Security deposit/Performance bond
Law, regualation and requirements
Site inspection and site survey
Access and egress
Progress PhotographsProgress report
Site meetings
Site office and temporary building
Site office and temporary building (contd)
Site management and supervision
Site agent
Contractors site staff
Plant and equipment
Materials test
Form of contract (cont'd clause 5)
Form of contract (cont'd clause 19,20,21)Temporary access roads
Temporary Drains
Temporary crossings
Existing roads
Temporary electricity supply
Water for works
Temporary lighting (contd)
Telephone
Mosquitoes prevention
Pumping
Pollution
Signboard
Sheds etc
Safety,health and welfare of work people
Sanitary accommodation
Safety measures for the consurction of buildings
Site security
General scaffolding and staging
Shop drawings
As built drawings and opperating and maintainace instructions
Keeping site dry
Removal of rubbish
Clearing the works and handing overTemporary hoarding
Stamping of contract document
Calculated Preliminaries
Page 1/6 (performance bond)
Page 1/7
page 1/10
page 1/12
page 1/13
Description
7/29/2019 Contractor Evaluation ABC
11/30
Page 1/14
page 1/15
page 1/16
page 1/18
page 1/21
Page 1/25
page 1/29
page 1/33Page 1/49
page 1/50
page 1/52
page 1/53
page 1/54
page 1/56
page 1/57
page 1/58
page 1/59
page 1/60
page 1/64page 1/66
page 1/68
page 1/69
page 1/71
page 1/72
page 1/75
page 1/79
Electrical services
Electrical services
Electrical services
Telephone and CCTV system
Telephone and CCTV system
Telephone and CCTV system
Cold water and sanitary plumbing services
Cold water and sanitary plumbing services
Cold water and sanitary plumbing services
Fire fighting services
Fire fighting services
Fire fighting services
Airconditioning services
Airconditioning services
Airconditioning services
Lift installationLift installation
Lift installation
Landscaping works
Landscaping works
Landscaping works
Glass canopy roof
Glass canopy roof
Glass canopy roof
7/29/2019 Contractor Evaluation ABC
12/30
Glass railing to main staircase first & second floor terrance and void area
Glass railing to main staircase first & second floor terrance and void area
Glass railing to main staircase first & second floor terrance and void area
Timber pergola with transparent polycarbonate sheet
Compact TNB sub-station
Rainwater harvesting retention tank
Entrance culvert slab
Fencing wallMild steel entrance gate
Contingencies sum
Calculated Prime cost and provisional sums
Page 2/2
Page 2/3
Page 2/4
To provide design and shop drawings
setting out pile points
Grout test
Piling equipment
Piling equipmentPiling records
Piling records
Piling records
Piling records
Piling records
Piling records
Load test
Load test
Page 3/1
Page 3/2
Page 3/6
Piling equipment
Piling equipment
Piling equipment
Setting out and as-built drawings
Setting out and as-built drawings
supply,deliver,unload,handle,transport, pitching within the site
supply,deliver,unload,handle,transport, pitching within the site
supply,deliver,unload,handle,transport, pitching within the site
drive only with jacked-in method; complete with standard x-point shoe
extension joint
cutting off pile heads
pile pluggingLoad test
Load test
Calculated Piling works
Page 3/9
Page 3/10
Page 3/11
Micro Piling works
Pretensioned spun concrete piles
7/29/2019 Contractor Evaluation ABC
13/30
Excavator: Below lowest floor level
Excavator: Below lowest floor level
Excavator: Below lowest floor level
Excavator: Below lowest floor level
Excavator: Below lowest floor level
Concretor: Below lowest floor level
Concretor: Below lowest floor level
Concretor: Below lowest floor levelConcretor: Below lowest floor level
Concretor: pile caps, column stumps, ground beams lift pit walls
Concretor: ground slab BRC A7
Concretor (sawn formwork): pile caps, column stumps, ground beams lift pit walls
Sundries: underneath ground slab
Sundries: underneath ground slab and beams
Sundries: lift pit walls
Page 4/1
Page 4/2
Page 4/3
Concretor: suspendend floor beamsConcretor: columns
Concretor: lift core walls
Concretor: mild steel and high tensile bar reinforcement; links, stirrups or binders
Concretor: swan formwork; sides, vertical, soffit
Prestressed concrete floor beams: second floor beams
Prestressed concrete floor beams: third floor beams
Frame: structural steel; Sundries
page 4/5
page 4/6
page 4/7
Concretor: suspendend floor slab
Concretor: suspendend cornice slab
Concretor: mild steel and high tensile bar reinforcement; links, stirrups or binders
Concretor: suspendend floor slab
waterproofing membrane
pavior
Concretor: suspendend roof beams
Concretor: suspendend roof slab
Concretor: suspendend roof slab
Concretor: mild steel and high tensile bar reinforcement; links, stirrups or binders
Concretor: mild steel and high tensile bar reinforcement; links, stirrups or binders
concretor: sawn formwork; sides and soffit suspended roof beams
concretor: sawn formwork; soffit; horizontal suspended roof slabProprietary steel roof truss: pitched roof; 30 degrees
Proprietary steel roof truss: pitched roof; 10 degrees
Roofer: pitched roof; 30 degrees
Roofer: extra over for ridge capping
Roofer: pitched roof; 10 degrees
Roofer: pitched roof; 30 degrees (1 layer of bison woven 2 double sided aluminum foil)
Roofer: pitched roof; 10 degrees (1 layer of bison woven 2 double sided aluminum foil)
Roofer: pitched roof; 30 degrees (1 layer of roxul 50mm thich x 40kg/m3)
7/29/2019 Contractor Evaluation ABC
14/30
Roofer: pitched roof; 10 degrees (1 layer of roxul 50mm thich x 40kg/m3)
Rainwater goods: 100mm diameter
Rainwater goods: extra over for bends
Rainwater goods: extra over for forming outlets
Rainwater goods: extra over for 150mm diameter dome grating
Rainwater goods: Embedded ground slabs (100mm diameter)
Sundries
SundriesWaterproofing membrane
pavior
page 4/10
page 4/11
page 4/12
page 4/13
Concretor: to staircase
Concretor: to landing slab; 175mm thick
Concretor: to landing beam
Concretor: to staircase and landing slab
Concretor: to landing beamsConcretor: undercut risers; exceeding 100mm but not exceeding 200mm high
Concretor: open string including cutting to profile of threads and risers
Concretor: landing slab, staircase, landing beams
Plasterer: sides of open string; extreme 300mm wide
Plasterer: slopping soffit of staircase, soffit of landing slab, sides and soffit of landing beam
Pavior: to thread 200mm-300mm wide
Pavior: to riser; 100mm - 200mm high
Pavior: to landing slab
Pavior: skirting; 100mm high
Pavior: extra over for nosing tiles
Painter: sides of open string; extreme wide
Painter: slopping soffit of staircase, soffit of landing slab, sides and soffit of landing beam
Works associated in mild steel: work to staircase 100mm high
page 4/15
page 4/16
page 4/17
Brick layer: to external walls
Brick layer: to external walls
Brick layer: to internal walls
Concretor: Windows
Aluminium worker: top hung windows
Aluminium worker: Casement windows
Aluminium worker: Casement windowsAluminium worker: Casement windows with fixed glass panel
Aluminium worker: fixed glass window 1200mm x 3500mm (w7)
Aluminium worker: fixed glass window 900mm x 3000mm (gridline 4/D-C)
Aluminium worker: fixed glass window 7665mm x 2000mm (roof level)
Aluminium worker: fixed glass window 7665mm x 1000mm (roof level)
Aluminium worker: fixed glass window 2200mm x 2000mm (roof level)
Aluminium worker: aluminium fixed louvred window
Aluminium worker: aluminium fixed louvred window
7/29/2019 Contractor Evaluation ABC
15/30
Aluminium worker: aluminium fixed louvred window
Aluminium worker: aluminium fixed louvred window
Page 4/21
Page 4/22
conretor: lintol (doors)
concretor: To suit door openings
concretor: To suit door openings
concretor: To suit door openingsconcretor: To suit door openings
Joiner: wrought pressure treated grade B timber
Joiner: wrought pressure treated grade B timber
Joiner: wrought pressure treated grade B timber
Joiner: wrought pressure treated grade B timber
Joiner: one hour fire rated
Joiner: one hour fire rated
Work associated in mild steel: mild steel grille
Painter: work to metal surface
Painter: work to door leaf
Ironmongery: fixing to timber doorsSundries: fixing cramps (doors)
Page 4/24
Page 4/25
Page 4/26
Page 4/27
Plasterer: walls and columns
Plasterer: walls and columns
Painter: walls and columns
Painter: walls and columns
Wall Tiler: to walls
Page 4/29
Page 4/30
Pavior: to floors
Pavior: to floors; levelled
Pavior: to floors; levelled
Pavior: to skirting
Waterproofing membrane: floors (toilet area)
Waterproofing membrane: extra over 1:3 cement and sand angle fillet
Waterproofing membrane: extra over for 300mm high upstand skirting
Page 4/32
Page 4/33
Plasterer: Ceiling finishes
Plasterer: Ceiling finishesPlasterer: Ceiling finishes
Plasterer: Ceiling finishes
Plasterer: Ceiling finishes
Plasterer: Ceiling finishes
Plasterer: Ceiling finishes
Plasterer: Ceiling finishes
Suspended Ceiling
Painter: Ceiling finishes
7/29/2019 Contractor Evaluation ABC
16/30
Painter: Ceiling finishes
Painter: Ceiling finishes
Painter: Ceiling finishes
Painter: Ceiling finishes
Painter: Ceiling finishes
Painter: Ceiling finishes
Painter: Ceiling finishes
Page 4/35Page 4/36
Sanitary fittings and accessories: Luton
Sanitary fittings and accessories: Andermatt
Sanitary fittings and accessories: windsor
Sanitary fittings and accessories: yale
Sanitary fittings and accessories: toilet paper holder
Sanitary fittings and accessories: malvern
Sanitary fittings and accessories: Shower rose
Sanitary fittings and accessories: bib tap
Sanitary fittings and accessories: bowl, sink, tap etc
Sanitary fittings and accessories: floor trapPage 4/38
Page 4/39
Demolition works: Existing prayer hall
Concrete vanity top
Concrete vanity top
Calculated Building works
Work below lowest floor level
Frame
Upper floor
Roof
Staircase
External Walls
Internal walls
Windows
Doors
Wall finishes
Floor Finishes
Ceiling Finishes
Sanitary appliances
Miscellanrous works
Earthworks: Site clearance
Earthworks: excavator
Earthworks: excavatorEarthworks: Backfilling with imported earth
Earthworks: temporary earth drain
Earthworks: Wash trough
Earthworks: Sediment Basin
Earthworks: Temporary access road
Earthworks: Temporary access road
Earthworks: Temporary pipe culvert
Earthworks: Removal of temporary works
7/29/2019 Contractor Evaluation ABC
17/30
Earthworks: Removal of temporary works
Earthworks: Removal of temporary works
Earthworks: Removal of temporary works
Earthworks: Removal of temporary works
Earthworks: Demolition of existing retaining wall
Earthworks: Relocation of existing pipe culvert
Page 5/1
Page 5/2Page 5/3
Page 5/4
Reinforced concrete retaining walls: Excavator
Reinforced concrete retaining walls: Excavator
Reinforced concrete retaining walls: Excavator
Reinforced concrete retaining walls: Excavator
Reinforced concrete retaining walls: Excavator
Reinforced concrete retaining walls: Excavator
Reinforced concrete retaining walls: Concretor
Reinforced concrete retaining walls: Concretor
Reinforced concrete retaining walls: ConcretorReinforced concrete retaining walls: Concretor
Reinforced concrete retaining walls: Concretor
Reinforced concrete retaining walls: Concretor
Reinforced concrete retaining walls: Concretor
Reinforced concrete retaining walls: Drainage works
Reinforced concrete retaining walls: Drainage works (sundries)
Reinforced concrete retaining walls: Drainage works (sundries)
Page 5/6
Page 5/7
Page 5/8
Road works: Concrete drive way
Road works: Road
Road works: high road kerb
Road works: high outlet road kerbs
Road works: closed turfing (ground)
Road marking and furnitures
Road marking and furnitures
Road marking and furnitures
Road marking and furnitures
Road marking and furnitures
Road marking and furnitures
Road marking and furnitures
Road marking and furnituresRoad marking and furnitures
Page 5/10
Page 5/11
Drainage works: Brickwall Drain
Drainage works: precast concrete drain cover slab
Drainage works: reinforced concrete catch pit
Sump: Brick wall sump
Sump: Brick wall sump
7/29/2019 Contractor Evaluation ABC
18/30
Sump: discharge control pit
Pipe culvert: 600mm diameter
Pipe culvert: 900mm diameter
Pipe culvert: 1200mm diameter
Earthworks
Reinforced concrete retaining walls
Road works
Drainage worksSump
Pipe culvert
Calculated external works
Preliminaries
Prime costs and provisional sums
Piling works
Building works
External works
7/29/2019 Contractor Evaluation ABC
19/30
A B C
A,B 9,000 Waved ------------- N/A included in report but no
F N/A 11,800 ------------- Missing in contractors re
A,B,C,D N/A N/A 5,000
E,F,G N/A 11,800 N/A
B 1,000 2,124 1,500C,D 1,000 N/A 3,000
C,D 1,000
E 8,000 15,340 10,000
A,B,C,D,E,F 12,000
D,E 36,000 ------------- 24,000
B,C,D 54,000
C,D,E,F,G 18,000 169,920 -------------
B,C,D,E,F N/A 141,600 25,000
E,F,G 3,000 5,900 N/A
A 3,500 11,800 -------------
A,B,C 7,000 18,880 35,000E 3,000 ------------- 5,000
A N/A ------------- 3,000
B N/A ------------- 3,000
C,D,E,F 3,000 ------------- 5,000
A,B,C,D,E 8,000 27,140 -------------
A 4,000 37,760 20,000
A 1,000
B 1,000 10,620 -------------
A,B,C N/A 3,186 5,000
D N/A N/A 8,000
E,F N/A N/A 5,000
B 2,400 3,540 1,500
C,D N/A N/A 5,000
E N/A N/A 5,000
A,B 2,400 ------------- 5,000
A,B,C,D,E,F,G 1,800 N/A N/A
C 18,000 25,488 27,000
C,D,E ------------- ------------- 35,000
C,D,E,F,G N/A 3,540 -------------
A,B,C 1,800
B,C,D N/A ------------- 5,000
D N/A 16,520 N/A
F 6,000 5,900 5,000A,B 6,000 30,444 10,000
F N/A 9,440 7,500
211,900 562,742 263,500
9,000 waved N/A
N/A 11,800 N/A
N/A 11,800 5,000
2,000 2,124 4,500
9,000 15,340 10,000
Contractor (amounts RM)item
7/29/2019 Contractor Evaluation ABC
20/30
12,000
36,000 N/A 24,000
54,000
18,000 169,920 N/A
N/A 141,600 25,000
3,000 5,900
3,500 11,800
7,000 18,880 35,0003,000 ------------- 5,000
3,000 ------------- 11,000
8,000 27,140 20,000
4,000 37,760 20,000
2,000 10,620
N/A 3,186 18,000
2,400 3,540 11,500
2,400 ------------- 5,000
1,800
18,000 25,488 27,000
N/A ------------- 35,000N/A ------------- 5,000
N/A 3,540 -------------
1,800 5,900 -------------
N/A 22,420 5,000
6,000
6,000 30,444 10,000
N/A 9,440 7,500
A 400,000 400,000 400,000
B 8,000 8,000
C 4,000 8,000
D 100,000 100,000 100,000
E 2,000 2,000
F 1,000 2,000
G 140,000 140,000 140,000
H 2800 2,800
I 1400 2,800
J 300,000 300,000 300,000
K 6,000 6,000
L 3,000 6,000
J 600,000 600,000 600,000
K 12,000 12,000
L 6,000 12,000
A 240,000 240,000 240,000B 2400 4,800
C 2400 4,800
D 100,000 100,000 100,000
E 1,000 2,000
F 1,000 2,000
G 150,000 150,000 150,000
H 3,000 3,000
I 1,500 3,000
10,000
2,500
3,750
3,500
7,500
15,000
6,000
2,500
7/29/2019 Contractor Evaluation ABC
21/30
J 100,000 100,000 100,000
K 2,000 2,000
L 1,000 2,000
A 55,000 55,000 55,000
B 120,000 120,000 120,000
C 30,000 30,000 30,000
D 5,000 5,000 5,000
E 50,000 50,000 50,000F 6,000 6,000 6,000
G 200,000 200,000 200,000
2,656,500 2,681,200 2,649,250
1,586,200 1,601,600 1,578,500
604,300 613,600 604,750
466,000 466,000 466,000
6,500 1,180 -------------
4,000 1,770 -------------
3,000 ------------- -------------
A 35,000 33,040 45,000
B 25,000 11,800 15,000C 1,000 1,770 2,000
D 62,496 75,501.12 133,920
E 22,400 29,734 49,000
F 178,560 245,817.60 200,880
G 66,250 61,289.20 79,500
H 12,090 13,900.40 18,600
I 20,000 33,040 22,000
J 4,000 6,608 5,000
10,500 2,950 N/A
3,000 N/A N/A
426,796 512,502.30 570,900
A 35,000 48,380 25,000
B 8,000 3,540 10,000
C 1,000 1,770 2,000
D 4,000 1,180 2,500
E 2,000 1,180 2,500
A 61,100 56,846.50 65,800
B 56,400 56,846.50 65,800
C rate only rate only rate only
D 34,968 50,579.50 39,480
E 2,115 3,050.30 2,820
F 2,585 5,546 5,640
G 4,935 5,546 21,150A 20,000 22,650 22,000
B 6,000 7,788 7,500
678,399 780,353 843,090
50,000 56,050 42,000
162,103 178,414.82 200,690
26,000 30,444 29,500
A 426,796 518,452.32 570,900
B 238,103 264,908.82 272,190
2,500
7/29/2019 Contractor Evaluation ABC
22/30
A 9440 13,924 10,195.20
B 2,500 2,950 2,160
C 1020 1,404.20 765
D 1,830 1,799.50 1,317.60
E 21,320 15,094.56 12,792
F,G,H 26168 19,159.10 18112
A,B,C 37800 36,957.60 -------------
D 51,168 49,249.20 ------------- MISSING PAGEE 3,869 3,754.52 ------------- c
F,G,H,I 72439.2 77,872.14 -------------
J 24,264 22,673.36 -------------
A,B,C,D 26272 35,844.86 32617.2
E 4044 7,157.88 14,558.40
F 4044 7,953.20 8,088
G 1855 1,563.50 1,908
62278 54,331.36 45,341.80
189,540.20 190,506.82 197,559.40
36,215 52,519.44 50,169.60
A 87360 84,078.54 79,142.70B 36800 35,417.70 33,338.50
C 16,060 15,584.80 15,400
D,E,F 341254.8 366,848.91 350734.1
G,H,I,J 92860 132,377.12 94598.4
A 156,520 42,621.60 137,600
B 403,040 113,492.40 366,400
A,B,C,D 25,000 N/A N/A
574,334.80 634,307.07 UNCLEAR DESIGNATION
559,560 156,114 573,213.70 c
25,000 N/A 504,000
A 113,200 108,955 102,446
B 2592 2,494.80 2,349
C 117,241.20 126,034.29 120,497.90
D 92288 125,915.44 89,980.80
E 13,871 21,936.20 10,296
F 12,012 17,634.76 9,895.60
A 25920 24,946.38 23,481.90
B 13248 12,751.20 12,006
C 7040 6,776 6,380
D 57988.8 62,337.96 59,599.60
E 20541.6 22,082.22 21,112.20
F 24192 29,339.82 20,966.40
G 12352 16,852.76 12,043.20A 21675 12,036 24,225
B 30515 16,944.80 34,105
C 19890 13,540 21,675
D 1380 1,085.60 2,760
E 28002 19,062.90 30,515
A 2040 1,504.50 2,550
B 2872 2,118.10 3,590
C 3570 5,265.75 9,690
7/29/2019 Contractor Evaluation ABC
23/30
D 5026 7,413.35 13,642
E 3560 4,200.80 4191.9
F 300 424.80 2577.6
G 150 212.40 1288.8
H 150 212.40 1189.2
I 750 708.00 706.5
A 2520 3,221.40 1,008
B 3780 3,221.40 4,284C 18,721 29,606.20 13,896
D 16,212 23,800.76 13,355.60
161,282.40 175,086.04 155,589.30
101,462 62,669.80 113,280
18,418 22,060.10 39,426
41,233 59,849.76 32,543.60
A 12,800 12,319.20 11,596
B 2,640 2,371.60 2230.8
C 2,240 2,155.86 2029.3
D 21,675.20 22,074.48 21,104.80
E 3,607.20 3,877.74 3707.4F 2,975 3,710.25 2635
G 2,350 3,078.50 2820
H,I,J 8986 11,395.26 8143.2
A 2,115 2,079.75 1,551
B,C,D 6898 7,699.50 5715.9
E 42,500 22,418.75 13,515
F 51,000 14,943.00 9,010
G 4400 3,868.04 4,659.60
H 3260 3,582.74 1,727.80
I 8500 10,030 1,270
A 705 270.25 1,692.00
B,C,D 1827 1,002.24 1879.2
E 122,200 12,390 47,000
57,273.40 60,982.89 54,266.50
118,673 64,621.78 48,929.30
124,732 13,662.49 50,571.20
A 55,330 50,511.26 44,968.20
B 114,660 84,591.78 27,136.20
A 72,710 66,377.62 59,093.40
A 6960 2,737.60 5336
B 1,820 1,321.60 1960
C 8,050 6,277.60 9800
D 14,400 11,479.04 17,920E 6,400 4,493.44 7840
A 3,500 1,519.84 3,360
B 13,800 5,947.20 12,600
C 19,200 8,673.20 25,200
D 6,600 2,891 16,800
E 2,000 867.30 1764
F 700 377.60 560
G 1,800 991.20 1470
7/29/2019 Contractor Evaluation ABC
24/30
H 3,600 1,982.40 2893
I 700 377.60 560
37,630 26,309.28 42,856
51,900 23,627.14 65,207
A 7020 2,761.20 5,382
B 600 223.62 324
C 6150 3,193.08 5,280.80
D 2560 1,255.52 2,060.80E 400 177.00 313.2
F 6720 2,360 4,051.20
A 17,220 6,773.20 10,381.20
B 2160 1,298 732
C 4800 2,006 9,732
D 18,000 16,820 23,520
E 19,800 14,868 17,280
A 9200 8,260 4,746
B 1830 863 671
C 4680 2,208.96 1,684.80
D 2440 5,038.60 3,660A 862 1,017.16 2,586
23,450 9,969.82 17,412
61,980 41,465.20 61,645.20
18,150 16,370.71 10,761.80
862 1,017.16 2,586
A 16,940 18,561.40 13,068.00
B 66,482 75,431.50 55,231.20
C 7,260 6,068.15 8,712
D 20,456 9,818.88 36,820.80
A 62,100 60,657.90 58,650
111,138 109,879.93 113,832
62,100 60,657.90 58,650
A 10,215 10,714.40 27,240
B 12,150 11,867.85 11,475
C 359,000 366,431.30 305,150
D 12,980 13,246.09 6879.4
A 4725 3,982.50 4860
B 875 2,065 2100
C 1750 3,097.50 2100
394,345 402,259.64 350,744.40
7350 9,145 9,060
A 14,736 10,867.80 11,052
B 5584 8,236.40 4,606.80C 7310 12,938.70 5,263.20
D 3680 8,684.80 3,091.20
E 15,262 15,931.18 11,974.80
F 5994 7,334.88 4,528.80
G 7456 9,073.02 4,753.20
H 3776 5,291.12 2,407.20
I rate only rate only rate only
A 14,736 7,073.28 13,262.40
7/29/2019 Contractor Evaluation ABC
25/30
B 5,584 3,092.14 5,444.40
C 6,579 4,100.91 6,140.40
D 3,312 2,932.96 3,459.40
E 4,696 2,254.08 4,226.40
F 1,776 983.46 1,731.60
G 2,097 1,307.13 1,957.20
H 1,062 940.46 1,109.20
63,798 78,357.90 47,677.2039,842 22,684.42 37,330.80
A 720 1,298 1,920
B 9,300 14,632 14,508
C 2,800 4,130 5,880
D 6,300 11,770.50 10,080
E 1,386 1,168.20 3,960
F 2,160 15,930 5,400
A 2,100 2,478 3,360
B 3,100 1,829 780
C 400 177 600
D 1,200 1,180 2,88022,666 48,928.70 41,748
6,800 5,664 7,620
A 18,000 29,500 25,000
B 6,000 2,336.40 6,000
C 10,800 4,460.40 7,500
3,600,717 3,044,097 3,035,147
A 288,033.20 297,357.62 293,030.80
B 1,158,894.80 790,421.07 1,077,213.70
C 351,204.20 402,970.49 335,465.30
D 322,395.40 319,665.70 340,838.90
E 300,678.40 139,267.16 153,764 c
F 169,990 135,103.04 72,104.40
G 72,710 66,377.62 59,093.40
H 89,530 49,936.42 108,063
I 104,442 68,822.89 92,405
J 173,238 170,537.83 172,482
K 401,695 411,404.64 359,804.40
L 103,640 101,042.32 85,008
M 29,466 54,592.70 49,368
N 34,800 36,296.80 38,500
A 5,000 11,800 10,000
B 5,000 7,375 5,000
C rate only rate only rate onlyA 78,000 38,350 62,400
B 1,660 4,897 3,320
C 13,000 41,300 12,000
D 4,600 9,440 12,000
A 30,800 15,446.20 13,860
B 3,000 7,080 2,000
C 2,400 2,124 3,600
A 1,660 3,917.60 1,992
7/29/2019 Contractor Evaluation ABC
26/30
B 3,000 2,360 2,400
C 1,000 1,180 2,400
D 9,240 2,725.80 7,700
E 600 354 7,200
F 8,000 11,800 30,000
G 1,800 3,540 12,000
10,000 19,175 15,000
97,260 93,987 89,72036,200 24,650.20 19,460
25,300 25,877.40 63,692
A 6,425 7,581.50 5551.2
B 7,710 9,097.80 6476.4
C 7,210 8,507.80 6180
D 10,620 10,443 5097.6
E 12,500 14,750 13,500
F 3,420 2,421.36 2,052
A 2,565 2,315.34 2188.8
B 16,416 15,798.69 14,877
C 16,640 16,016 15,080D 17,809.20 20,271.06 19,380.60
E 30,974 35,255.70 33,707
F 1,344 1,467.20 1052.8
G 13,312 20,616.96 12,979.80
A 22,400 9,912 26,880
B 1,120 2,312.80 672
C 2,240 4,956 3360
47,885 52,801.46 38,857.20
99,060.20 111,740.95 99,265.40
25,760 17,180.80 30,912
A 120,510 82,039.50 100,116
B 59,840 40,120 29,376
C 23,700 4,661 3318
D 5,200 920.40 1248
E 5,140 3,032.60 3084
A 8040 1,976.50 3886
B 90 26.55 19.8
C 120 236.00 240
D 120 354.00 288
E 120 354.00 360
F 120 354.00 480
G 790 1,398.30 711
H 600 1,654 1200I 13,200 6,490 7260
214,390 130,773.50 137,142
23,200 12,841.35 14,444.80
A 22,400 26,432 36960
B 2820 3,882.20 11,280
C 3,000 3,835 3900
A 12,600 15,900.50 12,600
B 12,000 12,626 12,000
7/29/2019 Contractor Evaluation ABC
27/30
C 3,000 3,156.50 4,800
A 350 354 720
B 34,200 31,388 36,480
C 26,600 21,299 28,500
A 168,760 163,689.60 187,872
B 172,705.20 181,723.21 169,034.60
C 237,590 143,614.85 151,586.80
D 28,220 34,149.20 52,140E 27,600 31,683 29,400
F 61,150 53,041 65,700
696,025 607,903 655,734
211,900 568,642 283,500
2,656,500 2,681,200 2,649,250
664,899 780,361.14 843,090
3,600,717 3,043,796.30 3,237,243.90
696,025.20 607,900.86 655,733.40
7/29/2019 Contractor Evaluation ABC
28/30
t applicable
port
7/29/2019 Contractor Evaluation ABC
29/30
A B C A B
Preliminaries 211,900 568,642 283,500 211,900 562,742
Prime costs and provisional sums 2,656,500 2,681,200 2,649,250 2,656,500 2,681,200
Piling works 664,899 780,361.14 843,090 678,399 780,353
Building works 3,600,717 3,043,796.30 3,237,243.90 3,600,717 3,044,097External works 696,025.20 607,900.86 655,733.40 696,025 607,903
Total 7,830,041 7,681,900 7,668,817 7,843,541 7,676,295
CalculatedGiven data
7/29/2019 Contractor Evaluation ABC
30/30
Difference
C A B C
263,500 0 5,900 20,000 Error in contractor reports
2,649,250 0 0 0
843,090 13,500 8 0
3,035,147 0 301 202,097 Error in my calculation655,734 0.00 2.00 0.60
7,446,721 13,500 6,211 222,098