsmanagementandpersonalpropertyinventorytaxes.Whenaddedup,thetotalcostofownershipissignificantlyhigherthanisexpected.
Furthermore,rentedloadsystemshaveahigheron-sitereliabilityfactor;powermonitoringtoolsarecalibratedbeforeeachrentalandoftenhaveupgradedfirmware/software,ensuringbetteraccuracyandloweroverallcost.
Check us out on social media for the latest in industry news and insights from the ComRent team:
ComRent Load Bank Solutions 8
Contact Us
Wehopeyoufoundthiswhitepaperusefulandlookforwardtoprovidingadditionalpublicationsthroughouttheyeartohelpyourbusinessstayaheadofthecurve.
With18strategicallylocatedcentersandNorthAmerica’slargestinventory–over2,500piecesofequipmentand90milesofcable–ComRentcanmeetawidevarietyofloadrequirements,regardlessofyourindustryandtestingobjectives.Andwithover30,000loadtestsperformedanda99.99%onsiteperformancerecord,there’snobetterormoreexperiencecompanyinthebusiness.ComRentisyoursinglesourceforelectricandthermalloadtesting.