7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
1/14
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
2/14
GENERAL CONDITIONS
SANITARY FIXTURES AND CP FITTINGS
The work shall include cutting, chipping the walls / floors and neatly finished the surface after completion of the
work, necessary consumables like brass screws, CP extension nipple, wooden plugs, white cement, sealants
etc.Only drilling machines shall be used for making the holes in the walls for fixing, no wall jumper and hammer
will be allowed.
The work shall include setting of orissa pan in cement concrete in 1:2:4 ratio, filling it with fine sand for protection
and finally finishing with applying of white cement. The work shall include cutting, chipping the walls / floors and
neatly finished the surface after completion of the work etc., complete
CPVC PIPES
Internal Piping
The work shall include cutting jointing with solvent, cement pressure testing the joints / pipeline for 10 kg/sq.cm
hydraulic pressure, for 2 hours etc. making holes, including chasing in masonry walls with groove cutting
machine to required width and depth, making bores in walls, foundations and RCC slabs and neatly finished thesurface after completion of the work and bores in CC or CM 1:3 as applicable clearing the debris, grouting of
concealed pipes, MS hooks for fixing pipes etc.,complete.
External Piping
The work shall include cutting jointing with solvent cement pressure testing the joints / pipeline for 10 kg/sq.cm
hydraulic pressure, for 2 hours hours etc., fixed on to the wall in vertical shafts / terrace with fabricated MS
brackets of suitable size with GI 'U' clamps, bolts, nuts and GI washers including MS brackets including neatly
finished the surface after completion of the work etc., complete.
PVC PIPES
Internal Piping
The work shall include cutting, jointing with solvent cement followed by application of leak proof adhesive like FRP
paste & laid on floors inside the toilets and kitchen to the required slope including making necessary bores in
walls / foundations / concrete slab as applicable, neatly finished the surface after completion of the work with CM1:3 or cement concrete as applicable, curing etc., complete.External Shaft Piping
The work shall include cutting, jointing with rubber ring / solvent cement followed by application of leak proof
adhesive like FRP paste, fixed to wall with properly fabricated MS bracket of suitable size, GI 'U' clamps with bolts,
nuts and GI washers complete, for soil, waste pipe and rain water pipes lines laid in vertical shafts including
neatly finished the surface after completion of the work,etc., complete.
Sewer Line
For the pipes laid under the soil from chamber to chamber outside the building, to the required slopes, jointing with
solvent cement followed by application leak proof adhesivesof FRP paste, including covering only the joints with
cement concrete 1:3:6 at all the joints and testing of joints with water column ,including neatly finished the surface
after completion of the work etc. complete
Floor Traps
The work shall include jointing with rubber ring / solvent cement followed by application of leak proof adhesive like
FRP paste including encasing all round fixing the trap in cement concrete 1:2:4 ratio (approx) including neatly
finished the surface after completion of the work etc., complete.
BMM STAFF APARTMENT
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
3/14
1.1 SANITARY FIXTURES AND CP FITTINGS
1.1.1 Providing, installation and commissioning of following type European
Wall Mounted Water Closet with concealed 'S' / 'P' trap, PVC Cistern
including all internal parts etc., complete.Wall Mounted water Closet -Make:
Model:
Catalogue No.
Seat Cover -
Make:
Model:
PVC Cistern -
Make:
Catalogue No.
Angle Stop Cock -
Make:
Model:
Catalogue No. :
PVC Flexible Pipe -Make:
Supply: Nos. 24 0
Installation: Nos. 24 0
1.1.2 Providing, installation and commissioning of following type Indian Water
Closet including all internal parts etc., complete.Orissa water Closet -
Make:
Model:
Catalogue No.
Supply: Nos. RO 0
Installation: Nos. RO 0
1.1.3 Providing, installation and commissioning of following type rectangular
wash basin with followin CP fittin s etc., complete.Rectangular Wash Basin -
Make:
Model:
Catalogue No.
CP Pillar Cock -
Make:
Model:
Catalogue No. :
CP Waste Coupling -
Make:
Model:
Catalogue No. :
CP Bottle Trap -
Make:Model:
Catalogue No. :
Angle Stop Cock -
Make:
Model:
Catalogue No. :
PVC Flexible Pipe -
Make:
Supply: Nos. 36 0
Installation: Nos. 36 0
BMM STAFF APARTMENT
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
BILL OF QUANTITIES FOR WATERSUPPLY AND DRAINAGE WORKS.
3
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
4/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
1.1.4 Providing, installation and commissioning of following type Oval counter
top / bottom wash basin with following CP fittings etc., complete.
Oval counter top / bottom wash basin -
Make:
Model:
Catalogue No.
CP Pillar Cock -
Make:
Model:Catalogue No. :
CP Waste Coupling -
Make:
Model:
Catalogue No. :
CP Bottle Trap -
Make:
Model:
Catalogue No. :
Angle Stop Cock -
Make:
Model:
Catalogue No. :
PVC Flexible Pipe - .Make:
Supply: Nos. RO 0
Installation: Nos. RO 0
1.1.5 Providing and fixing of SS or Aluminium Powder coated towel ring with
flange with concealed brass screws etc., complete
Make:
Model:
Catalogue No. :
Supply: Nos. RO 0
Installation: Nos. RO 0
1.1.6 Providing, Fixing and commissioning of SS or Aluminium Powder coated
towel rail with brackets, and flange with concealed brass screws etc.,
complete
Make:Model:
Catalogue No. :
Supply: Nos. RO 0
Installation: Nos. RO 0
1.1.7 Providing, Fixing and commissioning of 15mm dia CP short body bib
cock with CP wall flange. ( Utility area)
Make:
Model:
Catalogue No. :
Supply: Nos. 24 0
Installation: Nos. 24 0
1.1.8 Providing, installation and commissioning of following type Stainless
Steel Sink with single bowl and single drain board with following CP
fittin s etc., complete.Sink -
Make:
Diamond Sink Model:
Over all Size:
Bowl Size :
CP Waste Coupling -
Make:
Model:
Catalogue No. :
PVC Waste pipe connecting to the floor trap with clean out junction
provision to be made
4
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
5/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
Supply: Nos. 48 0
Installation: Nos. 48 0
1.1.9 Providing, installation and commissioning of following type stainless steel
kitchen sink with single bowl only made of 18 gauge sheet with following
CP fittings etc., complete.Sink -
Make:
Diamond Sink Model:
Over all Size:
Bowl Size :CP Waste Coupling -
Make:
Model:
Catalogue No. :
PVC Waste pipe connecting to the floor trap with clean out junction
provision to be made
Supply: Nos. RO 0
Installation: Nos. RO 0
1.1.10 Providing, installation and commissioning of following type CP Health
Faucet with following CP fittings etc., complete.Hand Operated Spray Unit with Crutch / Holder and PVC flexible hose -
Make:
Model:Catalogue No. :
Angle Stop Cock -
Make:
Model:
Catalogue No. :
Supply: Nos. 24 0
Installation: Nos. 24 0
1.1.11 Providing, installation and commissioning of following type soap dish
with brackets, and flange with concealed brass screws etc., complete
Make:
Model:
Catalogue No.
Supply: Nos. RO 0Installation: Nos. RO 0
1.1.12 Providing, installation and commissioning of following type CP long body
bib cock with CP wall flan e etc for sink.Make:
Model:
Catalogue No.
Supply: Nos. 24 0
Installation: Nos. 24 0
1.1.13 Providing, installation and commissioning of following type Concealed
Stop Cock with CP wall flan e etc.Make:
Model:
Catalogue No.
Supply: Nos. 24 0Installation: Nos. 24 0
1.1.14 Providing, installation and commissioning of following type Angle Stop
Cock with CP wall flange etc for aqua guard pointAngle Stop Cock -
Make:
Model:
Catalogue No. :
Supply: Nos. 24 0
Installation: Nos. 24 0
5
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
6/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
1.1.15 Collecting, fixing, testing and commissioning of two - in - one wall mixer
shower assembly unit consisting of the following in the shower area:
a) One no. two - in - one wall mixer with CP conversion bend for ovehead
shower with builtin spout.
b) One no. CP overhead shower arm with wall f lange and CP adjustable
shower rose (casted heavy with wall flange)
The work shall include cutting, chasing the walls and making good the
walls. Notes: Conditions mentioned in item no.1 shall be applicable. Nos. 24 0
TOTAL0
6
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
7/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.1.2 CPVC PIPES AND FITTNGS (INTERNAL AND EXTERNAL WATERSUPPLY):
1.2.1 Providing & fixing of CPVC pipes including fitting & specials etc.,
complete - for internal water supply pipingMake : Astral / Ashirwad - SDR- 11
a) 15 mm dia
Supply: Mtr. 30 0
Installation: Mtr. 30 0
b) 20 mm dia
Supply: Mtr. 825 0
Installation: Mtr. 825 0
1.2.2 Providing & fixing of CPVC pipes including fitting & specials etc.,
complete for External shaft water supply pipingMake : Astral / Ashirwad - SDR- 11
a) 20 mm dia
Supply: Mtr. 50 0
Installation: Mtr. 50 0
b) 25 mm dia
Supply: Mtr. 200 0
Installation: Mtr. 200 0
c) 32 mm dia
Supply: Mtr. 10 0
Installation: Mtr. 10 0
d) 40 mm dia Supply: Mtr. RO 0
Installation: Mtr. RO 0
1.2.3 Providing & fixing of CPVC pipes including fitting & specials etc.,
complete - for Pump Rising MainMake : Astral / Ashirwad - SDR -11
a) 32 mm dia
Supply: Mtr. 100 0
Installation: Mtr. 100 0
1.2.4 Providing & fixing of CPVC pipes including fitting & specials etc.,
complete - for Terrace Header LineMake : Astral / Ashirwad - SDR- 11
a) 65 mm dia
Supply: Mtr. 150 0
Installation: Mtr. 150 01.2.5 Providing & fixing of CPVC pipes including fitting & specials etc.,
complete - for Under ground burried pipingMake : Astral / Ashirwad - SDR- 11
a) 25 mm dia (Landscaping piping)
Supply: Mtr. 25 0
Installation: Mtr. 25 0
b) 32 mm dia (Landscaping piping)
Supply: Mtr. 150 0
Installation: Mtr. 150 0
c) 32 mm dia (Inlet pipe connection to sump)
Supply: Mtr. 25 0
Installation: Mtr. 25 0
1.2.6 Providing & fixing of CPVC ball valves with CPVC UnionsMake : Astral / Ashirwad
a) 20 mm dia
Supply: Nos. 250 0
Installation: Nos. 250 0
b) 25 mm dia
Supply: Nos. 20 0
Installation: Nos. 20 0
c) 32 mm dia
Supply: Nos. 10 0
Installation: Nos. 10 0
7
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
8/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
d) 40 mm dia
Supply: Nos. RO 0
Installation: Nos. RO 0
e) 50 mm dia
Supply: Nos. RO 0
Installation: Nos. RO 0
1.2.7 Providing & fixing of CPVC ball valves with UnionsMake : Astral / Ashirwad
a) 65 mm diaSupply: Nos. 10 0
Installation: Nos. 10 0
b) 80 mm dia
Supply: Nos. RO 0
Installation: Nos. RO 0
1.2.8 Providing & fixing of Water Meter with all integral parts of gun metal or
brass with neccesary fittings such as threaded pieces, unions, check nuts
completeMake : Dashmesh
a) 25 mm dia
Supply: Nos. 1 0
Installation: Nos. 1 0
1.2.9 Providing and Construction of valve chambers with first class
designation bricks with cement motar joints in cm 1:4 including
excavation, internal plastering in cm 1:3 and providig RCC precast cover
with MS L angle frame of size 50 x 50 x 6 mm thick. (RCC Cover has to
be designed for taking minimum 12 tonnes vehicular road )
a) Size 450 x 450 x 600mm deep Nos. 2 0
1.2.10 Providing and construction of RCC Pedastas
a) 200 mm x 200 mm Nos. 150 0
1.2.11 Excavating trenches of required width and depth for external
underground water supply pipes and backfilling the excavated earth.a) Regural soil Cu.m. 35 0
b) Hard Murrum Cu.m. 05 0
1.2.12 Providing, fixing, testing and commissioning of brass`Y' stainer screw
type tested to 20 kg / sq.cm.Make : Intervalve / Audco
a) 80 mm dia
Supply: Nos. 02 0
Installation: Nos. 02 0
1.2.13 Construction of valve chambers
a) Size 600 x 600 x 450mm deep
Materials: Nos. 2 0Construction: Nos. 2 0
b) Size 600 x 600 x 600mm deep
Materials: Nos. 2 0
Construction: Nos. 2 0
c) Size 600 x 600 x 750mm deep
Materials: Nos. 2 0
Construction: Nos. 2 0
8
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
9/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
1.2.14 Providing & fixing of brass body nickle plated automatic Air release valve
Make :RB / TBS
a) 20 mm dia
Supply: Nos. 02 0
Installation: Nos. 02 0
1.2.15 Providing and fixing 600mm long puddle flange consisting of 6mm thick
welded GI / MS plate, f langes of sutible size hot dip galvanised to 100
micron properly fixed in walls of water tanks as per specifications andapproved drawings and shall be of following diameters.
a) 50 mm dia
Supply: Nos. 05 0
Installation: Nos. 05 0
b) 100 mm dia
Supply: Nos. 02 0
Installation: Nos. 02 0
1.2.16 Providing, fixing, testing and commissioning of plastic ball float valve
a) 50 mm dia
Supply: Nos. 01 0Installation: Nos. 01 0
1.2.17 Making of core cutting in RCC slabs of required size for routing
a) 100 mm dia : Nos. 10 0
b) 125 mm dia : Nos. 25 0
c) 150 mm dia : Nos. 10 0
TOTAL -
9
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
10/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
1.3 PVC SOIL,WASTE,VENT PIPES AND FITTINGS ( INTERNAL & EXTERNAL)
1.3.1 Providing and fixing of PVC soil, waste and vent pipe confirming to IS
13592 of SWR quality 2 kg / sq.cm Presuusre rated or Type B for
Internal draina e pipinMake: Prince / Supreme
a) 75mm dia
Supply: Mtr. 100 0
Installation: Mtr. 100 0
b) 110mm dia
Supply: Mtr. 90 0Installation: Mtr. 90 0
1.3.2 Providing, fixing, testing and commissioning of PVC soil, waste and vent
pipe confirming to IS 13592 of SWR quality 4 kg / sq.cm Presuusre
rated or T pe A for External shaft draina e pipinMake: Prince / Supreme
a) 75mm dia
Supply: Mtr. 175 0
Installation: Mtr. 175 0
b) 110mm dia
Supply: Mtr. 100 0
Installation: Mtr. 100 0
1.3.3 Providing, f ixing, testing and commissioning of PVC under ground
sewer line pipe confirming to IS 4985 of Agricultural series - 6 kg / sq.cm Pressure rated or T pe B.Make: Prince / Supreme
a) 75mm dia
Supply: Mtr. 25 0
Installation: Mtr. 25 0
b) 110mm dia
Supply: Mtr. 25 0
Installation: Mtr. 25 0
c) 160mm dia
Supply: Mtr. 175 0
Installation: Mtr. 175 0
1.3.4 Providing, fixing, testing and commissioning of PVC multi inlet floor trap
Make: Prince / Supremea) 110mm dia inlet 75mm dia out let ( Multi Utility trap )
Supply: Nos. 75 0
Installation: Nos. 75 0
b) 110mm dia inlet 110mm dia out let (P Trap) - Deep seal type
Supply: Nos. 5 0
Installation: Nos. 5 0
1.3.5 Providing, fixing, testing and commissioning of PVC connecting collar
(fabricated) for connecting the waste pipe of Wash Basin and Sink to the
floor trap
Make: Clariona) 110 mm x 40 mm dia
Supply: Nos. 36 0
Installation: Nos. 36 0
b) 110 mm x 50 mm dia
Supply: Nos. 48 0
Installation: Nos. 48 0
1.3.6 Providing, fixing, testing and commissioning of CP grating with circular
frame and gratingMake: Chilli
a) 125 mm dia
10
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
11/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
Supply: Nos. 80 0
Installation: Nos. 80 0
1.3.7 Providing, fixing, testing and commissioning of PVC waste pipe for wash
basin and sink connecting to floor trap of agricultural sereis conforming to
IS 4985 including all fittings of 15 kg / sq.cm pressure rated .
Make: Prince / Supremea) 40 mm dia
Supply: Mtr. 50 0
Installation: Mtr. 50 0b) 50 mm dia
Supply: Mtr. 100 0
Installation: Mtr. 100 0
1.3.7 Providing and Construction of PVC gullytrap of 100 x 100 mm size with
100 mm dia outlet making excavation pit in all kinds of soil excluding soft
rock and hard murrum to a size of 600 x 600 mm and laying of 100 mm
thick 1:4:8 mix cement concrete bed and constructing chamber with
internal clear dimension of 300 x 300 mm using brick work 115 mm thick
in cement mortar 1:6 up to a height of 300 mm above gully trap or up to
100 mm above paving level, plastering external surface with cement
mortar 1:4. including 40 mm thick precast ready made light duty RCC
cover slab (RCC Cover has to be designed for taking minimum 12 tonnes
vehicular road ) clearing the surplus material, earthMake: Prince / Supreme
Supply: Nos. 12 0
Installation: Nos. 12 0
1.3.8 Providing and Construction of brick masonry inspection chambers of
internal clear dimension as mentioned below by using first class table
moulded modular bricks 230 mm thick wall in cement mortor joints in 1:4,
over CC 1:4:8 bed 150 mm thick including providing precast RCC top
slab in 1:2:4 Mix (1 cement: 2 coarse coarse sand: 8 graded stone
aggregate), with angle iron frame, inside plastering 15mm thick with CM
1:3 (1 cement:3 fine sand) finished very smooth with floating coat of neat
cement & making benching and channelling in cement concrete 1:2:4 (1
cement: 2 coarse sand: 4 gradedstone aggregate) neatly finished
complete as per standard design and as per drawing and specifications.(The rate shall include necessary earth work excavation in all types of soil
excluding soft and hard rock, back filling including consolidation disposing
the excess earth to all leads curing, finishing etc., complete).
Inside size of 450 x 450mm & depth not exceeding 600mm including
providing 450 x 450mm RCC cover with MS L angle frame of size 50 x 50
x 6 mm thick. (Cover has to be designed for taking minimum 12
tonnes vehicular road ) Nos. 5 0
Inside size of 600 x 600mm & depth not exceeding 900mm including
providing 600 x 600mm RCC cover with MS L angle frame of size 50 x 50
x 6 mm thick. (Cover has to be designed for taking minimum 12
tonnes vehicular road ) Nos. 5 0
Inside size of 900 x 900mm & depth not exceeding 900mm including
providing 900 x 900mm RCC cover with MS l angle frame of size 50 x 50
x 6mm thick. (Cover has to be designed for taking minimum 12tonnes vehicular road ) Nos. 5 0
1.3.9 Construction of circular manhole of required internal dia at bottom and
540/600 mm at top for required initial depth and brick masonry 1:2, 230
mm thick wall upto 1.5 mtrsdepth from the top of the frame and balance
height with 345 mm brick masonry in cm 1:2, in cylindrial shape over a
300 mm thick CC 1:2:4 bed with 300 mm offset from outer finished wall
surface, also for benching 20 mm thick plaster in cm 1:1 with water
proofing compound @ 2% by weight of the cement and external and
internal surface, channel finished with floating coat of neat cement and
external surface finished rough with wooden float.
Manhole RCC Cover Make: SFRC
11
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
12/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
I) Medium duty frame select size 110 mm wide x 105 mm deep and cover
thick 50 mm
ii) Heavy duty frame select size 115 mm wide x 105 mm deep and cover
thick 95 mm
a) Depth upto 1.5 m Nos. 1 0
b) Depth upto 2.0 m Nos. RO 0
c) Depth upto 2.5 m Nos. RO 0
1.3.10 Providing and fixing of Cast Iron soil, waste and vent pipes
Make: Prince / Supreme
a) 150 mm dia
Supply: Nos. RO 0
Installation: Nos. RO 0
1.3.11 Providing and fixing of cast iron `P' trap of self cleansing design
Make: Prince / Supreme
Supply: Nos. RO 0
Installation: Nos. RO 0
1.3.12 Excavating trenches of required width and depth for external
underground drainage pipes and backfilling of excavated earth
Regural soil Cu.m. 50 0
Hard Murrum Cu.m. 0 0
TOTAL -
12
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
13/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
1.4 PVC RAIN WATER PIPES AND FITTINGS
1.4.1 Providing, fixing, testing and commissioning of PVC rain water pipe
confirming to IS 13592 of SWR quality 4kg / sq.cm pressure rated - Type
Make: Prince / Supremea) 50 mm dia
Supply: Mtr 25 0
Installation: Mtr 25 0
b) 75mm dia
Supply: Mtr 80 0
Installation: Mtr 80 0c) 110mm dia
Supply: Mtr 125 0
Installation: Mtr 125 0
d) 160mm dia
Supply: Mtr 10 0
Installation: Mtr 10 0
e) 200mm dia
Supply: Mtr RO 0
Installation: Mtr RO 0
1.4.2 Providing, fixing, testing and commissioning of PVC welded rain water
head /khurras
a) 110 x 110mmSupply: Nos. 10 0
Installation: Nos. 10 0
b) 160 x 160mm
Supply: Nos. RO 0
Installation: Nos. RO 0
c) 200 x 200mm
Supply: Nos. RO 0
Installation: Nos. RO 0
1.4.3 Excavating trenches of required width and depth for external Rain water
pipes and backfilling of excavated earth
a) Regural soil Cu.m. 10 0
b) Hard Murrum Cu.m. 0 0
1.4.4 Providing and fixingConstructing storm water catch basin internal clear
dimension as mentioned below with 230 mm thick brick masonry wall
using 1st class table moulded brick in 1:4 over a bed of 150 mm thick
1:4:8 PCC in cement motar 1:5 (1cement: 5 fine sand),sand), precast
perforated RCC top slab in 1:2:4 Mix (1 cement: 2 coarse sand: 8 graded
stone aggregate),with angle iron frame, inside plastring 15 mm thick with
CM 1:3 (1cement: 3 fine sand) finished very smooth with floating coat of
neat cement & making channel in cement concrete 1:2:4 (1cement: 2
coarse sand: 4 gradedstone aggregate) neatly finished complete as per
standard design and as per drawing.
Inside size of 450 x 450mm & depth not exceeding 600mm including
providing 450 x 450mm RCC cover with MS L angle frame of size 50 x 50
x 6 mm thick. (Cover has to be designed for taking minimum 12tonnes vehicular road ) Nos. 2 0
Inside size of 600 x 600mm & depth not exceeding 900mm including
providing 600 x 600mm RCC cover with MS L angle frame of size 50 x 50
x 6 mm thick. (Cover has to be designed for taking minimum 12
tonnes vehicular road ) Nos. 2 0
1.4.5 Providing & fixing of PVC baby nahani trap of self cleansing design
moulded.Make: Prince / Supreme
a) 75mm x 50mm dia
Supply: Nos. 24 0
Installation: Nos. 24 0
13
7/29/2019 Copy of BMM Staff Qtrs PHE -BOQ 10.07.12
14/14
UNITDESCRIPTION QTY AMOUNTRATESL.
NO.
1.4.6 Providing, laying, jointing testing socketed and spigotted RCC hume
pipes (NP2 class) conforming to IS: 458 with collar joint in CM 1:3
packing the collar joints with as bestos rope dipped in cement slurry,
finishing the surface smopth with neat cement slurry, curing & laid to
correct levels and required slope below ground in trenches up to required
depth including excavation in all kind of soil excluding soft rock and hard
rock, back filling with available earth in layer not exceeding 20 cm in
depth, watering, levelling consolidation, disposing the excess earth to all
a) 160 mm dia Mtr. 10 0
b) 200 mm dia Mtr. 10 0
1.4.7 Construction of percolation well/rain water harvest pit of 1.2 m dia
and 3m deep with precast RCC rings, covering the top with RCC slab
including supply and fixing 600 x 600 RCC MH cover CI / MS rungs etc.
The quoted rate shall include earth work excavation, back filling,
removing excess earth and making good the floor.Allernate layers of brick bats, activated charcoal, gravel, pebbles and
toped with fine sand for good infiltration.
b) Bore holes of 160 mm dia from the bottom of percolation pit for a depth of
6m, drilled by using auger manually.
c) Bore hole to be filled with medium sized pebbles to provide strength to
the holes and enhance infiltration.d) Rate quoted shall be inclusive of earthwork excavation, back filling,
removing of excess earth as per the instructions of engineer - in charge.Nos. 2.00 0
TOTAL-