STRATEGIC INVESTMENTS DIVISIONO F F I C E O F T H E C H I E F F I N A N C I A L O F F I C E R
Cost and Schedule Insights
Kevin GilliganAugust 2018 1
Todayrsquos Discussion
bull Lifecycle Cost (LCC) and Development Cost Metrics Against Baselines
Formulation KDP Range Estimates
Development Cost Metrics Controlling for Launch Services
bull
bull
2
LCC and Development Cost Metrics Against BaselineLCC Dev
3
LCC and Dev Cost Metrics Against Baseline
4
70 Joint Cost and Schedule ConfidenceAre we meeting the expected 70 success rate across the portfolio
bull NPR 71205Ebull ABC at 70 confidence
MA at 50 confidencebull
bull Aggregate NASA confidence at baselinebull ABC at 71 confidence
MA at 52 confidencebull
bull Actual performancebull 41 of projects met ABC commitments
30 of projects met MA commitmentsbull
bull Projects currently in Phase Dbull 20 meeting ABC commitments
0 meeting MA commitmentsbull
5
Formulation Cost and Schedule Ranges
bull
bullbull
bull
bullbull
Are we capturing the Agencyrsquos cost exposure in early estimates
In aggregate the high cost estimate is at or below the high estimate established at the preceding KDP
37 of the time for cost40 of the time for schedule
For projects that held a KDP-A the eventual KDP-C baseline cost and schedule (high estimates) are at or below the KDP-A estimate
31 of the time for cost18 of the time for schedule
6
Development Cost Metrics When Controlling for Launch Vehicle Cost Variation
28Avg LV Proportion of Dev Cost Baseline
-8Avg Post-Baseline LV Cost Variation
7
Development Cost Performance When Controlling for Launch Vehicle Cost VariationHow would our development cost reporting metrics change
Lower LV costs can provide unexpected funds to cover growth in reporting
Lower LV costs sometimes have no effect on cost reporting
Higher LV costs can mask otherwise good cost performance
8
bull NASA cost performance has drastically improved since the early 2000rsquos
We are falling short of our portfolio goal of 70 projects hitting cost targets
Our cost and schedule ranges at KDP-A and KDP-B are optimistic and more often than do not capture the eventual high cost or schedule commitments at KDP-C baseline
Development cost reporting metrics can misrepresent how our projects are performing (both positively and negatively) if the LV contract award is well above or below the estimate included in the KDP-C baseline
bull
bull
bull
9
Back-up
10
1111
1212
Total KDPs Within Cost Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 14 31 45 31ABCHigh at or below Preceding KDP High 19 33 52 37
Total KDPs Within Schedule Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 27 26 53 51ABCHigh at or below Preceding KDP High 21 32 53 40
KDP-A to KDP-B CostYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 4 10 14 29KDP-B High at or below KDP-A High 9 12 21 43
KDP-A to KDP-B ScheduleYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 13 9 22 59KDP-B High at or below KDP-A High 12 10 22 55
KDP-B to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-B Low 10 21 31 32ABC at or below KDP-B High 10 21 31 32
KDP-B to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-B Low 14 17 31 45ABC at or below KDP-B High 9 22 31 29
KDP-A to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-A Low 2 7 9 22ABC at or below KDP-A High 5 11 16 31
KDP-A to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-A Low 5 12 17 29ABC at or below KDP-A High 3 14 17 18
COST ($M)
KDP-C to Replan (MA)595000000000000281704999999999999750000000000000014025429999999999993-178400000000000095115-85999999999999943826-25999999999996248E-200911-518999999999999773-1220000000000004531770000000000005117000000000000176266192299999999999951671-2800000000000011401112644044106389999999999965159999999999999425999999999999972-1246900000000005125710000000000002140107999999999999551896472000000000000171666999999999998263820000000000005922000000000000459114748445624775539999999999999103258999999999999811180000000000001939999999999999151167299999999999384830000000000109-33599999999999909-5550000000000011416020000000000005-3200000000000002831553639000000000000974113401372999999999999515260000000000002-5800000000000011429476-180455789999999999997710099999999999994-76000000000000227KDP-C to Replan (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS59500000000000028211499999999999918399999999999977392842000000000001592E-2-3084000000000000941809999999999991-8599999999999994344599999999999994-46999999999997044E-210860399999999999994316E-2978-45-281000000000000238420000000000004520329999999999995419999999999998866751153799999999999951802-108000000000000111623851847387182770000000000073628999999999999770-4297100000000000423299999999999983142-039999999999997726203338000000000000119256712921999999999999321011613781300000000000186840000000000000658600000000000023553999999999999910349911780000000000001329999999999999729948999999999996437460000000000036-88599999999999909-5720000000000004511440000000000009-32000000000000028235100000000000023453000000000000711081481372999999999999503989999999999997729551-18045-210000000000002270-21600000000000023
COST Change ($M)
B to C (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS01047535211267606203370517928286851448611111111110973E-2075077759107650046E-4-98804985102361215E-201486366383447687-7818181818181813E-2030674002751031632-37226838174140057E-4013440860215052999E-30-46012269938650305E-2-61086956521739177E-201085051546391753202363403859567541916901408450704179E-200227818101022070730-65060240963855487E-2071729957805907171E-20592556945781199880779814665592264319368421052631587E-20314499999999999890-4630495689655173E-288694328130947783E-2017749999999999999-42462845010613295E-400166502463054187263934495959166312E-2093093699515347267E-200048437693738375709067597185373168792E-20526615969581748940003366676193198057128745644599303111E-296699259374453242E-233198918775202764E-2-732231404958677E-2-5100766898519711E-279499652536483736E-2-27777777777777801E-203746613545816733204003014143287735301290322580645161315265600825167612E-20176206365503080030010075757575757570-061063923386687424-27818254073387508E-30-54000000000000055E-2
COST Change ()
Cost - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate04285714285714285503225806451612903103125036538461538461536Schedule - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate054545454545454541029032258064516131017647058823529413039622641509433965Cost - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate02857142857142857032258064516129031022222222222222221031111111111111112Schedule - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate059090909090909094045161290322580644029411764705882354050943396226415094
High Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (high)01682251932581422Category 2 Change (high)60501935980863335E-2Category 3 Change (high)37110484780157868E-2Total Change (high)014626442296281486
Low Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (low)010106870229007633Category 2 Change (low)19806591564406897Category 3 Change (low)0Total Change (low)21873131670301591
KDP-A to KDP-B Schedule Growth - Low Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion0-9-49-2-1-100000200912326273242
KDP-A to KDP-B Schedule Growth - High Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion-36-8-8-3-2-1-1000002569121726414451
Cost Variation Against Baselines
13
Methodology and Assumptions
The first step in conducting this analysis was to verify and validate the cost baseline information using source documentation KDP-C figures takes priority as the definitive baseline Where KDP-C decision memoranda was not available as in the case of many projects baselined prior to approximately 2009 figures were pulled from the first appearance as a development project in a Presidentrsquos Budget as the baseline against which to measure In a few cases notificationsreports to Congress (eg NSPD-49 reports) were used to identify a baseline figure MA figures were pulled solely from decision memoranda and thus our dataset with regard to MArsquos is smaller as it excludes many of the older projects that did not have standardized baseline documentation with MArsquos noted Variance to the baseline was then measured by using the most recent quarterly cost and schedule report Latest cost data is valid through the FY18 Q3 reporting period Slide 3 charts illustrate each project in the dataset with respective LCC and dev cost variances
The confidence level policy applied to each project was noted using source documentation as well as a cross-reference against when policy changes were implemented recognizing that a subset of projects received waivers to new policies during policy transition Certain exclusions were applied to ensure a dataset comparable across projects For example SOFIA had conducted a JCL on a replan but the decision memorandum made clear the baseline was not changing therefore the JCL confidence level could not fairly be applied to measure performance against the baseline Another example is GPM which was excluded as it was one of the very first projects baselined after JCL policy implementation and was not a ldquotruerdquo JCL with the decision memorandum noting that the intent was met while a JCL DPMC would be held many months later to evaluate progress There were a couple of additional exclusions applied
When a project is confirmed at KDP-C cost performance measurements were applied to that baseline If a project was then rebaselined a ldquonewrdquo project was added to the dataset using the rebaselined figures against which to measure as the Agency made the decision at that point to press ahead with the project and Congress provided reauthorization The ldquooriginalrdquo project was ldquofrozenrdquo in terms of development phase to fairly capture the contemporary phase performance (eg the ldquooriginalrdquo OCO-2 cost growth will always be categorized within the ldquoprojects in developmentrdquo performance category while the rebaselined OCO-2 cost performance falls into the ldquoprojects launchedrdquo category) The latest cost figures however were used to measure cost performance across both original baselines and rebaselines in order to fairly capture the accuracy of original estimates against final outcomes
This insight while placing an emphasis on the JCL while measuring performance does not intend to convey a discovered causal relationship between JCL and cost performance There have been many other related programmatic and technical advancements over the past 10 to 20 years that have influenced cost and schedule performance in the overall positive direction Other insights look into other influencers of costschedule performance
13
Dev Cost Metrics Controlling for LV Cost Variation
14
Methodology and Assumptions
SID pulled a number of data elements from a total of 22 SMD projects to conduct this analysis Data elements from a projectrsquos baseline include total development cost and the launch services cost estimate and have been sourced from KDP documentation quarterly reports and Cost Analysis Data Requirements (CADREs) These data were compared to currentactual total development and launch services costs from the most recent KDPquarterly reports Other data elements include Division Lead Center type of launch vehicle LCC category and current phase
SID calculated the overall development cost deltas from the baseline cost and verified the percentage growth with external reporting data where applicable SID then calculated the percent change in launch services development cost from baseline to currentactual The development cost percent change was calculated after removing launch services from the inputs
For further insight these same calculations were conducted by Division Lead Center type of launch vehicle and LCC category Division Lead Center and LCC category were then further broken down by looking only at projects currently in development
The 22 projects used in this analysis include Mars 2020 ICESat-2 ICON InSight SOC PSP SWOT TESS Juno Landsat-8 MMS OSIRIS-REx SMAP MAVEN GRAIL NuSTAR RBSP IRIS LADEE OCO-2 CYGNSS and Landsat 9 Representation includes seven planetary science seven earth science six heliophysics and two astrophysics missions twelve GSFC-led projects and eight JPL-led projects (LaRC and ARC representing the other two) ten Atlas V one Delta IV-H two Falcon 9 four Delta II four Pegasus and one Minotaur V rockets and six category 1 thirteen category 2 and three category 3 projects Seven projects assessed are currently in development
Other projects considered were excluded if launch was or is to be on a ride-share and launch services costs were negligible (eg RBI) Projects launching on internationally-contributed rockets were also excluded (eg GPM JWST) Other exclusions were based on data limitations at the time of analysis (eg no launch services costs available from baseline)
Did not add GPM international launchSOFIA no launchJWST international launch
RBI rideshareSentinel-6 international launch
Dawn no launch vehicle numbers availableSNPP No baseline LV estimate available
NISAR international launchLCRD rideshare
GRACE-FO rideshare
14
Formulation KDPs
15
Methodology and Assumptions
Comparative analysis was conducted where possible (ie when highlow costschedule figures were available in KDP-ABC decision memoranda This analysis does not attempt to explain why the majority of costschedule estimates at KDPrsquos exceed prior estimates
Cost and schedule ranges were extracted from KDP-A and KDP-B decision memoranda Agency Baseline Commitments and Management Agreements were extracted from KDP-C decision memoranda Lifecycle cost was used in all cases (as opposed to development cost only) A project did not need to have all KDP-A through C figures to be included in the analysis (eg a project that did not have a KDP-A range was still included in the KDP-B to KDP-C statistics)
This analysis includes data from KDP-A KDP-B and KDP-C milestones At KDP-A and KDP-B a high and low estimate is established for both cost and schedule At KDP-C a Management Agreement and an Agency Baseline Commitment is established for both cost and schedule For ease of conveyance this analysis equates the Management Agreement as the low estimate for KDP-C and equates the Agency Baselines Commitment as the high estimate for KDP-C
15
Column1 | KDP-C Date | Lead Center | Division | Launch Vehicle | LCC Category | Phase | Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | Notes | |||||||||||||||||
Juno | Aug-08 | JPL | Planetary | Atlas V | 1 | Ops | $ 7423 | $ 7089 | $ 1904 | $ 1817 | $ 5519 | $ 5272 | -45 | -46 | -45 | ||||||||||||||||||
RBSP | Dec-08 | GSFC | Helio | Atlas V | 2 | Ops | $ 5338 | $ 5040 | $ 1336 | $ 1324 | $ 4002 | $ 3716 | -56 | -09 | -71 | ||||||||||||||||||
GRAIL | Jan-09 | JPL | Planetary | Delta II | 2 | Ops | $ 4270 | $ 3983 | $ 1528 | $ 1508 | $ 2742 | $ 2475 | -67 | -13 | -97 | ||||||||||||||||||
MMS | Jun-09 | GSFC | Helio | Atlas V | 1 | Ops | $ 8573 | $ 8753 | $ 1942 | $ 1788 | $ 6631 | $ 6965 | 21 | -79 | 50 | ||||||||||||||||||
NuSTAR | Sep-09 | JPL | Astro | Pegasus | 3 | Ops | $ 1099 | $ 1162 | $ 358 | $ 332 | $ 741 | $ 830 | 57 | -73 | 120 | ||||||||||||||||||
Landsat-8 | Dec-09 | GSFC | Earth | Atlas V | 2 | Ops | $ 5830 | $ 5028 | $ 1264 | $ 1218 | $ 4566 | $ 3810 | -138 | -36 | -166 | ||||||||||||||||||
LADEE | Aug-10 | ARC | Planetary | Minotaur V | 2 | Ops | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||
OCO-2 | Sep-10 | JPL | Earth | Delta II | 2 | Ops | $ 2490 | $ 3200 | $ 676 | $ 1368 | $ 1814 | $ 1832 | 285 | 1024 | 10 | against original baseline rebaseline primary LV-driven aside from some RWA issues | |||||||||||||||||
MAVEN | Oct-10 | GSFC | Planetary | Atlas V | 2 | Ops | $ 5672 | $ 4720 | $ 1870 | $ 1541 | $ 3802 | $ 3179 | -168 | -176 | -164 | ||||||||||||||||||
IRIS | Nov-10 | GSFC | Helio | Pegasus | 3 | Ops | $ 1407 | $ 1430 | $ 404 | $ 426 | $ 1003 | $ 1004 | 16 | 54 | 01 | ||||||||||||||||||
SMAP | May-12 | JPL | Earth | Delta II | 2 | Ops | $ 4857 | $ 4543 | $ 1319 | $ 1201 | $ 3538 | $ 3342 | -65 | -89 | -55 | ||||||||||||||||||
SOC | Mar-13 | GSFC | Helio | Atlas V | 2 | Dev | $ 3769 | $ 3100 | $ 2500 | $ 1727 | $ 1269 | $ 1373 | -178 | -309 | 82 | ||||||||||||||||||
OSIRIS-REx | May-13 | GSFC | Planetary | Atlas V | 1 | Ops | $ 7786 | $ 6156 | $ 2340 | $ 1888 | $ 5446 | $ 4268 | -209 | -193 | -216 | ||||||||||||||||||
CYGNSS | Feb-14 | LaRC | Earth | Pegasus | 3 | Ops | $ 1511 | $ 1287 | $ 523 | $ 623 | $ 988 | $ 664 | -148 | 191 | -328 | ||||||||||||||||||
InSight | Mar-14 | JPL | Planetary | Atlas V | 2 | Ops | $ 5418 | $ 6483 | $ 1599 | $ 1685 | $ 3819 | $ 4798 | 197 | 54 | 256 | ||||||||||||||||||
PSP | Mar-14 | GSFC | Helio | Delta IV-H | 1 | Dev | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||
ICESat-2 | May-14 | GSFC | Earth | Delta II | 1 | Dev | $ 7637 | $ 7441 | $ 1188 | $ 1183 | $ 6449 | $ 6258 | -26 | -04 | -30 | ||||||||||||||||||
ICON | Oct-14 | GSFC | Helio | Pegasus | 2 | Dev | $ 1960 | $ 1982 | $ 543 | $ 563 | $ 1417 | $ 1419 | 11 | 37 | 01 | ||||||||||||||||||
TESS | Oct-14 | GSFC | Astro | Falcon 9 | 2 | Ops | $ 3232 | $ 2799 | $ 1141 | $ 874 | $ 2091 | $ 1925 | -134 | -234 | -79 | ||||||||||||||||||
SWOT | May-16 | JPL | Earth | Falcon 9 | 2 | Dev | $ 5715 | $ 5715 | $ 1313 | $ 1078 | $ 4402 | $ 4638 | 00 | -179 | 53 | ||||||||||||||||||
Mars 2020 | Jun-16 | JPL | Planetary | Atlas V | 1 | Dev | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||
Landsat 9 | Dec-17 | GSFC | Earth | Atlas V | 2 | Dev | $ 6342 | $ 6342 | $ 1544 | $ 1542 | $ 4798 | $ 4800 | 00 | -01 | 00 | ||||||||||||||||||
Projects in Development | $ 52749 | $ 52336 | $ 14819 | $ 12738 | $ 37930 | $ 39598 | -08 | -140 | 44 | ||||||||||||||||||||||||
Projects in Operations | $ 66588 | $ 63555 | $ 18647 | $ 18196 | $ 47941 | $ 45359 | -46 | -24 | -54 | ||||||||||||||||||||||||
Total | $ 119337 | $ 115891 | $ 33466 | $ 30935 | $ 85871 | $ 84956 | -29 | -76 | -11 | ||||||||||||||||||||||||
Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | |||||||||||||||||||||||||
GSFC Project Total | $ 68103 | $ 63294 | $ 20377 | $ 18325 | $ 47726 | $ 44969 | -71 | -101 | -58 | ||||||||||||||||||||||||
JPL Projects Total | $ 48041 | $ 49428 | $ 12122 | $ 11384 | $ 35919 | $ 38044 | 29 | -61 | 59 | ||||||||||||||||||||||||
Did not add | GPM | international launch | GSFC Projects in Ops | $ 37838 | $ 33926 | $ 10297 | $ 9059 | $ 27541 | $ 24867 | -103 | -120 | -97 | |||||||||||||||||||||
SOFIA | no launch | JPL Projects in Ops | $ 25557 | $ 26460 | $ 7384 | $ 7911 | $ 18173 | $ 18549 | 35 | 71 | 21 | ||||||||||||||||||||||
JWST | international launch | GSFC Projects in Dev | $ 30265 | $ 29368 | $ 10080 | $ 9266 | $ 20185 | $ 20102 | -30 | -81 | -04 | ||||||||||||||||||||||
RBI | rideshare | JPL Projects in Dev | $ 22484 | $ 22968 | $ 4738 | $ 3473 | $ 17746 | $ 19495 | 22 | -267 | 99 | ||||||||||||||||||||||
Sentinel-6 | international launch | ||||||||||||||||||||||||||||||||
Dawn | no launch vehicle numbers available | Astro | $ 4331 | $ 3961 | $ 1499 | $ 1206 | $ 2832 | $ 2755 | -85 | -195 | -27 | ||||||||||||||||||||||
SNPP | No baseline LV estimate available | Planetary | $ 49020 | $ 47566 | $ 13109 | $ 11437 | $ 35911 | $ 36129 | -30 | -128 | 06 | ||||||||||||||||||||||
NISAR | international launch | Helio | $ 31604 | $ 30808 | $ 11030 | $ 10078 | $ 20574 | $ 20730 | -25 | -86 | 08 | ||||||||||||||||||||||
LCRD | rideshare | Earth | $ 34382 | $ 33556 | $ 7827 | $ 8213 | $ 26555 | $ 25343 | -24 | 49 | -46 | ||||||||||||||||||||||
GRACE-FO | rideshare | ||||||||||||||||||||||||||||||||
Astro - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
Planetary - Dev Only | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||||||||
Helio - Dev Only | $ 16286 | $ 15585 | $ 7348 | $ 6540 | $ 8938 | $ 9045 | -43 | -110 | 12 | ||||||||||||||||||||||||
Earth - Dev Only | $ 19694 | $ 19498 | $ 4045 | $ 3803 | $ 15649 | $ 15695 | -10 | -60 | 03 | ||||||||||||||||||||||||
Atlas V | $ 72920 | $ 69964 | $ 19725 | $ 16926 | $ 53195 | $ 53038 | -41 | -142 | -03 | ||||||||||||||||||||||||
Delta IV-H | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||||||||
Falcon 9 | $ 8947 | $ 8514 | $ 2454 | $ 1952 | $ 6493 | $ 6562 | -48 | -205 | 11 | ||||||||||||||||||||||||
Delta II | $ 19254 | $ 19167 | $ 4711 | $ 5260 | $ 14543 | $ 13907 | -05 | 117 | -44 | this is skewed by OCO-2 which switched from the baseline Taurus XL to the Delta-II at the rebaseline | |||||||||||||||||||||||
Pegasus | $ 5977 | $ 5861 | $ 1828 | $ 1944 | $ 4149 | $ 3917 | -19 | 63 | -56 | ||||||||||||||||||||||||
Minotaur V | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||||||||
Category 1 | $ 58745 | $ 57195 | $ 15104 | $ 13322 | $ 43641 | $ 43873 | -26 | -118 | 05 | ||||||||||||||||||||||||
Category 2 | $ 56575 | $ 54817 | $ 17076 | $ 16232 | $ 39499 | $ 38585 | -31 | -49 | -23 | ||||||||||||||||||||||||
Category 3 | $ 4017 | $ 3879 | $ 1285 | $ 1381 | $ 2732 | $ 2498 | -34 | 75 | -86 | ||||||||||||||||||||||||
Category 1 - Dev Only | $ 34963 | $ 35197 | $ 8918 | $ 7829 | $ 26045 | $ 27368 | 07 | -122 | 51 | ||||||||||||||||||||||||
Category 2 - Dev Only | $ 17786 | $ 17139 | $ 5900 | $ 4909 | $ 11886 | $ 12230 | -36 | -168 | 29 | ||||||||||||||||||||||||
Category 3 - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
LV of Total Dev at Baseline | 280 | ||||||||||||||||||||||||||||||||
LV of Total Dev at FY18 Q3 | 267 | ||||||||||||||||||||||||||||||||
Launch Vehicle Percent Cost Variation from Baseline Estimate in Chronological Order |
Mission | LCC Category | KDP-A (low) | KDP-A (high) | KDP-B (low) | KDP-B (high) | Low Delta (months) | High Delta (months) | KDP-C MA | MA Variance from A | KDP-C ABC | ABC Variance from A | |||||||||||||||
Restore-L | 2 | Jun-20 | Dec-23 | Jun-20 | Dec-20 | 0 | -36 | |||||||||||||||||||
SLS | 1 | Dec-17 | Dec-17 | Mar-17 | Apr-17 | -9 | -8 | Dec-17 | 0 | Nov-18 | 11 | |||||||||||||||
PACE | 2 | Dec-22 | Dec-23 | Aug-22 | Apr-23 | -4 | -8 | |||||||||||||||||||
WFIRST | 1 | Dec-24 | Dec-26 | Sep-25 | Sep-26 | 9 | -3 | |||||||||||||||||||
OCO-3 | 3 | Sep-16 | Dec-16 | Jul-16 | Oct-16 | -2 | -2 | Mar-18 | 18 | May-18 | 17 | |||||||||||||||
PSP | 1 | Aug-18 | Aug-18 | Jul-18 | Jul-18 | -1 | -1 | Aug-18 | 0 | Aug-18 | 0 | |||||||||||||||
LCRD | 2 | Mar-17 | Mar-17 | Feb-17 | Feb-17 | -1 | -1 | Jun-19 | 27 | Nov-19 | 32 | |||||||||||||||
Euclid | 3 | Dec-14 | Dec-14 | Dec-14 | Dec-14 | 0 | 0 | May-15 | 5 | May-16 | 17 | |||||||||||||||
GRACE-FO | 2 | Aug-17 | Aug-17 | Aug-17 | Aug-17 | 0 | 0 | Aug-17 | 0 | Feb-18 | 6 | |||||||||||||||
Mars 2020 | 1 | Jul-20 | Jul-20 | Jul-20 | Jul-20 | 0 | 0 | Jul-20 | 0 | Jul-20 | 0 | |||||||||||||||
SAGE-III | 3 | Aug-14 | Aug-14 | Aug-14 | Aug-14 | 0 | 0 | Aug-14 | 0 | Aug-14 | 0 | |||||||||||||||
SWOT | 2 | Oct-20 | Oct-20 | Oct-20 | Oct-20 | 0 | 0 | Apr-21 | 6 | Apr-22 | 18 | |||||||||||||||
LADEE | 3 | Mar-12 | Mar-12 | May-12 | May-12 | 2 | 2 | May-13 | 14 | Nov-13 | 20 | |||||||||||||||
DART | 2 | Dec-20 | Dec-20 | Dec-20 | May-21 | 0 | 5 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | ||||||||||||||||||
NISAR | 2 | Dec-20 | Dec-21 | Dec-20 | Jun-22 | 0 | 6 | Dec-21 | 12 | Sep-22 | 9 | |||||||||||||||
JASON-3 | 3 | Jul-13 | Jul-13 | Apr-14 | Apr-14 | 9 | 9 | Mar-15 | 20 | Mar-15 | 20 | |||||||||||||||
MMS | 1 | Oct-13 | Oct-13 | Oct-14 | Oct-14 | 12 | 12 | Aug-14 | 10 | Mar-15 | 17 | |||||||||||||||
ECOSTRESS | 3 | May-17 | Mar-18 | Aug-17 | Aug-19 | 3 | 17 | Aug-17 | 3 | Aug-19 | 17 | |||||||||||||||
SMAP | 2 | Mar-13 | Mar-13 | May-15 | May-15 | 26 | 26 | Oct-14 | 19 | Mar-15 | 24 | |||||||||||||||
XARM | 3 | Oct-19 | Oct-19 | Jan-22 | Mar-23 | 27 | 41 | |||||||||||||||||||
SOC | 2 | Apr-15 | Apr-15 | Dec-17 | Dec-18 | 32 | 44 | Jan-17 | 21 | Oct-18 | 42 | |||||||||||||||
Orion | 1 | Dec-17 | Dec-17 | Jun-21 | Mar-22 | 42 | 51 | Aug-21 | 44 | Apr-23 | 64 | |||||||||||||||
MAIA | 3 | NA | NA | Dec-19 | Mar-21 | NA | NA | |||||||||||||||||||
ICON | 3 | NA | NA | Feb-17 | Jun-17 | NA | NA | |||||||||||||||||||
GOLD | 3 | NA | NA | Dec-17 | Dec-17 | NA | NA | |||||||||||||||||||
GeoCarb | 3 | NA | NA | Jun-22 | Jun-23 | NA | NA | |||||||||||||||||||
IXPE | 3 | NA | NA | Dec-20 | Dec-20 | NA | NA | |||||||||||||||||||
Landsat 9 | 2 | NA | NA | Dec-20 | Nov-21 | NA | NA | |||||||||||||||||||
Lucy | 2 | NA | NA | Oct-21 | Nov-21 | NA | NA | |||||||||||||||||||
TROPICS | 3 | NA | NA | Sep-19 | Sep-20 | NA | NA | |||||||||||||||||||
JUICE | 3 | NA | NA | Sep-19 | Sep-19 | NA | NA | |||||||||||||||||||
Psyche | 2 | NA | NA | Aug-22 | Aug-22 | NA | NA | |||||||||||||||||||
Clipper | 1 | NA | NA | Jun-22 | Jul-23 | NA | NA | removed Clipper from schedule calculations due to no KDP-A schedule estimate | ||||||||||||||||||
CLARREO-PF | 3 | Jan-20 | Jan-22 | |||||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
of Pp | (LowMA) | (HighABC) | (LowMA) | (HighABC) | ||||||||||||||||||||||
Category I | 7 | 62 | 165 | 88 | 85 | |||||||||||||||||||||
Category II | 12 | 38 | 109 | 59 | 40 | |||||||||||||||||||||
Category III | 15 | - | -07 | 56 | 96 | |||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
(LowMA) | (HighABC) | (LowMA) | (HighABC) | |||||||||||||||||||||||
Average | 80 | 118 | 66 | 70 | ||||||||||||||||||||||
Median | 15 | - | 00 | 00 | ||||||||||||||||||||||
Standard Deviation | 145 | 233 | 129 | 189 | ||||||||||||||||||||||
Minimum | -12 | -65 | -9 | -36 | ||||||||||||||||||||||
Maximum | 417 | 745 | 42 | 51 |
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | KDP-C MA | KDP-C ABC | MA Variance From A | ABC Variance From A | |||||||||||||||||
Clipper | 1 | $ 4000 | $ 4000 | $ - 0 | 00 | $ 3000 | $ 3100 | $ 100 | 33 | ||||||||||||||||||||||
DART | 2 | $ 270 | $ 291 | $ 21 | 78 | $ 175 | $ 248 | $ 73 | 417 | ||||||||||||||||||||||
Euclid | 3 | $ 110 | $ 110 | $ - 0 | 00 | $ 100 | $ 100 | $ - 0 | 00 | Combined KDP-AB so no possible change | 964 | 1014 | -4 | -8 | |||||||||||||||||
GRACE-FO | 2 | $ 470 | $ 460 | $ (10) | -21 | $ 409 | $ 404 | $ (5) | -12 | 4059 | 4319 | -1 | -8 | ||||||||||||||||||
JASON-3 | 3 | $ 159 | $ 166 | $ 7 | 44 | $ - 0 | $ 158 | 1552 | 1552 | -2 | |||||||||||||||||||||
LADEE | 3 | $ 214 | $ 200 | $ (14) | -65 | $ - 0 | $ 184 | 2359 | 2629 | 23 | |||||||||||||||||||||
LCRD | 2 | $ 239 | $ 239 | $ 0 | 02 | $ 239 | $ 239 | $ 0 | 02 | 2571 | 2627 | 8 | 10 | ||||||||||||||||||
Mars 2020 | 1 | $ 2350 | $ 2351 | $ 1 | 00 | $ 2140 | $ 2186 | $ 46 | 21 | 22727 | 24435 | 6 | 4 | ||||||||||||||||||
MMS | 1 | $ 777 | $ 990 | $ 213 | 275 | $ 777 | $ 928 | $ 151 | 195 | 10026 | 10826 | 29 | 39 | ||||||||||||||||||
NISAR | 2 | $ 808 | $ 808 | $ - 0 | 00 | $ 718 | $ 718 | $ - 0 | 00 | 7953 | 8669 | 11 | 7 | ||||||||||||||||||
OCO-3 | 3 | $ 120 | $ 111 | $ (9) | -71 | $ 100 | $ 101 | $ 1 | 13 | 1108 | 1148 | 11 | -4 | ||||||||||||||||||
Orion | 1 | $ 6391 | $ 10288 | $ 3897 | 610 | $ - 0 | $ 8534 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | 108098 | 112835 | 77 | ||||||||||||||||||||
PACE | 2 | $ 850 | $ 850 | $ - 0 | 00 | $ 805 | $ 805 | $ - 0 | 00 | ||||||||||||||||||||||
PSP | 1 | $ 1300 | $ 1439 | $ 139 | 107 | $ 1000 | $ 1233 | $ 233 | 233 | 13932 | 15534 | 39 | 19 | ||||||||||||||||||
Restore-L | 2 | $ 787 | $ 753 | $ (34) | -43 | $ 500 | $ 628 | $ 128 | 256 | ||||||||||||||||||||||
SAGE-III | 3 | $ 112 | $ 115 | $ 3 | 27 | $ - 0 | $ 104 | 101 | 112 | 0 | |||||||||||||||||||||
SLS | 1 | $ 8855 | $ 8587 | $ (268) | -30 | $ - 0 | $ 7653 | 8394 | 9695 | 9 | |||||||||||||||||||||
SMAP | 2 | $ 514 | $ 649 | $ 135 | 263 | $ - 0 | $ - 0 | $ - 0 | 7218 | 9165 | 78 | ||||||||||||||||||||
SOC | 2 | $ 243 | $ 424 | $ 181 | 745 | $ - 0 | $ 371 | 3662 | 4359 | 79 | |||||||||||||||||||||
SWOT | 2 | $ 752 | $ 757 | $ 5 | 07 | $ 642 | $ 647 | $ 5 | 08 | 7049 | 7549 | 10 | 0 | ||||||||||||||||||
XARM | 3 | $ 172 | $ 217 | $ 45 | 264 | $ 161 | $ 179 | $ 18 | 110 | ||||||||||||||||||||||
Count | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta | Change (low) | Notes | ||||||||||||||||||||||
Category 1 | 6 | $ 23673 | $ 27655 | $ 3982 | 168 | $ 3275 | $ 3606 | $ 331 | 101 | ||||||||||||||||||||||
Category 2 | 9 | $ 4933 | $ 5231 | $ 298 | 61 | $ 4474 | $ 13335 | $ 8861 | 1981 | ||||||||||||||||||||||
Category 3 | 6 | $ 887 | $ 920 | $ 33 | 37 | $ - 0 | $ 7757 | $ 7757 | ERRORDIV0 | ||||||||||||||||||||||
Total | 21 | $ 29493 | $ 33807 | $ 4314 | 146 | $ 7749 | $ 24698 | $ 16949 | 2187 | ||||||||||||||||||||||
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | |||||||||||||||||||||
CLARREO-PF | 3 | $ 75 | $ (75) | -1000 | $ 64 | ||||||||||||||||||||||||||
ICON | 3 | $ 249 | $ 218 | ||||||||||||||||||||||||||||
ECOSTRESS | 3 | $ 56 | $ 49 | ||||||||||||||||||||||||||||
GeoCarb | 3 | $ 181 | $ 171 | ||||||||||||||||||||||||||||
GOLD | 3 | $ 74 | $ 64 | ||||||||||||||||||||||||||||
IXPE | 3 | $ 205 | $ 189 | ||||||||||||||||||||||||||||
JUICE | 3 | $ 119 | $ 103 | ||||||||||||||||||||||||||||
Landsat 9 | 2 | $ 928 | $ 851 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | |||||||||||||||||||||||||||
Lucy | 2 | $ 984 | $ 914 | ||||||||||||||||||||||||||||
Psyche | 2 | $ 957 | $ 907 | ||||||||||||||||||||||||||||
TROPICS | 3 | $ 30 | $ 30 | ||||||||||||||||||||||||||||
MAIA | 3 | $ 178 | $ 150 | ||||||||||||||||||||||||||||
Cost Estimate Deltas - KDP-A to KDP-B | COST Growth () | |||||||||||||||||||
Mission | Estimate | KDP-A | KDP-B | Notes | of Pp | Low (MA) | High (ABC) | |||||||||||||
SOC | High | $ 243 | 745 | $ 424 | Category I | 4 | 127 | 172 | ||||||||||||
Low | $ - 0 | $ 371 | Category II | 5 | -01 | 199 | ||||||||||||||
Orion | High | $ 6391 | 610 | $ 10288 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | Category III | 4 | 00 | 01 | |||||||||||
Low | $ - 0 | $ 8534 | ||||||||||||||||||
SMAP | High | $ 514 | 263 | $ 649 | ||||||||||||||||
Low | $ - 0 | $ - 0 | ||||||||||||||||||
SPP | High | $ 1300 | 107 | $ 1439 | ||||||||||||||||
Low | $ 1000 | 233 | $ 1233 | |||||||||||||||||
JASON-3 | High | $ 159 | 44 | $ 166 | ||||||||||||||||
Low | $ - 0 | $ 158 | ||||||||||||||||||
SAGE-III | High | $ 112 | 27 | $ 115 | ||||||||||||||||
Low | $ - 0 | $ 104 | ||||||||||||||||||
SWOT | High | $ 752 | 07 | $ 757 | ||||||||||||||||
Low | $ 642 | 08 | $ 647 | |||||||||||||||||
Mars 2020 | High | $ 2350 | 00 | $ 2351 | ||||||||||||||||
Low | $ 2140 | 21 | $ 2186 | |||||||||||||||||
NISAR | High | $ 808 | 00 | $ 808 | ||||||||||||||||
Low | $ 718 | 00 | $ 718 | |||||||||||||||||
Euclid | High | $ 110 | 00 | $ 110 | Combined KDP-AB so no change possible | |||||||||||||||
Low | $ 100 | 00 | $ 100 | |||||||||||||||||
GRACE Follow On | High | $ 470 | -21 | $ 460 | ||||||||||||||||
Low | $ 409 | -12 | $ 404 | |||||||||||||||||
SLS | High | $ 8855 | -30 | $ 8587 | ||||||||||||||||
Low | $ - 0 | $ 7653 | ||||||||||||||||||
LADEE | High | $ 214 | -65 | $ 200 | ||||||||||||||||
Low | $ - 0 | $ 184 | ||||||||||||||||||
ProgramProject Name | Category | KDP A to B analysis (13 missions) | |||||||||||||||
ASTRO-H | 3 | ASTRO-Hreg | 3 | bull13 Missions KDP-B Data Unavailable | |||||||||||||
CYGNSS | 3 | CYGNSS | 3 | bull7 Missions KDP-Crsquos have not yet occurred | |||||||||||||
DSCOVR | 3 | DSCOVR | 3 | ||||||||||||||
C | ECOSTRESS | 3 | ECOSTRESS | 3 | |||||||||||||
EUCLID | 3 | EUCLIDreg | 3 | Euclid | |||||||||||||
C | GEDI | 3 | GEDI | 3 | |||||||||||||
GOES-R | 1 | GOES-R | 1 | ||||||||||||||
GOLD | 3 | GOLD | 3 | ||||||||||||||
GPM | 2 | GPM | 2 | ||||||||||||||
GRACE-FO | 2 | GRACE-FO | 2 | GRACE Follow On | |||||||||||||
GSDO | 1 | GSDO | 1 | ||||||||||||||
ICESat-2 | 1 | ICESat-2reg | 1 | ||||||||||||||
ICON | 2 | ICON | 2 | ||||||||||||||
InSight | 2 | InSight | 2 | ||||||||||||||
IRIS | 3 | IRIS | 3 | ||||||||||||||
Jason-3 | 3 | Jason-3 | 3 | JASON-3 | |||||||||||||
JPSS-1 | 1 | JPSS-1 | 1 | ||||||||||||||
JWST | 1 | JWSTreg | 1 | ||||||||||||||
LADEE | 2 | LADEEreg | 2 | LADEE | |||||||||||||
C | LCRD | 3 | LCRD | 3 | |||||||||||||
LDCM | 2 | LDCMreg | 2 | ||||||||||||||
LDSD | 3 | LDSD | 3 | ||||||||||||||
C | Mars 2020 | 1 | Mars 2020 | 1 | Mars 2020 | ||||||||||||
MAVEN | 2 | MAVEN | 2 | ||||||||||||||
MMS | 1 | MMS | 1 | ||||||||||||||
MOMA | 3 | MOMA | 3 | ||||||||||||||
MSL | 1 | MSL | 1 | ||||||||||||||
NICER | 3 | NICER | 3 | ||||||||||||||
C | NISAR | 2 | NISAR | 2 | NISAR | ||||||||||||
NuSTAR | 3 | NuSTARreg | 3 | ||||||||||||||
OCO-2 | 2 | OCO-2 | 2 | ||||||||||||||
C | OCO-3 | 3 | OCO-3 | 3 | |||||||||||||
ORION | 1 | ORION | 1 | Orion | |||||||||||||
OSIRIS Rex | 1 | OSIRIS Rexreg | 1 | ||||||||||||||
SAGE III | 3 | SAGE III | 3 | SAGE-III | |||||||||||||
SGSS | 1 | SGSSreg | 1 | ||||||||||||||
SLS | 1 | SLS | 1 | SLS | |||||||||||||
SMAP | 2 | SMAPreg | 2 | SMAP | |||||||||||||
SOC | 2 | SOC | 2 | SOC | |||||||||||||
SOFIA | 1 | SOFIA | 1 | ||||||||||||||
PSP | 1 | PSP | 1 | PSP | |||||||||||||
C | SWOT | 2 | SWOT | 2 | SWOT | ||||||||||||
TEMPO | 3 | TEMPO | 3 | ||||||||||||||
TESS | 2 | TESS | 2 | ||||||||||||||
Clipper | |||||||||||||||||
DART | |||||||||||||||||
PACE | |||||||||||||||||
Restore-L | |||||||||||||||||
XARM |
Statistics | COST Growth ($M) | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Average | 9 | 9 | 43 | 61 | 136 | 070 | ||||||||
Median | 5 | 6 | 20 | 45 | 112 | 034 | ||||||||
Standard Deviation | 14 | 16 | 73 | 83 | 93 | 081 | ||||||||
Variance | 2 | 3 | 535 | 685 | 871 | 066 | ||||||||
Minimum | -9 | -8 | (71) | (31) | 15 | - 0 | ||||||||
Maximum | 38 | 53 | 244 | 315 | 345 | 242 | ||||||||
no JWST | ||||||||||||||
Statistics | ||||||||||||||
COST Growth | Schedule Growth (months) | Duration (months) | ||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 18 | 17 | 118 | 131 | 1989 | 065 | ||||||||
Median | 20 | 17 | 101 | 132 | 19167 | 0582 | ||||||||
Standard Deviation | 16 | 19 | 105 | 117 | 11557 | 0830 | ||||||||
Sample Variance | 3 | 4 | 1101 | 1377 | 133562 | 0688 | ||||||||
Minimum | -6 | -5 | - 0 | - 0 | 397 | - 0 | ||||||||
Maximum | 46 | 48 | 284 | 274 | 4527 | 310 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 20 | 21 | 156 | 159 | 2031 | 075 | ||||||||
Median | 21 | 20 | 132 | 147 | 20783 | 0589 | ||||||||
Standard Deviation | 17 | 25 | 174 | 155 | 11214 | 0881 | ||||||||
Sample Variance | 3 | 6 | 3035 | 2394 | 125751 | 0776 | ||||||||
Minimum | -6 | -5 | 00 | 00 | 40 | - 0 | ||||||||
Maximum | 48 | 78 | 649 | 528 | 453 | 31 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 4 | 3 | 47 | 136 | 253 | 054 | ||||||||
Median | 9 | 9 | 61 | 132 | 24333 | 042 | ||||||||
Standard Deviation | 10 | 12 | 52 | 56 | 6657 | 022 | ||||||||
Sample Variance | 1 | 1 | 273 | 311 | 44310 | 005 | ||||||||
Minimum | -7 | -11 | (10) | 82 | 1923 | 041 | ||||||||
Maximum | 11 | 11 | 92 | 193 | 3243 | 079 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | ||||||||||||
of Pp | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | ||||||||||
Category I | 6 | 4 | 4 | 22 | 78 | |||||||||
Category II | 9 | 8 | 13 | 71 | 83 | |||||||||
Category III | 8 | 6 | 11 | 28 | 52 | |||||||||
Timeline | Total Programs | 46 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDB C for comaprison | planned | Total Replans | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statictics - PresentFinal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 41416 | 14 | 9 | 9 | 8 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | |||||||||||||||||||||||||||||||||||||
ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||
ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 758 | Feb-16 | 759 | Mar-16 | FY16Q2 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -5 | -10 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||
CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 1595 | Oct-16 | 1742 | May-17 | FY16Q2 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -4 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | ||||||||||||||||||||||||||||||||||||||||
EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 179 | Dec-21 | 190 | Dec-22 | FY16Q2 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 0 | 00 | 5787 | 5480 | |||||||||||||||||||||||||||||||||||||||
GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | ||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 108295 | Oct-16 | kDP-D Sep-14 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | ||||||||||||||||||||||||||||||||||||||||||||||
GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||
GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q2 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -1 | -3 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||
GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4079 | Aug-17 | 4318 | Feb-18 | FY16Q2 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | -00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ESD | GSDO | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 26336 | Jun-18 | 28129 | Nov-18 | FY16Q2 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 9916 | Oct-17 | 10636 | Jun-18 | FY16Q2 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 232 | Jun-17 | 2527 | Oct-17 | FY16Q2 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 1 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Planetary | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | 6536 | Mar-16 | 6751 | Mar-16 | FY16Q2 | N | N | 0 | 0 | 4 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E draft | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||
JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||
LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||
Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
LDCM | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
LDCMreg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 8501 | Feb-13 | 8568 | Feb-13 | FY15Q4 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | ||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||
Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||
MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 598 | Nov-13 | 600 | Nov-13 | FY16Q1 | N | N | 0 | 0 | -7 | -11 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1121 | Sep-15 | 1121 | Sep-15 | FY16Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 11 | 4 | 1320 | 613 | |||||||||||||||||||||||||||||||||||||||||
MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 904 | Jul-18 | 1004 | Jul-18 | FY16Q2 | N | N | 0 | 0 | -1 | -1 | 3347 | 3347 | |||||||||||||||||||||||||||||||||||||||||||||||||
MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||
NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 684 | Feb-17 | 67 | Feb-17 | KDP-D Jan-16 | N | N | 0 | 0 | 9 | -2 | 613 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||
NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||
NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 166 | Jun-12 | 166 | Jun-12 | FY14Q4 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | 3 | 3 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||
OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4276 | Jul-14 | 4276 | Jul-14 | FY16Q2 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -2 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||
OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ORION | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | 108098 | Aug-21 | 112835 | Apr-23 | FY16Q2 | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 10014 | Oct-16 | 10572 | Oct-16 | FY16Q2 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 1 | -1 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13931 | Aug-18 | 15534 | Aug-18 | FY16Q2 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 1265 | Aug-16 | 133 | Aug-16 | FY16Q2 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 20 | 19 | 2437 | 2437 | |||||||||||||||||||||||||||||||||||||||||
SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||
SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1216 | Jul-19 | 1228 | Sep-19 | PPBE18 PMR | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 2 | 2 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ESD | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||
SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | May-15 | 8899 | May-15 | FY16Q2 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 707 | 203 | |||||||||||||||||||||||||||||||||||||||||
SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 2892 | Oct-18 | 3789 | Oct-18 | FY16Q2 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -27 | -13 | 2127 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
SOFIA (Budget) | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 29048 | Feb-14 | 29122 | Feb-14 | FY16Q2 | Budget Reduction | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||
TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 1809 | Sep-17 | 2178 | Nov-17 | FY16Q2 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 31976 | Dec-17 | 3517 | Jun-18 | FY16Q2 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -7 | -7 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Currently in B | Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CLARREO-PF | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DART | KDP-C in July | Mean | 13 | -13 | 55 | 28 | 1729 | 115 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Europa Clipper | 02045454545 | Median | 17 | -06 | 21 | 00 | 17483 | 0862 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GeoCarb | Standard Deviation | 84 | 68 | 88 | 87 | 10875 | 0863 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IXPE | Minimum | -27 | -13 | 00 | -72 | 397 | 050 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lucy | Maximum | 20 | 19 | 335 | 335 | 4527 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MAIA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PACE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Psyche | Paste data from above to this table for analysis | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Restore-L | -27 | -13 | 2127 | - 0 | 1610 | 050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SOC Replan | Breach notification made DM not yet final | -7 | -7 | - 0 | - 0 | 080 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TROPICS | -7 | -11 | - 0 | - 0 | 817 | 060 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
XARM | -5 | -10 | 307 | - 0 | 867 | 088 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -9 | - 0 | (717) | 2767 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -8 | 717 | 717 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -3 | - 0 | (400) | 510 | 058 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -9 | 207 | (400) | 800 | 099 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -1 | 3347 | 3347 | 2240 | 205 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -1 | - 0 | - 0 | 397 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -01 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | - 0 | - 0 | 1053 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | 407 | 1020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | -3 | 707 | 203 | 2577 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | 00 | - 0 | - 0 | 2777 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 00 | - 0 | - 0 | 1887 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | 3 | 710 | 403 | 1167 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | -4 | - 0 | - 0 | 1983 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 4 | 207 | (203) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 5 | - 0 | - 0 | 1917 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | 6 | 103 | - 0 | 2733 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | -2 | 613 | - 0 | 4527 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 1320 | 613 | 503 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 607 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 | 19 | 2437 | 2437 |
Timeline | Total Programs | 46 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDP C for comaprison | planned | Total Replans | 14 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statistics - PresentFinal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 72618 | 20 | 13 | 13 | 9 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 74855 | Feb-16 | 109271 | Mar-16 | FY17 Q1 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -7 | 30 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 159503 | Dec-16 | 159503 | Dec-16 | FY18 Q3 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -12 | 203 | (503) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | 51043 | Apr-18 | 52443 | Aug-19 | KDP-E May-18 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGS | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 27418 | Sep-18 | 28129 | Nov-18 | FY17 Q1 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 4 | 00 | 307 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGSreg | 1 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | 3145 | Dec-19 | 3231 | Jun-20 | Dec-17 | 5115 | 4181 | 31446 | Dec-19 | 31446 | Dec-19 | FY18 Q3 | Y | Y | Y | 16 | 15 | 1827 | 1927 | 3957 | 049 | -0 | -27 | - 0 | (610) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | APD | EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 206214 | Mar-20 | 223452 | Mar-20 | FY18 Q3 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 13 | 176 | 3653 | 2130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | 120774 | Nov-18 | 123774 | Mar-19 | FY18 Q3 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 10150 | Nov-16 | KDP-E Oct-16 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | 663 | Feb-18 | 73 | Apr-18 | KDP-E Dec-17 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16 Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8834 | Feb-14 | 8904 | Feb-14 | FY17 Q3 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -3 | -5 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4059 | May-18 | 4319 | May-18 | FY18 Q3 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | 00 | 910 | 297 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 10561 | Sep-18 | 10636 | Oct-18 | FY18 Q3 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 6 | 00 | 1117 | 407 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 243 | Jun-18 | 2527 | Jun-18 | FY18 Q3 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 6 | 00 | 1217 | 810 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSightreg | 2 | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 8189 | May-18 | 8289 | May-18 | Sep-16 | 1923 | 1538 | 8138 | May-18 | 8138 | May-18 | FY18 Q3 | Y | Y | Y | Y | 23 | 23 | 2637 | 2637 | 3050 | 086 | -1 | -18 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16 Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E Sep-16 | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | 1144 | Sep-19 | 127 | Sep-19 | KDP-C Apr-17 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16 Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTregreg | 1 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 94889 | Nov-20 | 96627 | Mar-21 | May-18 | 10639 | 8277 | 94889 | Nov-20 | 96627 | Mar-21 | FY18 Q3 | Y | Y | Y | 9 | 2940 | 8113 | 036 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15 Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | 8385 | Dec-20 | 885 | Nov-21 | FY18 Q3 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | 2571 | Jun-19 | 2627 | Nov-19 | FY18 Q3 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8 | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8reg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 85006 | Feb-13 | 85666 | Feb-13 | FY18 Q3 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15 Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | 23634 | Jul-20 | 25304 | Jul-20 | FY18 Q3 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 5753 | Nov-13 | 5753 | Nov-13 | FY16 Q3 | N | N | 0 | 0 | -11 | -14 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1098 | Mar-15 | 1098 | Mar-15 | FY18 Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 9 | 1 | 707 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 120243 | Jul-20 | 128226 | Jul-20 | FY18 Q3 | N | N | 0 | 0 | 24 | 27 | 5783 | 5783 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15 Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 694 | Jun-17 | 706 | Aug-17 | KDP-E May-17 | N | N | 0 | 0 | 10 | 3 | 1013 | 603 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | 7953 | Dec-21 | 8969 | Sep-22 | FY18 Q3 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | 0 | 00346060676 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 115315 | Jun-12 | 115315 | Jun-12 | FY15 Q1 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | -39 | -28 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4245 | Jul-14 | 4245 | Jul-14 | FY17 Q1 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -3 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | 113388 | Mar-18 | 113388 | May-18 | FY18 Q3 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orion | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orionreg | 1 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 116581 | Jun-22 | 116581 | Jun-22 | Jun-18 | 8483 | 3746 | 116581 | Jun-22 | 116581 | Jun-22 | FY18 Q3 | Y | N | 7 | 3 | 1013 | (1013) | 3347 | 030 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 9975 | Sep-16 | 10532 | Sep-16 | FY18 Q3 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 0 | -1 | (100) | (100) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13821 | Aug-18 | 15482 | Aug-18 | FY18 Q3 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -1 | -03 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 129364 | Feb-17 | 129364 | Feb-17 | FY18 Q3 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 22 | 16 | 3050 | 3050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1251 | Sep-19 | 1261284 | Nov-19 | Path Forward APMC Dec 2016 | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 4 | 4 | 223 | 267 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16 Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLSreg | 1 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 9734 | Dec-19 | 9843 | Jun-20 | Dec-17 | 1340 | 148 | 98029 | Dec-19 | 98029 | Dec-19 | FY18 Q3 | Y | Y | Y | 14 | 2 | 2433 | 1927 | 4060 | 047 | 1 | -04 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | Jan-15 | 8899 | Jan-15 | FY18 Q3 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 307 | (197) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 3433 | Feb-20 | 3866 | Feb-20 | FY18 Q3 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -7 | -11 | 3753 | 1627 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIAreg | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 15874 | Feb-14 | 15949 | Feb-14 | FY18 Q3 | Y | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | 7049 | Apr-21 | 7549 | Apr-22 | FY18 Q3 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 181242 | Sep-17 | 197242 | Nov-17 | FY18 Q3 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | -94 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 3333 | Apr-18 | 3333 | Jun-18 | FY18 Q3 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -3 | -12 | 403 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mean | 90 | 88 | 50 | 81 | 1773 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02045454545 | Median | 82 | 49 | 10 | 60 | 16233 | 0374 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Standard Deviation | 118 | 164 | 77 | 97 | 13962 | 0647 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum | -7 | -10 | -71 | -31 | 147 | - 0 | SPP | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum | 38 | 59 | 244 | 345 | 7433 | 242 | EUCLIDreg | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GSDO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Paste data from above to this table for analysis | ORION | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-7 | -10 | 607 | 817 | 1923 | 042 | SLS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-3 | -7 | - 0 | - 0 | 147 | - 0 | TEMPO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -7 | 1113 | 1113 | 1887 | 059 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
0 | -6 | - 0 | 613 | 1897 | 032 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total KDPs Within Cost Range of Prior KDP | Total KDPs Within Schedule Range of Prior KDP | -2 | -5 | 303 | 910 | 510 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | -3 | -3 | - 0 | - 0 | 503 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MALow at or below Preceding KDP Low | 14 | 31 | 45 | 31 | MALow at or below Preceding KDP Low | 27 | 26 | 53 | 51 | 6 | 0 | 410 | (100) | 1217 | 008 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABCHigh at or below Preceding KDP High | 19 | 33 | 52 | 37 | ABCHigh at or below Preceding KDP High | 21 | 32 | 53 | 40 | 0 | 0 | (203) | 403 | 167 | 242 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 2 | 810 | 307 | 500 | 061 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-B Cost | KDP-A to KDP-B Schedule | 33 | 5 | - 0 | 100 | 800 | 013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 11 | 8 | 103 | 103 | 2670 | 004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B Low at or below KDP-A Low | 4 | 10 | 14 | 29 | KDP-B Low at or below KDP-A Low | 13 | 9 | 22 | 59 | 9 | 9 | (203) | 503 | 1983 | 025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B High at or below KDP-A High | 9 | 12 | 21 | 43 | KDP-B High at or below KDP-A High | 12 | 10 | 22 | 55 | 11 | 10 | (103) | 1320 | 3243 | 041 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | 10 | 2437 | 3147 | 1610 | 195 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | 10 | 613 | 613 | 3450 | 018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B to KDP-C Cost | KDP-B to KDP-C Schedule | -2 | 11 | 813 | 603 | 1687 | 036 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 9 | 13 | 917 | 1930 | 2433 | 079 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-B Low | 10 | 21 | 31 | 32 | MA at or below KDP-B Low | 14 | 17 | 31 | 45 | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-B High | 10 | 21 | 31 | 32 | ABC at or below KDP-B High | 9 | 22 | 31 | 29 | 16 | 18 | - 0 | 607 | 707 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 31 | 1217 | 1830 | 1027 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-C Cost | KDP-A to KDP-C Schedule | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 29 | 59 | 2233 | 3450 | 7433 | 046 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-A Low | 2 | 7 | 9 | 22 | MA at or below KDP-A Low | 5 | 12 | 17 | 29 | added | 5 | 0 | - 0 | - 0 | 813 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-A High | 5 | 11 | 16 | 31 | ABC at or below KDP-A High | 3 | 14 | 17 | 18 | added | -0 | -0 | 103 | 1013 | 1017 | 100 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 7 | 4 | - 0 | - 0 | 1323 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-C (MA) | KDP-C (ABC) | Replan (MA) | Replan (ABC) | KDP-C to Replan (MA) | KDP-C to Replan (ABC) | KDP-C (or Replan) to PresentFinal (MA) | KDP-C (or Replan) to PresentFinal (ABC) | added | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Percentage of Project CostSchedule HighLow Estimates Within Prior KDP Range Estimates | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B Estimate at or below A Estimate | C Estimate at or below B Estimate | C Estimate at or below A Estimate | Total at or below Preceding KDP Estimate | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - High | 43 | 32 | 31 | 37 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - Low | 29 | 32 | 22 | 31 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - High | 55 | 29 | 18 | 40 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - Low | 59 | 45 | 29 | 51 |
Todayrsquos Discussion
bull Lifecycle Cost (LCC) and Development Cost Metrics Against Baselines
Formulation KDP Range Estimates
Development Cost Metrics Controlling for Launch Services
bull
bull
2
LCC and Development Cost Metrics Against BaselineLCC Dev
3
LCC and Dev Cost Metrics Against Baseline
4
70 Joint Cost and Schedule ConfidenceAre we meeting the expected 70 success rate across the portfolio
bull NPR 71205Ebull ABC at 70 confidence
MA at 50 confidencebull
bull Aggregate NASA confidence at baselinebull ABC at 71 confidence
MA at 52 confidencebull
bull Actual performancebull 41 of projects met ABC commitments
30 of projects met MA commitmentsbull
bull Projects currently in Phase Dbull 20 meeting ABC commitments
0 meeting MA commitmentsbull
5
Formulation Cost and Schedule Ranges
bull
bullbull
bull
bullbull
Are we capturing the Agencyrsquos cost exposure in early estimates
In aggregate the high cost estimate is at or below the high estimate established at the preceding KDP
37 of the time for cost40 of the time for schedule
For projects that held a KDP-A the eventual KDP-C baseline cost and schedule (high estimates) are at or below the KDP-A estimate
31 of the time for cost18 of the time for schedule
6
Development Cost Metrics When Controlling for Launch Vehicle Cost Variation
28Avg LV Proportion of Dev Cost Baseline
-8Avg Post-Baseline LV Cost Variation
7
Development Cost Performance When Controlling for Launch Vehicle Cost VariationHow would our development cost reporting metrics change
Lower LV costs can provide unexpected funds to cover growth in reporting
Lower LV costs sometimes have no effect on cost reporting
Higher LV costs can mask otherwise good cost performance
8
bull NASA cost performance has drastically improved since the early 2000rsquos
We are falling short of our portfolio goal of 70 projects hitting cost targets
Our cost and schedule ranges at KDP-A and KDP-B are optimistic and more often than do not capture the eventual high cost or schedule commitments at KDP-C baseline
Development cost reporting metrics can misrepresent how our projects are performing (both positively and negatively) if the LV contract award is well above or below the estimate included in the KDP-C baseline
bull
bull
bull
9
Back-up
10
1111
1212
Total KDPs Within Cost Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 14 31 45 31ABCHigh at or below Preceding KDP High 19 33 52 37
Total KDPs Within Schedule Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 27 26 53 51ABCHigh at or below Preceding KDP High 21 32 53 40
KDP-A to KDP-B CostYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 4 10 14 29KDP-B High at or below KDP-A High 9 12 21 43
KDP-A to KDP-B ScheduleYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 13 9 22 59KDP-B High at or below KDP-A High 12 10 22 55
KDP-B to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-B Low 10 21 31 32ABC at or below KDP-B High 10 21 31 32
KDP-B to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-B Low 14 17 31 45ABC at or below KDP-B High 9 22 31 29
KDP-A to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-A Low 2 7 9 22ABC at or below KDP-A High 5 11 16 31
KDP-A to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-A Low 5 12 17 29ABC at or below KDP-A High 3 14 17 18
COST ($M)
KDP-C to Replan (MA)595000000000000281704999999999999750000000000000014025429999999999993-178400000000000095115-85999999999999943826-25999999999996248E-200911-518999999999999773-1220000000000004531770000000000005117000000000000176266192299999999999951671-2800000000000011401112644044106389999999999965159999999999999425999999999999972-1246900000000005125710000000000002140107999999999999551896472000000000000171666999999999998263820000000000005922000000000000459114748445624775539999999999999103258999999999999811180000000000001939999999999999151167299999999999384830000000000109-33599999999999909-5550000000000011416020000000000005-3200000000000002831553639000000000000974113401372999999999999515260000000000002-5800000000000011429476-180455789999999999997710099999999999994-76000000000000227KDP-C to Replan (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS59500000000000028211499999999999918399999999999977392842000000000001592E-2-3084000000000000941809999999999991-8599999999999994344599999999999994-46999999999997044E-210860399999999999994316E-2978-45-281000000000000238420000000000004520329999999999995419999999999998866751153799999999999951802-108000000000000111623851847387182770000000000073628999999999999770-4297100000000000423299999999999983142-039999999999997726203338000000000000119256712921999999999999321011613781300000000000186840000000000000658600000000000023553999999999999910349911780000000000001329999999999999729948999999999996437460000000000036-88599999999999909-5720000000000004511440000000000009-32000000000000028235100000000000023453000000000000711081481372999999999999503989999999999997729551-18045-210000000000002270-21600000000000023
COST Change ($M)
B to C (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS01047535211267606203370517928286851448611111111110973E-2075077759107650046E-4-98804985102361215E-201486366383447687-7818181818181813E-2030674002751031632-37226838174140057E-4013440860215052999E-30-46012269938650305E-2-61086956521739177E-201085051546391753202363403859567541916901408450704179E-200227818101022070730-65060240963855487E-2071729957805907171E-20592556945781199880779814665592264319368421052631587E-20314499999999999890-4630495689655173E-288694328130947783E-2017749999999999999-42462845010613295E-400166502463054187263934495959166312E-2093093699515347267E-200048437693738375709067597185373168792E-20526615969581748940003366676193198057128745644599303111E-296699259374453242E-233198918775202764E-2-732231404958677E-2-5100766898519711E-279499652536483736E-2-27777777777777801E-203746613545816733204003014143287735301290322580645161315265600825167612E-20176206365503080030010075757575757570-061063923386687424-27818254073387508E-30-54000000000000055E-2
COST Change ()
Cost - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate04285714285714285503225806451612903103125036538461538461536Schedule - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate054545454545454541029032258064516131017647058823529413039622641509433965Cost - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate02857142857142857032258064516129031022222222222222221031111111111111112Schedule - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate059090909090909094045161290322580644029411764705882354050943396226415094
High Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (high)01682251932581422Category 2 Change (high)60501935980863335E-2Category 3 Change (high)37110484780157868E-2Total Change (high)014626442296281486
Low Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (low)010106870229007633Category 2 Change (low)19806591564406897Category 3 Change (low)0Total Change (low)21873131670301591
KDP-A to KDP-B Schedule Growth - Low Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion0-9-49-2-1-100000200912326273242
KDP-A to KDP-B Schedule Growth - High Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion-36-8-8-3-2-1-1000002569121726414451
Cost Variation Against Baselines
13
Methodology and Assumptions
The first step in conducting this analysis was to verify and validate the cost baseline information using source documentation KDP-C figures takes priority as the definitive baseline Where KDP-C decision memoranda was not available as in the case of many projects baselined prior to approximately 2009 figures were pulled from the first appearance as a development project in a Presidentrsquos Budget as the baseline against which to measure In a few cases notificationsreports to Congress (eg NSPD-49 reports) were used to identify a baseline figure MA figures were pulled solely from decision memoranda and thus our dataset with regard to MArsquos is smaller as it excludes many of the older projects that did not have standardized baseline documentation with MArsquos noted Variance to the baseline was then measured by using the most recent quarterly cost and schedule report Latest cost data is valid through the FY18 Q3 reporting period Slide 3 charts illustrate each project in the dataset with respective LCC and dev cost variances
The confidence level policy applied to each project was noted using source documentation as well as a cross-reference against when policy changes were implemented recognizing that a subset of projects received waivers to new policies during policy transition Certain exclusions were applied to ensure a dataset comparable across projects For example SOFIA had conducted a JCL on a replan but the decision memorandum made clear the baseline was not changing therefore the JCL confidence level could not fairly be applied to measure performance against the baseline Another example is GPM which was excluded as it was one of the very first projects baselined after JCL policy implementation and was not a ldquotruerdquo JCL with the decision memorandum noting that the intent was met while a JCL DPMC would be held many months later to evaluate progress There were a couple of additional exclusions applied
When a project is confirmed at KDP-C cost performance measurements were applied to that baseline If a project was then rebaselined a ldquonewrdquo project was added to the dataset using the rebaselined figures against which to measure as the Agency made the decision at that point to press ahead with the project and Congress provided reauthorization The ldquooriginalrdquo project was ldquofrozenrdquo in terms of development phase to fairly capture the contemporary phase performance (eg the ldquooriginalrdquo OCO-2 cost growth will always be categorized within the ldquoprojects in developmentrdquo performance category while the rebaselined OCO-2 cost performance falls into the ldquoprojects launchedrdquo category) The latest cost figures however were used to measure cost performance across both original baselines and rebaselines in order to fairly capture the accuracy of original estimates against final outcomes
This insight while placing an emphasis on the JCL while measuring performance does not intend to convey a discovered causal relationship between JCL and cost performance There have been many other related programmatic and technical advancements over the past 10 to 20 years that have influenced cost and schedule performance in the overall positive direction Other insights look into other influencers of costschedule performance
13
Dev Cost Metrics Controlling for LV Cost Variation
14
Methodology and Assumptions
SID pulled a number of data elements from a total of 22 SMD projects to conduct this analysis Data elements from a projectrsquos baseline include total development cost and the launch services cost estimate and have been sourced from KDP documentation quarterly reports and Cost Analysis Data Requirements (CADREs) These data were compared to currentactual total development and launch services costs from the most recent KDPquarterly reports Other data elements include Division Lead Center type of launch vehicle LCC category and current phase
SID calculated the overall development cost deltas from the baseline cost and verified the percentage growth with external reporting data where applicable SID then calculated the percent change in launch services development cost from baseline to currentactual The development cost percent change was calculated after removing launch services from the inputs
For further insight these same calculations were conducted by Division Lead Center type of launch vehicle and LCC category Division Lead Center and LCC category were then further broken down by looking only at projects currently in development
The 22 projects used in this analysis include Mars 2020 ICESat-2 ICON InSight SOC PSP SWOT TESS Juno Landsat-8 MMS OSIRIS-REx SMAP MAVEN GRAIL NuSTAR RBSP IRIS LADEE OCO-2 CYGNSS and Landsat 9 Representation includes seven planetary science seven earth science six heliophysics and two astrophysics missions twelve GSFC-led projects and eight JPL-led projects (LaRC and ARC representing the other two) ten Atlas V one Delta IV-H two Falcon 9 four Delta II four Pegasus and one Minotaur V rockets and six category 1 thirteen category 2 and three category 3 projects Seven projects assessed are currently in development
Other projects considered were excluded if launch was or is to be on a ride-share and launch services costs were negligible (eg RBI) Projects launching on internationally-contributed rockets were also excluded (eg GPM JWST) Other exclusions were based on data limitations at the time of analysis (eg no launch services costs available from baseline)
Did not add GPM international launchSOFIA no launchJWST international launch
RBI rideshareSentinel-6 international launch
Dawn no launch vehicle numbers availableSNPP No baseline LV estimate available
NISAR international launchLCRD rideshare
GRACE-FO rideshare
14
Formulation KDPs
15
Methodology and Assumptions
Comparative analysis was conducted where possible (ie when highlow costschedule figures were available in KDP-ABC decision memoranda This analysis does not attempt to explain why the majority of costschedule estimates at KDPrsquos exceed prior estimates
Cost and schedule ranges were extracted from KDP-A and KDP-B decision memoranda Agency Baseline Commitments and Management Agreements were extracted from KDP-C decision memoranda Lifecycle cost was used in all cases (as opposed to development cost only) A project did not need to have all KDP-A through C figures to be included in the analysis (eg a project that did not have a KDP-A range was still included in the KDP-B to KDP-C statistics)
This analysis includes data from KDP-A KDP-B and KDP-C milestones At KDP-A and KDP-B a high and low estimate is established for both cost and schedule At KDP-C a Management Agreement and an Agency Baseline Commitment is established for both cost and schedule For ease of conveyance this analysis equates the Management Agreement as the low estimate for KDP-C and equates the Agency Baselines Commitment as the high estimate for KDP-C
15
Column1 | KDP-C Date | Lead Center | Division | Launch Vehicle | LCC Category | Phase | Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | Notes | |||||||||||||||||
Juno | Aug-08 | JPL | Planetary | Atlas V | 1 | Ops | $ 7423 | $ 7089 | $ 1904 | $ 1817 | $ 5519 | $ 5272 | -45 | -46 | -45 | ||||||||||||||||||
RBSP | Dec-08 | GSFC | Helio | Atlas V | 2 | Ops | $ 5338 | $ 5040 | $ 1336 | $ 1324 | $ 4002 | $ 3716 | -56 | -09 | -71 | ||||||||||||||||||
GRAIL | Jan-09 | JPL | Planetary | Delta II | 2 | Ops | $ 4270 | $ 3983 | $ 1528 | $ 1508 | $ 2742 | $ 2475 | -67 | -13 | -97 | ||||||||||||||||||
MMS | Jun-09 | GSFC | Helio | Atlas V | 1 | Ops | $ 8573 | $ 8753 | $ 1942 | $ 1788 | $ 6631 | $ 6965 | 21 | -79 | 50 | ||||||||||||||||||
NuSTAR | Sep-09 | JPL | Astro | Pegasus | 3 | Ops | $ 1099 | $ 1162 | $ 358 | $ 332 | $ 741 | $ 830 | 57 | -73 | 120 | ||||||||||||||||||
Landsat-8 | Dec-09 | GSFC | Earth | Atlas V | 2 | Ops | $ 5830 | $ 5028 | $ 1264 | $ 1218 | $ 4566 | $ 3810 | -138 | -36 | -166 | ||||||||||||||||||
LADEE | Aug-10 | ARC | Planetary | Minotaur V | 2 | Ops | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||
OCO-2 | Sep-10 | JPL | Earth | Delta II | 2 | Ops | $ 2490 | $ 3200 | $ 676 | $ 1368 | $ 1814 | $ 1832 | 285 | 1024 | 10 | against original baseline rebaseline primary LV-driven aside from some RWA issues | |||||||||||||||||
MAVEN | Oct-10 | GSFC | Planetary | Atlas V | 2 | Ops | $ 5672 | $ 4720 | $ 1870 | $ 1541 | $ 3802 | $ 3179 | -168 | -176 | -164 | ||||||||||||||||||
IRIS | Nov-10 | GSFC | Helio | Pegasus | 3 | Ops | $ 1407 | $ 1430 | $ 404 | $ 426 | $ 1003 | $ 1004 | 16 | 54 | 01 | ||||||||||||||||||
SMAP | May-12 | JPL | Earth | Delta II | 2 | Ops | $ 4857 | $ 4543 | $ 1319 | $ 1201 | $ 3538 | $ 3342 | -65 | -89 | -55 | ||||||||||||||||||
SOC | Mar-13 | GSFC | Helio | Atlas V | 2 | Dev | $ 3769 | $ 3100 | $ 2500 | $ 1727 | $ 1269 | $ 1373 | -178 | -309 | 82 | ||||||||||||||||||
OSIRIS-REx | May-13 | GSFC | Planetary | Atlas V | 1 | Ops | $ 7786 | $ 6156 | $ 2340 | $ 1888 | $ 5446 | $ 4268 | -209 | -193 | -216 | ||||||||||||||||||
CYGNSS | Feb-14 | LaRC | Earth | Pegasus | 3 | Ops | $ 1511 | $ 1287 | $ 523 | $ 623 | $ 988 | $ 664 | -148 | 191 | -328 | ||||||||||||||||||
InSight | Mar-14 | JPL | Planetary | Atlas V | 2 | Ops | $ 5418 | $ 6483 | $ 1599 | $ 1685 | $ 3819 | $ 4798 | 197 | 54 | 256 | ||||||||||||||||||
PSP | Mar-14 | GSFC | Helio | Delta IV-H | 1 | Dev | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||
ICESat-2 | May-14 | GSFC | Earth | Delta II | 1 | Dev | $ 7637 | $ 7441 | $ 1188 | $ 1183 | $ 6449 | $ 6258 | -26 | -04 | -30 | ||||||||||||||||||
ICON | Oct-14 | GSFC | Helio | Pegasus | 2 | Dev | $ 1960 | $ 1982 | $ 543 | $ 563 | $ 1417 | $ 1419 | 11 | 37 | 01 | ||||||||||||||||||
TESS | Oct-14 | GSFC | Astro | Falcon 9 | 2 | Ops | $ 3232 | $ 2799 | $ 1141 | $ 874 | $ 2091 | $ 1925 | -134 | -234 | -79 | ||||||||||||||||||
SWOT | May-16 | JPL | Earth | Falcon 9 | 2 | Dev | $ 5715 | $ 5715 | $ 1313 | $ 1078 | $ 4402 | $ 4638 | 00 | -179 | 53 | ||||||||||||||||||
Mars 2020 | Jun-16 | JPL | Planetary | Atlas V | 1 | Dev | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||
Landsat 9 | Dec-17 | GSFC | Earth | Atlas V | 2 | Dev | $ 6342 | $ 6342 | $ 1544 | $ 1542 | $ 4798 | $ 4800 | 00 | -01 | 00 | ||||||||||||||||||
Projects in Development | $ 52749 | $ 52336 | $ 14819 | $ 12738 | $ 37930 | $ 39598 | -08 | -140 | 44 | ||||||||||||||||||||||||
Projects in Operations | $ 66588 | $ 63555 | $ 18647 | $ 18196 | $ 47941 | $ 45359 | -46 | -24 | -54 | ||||||||||||||||||||||||
Total | $ 119337 | $ 115891 | $ 33466 | $ 30935 | $ 85871 | $ 84956 | -29 | -76 | -11 | ||||||||||||||||||||||||
Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | |||||||||||||||||||||||||
GSFC Project Total | $ 68103 | $ 63294 | $ 20377 | $ 18325 | $ 47726 | $ 44969 | -71 | -101 | -58 | ||||||||||||||||||||||||
JPL Projects Total | $ 48041 | $ 49428 | $ 12122 | $ 11384 | $ 35919 | $ 38044 | 29 | -61 | 59 | ||||||||||||||||||||||||
Did not add | GPM | international launch | GSFC Projects in Ops | $ 37838 | $ 33926 | $ 10297 | $ 9059 | $ 27541 | $ 24867 | -103 | -120 | -97 | |||||||||||||||||||||
SOFIA | no launch | JPL Projects in Ops | $ 25557 | $ 26460 | $ 7384 | $ 7911 | $ 18173 | $ 18549 | 35 | 71 | 21 | ||||||||||||||||||||||
JWST | international launch | GSFC Projects in Dev | $ 30265 | $ 29368 | $ 10080 | $ 9266 | $ 20185 | $ 20102 | -30 | -81 | -04 | ||||||||||||||||||||||
RBI | rideshare | JPL Projects in Dev | $ 22484 | $ 22968 | $ 4738 | $ 3473 | $ 17746 | $ 19495 | 22 | -267 | 99 | ||||||||||||||||||||||
Sentinel-6 | international launch | ||||||||||||||||||||||||||||||||
Dawn | no launch vehicle numbers available | Astro | $ 4331 | $ 3961 | $ 1499 | $ 1206 | $ 2832 | $ 2755 | -85 | -195 | -27 | ||||||||||||||||||||||
SNPP | No baseline LV estimate available | Planetary | $ 49020 | $ 47566 | $ 13109 | $ 11437 | $ 35911 | $ 36129 | -30 | -128 | 06 | ||||||||||||||||||||||
NISAR | international launch | Helio | $ 31604 | $ 30808 | $ 11030 | $ 10078 | $ 20574 | $ 20730 | -25 | -86 | 08 | ||||||||||||||||||||||
LCRD | rideshare | Earth | $ 34382 | $ 33556 | $ 7827 | $ 8213 | $ 26555 | $ 25343 | -24 | 49 | -46 | ||||||||||||||||||||||
GRACE-FO | rideshare | ||||||||||||||||||||||||||||||||
Astro - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
Planetary - Dev Only | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||||||||
Helio - Dev Only | $ 16286 | $ 15585 | $ 7348 | $ 6540 | $ 8938 | $ 9045 | -43 | -110 | 12 | ||||||||||||||||||||||||
Earth - Dev Only | $ 19694 | $ 19498 | $ 4045 | $ 3803 | $ 15649 | $ 15695 | -10 | -60 | 03 | ||||||||||||||||||||||||
Atlas V | $ 72920 | $ 69964 | $ 19725 | $ 16926 | $ 53195 | $ 53038 | -41 | -142 | -03 | ||||||||||||||||||||||||
Delta IV-H | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||||||||
Falcon 9 | $ 8947 | $ 8514 | $ 2454 | $ 1952 | $ 6493 | $ 6562 | -48 | -205 | 11 | ||||||||||||||||||||||||
Delta II | $ 19254 | $ 19167 | $ 4711 | $ 5260 | $ 14543 | $ 13907 | -05 | 117 | -44 | this is skewed by OCO-2 which switched from the baseline Taurus XL to the Delta-II at the rebaseline | |||||||||||||||||||||||
Pegasus | $ 5977 | $ 5861 | $ 1828 | $ 1944 | $ 4149 | $ 3917 | -19 | 63 | -56 | ||||||||||||||||||||||||
Minotaur V | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||||||||
Category 1 | $ 58745 | $ 57195 | $ 15104 | $ 13322 | $ 43641 | $ 43873 | -26 | -118 | 05 | ||||||||||||||||||||||||
Category 2 | $ 56575 | $ 54817 | $ 17076 | $ 16232 | $ 39499 | $ 38585 | -31 | -49 | -23 | ||||||||||||||||||||||||
Category 3 | $ 4017 | $ 3879 | $ 1285 | $ 1381 | $ 2732 | $ 2498 | -34 | 75 | -86 | ||||||||||||||||||||||||
Category 1 - Dev Only | $ 34963 | $ 35197 | $ 8918 | $ 7829 | $ 26045 | $ 27368 | 07 | -122 | 51 | ||||||||||||||||||||||||
Category 2 - Dev Only | $ 17786 | $ 17139 | $ 5900 | $ 4909 | $ 11886 | $ 12230 | -36 | -168 | 29 | ||||||||||||||||||||||||
Category 3 - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
LV of Total Dev at Baseline | 280 | ||||||||||||||||||||||||||||||||
LV of Total Dev at FY18 Q3 | 267 | ||||||||||||||||||||||||||||||||
Launch Vehicle Percent Cost Variation from Baseline Estimate in Chronological Order |
Mission | LCC Category | KDP-A (low) | KDP-A (high) | KDP-B (low) | KDP-B (high) | Low Delta (months) | High Delta (months) | KDP-C MA | MA Variance from A | KDP-C ABC | ABC Variance from A | |||||||||||||||
Restore-L | 2 | Jun-20 | Dec-23 | Jun-20 | Dec-20 | 0 | -36 | |||||||||||||||||||
SLS | 1 | Dec-17 | Dec-17 | Mar-17 | Apr-17 | -9 | -8 | Dec-17 | 0 | Nov-18 | 11 | |||||||||||||||
PACE | 2 | Dec-22 | Dec-23 | Aug-22 | Apr-23 | -4 | -8 | |||||||||||||||||||
WFIRST | 1 | Dec-24 | Dec-26 | Sep-25 | Sep-26 | 9 | -3 | |||||||||||||||||||
OCO-3 | 3 | Sep-16 | Dec-16 | Jul-16 | Oct-16 | -2 | -2 | Mar-18 | 18 | May-18 | 17 | |||||||||||||||
PSP | 1 | Aug-18 | Aug-18 | Jul-18 | Jul-18 | -1 | -1 | Aug-18 | 0 | Aug-18 | 0 | |||||||||||||||
LCRD | 2 | Mar-17 | Mar-17 | Feb-17 | Feb-17 | -1 | -1 | Jun-19 | 27 | Nov-19 | 32 | |||||||||||||||
Euclid | 3 | Dec-14 | Dec-14 | Dec-14 | Dec-14 | 0 | 0 | May-15 | 5 | May-16 | 17 | |||||||||||||||
GRACE-FO | 2 | Aug-17 | Aug-17 | Aug-17 | Aug-17 | 0 | 0 | Aug-17 | 0 | Feb-18 | 6 | |||||||||||||||
Mars 2020 | 1 | Jul-20 | Jul-20 | Jul-20 | Jul-20 | 0 | 0 | Jul-20 | 0 | Jul-20 | 0 | |||||||||||||||
SAGE-III | 3 | Aug-14 | Aug-14 | Aug-14 | Aug-14 | 0 | 0 | Aug-14 | 0 | Aug-14 | 0 | |||||||||||||||
SWOT | 2 | Oct-20 | Oct-20 | Oct-20 | Oct-20 | 0 | 0 | Apr-21 | 6 | Apr-22 | 18 | |||||||||||||||
LADEE | 3 | Mar-12 | Mar-12 | May-12 | May-12 | 2 | 2 | May-13 | 14 | Nov-13 | 20 | |||||||||||||||
DART | 2 | Dec-20 | Dec-20 | Dec-20 | May-21 | 0 | 5 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | ||||||||||||||||||
NISAR | 2 | Dec-20 | Dec-21 | Dec-20 | Jun-22 | 0 | 6 | Dec-21 | 12 | Sep-22 | 9 | |||||||||||||||
JASON-3 | 3 | Jul-13 | Jul-13 | Apr-14 | Apr-14 | 9 | 9 | Mar-15 | 20 | Mar-15 | 20 | |||||||||||||||
MMS | 1 | Oct-13 | Oct-13 | Oct-14 | Oct-14 | 12 | 12 | Aug-14 | 10 | Mar-15 | 17 | |||||||||||||||
ECOSTRESS | 3 | May-17 | Mar-18 | Aug-17 | Aug-19 | 3 | 17 | Aug-17 | 3 | Aug-19 | 17 | |||||||||||||||
SMAP | 2 | Mar-13 | Mar-13 | May-15 | May-15 | 26 | 26 | Oct-14 | 19 | Mar-15 | 24 | |||||||||||||||
XARM | 3 | Oct-19 | Oct-19 | Jan-22 | Mar-23 | 27 | 41 | |||||||||||||||||||
SOC | 2 | Apr-15 | Apr-15 | Dec-17 | Dec-18 | 32 | 44 | Jan-17 | 21 | Oct-18 | 42 | |||||||||||||||
Orion | 1 | Dec-17 | Dec-17 | Jun-21 | Mar-22 | 42 | 51 | Aug-21 | 44 | Apr-23 | 64 | |||||||||||||||
MAIA | 3 | NA | NA | Dec-19 | Mar-21 | NA | NA | |||||||||||||||||||
ICON | 3 | NA | NA | Feb-17 | Jun-17 | NA | NA | |||||||||||||||||||
GOLD | 3 | NA | NA | Dec-17 | Dec-17 | NA | NA | |||||||||||||||||||
GeoCarb | 3 | NA | NA | Jun-22 | Jun-23 | NA | NA | |||||||||||||||||||
IXPE | 3 | NA | NA | Dec-20 | Dec-20 | NA | NA | |||||||||||||||||||
Landsat 9 | 2 | NA | NA | Dec-20 | Nov-21 | NA | NA | |||||||||||||||||||
Lucy | 2 | NA | NA | Oct-21 | Nov-21 | NA | NA | |||||||||||||||||||
TROPICS | 3 | NA | NA | Sep-19 | Sep-20 | NA | NA | |||||||||||||||||||
JUICE | 3 | NA | NA | Sep-19 | Sep-19 | NA | NA | |||||||||||||||||||
Psyche | 2 | NA | NA | Aug-22 | Aug-22 | NA | NA | |||||||||||||||||||
Clipper | 1 | NA | NA | Jun-22 | Jul-23 | NA | NA | removed Clipper from schedule calculations due to no KDP-A schedule estimate | ||||||||||||||||||
CLARREO-PF | 3 | Jan-20 | Jan-22 | |||||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
of Pp | (LowMA) | (HighABC) | (LowMA) | (HighABC) | ||||||||||||||||||||||
Category I | 7 | 62 | 165 | 88 | 85 | |||||||||||||||||||||
Category II | 12 | 38 | 109 | 59 | 40 | |||||||||||||||||||||
Category III | 15 | - | -07 | 56 | 96 | |||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
(LowMA) | (HighABC) | (LowMA) | (HighABC) | |||||||||||||||||||||||
Average | 80 | 118 | 66 | 70 | ||||||||||||||||||||||
Median | 15 | - | 00 | 00 | ||||||||||||||||||||||
Standard Deviation | 145 | 233 | 129 | 189 | ||||||||||||||||||||||
Minimum | -12 | -65 | -9 | -36 | ||||||||||||||||||||||
Maximum | 417 | 745 | 42 | 51 |
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | KDP-C MA | KDP-C ABC | MA Variance From A | ABC Variance From A | |||||||||||||||||
Clipper | 1 | $ 4000 | $ 4000 | $ - 0 | 00 | $ 3000 | $ 3100 | $ 100 | 33 | ||||||||||||||||||||||
DART | 2 | $ 270 | $ 291 | $ 21 | 78 | $ 175 | $ 248 | $ 73 | 417 | ||||||||||||||||||||||
Euclid | 3 | $ 110 | $ 110 | $ - 0 | 00 | $ 100 | $ 100 | $ - 0 | 00 | Combined KDP-AB so no possible change | 964 | 1014 | -4 | -8 | |||||||||||||||||
GRACE-FO | 2 | $ 470 | $ 460 | $ (10) | -21 | $ 409 | $ 404 | $ (5) | -12 | 4059 | 4319 | -1 | -8 | ||||||||||||||||||
JASON-3 | 3 | $ 159 | $ 166 | $ 7 | 44 | $ - 0 | $ 158 | 1552 | 1552 | -2 | |||||||||||||||||||||
LADEE | 3 | $ 214 | $ 200 | $ (14) | -65 | $ - 0 | $ 184 | 2359 | 2629 | 23 | |||||||||||||||||||||
LCRD | 2 | $ 239 | $ 239 | $ 0 | 02 | $ 239 | $ 239 | $ 0 | 02 | 2571 | 2627 | 8 | 10 | ||||||||||||||||||
Mars 2020 | 1 | $ 2350 | $ 2351 | $ 1 | 00 | $ 2140 | $ 2186 | $ 46 | 21 | 22727 | 24435 | 6 | 4 | ||||||||||||||||||
MMS | 1 | $ 777 | $ 990 | $ 213 | 275 | $ 777 | $ 928 | $ 151 | 195 | 10026 | 10826 | 29 | 39 | ||||||||||||||||||
NISAR | 2 | $ 808 | $ 808 | $ - 0 | 00 | $ 718 | $ 718 | $ - 0 | 00 | 7953 | 8669 | 11 | 7 | ||||||||||||||||||
OCO-3 | 3 | $ 120 | $ 111 | $ (9) | -71 | $ 100 | $ 101 | $ 1 | 13 | 1108 | 1148 | 11 | -4 | ||||||||||||||||||
Orion | 1 | $ 6391 | $ 10288 | $ 3897 | 610 | $ - 0 | $ 8534 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | 108098 | 112835 | 77 | ||||||||||||||||||||
PACE | 2 | $ 850 | $ 850 | $ - 0 | 00 | $ 805 | $ 805 | $ - 0 | 00 | ||||||||||||||||||||||
PSP | 1 | $ 1300 | $ 1439 | $ 139 | 107 | $ 1000 | $ 1233 | $ 233 | 233 | 13932 | 15534 | 39 | 19 | ||||||||||||||||||
Restore-L | 2 | $ 787 | $ 753 | $ (34) | -43 | $ 500 | $ 628 | $ 128 | 256 | ||||||||||||||||||||||
SAGE-III | 3 | $ 112 | $ 115 | $ 3 | 27 | $ - 0 | $ 104 | 101 | 112 | 0 | |||||||||||||||||||||
SLS | 1 | $ 8855 | $ 8587 | $ (268) | -30 | $ - 0 | $ 7653 | 8394 | 9695 | 9 | |||||||||||||||||||||
SMAP | 2 | $ 514 | $ 649 | $ 135 | 263 | $ - 0 | $ - 0 | $ - 0 | 7218 | 9165 | 78 | ||||||||||||||||||||
SOC | 2 | $ 243 | $ 424 | $ 181 | 745 | $ - 0 | $ 371 | 3662 | 4359 | 79 | |||||||||||||||||||||
SWOT | 2 | $ 752 | $ 757 | $ 5 | 07 | $ 642 | $ 647 | $ 5 | 08 | 7049 | 7549 | 10 | 0 | ||||||||||||||||||
XARM | 3 | $ 172 | $ 217 | $ 45 | 264 | $ 161 | $ 179 | $ 18 | 110 | ||||||||||||||||||||||
Count | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta | Change (low) | Notes | ||||||||||||||||||||||
Category 1 | 6 | $ 23673 | $ 27655 | $ 3982 | 168 | $ 3275 | $ 3606 | $ 331 | 101 | ||||||||||||||||||||||
Category 2 | 9 | $ 4933 | $ 5231 | $ 298 | 61 | $ 4474 | $ 13335 | $ 8861 | 1981 | ||||||||||||||||||||||
Category 3 | 6 | $ 887 | $ 920 | $ 33 | 37 | $ - 0 | $ 7757 | $ 7757 | ERRORDIV0 | ||||||||||||||||||||||
Total | 21 | $ 29493 | $ 33807 | $ 4314 | 146 | $ 7749 | $ 24698 | $ 16949 | 2187 | ||||||||||||||||||||||
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | |||||||||||||||||||||
CLARREO-PF | 3 | $ 75 | $ (75) | -1000 | $ 64 | ||||||||||||||||||||||||||
ICON | 3 | $ 249 | $ 218 | ||||||||||||||||||||||||||||
ECOSTRESS | 3 | $ 56 | $ 49 | ||||||||||||||||||||||||||||
GeoCarb | 3 | $ 181 | $ 171 | ||||||||||||||||||||||||||||
GOLD | 3 | $ 74 | $ 64 | ||||||||||||||||||||||||||||
IXPE | 3 | $ 205 | $ 189 | ||||||||||||||||||||||||||||
JUICE | 3 | $ 119 | $ 103 | ||||||||||||||||||||||||||||
Landsat 9 | 2 | $ 928 | $ 851 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | |||||||||||||||||||||||||||
Lucy | 2 | $ 984 | $ 914 | ||||||||||||||||||||||||||||
Psyche | 2 | $ 957 | $ 907 | ||||||||||||||||||||||||||||
TROPICS | 3 | $ 30 | $ 30 | ||||||||||||||||||||||||||||
MAIA | 3 | $ 178 | $ 150 | ||||||||||||||||||||||||||||
Cost Estimate Deltas - KDP-A to KDP-B | COST Growth () | |||||||||||||||||||
Mission | Estimate | KDP-A | KDP-B | Notes | of Pp | Low (MA) | High (ABC) | |||||||||||||
SOC | High | $ 243 | 745 | $ 424 | Category I | 4 | 127 | 172 | ||||||||||||
Low | $ - 0 | $ 371 | Category II | 5 | -01 | 199 | ||||||||||||||
Orion | High | $ 6391 | 610 | $ 10288 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | Category III | 4 | 00 | 01 | |||||||||||
Low | $ - 0 | $ 8534 | ||||||||||||||||||
SMAP | High | $ 514 | 263 | $ 649 | ||||||||||||||||
Low | $ - 0 | $ - 0 | ||||||||||||||||||
SPP | High | $ 1300 | 107 | $ 1439 | ||||||||||||||||
Low | $ 1000 | 233 | $ 1233 | |||||||||||||||||
JASON-3 | High | $ 159 | 44 | $ 166 | ||||||||||||||||
Low | $ - 0 | $ 158 | ||||||||||||||||||
SAGE-III | High | $ 112 | 27 | $ 115 | ||||||||||||||||
Low | $ - 0 | $ 104 | ||||||||||||||||||
SWOT | High | $ 752 | 07 | $ 757 | ||||||||||||||||
Low | $ 642 | 08 | $ 647 | |||||||||||||||||
Mars 2020 | High | $ 2350 | 00 | $ 2351 | ||||||||||||||||
Low | $ 2140 | 21 | $ 2186 | |||||||||||||||||
NISAR | High | $ 808 | 00 | $ 808 | ||||||||||||||||
Low | $ 718 | 00 | $ 718 | |||||||||||||||||
Euclid | High | $ 110 | 00 | $ 110 | Combined KDP-AB so no change possible | |||||||||||||||
Low | $ 100 | 00 | $ 100 | |||||||||||||||||
GRACE Follow On | High | $ 470 | -21 | $ 460 | ||||||||||||||||
Low | $ 409 | -12 | $ 404 | |||||||||||||||||
SLS | High | $ 8855 | -30 | $ 8587 | ||||||||||||||||
Low | $ - 0 | $ 7653 | ||||||||||||||||||
LADEE | High | $ 214 | -65 | $ 200 | ||||||||||||||||
Low | $ - 0 | $ 184 | ||||||||||||||||||
ProgramProject Name | Category | KDP A to B analysis (13 missions) | |||||||||||||||
ASTRO-H | 3 | ASTRO-Hreg | 3 | bull13 Missions KDP-B Data Unavailable | |||||||||||||
CYGNSS | 3 | CYGNSS | 3 | bull7 Missions KDP-Crsquos have not yet occurred | |||||||||||||
DSCOVR | 3 | DSCOVR | 3 | ||||||||||||||
C | ECOSTRESS | 3 | ECOSTRESS | 3 | |||||||||||||
EUCLID | 3 | EUCLIDreg | 3 | Euclid | |||||||||||||
C | GEDI | 3 | GEDI | 3 | |||||||||||||
GOES-R | 1 | GOES-R | 1 | ||||||||||||||
GOLD | 3 | GOLD | 3 | ||||||||||||||
GPM | 2 | GPM | 2 | ||||||||||||||
GRACE-FO | 2 | GRACE-FO | 2 | GRACE Follow On | |||||||||||||
GSDO | 1 | GSDO | 1 | ||||||||||||||
ICESat-2 | 1 | ICESat-2reg | 1 | ||||||||||||||
ICON | 2 | ICON | 2 | ||||||||||||||
InSight | 2 | InSight | 2 | ||||||||||||||
IRIS | 3 | IRIS | 3 | ||||||||||||||
Jason-3 | 3 | Jason-3 | 3 | JASON-3 | |||||||||||||
JPSS-1 | 1 | JPSS-1 | 1 | ||||||||||||||
JWST | 1 | JWSTreg | 1 | ||||||||||||||
LADEE | 2 | LADEEreg | 2 | LADEE | |||||||||||||
C | LCRD | 3 | LCRD | 3 | |||||||||||||
LDCM | 2 | LDCMreg | 2 | ||||||||||||||
LDSD | 3 | LDSD | 3 | ||||||||||||||
C | Mars 2020 | 1 | Mars 2020 | 1 | Mars 2020 | ||||||||||||
MAVEN | 2 | MAVEN | 2 | ||||||||||||||
MMS | 1 | MMS | 1 | ||||||||||||||
MOMA | 3 | MOMA | 3 | ||||||||||||||
MSL | 1 | MSL | 1 | ||||||||||||||
NICER | 3 | NICER | 3 | ||||||||||||||
C | NISAR | 2 | NISAR | 2 | NISAR | ||||||||||||
NuSTAR | 3 | NuSTARreg | 3 | ||||||||||||||
OCO-2 | 2 | OCO-2 | 2 | ||||||||||||||
C | OCO-3 | 3 | OCO-3 | 3 | |||||||||||||
ORION | 1 | ORION | 1 | Orion | |||||||||||||
OSIRIS Rex | 1 | OSIRIS Rexreg | 1 | ||||||||||||||
SAGE III | 3 | SAGE III | 3 | SAGE-III | |||||||||||||
SGSS | 1 | SGSSreg | 1 | ||||||||||||||
SLS | 1 | SLS | 1 | SLS | |||||||||||||
SMAP | 2 | SMAPreg | 2 | SMAP | |||||||||||||
SOC | 2 | SOC | 2 | SOC | |||||||||||||
SOFIA | 1 | SOFIA | 1 | ||||||||||||||
PSP | 1 | PSP | 1 | PSP | |||||||||||||
C | SWOT | 2 | SWOT | 2 | SWOT | ||||||||||||
TEMPO | 3 | TEMPO | 3 | ||||||||||||||
TESS | 2 | TESS | 2 | ||||||||||||||
Clipper | |||||||||||||||||
DART | |||||||||||||||||
PACE | |||||||||||||||||
Restore-L | |||||||||||||||||
XARM |
Statistics | COST Growth ($M) | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Average | 9 | 9 | 43 | 61 | 136 | 070 | ||||||||
Median | 5 | 6 | 20 | 45 | 112 | 034 | ||||||||
Standard Deviation | 14 | 16 | 73 | 83 | 93 | 081 | ||||||||
Variance | 2 | 3 | 535 | 685 | 871 | 066 | ||||||||
Minimum | -9 | -8 | (71) | (31) | 15 | - 0 | ||||||||
Maximum | 38 | 53 | 244 | 315 | 345 | 242 | ||||||||
no JWST | ||||||||||||||
Statistics | ||||||||||||||
COST Growth | Schedule Growth (months) | Duration (months) | ||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 18 | 17 | 118 | 131 | 1989 | 065 | ||||||||
Median | 20 | 17 | 101 | 132 | 19167 | 0582 | ||||||||
Standard Deviation | 16 | 19 | 105 | 117 | 11557 | 0830 | ||||||||
Sample Variance | 3 | 4 | 1101 | 1377 | 133562 | 0688 | ||||||||
Minimum | -6 | -5 | - 0 | - 0 | 397 | - 0 | ||||||||
Maximum | 46 | 48 | 284 | 274 | 4527 | 310 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 20 | 21 | 156 | 159 | 2031 | 075 | ||||||||
Median | 21 | 20 | 132 | 147 | 20783 | 0589 | ||||||||
Standard Deviation | 17 | 25 | 174 | 155 | 11214 | 0881 | ||||||||
Sample Variance | 3 | 6 | 3035 | 2394 | 125751 | 0776 | ||||||||
Minimum | -6 | -5 | 00 | 00 | 40 | - 0 | ||||||||
Maximum | 48 | 78 | 649 | 528 | 453 | 31 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 4 | 3 | 47 | 136 | 253 | 054 | ||||||||
Median | 9 | 9 | 61 | 132 | 24333 | 042 | ||||||||
Standard Deviation | 10 | 12 | 52 | 56 | 6657 | 022 | ||||||||
Sample Variance | 1 | 1 | 273 | 311 | 44310 | 005 | ||||||||
Minimum | -7 | -11 | (10) | 82 | 1923 | 041 | ||||||||
Maximum | 11 | 11 | 92 | 193 | 3243 | 079 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | ||||||||||||
of Pp | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | ||||||||||
Category I | 6 | 4 | 4 | 22 | 78 | |||||||||
Category II | 9 | 8 | 13 | 71 | 83 | |||||||||
Category III | 8 | 6 | 11 | 28 | 52 | |||||||||
Timeline | Total Programs | 46 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDB C for comaprison | planned | Total Replans | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statictics - PresentFinal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 41416 | 14 | 9 | 9 | 8 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | |||||||||||||||||||||||||||||||||||||
ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||
ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 758 | Feb-16 | 759 | Mar-16 | FY16Q2 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -5 | -10 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||
CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 1595 | Oct-16 | 1742 | May-17 | FY16Q2 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -4 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | ||||||||||||||||||||||||||||||||||||||||
EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 179 | Dec-21 | 190 | Dec-22 | FY16Q2 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 0 | 00 | 5787 | 5480 | |||||||||||||||||||||||||||||||||||||||
GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | ||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 108295 | Oct-16 | kDP-D Sep-14 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | ||||||||||||||||||||||||||||||||||||||||||||||
GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||
GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q2 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -1 | -3 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||
GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4079 | Aug-17 | 4318 | Feb-18 | FY16Q2 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | -00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ESD | GSDO | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 26336 | Jun-18 | 28129 | Nov-18 | FY16Q2 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 9916 | Oct-17 | 10636 | Jun-18 | FY16Q2 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 232 | Jun-17 | 2527 | Oct-17 | FY16Q2 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 1 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Planetary | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | 6536 | Mar-16 | 6751 | Mar-16 | FY16Q2 | N | N | 0 | 0 | 4 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E draft | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||
JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||
LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||
Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
LDCM | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
LDCMreg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 8501 | Feb-13 | 8568 | Feb-13 | FY15Q4 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | ||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||
Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||
MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 598 | Nov-13 | 600 | Nov-13 | FY16Q1 | N | N | 0 | 0 | -7 | -11 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1121 | Sep-15 | 1121 | Sep-15 | FY16Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 11 | 4 | 1320 | 613 | |||||||||||||||||||||||||||||||||||||||||
MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 904 | Jul-18 | 1004 | Jul-18 | FY16Q2 | N | N | 0 | 0 | -1 | -1 | 3347 | 3347 | |||||||||||||||||||||||||||||||||||||||||||||||||
MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||
NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 684 | Feb-17 | 67 | Feb-17 | KDP-D Jan-16 | N | N | 0 | 0 | 9 | -2 | 613 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||
NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||
NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 166 | Jun-12 | 166 | Jun-12 | FY14Q4 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | 3 | 3 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||
OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4276 | Jul-14 | 4276 | Jul-14 | FY16Q2 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -2 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||
OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ORION | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | 108098 | Aug-21 | 112835 | Apr-23 | FY16Q2 | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 10014 | Oct-16 | 10572 | Oct-16 | FY16Q2 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 1 | -1 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13931 | Aug-18 | 15534 | Aug-18 | FY16Q2 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 1265 | Aug-16 | 133 | Aug-16 | FY16Q2 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 20 | 19 | 2437 | 2437 | |||||||||||||||||||||||||||||||||||||||||
SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||
SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1216 | Jul-19 | 1228 | Sep-19 | PPBE18 PMR | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 2 | 2 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ESD | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||
SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | May-15 | 8899 | May-15 | FY16Q2 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 707 | 203 | |||||||||||||||||||||||||||||||||||||||||
SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 2892 | Oct-18 | 3789 | Oct-18 | FY16Q2 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -27 | -13 | 2127 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
SOFIA (Budget) | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 29048 | Feb-14 | 29122 | Feb-14 | FY16Q2 | Budget Reduction | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||
TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 1809 | Sep-17 | 2178 | Nov-17 | FY16Q2 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 31976 | Dec-17 | 3517 | Jun-18 | FY16Q2 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -7 | -7 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Currently in B | Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CLARREO-PF | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DART | KDP-C in July | Mean | 13 | -13 | 55 | 28 | 1729 | 115 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Europa Clipper | 02045454545 | Median | 17 | -06 | 21 | 00 | 17483 | 0862 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GeoCarb | Standard Deviation | 84 | 68 | 88 | 87 | 10875 | 0863 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IXPE | Minimum | -27 | -13 | 00 | -72 | 397 | 050 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lucy | Maximum | 20 | 19 | 335 | 335 | 4527 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MAIA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PACE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Psyche | Paste data from above to this table for analysis | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Restore-L | -27 | -13 | 2127 | - 0 | 1610 | 050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SOC Replan | Breach notification made DM not yet final | -7 | -7 | - 0 | - 0 | 080 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TROPICS | -7 | -11 | - 0 | - 0 | 817 | 060 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
XARM | -5 | -10 | 307 | - 0 | 867 | 088 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -9 | - 0 | (717) | 2767 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -8 | 717 | 717 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -3 | - 0 | (400) | 510 | 058 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -9 | 207 | (400) | 800 | 099 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -1 | 3347 | 3347 | 2240 | 205 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -1 | - 0 | - 0 | 397 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -01 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | - 0 | - 0 | 1053 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | 407 | 1020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | -3 | 707 | 203 | 2577 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | 00 | - 0 | - 0 | 2777 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 00 | - 0 | - 0 | 1887 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | 3 | 710 | 403 | 1167 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | -4 | - 0 | - 0 | 1983 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 4 | 207 | (203) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 5 | - 0 | - 0 | 1917 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | 6 | 103 | - 0 | 2733 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | -2 | 613 | - 0 | 4527 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 1320 | 613 | 503 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 607 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 | 19 | 2437 | 2437 |
Timeline | Total Programs | 46 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDP C for comaprison | planned | Total Replans | 14 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statistics - PresentFinal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 72618 | 20 | 13 | 13 | 9 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 74855 | Feb-16 | 109271 | Mar-16 | FY17 Q1 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -7 | 30 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 159503 | Dec-16 | 159503 | Dec-16 | FY18 Q3 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -12 | 203 | (503) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | 51043 | Apr-18 | 52443 | Aug-19 | KDP-E May-18 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGS | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 27418 | Sep-18 | 28129 | Nov-18 | FY17 Q1 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 4 | 00 | 307 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGSreg | 1 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | 3145 | Dec-19 | 3231 | Jun-20 | Dec-17 | 5115 | 4181 | 31446 | Dec-19 | 31446 | Dec-19 | FY18 Q3 | Y | Y | Y | 16 | 15 | 1827 | 1927 | 3957 | 049 | -0 | -27 | - 0 | (610) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | APD | EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 206214 | Mar-20 | 223452 | Mar-20 | FY18 Q3 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 13 | 176 | 3653 | 2130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | 120774 | Nov-18 | 123774 | Mar-19 | FY18 Q3 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 10150 | Nov-16 | KDP-E Oct-16 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | 663 | Feb-18 | 73 | Apr-18 | KDP-E Dec-17 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16 Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8834 | Feb-14 | 8904 | Feb-14 | FY17 Q3 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -3 | -5 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4059 | May-18 | 4319 | May-18 | FY18 Q3 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | 00 | 910 | 297 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 10561 | Sep-18 | 10636 | Oct-18 | FY18 Q3 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 6 | 00 | 1117 | 407 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 243 | Jun-18 | 2527 | Jun-18 | FY18 Q3 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 6 | 00 | 1217 | 810 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSightreg | 2 | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 8189 | May-18 | 8289 | May-18 | Sep-16 | 1923 | 1538 | 8138 | May-18 | 8138 | May-18 | FY18 Q3 | Y | Y | Y | Y | 23 | 23 | 2637 | 2637 | 3050 | 086 | -1 | -18 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16 Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E Sep-16 | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | 1144 | Sep-19 | 127 | Sep-19 | KDP-C Apr-17 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16 Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTregreg | 1 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 94889 | Nov-20 | 96627 | Mar-21 | May-18 | 10639 | 8277 | 94889 | Nov-20 | 96627 | Mar-21 | FY18 Q3 | Y | Y | Y | 9 | 2940 | 8113 | 036 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15 Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | 8385 | Dec-20 | 885 | Nov-21 | FY18 Q3 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | 2571 | Jun-19 | 2627 | Nov-19 | FY18 Q3 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8 | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8reg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 85006 | Feb-13 | 85666 | Feb-13 | FY18 Q3 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15 Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | 23634 | Jul-20 | 25304 | Jul-20 | FY18 Q3 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 5753 | Nov-13 | 5753 | Nov-13 | FY16 Q3 | N | N | 0 | 0 | -11 | -14 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1098 | Mar-15 | 1098 | Mar-15 | FY18 Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 9 | 1 | 707 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 120243 | Jul-20 | 128226 | Jul-20 | FY18 Q3 | N | N | 0 | 0 | 24 | 27 | 5783 | 5783 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15 Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 694 | Jun-17 | 706 | Aug-17 | KDP-E May-17 | N | N | 0 | 0 | 10 | 3 | 1013 | 603 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | 7953 | Dec-21 | 8969 | Sep-22 | FY18 Q3 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | 0 | 00346060676 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 115315 | Jun-12 | 115315 | Jun-12 | FY15 Q1 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | -39 | -28 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4245 | Jul-14 | 4245 | Jul-14 | FY17 Q1 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -3 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | 113388 | Mar-18 | 113388 | May-18 | FY18 Q3 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orion | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orionreg | 1 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 116581 | Jun-22 | 116581 | Jun-22 | Jun-18 | 8483 | 3746 | 116581 | Jun-22 | 116581 | Jun-22 | FY18 Q3 | Y | N | 7 | 3 | 1013 | (1013) | 3347 | 030 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 9975 | Sep-16 | 10532 | Sep-16 | FY18 Q3 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 0 | -1 | (100) | (100) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13821 | Aug-18 | 15482 | Aug-18 | FY18 Q3 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -1 | -03 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 129364 | Feb-17 | 129364 | Feb-17 | FY18 Q3 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 22 | 16 | 3050 | 3050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1251 | Sep-19 | 1261284 | Nov-19 | Path Forward APMC Dec 2016 | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 4 | 4 | 223 | 267 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16 Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLSreg | 1 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 9734 | Dec-19 | 9843 | Jun-20 | Dec-17 | 1340 | 148 | 98029 | Dec-19 | 98029 | Dec-19 | FY18 Q3 | Y | Y | Y | 14 | 2 | 2433 | 1927 | 4060 | 047 | 1 | -04 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | Jan-15 | 8899 | Jan-15 | FY18 Q3 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 307 | (197) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 3433 | Feb-20 | 3866 | Feb-20 | FY18 Q3 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -7 | -11 | 3753 | 1627 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIAreg | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 15874 | Feb-14 | 15949 | Feb-14 | FY18 Q3 | Y | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | 7049 | Apr-21 | 7549 | Apr-22 | FY18 Q3 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 181242 | Sep-17 | 197242 | Nov-17 | FY18 Q3 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | -94 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 3333 | Apr-18 | 3333 | Jun-18 | FY18 Q3 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -3 | -12 | 403 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mean | 90 | 88 | 50 | 81 | 1773 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02045454545 | Median | 82 | 49 | 10 | 60 | 16233 | 0374 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Standard Deviation | 118 | 164 | 77 | 97 | 13962 | 0647 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum | -7 | -10 | -71 | -31 | 147 | - 0 | SPP | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum | 38 | 59 | 244 | 345 | 7433 | 242 | EUCLIDreg | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GSDO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Paste data from above to this table for analysis | ORION | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-7 | -10 | 607 | 817 | 1923 | 042 | SLS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-3 | -7 | - 0 | - 0 | 147 | - 0 | TEMPO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -7 | 1113 | 1113 | 1887 | 059 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
0 | -6 | - 0 | 613 | 1897 | 032 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total KDPs Within Cost Range of Prior KDP | Total KDPs Within Schedule Range of Prior KDP | -2 | -5 | 303 | 910 | 510 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | -3 | -3 | - 0 | - 0 | 503 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MALow at or below Preceding KDP Low | 14 | 31 | 45 | 31 | MALow at or below Preceding KDP Low | 27 | 26 | 53 | 51 | 6 | 0 | 410 | (100) | 1217 | 008 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABCHigh at or below Preceding KDP High | 19 | 33 | 52 | 37 | ABCHigh at or below Preceding KDP High | 21 | 32 | 53 | 40 | 0 | 0 | (203) | 403 | 167 | 242 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 2 | 810 | 307 | 500 | 061 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-B Cost | KDP-A to KDP-B Schedule | 33 | 5 | - 0 | 100 | 800 | 013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 11 | 8 | 103 | 103 | 2670 | 004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B Low at or below KDP-A Low | 4 | 10 | 14 | 29 | KDP-B Low at or below KDP-A Low | 13 | 9 | 22 | 59 | 9 | 9 | (203) | 503 | 1983 | 025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B High at or below KDP-A High | 9 | 12 | 21 | 43 | KDP-B High at or below KDP-A High | 12 | 10 | 22 | 55 | 11 | 10 | (103) | 1320 | 3243 | 041 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | 10 | 2437 | 3147 | 1610 | 195 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | 10 | 613 | 613 | 3450 | 018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B to KDP-C Cost | KDP-B to KDP-C Schedule | -2 | 11 | 813 | 603 | 1687 | 036 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 9 | 13 | 917 | 1930 | 2433 | 079 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-B Low | 10 | 21 | 31 | 32 | MA at or below KDP-B Low | 14 | 17 | 31 | 45 | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-B High | 10 | 21 | 31 | 32 | ABC at or below KDP-B High | 9 | 22 | 31 | 29 | 16 | 18 | - 0 | 607 | 707 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 31 | 1217 | 1830 | 1027 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-C Cost | KDP-A to KDP-C Schedule | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 29 | 59 | 2233 | 3450 | 7433 | 046 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-A Low | 2 | 7 | 9 | 22 | MA at or below KDP-A Low | 5 | 12 | 17 | 29 | added | 5 | 0 | - 0 | - 0 | 813 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-A High | 5 | 11 | 16 | 31 | ABC at or below KDP-A High | 3 | 14 | 17 | 18 | added | -0 | -0 | 103 | 1013 | 1017 | 100 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 7 | 4 | - 0 | - 0 | 1323 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-C (MA) | KDP-C (ABC) | Replan (MA) | Replan (ABC) | KDP-C to Replan (MA) | KDP-C to Replan (ABC) | KDP-C (or Replan) to PresentFinal (MA) | KDP-C (or Replan) to PresentFinal (ABC) | added | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Percentage of Project CostSchedule HighLow Estimates Within Prior KDP Range Estimates | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B Estimate at or below A Estimate | C Estimate at or below B Estimate | C Estimate at or below A Estimate | Total at or below Preceding KDP Estimate | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - High | 43 | 32 | 31 | 37 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - Low | 29 | 32 | 22 | 31 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - High | 55 | 29 | 18 | 40 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - Low | 59 | 45 | 29 | 51 |
LCC and Development Cost Metrics Against BaselineLCC Dev
3
LCC and Dev Cost Metrics Against Baseline
4
70 Joint Cost and Schedule ConfidenceAre we meeting the expected 70 success rate across the portfolio
bull NPR 71205Ebull ABC at 70 confidence
MA at 50 confidencebull
bull Aggregate NASA confidence at baselinebull ABC at 71 confidence
MA at 52 confidencebull
bull Actual performancebull 41 of projects met ABC commitments
30 of projects met MA commitmentsbull
bull Projects currently in Phase Dbull 20 meeting ABC commitments
0 meeting MA commitmentsbull
5
Formulation Cost and Schedule Ranges
bull
bullbull
bull
bullbull
Are we capturing the Agencyrsquos cost exposure in early estimates
In aggregate the high cost estimate is at or below the high estimate established at the preceding KDP
37 of the time for cost40 of the time for schedule
For projects that held a KDP-A the eventual KDP-C baseline cost and schedule (high estimates) are at or below the KDP-A estimate
31 of the time for cost18 of the time for schedule
6
Development Cost Metrics When Controlling for Launch Vehicle Cost Variation
28Avg LV Proportion of Dev Cost Baseline
-8Avg Post-Baseline LV Cost Variation
7
Development Cost Performance When Controlling for Launch Vehicle Cost VariationHow would our development cost reporting metrics change
Lower LV costs can provide unexpected funds to cover growth in reporting
Lower LV costs sometimes have no effect on cost reporting
Higher LV costs can mask otherwise good cost performance
8
bull NASA cost performance has drastically improved since the early 2000rsquos
We are falling short of our portfolio goal of 70 projects hitting cost targets
Our cost and schedule ranges at KDP-A and KDP-B are optimistic and more often than do not capture the eventual high cost or schedule commitments at KDP-C baseline
Development cost reporting metrics can misrepresent how our projects are performing (both positively and negatively) if the LV contract award is well above or below the estimate included in the KDP-C baseline
bull
bull
bull
9
Back-up
10
1111
1212
Total KDPs Within Cost Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 14 31 45 31ABCHigh at or below Preceding KDP High 19 33 52 37
Total KDPs Within Schedule Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 27 26 53 51ABCHigh at or below Preceding KDP High 21 32 53 40
KDP-A to KDP-B CostYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 4 10 14 29KDP-B High at or below KDP-A High 9 12 21 43
KDP-A to KDP-B ScheduleYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 13 9 22 59KDP-B High at or below KDP-A High 12 10 22 55
KDP-B to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-B Low 10 21 31 32ABC at or below KDP-B High 10 21 31 32
KDP-B to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-B Low 14 17 31 45ABC at or below KDP-B High 9 22 31 29
KDP-A to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-A Low 2 7 9 22ABC at or below KDP-A High 5 11 16 31
KDP-A to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-A Low 5 12 17 29ABC at or below KDP-A High 3 14 17 18
COST ($M)
KDP-C to Replan (MA)595000000000000281704999999999999750000000000000014025429999999999993-178400000000000095115-85999999999999943826-25999999999996248E-200911-518999999999999773-1220000000000004531770000000000005117000000000000176266192299999999999951671-2800000000000011401112644044106389999999999965159999999999999425999999999999972-1246900000000005125710000000000002140107999999999999551896472000000000000171666999999999998263820000000000005922000000000000459114748445624775539999999999999103258999999999999811180000000000001939999999999999151167299999999999384830000000000109-33599999999999909-5550000000000011416020000000000005-3200000000000002831553639000000000000974113401372999999999999515260000000000002-5800000000000011429476-180455789999999999997710099999999999994-76000000000000227KDP-C to Replan (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS59500000000000028211499999999999918399999999999977392842000000000001592E-2-3084000000000000941809999999999991-8599999999999994344599999999999994-46999999999997044E-210860399999999999994316E-2978-45-281000000000000238420000000000004520329999999999995419999999999998866751153799999999999951802-108000000000000111623851847387182770000000000073628999999999999770-4297100000000000423299999999999983142-039999999999997726203338000000000000119256712921999999999999321011613781300000000000186840000000000000658600000000000023553999999999999910349911780000000000001329999999999999729948999999999996437460000000000036-88599999999999909-5720000000000004511440000000000009-32000000000000028235100000000000023453000000000000711081481372999999999999503989999999999997729551-18045-210000000000002270-21600000000000023
COST Change ($M)
B to C (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS01047535211267606203370517928286851448611111111110973E-2075077759107650046E-4-98804985102361215E-201486366383447687-7818181818181813E-2030674002751031632-37226838174140057E-4013440860215052999E-30-46012269938650305E-2-61086956521739177E-201085051546391753202363403859567541916901408450704179E-200227818101022070730-65060240963855487E-2071729957805907171E-20592556945781199880779814665592264319368421052631587E-20314499999999999890-4630495689655173E-288694328130947783E-2017749999999999999-42462845010613295E-400166502463054187263934495959166312E-2093093699515347267E-200048437693738375709067597185373168792E-20526615969581748940003366676193198057128745644599303111E-296699259374453242E-233198918775202764E-2-732231404958677E-2-5100766898519711E-279499652536483736E-2-27777777777777801E-203746613545816733204003014143287735301290322580645161315265600825167612E-20176206365503080030010075757575757570-061063923386687424-27818254073387508E-30-54000000000000055E-2
COST Change ()
Cost - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate04285714285714285503225806451612903103125036538461538461536Schedule - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate054545454545454541029032258064516131017647058823529413039622641509433965Cost - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate02857142857142857032258064516129031022222222222222221031111111111111112Schedule - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate059090909090909094045161290322580644029411764705882354050943396226415094
High Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (high)01682251932581422Category 2 Change (high)60501935980863335E-2Category 3 Change (high)37110484780157868E-2Total Change (high)014626442296281486
Low Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (low)010106870229007633Category 2 Change (low)19806591564406897Category 3 Change (low)0Total Change (low)21873131670301591
KDP-A to KDP-B Schedule Growth - Low Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion0-9-49-2-1-100000200912326273242
KDP-A to KDP-B Schedule Growth - High Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion-36-8-8-3-2-1-1000002569121726414451
Cost Variation Against Baselines
13
Methodology and Assumptions
The first step in conducting this analysis was to verify and validate the cost baseline information using source documentation KDP-C figures takes priority as the definitive baseline Where KDP-C decision memoranda was not available as in the case of many projects baselined prior to approximately 2009 figures were pulled from the first appearance as a development project in a Presidentrsquos Budget as the baseline against which to measure In a few cases notificationsreports to Congress (eg NSPD-49 reports) were used to identify a baseline figure MA figures were pulled solely from decision memoranda and thus our dataset with regard to MArsquos is smaller as it excludes many of the older projects that did not have standardized baseline documentation with MArsquos noted Variance to the baseline was then measured by using the most recent quarterly cost and schedule report Latest cost data is valid through the FY18 Q3 reporting period Slide 3 charts illustrate each project in the dataset with respective LCC and dev cost variances
The confidence level policy applied to each project was noted using source documentation as well as a cross-reference against when policy changes were implemented recognizing that a subset of projects received waivers to new policies during policy transition Certain exclusions were applied to ensure a dataset comparable across projects For example SOFIA had conducted a JCL on a replan but the decision memorandum made clear the baseline was not changing therefore the JCL confidence level could not fairly be applied to measure performance against the baseline Another example is GPM which was excluded as it was one of the very first projects baselined after JCL policy implementation and was not a ldquotruerdquo JCL with the decision memorandum noting that the intent was met while a JCL DPMC would be held many months later to evaluate progress There were a couple of additional exclusions applied
When a project is confirmed at KDP-C cost performance measurements were applied to that baseline If a project was then rebaselined a ldquonewrdquo project was added to the dataset using the rebaselined figures against which to measure as the Agency made the decision at that point to press ahead with the project and Congress provided reauthorization The ldquooriginalrdquo project was ldquofrozenrdquo in terms of development phase to fairly capture the contemporary phase performance (eg the ldquooriginalrdquo OCO-2 cost growth will always be categorized within the ldquoprojects in developmentrdquo performance category while the rebaselined OCO-2 cost performance falls into the ldquoprojects launchedrdquo category) The latest cost figures however were used to measure cost performance across both original baselines and rebaselines in order to fairly capture the accuracy of original estimates against final outcomes
This insight while placing an emphasis on the JCL while measuring performance does not intend to convey a discovered causal relationship between JCL and cost performance There have been many other related programmatic and technical advancements over the past 10 to 20 years that have influenced cost and schedule performance in the overall positive direction Other insights look into other influencers of costschedule performance
13
Dev Cost Metrics Controlling for LV Cost Variation
14
Methodology and Assumptions
SID pulled a number of data elements from a total of 22 SMD projects to conduct this analysis Data elements from a projectrsquos baseline include total development cost and the launch services cost estimate and have been sourced from KDP documentation quarterly reports and Cost Analysis Data Requirements (CADREs) These data were compared to currentactual total development and launch services costs from the most recent KDPquarterly reports Other data elements include Division Lead Center type of launch vehicle LCC category and current phase
SID calculated the overall development cost deltas from the baseline cost and verified the percentage growth with external reporting data where applicable SID then calculated the percent change in launch services development cost from baseline to currentactual The development cost percent change was calculated after removing launch services from the inputs
For further insight these same calculations were conducted by Division Lead Center type of launch vehicle and LCC category Division Lead Center and LCC category were then further broken down by looking only at projects currently in development
The 22 projects used in this analysis include Mars 2020 ICESat-2 ICON InSight SOC PSP SWOT TESS Juno Landsat-8 MMS OSIRIS-REx SMAP MAVEN GRAIL NuSTAR RBSP IRIS LADEE OCO-2 CYGNSS and Landsat 9 Representation includes seven planetary science seven earth science six heliophysics and two astrophysics missions twelve GSFC-led projects and eight JPL-led projects (LaRC and ARC representing the other two) ten Atlas V one Delta IV-H two Falcon 9 four Delta II four Pegasus and one Minotaur V rockets and six category 1 thirteen category 2 and three category 3 projects Seven projects assessed are currently in development
Other projects considered were excluded if launch was or is to be on a ride-share and launch services costs were negligible (eg RBI) Projects launching on internationally-contributed rockets were also excluded (eg GPM JWST) Other exclusions were based on data limitations at the time of analysis (eg no launch services costs available from baseline)
Did not add GPM international launchSOFIA no launchJWST international launch
RBI rideshareSentinel-6 international launch
Dawn no launch vehicle numbers availableSNPP No baseline LV estimate available
NISAR international launchLCRD rideshare
GRACE-FO rideshare
14
Formulation KDPs
15
Methodology and Assumptions
Comparative analysis was conducted where possible (ie when highlow costschedule figures were available in KDP-ABC decision memoranda This analysis does not attempt to explain why the majority of costschedule estimates at KDPrsquos exceed prior estimates
Cost and schedule ranges were extracted from KDP-A and KDP-B decision memoranda Agency Baseline Commitments and Management Agreements were extracted from KDP-C decision memoranda Lifecycle cost was used in all cases (as opposed to development cost only) A project did not need to have all KDP-A through C figures to be included in the analysis (eg a project that did not have a KDP-A range was still included in the KDP-B to KDP-C statistics)
This analysis includes data from KDP-A KDP-B and KDP-C milestones At KDP-A and KDP-B a high and low estimate is established for both cost and schedule At KDP-C a Management Agreement and an Agency Baseline Commitment is established for both cost and schedule For ease of conveyance this analysis equates the Management Agreement as the low estimate for KDP-C and equates the Agency Baselines Commitment as the high estimate for KDP-C
15
Column1 | KDP-C Date | Lead Center | Division | Launch Vehicle | LCC Category | Phase | Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | Notes | |||||||||||||||||
Juno | Aug-08 | JPL | Planetary | Atlas V | 1 | Ops | $ 7423 | $ 7089 | $ 1904 | $ 1817 | $ 5519 | $ 5272 | -45 | -46 | -45 | ||||||||||||||||||
RBSP | Dec-08 | GSFC | Helio | Atlas V | 2 | Ops | $ 5338 | $ 5040 | $ 1336 | $ 1324 | $ 4002 | $ 3716 | -56 | -09 | -71 | ||||||||||||||||||
GRAIL | Jan-09 | JPL | Planetary | Delta II | 2 | Ops | $ 4270 | $ 3983 | $ 1528 | $ 1508 | $ 2742 | $ 2475 | -67 | -13 | -97 | ||||||||||||||||||
MMS | Jun-09 | GSFC | Helio | Atlas V | 1 | Ops | $ 8573 | $ 8753 | $ 1942 | $ 1788 | $ 6631 | $ 6965 | 21 | -79 | 50 | ||||||||||||||||||
NuSTAR | Sep-09 | JPL | Astro | Pegasus | 3 | Ops | $ 1099 | $ 1162 | $ 358 | $ 332 | $ 741 | $ 830 | 57 | -73 | 120 | ||||||||||||||||||
Landsat-8 | Dec-09 | GSFC | Earth | Atlas V | 2 | Ops | $ 5830 | $ 5028 | $ 1264 | $ 1218 | $ 4566 | $ 3810 | -138 | -36 | -166 | ||||||||||||||||||
LADEE | Aug-10 | ARC | Planetary | Minotaur V | 2 | Ops | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||
OCO-2 | Sep-10 | JPL | Earth | Delta II | 2 | Ops | $ 2490 | $ 3200 | $ 676 | $ 1368 | $ 1814 | $ 1832 | 285 | 1024 | 10 | against original baseline rebaseline primary LV-driven aside from some RWA issues | |||||||||||||||||
MAVEN | Oct-10 | GSFC | Planetary | Atlas V | 2 | Ops | $ 5672 | $ 4720 | $ 1870 | $ 1541 | $ 3802 | $ 3179 | -168 | -176 | -164 | ||||||||||||||||||
IRIS | Nov-10 | GSFC | Helio | Pegasus | 3 | Ops | $ 1407 | $ 1430 | $ 404 | $ 426 | $ 1003 | $ 1004 | 16 | 54 | 01 | ||||||||||||||||||
SMAP | May-12 | JPL | Earth | Delta II | 2 | Ops | $ 4857 | $ 4543 | $ 1319 | $ 1201 | $ 3538 | $ 3342 | -65 | -89 | -55 | ||||||||||||||||||
SOC | Mar-13 | GSFC | Helio | Atlas V | 2 | Dev | $ 3769 | $ 3100 | $ 2500 | $ 1727 | $ 1269 | $ 1373 | -178 | -309 | 82 | ||||||||||||||||||
OSIRIS-REx | May-13 | GSFC | Planetary | Atlas V | 1 | Ops | $ 7786 | $ 6156 | $ 2340 | $ 1888 | $ 5446 | $ 4268 | -209 | -193 | -216 | ||||||||||||||||||
CYGNSS | Feb-14 | LaRC | Earth | Pegasus | 3 | Ops | $ 1511 | $ 1287 | $ 523 | $ 623 | $ 988 | $ 664 | -148 | 191 | -328 | ||||||||||||||||||
InSight | Mar-14 | JPL | Planetary | Atlas V | 2 | Ops | $ 5418 | $ 6483 | $ 1599 | $ 1685 | $ 3819 | $ 4798 | 197 | 54 | 256 | ||||||||||||||||||
PSP | Mar-14 | GSFC | Helio | Delta IV-H | 1 | Dev | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||
ICESat-2 | May-14 | GSFC | Earth | Delta II | 1 | Dev | $ 7637 | $ 7441 | $ 1188 | $ 1183 | $ 6449 | $ 6258 | -26 | -04 | -30 | ||||||||||||||||||
ICON | Oct-14 | GSFC | Helio | Pegasus | 2 | Dev | $ 1960 | $ 1982 | $ 543 | $ 563 | $ 1417 | $ 1419 | 11 | 37 | 01 | ||||||||||||||||||
TESS | Oct-14 | GSFC | Astro | Falcon 9 | 2 | Ops | $ 3232 | $ 2799 | $ 1141 | $ 874 | $ 2091 | $ 1925 | -134 | -234 | -79 | ||||||||||||||||||
SWOT | May-16 | JPL | Earth | Falcon 9 | 2 | Dev | $ 5715 | $ 5715 | $ 1313 | $ 1078 | $ 4402 | $ 4638 | 00 | -179 | 53 | ||||||||||||||||||
Mars 2020 | Jun-16 | JPL | Planetary | Atlas V | 1 | Dev | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||
Landsat 9 | Dec-17 | GSFC | Earth | Atlas V | 2 | Dev | $ 6342 | $ 6342 | $ 1544 | $ 1542 | $ 4798 | $ 4800 | 00 | -01 | 00 | ||||||||||||||||||
Projects in Development | $ 52749 | $ 52336 | $ 14819 | $ 12738 | $ 37930 | $ 39598 | -08 | -140 | 44 | ||||||||||||||||||||||||
Projects in Operations | $ 66588 | $ 63555 | $ 18647 | $ 18196 | $ 47941 | $ 45359 | -46 | -24 | -54 | ||||||||||||||||||||||||
Total | $ 119337 | $ 115891 | $ 33466 | $ 30935 | $ 85871 | $ 84956 | -29 | -76 | -11 | ||||||||||||||||||||||||
Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | |||||||||||||||||||||||||
GSFC Project Total | $ 68103 | $ 63294 | $ 20377 | $ 18325 | $ 47726 | $ 44969 | -71 | -101 | -58 | ||||||||||||||||||||||||
JPL Projects Total | $ 48041 | $ 49428 | $ 12122 | $ 11384 | $ 35919 | $ 38044 | 29 | -61 | 59 | ||||||||||||||||||||||||
Did not add | GPM | international launch | GSFC Projects in Ops | $ 37838 | $ 33926 | $ 10297 | $ 9059 | $ 27541 | $ 24867 | -103 | -120 | -97 | |||||||||||||||||||||
SOFIA | no launch | JPL Projects in Ops | $ 25557 | $ 26460 | $ 7384 | $ 7911 | $ 18173 | $ 18549 | 35 | 71 | 21 | ||||||||||||||||||||||
JWST | international launch | GSFC Projects in Dev | $ 30265 | $ 29368 | $ 10080 | $ 9266 | $ 20185 | $ 20102 | -30 | -81 | -04 | ||||||||||||||||||||||
RBI | rideshare | JPL Projects in Dev | $ 22484 | $ 22968 | $ 4738 | $ 3473 | $ 17746 | $ 19495 | 22 | -267 | 99 | ||||||||||||||||||||||
Sentinel-6 | international launch | ||||||||||||||||||||||||||||||||
Dawn | no launch vehicle numbers available | Astro | $ 4331 | $ 3961 | $ 1499 | $ 1206 | $ 2832 | $ 2755 | -85 | -195 | -27 | ||||||||||||||||||||||
SNPP | No baseline LV estimate available | Planetary | $ 49020 | $ 47566 | $ 13109 | $ 11437 | $ 35911 | $ 36129 | -30 | -128 | 06 | ||||||||||||||||||||||
NISAR | international launch | Helio | $ 31604 | $ 30808 | $ 11030 | $ 10078 | $ 20574 | $ 20730 | -25 | -86 | 08 | ||||||||||||||||||||||
LCRD | rideshare | Earth | $ 34382 | $ 33556 | $ 7827 | $ 8213 | $ 26555 | $ 25343 | -24 | 49 | -46 | ||||||||||||||||||||||
GRACE-FO | rideshare | ||||||||||||||||||||||||||||||||
Astro - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
Planetary - Dev Only | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||||||||
Helio - Dev Only | $ 16286 | $ 15585 | $ 7348 | $ 6540 | $ 8938 | $ 9045 | -43 | -110 | 12 | ||||||||||||||||||||||||
Earth - Dev Only | $ 19694 | $ 19498 | $ 4045 | $ 3803 | $ 15649 | $ 15695 | -10 | -60 | 03 | ||||||||||||||||||||||||
Atlas V | $ 72920 | $ 69964 | $ 19725 | $ 16926 | $ 53195 | $ 53038 | -41 | -142 | -03 | ||||||||||||||||||||||||
Delta IV-H | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||||||||
Falcon 9 | $ 8947 | $ 8514 | $ 2454 | $ 1952 | $ 6493 | $ 6562 | -48 | -205 | 11 | ||||||||||||||||||||||||
Delta II | $ 19254 | $ 19167 | $ 4711 | $ 5260 | $ 14543 | $ 13907 | -05 | 117 | -44 | this is skewed by OCO-2 which switched from the baseline Taurus XL to the Delta-II at the rebaseline | |||||||||||||||||||||||
Pegasus | $ 5977 | $ 5861 | $ 1828 | $ 1944 | $ 4149 | $ 3917 | -19 | 63 | -56 | ||||||||||||||||||||||||
Minotaur V | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||||||||
Category 1 | $ 58745 | $ 57195 | $ 15104 | $ 13322 | $ 43641 | $ 43873 | -26 | -118 | 05 | ||||||||||||||||||||||||
Category 2 | $ 56575 | $ 54817 | $ 17076 | $ 16232 | $ 39499 | $ 38585 | -31 | -49 | -23 | ||||||||||||||||||||||||
Category 3 | $ 4017 | $ 3879 | $ 1285 | $ 1381 | $ 2732 | $ 2498 | -34 | 75 | -86 | ||||||||||||||||||||||||
Category 1 - Dev Only | $ 34963 | $ 35197 | $ 8918 | $ 7829 | $ 26045 | $ 27368 | 07 | -122 | 51 | ||||||||||||||||||||||||
Category 2 - Dev Only | $ 17786 | $ 17139 | $ 5900 | $ 4909 | $ 11886 | $ 12230 | -36 | -168 | 29 | ||||||||||||||||||||||||
Category 3 - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
LV of Total Dev at Baseline | 280 | ||||||||||||||||||||||||||||||||
LV of Total Dev at FY18 Q3 | 267 | ||||||||||||||||||||||||||||||||
Launch Vehicle Percent Cost Variation from Baseline Estimate in Chronological Order |
Mission | LCC Category | KDP-A (low) | KDP-A (high) | KDP-B (low) | KDP-B (high) | Low Delta (months) | High Delta (months) | KDP-C MA | MA Variance from A | KDP-C ABC | ABC Variance from A | |||||||||||||||
Restore-L | 2 | Jun-20 | Dec-23 | Jun-20 | Dec-20 | 0 | -36 | |||||||||||||||||||
SLS | 1 | Dec-17 | Dec-17 | Mar-17 | Apr-17 | -9 | -8 | Dec-17 | 0 | Nov-18 | 11 | |||||||||||||||
PACE | 2 | Dec-22 | Dec-23 | Aug-22 | Apr-23 | -4 | -8 | |||||||||||||||||||
WFIRST | 1 | Dec-24 | Dec-26 | Sep-25 | Sep-26 | 9 | -3 | |||||||||||||||||||
OCO-3 | 3 | Sep-16 | Dec-16 | Jul-16 | Oct-16 | -2 | -2 | Mar-18 | 18 | May-18 | 17 | |||||||||||||||
PSP | 1 | Aug-18 | Aug-18 | Jul-18 | Jul-18 | -1 | -1 | Aug-18 | 0 | Aug-18 | 0 | |||||||||||||||
LCRD | 2 | Mar-17 | Mar-17 | Feb-17 | Feb-17 | -1 | -1 | Jun-19 | 27 | Nov-19 | 32 | |||||||||||||||
Euclid | 3 | Dec-14 | Dec-14 | Dec-14 | Dec-14 | 0 | 0 | May-15 | 5 | May-16 | 17 | |||||||||||||||
GRACE-FO | 2 | Aug-17 | Aug-17 | Aug-17 | Aug-17 | 0 | 0 | Aug-17 | 0 | Feb-18 | 6 | |||||||||||||||
Mars 2020 | 1 | Jul-20 | Jul-20 | Jul-20 | Jul-20 | 0 | 0 | Jul-20 | 0 | Jul-20 | 0 | |||||||||||||||
SAGE-III | 3 | Aug-14 | Aug-14 | Aug-14 | Aug-14 | 0 | 0 | Aug-14 | 0 | Aug-14 | 0 | |||||||||||||||
SWOT | 2 | Oct-20 | Oct-20 | Oct-20 | Oct-20 | 0 | 0 | Apr-21 | 6 | Apr-22 | 18 | |||||||||||||||
LADEE | 3 | Mar-12 | Mar-12 | May-12 | May-12 | 2 | 2 | May-13 | 14 | Nov-13 | 20 | |||||||||||||||
DART | 2 | Dec-20 | Dec-20 | Dec-20 | May-21 | 0 | 5 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | ||||||||||||||||||
NISAR | 2 | Dec-20 | Dec-21 | Dec-20 | Jun-22 | 0 | 6 | Dec-21 | 12 | Sep-22 | 9 | |||||||||||||||
JASON-3 | 3 | Jul-13 | Jul-13 | Apr-14 | Apr-14 | 9 | 9 | Mar-15 | 20 | Mar-15 | 20 | |||||||||||||||
MMS | 1 | Oct-13 | Oct-13 | Oct-14 | Oct-14 | 12 | 12 | Aug-14 | 10 | Mar-15 | 17 | |||||||||||||||
ECOSTRESS | 3 | May-17 | Mar-18 | Aug-17 | Aug-19 | 3 | 17 | Aug-17 | 3 | Aug-19 | 17 | |||||||||||||||
SMAP | 2 | Mar-13 | Mar-13 | May-15 | May-15 | 26 | 26 | Oct-14 | 19 | Mar-15 | 24 | |||||||||||||||
XARM | 3 | Oct-19 | Oct-19 | Jan-22 | Mar-23 | 27 | 41 | |||||||||||||||||||
SOC | 2 | Apr-15 | Apr-15 | Dec-17 | Dec-18 | 32 | 44 | Jan-17 | 21 | Oct-18 | 42 | |||||||||||||||
Orion | 1 | Dec-17 | Dec-17 | Jun-21 | Mar-22 | 42 | 51 | Aug-21 | 44 | Apr-23 | 64 | |||||||||||||||
MAIA | 3 | NA | NA | Dec-19 | Mar-21 | NA | NA | |||||||||||||||||||
ICON | 3 | NA | NA | Feb-17 | Jun-17 | NA | NA | |||||||||||||||||||
GOLD | 3 | NA | NA | Dec-17 | Dec-17 | NA | NA | |||||||||||||||||||
GeoCarb | 3 | NA | NA | Jun-22 | Jun-23 | NA | NA | |||||||||||||||||||
IXPE | 3 | NA | NA | Dec-20 | Dec-20 | NA | NA | |||||||||||||||||||
Landsat 9 | 2 | NA | NA | Dec-20 | Nov-21 | NA | NA | |||||||||||||||||||
Lucy | 2 | NA | NA | Oct-21 | Nov-21 | NA | NA | |||||||||||||||||||
TROPICS | 3 | NA | NA | Sep-19 | Sep-20 | NA | NA | |||||||||||||||||||
JUICE | 3 | NA | NA | Sep-19 | Sep-19 | NA | NA | |||||||||||||||||||
Psyche | 2 | NA | NA | Aug-22 | Aug-22 | NA | NA | |||||||||||||||||||
Clipper | 1 | NA | NA | Jun-22 | Jul-23 | NA | NA | removed Clipper from schedule calculations due to no KDP-A schedule estimate | ||||||||||||||||||
CLARREO-PF | 3 | Jan-20 | Jan-22 | |||||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
of Pp | (LowMA) | (HighABC) | (LowMA) | (HighABC) | ||||||||||||||||||||||
Category I | 7 | 62 | 165 | 88 | 85 | |||||||||||||||||||||
Category II | 12 | 38 | 109 | 59 | 40 | |||||||||||||||||||||
Category III | 15 | - | -07 | 56 | 96 | |||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
(LowMA) | (HighABC) | (LowMA) | (HighABC) | |||||||||||||||||||||||
Average | 80 | 118 | 66 | 70 | ||||||||||||||||||||||
Median | 15 | - | 00 | 00 | ||||||||||||||||||||||
Standard Deviation | 145 | 233 | 129 | 189 | ||||||||||||||||||||||
Minimum | -12 | -65 | -9 | -36 | ||||||||||||||||||||||
Maximum | 417 | 745 | 42 | 51 |
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | KDP-C MA | KDP-C ABC | MA Variance From A | ABC Variance From A | |||||||||||||||||
Clipper | 1 | $ 4000 | $ 4000 | $ - 0 | 00 | $ 3000 | $ 3100 | $ 100 | 33 | ||||||||||||||||||||||
DART | 2 | $ 270 | $ 291 | $ 21 | 78 | $ 175 | $ 248 | $ 73 | 417 | ||||||||||||||||||||||
Euclid | 3 | $ 110 | $ 110 | $ - 0 | 00 | $ 100 | $ 100 | $ - 0 | 00 | Combined KDP-AB so no possible change | 964 | 1014 | -4 | -8 | |||||||||||||||||
GRACE-FO | 2 | $ 470 | $ 460 | $ (10) | -21 | $ 409 | $ 404 | $ (5) | -12 | 4059 | 4319 | -1 | -8 | ||||||||||||||||||
JASON-3 | 3 | $ 159 | $ 166 | $ 7 | 44 | $ - 0 | $ 158 | 1552 | 1552 | -2 | |||||||||||||||||||||
LADEE | 3 | $ 214 | $ 200 | $ (14) | -65 | $ - 0 | $ 184 | 2359 | 2629 | 23 | |||||||||||||||||||||
LCRD | 2 | $ 239 | $ 239 | $ 0 | 02 | $ 239 | $ 239 | $ 0 | 02 | 2571 | 2627 | 8 | 10 | ||||||||||||||||||
Mars 2020 | 1 | $ 2350 | $ 2351 | $ 1 | 00 | $ 2140 | $ 2186 | $ 46 | 21 | 22727 | 24435 | 6 | 4 | ||||||||||||||||||
MMS | 1 | $ 777 | $ 990 | $ 213 | 275 | $ 777 | $ 928 | $ 151 | 195 | 10026 | 10826 | 29 | 39 | ||||||||||||||||||
NISAR | 2 | $ 808 | $ 808 | $ - 0 | 00 | $ 718 | $ 718 | $ - 0 | 00 | 7953 | 8669 | 11 | 7 | ||||||||||||||||||
OCO-3 | 3 | $ 120 | $ 111 | $ (9) | -71 | $ 100 | $ 101 | $ 1 | 13 | 1108 | 1148 | 11 | -4 | ||||||||||||||||||
Orion | 1 | $ 6391 | $ 10288 | $ 3897 | 610 | $ - 0 | $ 8534 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | 108098 | 112835 | 77 | ||||||||||||||||||||
PACE | 2 | $ 850 | $ 850 | $ - 0 | 00 | $ 805 | $ 805 | $ - 0 | 00 | ||||||||||||||||||||||
PSP | 1 | $ 1300 | $ 1439 | $ 139 | 107 | $ 1000 | $ 1233 | $ 233 | 233 | 13932 | 15534 | 39 | 19 | ||||||||||||||||||
Restore-L | 2 | $ 787 | $ 753 | $ (34) | -43 | $ 500 | $ 628 | $ 128 | 256 | ||||||||||||||||||||||
SAGE-III | 3 | $ 112 | $ 115 | $ 3 | 27 | $ - 0 | $ 104 | 101 | 112 | 0 | |||||||||||||||||||||
SLS | 1 | $ 8855 | $ 8587 | $ (268) | -30 | $ - 0 | $ 7653 | 8394 | 9695 | 9 | |||||||||||||||||||||
SMAP | 2 | $ 514 | $ 649 | $ 135 | 263 | $ - 0 | $ - 0 | $ - 0 | 7218 | 9165 | 78 | ||||||||||||||||||||
SOC | 2 | $ 243 | $ 424 | $ 181 | 745 | $ - 0 | $ 371 | 3662 | 4359 | 79 | |||||||||||||||||||||
SWOT | 2 | $ 752 | $ 757 | $ 5 | 07 | $ 642 | $ 647 | $ 5 | 08 | 7049 | 7549 | 10 | 0 | ||||||||||||||||||
XARM | 3 | $ 172 | $ 217 | $ 45 | 264 | $ 161 | $ 179 | $ 18 | 110 | ||||||||||||||||||||||
Count | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta | Change (low) | Notes | ||||||||||||||||||||||
Category 1 | 6 | $ 23673 | $ 27655 | $ 3982 | 168 | $ 3275 | $ 3606 | $ 331 | 101 | ||||||||||||||||||||||
Category 2 | 9 | $ 4933 | $ 5231 | $ 298 | 61 | $ 4474 | $ 13335 | $ 8861 | 1981 | ||||||||||||||||||||||
Category 3 | 6 | $ 887 | $ 920 | $ 33 | 37 | $ - 0 | $ 7757 | $ 7757 | ERRORDIV0 | ||||||||||||||||||||||
Total | 21 | $ 29493 | $ 33807 | $ 4314 | 146 | $ 7749 | $ 24698 | $ 16949 | 2187 | ||||||||||||||||||||||
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | |||||||||||||||||||||
CLARREO-PF | 3 | $ 75 | $ (75) | -1000 | $ 64 | ||||||||||||||||||||||||||
ICON | 3 | $ 249 | $ 218 | ||||||||||||||||||||||||||||
ECOSTRESS | 3 | $ 56 | $ 49 | ||||||||||||||||||||||||||||
GeoCarb | 3 | $ 181 | $ 171 | ||||||||||||||||||||||||||||
GOLD | 3 | $ 74 | $ 64 | ||||||||||||||||||||||||||||
IXPE | 3 | $ 205 | $ 189 | ||||||||||||||||||||||||||||
JUICE | 3 | $ 119 | $ 103 | ||||||||||||||||||||||||||||
Landsat 9 | 2 | $ 928 | $ 851 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | |||||||||||||||||||||||||||
Lucy | 2 | $ 984 | $ 914 | ||||||||||||||||||||||||||||
Psyche | 2 | $ 957 | $ 907 | ||||||||||||||||||||||||||||
TROPICS | 3 | $ 30 | $ 30 | ||||||||||||||||||||||||||||
MAIA | 3 | $ 178 | $ 150 | ||||||||||||||||||||||||||||
Cost Estimate Deltas - KDP-A to KDP-B | COST Growth () | |||||||||||||||||||
Mission | Estimate | KDP-A | KDP-B | Notes | of Pp | Low (MA) | High (ABC) | |||||||||||||
SOC | High | $ 243 | 745 | $ 424 | Category I | 4 | 127 | 172 | ||||||||||||
Low | $ - 0 | $ 371 | Category II | 5 | -01 | 199 | ||||||||||||||
Orion | High | $ 6391 | 610 | $ 10288 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | Category III | 4 | 00 | 01 | |||||||||||
Low | $ - 0 | $ 8534 | ||||||||||||||||||
SMAP | High | $ 514 | 263 | $ 649 | ||||||||||||||||
Low | $ - 0 | $ - 0 | ||||||||||||||||||
SPP | High | $ 1300 | 107 | $ 1439 | ||||||||||||||||
Low | $ 1000 | 233 | $ 1233 | |||||||||||||||||
JASON-3 | High | $ 159 | 44 | $ 166 | ||||||||||||||||
Low | $ - 0 | $ 158 | ||||||||||||||||||
SAGE-III | High | $ 112 | 27 | $ 115 | ||||||||||||||||
Low | $ - 0 | $ 104 | ||||||||||||||||||
SWOT | High | $ 752 | 07 | $ 757 | ||||||||||||||||
Low | $ 642 | 08 | $ 647 | |||||||||||||||||
Mars 2020 | High | $ 2350 | 00 | $ 2351 | ||||||||||||||||
Low | $ 2140 | 21 | $ 2186 | |||||||||||||||||
NISAR | High | $ 808 | 00 | $ 808 | ||||||||||||||||
Low | $ 718 | 00 | $ 718 | |||||||||||||||||
Euclid | High | $ 110 | 00 | $ 110 | Combined KDP-AB so no change possible | |||||||||||||||
Low | $ 100 | 00 | $ 100 | |||||||||||||||||
GRACE Follow On | High | $ 470 | -21 | $ 460 | ||||||||||||||||
Low | $ 409 | -12 | $ 404 | |||||||||||||||||
SLS | High | $ 8855 | -30 | $ 8587 | ||||||||||||||||
Low | $ - 0 | $ 7653 | ||||||||||||||||||
LADEE | High | $ 214 | -65 | $ 200 | ||||||||||||||||
Low | $ - 0 | $ 184 | ||||||||||||||||||
ProgramProject Name | Category | KDP A to B analysis (13 missions) | |||||||||||||||
ASTRO-H | 3 | ASTRO-Hreg | 3 | bull13 Missions KDP-B Data Unavailable | |||||||||||||
CYGNSS | 3 | CYGNSS | 3 | bull7 Missions KDP-Crsquos have not yet occurred | |||||||||||||
DSCOVR | 3 | DSCOVR | 3 | ||||||||||||||
C | ECOSTRESS | 3 | ECOSTRESS | 3 | |||||||||||||
EUCLID | 3 | EUCLIDreg | 3 | Euclid | |||||||||||||
C | GEDI | 3 | GEDI | 3 | |||||||||||||
GOES-R | 1 | GOES-R | 1 | ||||||||||||||
GOLD | 3 | GOLD | 3 | ||||||||||||||
GPM | 2 | GPM | 2 | ||||||||||||||
GRACE-FO | 2 | GRACE-FO | 2 | GRACE Follow On | |||||||||||||
GSDO | 1 | GSDO | 1 | ||||||||||||||
ICESat-2 | 1 | ICESat-2reg | 1 | ||||||||||||||
ICON | 2 | ICON | 2 | ||||||||||||||
InSight | 2 | InSight | 2 | ||||||||||||||
IRIS | 3 | IRIS | 3 | ||||||||||||||
Jason-3 | 3 | Jason-3 | 3 | JASON-3 | |||||||||||||
JPSS-1 | 1 | JPSS-1 | 1 | ||||||||||||||
JWST | 1 | JWSTreg | 1 | ||||||||||||||
LADEE | 2 | LADEEreg | 2 | LADEE | |||||||||||||
C | LCRD | 3 | LCRD | 3 | |||||||||||||
LDCM | 2 | LDCMreg | 2 | ||||||||||||||
LDSD | 3 | LDSD | 3 | ||||||||||||||
C | Mars 2020 | 1 | Mars 2020 | 1 | Mars 2020 | ||||||||||||
MAVEN | 2 | MAVEN | 2 | ||||||||||||||
MMS | 1 | MMS | 1 | ||||||||||||||
MOMA | 3 | MOMA | 3 | ||||||||||||||
MSL | 1 | MSL | 1 | ||||||||||||||
NICER | 3 | NICER | 3 | ||||||||||||||
C | NISAR | 2 | NISAR | 2 | NISAR | ||||||||||||
NuSTAR | 3 | NuSTARreg | 3 | ||||||||||||||
OCO-2 | 2 | OCO-2 | 2 | ||||||||||||||
C | OCO-3 | 3 | OCO-3 | 3 | |||||||||||||
ORION | 1 | ORION | 1 | Orion | |||||||||||||
OSIRIS Rex | 1 | OSIRIS Rexreg | 1 | ||||||||||||||
SAGE III | 3 | SAGE III | 3 | SAGE-III | |||||||||||||
SGSS | 1 | SGSSreg | 1 | ||||||||||||||
SLS | 1 | SLS | 1 | SLS | |||||||||||||
SMAP | 2 | SMAPreg | 2 | SMAP | |||||||||||||
SOC | 2 | SOC | 2 | SOC | |||||||||||||
SOFIA | 1 | SOFIA | 1 | ||||||||||||||
PSP | 1 | PSP | 1 | PSP | |||||||||||||
C | SWOT | 2 | SWOT | 2 | SWOT | ||||||||||||
TEMPO | 3 | TEMPO | 3 | ||||||||||||||
TESS | 2 | TESS | 2 | ||||||||||||||
Clipper | |||||||||||||||||
DART | |||||||||||||||||
PACE | |||||||||||||||||
Restore-L | |||||||||||||||||
XARM |
Statistics | COST Growth ($M) | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Average | 9 | 9 | 43 | 61 | 136 | 070 | ||||||||
Median | 5 | 6 | 20 | 45 | 112 | 034 | ||||||||
Standard Deviation | 14 | 16 | 73 | 83 | 93 | 081 | ||||||||
Variance | 2 | 3 | 535 | 685 | 871 | 066 | ||||||||
Minimum | -9 | -8 | (71) | (31) | 15 | - 0 | ||||||||
Maximum | 38 | 53 | 244 | 315 | 345 | 242 | ||||||||
no JWST | ||||||||||||||
Statistics | ||||||||||||||
COST Growth | Schedule Growth (months) | Duration (months) | ||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 18 | 17 | 118 | 131 | 1989 | 065 | ||||||||
Median | 20 | 17 | 101 | 132 | 19167 | 0582 | ||||||||
Standard Deviation | 16 | 19 | 105 | 117 | 11557 | 0830 | ||||||||
Sample Variance | 3 | 4 | 1101 | 1377 | 133562 | 0688 | ||||||||
Minimum | -6 | -5 | - 0 | - 0 | 397 | - 0 | ||||||||
Maximum | 46 | 48 | 284 | 274 | 4527 | 310 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 20 | 21 | 156 | 159 | 2031 | 075 | ||||||||
Median | 21 | 20 | 132 | 147 | 20783 | 0589 | ||||||||
Standard Deviation | 17 | 25 | 174 | 155 | 11214 | 0881 | ||||||||
Sample Variance | 3 | 6 | 3035 | 2394 | 125751 | 0776 | ||||||||
Minimum | -6 | -5 | 00 | 00 | 40 | - 0 | ||||||||
Maximum | 48 | 78 | 649 | 528 | 453 | 31 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 4 | 3 | 47 | 136 | 253 | 054 | ||||||||
Median | 9 | 9 | 61 | 132 | 24333 | 042 | ||||||||
Standard Deviation | 10 | 12 | 52 | 56 | 6657 | 022 | ||||||||
Sample Variance | 1 | 1 | 273 | 311 | 44310 | 005 | ||||||||
Minimum | -7 | -11 | (10) | 82 | 1923 | 041 | ||||||||
Maximum | 11 | 11 | 92 | 193 | 3243 | 079 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | ||||||||||||
of Pp | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | ||||||||||
Category I | 6 | 4 | 4 | 22 | 78 | |||||||||
Category II | 9 | 8 | 13 | 71 | 83 | |||||||||
Category III | 8 | 6 | 11 | 28 | 52 | |||||||||
Timeline | Total Programs | 46 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDB C for comaprison | planned | Total Replans | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statictics - PresentFinal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 41416 | 14 | 9 | 9 | 8 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | |||||||||||||||||||||||||||||||||||||
ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||
ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 758 | Feb-16 | 759 | Mar-16 | FY16Q2 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -5 | -10 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||
CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 1595 | Oct-16 | 1742 | May-17 | FY16Q2 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -4 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | ||||||||||||||||||||||||||||||||||||||||
EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 179 | Dec-21 | 190 | Dec-22 | FY16Q2 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 0 | 00 | 5787 | 5480 | |||||||||||||||||||||||||||||||||||||||
GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | ||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 108295 | Oct-16 | kDP-D Sep-14 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | ||||||||||||||||||||||||||||||||||||||||||||||
GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||
GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q2 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -1 | -3 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||
GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4079 | Aug-17 | 4318 | Feb-18 | FY16Q2 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | -00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ESD | GSDO | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 26336 | Jun-18 | 28129 | Nov-18 | FY16Q2 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 9916 | Oct-17 | 10636 | Jun-18 | FY16Q2 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 232 | Jun-17 | 2527 | Oct-17 | FY16Q2 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 1 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Planetary | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | 6536 | Mar-16 | 6751 | Mar-16 | FY16Q2 | N | N | 0 | 0 | 4 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E draft | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||
JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||
LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||
Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
LDCM | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
LDCMreg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 8501 | Feb-13 | 8568 | Feb-13 | FY15Q4 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | ||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||
Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||
MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 598 | Nov-13 | 600 | Nov-13 | FY16Q1 | N | N | 0 | 0 | -7 | -11 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1121 | Sep-15 | 1121 | Sep-15 | FY16Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 11 | 4 | 1320 | 613 | |||||||||||||||||||||||||||||||||||||||||
MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 904 | Jul-18 | 1004 | Jul-18 | FY16Q2 | N | N | 0 | 0 | -1 | -1 | 3347 | 3347 | |||||||||||||||||||||||||||||||||||||||||||||||||
MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||
NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 684 | Feb-17 | 67 | Feb-17 | KDP-D Jan-16 | N | N | 0 | 0 | 9 | -2 | 613 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||
NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||
NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 166 | Jun-12 | 166 | Jun-12 | FY14Q4 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | 3 | 3 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||
OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4276 | Jul-14 | 4276 | Jul-14 | FY16Q2 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -2 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||
OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ORION | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | 108098 | Aug-21 | 112835 | Apr-23 | FY16Q2 | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 10014 | Oct-16 | 10572 | Oct-16 | FY16Q2 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 1 | -1 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13931 | Aug-18 | 15534 | Aug-18 | FY16Q2 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 1265 | Aug-16 | 133 | Aug-16 | FY16Q2 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 20 | 19 | 2437 | 2437 | |||||||||||||||||||||||||||||||||||||||||
SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||
SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1216 | Jul-19 | 1228 | Sep-19 | PPBE18 PMR | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 2 | 2 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ESD | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||
SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | May-15 | 8899 | May-15 | FY16Q2 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 707 | 203 | |||||||||||||||||||||||||||||||||||||||||
SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 2892 | Oct-18 | 3789 | Oct-18 | FY16Q2 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -27 | -13 | 2127 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
SOFIA (Budget) | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 29048 | Feb-14 | 29122 | Feb-14 | FY16Q2 | Budget Reduction | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||
TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 1809 | Sep-17 | 2178 | Nov-17 | FY16Q2 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 31976 | Dec-17 | 3517 | Jun-18 | FY16Q2 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -7 | -7 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Currently in B | Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CLARREO-PF | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DART | KDP-C in July | Mean | 13 | -13 | 55 | 28 | 1729 | 115 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Europa Clipper | 02045454545 | Median | 17 | -06 | 21 | 00 | 17483 | 0862 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GeoCarb | Standard Deviation | 84 | 68 | 88 | 87 | 10875 | 0863 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IXPE | Minimum | -27 | -13 | 00 | -72 | 397 | 050 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lucy | Maximum | 20 | 19 | 335 | 335 | 4527 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MAIA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PACE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Psyche | Paste data from above to this table for analysis | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Restore-L | -27 | -13 | 2127 | - 0 | 1610 | 050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SOC Replan | Breach notification made DM not yet final | -7 | -7 | - 0 | - 0 | 080 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TROPICS | -7 | -11 | - 0 | - 0 | 817 | 060 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
XARM | -5 | -10 | 307 | - 0 | 867 | 088 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -9 | - 0 | (717) | 2767 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -8 | 717 | 717 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -3 | - 0 | (400) | 510 | 058 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -9 | 207 | (400) | 800 | 099 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -1 | 3347 | 3347 | 2240 | 205 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -1 | - 0 | - 0 | 397 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -01 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | - 0 | - 0 | 1053 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | 407 | 1020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | -3 | 707 | 203 | 2577 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | 00 | - 0 | - 0 | 2777 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 00 | - 0 | - 0 | 1887 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | 3 | 710 | 403 | 1167 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | -4 | - 0 | - 0 | 1983 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 4 | 207 | (203) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 5 | - 0 | - 0 | 1917 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | 6 | 103 | - 0 | 2733 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | -2 | 613 | - 0 | 4527 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 1320 | 613 | 503 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 607 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 | 19 | 2437 | 2437 |
Timeline | Total Programs | 46 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDP C for comaprison | planned | Total Replans | 14 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statistics - PresentFinal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 72618 | 20 | 13 | 13 | 9 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 74855 | Feb-16 | 109271 | Mar-16 | FY17 Q1 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -7 | 30 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 159503 | Dec-16 | 159503 | Dec-16 | FY18 Q3 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -12 | 203 | (503) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | 51043 | Apr-18 | 52443 | Aug-19 | KDP-E May-18 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGS | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 27418 | Sep-18 | 28129 | Nov-18 | FY17 Q1 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 4 | 00 | 307 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGSreg | 1 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | 3145 | Dec-19 | 3231 | Jun-20 | Dec-17 | 5115 | 4181 | 31446 | Dec-19 | 31446 | Dec-19 | FY18 Q3 | Y | Y | Y | 16 | 15 | 1827 | 1927 | 3957 | 049 | -0 | -27 | - 0 | (610) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | APD | EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 206214 | Mar-20 | 223452 | Mar-20 | FY18 Q3 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 13 | 176 | 3653 | 2130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | 120774 | Nov-18 | 123774 | Mar-19 | FY18 Q3 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 10150 | Nov-16 | KDP-E Oct-16 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | 663 | Feb-18 | 73 | Apr-18 | KDP-E Dec-17 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16 Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8834 | Feb-14 | 8904 | Feb-14 | FY17 Q3 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -3 | -5 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4059 | May-18 | 4319 | May-18 | FY18 Q3 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | 00 | 910 | 297 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 10561 | Sep-18 | 10636 | Oct-18 | FY18 Q3 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 6 | 00 | 1117 | 407 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 243 | Jun-18 | 2527 | Jun-18 | FY18 Q3 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 6 | 00 | 1217 | 810 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSightreg | 2 | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 8189 | May-18 | 8289 | May-18 | Sep-16 | 1923 | 1538 | 8138 | May-18 | 8138 | May-18 | FY18 Q3 | Y | Y | Y | Y | 23 | 23 | 2637 | 2637 | 3050 | 086 | -1 | -18 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16 Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E Sep-16 | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | 1144 | Sep-19 | 127 | Sep-19 | KDP-C Apr-17 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16 Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTregreg | 1 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 94889 | Nov-20 | 96627 | Mar-21 | May-18 | 10639 | 8277 | 94889 | Nov-20 | 96627 | Mar-21 | FY18 Q3 | Y | Y | Y | 9 | 2940 | 8113 | 036 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15 Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | 8385 | Dec-20 | 885 | Nov-21 | FY18 Q3 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | 2571 | Jun-19 | 2627 | Nov-19 | FY18 Q3 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8 | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8reg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 85006 | Feb-13 | 85666 | Feb-13 | FY18 Q3 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15 Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | 23634 | Jul-20 | 25304 | Jul-20 | FY18 Q3 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 5753 | Nov-13 | 5753 | Nov-13 | FY16 Q3 | N | N | 0 | 0 | -11 | -14 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1098 | Mar-15 | 1098 | Mar-15 | FY18 Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 9 | 1 | 707 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 120243 | Jul-20 | 128226 | Jul-20 | FY18 Q3 | N | N | 0 | 0 | 24 | 27 | 5783 | 5783 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15 Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 694 | Jun-17 | 706 | Aug-17 | KDP-E May-17 | N | N | 0 | 0 | 10 | 3 | 1013 | 603 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | 7953 | Dec-21 | 8969 | Sep-22 | FY18 Q3 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | 0 | 00346060676 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 115315 | Jun-12 | 115315 | Jun-12 | FY15 Q1 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | -39 | -28 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4245 | Jul-14 | 4245 | Jul-14 | FY17 Q1 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -3 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | 113388 | Mar-18 | 113388 | May-18 | FY18 Q3 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orion | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orionreg | 1 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 116581 | Jun-22 | 116581 | Jun-22 | Jun-18 | 8483 | 3746 | 116581 | Jun-22 | 116581 | Jun-22 | FY18 Q3 | Y | N | 7 | 3 | 1013 | (1013) | 3347 | 030 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 9975 | Sep-16 | 10532 | Sep-16 | FY18 Q3 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 0 | -1 | (100) | (100) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13821 | Aug-18 | 15482 | Aug-18 | FY18 Q3 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -1 | -03 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 129364 | Feb-17 | 129364 | Feb-17 | FY18 Q3 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 22 | 16 | 3050 | 3050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1251 | Sep-19 | 1261284 | Nov-19 | Path Forward APMC Dec 2016 | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 4 | 4 | 223 | 267 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16 Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLSreg | 1 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 9734 | Dec-19 | 9843 | Jun-20 | Dec-17 | 1340 | 148 | 98029 | Dec-19 | 98029 | Dec-19 | FY18 Q3 | Y | Y | Y | 14 | 2 | 2433 | 1927 | 4060 | 047 | 1 | -04 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | Jan-15 | 8899 | Jan-15 | FY18 Q3 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 307 | (197) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 3433 | Feb-20 | 3866 | Feb-20 | FY18 Q3 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -7 | -11 | 3753 | 1627 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIAreg | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 15874 | Feb-14 | 15949 | Feb-14 | FY18 Q3 | Y | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | 7049 | Apr-21 | 7549 | Apr-22 | FY18 Q3 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 181242 | Sep-17 | 197242 | Nov-17 | FY18 Q3 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | -94 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 3333 | Apr-18 | 3333 | Jun-18 | FY18 Q3 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -3 | -12 | 403 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mean | 90 | 88 | 50 | 81 | 1773 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02045454545 | Median | 82 | 49 | 10 | 60 | 16233 | 0374 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Standard Deviation | 118 | 164 | 77 | 97 | 13962 | 0647 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum | -7 | -10 | -71 | -31 | 147 | - 0 | SPP | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum | 38 | 59 | 244 | 345 | 7433 | 242 | EUCLIDreg | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GSDO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Paste data from above to this table for analysis | ORION | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-7 | -10 | 607 | 817 | 1923 | 042 | SLS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-3 | -7 | - 0 | - 0 | 147 | - 0 | TEMPO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -7 | 1113 | 1113 | 1887 | 059 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
0 | -6 | - 0 | 613 | 1897 | 032 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total KDPs Within Cost Range of Prior KDP | Total KDPs Within Schedule Range of Prior KDP | -2 | -5 | 303 | 910 | 510 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | -3 | -3 | - 0 | - 0 | 503 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MALow at or below Preceding KDP Low | 14 | 31 | 45 | 31 | MALow at or below Preceding KDP Low | 27 | 26 | 53 | 51 | 6 | 0 | 410 | (100) | 1217 | 008 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABCHigh at or below Preceding KDP High | 19 | 33 | 52 | 37 | ABCHigh at or below Preceding KDP High | 21 | 32 | 53 | 40 | 0 | 0 | (203) | 403 | 167 | 242 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 2 | 810 | 307 | 500 | 061 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-B Cost | KDP-A to KDP-B Schedule | 33 | 5 | - 0 | 100 | 800 | 013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 11 | 8 | 103 | 103 | 2670 | 004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B Low at or below KDP-A Low | 4 | 10 | 14 | 29 | KDP-B Low at or below KDP-A Low | 13 | 9 | 22 | 59 | 9 | 9 | (203) | 503 | 1983 | 025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B High at or below KDP-A High | 9 | 12 | 21 | 43 | KDP-B High at or below KDP-A High | 12 | 10 | 22 | 55 | 11 | 10 | (103) | 1320 | 3243 | 041 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | 10 | 2437 | 3147 | 1610 | 195 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | 10 | 613 | 613 | 3450 | 018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B to KDP-C Cost | KDP-B to KDP-C Schedule | -2 | 11 | 813 | 603 | 1687 | 036 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 9 | 13 | 917 | 1930 | 2433 | 079 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-B Low | 10 | 21 | 31 | 32 | MA at or below KDP-B Low | 14 | 17 | 31 | 45 | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-B High | 10 | 21 | 31 | 32 | ABC at or below KDP-B High | 9 | 22 | 31 | 29 | 16 | 18 | - 0 | 607 | 707 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 31 | 1217 | 1830 | 1027 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-C Cost | KDP-A to KDP-C Schedule | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 29 | 59 | 2233 | 3450 | 7433 | 046 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-A Low | 2 | 7 | 9 | 22 | MA at or below KDP-A Low | 5 | 12 | 17 | 29 | added | 5 | 0 | - 0 | - 0 | 813 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-A High | 5 | 11 | 16 | 31 | ABC at or below KDP-A High | 3 | 14 | 17 | 18 | added | -0 | -0 | 103 | 1013 | 1017 | 100 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 7 | 4 | - 0 | - 0 | 1323 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-C (MA) | KDP-C (ABC) | Replan (MA) | Replan (ABC) | KDP-C to Replan (MA) | KDP-C to Replan (ABC) | KDP-C (or Replan) to PresentFinal (MA) | KDP-C (or Replan) to PresentFinal (ABC) | added | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Percentage of Project CostSchedule HighLow Estimates Within Prior KDP Range Estimates | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B Estimate at or below A Estimate | C Estimate at or below B Estimate | C Estimate at or below A Estimate | Total at or below Preceding KDP Estimate | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - High | 43 | 32 | 31 | 37 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - Low | 29 | 32 | 22 | 31 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - High | 55 | 29 | 18 | 40 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - Low | 59 | 45 | 29 | 51 |
LCC and Dev Cost Metrics Against Baseline
4
70 Joint Cost and Schedule ConfidenceAre we meeting the expected 70 success rate across the portfolio
bull NPR 71205Ebull ABC at 70 confidence
MA at 50 confidencebull
bull Aggregate NASA confidence at baselinebull ABC at 71 confidence
MA at 52 confidencebull
bull Actual performancebull 41 of projects met ABC commitments
30 of projects met MA commitmentsbull
bull Projects currently in Phase Dbull 20 meeting ABC commitments
0 meeting MA commitmentsbull
5
Formulation Cost and Schedule Ranges
bull
bullbull
bull
bullbull
Are we capturing the Agencyrsquos cost exposure in early estimates
In aggregate the high cost estimate is at or below the high estimate established at the preceding KDP
37 of the time for cost40 of the time for schedule
For projects that held a KDP-A the eventual KDP-C baseline cost and schedule (high estimates) are at or below the KDP-A estimate
31 of the time for cost18 of the time for schedule
6
Development Cost Metrics When Controlling for Launch Vehicle Cost Variation
28Avg LV Proportion of Dev Cost Baseline
-8Avg Post-Baseline LV Cost Variation
7
Development Cost Performance When Controlling for Launch Vehicle Cost VariationHow would our development cost reporting metrics change
Lower LV costs can provide unexpected funds to cover growth in reporting
Lower LV costs sometimes have no effect on cost reporting
Higher LV costs can mask otherwise good cost performance
8
bull NASA cost performance has drastically improved since the early 2000rsquos
We are falling short of our portfolio goal of 70 projects hitting cost targets
Our cost and schedule ranges at KDP-A and KDP-B are optimistic and more often than do not capture the eventual high cost or schedule commitments at KDP-C baseline
Development cost reporting metrics can misrepresent how our projects are performing (both positively and negatively) if the LV contract award is well above or below the estimate included in the KDP-C baseline
bull
bull
bull
9
Back-up
10
1111
1212
Total KDPs Within Cost Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 14 31 45 31ABCHigh at or below Preceding KDP High 19 33 52 37
Total KDPs Within Schedule Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 27 26 53 51ABCHigh at or below Preceding KDP High 21 32 53 40
KDP-A to KDP-B CostYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 4 10 14 29KDP-B High at or below KDP-A High 9 12 21 43
KDP-A to KDP-B ScheduleYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 13 9 22 59KDP-B High at or below KDP-A High 12 10 22 55
KDP-B to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-B Low 10 21 31 32ABC at or below KDP-B High 10 21 31 32
KDP-B to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-B Low 14 17 31 45ABC at or below KDP-B High 9 22 31 29
KDP-A to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-A Low 2 7 9 22ABC at or below KDP-A High 5 11 16 31
KDP-A to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-A Low 5 12 17 29ABC at or below KDP-A High 3 14 17 18
COST ($M)
KDP-C to Replan (MA)595000000000000281704999999999999750000000000000014025429999999999993-178400000000000095115-85999999999999943826-25999999999996248E-200911-518999999999999773-1220000000000004531770000000000005117000000000000176266192299999999999951671-2800000000000011401112644044106389999999999965159999999999999425999999999999972-1246900000000005125710000000000002140107999999999999551896472000000000000171666999999999998263820000000000005922000000000000459114748445624775539999999999999103258999999999999811180000000000001939999999999999151167299999999999384830000000000109-33599999999999909-5550000000000011416020000000000005-3200000000000002831553639000000000000974113401372999999999999515260000000000002-5800000000000011429476-180455789999999999997710099999999999994-76000000000000227KDP-C to Replan (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS59500000000000028211499999999999918399999999999977392842000000000001592E-2-3084000000000000941809999999999991-8599999999999994344599999999999994-46999999999997044E-210860399999999999994316E-2978-45-281000000000000238420000000000004520329999999999995419999999999998866751153799999999999951802-108000000000000111623851847387182770000000000073628999999999999770-4297100000000000423299999999999983142-039999999999997726203338000000000000119256712921999999999999321011613781300000000000186840000000000000658600000000000023553999999999999910349911780000000000001329999999999999729948999999999996437460000000000036-88599999999999909-5720000000000004511440000000000009-32000000000000028235100000000000023453000000000000711081481372999999999999503989999999999997729551-18045-210000000000002270-21600000000000023
COST Change ($M)
B to C (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS01047535211267606203370517928286851448611111111110973E-2075077759107650046E-4-98804985102361215E-201486366383447687-7818181818181813E-2030674002751031632-37226838174140057E-4013440860215052999E-30-46012269938650305E-2-61086956521739177E-201085051546391753202363403859567541916901408450704179E-200227818101022070730-65060240963855487E-2071729957805907171E-20592556945781199880779814665592264319368421052631587E-20314499999999999890-4630495689655173E-288694328130947783E-2017749999999999999-42462845010613295E-400166502463054187263934495959166312E-2093093699515347267E-200048437693738375709067597185373168792E-20526615969581748940003366676193198057128745644599303111E-296699259374453242E-233198918775202764E-2-732231404958677E-2-5100766898519711E-279499652536483736E-2-27777777777777801E-203746613545816733204003014143287735301290322580645161315265600825167612E-20176206365503080030010075757575757570-061063923386687424-27818254073387508E-30-54000000000000055E-2
COST Change ()
Cost - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate04285714285714285503225806451612903103125036538461538461536Schedule - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate054545454545454541029032258064516131017647058823529413039622641509433965Cost - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate02857142857142857032258064516129031022222222222222221031111111111111112Schedule - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate059090909090909094045161290322580644029411764705882354050943396226415094
High Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (high)01682251932581422Category 2 Change (high)60501935980863335E-2Category 3 Change (high)37110484780157868E-2Total Change (high)014626442296281486
Low Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (low)010106870229007633Category 2 Change (low)19806591564406897Category 3 Change (low)0Total Change (low)21873131670301591
KDP-A to KDP-B Schedule Growth - Low Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion0-9-49-2-1-100000200912326273242
KDP-A to KDP-B Schedule Growth - High Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion-36-8-8-3-2-1-1000002569121726414451
Cost Variation Against Baselines
13
Methodology and Assumptions
The first step in conducting this analysis was to verify and validate the cost baseline information using source documentation KDP-C figures takes priority as the definitive baseline Where KDP-C decision memoranda was not available as in the case of many projects baselined prior to approximately 2009 figures were pulled from the first appearance as a development project in a Presidentrsquos Budget as the baseline against which to measure In a few cases notificationsreports to Congress (eg NSPD-49 reports) were used to identify a baseline figure MA figures were pulled solely from decision memoranda and thus our dataset with regard to MArsquos is smaller as it excludes many of the older projects that did not have standardized baseline documentation with MArsquos noted Variance to the baseline was then measured by using the most recent quarterly cost and schedule report Latest cost data is valid through the FY18 Q3 reporting period Slide 3 charts illustrate each project in the dataset with respective LCC and dev cost variances
The confidence level policy applied to each project was noted using source documentation as well as a cross-reference against when policy changes were implemented recognizing that a subset of projects received waivers to new policies during policy transition Certain exclusions were applied to ensure a dataset comparable across projects For example SOFIA had conducted a JCL on a replan but the decision memorandum made clear the baseline was not changing therefore the JCL confidence level could not fairly be applied to measure performance against the baseline Another example is GPM which was excluded as it was one of the very first projects baselined after JCL policy implementation and was not a ldquotruerdquo JCL with the decision memorandum noting that the intent was met while a JCL DPMC would be held many months later to evaluate progress There were a couple of additional exclusions applied
When a project is confirmed at KDP-C cost performance measurements were applied to that baseline If a project was then rebaselined a ldquonewrdquo project was added to the dataset using the rebaselined figures against which to measure as the Agency made the decision at that point to press ahead with the project and Congress provided reauthorization The ldquooriginalrdquo project was ldquofrozenrdquo in terms of development phase to fairly capture the contemporary phase performance (eg the ldquooriginalrdquo OCO-2 cost growth will always be categorized within the ldquoprojects in developmentrdquo performance category while the rebaselined OCO-2 cost performance falls into the ldquoprojects launchedrdquo category) The latest cost figures however were used to measure cost performance across both original baselines and rebaselines in order to fairly capture the accuracy of original estimates against final outcomes
This insight while placing an emphasis on the JCL while measuring performance does not intend to convey a discovered causal relationship between JCL and cost performance There have been many other related programmatic and technical advancements over the past 10 to 20 years that have influenced cost and schedule performance in the overall positive direction Other insights look into other influencers of costschedule performance
13
Dev Cost Metrics Controlling for LV Cost Variation
14
Methodology and Assumptions
SID pulled a number of data elements from a total of 22 SMD projects to conduct this analysis Data elements from a projectrsquos baseline include total development cost and the launch services cost estimate and have been sourced from KDP documentation quarterly reports and Cost Analysis Data Requirements (CADREs) These data were compared to currentactual total development and launch services costs from the most recent KDPquarterly reports Other data elements include Division Lead Center type of launch vehicle LCC category and current phase
SID calculated the overall development cost deltas from the baseline cost and verified the percentage growth with external reporting data where applicable SID then calculated the percent change in launch services development cost from baseline to currentactual The development cost percent change was calculated after removing launch services from the inputs
For further insight these same calculations were conducted by Division Lead Center type of launch vehicle and LCC category Division Lead Center and LCC category were then further broken down by looking only at projects currently in development
The 22 projects used in this analysis include Mars 2020 ICESat-2 ICON InSight SOC PSP SWOT TESS Juno Landsat-8 MMS OSIRIS-REx SMAP MAVEN GRAIL NuSTAR RBSP IRIS LADEE OCO-2 CYGNSS and Landsat 9 Representation includes seven planetary science seven earth science six heliophysics and two astrophysics missions twelve GSFC-led projects and eight JPL-led projects (LaRC and ARC representing the other two) ten Atlas V one Delta IV-H two Falcon 9 four Delta II four Pegasus and one Minotaur V rockets and six category 1 thirteen category 2 and three category 3 projects Seven projects assessed are currently in development
Other projects considered were excluded if launch was or is to be on a ride-share and launch services costs were negligible (eg RBI) Projects launching on internationally-contributed rockets were also excluded (eg GPM JWST) Other exclusions were based on data limitations at the time of analysis (eg no launch services costs available from baseline)
Did not add GPM international launchSOFIA no launchJWST international launch
RBI rideshareSentinel-6 international launch
Dawn no launch vehicle numbers availableSNPP No baseline LV estimate available
NISAR international launchLCRD rideshare
GRACE-FO rideshare
14
Formulation KDPs
15
Methodology and Assumptions
Comparative analysis was conducted where possible (ie when highlow costschedule figures were available in KDP-ABC decision memoranda This analysis does not attempt to explain why the majority of costschedule estimates at KDPrsquos exceed prior estimates
Cost and schedule ranges were extracted from KDP-A and KDP-B decision memoranda Agency Baseline Commitments and Management Agreements were extracted from KDP-C decision memoranda Lifecycle cost was used in all cases (as opposed to development cost only) A project did not need to have all KDP-A through C figures to be included in the analysis (eg a project that did not have a KDP-A range was still included in the KDP-B to KDP-C statistics)
This analysis includes data from KDP-A KDP-B and KDP-C milestones At KDP-A and KDP-B a high and low estimate is established for both cost and schedule At KDP-C a Management Agreement and an Agency Baseline Commitment is established for both cost and schedule For ease of conveyance this analysis equates the Management Agreement as the low estimate for KDP-C and equates the Agency Baselines Commitment as the high estimate for KDP-C
15
Column1 | KDP-C Date | Lead Center | Division | Launch Vehicle | LCC Category | Phase | Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | Notes | |||||||||||||||||
Juno | Aug-08 | JPL | Planetary | Atlas V | 1 | Ops | $ 7423 | $ 7089 | $ 1904 | $ 1817 | $ 5519 | $ 5272 | -45 | -46 | -45 | ||||||||||||||||||
RBSP | Dec-08 | GSFC | Helio | Atlas V | 2 | Ops | $ 5338 | $ 5040 | $ 1336 | $ 1324 | $ 4002 | $ 3716 | -56 | -09 | -71 | ||||||||||||||||||
GRAIL | Jan-09 | JPL | Planetary | Delta II | 2 | Ops | $ 4270 | $ 3983 | $ 1528 | $ 1508 | $ 2742 | $ 2475 | -67 | -13 | -97 | ||||||||||||||||||
MMS | Jun-09 | GSFC | Helio | Atlas V | 1 | Ops | $ 8573 | $ 8753 | $ 1942 | $ 1788 | $ 6631 | $ 6965 | 21 | -79 | 50 | ||||||||||||||||||
NuSTAR | Sep-09 | JPL | Astro | Pegasus | 3 | Ops | $ 1099 | $ 1162 | $ 358 | $ 332 | $ 741 | $ 830 | 57 | -73 | 120 | ||||||||||||||||||
Landsat-8 | Dec-09 | GSFC | Earth | Atlas V | 2 | Ops | $ 5830 | $ 5028 | $ 1264 | $ 1218 | $ 4566 | $ 3810 | -138 | -36 | -166 | ||||||||||||||||||
LADEE | Aug-10 | ARC | Planetary | Minotaur V | 2 | Ops | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||
OCO-2 | Sep-10 | JPL | Earth | Delta II | 2 | Ops | $ 2490 | $ 3200 | $ 676 | $ 1368 | $ 1814 | $ 1832 | 285 | 1024 | 10 | against original baseline rebaseline primary LV-driven aside from some RWA issues | |||||||||||||||||
MAVEN | Oct-10 | GSFC | Planetary | Atlas V | 2 | Ops | $ 5672 | $ 4720 | $ 1870 | $ 1541 | $ 3802 | $ 3179 | -168 | -176 | -164 | ||||||||||||||||||
IRIS | Nov-10 | GSFC | Helio | Pegasus | 3 | Ops | $ 1407 | $ 1430 | $ 404 | $ 426 | $ 1003 | $ 1004 | 16 | 54 | 01 | ||||||||||||||||||
SMAP | May-12 | JPL | Earth | Delta II | 2 | Ops | $ 4857 | $ 4543 | $ 1319 | $ 1201 | $ 3538 | $ 3342 | -65 | -89 | -55 | ||||||||||||||||||
SOC | Mar-13 | GSFC | Helio | Atlas V | 2 | Dev | $ 3769 | $ 3100 | $ 2500 | $ 1727 | $ 1269 | $ 1373 | -178 | -309 | 82 | ||||||||||||||||||
OSIRIS-REx | May-13 | GSFC | Planetary | Atlas V | 1 | Ops | $ 7786 | $ 6156 | $ 2340 | $ 1888 | $ 5446 | $ 4268 | -209 | -193 | -216 | ||||||||||||||||||
CYGNSS | Feb-14 | LaRC | Earth | Pegasus | 3 | Ops | $ 1511 | $ 1287 | $ 523 | $ 623 | $ 988 | $ 664 | -148 | 191 | -328 | ||||||||||||||||||
InSight | Mar-14 | JPL | Planetary | Atlas V | 2 | Ops | $ 5418 | $ 6483 | $ 1599 | $ 1685 | $ 3819 | $ 4798 | 197 | 54 | 256 | ||||||||||||||||||
PSP | Mar-14 | GSFC | Helio | Delta IV-H | 1 | Dev | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||
ICESat-2 | May-14 | GSFC | Earth | Delta II | 1 | Dev | $ 7637 | $ 7441 | $ 1188 | $ 1183 | $ 6449 | $ 6258 | -26 | -04 | -30 | ||||||||||||||||||
ICON | Oct-14 | GSFC | Helio | Pegasus | 2 | Dev | $ 1960 | $ 1982 | $ 543 | $ 563 | $ 1417 | $ 1419 | 11 | 37 | 01 | ||||||||||||||||||
TESS | Oct-14 | GSFC | Astro | Falcon 9 | 2 | Ops | $ 3232 | $ 2799 | $ 1141 | $ 874 | $ 2091 | $ 1925 | -134 | -234 | -79 | ||||||||||||||||||
SWOT | May-16 | JPL | Earth | Falcon 9 | 2 | Dev | $ 5715 | $ 5715 | $ 1313 | $ 1078 | $ 4402 | $ 4638 | 00 | -179 | 53 | ||||||||||||||||||
Mars 2020 | Jun-16 | JPL | Planetary | Atlas V | 1 | Dev | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||
Landsat 9 | Dec-17 | GSFC | Earth | Atlas V | 2 | Dev | $ 6342 | $ 6342 | $ 1544 | $ 1542 | $ 4798 | $ 4800 | 00 | -01 | 00 | ||||||||||||||||||
Projects in Development | $ 52749 | $ 52336 | $ 14819 | $ 12738 | $ 37930 | $ 39598 | -08 | -140 | 44 | ||||||||||||||||||||||||
Projects in Operations | $ 66588 | $ 63555 | $ 18647 | $ 18196 | $ 47941 | $ 45359 | -46 | -24 | -54 | ||||||||||||||||||||||||
Total | $ 119337 | $ 115891 | $ 33466 | $ 30935 | $ 85871 | $ 84956 | -29 | -76 | -11 | ||||||||||||||||||||||||
Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | |||||||||||||||||||||||||
GSFC Project Total | $ 68103 | $ 63294 | $ 20377 | $ 18325 | $ 47726 | $ 44969 | -71 | -101 | -58 | ||||||||||||||||||||||||
JPL Projects Total | $ 48041 | $ 49428 | $ 12122 | $ 11384 | $ 35919 | $ 38044 | 29 | -61 | 59 | ||||||||||||||||||||||||
Did not add | GPM | international launch | GSFC Projects in Ops | $ 37838 | $ 33926 | $ 10297 | $ 9059 | $ 27541 | $ 24867 | -103 | -120 | -97 | |||||||||||||||||||||
SOFIA | no launch | JPL Projects in Ops | $ 25557 | $ 26460 | $ 7384 | $ 7911 | $ 18173 | $ 18549 | 35 | 71 | 21 | ||||||||||||||||||||||
JWST | international launch | GSFC Projects in Dev | $ 30265 | $ 29368 | $ 10080 | $ 9266 | $ 20185 | $ 20102 | -30 | -81 | -04 | ||||||||||||||||||||||
RBI | rideshare | JPL Projects in Dev | $ 22484 | $ 22968 | $ 4738 | $ 3473 | $ 17746 | $ 19495 | 22 | -267 | 99 | ||||||||||||||||||||||
Sentinel-6 | international launch | ||||||||||||||||||||||||||||||||
Dawn | no launch vehicle numbers available | Astro | $ 4331 | $ 3961 | $ 1499 | $ 1206 | $ 2832 | $ 2755 | -85 | -195 | -27 | ||||||||||||||||||||||
SNPP | No baseline LV estimate available | Planetary | $ 49020 | $ 47566 | $ 13109 | $ 11437 | $ 35911 | $ 36129 | -30 | -128 | 06 | ||||||||||||||||||||||
NISAR | international launch | Helio | $ 31604 | $ 30808 | $ 11030 | $ 10078 | $ 20574 | $ 20730 | -25 | -86 | 08 | ||||||||||||||||||||||
LCRD | rideshare | Earth | $ 34382 | $ 33556 | $ 7827 | $ 8213 | $ 26555 | $ 25343 | -24 | 49 | -46 | ||||||||||||||||||||||
GRACE-FO | rideshare | ||||||||||||||||||||||||||||||||
Astro - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
Planetary - Dev Only | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||||||||
Helio - Dev Only | $ 16286 | $ 15585 | $ 7348 | $ 6540 | $ 8938 | $ 9045 | -43 | -110 | 12 | ||||||||||||||||||||||||
Earth - Dev Only | $ 19694 | $ 19498 | $ 4045 | $ 3803 | $ 15649 | $ 15695 | -10 | -60 | 03 | ||||||||||||||||||||||||
Atlas V | $ 72920 | $ 69964 | $ 19725 | $ 16926 | $ 53195 | $ 53038 | -41 | -142 | -03 | ||||||||||||||||||||||||
Delta IV-H | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||||||||
Falcon 9 | $ 8947 | $ 8514 | $ 2454 | $ 1952 | $ 6493 | $ 6562 | -48 | -205 | 11 | ||||||||||||||||||||||||
Delta II | $ 19254 | $ 19167 | $ 4711 | $ 5260 | $ 14543 | $ 13907 | -05 | 117 | -44 | this is skewed by OCO-2 which switched from the baseline Taurus XL to the Delta-II at the rebaseline | |||||||||||||||||||||||
Pegasus | $ 5977 | $ 5861 | $ 1828 | $ 1944 | $ 4149 | $ 3917 | -19 | 63 | -56 | ||||||||||||||||||||||||
Minotaur V | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||||||||
Category 1 | $ 58745 | $ 57195 | $ 15104 | $ 13322 | $ 43641 | $ 43873 | -26 | -118 | 05 | ||||||||||||||||||||||||
Category 2 | $ 56575 | $ 54817 | $ 17076 | $ 16232 | $ 39499 | $ 38585 | -31 | -49 | -23 | ||||||||||||||||||||||||
Category 3 | $ 4017 | $ 3879 | $ 1285 | $ 1381 | $ 2732 | $ 2498 | -34 | 75 | -86 | ||||||||||||||||||||||||
Category 1 - Dev Only | $ 34963 | $ 35197 | $ 8918 | $ 7829 | $ 26045 | $ 27368 | 07 | -122 | 51 | ||||||||||||||||||||||||
Category 2 - Dev Only | $ 17786 | $ 17139 | $ 5900 | $ 4909 | $ 11886 | $ 12230 | -36 | -168 | 29 | ||||||||||||||||||||||||
Category 3 - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
LV of Total Dev at Baseline | 280 | ||||||||||||||||||||||||||||||||
LV of Total Dev at FY18 Q3 | 267 | ||||||||||||||||||||||||||||||||
Launch Vehicle Percent Cost Variation from Baseline Estimate in Chronological Order |
Mission | LCC Category | KDP-A (low) | KDP-A (high) | KDP-B (low) | KDP-B (high) | Low Delta (months) | High Delta (months) | KDP-C MA | MA Variance from A | KDP-C ABC | ABC Variance from A | |||||||||||||||
Restore-L | 2 | Jun-20 | Dec-23 | Jun-20 | Dec-20 | 0 | -36 | |||||||||||||||||||
SLS | 1 | Dec-17 | Dec-17 | Mar-17 | Apr-17 | -9 | -8 | Dec-17 | 0 | Nov-18 | 11 | |||||||||||||||
PACE | 2 | Dec-22 | Dec-23 | Aug-22 | Apr-23 | -4 | -8 | |||||||||||||||||||
WFIRST | 1 | Dec-24 | Dec-26 | Sep-25 | Sep-26 | 9 | -3 | |||||||||||||||||||
OCO-3 | 3 | Sep-16 | Dec-16 | Jul-16 | Oct-16 | -2 | -2 | Mar-18 | 18 | May-18 | 17 | |||||||||||||||
PSP | 1 | Aug-18 | Aug-18 | Jul-18 | Jul-18 | -1 | -1 | Aug-18 | 0 | Aug-18 | 0 | |||||||||||||||
LCRD | 2 | Mar-17 | Mar-17 | Feb-17 | Feb-17 | -1 | -1 | Jun-19 | 27 | Nov-19 | 32 | |||||||||||||||
Euclid | 3 | Dec-14 | Dec-14 | Dec-14 | Dec-14 | 0 | 0 | May-15 | 5 | May-16 | 17 | |||||||||||||||
GRACE-FO | 2 | Aug-17 | Aug-17 | Aug-17 | Aug-17 | 0 | 0 | Aug-17 | 0 | Feb-18 | 6 | |||||||||||||||
Mars 2020 | 1 | Jul-20 | Jul-20 | Jul-20 | Jul-20 | 0 | 0 | Jul-20 | 0 | Jul-20 | 0 | |||||||||||||||
SAGE-III | 3 | Aug-14 | Aug-14 | Aug-14 | Aug-14 | 0 | 0 | Aug-14 | 0 | Aug-14 | 0 | |||||||||||||||
SWOT | 2 | Oct-20 | Oct-20 | Oct-20 | Oct-20 | 0 | 0 | Apr-21 | 6 | Apr-22 | 18 | |||||||||||||||
LADEE | 3 | Mar-12 | Mar-12 | May-12 | May-12 | 2 | 2 | May-13 | 14 | Nov-13 | 20 | |||||||||||||||
DART | 2 | Dec-20 | Dec-20 | Dec-20 | May-21 | 0 | 5 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | ||||||||||||||||||
NISAR | 2 | Dec-20 | Dec-21 | Dec-20 | Jun-22 | 0 | 6 | Dec-21 | 12 | Sep-22 | 9 | |||||||||||||||
JASON-3 | 3 | Jul-13 | Jul-13 | Apr-14 | Apr-14 | 9 | 9 | Mar-15 | 20 | Mar-15 | 20 | |||||||||||||||
MMS | 1 | Oct-13 | Oct-13 | Oct-14 | Oct-14 | 12 | 12 | Aug-14 | 10 | Mar-15 | 17 | |||||||||||||||
ECOSTRESS | 3 | May-17 | Mar-18 | Aug-17 | Aug-19 | 3 | 17 | Aug-17 | 3 | Aug-19 | 17 | |||||||||||||||
SMAP | 2 | Mar-13 | Mar-13 | May-15 | May-15 | 26 | 26 | Oct-14 | 19 | Mar-15 | 24 | |||||||||||||||
XARM | 3 | Oct-19 | Oct-19 | Jan-22 | Mar-23 | 27 | 41 | |||||||||||||||||||
SOC | 2 | Apr-15 | Apr-15 | Dec-17 | Dec-18 | 32 | 44 | Jan-17 | 21 | Oct-18 | 42 | |||||||||||||||
Orion | 1 | Dec-17 | Dec-17 | Jun-21 | Mar-22 | 42 | 51 | Aug-21 | 44 | Apr-23 | 64 | |||||||||||||||
MAIA | 3 | NA | NA | Dec-19 | Mar-21 | NA | NA | |||||||||||||||||||
ICON | 3 | NA | NA | Feb-17 | Jun-17 | NA | NA | |||||||||||||||||||
GOLD | 3 | NA | NA | Dec-17 | Dec-17 | NA | NA | |||||||||||||||||||
GeoCarb | 3 | NA | NA | Jun-22 | Jun-23 | NA | NA | |||||||||||||||||||
IXPE | 3 | NA | NA | Dec-20 | Dec-20 | NA | NA | |||||||||||||||||||
Landsat 9 | 2 | NA | NA | Dec-20 | Nov-21 | NA | NA | |||||||||||||||||||
Lucy | 2 | NA | NA | Oct-21 | Nov-21 | NA | NA | |||||||||||||||||||
TROPICS | 3 | NA | NA | Sep-19 | Sep-20 | NA | NA | |||||||||||||||||||
JUICE | 3 | NA | NA | Sep-19 | Sep-19 | NA | NA | |||||||||||||||||||
Psyche | 2 | NA | NA | Aug-22 | Aug-22 | NA | NA | |||||||||||||||||||
Clipper | 1 | NA | NA | Jun-22 | Jul-23 | NA | NA | removed Clipper from schedule calculations due to no KDP-A schedule estimate | ||||||||||||||||||
CLARREO-PF | 3 | Jan-20 | Jan-22 | |||||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
of Pp | (LowMA) | (HighABC) | (LowMA) | (HighABC) | ||||||||||||||||||||||
Category I | 7 | 62 | 165 | 88 | 85 | |||||||||||||||||||||
Category II | 12 | 38 | 109 | 59 | 40 | |||||||||||||||||||||
Category III | 15 | - | -07 | 56 | 96 | |||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
(LowMA) | (HighABC) | (LowMA) | (HighABC) | |||||||||||||||||||||||
Average | 80 | 118 | 66 | 70 | ||||||||||||||||||||||
Median | 15 | - | 00 | 00 | ||||||||||||||||||||||
Standard Deviation | 145 | 233 | 129 | 189 | ||||||||||||||||||||||
Minimum | -12 | -65 | -9 | -36 | ||||||||||||||||||||||
Maximum | 417 | 745 | 42 | 51 |
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | KDP-C MA | KDP-C ABC | MA Variance From A | ABC Variance From A | |||||||||||||||||
Clipper | 1 | $ 4000 | $ 4000 | $ - 0 | 00 | $ 3000 | $ 3100 | $ 100 | 33 | ||||||||||||||||||||||
DART | 2 | $ 270 | $ 291 | $ 21 | 78 | $ 175 | $ 248 | $ 73 | 417 | ||||||||||||||||||||||
Euclid | 3 | $ 110 | $ 110 | $ - 0 | 00 | $ 100 | $ 100 | $ - 0 | 00 | Combined KDP-AB so no possible change | 964 | 1014 | -4 | -8 | |||||||||||||||||
GRACE-FO | 2 | $ 470 | $ 460 | $ (10) | -21 | $ 409 | $ 404 | $ (5) | -12 | 4059 | 4319 | -1 | -8 | ||||||||||||||||||
JASON-3 | 3 | $ 159 | $ 166 | $ 7 | 44 | $ - 0 | $ 158 | 1552 | 1552 | -2 | |||||||||||||||||||||
LADEE | 3 | $ 214 | $ 200 | $ (14) | -65 | $ - 0 | $ 184 | 2359 | 2629 | 23 | |||||||||||||||||||||
LCRD | 2 | $ 239 | $ 239 | $ 0 | 02 | $ 239 | $ 239 | $ 0 | 02 | 2571 | 2627 | 8 | 10 | ||||||||||||||||||
Mars 2020 | 1 | $ 2350 | $ 2351 | $ 1 | 00 | $ 2140 | $ 2186 | $ 46 | 21 | 22727 | 24435 | 6 | 4 | ||||||||||||||||||
MMS | 1 | $ 777 | $ 990 | $ 213 | 275 | $ 777 | $ 928 | $ 151 | 195 | 10026 | 10826 | 29 | 39 | ||||||||||||||||||
NISAR | 2 | $ 808 | $ 808 | $ - 0 | 00 | $ 718 | $ 718 | $ - 0 | 00 | 7953 | 8669 | 11 | 7 | ||||||||||||||||||
OCO-3 | 3 | $ 120 | $ 111 | $ (9) | -71 | $ 100 | $ 101 | $ 1 | 13 | 1108 | 1148 | 11 | -4 | ||||||||||||||||||
Orion | 1 | $ 6391 | $ 10288 | $ 3897 | 610 | $ - 0 | $ 8534 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | 108098 | 112835 | 77 | ||||||||||||||||||||
PACE | 2 | $ 850 | $ 850 | $ - 0 | 00 | $ 805 | $ 805 | $ - 0 | 00 | ||||||||||||||||||||||
PSP | 1 | $ 1300 | $ 1439 | $ 139 | 107 | $ 1000 | $ 1233 | $ 233 | 233 | 13932 | 15534 | 39 | 19 | ||||||||||||||||||
Restore-L | 2 | $ 787 | $ 753 | $ (34) | -43 | $ 500 | $ 628 | $ 128 | 256 | ||||||||||||||||||||||
SAGE-III | 3 | $ 112 | $ 115 | $ 3 | 27 | $ - 0 | $ 104 | 101 | 112 | 0 | |||||||||||||||||||||
SLS | 1 | $ 8855 | $ 8587 | $ (268) | -30 | $ - 0 | $ 7653 | 8394 | 9695 | 9 | |||||||||||||||||||||
SMAP | 2 | $ 514 | $ 649 | $ 135 | 263 | $ - 0 | $ - 0 | $ - 0 | 7218 | 9165 | 78 | ||||||||||||||||||||
SOC | 2 | $ 243 | $ 424 | $ 181 | 745 | $ - 0 | $ 371 | 3662 | 4359 | 79 | |||||||||||||||||||||
SWOT | 2 | $ 752 | $ 757 | $ 5 | 07 | $ 642 | $ 647 | $ 5 | 08 | 7049 | 7549 | 10 | 0 | ||||||||||||||||||
XARM | 3 | $ 172 | $ 217 | $ 45 | 264 | $ 161 | $ 179 | $ 18 | 110 | ||||||||||||||||||||||
Count | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta | Change (low) | Notes | ||||||||||||||||||||||
Category 1 | 6 | $ 23673 | $ 27655 | $ 3982 | 168 | $ 3275 | $ 3606 | $ 331 | 101 | ||||||||||||||||||||||
Category 2 | 9 | $ 4933 | $ 5231 | $ 298 | 61 | $ 4474 | $ 13335 | $ 8861 | 1981 | ||||||||||||||||||||||
Category 3 | 6 | $ 887 | $ 920 | $ 33 | 37 | $ - 0 | $ 7757 | $ 7757 | ERRORDIV0 | ||||||||||||||||||||||
Total | 21 | $ 29493 | $ 33807 | $ 4314 | 146 | $ 7749 | $ 24698 | $ 16949 | 2187 | ||||||||||||||||||||||
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | |||||||||||||||||||||
CLARREO-PF | 3 | $ 75 | $ (75) | -1000 | $ 64 | ||||||||||||||||||||||||||
ICON | 3 | $ 249 | $ 218 | ||||||||||||||||||||||||||||
ECOSTRESS | 3 | $ 56 | $ 49 | ||||||||||||||||||||||||||||
GeoCarb | 3 | $ 181 | $ 171 | ||||||||||||||||||||||||||||
GOLD | 3 | $ 74 | $ 64 | ||||||||||||||||||||||||||||
IXPE | 3 | $ 205 | $ 189 | ||||||||||||||||||||||||||||
JUICE | 3 | $ 119 | $ 103 | ||||||||||||||||||||||||||||
Landsat 9 | 2 | $ 928 | $ 851 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | |||||||||||||||||||||||||||
Lucy | 2 | $ 984 | $ 914 | ||||||||||||||||||||||||||||
Psyche | 2 | $ 957 | $ 907 | ||||||||||||||||||||||||||||
TROPICS | 3 | $ 30 | $ 30 | ||||||||||||||||||||||||||||
MAIA | 3 | $ 178 | $ 150 | ||||||||||||||||||||||||||||
Cost Estimate Deltas - KDP-A to KDP-B | COST Growth () | |||||||||||||||||||
Mission | Estimate | KDP-A | KDP-B | Notes | of Pp | Low (MA) | High (ABC) | |||||||||||||
SOC | High | $ 243 | 745 | $ 424 | Category I | 4 | 127 | 172 | ||||||||||||
Low | $ - 0 | $ 371 | Category II | 5 | -01 | 199 | ||||||||||||||
Orion | High | $ 6391 | 610 | $ 10288 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | Category III | 4 | 00 | 01 | |||||||||||
Low | $ - 0 | $ 8534 | ||||||||||||||||||
SMAP | High | $ 514 | 263 | $ 649 | ||||||||||||||||
Low | $ - 0 | $ - 0 | ||||||||||||||||||
SPP | High | $ 1300 | 107 | $ 1439 | ||||||||||||||||
Low | $ 1000 | 233 | $ 1233 | |||||||||||||||||
JASON-3 | High | $ 159 | 44 | $ 166 | ||||||||||||||||
Low | $ - 0 | $ 158 | ||||||||||||||||||
SAGE-III | High | $ 112 | 27 | $ 115 | ||||||||||||||||
Low | $ - 0 | $ 104 | ||||||||||||||||||
SWOT | High | $ 752 | 07 | $ 757 | ||||||||||||||||
Low | $ 642 | 08 | $ 647 | |||||||||||||||||
Mars 2020 | High | $ 2350 | 00 | $ 2351 | ||||||||||||||||
Low | $ 2140 | 21 | $ 2186 | |||||||||||||||||
NISAR | High | $ 808 | 00 | $ 808 | ||||||||||||||||
Low | $ 718 | 00 | $ 718 | |||||||||||||||||
Euclid | High | $ 110 | 00 | $ 110 | Combined KDP-AB so no change possible | |||||||||||||||
Low | $ 100 | 00 | $ 100 | |||||||||||||||||
GRACE Follow On | High | $ 470 | -21 | $ 460 | ||||||||||||||||
Low | $ 409 | -12 | $ 404 | |||||||||||||||||
SLS | High | $ 8855 | -30 | $ 8587 | ||||||||||||||||
Low | $ - 0 | $ 7653 | ||||||||||||||||||
LADEE | High | $ 214 | -65 | $ 200 | ||||||||||||||||
Low | $ - 0 | $ 184 | ||||||||||||||||||
ProgramProject Name | Category | KDP A to B analysis (13 missions) | |||||||||||||||
ASTRO-H | 3 | ASTRO-Hreg | 3 | bull13 Missions KDP-B Data Unavailable | |||||||||||||
CYGNSS | 3 | CYGNSS | 3 | bull7 Missions KDP-Crsquos have not yet occurred | |||||||||||||
DSCOVR | 3 | DSCOVR | 3 | ||||||||||||||
C | ECOSTRESS | 3 | ECOSTRESS | 3 | |||||||||||||
EUCLID | 3 | EUCLIDreg | 3 | Euclid | |||||||||||||
C | GEDI | 3 | GEDI | 3 | |||||||||||||
GOES-R | 1 | GOES-R | 1 | ||||||||||||||
GOLD | 3 | GOLD | 3 | ||||||||||||||
GPM | 2 | GPM | 2 | ||||||||||||||
GRACE-FO | 2 | GRACE-FO | 2 | GRACE Follow On | |||||||||||||
GSDO | 1 | GSDO | 1 | ||||||||||||||
ICESat-2 | 1 | ICESat-2reg | 1 | ||||||||||||||
ICON | 2 | ICON | 2 | ||||||||||||||
InSight | 2 | InSight | 2 | ||||||||||||||
IRIS | 3 | IRIS | 3 | ||||||||||||||
Jason-3 | 3 | Jason-3 | 3 | JASON-3 | |||||||||||||
JPSS-1 | 1 | JPSS-1 | 1 | ||||||||||||||
JWST | 1 | JWSTreg | 1 | ||||||||||||||
LADEE | 2 | LADEEreg | 2 | LADEE | |||||||||||||
C | LCRD | 3 | LCRD | 3 | |||||||||||||
LDCM | 2 | LDCMreg | 2 | ||||||||||||||
LDSD | 3 | LDSD | 3 | ||||||||||||||
C | Mars 2020 | 1 | Mars 2020 | 1 | Mars 2020 | ||||||||||||
MAVEN | 2 | MAVEN | 2 | ||||||||||||||
MMS | 1 | MMS | 1 | ||||||||||||||
MOMA | 3 | MOMA | 3 | ||||||||||||||
MSL | 1 | MSL | 1 | ||||||||||||||
NICER | 3 | NICER | 3 | ||||||||||||||
C | NISAR | 2 | NISAR | 2 | NISAR | ||||||||||||
NuSTAR | 3 | NuSTARreg | 3 | ||||||||||||||
OCO-2 | 2 | OCO-2 | 2 | ||||||||||||||
C | OCO-3 | 3 | OCO-3 | 3 | |||||||||||||
ORION | 1 | ORION | 1 | Orion | |||||||||||||
OSIRIS Rex | 1 | OSIRIS Rexreg | 1 | ||||||||||||||
SAGE III | 3 | SAGE III | 3 | SAGE-III | |||||||||||||
SGSS | 1 | SGSSreg | 1 | ||||||||||||||
SLS | 1 | SLS | 1 | SLS | |||||||||||||
SMAP | 2 | SMAPreg | 2 | SMAP | |||||||||||||
SOC | 2 | SOC | 2 | SOC | |||||||||||||
SOFIA | 1 | SOFIA | 1 | ||||||||||||||
PSP | 1 | PSP | 1 | PSP | |||||||||||||
C | SWOT | 2 | SWOT | 2 | SWOT | ||||||||||||
TEMPO | 3 | TEMPO | 3 | ||||||||||||||
TESS | 2 | TESS | 2 | ||||||||||||||
Clipper | |||||||||||||||||
DART | |||||||||||||||||
PACE | |||||||||||||||||
Restore-L | |||||||||||||||||
XARM |
Statistics | COST Growth ($M) | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Average | 9 | 9 | 43 | 61 | 136 | 070 | ||||||||
Median | 5 | 6 | 20 | 45 | 112 | 034 | ||||||||
Standard Deviation | 14 | 16 | 73 | 83 | 93 | 081 | ||||||||
Variance | 2 | 3 | 535 | 685 | 871 | 066 | ||||||||
Minimum | -9 | -8 | (71) | (31) | 15 | - 0 | ||||||||
Maximum | 38 | 53 | 244 | 315 | 345 | 242 | ||||||||
no JWST | ||||||||||||||
Statistics | ||||||||||||||
COST Growth | Schedule Growth (months) | Duration (months) | ||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 18 | 17 | 118 | 131 | 1989 | 065 | ||||||||
Median | 20 | 17 | 101 | 132 | 19167 | 0582 | ||||||||
Standard Deviation | 16 | 19 | 105 | 117 | 11557 | 0830 | ||||||||
Sample Variance | 3 | 4 | 1101 | 1377 | 133562 | 0688 | ||||||||
Minimum | -6 | -5 | - 0 | - 0 | 397 | - 0 | ||||||||
Maximum | 46 | 48 | 284 | 274 | 4527 | 310 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 20 | 21 | 156 | 159 | 2031 | 075 | ||||||||
Median | 21 | 20 | 132 | 147 | 20783 | 0589 | ||||||||
Standard Deviation | 17 | 25 | 174 | 155 | 11214 | 0881 | ||||||||
Sample Variance | 3 | 6 | 3035 | 2394 | 125751 | 0776 | ||||||||
Minimum | -6 | -5 | 00 | 00 | 40 | - 0 | ||||||||
Maximum | 48 | 78 | 649 | 528 | 453 | 31 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 4 | 3 | 47 | 136 | 253 | 054 | ||||||||
Median | 9 | 9 | 61 | 132 | 24333 | 042 | ||||||||
Standard Deviation | 10 | 12 | 52 | 56 | 6657 | 022 | ||||||||
Sample Variance | 1 | 1 | 273 | 311 | 44310 | 005 | ||||||||
Minimum | -7 | -11 | (10) | 82 | 1923 | 041 | ||||||||
Maximum | 11 | 11 | 92 | 193 | 3243 | 079 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | ||||||||||||
of Pp | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | ||||||||||
Category I | 6 | 4 | 4 | 22 | 78 | |||||||||
Category II | 9 | 8 | 13 | 71 | 83 | |||||||||
Category III | 8 | 6 | 11 | 28 | 52 | |||||||||
Timeline | Total Programs | 46 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDB C for comaprison | planned | Total Replans | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statictics - PresentFinal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 41416 | 14 | 9 | 9 | 8 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | |||||||||||||||||||||||||||||||||||||
ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||
ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 758 | Feb-16 | 759 | Mar-16 | FY16Q2 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -5 | -10 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||
CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 1595 | Oct-16 | 1742 | May-17 | FY16Q2 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -4 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | ||||||||||||||||||||||||||||||||||||||||
EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 179 | Dec-21 | 190 | Dec-22 | FY16Q2 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 0 | 00 | 5787 | 5480 | |||||||||||||||||||||||||||||||||||||||
GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | ||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 108295 | Oct-16 | kDP-D Sep-14 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | ||||||||||||||||||||||||||||||||||||||||||||||
GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||
GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q2 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -1 | -3 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||
GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4079 | Aug-17 | 4318 | Feb-18 | FY16Q2 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | -00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ESD | GSDO | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 26336 | Jun-18 | 28129 | Nov-18 | FY16Q2 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 9916 | Oct-17 | 10636 | Jun-18 | FY16Q2 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 232 | Jun-17 | 2527 | Oct-17 | FY16Q2 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 1 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Planetary | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | 6536 | Mar-16 | 6751 | Mar-16 | FY16Q2 | N | N | 0 | 0 | 4 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E draft | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||
JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||
LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||
Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
LDCM | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
LDCMreg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 8501 | Feb-13 | 8568 | Feb-13 | FY15Q4 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | ||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||
Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||
MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 598 | Nov-13 | 600 | Nov-13 | FY16Q1 | N | N | 0 | 0 | -7 | -11 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1121 | Sep-15 | 1121 | Sep-15 | FY16Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 11 | 4 | 1320 | 613 | |||||||||||||||||||||||||||||||||||||||||
MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 904 | Jul-18 | 1004 | Jul-18 | FY16Q2 | N | N | 0 | 0 | -1 | -1 | 3347 | 3347 | |||||||||||||||||||||||||||||||||||||||||||||||||
MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||
NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 684 | Feb-17 | 67 | Feb-17 | KDP-D Jan-16 | N | N | 0 | 0 | 9 | -2 | 613 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||
NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||
NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 166 | Jun-12 | 166 | Jun-12 | FY14Q4 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | 3 | 3 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||
OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4276 | Jul-14 | 4276 | Jul-14 | FY16Q2 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -2 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||
OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ORION | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | 108098 | Aug-21 | 112835 | Apr-23 | FY16Q2 | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 10014 | Oct-16 | 10572 | Oct-16 | FY16Q2 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 1 | -1 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13931 | Aug-18 | 15534 | Aug-18 | FY16Q2 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 1265 | Aug-16 | 133 | Aug-16 | FY16Q2 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 20 | 19 | 2437 | 2437 | |||||||||||||||||||||||||||||||||||||||||
SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||
SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1216 | Jul-19 | 1228 | Sep-19 | PPBE18 PMR | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 2 | 2 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ESD | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||
SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | May-15 | 8899 | May-15 | FY16Q2 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 707 | 203 | |||||||||||||||||||||||||||||||||||||||||
SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 2892 | Oct-18 | 3789 | Oct-18 | FY16Q2 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -27 | -13 | 2127 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
SOFIA (Budget) | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 29048 | Feb-14 | 29122 | Feb-14 | FY16Q2 | Budget Reduction | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||
TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 1809 | Sep-17 | 2178 | Nov-17 | FY16Q2 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 31976 | Dec-17 | 3517 | Jun-18 | FY16Q2 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -7 | -7 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Currently in B | Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CLARREO-PF | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DART | KDP-C in July | Mean | 13 | -13 | 55 | 28 | 1729 | 115 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Europa Clipper | 02045454545 | Median | 17 | -06 | 21 | 00 | 17483 | 0862 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GeoCarb | Standard Deviation | 84 | 68 | 88 | 87 | 10875 | 0863 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IXPE | Minimum | -27 | -13 | 00 | -72 | 397 | 050 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lucy | Maximum | 20 | 19 | 335 | 335 | 4527 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MAIA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PACE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Psyche | Paste data from above to this table for analysis | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Restore-L | -27 | -13 | 2127 | - 0 | 1610 | 050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SOC Replan | Breach notification made DM not yet final | -7 | -7 | - 0 | - 0 | 080 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TROPICS | -7 | -11 | - 0 | - 0 | 817 | 060 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
XARM | -5 | -10 | 307 | - 0 | 867 | 088 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -9 | - 0 | (717) | 2767 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -8 | 717 | 717 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -3 | - 0 | (400) | 510 | 058 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -9 | 207 | (400) | 800 | 099 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -1 | 3347 | 3347 | 2240 | 205 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -1 | - 0 | - 0 | 397 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -01 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | - 0 | - 0 | 1053 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | 407 | 1020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | -3 | 707 | 203 | 2577 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | 00 | - 0 | - 0 | 2777 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 00 | - 0 | - 0 | 1887 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | 3 | 710 | 403 | 1167 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | -4 | - 0 | - 0 | 1983 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 4 | 207 | (203) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 5 | - 0 | - 0 | 1917 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | 6 | 103 | - 0 | 2733 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | -2 | 613 | - 0 | 4527 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 1320 | 613 | 503 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 607 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 | 19 | 2437 | 2437 |
Timeline | Total Programs | 46 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDP C for comaprison | planned | Total Replans | 14 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statistics - PresentFinal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 72618 | 20 | 13 | 13 | 9 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 74855 | Feb-16 | 109271 | Mar-16 | FY17 Q1 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -7 | 30 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 159503 | Dec-16 | 159503 | Dec-16 | FY18 Q3 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -12 | 203 | (503) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | 51043 | Apr-18 | 52443 | Aug-19 | KDP-E May-18 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGS | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 27418 | Sep-18 | 28129 | Nov-18 | FY17 Q1 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 4 | 00 | 307 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGSreg | 1 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | 3145 | Dec-19 | 3231 | Jun-20 | Dec-17 | 5115 | 4181 | 31446 | Dec-19 | 31446 | Dec-19 | FY18 Q3 | Y | Y | Y | 16 | 15 | 1827 | 1927 | 3957 | 049 | -0 | -27 | - 0 | (610) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | APD | EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 206214 | Mar-20 | 223452 | Mar-20 | FY18 Q3 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 13 | 176 | 3653 | 2130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | 120774 | Nov-18 | 123774 | Mar-19 | FY18 Q3 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 10150 | Nov-16 | KDP-E Oct-16 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | 663 | Feb-18 | 73 | Apr-18 | KDP-E Dec-17 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16 Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8834 | Feb-14 | 8904 | Feb-14 | FY17 Q3 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -3 | -5 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4059 | May-18 | 4319 | May-18 | FY18 Q3 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | 00 | 910 | 297 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 10561 | Sep-18 | 10636 | Oct-18 | FY18 Q3 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 6 | 00 | 1117 | 407 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 243 | Jun-18 | 2527 | Jun-18 | FY18 Q3 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 6 | 00 | 1217 | 810 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSightreg | 2 | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 8189 | May-18 | 8289 | May-18 | Sep-16 | 1923 | 1538 | 8138 | May-18 | 8138 | May-18 | FY18 Q3 | Y | Y | Y | Y | 23 | 23 | 2637 | 2637 | 3050 | 086 | -1 | -18 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16 Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E Sep-16 | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | 1144 | Sep-19 | 127 | Sep-19 | KDP-C Apr-17 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16 Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTregreg | 1 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 94889 | Nov-20 | 96627 | Mar-21 | May-18 | 10639 | 8277 | 94889 | Nov-20 | 96627 | Mar-21 | FY18 Q3 | Y | Y | Y | 9 | 2940 | 8113 | 036 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15 Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | 8385 | Dec-20 | 885 | Nov-21 | FY18 Q3 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | 2571 | Jun-19 | 2627 | Nov-19 | FY18 Q3 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8 | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8reg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 85006 | Feb-13 | 85666 | Feb-13 | FY18 Q3 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15 Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | 23634 | Jul-20 | 25304 | Jul-20 | FY18 Q3 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 5753 | Nov-13 | 5753 | Nov-13 | FY16 Q3 | N | N | 0 | 0 | -11 | -14 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1098 | Mar-15 | 1098 | Mar-15 | FY18 Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 9 | 1 | 707 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 120243 | Jul-20 | 128226 | Jul-20 | FY18 Q3 | N | N | 0 | 0 | 24 | 27 | 5783 | 5783 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15 Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 694 | Jun-17 | 706 | Aug-17 | KDP-E May-17 | N | N | 0 | 0 | 10 | 3 | 1013 | 603 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | 7953 | Dec-21 | 8969 | Sep-22 | FY18 Q3 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | 0 | 00346060676 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 115315 | Jun-12 | 115315 | Jun-12 | FY15 Q1 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | -39 | -28 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4245 | Jul-14 | 4245 | Jul-14 | FY17 Q1 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -3 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | 113388 | Mar-18 | 113388 | May-18 | FY18 Q3 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orion | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orionreg | 1 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 116581 | Jun-22 | 116581 | Jun-22 | Jun-18 | 8483 | 3746 | 116581 | Jun-22 | 116581 | Jun-22 | FY18 Q3 | Y | N | 7 | 3 | 1013 | (1013) | 3347 | 030 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 9975 | Sep-16 | 10532 | Sep-16 | FY18 Q3 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 0 | -1 | (100) | (100) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13821 | Aug-18 | 15482 | Aug-18 | FY18 Q3 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -1 | -03 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 129364 | Feb-17 | 129364 | Feb-17 | FY18 Q3 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 22 | 16 | 3050 | 3050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1251 | Sep-19 | 1261284 | Nov-19 | Path Forward APMC Dec 2016 | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 4 | 4 | 223 | 267 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16 Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLSreg | 1 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 9734 | Dec-19 | 9843 | Jun-20 | Dec-17 | 1340 | 148 | 98029 | Dec-19 | 98029 | Dec-19 | FY18 Q3 | Y | Y | Y | 14 | 2 | 2433 | 1927 | 4060 | 047 | 1 | -04 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | Jan-15 | 8899 | Jan-15 | FY18 Q3 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 307 | (197) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 3433 | Feb-20 | 3866 | Feb-20 | FY18 Q3 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -7 | -11 | 3753 | 1627 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIAreg | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 15874 | Feb-14 | 15949 | Feb-14 | FY18 Q3 | Y | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | 7049 | Apr-21 | 7549 | Apr-22 | FY18 Q3 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 181242 | Sep-17 | 197242 | Nov-17 | FY18 Q3 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | -94 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 3333 | Apr-18 | 3333 | Jun-18 | FY18 Q3 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -3 | -12 | 403 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mean | 90 | 88 | 50 | 81 | 1773 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02045454545 | Median | 82 | 49 | 10 | 60 | 16233 | 0374 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Standard Deviation | 118 | 164 | 77 | 97 | 13962 | 0647 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum | -7 | -10 | -71 | -31 | 147 | - 0 | SPP | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum | 38 | 59 | 244 | 345 | 7433 | 242 | EUCLIDreg | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GSDO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Paste data from above to this table for analysis | ORION | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-7 | -10 | 607 | 817 | 1923 | 042 | SLS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-3 | -7 | - 0 | - 0 | 147 | - 0 | TEMPO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -7 | 1113 | 1113 | 1887 | 059 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
0 | -6 | - 0 | 613 | 1897 | 032 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total KDPs Within Cost Range of Prior KDP | Total KDPs Within Schedule Range of Prior KDP | -2 | -5 | 303 | 910 | 510 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | -3 | -3 | - 0 | - 0 | 503 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MALow at or below Preceding KDP Low | 14 | 31 | 45 | 31 | MALow at or below Preceding KDP Low | 27 | 26 | 53 | 51 | 6 | 0 | 410 | (100) | 1217 | 008 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABCHigh at or below Preceding KDP High | 19 | 33 | 52 | 37 | ABCHigh at or below Preceding KDP High | 21 | 32 | 53 | 40 | 0 | 0 | (203) | 403 | 167 | 242 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 2 | 810 | 307 | 500 | 061 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-B Cost | KDP-A to KDP-B Schedule | 33 | 5 | - 0 | 100 | 800 | 013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 11 | 8 | 103 | 103 | 2670 | 004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B Low at or below KDP-A Low | 4 | 10 | 14 | 29 | KDP-B Low at or below KDP-A Low | 13 | 9 | 22 | 59 | 9 | 9 | (203) | 503 | 1983 | 025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B High at or below KDP-A High | 9 | 12 | 21 | 43 | KDP-B High at or below KDP-A High | 12 | 10 | 22 | 55 | 11 | 10 | (103) | 1320 | 3243 | 041 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | 10 | 2437 | 3147 | 1610 | 195 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | 10 | 613 | 613 | 3450 | 018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B to KDP-C Cost | KDP-B to KDP-C Schedule | -2 | 11 | 813 | 603 | 1687 | 036 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 9 | 13 | 917 | 1930 | 2433 | 079 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-B Low | 10 | 21 | 31 | 32 | MA at or below KDP-B Low | 14 | 17 | 31 | 45 | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-B High | 10 | 21 | 31 | 32 | ABC at or below KDP-B High | 9 | 22 | 31 | 29 | 16 | 18 | - 0 | 607 | 707 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 31 | 1217 | 1830 | 1027 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-C Cost | KDP-A to KDP-C Schedule | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 29 | 59 | 2233 | 3450 | 7433 | 046 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-A Low | 2 | 7 | 9 | 22 | MA at or below KDP-A Low | 5 | 12 | 17 | 29 | added | 5 | 0 | - 0 | - 0 | 813 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-A High | 5 | 11 | 16 | 31 | ABC at or below KDP-A High | 3 | 14 | 17 | 18 | added | -0 | -0 | 103 | 1013 | 1017 | 100 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 7 | 4 | - 0 | - 0 | 1323 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-C (MA) | KDP-C (ABC) | Replan (MA) | Replan (ABC) | KDP-C to Replan (MA) | KDP-C to Replan (ABC) | KDP-C (or Replan) to PresentFinal (MA) | KDP-C (or Replan) to PresentFinal (ABC) | added | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Percentage of Project CostSchedule HighLow Estimates Within Prior KDP Range Estimates | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B Estimate at or below A Estimate | C Estimate at or below B Estimate | C Estimate at or below A Estimate | Total at or below Preceding KDP Estimate | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - High | 43 | 32 | 31 | 37 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - Low | 29 | 32 | 22 | 31 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - High | 55 | 29 | 18 | 40 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - Low | 59 | 45 | 29 | 51 |
70 Joint Cost and Schedule ConfidenceAre we meeting the expected 70 success rate across the portfolio
bull NPR 71205Ebull ABC at 70 confidence
MA at 50 confidencebull
bull Aggregate NASA confidence at baselinebull ABC at 71 confidence
MA at 52 confidencebull
bull Actual performancebull 41 of projects met ABC commitments
30 of projects met MA commitmentsbull
bull Projects currently in Phase Dbull 20 meeting ABC commitments
0 meeting MA commitmentsbull
5
Formulation Cost and Schedule Ranges
bull
bullbull
bull
bullbull
Are we capturing the Agencyrsquos cost exposure in early estimates
In aggregate the high cost estimate is at or below the high estimate established at the preceding KDP
37 of the time for cost40 of the time for schedule
For projects that held a KDP-A the eventual KDP-C baseline cost and schedule (high estimates) are at or below the KDP-A estimate
31 of the time for cost18 of the time for schedule
6
Development Cost Metrics When Controlling for Launch Vehicle Cost Variation
28Avg LV Proportion of Dev Cost Baseline
-8Avg Post-Baseline LV Cost Variation
7
Development Cost Performance When Controlling for Launch Vehicle Cost VariationHow would our development cost reporting metrics change
Lower LV costs can provide unexpected funds to cover growth in reporting
Lower LV costs sometimes have no effect on cost reporting
Higher LV costs can mask otherwise good cost performance
8
bull NASA cost performance has drastically improved since the early 2000rsquos
We are falling short of our portfolio goal of 70 projects hitting cost targets
Our cost and schedule ranges at KDP-A and KDP-B are optimistic and more often than do not capture the eventual high cost or schedule commitments at KDP-C baseline
Development cost reporting metrics can misrepresent how our projects are performing (both positively and negatively) if the LV contract award is well above or below the estimate included in the KDP-C baseline
bull
bull
bull
9
Back-up
10
1111
1212
Total KDPs Within Cost Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 14 31 45 31ABCHigh at or below Preceding KDP High 19 33 52 37
Total KDPs Within Schedule Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 27 26 53 51ABCHigh at or below Preceding KDP High 21 32 53 40
KDP-A to KDP-B CostYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 4 10 14 29KDP-B High at or below KDP-A High 9 12 21 43
KDP-A to KDP-B ScheduleYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 13 9 22 59KDP-B High at or below KDP-A High 12 10 22 55
KDP-B to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-B Low 10 21 31 32ABC at or below KDP-B High 10 21 31 32
KDP-B to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-B Low 14 17 31 45ABC at or below KDP-B High 9 22 31 29
KDP-A to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-A Low 2 7 9 22ABC at or below KDP-A High 5 11 16 31
KDP-A to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-A Low 5 12 17 29ABC at or below KDP-A High 3 14 17 18
COST ($M)
KDP-C to Replan (MA)595000000000000281704999999999999750000000000000014025429999999999993-178400000000000095115-85999999999999943826-25999999999996248E-200911-518999999999999773-1220000000000004531770000000000005117000000000000176266192299999999999951671-2800000000000011401112644044106389999999999965159999999999999425999999999999972-1246900000000005125710000000000002140107999999999999551896472000000000000171666999999999998263820000000000005922000000000000459114748445624775539999999999999103258999999999999811180000000000001939999999999999151167299999999999384830000000000109-33599999999999909-5550000000000011416020000000000005-3200000000000002831553639000000000000974113401372999999999999515260000000000002-5800000000000011429476-180455789999999999997710099999999999994-76000000000000227KDP-C to Replan (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS59500000000000028211499999999999918399999999999977392842000000000001592E-2-3084000000000000941809999999999991-8599999999999994344599999999999994-46999999999997044E-210860399999999999994316E-2978-45-281000000000000238420000000000004520329999999999995419999999999998866751153799999999999951802-108000000000000111623851847387182770000000000073628999999999999770-4297100000000000423299999999999983142-039999999999997726203338000000000000119256712921999999999999321011613781300000000000186840000000000000658600000000000023553999999999999910349911780000000000001329999999999999729948999999999996437460000000000036-88599999999999909-5720000000000004511440000000000009-32000000000000028235100000000000023453000000000000711081481372999999999999503989999999999997729551-18045-210000000000002270-21600000000000023
COST Change ($M)
B to C (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS01047535211267606203370517928286851448611111111110973E-2075077759107650046E-4-98804985102361215E-201486366383447687-7818181818181813E-2030674002751031632-37226838174140057E-4013440860215052999E-30-46012269938650305E-2-61086956521739177E-201085051546391753202363403859567541916901408450704179E-200227818101022070730-65060240963855487E-2071729957805907171E-20592556945781199880779814665592264319368421052631587E-20314499999999999890-4630495689655173E-288694328130947783E-2017749999999999999-42462845010613295E-400166502463054187263934495959166312E-2093093699515347267E-200048437693738375709067597185373168792E-20526615969581748940003366676193198057128745644599303111E-296699259374453242E-233198918775202764E-2-732231404958677E-2-5100766898519711E-279499652536483736E-2-27777777777777801E-203746613545816733204003014143287735301290322580645161315265600825167612E-20176206365503080030010075757575757570-061063923386687424-27818254073387508E-30-54000000000000055E-2
COST Change ()
Cost - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate04285714285714285503225806451612903103125036538461538461536Schedule - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate054545454545454541029032258064516131017647058823529413039622641509433965Cost - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate02857142857142857032258064516129031022222222222222221031111111111111112Schedule - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate059090909090909094045161290322580644029411764705882354050943396226415094
High Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (high)01682251932581422Category 2 Change (high)60501935980863335E-2Category 3 Change (high)37110484780157868E-2Total Change (high)014626442296281486
Low Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (low)010106870229007633Category 2 Change (low)19806591564406897Category 3 Change (low)0Total Change (low)21873131670301591
KDP-A to KDP-B Schedule Growth - Low Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion0-9-49-2-1-100000200912326273242
KDP-A to KDP-B Schedule Growth - High Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion-36-8-8-3-2-1-1000002569121726414451
Cost Variation Against Baselines
13
Methodology and Assumptions
The first step in conducting this analysis was to verify and validate the cost baseline information using source documentation KDP-C figures takes priority as the definitive baseline Where KDP-C decision memoranda was not available as in the case of many projects baselined prior to approximately 2009 figures were pulled from the first appearance as a development project in a Presidentrsquos Budget as the baseline against which to measure In a few cases notificationsreports to Congress (eg NSPD-49 reports) were used to identify a baseline figure MA figures were pulled solely from decision memoranda and thus our dataset with regard to MArsquos is smaller as it excludes many of the older projects that did not have standardized baseline documentation with MArsquos noted Variance to the baseline was then measured by using the most recent quarterly cost and schedule report Latest cost data is valid through the FY18 Q3 reporting period Slide 3 charts illustrate each project in the dataset with respective LCC and dev cost variances
The confidence level policy applied to each project was noted using source documentation as well as a cross-reference against when policy changes were implemented recognizing that a subset of projects received waivers to new policies during policy transition Certain exclusions were applied to ensure a dataset comparable across projects For example SOFIA had conducted a JCL on a replan but the decision memorandum made clear the baseline was not changing therefore the JCL confidence level could not fairly be applied to measure performance against the baseline Another example is GPM which was excluded as it was one of the very first projects baselined after JCL policy implementation and was not a ldquotruerdquo JCL with the decision memorandum noting that the intent was met while a JCL DPMC would be held many months later to evaluate progress There were a couple of additional exclusions applied
When a project is confirmed at KDP-C cost performance measurements were applied to that baseline If a project was then rebaselined a ldquonewrdquo project was added to the dataset using the rebaselined figures against which to measure as the Agency made the decision at that point to press ahead with the project and Congress provided reauthorization The ldquooriginalrdquo project was ldquofrozenrdquo in terms of development phase to fairly capture the contemporary phase performance (eg the ldquooriginalrdquo OCO-2 cost growth will always be categorized within the ldquoprojects in developmentrdquo performance category while the rebaselined OCO-2 cost performance falls into the ldquoprojects launchedrdquo category) The latest cost figures however were used to measure cost performance across both original baselines and rebaselines in order to fairly capture the accuracy of original estimates against final outcomes
This insight while placing an emphasis on the JCL while measuring performance does not intend to convey a discovered causal relationship between JCL and cost performance There have been many other related programmatic and technical advancements over the past 10 to 20 years that have influenced cost and schedule performance in the overall positive direction Other insights look into other influencers of costschedule performance
13
Dev Cost Metrics Controlling for LV Cost Variation
14
Methodology and Assumptions
SID pulled a number of data elements from a total of 22 SMD projects to conduct this analysis Data elements from a projectrsquos baseline include total development cost and the launch services cost estimate and have been sourced from KDP documentation quarterly reports and Cost Analysis Data Requirements (CADREs) These data were compared to currentactual total development and launch services costs from the most recent KDPquarterly reports Other data elements include Division Lead Center type of launch vehicle LCC category and current phase
SID calculated the overall development cost deltas from the baseline cost and verified the percentage growth with external reporting data where applicable SID then calculated the percent change in launch services development cost from baseline to currentactual The development cost percent change was calculated after removing launch services from the inputs
For further insight these same calculations were conducted by Division Lead Center type of launch vehicle and LCC category Division Lead Center and LCC category were then further broken down by looking only at projects currently in development
The 22 projects used in this analysis include Mars 2020 ICESat-2 ICON InSight SOC PSP SWOT TESS Juno Landsat-8 MMS OSIRIS-REx SMAP MAVEN GRAIL NuSTAR RBSP IRIS LADEE OCO-2 CYGNSS and Landsat 9 Representation includes seven planetary science seven earth science six heliophysics and two astrophysics missions twelve GSFC-led projects and eight JPL-led projects (LaRC and ARC representing the other two) ten Atlas V one Delta IV-H two Falcon 9 four Delta II four Pegasus and one Minotaur V rockets and six category 1 thirteen category 2 and three category 3 projects Seven projects assessed are currently in development
Other projects considered were excluded if launch was or is to be on a ride-share and launch services costs were negligible (eg RBI) Projects launching on internationally-contributed rockets were also excluded (eg GPM JWST) Other exclusions were based on data limitations at the time of analysis (eg no launch services costs available from baseline)
Did not add GPM international launchSOFIA no launchJWST international launch
RBI rideshareSentinel-6 international launch
Dawn no launch vehicle numbers availableSNPP No baseline LV estimate available
NISAR international launchLCRD rideshare
GRACE-FO rideshare
14
Formulation KDPs
15
Methodology and Assumptions
Comparative analysis was conducted where possible (ie when highlow costschedule figures were available in KDP-ABC decision memoranda This analysis does not attempt to explain why the majority of costschedule estimates at KDPrsquos exceed prior estimates
Cost and schedule ranges were extracted from KDP-A and KDP-B decision memoranda Agency Baseline Commitments and Management Agreements were extracted from KDP-C decision memoranda Lifecycle cost was used in all cases (as opposed to development cost only) A project did not need to have all KDP-A through C figures to be included in the analysis (eg a project that did not have a KDP-A range was still included in the KDP-B to KDP-C statistics)
This analysis includes data from KDP-A KDP-B and KDP-C milestones At KDP-A and KDP-B a high and low estimate is established for both cost and schedule At KDP-C a Management Agreement and an Agency Baseline Commitment is established for both cost and schedule For ease of conveyance this analysis equates the Management Agreement as the low estimate for KDP-C and equates the Agency Baselines Commitment as the high estimate for KDP-C
15
Column1 | KDP-C Date | Lead Center | Division | Launch Vehicle | LCC Category | Phase | Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | Notes | |||||||||||||||||
Juno | Aug-08 | JPL | Planetary | Atlas V | 1 | Ops | $ 7423 | $ 7089 | $ 1904 | $ 1817 | $ 5519 | $ 5272 | -45 | -46 | -45 | ||||||||||||||||||
RBSP | Dec-08 | GSFC | Helio | Atlas V | 2 | Ops | $ 5338 | $ 5040 | $ 1336 | $ 1324 | $ 4002 | $ 3716 | -56 | -09 | -71 | ||||||||||||||||||
GRAIL | Jan-09 | JPL | Planetary | Delta II | 2 | Ops | $ 4270 | $ 3983 | $ 1528 | $ 1508 | $ 2742 | $ 2475 | -67 | -13 | -97 | ||||||||||||||||||
MMS | Jun-09 | GSFC | Helio | Atlas V | 1 | Ops | $ 8573 | $ 8753 | $ 1942 | $ 1788 | $ 6631 | $ 6965 | 21 | -79 | 50 | ||||||||||||||||||
NuSTAR | Sep-09 | JPL | Astro | Pegasus | 3 | Ops | $ 1099 | $ 1162 | $ 358 | $ 332 | $ 741 | $ 830 | 57 | -73 | 120 | ||||||||||||||||||
Landsat-8 | Dec-09 | GSFC | Earth | Atlas V | 2 | Ops | $ 5830 | $ 5028 | $ 1264 | $ 1218 | $ 4566 | $ 3810 | -138 | -36 | -166 | ||||||||||||||||||
LADEE | Aug-10 | ARC | Planetary | Minotaur V | 2 | Ops | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||
OCO-2 | Sep-10 | JPL | Earth | Delta II | 2 | Ops | $ 2490 | $ 3200 | $ 676 | $ 1368 | $ 1814 | $ 1832 | 285 | 1024 | 10 | against original baseline rebaseline primary LV-driven aside from some RWA issues | |||||||||||||||||
MAVEN | Oct-10 | GSFC | Planetary | Atlas V | 2 | Ops | $ 5672 | $ 4720 | $ 1870 | $ 1541 | $ 3802 | $ 3179 | -168 | -176 | -164 | ||||||||||||||||||
IRIS | Nov-10 | GSFC | Helio | Pegasus | 3 | Ops | $ 1407 | $ 1430 | $ 404 | $ 426 | $ 1003 | $ 1004 | 16 | 54 | 01 | ||||||||||||||||||
SMAP | May-12 | JPL | Earth | Delta II | 2 | Ops | $ 4857 | $ 4543 | $ 1319 | $ 1201 | $ 3538 | $ 3342 | -65 | -89 | -55 | ||||||||||||||||||
SOC | Mar-13 | GSFC | Helio | Atlas V | 2 | Dev | $ 3769 | $ 3100 | $ 2500 | $ 1727 | $ 1269 | $ 1373 | -178 | -309 | 82 | ||||||||||||||||||
OSIRIS-REx | May-13 | GSFC | Planetary | Atlas V | 1 | Ops | $ 7786 | $ 6156 | $ 2340 | $ 1888 | $ 5446 | $ 4268 | -209 | -193 | -216 | ||||||||||||||||||
CYGNSS | Feb-14 | LaRC | Earth | Pegasus | 3 | Ops | $ 1511 | $ 1287 | $ 523 | $ 623 | $ 988 | $ 664 | -148 | 191 | -328 | ||||||||||||||||||
InSight | Mar-14 | JPL | Planetary | Atlas V | 2 | Ops | $ 5418 | $ 6483 | $ 1599 | $ 1685 | $ 3819 | $ 4798 | 197 | 54 | 256 | ||||||||||||||||||
PSP | Mar-14 | GSFC | Helio | Delta IV-H | 1 | Dev | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||
ICESat-2 | May-14 | GSFC | Earth | Delta II | 1 | Dev | $ 7637 | $ 7441 | $ 1188 | $ 1183 | $ 6449 | $ 6258 | -26 | -04 | -30 | ||||||||||||||||||
ICON | Oct-14 | GSFC | Helio | Pegasus | 2 | Dev | $ 1960 | $ 1982 | $ 543 | $ 563 | $ 1417 | $ 1419 | 11 | 37 | 01 | ||||||||||||||||||
TESS | Oct-14 | GSFC | Astro | Falcon 9 | 2 | Ops | $ 3232 | $ 2799 | $ 1141 | $ 874 | $ 2091 | $ 1925 | -134 | -234 | -79 | ||||||||||||||||||
SWOT | May-16 | JPL | Earth | Falcon 9 | 2 | Dev | $ 5715 | $ 5715 | $ 1313 | $ 1078 | $ 4402 | $ 4638 | 00 | -179 | 53 | ||||||||||||||||||
Mars 2020 | Jun-16 | JPL | Planetary | Atlas V | 1 | Dev | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||
Landsat 9 | Dec-17 | GSFC | Earth | Atlas V | 2 | Dev | $ 6342 | $ 6342 | $ 1544 | $ 1542 | $ 4798 | $ 4800 | 00 | -01 | 00 | ||||||||||||||||||
Projects in Development | $ 52749 | $ 52336 | $ 14819 | $ 12738 | $ 37930 | $ 39598 | -08 | -140 | 44 | ||||||||||||||||||||||||
Projects in Operations | $ 66588 | $ 63555 | $ 18647 | $ 18196 | $ 47941 | $ 45359 | -46 | -24 | -54 | ||||||||||||||||||||||||
Total | $ 119337 | $ 115891 | $ 33466 | $ 30935 | $ 85871 | $ 84956 | -29 | -76 | -11 | ||||||||||||||||||||||||
Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | |||||||||||||||||||||||||
GSFC Project Total | $ 68103 | $ 63294 | $ 20377 | $ 18325 | $ 47726 | $ 44969 | -71 | -101 | -58 | ||||||||||||||||||||||||
JPL Projects Total | $ 48041 | $ 49428 | $ 12122 | $ 11384 | $ 35919 | $ 38044 | 29 | -61 | 59 | ||||||||||||||||||||||||
Did not add | GPM | international launch | GSFC Projects in Ops | $ 37838 | $ 33926 | $ 10297 | $ 9059 | $ 27541 | $ 24867 | -103 | -120 | -97 | |||||||||||||||||||||
SOFIA | no launch | JPL Projects in Ops | $ 25557 | $ 26460 | $ 7384 | $ 7911 | $ 18173 | $ 18549 | 35 | 71 | 21 | ||||||||||||||||||||||
JWST | international launch | GSFC Projects in Dev | $ 30265 | $ 29368 | $ 10080 | $ 9266 | $ 20185 | $ 20102 | -30 | -81 | -04 | ||||||||||||||||||||||
RBI | rideshare | JPL Projects in Dev | $ 22484 | $ 22968 | $ 4738 | $ 3473 | $ 17746 | $ 19495 | 22 | -267 | 99 | ||||||||||||||||||||||
Sentinel-6 | international launch | ||||||||||||||||||||||||||||||||
Dawn | no launch vehicle numbers available | Astro | $ 4331 | $ 3961 | $ 1499 | $ 1206 | $ 2832 | $ 2755 | -85 | -195 | -27 | ||||||||||||||||||||||
SNPP | No baseline LV estimate available | Planetary | $ 49020 | $ 47566 | $ 13109 | $ 11437 | $ 35911 | $ 36129 | -30 | -128 | 06 | ||||||||||||||||||||||
NISAR | international launch | Helio | $ 31604 | $ 30808 | $ 11030 | $ 10078 | $ 20574 | $ 20730 | -25 | -86 | 08 | ||||||||||||||||||||||
LCRD | rideshare | Earth | $ 34382 | $ 33556 | $ 7827 | $ 8213 | $ 26555 | $ 25343 | -24 | 49 | -46 | ||||||||||||||||||||||
GRACE-FO | rideshare | ||||||||||||||||||||||||||||||||
Astro - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
Planetary - Dev Only | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||||||||
Helio - Dev Only | $ 16286 | $ 15585 | $ 7348 | $ 6540 | $ 8938 | $ 9045 | -43 | -110 | 12 | ||||||||||||||||||||||||
Earth - Dev Only | $ 19694 | $ 19498 | $ 4045 | $ 3803 | $ 15649 | $ 15695 | -10 | -60 | 03 | ||||||||||||||||||||||||
Atlas V | $ 72920 | $ 69964 | $ 19725 | $ 16926 | $ 53195 | $ 53038 | -41 | -142 | -03 | ||||||||||||||||||||||||
Delta IV-H | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||||||||
Falcon 9 | $ 8947 | $ 8514 | $ 2454 | $ 1952 | $ 6493 | $ 6562 | -48 | -205 | 11 | ||||||||||||||||||||||||
Delta II | $ 19254 | $ 19167 | $ 4711 | $ 5260 | $ 14543 | $ 13907 | -05 | 117 | -44 | this is skewed by OCO-2 which switched from the baseline Taurus XL to the Delta-II at the rebaseline | |||||||||||||||||||||||
Pegasus | $ 5977 | $ 5861 | $ 1828 | $ 1944 | $ 4149 | $ 3917 | -19 | 63 | -56 | ||||||||||||||||||||||||
Minotaur V | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||||||||
Category 1 | $ 58745 | $ 57195 | $ 15104 | $ 13322 | $ 43641 | $ 43873 | -26 | -118 | 05 | ||||||||||||||||||||||||
Category 2 | $ 56575 | $ 54817 | $ 17076 | $ 16232 | $ 39499 | $ 38585 | -31 | -49 | -23 | ||||||||||||||||||||||||
Category 3 | $ 4017 | $ 3879 | $ 1285 | $ 1381 | $ 2732 | $ 2498 | -34 | 75 | -86 | ||||||||||||||||||||||||
Category 1 - Dev Only | $ 34963 | $ 35197 | $ 8918 | $ 7829 | $ 26045 | $ 27368 | 07 | -122 | 51 | ||||||||||||||||||||||||
Category 2 - Dev Only | $ 17786 | $ 17139 | $ 5900 | $ 4909 | $ 11886 | $ 12230 | -36 | -168 | 29 | ||||||||||||||||||||||||
Category 3 - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
LV of Total Dev at Baseline | 280 | ||||||||||||||||||||||||||||||||
LV of Total Dev at FY18 Q3 | 267 | ||||||||||||||||||||||||||||||||
Launch Vehicle Percent Cost Variation from Baseline Estimate in Chronological Order |
Mission | LCC Category | KDP-A (low) | KDP-A (high) | KDP-B (low) | KDP-B (high) | Low Delta (months) | High Delta (months) | KDP-C MA | MA Variance from A | KDP-C ABC | ABC Variance from A | |||||||||||||||
Restore-L | 2 | Jun-20 | Dec-23 | Jun-20 | Dec-20 | 0 | -36 | |||||||||||||||||||
SLS | 1 | Dec-17 | Dec-17 | Mar-17 | Apr-17 | -9 | -8 | Dec-17 | 0 | Nov-18 | 11 | |||||||||||||||
PACE | 2 | Dec-22 | Dec-23 | Aug-22 | Apr-23 | -4 | -8 | |||||||||||||||||||
WFIRST | 1 | Dec-24 | Dec-26 | Sep-25 | Sep-26 | 9 | -3 | |||||||||||||||||||
OCO-3 | 3 | Sep-16 | Dec-16 | Jul-16 | Oct-16 | -2 | -2 | Mar-18 | 18 | May-18 | 17 | |||||||||||||||
PSP | 1 | Aug-18 | Aug-18 | Jul-18 | Jul-18 | -1 | -1 | Aug-18 | 0 | Aug-18 | 0 | |||||||||||||||
LCRD | 2 | Mar-17 | Mar-17 | Feb-17 | Feb-17 | -1 | -1 | Jun-19 | 27 | Nov-19 | 32 | |||||||||||||||
Euclid | 3 | Dec-14 | Dec-14 | Dec-14 | Dec-14 | 0 | 0 | May-15 | 5 | May-16 | 17 | |||||||||||||||
GRACE-FO | 2 | Aug-17 | Aug-17 | Aug-17 | Aug-17 | 0 | 0 | Aug-17 | 0 | Feb-18 | 6 | |||||||||||||||
Mars 2020 | 1 | Jul-20 | Jul-20 | Jul-20 | Jul-20 | 0 | 0 | Jul-20 | 0 | Jul-20 | 0 | |||||||||||||||
SAGE-III | 3 | Aug-14 | Aug-14 | Aug-14 | Aug-14 | 0 | 0 | Aug-14 | 0 | Aug-14 | 0 | |||||||||||||||
SWOT | 2 | Oct-20 | Oct-20 | Oct-20 | Oct-20 | 0 | 0 | Apr-21 | 6 | Apr-22 | 18 | |||||||||||||||
LADEE | 3 | Mar-12 | Mar-12 | May-12 | May-12 | 2 | 2 | May-13 | 14 | Nov-13 | 20 | |||||||||||||||
DART | 2 | Dec-20 | Dec-20 | Dec-20 | May-21 | 0 | 5 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | ||||||||||||||||||
NISAR | 2 | Dec-20 | Dec-21 | Dec-20 | Jun-22 | 0 | 6 | Dec-21 | 12 | Sep-22 | 9 | |||||||||||||||
JASON-3 | 3 | Jul-13 | Jul-13 | Apr-14 | Apr-14 | 9 | 9 | Mar-15 | 20 | Mar-15 | 20 | |||||||||||||||
MMS | 1 | Oct-13 | Oct-13 | Oct-14 | Oct-14 | 12 | 12 | Aug-14 | 10 | Mar-15 | 17 | |||||||||||||||
ECOSTRESS | 3 | May-17 | Mar-18 | Aug-17 | Aug-19 | 3 | 17 | Aug-17 | 3 | Aug-19 | 17 | |||||||||||||||
SMAP | 2 | Mar-13 | Mar-13 | May-15 | May-15 | 26 | 26 | Oct-14 | 19 | Mar-15 | 24 | |||||||||||||||
XARM | 3 | Oct-19 | Oct-19 | Jan-22 | Mar-23 | 27 | 41 | |||||||||||||||||||
SOC | 2 | Apr-15 | Apr-15 | Dec-17 | Dec-18 | 32 | 44 | Jan-17 | 21 | Oct-18 | 42 | |||||||||||||||
Orion | 1 | Dec-17 | Dec-17 | Jun-21 | Mar-22 | 42 | 51 | Aug-21 | 44 | Apr-23 | 64 | |||||||||||||||
MAIA | 3 | NA | NA | Dec-19 | Mar-21 | NA | NA | |||||||||||||||||||
ICON | 3 | NA | NA | Feb-17 | Jun-17 | NA | NA | |||||||||||||||||||
GOLD | 3 | NA | NA | Dec-17 | Dec-17 | NA | NA | |||||||||||||||||||
GeoCarb | 3 | NA | NA | Jun-22 | Jun-23 | NA | NA | |||||||||||||||||||
IXPE | 3 | NA | NA | Dec-20 | Dec-20 | NA | NA | |||||||||||||||||||
Landsat 9 | 2 | NA | NA | Dec-20 | Nov-21 | NA | NA | |||||||||||||||||||
Lucy | 2 | NA | NA | Oct-21 | Nov-21 | NA | NA | |||||||||||||||||||
TROPICS | 3 | NA | NA | Sep-19 | Sep-20 | NA | NA | |||||||||||||||||||
JUICE | 3 | NA | NA | Sep-19 | Sep-19 | NA | NA | |||||||||||||||||||
Psyche | 2 | NA | NA | Aug-22 | Aug-22 | NA | NA | |||||||||||||||||||
Clipper | 1 | NA | NA | Jun-22 | Jul-23 | NA | NA | removed Clipper from schedule calculations due to no KDP-A schedule estimate | ||||||||||||||||||
CLARREO-PF | 3 | Jan-20 | Jan-22 | |||||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
of Pp | (LowMA) | (HighABC) | (LowMA) | (HighABC) | ||||||||||||||||||||||
Category I | 7 | 62 | 165 | 88 | 85 | |||||||||||||||||||||
Category II | 12 | 38 | 109 | 59 | 40 | |||||||||||||||||||||
Category III | 15 | - | -07 | 56 | 96 | |||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
(LowMA) | (HighABC) | (LowMA) | (HighABC) | |||||||||||||||||||||||
Average | 80 | 118 | 66 | 70 | ||||||||||||||||||||||
Median | 15 | - | 00 | 00 | ||||||||||||||||||||||
Standard Deviation | 145 | 233 | 129 | 189 | ||||||||||||||||||||||
Minimum | -12 | -65 | -9 | -36 | ||||||||||||||||||||||
Maximum | 417 | 745 | 42 | 51 |
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | KDP-C MA | KDP-C ABC | MA Variance From A | ABC Variance From A | |||||||||||||||||
Clipper | 1 | $ 4000 | $ 4000 | $ - 0 | 00 | $ 3000 | $ 3100 | $ 100 | 33 | ||||||||||||||||||||||
DART | 2 | $ 270 | $ 291 | $ 21 | 78 | $ 175 | $ 248 | $ 73 | 417 | ||||||||||||||||||||||
Euclid | 3 | $ 110 | $ 110 | $ - 0 | 00 | $ 100 | $ 100 | $ - 0 | 00 | Combined KDP-AB so no possible change | 964 | 1014 | -4 | -8 | |||||||||||||||||
GRACE-FO | 2 | $ 470 | $ 460 | $ (10) | -21 | $ 409 | $ 404 | $ (5) | -12 | 4059 | 4319 | -1 | -8 | ||||||||||||||||||
JASON-3 | 3 | $ 159 | $ 166 | $ 7 | 44 | $ - 0 | $ 158 | 1552 | 1552 | -2 | |||||||||||||||||||||
LADEE | 3 | $ 214 | $ 200 | $ (14) | -65 | $ - 0 | $ 184 | 2359 | 2629 | 23 | |||||||||||||||||||||
LCRD | 2 | $ 239 | $ 239 | $ 0 | 02 | $ 239 | $ 239 | $ 0 | 02 | 2571 | 2627 | 8 | 10 | ||||||||||||||||||
Mars 2020 | 1 | $ 2350 | $ 2351 | $ 1 | 00 | $ 2140 | $ 2186 | $ 46 | 21 | 22727 | 24435 | 6 | 4 | ||||||||||||||||||
MMS | 1 | $ 777 | $ 990 | $ 213 | 275 | $ 777 | $ 928 | $ 151 | 195 | 10026 | 10826 | 29 | 39 | ||||||||||||||||||
NISAR | 2 | $ 808 | $ 808 | $ - 0 | 00 | $ 718 | $ 718 | $ - 0 | 00 | 7953 | 8669 | 11 | 7 | ||||||||||||||||||
OCO-3 | 3 | $ 120 | $ 111 | $ (9) | -71 | $ 100 | $ 101 | $ 1 | 13 | 1108 | 1148 | 11 | -4 | ||||||||||||||||||
Orion | 1 | $ 6391 | $ 10288 | $ 3897 | 610 | $ - 0 | $ 8534 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | 108098 | 112835 | 77 | ||||||||||||||||||||
PACE | 2 | $ 850 | $ 850 | $ - 0 | 00 | $ 805 | $ 805 | $ - 0 | 00 | ||||||||||||||||||||||
PSP | 1 | $ 1300 | $ 1439 | $ 139 | 107 | $ 1000 | $ 1233 | $ 233 | 233 | 13932 | 15534 | 39 | 19 | ||||||||||||||||||
Restore-L | 2 | $ 787 | $ 753 | $ (34) | -43 | $ 500 | $ 628 | $ 128 | 256 | ||||||||||||||||||||||
SAGE-III | 3 | $ 112 | $ 115 | $ 3 | 27 | $ - 0 | $ 104 | 101 | 112 | 0 | |||||||||||||||||||||
SLS | 1 | $ 8855 | $ 8587 | $ (268) | -30 | $ - 0 | $ 7653 | 8394 | 9695 | 9 | |||||||||||||||||||||
SMAP | 2 | $ 514 | $ 649 | $ 135 | 263 | $ - 0 | $ - 0 | $ - 0 | 7218 | 9165 | 78 | ||||||||||||||||||||
SOC | 2 | $ 243 | $ 424 | $ 181 | 745 | $ - 0 | $ 371 | 3662 | 4359 | 79 | |||||||||||||||||||||
SWOT | 2 | $ 752 | $ 757 | $ 5 | 07 | $ 642 | $ 647 | $ 5 | 08 | 7049 | 7549 | 10 | 0 | ||||||||||||||||||
XARM | 3 | $ 172 | $ 217 | $ 45 | 264 | $ 161 | $ 179 | $ 18 | 110 | ||||||||||||||||||||||
Count | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta | Change (low) | Notes | ||||||||||||||||||||||
Category 1 | 6 | $ 23673 | $ 27655 | $ 3982 | 168 | $ 3275 | $ 3606 | $ 331 | 101 | ||||||||||||||||||||||
Category 2 | 9 | $ 4933 | $ 5231 | $ 298 | 61 | $ 4474 | $ 13335 | $ 8861 | 1981 | ||||||||||||||||||||||
Category 3 | 6 | $ 887 | $ 920 | $ 33 | 37 | $ - 0 | $ 7757 | $ 7757 | ERRORDIV0 | ||||||||||||||||||||||
Total | 21 | $ 29493 | $ 33807 | $ 4314 | 146 | $ 7749 | $ 24698 | $ 16949 | 2187 | ||||||||||||||||||||||
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | |||||||||||||||||||||
CLARREO-PF | 3 | $ 75 | $ (75) | -1000 | $ 64 | ||||||||||||||||||||||||||
ICON | 3 | $ 249 | $ 218 | ||||||||||||||||||||||||||||
ECOSTRESS | 3 | $ 56 | $ 49 | ||||||||||||||||||||||||||||
GeoCarb | 3 | $ 181 | $ 171 | ||||||||||||||||||||||||||||
GOLD | 3 | $ 74 | $ 64 | ||||||||||||||||||||||||||||
IXPE | 3 | $ 205 | $ 189 | ||||||||||||||||||||||||||||
JUICE | 3 | $ 119 | $ 103 | ||||||||||||||||||||||||||||
Landsat 9 | 2 | $ 928 | $ 851 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | |||||||||||||||||||||||||||
Lucy | 2 | $ 984 | $ 914 | ||||||||||||||||||||||||||||
Psyche | 2 | $ 957 | $ 907 | ||||||||||||||||||||||||||||
TROPICS | 3 | $ 30 | $ 30 | ||||||||||||||||||||||||||||
MAIA | 3 | $ 178 | $ 150 | ||||||||||||||||||||||||||||
Cost Estimate Deltas - KDP-A to KDP-B | COST Growth () | |||||||||||||||||||
Mission | Estimate | KDP-A | KDP-B | Notes | of Pp | Low (MA) | High (ABC) | |||||||||||||
SOC | High | $ 243 | 745 | $ 424 | Category I | 4 | 127 | 172 | ||||||||||||
Low | $ - 0 | $ 371 | Category II | 5 | -01 | 199 | ||||||||||||||
Orion | High | $ 6391 | 610 | $ 10288 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | Category III | 4 | 00 | 01 | |||||||||||
Low | $ - 0 | $ 8534 | ||||||||||||||||||
SMAP | High | $ 514 | 263 | $ 649 | ||||||||||||||||
Low | $ - 0 | $ - 0 | ||||||||||||||||||
SPP | High | $ 1300 | 107 | $ 1439 | ||||||||||||||||
Low | $ 1000 | 233 | $ 1233 | |||||||||||||||||
JASON-3 | High | $ 159 | 44 | $ 166 | ||||||||||||||||
Low | $ - 0 | $ 158 | ||||||||||||||||||
SAGE-III | High | $ 112 | 27 | $ 115 | ||||||||||||||||
Low | $ - 0 | $ 104 | ||||||||||||||||||
SWOT | High | $ 752 | 07 | $ 757 | ||||||||||||||||
Low | $ 642 | 08 | $ 647 | |||||||||||||||||
Mars 2020 | High | $ 2350 | 00 | $ 2351 | ||||||||||||||||
Low | $ 2140 | 21 | $ 2186 | |||||||||||||||||
NISAR | High | $ 808 | 00 | $ 808 | ||||||||||||||||
Low | $ 718 | 00 | $ 718 | |||||||||||||||||
Euclid | High | $ 110 | 00 | $ 110 | Combined KDP-AB so no change possible | |||||||||||||||
Low | $ 100 | 00 | $ 100 | |||||||||||||||||
GRACE Follow On | High | $ 470 | -21 | $ 460 | ||||||||||||||||
Low | $ 409 | -12 | $ 404 | |||||||||||||||||
SLS | High | $ 8855 | -30 | $ 8587 | ||||||||||||||||
Low | $ - 0 | $ 7653 | ||||||||||||||||||
LADEE | High | $ 214 | -65 | $ 200 | ||||||||||||||||
Low | $ - 0 | $ 184 | ||||||||||||||||||
ProgramProject Name | Category | KDP A to B analysis (13 missions) | |||||||||||||||
ASTRO-H | 3 | ASTRO-Hreg | 3 | bull13 Missions KDP-B Data Unavailable | |||||||||||||
CYGNSS | 3 | CYGNSS | 3 | bull7 Missions KDP-Crsquos have not yet occurred | |||||||||||||
DSCOVR | 3 | DSCOVR | 3 | ||||||||||||||
C | ECOSTRESS | 3 | ECOSTRESS | 3 | |||||||||||||
EUCLID | 3 | EUCLIDreg | 3 | Euclid | |||||||||||||
C | GEDI | 3 | GEDI | 3 | |||||||||||||
GOES-R | 1 | GOES-R | 1 | ||||||||||||||
GOLD | 3 | GOLD | 3 | ||||||||||||||
GPM | 2 | GPM | 2 | ||||||||||||||
GRACE-FO | 2 | GRACE-FO | 2 | GRACE Follow On | |||||||||||||
GSDO | 1 | GSDO | 1 | ||||||||||||||
ICESat-2 | 1 | ICESat-2reg | 1 | ||||||||||||||
ICON | 2 | ICON | 2 | ||||||||||||||
InSight | 2 | InSight | 2 | ||||||||||||||
IRIS | 3 | IRIS | 3 | ||||||||||||||
Jason-3 | 3 | Jason-3 | 3 | JASON-3 | |||||||||||||
JPSS-1 | 1 | JPSS-1 | 1 | ||||||||||||||
JWST | 1 | JWSTreg | 1 | ||||||||||||||
LADEE | 2 | LADEEreg | 2 | LADEE | |||||||||||||
C | LCRD | 3 | LCRD | 3 | |||||||||||||
LDCM | 2 | LDCMreg | 2 | ||||||||||||||
LDSD | 3 | LDSD | 3 | ||||||||||||||
C | Mars 2020 | 1 | Mars 2020 | 1 | Mars 2020 | ||||||||||||
MAVEN | 2 | MAVEN | 2 | ||||||||||||||
MMS | 1 | MMS | 1 | ||||||||||||||
MOMA | 3 | MOMA | 3 | ||||||||||||||
MSL | 1 | MSL | 1 | ||||||||||||||
NICER | 3 | NICER | 3 | ||||||||||||||
C | NISAR | 2 | NISAR | 2 | NISAR | ||||||||||||
NuSTAR | 3 | NuSTARreg | 3 | ||||||||||||||
OCO-2 | 2 | OCO-2 | 2 | ||||||||||||||
C | OCO-3 | 3 | OCO-3 | 3 | |||||||||||||
ORION | 1 | ORION | 1 | Orion | |||||||||||||
OSIRIS Rex | 1 | OSIRIS Rexreg | 1 | ||||||||||||||
SAGE III | 3 | SAGE III | 3 | SAGE-III | |||||||||||||
SGSS | 1 | SGSSreg | 1 | ||||||||||||||
SLS | 1 | SLS | 1 | SLS | |||||||||||||
SMAP | 2 | SMAPreg | 2 | SMAP | |||||||||||||
SOC | 2 | SOC | 2 | SOC | |||||||||||||
SOFIA | 1 | SOFIA | 1 | ||||||||||||||
PSP | 1 | PSP | 1 | PSP | |||||||||||||
C | SWOT | 2 | SWOT | 2 | SWOT | ||||||||||||
TEMPO | 3 | TEMPO | 3 | ||||||||||||||
TESS | 2 | TESS | 2 | ||||||||||||||
Clipper | |||||||||||||||||
DART | |||||||||||||||||
PACE | |||||||||||||||||
Restore-L | |||||||||||||||||
XARM |
Statistics | COST Growth ($M) | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Average | 9 | 9 | 43 | 61 | 136 | 070 | ||||||||
Median | 5 | 6 | 20 | 45 | 112 | 034 | ||||||||
Standard Deviation | 14 | 16 | 73 | 83 | 93 | 081 | ||||||||
Variance | 2 | 3 | 535 | 685 | 871 | 066 | ||||||||
Minimum | -9 | -8 | (71) | (31) | 15 | - 0 | ||||||||
Maximum | 38 | 53 | 244 | 315 | 345 | 242 | ||||||||
no JWST | ||||||||||||||
Statistics | ||||||||||||||
COST Growth | Schedule Growth (months) | Duration (months) | ||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 18 | 17 | 118 | 131 | 1989 | 065 | ||||||||
Median | 20 | 17 | 101 | 132 | 19167 | 0582 | ||||||||
Standard Deviation | 16 | 19 | 105 | 117 | 11557 | 0830 | ||||||||
Sample Variance | 3 | 4 | 1101 | 1377 | 133562 | 0688 | ||||||||
Minimum | -6 | -5 | - 0 | - 0 | 397 | - 0 | ||||||||
Maximum | 46 | 48 | 284 | 274 | 4527 | 310 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 20 | 21 | 156 | 159 | 2031 | 075 | ||||||||
Median | 21 | 20 | 132 | 147 | 20783 | 0589 | ||||||||
Standard Deviation | 17 | 25 | 174 | 155 | 11214 | 0881 | ||||||||
Sample Variance | 3 | 6 | 3035 | 2394 | 125751 | 0776 | ||||||||
Minimum | -6 | -5 | 00 | 00 | 40 | - 0 | ||||||||
Maximum | 48 | 78 | 649 | 528 | 453 | 31 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 4 | 3 | 47 | 136 | 253 | 054 | ||||||||
Median | 9 | 9 | 61 | 132 | 24333 | 042 | ||||||||
Standard Deviation | 10 | 12 | 52 | 56 | 6657 | 022 | ||||||||
Sample Variance | 1 | 1 | 273 | 311 | 44310 | 005 | ||||||||
Minimum | -7 | -11 | (10) | 82 | 1923 | 041 | ||||||||
Maximum | 11 | 11 | 92 | 193 | 3243 | 079 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | ||||||||||||
of Pp | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | ||||||||||
Category I | 6 | 4 | 4 | 22 | 78 | |||||||||
Category II | 9 | 8 | 13 | 71 | 83 | |||||||||
Category III | 8 | 6 | 11 | 28 | 52 | |||||||||
Timeline | Total Programs | 46 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDB C for comaprison | planned | Total Replans | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statictics - PresentFinal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 41416 | 14 | 9 | 9 | 8 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | |||||||||||||||||||||||||||||||||||||
ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||
ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 758 | Feb-16 | 759 | Mar-16 | FY16Q2 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -5 | -10 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||
CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 1595 | Oct-16 | 1742 | May-17 | FY16Q2 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -4 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | ||||||||||||||||||||||||||||||||||||||||
EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 179 | Dec-21 | 190 | Dec-22 | FY16Q2 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 0 | 00 | 5787 | 5480 | |||||||||||||||||||||||||||||||||||||||
GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | ||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 108295 | Oct-16 | kDP-D Sep-14 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | ||||||||||||||||||||||||||||||||||||||||||||||
GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||
GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q2 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -1 | -3 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||
GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4079 | Aug-17 | 4318 | Feb-18 | FY16Q2 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | -00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ESD | GSDO | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 26336 | Jun-18 | 28129 | Nov-18 | FY16Q2 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 9916 | Oct-17 | 10636 | Jun-18 | FY16Q2 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 232 | Jun-17 | 2527 | Oct-17 | FY16Q2 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 1 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Planetary | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | 6536 | Mar-16 | 6751 | Mar-16 | FY16Q2 | N | N | 0 | 0 | 4 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E draft | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||
JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||
LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||
Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
LDCM | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
LDCMreg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 8501 | Feb-13 | 8568 | Feb-13 | FY15Q4 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | ||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||
Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||
MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 598 | Nov-13 | 600 | Nov-13 | FY16Q1 | N | N | 0 | 0 | -7 | -11 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1121 | Sep-15 | 1121 | Sep-15 | FY16Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 11 | 4 | 1320 | 613 | |||||||||||||||||||||||||||||||||||||||||
MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 904 | Jul-18 | 1004 | Jul-18 | FY16Q2 | N | N | 0 | 0 | -1 | -1 | 3347 | 3347 | |||||||||||||||||||||||||||||||||||||||||||||||||
MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||
NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 684 | Feb-17 | 67 | Feb-17 | KDP-D Jan-16 | N | N | 0 | 0 | 9 | -2 | 613 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||
NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||
NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 166 | Jun-12 | 166 | Jun-12 | FY14Q4 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | 3 | 3 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||
OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4276 | Jul-14 | 4276 | Jul-14 | FY16Q2 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -2 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||
OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ORION | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | 108098 | Aug-21 | 112835 | Apr-23 | FY16Q2 | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 10014 | Oct-16 | 10572 | Oct-16 | FY16Q2 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 1 | -1 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13931 | Aug-18 | 15534 | Aug-18 | FY16Q2 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 1265 | Aug-16 | 133 | Aug-16 | FY16Q2 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 20 | 19 | 2437 | 2437 | |||||||||||||||||||||||||||||||||||||||||
SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||
SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1216 | Jul-19 | 1228 | Sep-19 | PPBE18 PMR | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 2 | 2 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ESD | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||
SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | May-15 | 8899 | May-15 | FY16Q2 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 707 | 203 | |||||||||||||||||||||||||||||||||||||||||
SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 2892 | Oct-18 | 3789 | Oct-18 | FY16Q2 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -27 | -13 | 2127 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
SOFIA (Budget) | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 29048 | Feb-14 | 29122 | Feb-14 | FY16Q2 | Budget Reduction | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||
TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 1809 | Sep-17 | 2178 | Nov-17 | FY16Q2 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 31976 | Dec-17 | 3517 | Jun-18 | FY16Q2 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -7 | -7 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Currently in B | Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CLARREO-PF | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DART | KDP-C in July | Mean | 13 | -13 | 55 | 28 | 1729 | 115 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Europa Clipper | 02045454545 | Median | 17 | -06 | 21 | 00 | 17483 | 0862 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GeoCarb | Standard Deviation | 84 | 68 | 88 | 87 | 10875 | 0863 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IXPE | Minimum | -27 | -13 | 00 | -72 | 397 | 050 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lucy | Maximum | 20 | 19 | 335 | 335 | 4527 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MAIA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PACE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Psyche | Paste data from above to this table for analysis | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Restore-L | -27 | -13 | 2127 | - 0 | 1610 | 050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SOC Replan | Breach notification made DM not yet final | -7 | -7 | - 0 | - 0 | 080 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TROPICS | -7 | -11 | - 0 | - 0 | 817 | 060 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
XARM | -5 | -10 | 307 | - 0 | 867 | 088 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -9 | - 0 | (717) | 2767 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -8 | 717 | 717 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -3 | - 0 | (400) | 510 | 058 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -9 | 207 | (400) | 800 | 099 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -1 | 3347 | 3347 | 2240 | 205 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -1 | - 0 | - 0 | 397 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -01 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | - 0 | - 0 | 1053 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | 407 | 1020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | -3 | 707 | 203 | 2577 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | 00 | - 0 | - 0 | 2777 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 00 | - 0 | - 0 | 1887 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | 3 | 710 | 403 | 1167 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | -4 | - 0 | - 0 | 1983 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 4 | 207 | (203) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 5 | - 0 | - 0 | 1917 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | 6 | 103 | - 0 | 2733 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | -2 | 613 | - 0 | 4527 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 1320 | 613 | 503 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 607 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 | 19 | 2437 | 2437 |
Timeline | Total Programs | 46 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDP C for comaprison | planned | Total Replans | 14 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statistics - PresentFinal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 72618 | 20 | 13 | 13 | 9 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 74855 | Feb-16 | 109271 | Mar-16 | FY17 Q1 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -7 | 30 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 159503 | Dec-16 | 159503 | Dec-16 | FY18 Q3 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -12 | 203 | (503) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | 51043 | Apr-18 | 52443 | Aug-19 | KDP-E May-18 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGS | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 27418 | Sep-18 | 28129 | Nov-18 | FY17 Q1 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 4 | 00 | 307 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGSreg | 1 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | 3145 | Dec-19 | 3231 | Jun-20 | Dec-17 | 5115 | 4181 | 31446 | Dec-19 | 31446 | Dec-19 | FY18 Q3 | Y | Y | Y | 16 | 15 | 1827 | 1927 | 3957 | 049 | -0 | -27 | - 0 | (610) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | APD | EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 206214 | Mar-20 | 223452 | Mar-20 | FY18 Q3 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 13 | 176 | 3653 | 2130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | 120774 | Nov-18 | 123774 | Mar-19 | FY18 Q3 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 10150 | Nov-16 | KDP-E Oct-16 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | 663 | Feb-18 | 73 | Apr-18 | KDP-E Dec-17 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16 Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8834 | Feb-14 | 8904 | Feb-14 | FY17 Q3 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -3 | -5 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4059 | May-18 | 4319 | May-18 | FY18 Q3 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | 00 | 910 | 297 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 10561 | Sep-18 | 10636 | Oct-18 | FY18 Q3 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 6 | 00 | 1117 | 407 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 243 | Jun-18 | 2527 | Jun-18 | FY18 Q3 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 6 | 00 | 1217 | 810 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSightreg | 2 | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 8189 | May-18 | 8289 | May-18 | Sep-16 | 1923 | 1538 | 8138 | May-18 | 8138 | May-18 | FY18 Q3 | Y | Y | Y | Y | 23 | 23 | 2637 | 2637 | 3050 | 086 | -1 | -18 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16 Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E Sep-16 | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | 1144 | Sep-19 | 127 | Sep-19 | KDP-C Apr-17 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16 Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTregreg | 1 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 94889 | Nov-20 | 96627 | Mar-21 | May-18 | 10639 | 8277 | 94889 | Nov-20 | 96627 | Mar-21 | FY18 Q3 | Y | Y | Y | 9 | 2940 | 8113 | 036 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15 Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | 8385 | Dec-20 | 885 | Nov-21 | FY18 Q3 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | 2571 | Jun-19 | 2627 | Nov-19 | FY18 Q3 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8 | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8reg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 85006 | Feb-13 | 85666 | Feb-13 | FY18 Q3 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15 Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | 23634 | Jul-20 | 25304 | Jul-20 | FY18 Q3 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 5753 | Nov-13 | 5753 | Nov-13 | FY16 Q3 | N | N | 0 | 0 | -11 | -14 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1098 | Mar-15 | 1098 | Mar-15 | FY18 Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 9 | 1 | 707 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 120243 | Jul-20 | 128226 | Jul-20 | FY18 Q3 | N | N | 0 | 0 | 24 | 27 | 5783 | 5783 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15 Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 694 | Jun-17 | 706 | Aug-17 | KDP-E May-17 | N | N | 0 | 0 | 10 | 3 | 1013 | 603 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | 7953 | Dec-21 | 8969 | Sep-22 | FY18 Q3 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | 0 | 00346060676 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 115315 | Jun-12 | 115315 | Jun-12 | FY15 Q1 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | -39 | -28 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4245 | Jul-14 | 4245 | Jul-14 | FY17 Q1 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -3 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | 113388 | Mar-18 | 113388 | May-18 | FY18 Q3 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orion | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orionreg | 1 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 116581 | Jun-22 | 116581 | Jun-22 | Jun-18 | 8483 | 3746 | 116581 | Jun-22 | 116581 | Jun-22 | FY18 Q3 | Y | N | 7 | 3 | 1013 | (1013) | 3347 | 030 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 9975 | Sep-16 | 10532 | Sep-16 | FY18 Q3 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 0 | -1 | (100) | (100) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13821 | Aug-18 | 15482 | Aug-18 | FY18 Q3 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -1 | -03 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 129364 | Feb-17 | 129364 | Feb-17 | FY18 Q3 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 22 | 16 | 3050 | 3050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1251 | Sep-19 | 1261284 | Nov-19 | Path Forward APMC Dec 2016 | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 4 | 4 | 223 | 267 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16 Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLSreg | 1 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 9734 | Dec-19 | 9843 | Jun-20 | Dec-17 | 1340 | 148 | 98029 | Dec-19 | 98029 | Dec-19 | FY18 Q3 | Y | Y | Y | 14 | 2 | 2433 | 1927 | 4060 | 047 | 1 | -04 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | Jan-15 | 8899 | Jan-15 | FY18 Q3 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 307 | (197) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 3433 | Feb-20 | 3866 | Feb-20 | FY18 Q3 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -7 | -11 | 3753 | 1627 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIAreg | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 15874 | Feb-14 | 15949 | Feb-14 | FY18 Q3 | Y | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | 7049 | Apr-21 | 7549 | Apr-22 | FY18 Q3 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 181242 | Sep-17 | 197242 | Nov-17 | FY18 Q3 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | -94 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 3333 | Apr-18 | 3333 | Jun-18 | FY18 Q3 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -3 | -12 | 403 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mean | 90 | 88 | 50 | 81 | 1773 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02045454545 | Median | 82 | 49 | 10 | 60 | 16233 | 0374 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Standard Deviation | 118 | 164 | 77 | 97 | 13962 | 0647 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum | -7 | -10 | -71 | -31 | 147 | - 0 | SPP | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum | 38 | 59 | 244 | 345 | 7433 | 242 | EUCLIDreg | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GSDO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Paste data from above to this table for analysis | ORION | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-7 | -10 | 607 | 817 | 1923 | 042 | SLS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-3 | -7 | - 0 | - 0 | 147 | - 0 | TEMPO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -7 | 1113 | 1113 | 1887 | 059 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
0 | -6 | - 0 | 613 | 1897 | 032 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total KDPs Within Cost Range of Prior KDP | Total KDPs Within Schedule Range of Prior KDP | -2 | -5 | 303 | 910 | 510 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | -3 | -3 | - 0 | - 0 | 503 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MALow at or below Preceding KDP Low | 14 | 31 | 45 | 31 | MALow at or below Preceding KDP Low | 27 | 26 | 53 | 51 | 6 | 0 | 410 | (100) | 1217 | 008 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABCHigh at or below Preceding KDP High | 19 | 33 | 52 | 37 | ABCHigh at or below Preceding KDP High | 21 | 32 | 53 | 40 | 0 | 0 | (203) | 403 | 167 | 242 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 2 | 810 | 307 | 500 | 061 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-B Cost | KDP-A to KDP-B Schedule | 33 | 5 | - 0 | 100 | 800 | 013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 11 | 8 | 103 | 103 | 2670 | 004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B Low at or below KDP-A Low | 4 | 10 | 14 | 29 | KDP-B Low at or below KDP-A Low | 13 | 9 | 22 | 59 | 9 | 9 | (203) | 503 | 1983 | 025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B High at or below KDP-A High | 9 | 12 | 21 | 43 | KDP-B High at or below KDP-A High | 12 | 10 | 22 | 55 | 11 | 10 | (103) | 1320 | 3243 | 041 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | 10 | 2437 | 3147 | 1610 | 195 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | 10 | 613 | 613 | 3450 | 018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B to KDP-C Cost | KDP-B to KDP-C Schedule | -2 | 11 | 813 | 603 | 1687 | 036 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 9 | 13 | 917 | 1930 | 2433 | 079 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-B Low | 10 | 21 | 31 | 32 | MA at or below KDP-B Low | 14 | 17 | 31 | 45 | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-B High | 10 | 21 | 31 | 32 | ABC at or below KDP-B High | 9 | 22 | 31 | 29 | 16 | 18 | - 0 | 607 | 707 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 31 | 1217 | 1830 | 1027 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-C Cost | KDP-A to KDP-C Schedule | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 29 | 59 | 2233 | 3450 | 7433 | 046 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-A Low | 2 | 7 | 9 | 22 | MA at or below KDP-A Low | 5 | 12 | 17 | 29 | added | 5 | 0 | - 0 | - 0 | 813 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-A High | 5 | 11 | 16 | 31 | ABC at or below KDP-A High | 3 | 14 | 17 | 18 | added | -0 | -0 | 103 | 1013 | 1017 | 100 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 7 | 4 | - 0 | - 0 | 1323 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-C (MA) | KDP-C (ABC) | Replan (MA) | Replan (ABC) | KDP-C to Replan (MA) | KDP-C to Replan (ABC) | KDP-C (or Replan) to PresentFinal (MA) | KDP-C (or Replan) to PresentFinal (ABC) | added | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Percentage of Project CostSchedule HighLow Estimates Within Prior KDP Range Estimates | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B Estimate at or below A Estimate | C Estimate at or below B Estimate | C Estimate at or below A Estimate | Total at or below Preceding KDP Estimate | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - High | 43 | 32 | 31 | 37 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - Low | 29 | 32 | 22 | 31 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - High | 55 | 29 | 18 | 40 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - Low | 59 | 45 | 29 | 51 |
Formulation Cost and Schedule Ranges
bull
bullbull
bull
bullbull
Are we capturing the Agencyrsquos cost exposure in early estimates
In aggregate the high cost estimate is at or below the high estimate established at the preceding KDP
37 of the time for cost40 of the time for schedule
For projects that held a KDP-A the eventual KDP-C baseline cost and schedule (high estimates) are at or below the KDP-A estimate
31 of the time for cost18 of the time for schedule
6
Development Cost Metrics When Controlling for Launch Vehicle Cost Variation
28Avg LV Proportion of Dev Cost Baseline
-8Avg Post-Baseline LV Cost Variation
7
Development Cost Performance When Controlling for Launch Vehicle Cost VariationHow would our development cost reporting metrics change
Lower LV costs can provide unexpected funds to cover growth in reporting
Lower LV costs sometimes have no effect on cost reporting
Higher LV costs can mask otherwise good cost performance
8
bull NASA cost performance has drastically improved since the early 2000rsquos
We are falling short of our portfolio goal of 70 projects hitting cost targets
Our cost and schedule ranges at KDP-A and KDP-B are optimistic and more often than do not capture the eventual high cost or schedule commitments at KDP-C baseline
Development cost reporting metrics can misrepresent how our projects are performing (both positively and negatively) if the LV contract award is well above or below the estimate included in the KDP-C baseline
bull
bull
bull
9
Back-up
10
1111
1212
Total KDPs Within Cost Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 14 31 45 31ABCHigh at or below Preceding KDP High 19 33 52 37
Total KDPs Within Schedule Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 27 26 53 51ABCHigh at or below Preceding KDP High 21 32 53 40
KDP-A to KDP-B CostYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 4 10 14 29KDP-B High at or below KDP-A High 9 12 21 43
KDP-A to KDP-B ScheduleYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 13 9 22 59KDP-B High at or below KDP-A High 12 10 22 55
KDP-B to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-B Low 10 21 31 32ABC at or below KDP-B High 10 21 31 32
KDP-B to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-B Low 14 17 31 45ABC at or below KDP-B High 9 22 31 29
KDP-A to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-A Low 2 7 9 22ABC at or below KDP-A High 5 11 16 31
KDP-A to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-A Low 5 12 17 29ABC at or below KDP-A High 3 14 17 18
COST ($M)
KDP-C to Replan (MA)595000000000000281704999999999999750000000000000014025429999999999993-178400000000000095115-85999999999999943826-25999999999996248E-200911-518999999999999773-1220000000000004531770000000000005117000000000000176266192299999999999951671-2800000000000011401112644044106389999999999965159999999999999425999999999999972-1246900000000005125710000000000002140107999999999999551896472000000000000171666999999999998263820000000000005922000000000000459114748445624775539999999999999103258999999999999811180000000000001939999999999999151167299999999999384830000000000109-33599999999999909-5550000000000011416020000000000005-3200000000000002831553639000000000000974113401372999999999999515260000000000002-5800000000000011429476-180455789999999999997710099999999999994-76000000000000227KDP-C to Replan (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS59500000000000028211499999999999918399999999999977392842000000000001592E-2-3084000000000000941809999999999991-8599999999999994344599999999999994-46999999999997044E-210860399999999999994316E-2978-45-281000000000000238420000000000004520329999999999995419999999999998866751153799999999999951802-108000000000000111623851847387182770000000000073628999999999999770-4297100000000000423299999999999983142-039999999999997726203338000000000000119256712921999999999999321011613781300000000000186840000000000000658600000000000023553999999999999910349911780000000000001329999999999999729948999999999996437460000000000036-88599999999999909-5720000000000004511440000000000009-32000000000000028235100000000000023453000000000000711081481372999999999999503989999999999997729551-18045-210000000000002270-21600000000000023
COST Change ($M)
B to C (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS01047535211267606203370517928286851448611111111110973E-2075077759107650046E-4-98804985102361215E-201486366383447687-7818181818181813E-2030674002751031632-37226838174140057E-4013440860215052999E-30-46012269938650305E-2-61086956521739177E-201085051546391753202363403859567541916901408450704179E-200227818101022070730-65060240963855487E-2071729957805907171E-20592556945781199880779814665592264319368421052631587E-20314499999999999890-4630495689655173E-288694328130947783E-2017749999999999999-42462845010613295E-400166502463054187263934495959166312E-2093093699515347267E-200048437693738375709067597185373168792E-20526615969581748940003366676193198057128745644599303111E-296699259374453242E-233198918775202764E-2-732231404958677E-2-5100766898519711E-279499652536483736E-2-27777777777777801E-203746613545816733204003014143287735301290322580645161315265600825167612E-20176206365503080030010075757575757570-061063923386687424-27818254073387508E-30-54000000000000055E-2
COST Change ()
Cost - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate04285714285714285503225806451612903103125036538461538461536Schedule - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate054545454545454541029032258064516131017647058823529413039622641509433965Cost - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate02857142857142857032258064516129031022222222222222221031111111111111112Schedule - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate059090909090909094045161290322580644029411764705882354050943396226415094
High Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (high)01682251932581422Category 2 Change (high)60501935980863335E-2Category 3 Change (high)37110484780157868E-2Total Change (high)014626442296281486
Low Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (low)010106870229007633Category 2 Change (low)19806591564406897Category 3 Change (low)0Total Change (low)21873131670301591
KDP-A to KDP-B Schedule Growth - Low Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion0-9-49-2-1-100000200912326273242
KDP-A to KDP-B Schedule Growth - High Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion-36-8-8-3-2-1-1000002569121726414451
Cost Variation Against Baselines
13
Methodology and Assumptions
The first step in conducting this analysis was to verify and validate the cost baseline information using source documentation KDP-C figures takes priority as the definitive baseline Where KDP-C decision memoranda was not available as in the case of many projects baselined prior to approximately 2009 figures were pulled from the first appearance as a development project in a Presidentrsquos Budget as the baseline against which to measure In a few cases notificationsreports to Congress (eg NSPD-49 reports) were used to identify a baseline figure MA figures were pulled solely from decision memoranda and thus our dataset with regard to MArsquos is smaller as it excludes many of the older projects that did not have standardized baseline documentation with MArsquos noted Variance to the baseline was then measured by using the most recent quarterly cost and schedule report Latest cost data is valid through the FY18 Q3 reporting period Slide 3 charts illustrate each project in the dataset with respective LCC and dev cost variances
The confidence level policy applied to each project was noted using source documentation as well as a cross-reference against when policy changes were implemented recognizing that a subset of projects received waivers to new policies during policy transition Certain exclusions were applied to ensure a dataset comparable across projects For example SOFIA had conducted a JCL on a replan but the decision memorandum made clear the baseline was not changing therefore the JCL confidence level could not fairly be applied to measure performance against the baseline Another example is GPM which was excluded as it was one of the very first projects baselined after JCL policy implementation and was not a ldquotruerdquo JCL with the decision memorandum noting that the intent was met while a JCL DPMC would be held many months later to evaluate progress There were a couple of additional exclusions applied
When a project is confirmed at KDP-C cost performance measurements were applied to that baseline If a project was then rebaselined a ldquonewrdquo project was added to the dataset using the rebaselined figures against which to measure as the Agency made the decision at that point to press ahead with the project and Congress provided reauthorization The ldquooriginalrdquo project was ldquofrozenrdquo in terms of development phase to fairly capture the contemporary phase performance (eg the ldquooriginalrdquo OCO-2 cost growth will always be categorized within the ldquoprojects in developmentrdquo performance category while the rebaselined OCO-2 cost performance falls into the ldquoprojects launchedrdquo category) The latest cost figures however were used to measure cost performance across both original baselines and rebaselines in order to fairly capture the accuracy of original estimates against final outcomes
This insight while placing an emphasis on the JCL while measuring performance does not intend to convey a discovered causal relationship between JCL and cost performance There have been many other related programmatic and technical advancements over the past 10 to 20 years that have influenced cost and schedule performance in the overall positive direction Other insights look into other influencers of costschedule performance
13
Dev Cost Metrics Controlling for LV Cost Variation
14
Methodology and Assumptions
SID pulled a number of data elements from a total of 22 SMD projects to conduct this analysis Data elements from a projectrsquos baseline include total development cost and the launch services cost estimate and have been sourced from KDP documentation quarterly reports and Cost Analysis Data Requirements (CADREs) These data were compared to currentactual total development and launch services costs from the most recent KDPquarterly reports Other data elements include Division Lead Center type of launch vehicle LCC category and current phase
SID calculated the overall development cost deltas from the baseline cost and verified the percentage growth with external reporting data where applicable SID then calculated the percent change in launch services development cost from baseline to currentactual The development cost percent change was calculated after removing launch services from the inputs
For further insight these same calculations were conducted by Division Lead Center type of launch vehicle and LCC category Division Lead Center and LCC category were then further broken down by looking only at projects currently in development
The 22 projects used in this analysis include Mars 2020 ICESat-2 ICON InSight SOC PSP SWOT TESS Juno Landsat-8 MMS OSIRIS-REx SMAP MAVEN GRAIL NuSTAR RBSP IRIS LADEE OCO-2 CYGNSS and Landsat 9 Representation includes seven planetary science seven earth science six heliophysics and two astrophysics missions twelve GSFC-led projects and eight JPL-led projects (LaRC and ARC representing the other two) ten Atlas V one Delta IV-H two Falcon 9 four Delta II four Pegasus and one Minotaur V rockets and six category 1 thirteen category 2 and three category 3 projects Seven projects assessed are currently in development
Other projects considered were excluded if launch was or is to be on a ride-share and launch services costs were negligible (eg RBI) Projects launching on internationally-contributed rockets were also excluded (eg GPM JWST) Other exclusions were based on data limitations at the time of analysis (eg no launch services costs available from baseline)
Did not add GPM international launchSOFIA no launchJWST international launch
RBI rideshareSentinel-6 international launch
Dawn no launch vehicle numbers availableSNPP No baseline LV estimate available
NISAR international launchLCRD rideshare
GRACE-FO rideshare
14
Formulation KDPs
15
Methodology and Assumptions
Comparative analysis was conducted where possible (ie when highlow costschedule figures were available in KDP-ABC decision memoranda This analysis does not attempt to explain why the majority of costschedule estimates at KDPrsquos exceed prior estimates
Cost and schedule ranges were extracted from KDP-A and KDP-B decision memoranda Agency Baseline Commitments and Management Agreements were extracted from KDP-C decision memoranda Lifecycle cost was used in all cases (as opposed to development cost only) A project did not need to have all KDP-A through C figures to be included in the analysis (eg a project that did not have a KDP-A range was still included in the KDP-B to KDP-C statistics)
This analysis includes data from KDP-A KDP-B and KDP-C milestones At KDP-A and KDP-B a high and low estimate is established for both cost and schedule At KDP-C a Management Agreement and an Agency Baseline Commitment is established for both cost and schedule For ease of conveyance this analysis equates the Management Agreement as the low estimate for KDP-C and equates the Agency Baselines Commitment as the high estimate for KDP-C
15
Column1 | KDP-C Date | Lead Center | Division | Launch Vehicle | LCC Category | Phase | Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | Notes | |||||||||||||||||
Juno | Aug-08 | JPL | Planetary | Atlas V | 1 | Ops | $ 7423 | $ 7089 | $ 1904 | $ 1817 | $ 5519 | $ 5272 | -45 | -46 | -45 | ||||||||||||||||||
RBSP | Dec-08 | GSFC | Helio | Atlas V | 2 | Ops | $ 5338 | $ 5040 | $ 1336 | $ 1324 | $ 4002 | $ 3716 | -56 | -09 | -71 | ||||||||||||||||||
GRAIL | Jan-09 | JPL | Planetary | Delta II | 2 | Ops | $ 4270 | $ 3983 | $ 1528 | $ 1508 | $ 2742 | $ 2475 | -67 | -13 | -97 | ||||||||||||||||||
MMS | Jun-09 | GSFC | Helio | Atlas V | 1 | Ops | $ 8573 | $ 8753 | $ 1942 | $ 1788 | $ 6631 | $ 6965 | 21 | -79 | 50 | ||||||||||||||||||
NuSTAR | Sep-09 | JPL | Astro | Pegasus | 3 | Ops | $ 1099 | $ 1162 | $ 358 | $ 332 | $ 741 | $ 830 | 57 | -73 | 120 | ||||||||||||||||||
Landsat-8 | Dec-09 | GSFC | Earth | Atlas V | 2 | Ops | $ 5830 | $ 5028 | $ 1264 | $ 1218 | $ 4566 | $ 3810 | -138 | -36 | -166 | ||||||||||||||||||
LADEE | Aug-10 | ARC | Planetary | Minotaur V | 2 | Ops | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||
OCO-2 | Sep-10 | JPL | Earth | Delta II | 2 | Ops | $ 2490 | $ 3200 | $ 676 | $ 1368 | $ 1814 | $ 1832 | 285 | 1024 | 10 | against original baseline rebaseline primary LV-driven aside from some RWA issues | |||||||||||||||||
MAVEN | Oct-10 | GSFC | Planetary | Atlas V | 2 | Ops | $ 5672 | $ 4720 | $ 1870 | $ 1541 | $ 3802 | $ 3179 | -168 | -176 | -164 | ||||||||||||||||||
IRIS | Nov-10 | GSFC | Helio | Pegasus | 3 | Ops | $ 1407 | $ 1430 | $ 404 | $ 426 | $ 1003 | $ 1004 | 16 | 54 | 01 | ||||||||||||||||||
SMAP | May-12 | JPL | Earth | Delta II | 2 | Ops | $ 4857 | $ 4543 | $ 1319 | $ 1201 | $ 3538 | $ 3342 | -65 | -89 | -55 | ||||||||||||||||||
SOC | Mar-13 | GSFC | Helio | Atlas V | 2 | Dev | $ 3769 | $ 3100 | $ 2500 | $ 1727 | $ 1269 | $ 1373 | -178 | -309 | 82 | ||||||||||||||||||
OSIRIS-REx | May-13 | GSFC | Planetary | Atlas V | 1 | Ops | $ 7786 | $ 6156 | $ 2340 | $ 1888 | $ 5446 | $ 4268 | -209 | -193 | -216 | ||||||||||||||||||
CYGNSS | Feb-14 | LaRC | Earth | Pegasus | 3 | Ops | $ 1511 | $ 1287 | $ 523 | $ 623 | $ 988 | $ 664 | -148 | 191 | -328 | ||||||||||||||||||
InSight | Mar-14 | JPL | Planetary | Atlas V | 2 | Ops | $ 5418 | $ 6483 | $ 1599 | $ 1685 | $ 3819 | $ 4798 | 197 | 54 | 256 | ||||||||||||||||||
PSP | Mar-14 | GSFC | Helio | Delta IV-H | 1 | Dev | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||
ICESat-2 | May-14 | GSFC | Earth | Delta II | 1 | Dev | $ 7637 | $ 7441 | $ 1188 | $ 1183 | $ 6449 | $ 6258 | -26 | -04 | -30 | ||||||||||||||||||
ICON | Oct-14 | GSFC | Helio | Pegasus | 2 | Dev | $ 1960 | $ 1982 | $ 543 | $ 563 | $ 1417 | $ 1419 | 11 | 37 | 01 | ||||||||||||||||||
TESS | Oct-14 | GSFC | Astro | Falcon 9 | 2 | Ops | $ 3232 | $ 2799 | $ 1141 | $ 874 | $ 2091 | $ 1925 | -134 | -234 | -79 | ||||||||||||||||||
SWOT | May-16 | JPL | Earth | Falcon 9 | 2 | Dev | $ 5715 | $ 5715 | $ 1313 | $ 1078 | $ 4402 | $ 4638 | 00 | -179 | 53 | ||||||||||||||||||
Mars 2020 | Jun-16 | JPL | Planetary | Atlas V | 1 | Dev | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||
Landsat 9 | Dec-17 | GSFC | Earth | Atlas V | 2 | Dev | $ 6342 | $ 6342 | $ 1544 | $ 1542 | $ 4798 | $ 4800 | 00 | -01 | 00 | ||||||||||||||||||
Projects in Development | $ 52749 | $ 52336 | $ 14819 | $ 12738 | $ 37930 | $ 39598 | -08 | -140 | 44 | ||||||||||||||||||||||||
Projects in Operations | $ 66588 | $ 63555 | $ 18647 | $ 18196 | $ 47941 | $ 45359 | -46 | -24 | -54 | ||||||||||||||||||||||||
Total | $ 119337 | $ 115891 | $ 33466 | $ 30935 | $ 85871 | $ 84956 | -29 | -76 | -11 | ||||||||||||||||||||||||
Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | |||||||||||||||||||||||||
GSFC Project Total | $ 68103 | $ 63294 | $ 20377 | $ 18325 | $ 47726 | $ 44969 | -71 | -101 | -58 | ||||||||||||||||||||||||
JPL Projects Total | $ 48041 | $ 49428 | $ 12122 | $ 11384 | $ 35919 | $ 38044 | 29 | -61 | 59 | ||||||||||||||||||||||||
Did not add | GPM | international launch | GSFC Projects in Ops | $ 37838 | $ 33926 | $ 10297 | $ 9059 | $ 27541 | $ 24867 | -103 | -120 | -97 | |||||||||||||||||||||
SOFIA | no launch | JPL Projects in Ops | $ 25557 | $ 26460 | $ 7384 | $ 7911 | $ 18173 | $ 18549 | 35 | 71 | 21 | ||||||||||||||||||||||
JWST | international launch | GSFC Projects in Dev | $ 30265 | $ 29368 | $ 10080 | $ 9266 | $ 20185 | $ 20102 | -30 | -81 | -04 | ||||||||||||||||||||||
RBI | rideshare | JPL Projects in Dev | $ 22484 | $ 22968 | $ 4738 | $ 3473 | $ 17746 | $ 19495 | 22 | -267 | 99 | ||||||||||||||||||||||
Sentinel-6 | international launch | ||||||||||||||||||||||||||||||||
Dawn | no launch vehicle numbers available | Astro | $ 4331 | $ 3961 | $ 1499 | $ 1206 | $ 2832 | $ 2755 | -85 | -195 | -27 | ||||||||||||||||||||||
SNPP | No baseline LV estimate available | Planetary | $ 49020 | $ 47566 | $ 13109 | $ 11437 | $ 35911 | $ 36129 | -30 | -128 | 06 | ||||||||||||||||||||||
NISAR | international launch | Helio | $ 31604 | $ 30808 | $ 11030 | $ 10078 | $ 20574 | $ 20730 | -25 | -86 | 08 | ||||||||||||||||||||||
LCRD | rideshare | Earth | $ 34382 | $ 33556 | $ 7827 | $ 8213 | $ 26555 | $ 25343 | -24 | 49 | -46 | ||||||||||||||||||||||
GRACE-FO | rideshare | ||||||||||||||||||||||||||||||||
Astro - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
Planetary - Dev Only | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||||||||
Helio - Dev Only | $ 16286 | $ 15585 | $ 7348 | $ 6540 | $ 8938 | $ 9045 | -43 | -110 | 12 | ||||||||||||||||||||||||
Earth - Dev Only | $ 19694 | $ 19498 | $ 4045 | $ 3803 | $ 15649 | $ 15695 | -10 | -60 | 03 | ||||||||||||||||||||||||
Atlas V | $ 72920 | $ 69964 | $ 19725 | $ 16926 | $ 53195 | $ 53038 | -41 | -142 | -03 | ||||||||||||||||||||||||
Delta IV-H | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||||||||
Falcon 9 | $ 8947 | $ 8514 | $ 2454 | $ 1952 | $ 6493 | $ 6562 | -48 | -205 | 11 | ||||||||||||||||||||||||
Delta II | $ 19254 | $ 19167 | $ 4711 | $ 5260 | $ 14543 | $ 13907 | -05 | 117 | -44 | this is skewed by OCO-2 which switched from the baseline Taurus XL to the Delta-II at the rebaseline | |||||||||||||||||||||||
Pegasus | $ 5977 | $ 5861 | $ 1828 | $ 1944 | $ 4149 | $ 3917 | -19 | 63 | -56 | ||||||||||||||||||||||||
Minotaur V | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||||||||
Category 1 | $ 58745 | $ 57195 | $ 15104 | $ 13322 | $ 43641 | $ 43873 | -26 | -118 | 05 | ||||||||||||||||||||||||
Category 2 | $ 56575 | $ 54817 | $ 17076 | $ 16232 | $ 39499 | $ 38585 | -31 | -49 | -23 | ||||||||||||||||||||||||
Category 3 | $ 4017 | $ 3879 | $ 1285 | $ 1381 | $ 2732 | $ 2498 | -34 | 75 | -86 | ||||||||||||||||||||||||
Category 1 - Dev Only | $ 34963 | $ 35197 | $ 8918 | $ 7829 | $ 26045 | $ 27368 | 07 | -122 | 51 | ||||||||||||||||||||||||
Category 2 - Dev Only | $ 17786 | $ 17139 | $ 5900 | $ 4909 | $ 11886 | $ 12230 | -36 | -168 | 29 | ||||||||||||||||||||||||
Category 3 - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
LV of Total Dev at Baseline | 280 | ||||||||||||||||||||||||||||||||
LV of Total Dev at FY18 Q3 | 267 | ||||||||||||||||||||||||||||||||
Launch Vehicle Percent Cost Variation from Baseline Estimate in Chronological Order |
Mission | LCC Category | KDP-A (low) | KDP-A (high) | KDP-B (low) | KDP-B (high) | Low Delta (months) | High Delta (months) | KDP-C MA | MA Variance from A | KDP-C ABC | ABC Variance from A | |||||||||||||||
Restore-L | 2 | Jun-20 | Dec-23 | Jun-20 | Dec-20 | 0 | -36 | |||||||||||||||||||
SLS | 1 | Dec-17 | Dec-17 | Mar-17 | Apr-17 | -9 | -8 | Dec-17 | 0 | Nov-18 | 11 | |||||||||||||||
PACE | 2 | Dec-22 | Dec-23 | Aug-22 | Apr-23 | -4 | -8 | |||||||||||||||||||
WFIRST | 1 | Dec-24 | Dec-26 | Sep-25 | Sep-26 | 9 | -3 | |||||||||||||||||||
OCO-3 | 3 | Sep-16 | Dec-16 | Jul-16 | Oct-16 | -2 | -2 | Mar-18 | 18 | May-18 | 17 | |||||||||||||||
PSP | 1 | Aug-18 | Aug-18 | Jul-18 | Jul-18 | -1 | -1 | Aug-18 | 0 | Aug-18 | 0 | |||||||||||||||
LCRD | 2 | Mar-17 | Mar-17 | Feb-17 | Feb-17 | -1 | -1 | Jun-19 | 27 | Nov-19 | 32 | |||||||||||||||
Euclid | 3 | Dec-14 | Dec-14 | Dec-14 | Dec-14 | 0 | 0 | May-15 | 5 | May-16 | 17 | |||||||||||||||
GRACE-FO | 2 | Aug-17 | Aug-17 | Aug-17 | Aug-17 | 0 | 0 | Aug-17 | 0 | Feb-18 | 6 | |||||||||||||||
Mars 2020 | 1 | Jul-20 | Jul-20 | Jul-20 | Jul-20 | 0 | 0 | Jul-20 | 0 | Jul-20 | 0 | |||||||||||||||
SAGE-III | 3 | Aug-14 | Aug-14 | Aug-14 | Aug-14 | 0 | 0 | Aug-14 | 0 | Aug-14 | 0 | |||||||||||||||
SWOT | 2 | Oct-20 | Oct-20 | Oct-20 | Oct-20 | 0 | 0 | Apr-21 | 6 | Apr-22 | 18 | |||||||||||||||
LADEE | 3 | Mar-12 | Mar-12 | May-12 | May-12 | 2 | 2 | May-13 | 14 | Nov-13 | 20 | |||||||||||||||
DART | 2 | Dec-20 | Dec-20 | Dec-20 | May-21 | 0 | 5 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | ||||||||||||||||||
NISAR | 2 | Dec-20 | Dec-21 | Dec-20 | Jun-22 | 0 | 6 | Dec-21 | 12 | Sep-22 | 9 | |||||||||||||||
JASON-3 | 3 | Jul-13 | Jul-13 | Apr-14 | Apr-14 | 9 | 9 | Mar-15 | 20 | Mar-15 | 20 | |||||||||||||||
MMS | 1 | Oct-13 | Oct-13 | Oct-14 | Oct-14 | 12 | 12 | Aug-14 | 10 | Mar-15 | 17 | |||||||||||||||
ECOSTRESS | 3 | May-17 | Mar-18 | Aug-17 | Aug-19 | 3 | 17 | Aug-17 | 3 | Aug-19 | 17 | |||||||||||||||
SMAP | 2 | Mar-13 | Mar-13 | May-15 | May-15 | 26 | 26 | Oct-14 | 19 | Mar-15 | 24 | |||||||||||||||
XARM | 3 | Oct-19 | Oct-19 | Jan-22 | Mar-23 | 27 | 41 | |||||||||||||||||||
SOC | 2 | Apr-15 | Apr-15 | Dec-17 | Dec-18 | 32 | 44 | Jan-17 | 21 | Oct-18 | 42 | |||||||||||||||
Orion | 1 | Dec-17 | Dec-17 | Jun-21 | Mar-22 | 42 | 51 | Aug-21 | 44 | Apr-23 | 64 | |||||||||||||||
MAIA | 3 | NA | NA | Dec-19 | Mar-21 | NA | NA | |||||||||||||||||||
ICON | 3 | NA | NA | Feb-17 | Jun-17 | NA | NA | |||||||||||||||||||
GOLD | 3 | NA | NA | Dec-17 | Dec-17 | NA | NA | |||||||||||||||||||
GeoCarb | 3 | NA | NA | Jun-22 | Jun-23 | NA | NA | |||||||||||||||||||
IXPE | 3 | NA | NA | Dec-20 | Dec-20 | NA | NA | |||||||||||||||||||
Landsat 9 | 2 | NA | NA | Dec-20 | Nov-21 | NA | NA | |||||||||||||||||||
Lucy | 2 | NA | NA | Oct-21 | Nov-21 | NA | NA | |||||||||||||||||||
TROPICS | 3 | NA | NA | Sep-19 | Sep-20 | NA | NA | |||||||||||||||||||
JUICE | 3 | NA | NA | Sep-19 | Sep-19 | NA | NA | |||||||||||||||||||
Psyche | 2 | NA | NA | Aug-22 | Aug-22 | NA | NA | |||||||||||||||||||
Clipper | 1 | NA | NA | Jun-22 | Jul-23 | NA | NA | removed Clipper from schedule calculations due to no KDP-A schedule estimate | ||||||||||||||||||
CLARREO-PF | 3 | Jan-20 | Jan-22 | |||||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
of Pp | (LowMA) | (HighABC) | (LowMA) | (HighABC) | ||||||||||||||||||||||
Category I | 7 | 62 | 165 | 88 | 85 | |||||||||||||||||||||
Category II | 12 | 38 | 109 | 59 | 40 | |||||||||||||||||||||
Category III | 15 | - | -07 | 56 | 96 | |||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
(LowMA) | (HighABC) | (LowMA) | (HighABC) | |||||||||||||||||||||||
Average | 80 | 118 | 66 | 70 | ||||||||||||||||||||||
Median | 15 | - | 00 | 00 | ||||||||||||||||||||||
Standard Deviation | 145 | 233 | 129 | 189 | ||||||||||||||||||||||
Minimum | -12 | -65 | -9 | -36 | ||||||||||||||||||||||
Maximum | 417 | 745 | 42 | 51 |
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | KDP-C MA | KDP-C ABC | MA Variance From A | ABC Variance From A | |||||||||||||||||
Clipper | 1 | $ 4000 | $ 4000 | $ - 0 | 00 | $ 3000 | $ 3100 | $ 100 | 33 | ||||||||||||||||||||||
DART | 2 | $ 270 | $ 291 | $ 21 | 78 | $ 175 | $ 248 | $ 73 | 417 | ||||||||||||||||||||||
Euclid | 3 | $ 110 | $ 110 | $ - 0 | 00 | $ 100 | $ 100 | $ - 0 | 00 | Combined KDP-AB so no possible change | 964 | 1014 | -4 | -8 | |||||||||||||||||
GRACE-FO | 2 | $ 470 | $ 460 | $ (10) | -21 | $ 409 | $ 404 | $ (5) | -12 | 4059 | 4319 | -1 | -8 | ||||||||||||||||||
JASON-3 | 3 | $ 159 | $ 166 | $ 7 | 44 | $ - 0 | $ 158 | 1552 | 1552 | -2 | |||||||||||||||||||||
LADEE | 3 | $ 214 | $ 200 | $ (14) | -65 | $ - 0 | $ 184 | 2359 | 2629 | 23 | |||||||||||||||||||||
LCRD | 2 | $ 239 | $ 239 | $ 0 | 02 | $ 239 | $ 239 | $ 0 | 02 | 2571 | 2627 | 8 | 10 | ||||||||||||||||||
Mars 2020 | 1 | $ 2350 | $ 2351 | $ 1 | 00 | $ 2140 | $ 2186 | $ 46 | 21 | 22727 | 24435 | 6 | 4 | ||||||||||||||||||
MMS | 1 | $ 777 | $ 990 | $ 213 | 275 | $ 777 | $ 928 | $ 151 | 195 | 10026 | 10826 | 29 | 39 | ||||||||||||||||||
NISAR | 2 | $ 808 | $ 808 | $ - 0 | 00 | $ 718 | $ 718 | $ - 0 | 00 | 7953 | 8669 | 11 | 7 | ||||||||||||||||||
OCO-3 | 3 | $ 120 | $ 111 | $ (9) | -71 | $ 100 | $ 101 | $ 1 | 13 | 1108 | 1148 | 11 | -4 | ||||||||||||||||||
Orion | 1 | $ 6391 | $ 10288 | $ 3897 | 610 | $ - 0 | $ 8534 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | 108098 | 112835 | 77 | ||||||||||||||||||||
PACE | 2 | $ 850 | $ 850 | $ - 0 | 00 | $ 805 | $ 805 | $ - 0 | 00 | ||||||||||||||||||||||
PSP | 1 | $ 1300 | $ 1439 | $ 139 | 107 | $ 1000 | $ 1233 | $ 233 | 233 | 13932 | 15534 | 39 | 19 | ||||||||||||||||||
Restore-L | 2 | $ 787 | $ 753 | $ (34) | -43 | $ 500 | $ 628 | $ 128 | 256 | ||||||||||||||||||||||
SAGE-III | 3 | $ 112 | $ 115 | $ 3 | 27 | $ - 0 | $ 104 | 101 | 112 | 0 | |||||||||||||||||||||
SLS | 1 | $ 8855 | $ 8587 | $ (268) | -30 | $ - 0 | $ 7653 | 8394 | 9695 | 9 | |||||||||||||||||||||
SMAP | 2 | $ 514 | $ 649 | $ 135 | 263 | $ - 0 | $ - 0 | $ - 0 | 7218 | 9165 | 78 | ||||||||||||||||||||
SOC | 2 | $ 243 | $ 424 | $ 181 | 745 | $ - 0 | $ 371 | 3662 | 4359 | 79 | |||||||||||||||||||||
SWOT | 2 | $ 752 | $ 757 | $ 5 | 07 | $ 642 | $ 647 | $ 5 | 08 | 7049 | 7549 | 10 | 0 | ||||||||||||||||||
XARM | 3 | $ 172 | $ 217 | $ 45 | 264 | $ 161 | $ 179 | $ 18 | 110 | ||||||||||||||||||||||
Count | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta | Change (low) | Notes | ||||||||||||||||||||||
Category 1 | 6 | $ 23673 | $ 27655 | $ 3982 | 168 | $ 3275 | $ 3606 | $ 331 | 101 | ||||||||||||||||||||||
Category 2 | 9 | $ 4933 | $ 5231 | $ 298 | 61 | $ 4474 | $ 13335 | $ 8861 | 1981 | ||||||||||||||||||||||
Category 3 | 6 | $ 887 | $ 920 | $ 33 | 37 | $ - 0 | $ 7757 | $ 7757 | ERRORDIV0 | ||||||||||||||||||||||
Total | 21 | $ 29493 | $ 33807 | $ 4314 | 146 | $ 7749 | $ 24698 | $ 16949 | 2187 | ||||||||||||||||||||||
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | |||||||||||||||||||||
CLARREO-PF | 3 | $ 75 | $ (75) | -1000 | $ 64 | ||||||||||||||||||||||||||
ICON | 3 | $ 249 | $ 218 | ||||||||||||||||||||||||||||
ECOSTRESS | 3 | $ 56 | $ 49 | ||||||||||||||||||||||||||||
GeoCarb | 3 | $ 181 | $ 171 | ||||||||||||||||||||||||||||
GOLD | 3 | $ 74 | $ 64 | ||||||||||||||||||||||||||||
IXPE | 3 | $ 205 | $ 189 | ||||||||||||||||||||||||||||
JUICE | 3 | $ 119 | $ 103 | ||||||||||||||||||||||||||||
Landsat 9 | 2 | $ 928 | $ 851 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | |||||||||||||||||||||||||||
Lucy | 2 | $ 984 | $ 914 | ||||||||||||||||||||||||||||
Psyche | 2 | $ 957 | $ 907 | ||||||||||||||||||||||||||||
TROPICS | 3 | $ 30 | $ 30 | ||||||||||||||||||||||||||||
MAIA | 3 | $ 178 | $ 150 | ||||||||||||||||||||||||||||
Cost Estimate Deltas - KDP-A to KDP-B | COST Growth () | |||||||||||||||||||
Mission | Estimate | KDP-A | KDP-B | Notes | of Pp | Low (MA) | High (ABC) | |||||||||||||
SOC | High | $ 243 | 745 | $ 424 | Category I | 4 | 127 | 172 | ||||||||||||
Low | $ - 0 | $ 371 | Category II | 5 | -01 | 199 | ||||||||||||||
Orion | High | $ 6391 | 610 | $ 10288 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | Category III | 4 | 00 | 01 | |||||||||||
Low | $ - 0 | $ 8534 | ||||||||||||||||||
SMAP | High | $ 514 | 263 | $ 649 | ||||||||||||||||
Low | $ - 0 | $ - 0 | ||||||||||||||||||
SPP | High | $ 1300 | 107 | $ 1439 | ||||||||||||||||
Low | $ 1000 | 233 | $ 1233 | |||||||||||||||||
JASON-3 | High | $ 159 | 44 | $ 166 | ||||||||||||||||
Low | $ - 0 | $ 158 | ||||||||||||||||||
SAGE-III | High | $ 112 | 27 | $ 115 | ||||||||||||||||
Low | $ - 0 | $ 104 | ||||||||||||||||||
SWOT | High | $ 752 | 07 | $ 757 | ||||||||||||||||
Low | $ 642 | 08 | $ 647 | |||||||||||||||||
Mars 2020 | High | $ 2350 | 00 | $ 2351 | ||||||||||||||||
Low | $ 2140 | 21 | $ 2186 | |||||||||||||||||
NISAR | High | $ 808 | 00 | $ 808 | ||||||||||||||||
Low | $ 718 | 00 | $ 718 | |||||||||||||||||
Euclid | High | $ 110 | 00 | $ 110 | Combined KDP-AB so no change possible | |||||||||||||||
Low | $ 100 | 00 | $ 100 | |||||||||||||||||
GRACE Follow On | High | $ 470 | -21 | $ 460 | ||||||||||||||||
Low | $ 409 | -12 | $ 404 | |||||||||||||||||
SLS | High | $ 8855 | -30 | $ 8587 | ||||||||||||||||
Low | $ - 0 | $ 7653 | ||||||||||||||||||
LADEE | High | $ 214 | -65 | $ 200 | ||||||||||||||||
Low | $ - 0 | $ 184 | ||||||||||||||||||
ProgramProject Name | Category | KDP A to B analysis (13 missions) | |||||||||||||||
ASTRO-H | 3 | ASTRO-Hreg | 3 | bull13 Missions KDP-B Data Unavailable | |||||||||||||
CYGNSS | 3 | CYGNSS | 3 | bull7 Missions KDP-Crsquos have not yet occurred | |||||||||||||
DSCOVR | 3 | DSCOVR | 3 | ||||||||||||||
C | ECOSTRESS | 3 | ECOSTRESS | 3 | |||||||||||||
EUCLID | 3 | EUCLIDreg | 3 | Euclid | |||||||||||||
C | GEDI | 3 | GEDI | 3 | |||||||||||||
GOES-R | 1 | GOES-R | 1 | ||||||||||||||
GOLD | 3 | GOLD | 3 | ||||||||||||||
GPM | 2 | GPM | 2 | ||||||||||||||
GRACE-FO | 2 | GRACE-FO | 2 | GRACE Follow On | |||||||||||||
GSDO | 1 | GSDO | 1 | ||||||||||||||
ICESat-2 | 1 | ICESat-2reg | 1 | ||||||||||||||
ICON | 2 | ICON | 2 | ||||||||||||||
InSight | 2 | InSight | 2 | ||||||||||||||
IRIS | 3 | IRIS | 3 | ||||||||||||||
Jason-3 | 3 | Jason-3 | 3 | JASON-3 | |||||||||||||
JPSS-1 | 1 | JPSS-1 | 1 | ||||||||||||||
JWST | 1 | JWSTreg | 1 | ||||||||||||||
LADEE | 2 | LADEEreg | 2 | LADEE | |||||||||||||
C | LCRD | 3 | LCRD | 3 | |||||||||||||
LDCM | 2 | LDCMreg | 2 | ||||||||||||||
LDSD | 3 | LDSD | 3 | ||||||||||||||
C | Mars 2020 | 1 | Mars 2020 | 1 | Mars 2020 | ||||||||||||
MAVEN | 2 | MAVEN | 2 | ||||||||||||||
MMS | 1 | MMS | 1 | ||||||||||||||
MOMA | 3 | MOMA | 3 | ||||||||||||||
MSL | 1 | MSL | 1 | ||||||||||||||
NICER | 3 | NICER | 3 | ||||||||||||||
C | NISAR | 2 | NISAR | 2 | NISAR | ||||||||||||
NuSTAR | 3 | NuSTARreg | 3 | ||||||||||||||
OCO-2 | 2 | OCO-2 | 2 | ||||||||||||||
C | OCO-3 | 3 | OCO-3 | 3 | |||||||||||||
ORION | 1 | ORION | 1 | Orion | |||||||||||||
OSIRIS Rex | 1 | OSIRIS Rexreg | 1 | ||||||||||||||
SAGE III | 3 | SAGE III | 3 | SAGE-III | |||||||||||||
SGSS | 1 | SGSSreg | 1 | ||||||||||||||
SLS | 1 | SLS | 1 | SLS | |||||||||||||
SMAP | 2 | SMAPreg | 2 | SMAP | |||||||||||||
SOC | 2 | SOC | 2 | SOC | |||||||||||||
SOFIA | 1 | SOFIA | 1 | ||||||||||||||
PSP | 1 | PSP | 1 | PSP | |||||||||||||
C | SWOT | 2 | SWOT | 2 | SWOT | ||||||||||||
TEMPO | 3 | TEMPO | 3 | ||||||||||||||
TESS | 2 | TESS | 2 | ||||||||||||||
Clipper | |||||||||||||||||
DART | |||||||||||||||||
PACE | |||||||||||||||||
Restore-L | |||||||||||||||||
XARM |
Statistics | COST Growth ($M) | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Average | 9 | 9 | 43 | 61 | 136 | 070 | ||||||||
Median | 5 | 6 | 20 | 45 | 112 | 034 | ||||||||
Standard Deviation | 14 | 16 | 73 | 83 | 93 | 081 | ||||||||
Variance | 2 | 3 | 535 | 685 | 871 | 066 | ||||||||
Minimum | -9 | -8 | (71) | (31) | 15 | - 0 | ||||||||
Maximum | 38 | 53 | 244 | 315 | 345 | 242 | ||||||||
no JWST | ||||||||||||||
Statistics | ||||||||||||||
COST Growth | Schedule Growth (months) | Duration (months) | ||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 18 | 17 | 118 | 131 | 1989 | 065 | ||||||||
Median | 20 | 17 | 101 | 132 | 19167 | 0582 | ||||||||
Standard Deviation | 16 | 19 | 105 | 117 | 11557 | 0830 | ||||||||
Sample Variance | 3 | 4 | 1101 | 1377 | 133562 | 0688 | ||||||||
Minimum | -6 | -5 | - 0 | - 0 | 397 | - 0 | ||||||||
Maximum | 46 | 48 | 284 | 274 | 4527 | 310 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 20 | 21 | 156 | 159 | 2031 | 075 | ||||||||
Median | 21 | 20 | 132 | 147 | 20783 | 0589 | ||||||||
Standard Deviation | 17 | 25 | 174 | 155 | 11214 | 0881 | ||||||||
Sample Variance | 3 | 6 | 3035 | 2394 | 125751 | 0776 | ||||||||
Minimum | -6 | -5 | 00 | 00 | 40 | - 0 | ||||||||
Maximum | 48 | 78 | 649 | 528 | 453 | 31 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 4 | 3 | 47 | 136 | 253 | 054 | ||||||||
Median | 9 | 9 | 61 | 132 | 24333 | 042 | ||||||||
Standard Deviation | 10 | 12 | 52 | 56 | 6657 | 022 | ||||||||
Sample Variance | 1 | 1 | 273 | 311 | 44310 | 005 | ||||||||
Minimum | -7 | -11 | (10) | 82 | 1923 | 041 | ||||||||
Maximum | 11 | 11 | 92 | 193 | 3243 | 079 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | ||||||||||||
of Pp | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | ||||||||||
Category I | 6 | 4 | 4 | 22 | 78 | |||||||||
Category II | 9 | 8 | 13 | 71 | 83 | |||||||||
Category III | 8 | 6 | 11 | 28 | 52 | |||||||||
Timeline | Total Programs | 46 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDB C for comaprison | planned | Total Replans | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statictics - PresentFinal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 41416 | 14 | 9 | 9 | 8 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | |||||||||||||||||||||||||||||||||||||
ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||
ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 758 | Feb-16 | 759 | Mar-16 | FY16Q2 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -5 | -10 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||
CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 1595 | Oct-16 | 1742 | May-17 | FY16Q2 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -4 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | ||||||||||||||||||||||||||||||||||||||||
EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 179 | Dec-21 | 190 | Dec-22 | FY16Q2 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 0 | 00 | 5787 | 5480 | |||||||||||||||||||||||||||||||||||||||
GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | ||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 108295 | Oct-16 | kDP-D Sep-14 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | ||||||||||||||||||||||||||||||||||||||||||||||
GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||
GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q2 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -1 | -3 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||
GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4079 | Aug-17 | 4318 | Feb-18 | FY16Q2 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | -00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ESD | GSDO | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 26336 | Jun-18 | 28129 | Nov-18 | FY16Q2 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 9916 | Oct-17 | 10636 | Jun-18 | FY16Q2 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 232 | Jun-17 | 2527 | Oct-17 | FY16Q2 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 1 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Planetary | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | 6536 | Mar-16 | 6751 | Mar-16 | FY16Q2 | N | N | 0 | 0 | 4 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E draft | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||
JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||
LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||
Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
LDCM | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
LDCMreg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 8501 | Feb-13 | 8568 | Feb-13 | FY15Q4 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | ||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||
Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||
MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 598 | Nov-13 | 600 | Nov-13 | FY16Q1 | N | N | 0 | 0 | -7 | -11 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1121 | Sep-15 | 1121 | Sep-15 | FY16Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 11 | 4 | 1320 | 613 | |||||||||||||||||||||||||||||||||||||||||
MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 904 | Jul-18 | 1004 | Jul-18 | FY16Q2 | N | N | 0 | 0 | -1 | -1 | 3347 | 3347 | |||||||||||||||||||||||||||||||||||||||||||||||||
MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||
NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 684 | Feb-17 | 67 | Feb-17 | KDP-D Jan-16 | N | N | 0 | 0 | 9 | -2 | 613 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||
NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||
NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 166 | Jun-12 | 166 | Jun-12 | FY14Q4 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | 3 | 3 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||
OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4276 | Jul-14 | 4276 | Jul-14 | FY16Q2 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -2 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||
OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ORION | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | 108098 | Aug-21 | 112835 | Apr-23 | FY16Q2 | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 10014 | Oct-16 | 10572 | Oct-16 | FY16Q2 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 1 | -1 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13931 | Aug-18 | 15534 | Aug-18 | FY16Q2 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 1265 | Aug-16 | 133 | Aug-16 | FY16Q2 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 20 | 19 | 2437 | 2437 | |||||||||||||||||||||||||||||||||||||||||
SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||
SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1216 | Jul-19 | 1228 | Sep-19 | PPBE18 PMR | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 2 | 2 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ESD | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||
SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | May-15 | 8899 | May-15 | FY16Q2 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 707 | 203 | |||||||||||||||||||||||||||||||||||||||||
SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 2892 | Oct-18 | 3789 | Oct-18 | FY16Q2 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -27 | -13 | 2127 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
SOFIA (Budget) | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 29048 | Feb-14 | 29122 | Feb-14 | FY16Q2 | Budget Reduction | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||
TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 1809 | Sep-17 | 2178 | Nov-17 | FY16Q2 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 31976 | Dec-17 | 3517 | Jun-18 | FY16Q2 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -7 | -7 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Currently in B | Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CLARREO-PF | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DART | KDP-C in July | Mean | 13 | -13 | 55 | 28 | 1729 | 115 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Europa Clipper | 02045454545 | Median | 17 | -06 | 21 | 00 | 17483 | 0862 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GeoCarb | Standard Deviation | 84 | 68 | 88 | 87 | 10875 | 0863 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IXPE | Minimum | -27 | -13 | 00 | -72 | 397 | 050 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lucy | Maximum | 20 | 19 | 335 | 335 | 4527 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MAIA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PACE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Psyche | Paste data from above to this table for analysis | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Restore-L | -27 | -13 | 2127 | - 0 | 1610 | 050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SOC Replan | Breach notification made DM not yet final | -7 | -7 | - 0 | - 0 | 080 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TROPICS | -7 | -11 | - 0 | - 0 | 817 | 060 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
XARM | -5 | -10 | 307 | - 0 | 867 | 088 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -9 | - 0 | (717) | 2767 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -8 | 717 | 717 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -3 | - 0 | (400) | 510 | 058 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -9 | 207 | (400) | 800 | 099 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -1 | 3347 | 3347 | 2240 | 205 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -1 | - 0 | - 0 | 397 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -01 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | - 0 | - 0 | 1053 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | 407 | 1020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | -3 | 707 | 203 | 2577 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | 00 | - 0 | - 0 | 2777 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 00 | - 0 | - 0 | 1887 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | 3 | 710 | 403 | 1167 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | -4 | - 0 | - 0 | 1983 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 4 | 207 | (203) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 5 | - 0 | - 0 | 1917 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | 6 | 103 | - 0 | 2733 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | -2 | 613 | - 0 | 4527 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 1320 | 613 | 503 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 607 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 | 19 | 2437 | 2437 |
Timeline | Total Programs | 46 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDP C for comaprison | planned | Total Replans | 14 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statistics - PresentFinal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 72618 | 20 | 13 | 13 | 9 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 74855 | Feb-16 | 109271 | Mar-16 | FY17 Q1 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -7 | 30 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 159503 | Dec-16 | 159503 | Dec-16 | FY18 Q3 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -12 | 203 | (503) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | 51043 | Apr-18 | 52443 | Aug-19 | KDP-E May-18 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGS | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 27418 | Sep-18 | 28129 | Nov-18 | FY17 Q1 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 4 | 00 | 307 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGSreg | 1 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | 3145 | Dec-19 | 3231 | Jun-20 | Dec-17 | 5115 | 4181 | 31446 | Dec-19 | 31446 | Dec-19 | FY18 Q3 | Y | Y | Y | 16 | 15 | 1827 | 1927 | 3957 | 049 | -0 | -27 | - 0 | (610) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | APD | EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 206214 | Mar-20 | 223452 | Mar-20 | FY18 Q3 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 13 | 176 | 3653 | 2130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | 120774 | Nov-18 | 123774 | Mar-19 | FY18 Q3 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 10150 | Nov-16 | KDP-E Oct-16 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | 663 | Feb-18 | 73 | Apr-18 | KDP-E Dec-17 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16 Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8834 | Feb-14 | 8904 | Feb-14 | FY17 Q3 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -3 | -5 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4059 | May-18 | 4319 | May-18 | FY18 Q3 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | 00 | 910 | 297 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 10561 | Sep-18 | 10636 | Oct-18 | FY18 Q3 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 6 | 00 | 1117 | 407 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 243 | Jun-18 | 2527 | Jun-18 | FY18 Q3 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 6 | 00 | 1217 | 810 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSightreg | 2 | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 8189 | May-18 | 8289 | May-18 | Sep-16 | 1923 | 1538 | 8138 | May-18 | 8138 | May-18 | FY18 Q3 | Y | Y | Y | Y | 23 | 23 | 2637 | 2637 | 3050 | 086 | -1 | -18 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16 Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E Sep-16 | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | 1144 | Sep-19 | 127 | Sep-19 | KDP-C Apr-17 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16 Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTregreg | 1 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 94889 | Nov-20 | 96627 | Mar-21 | May-18 | 10639 | 8277 | 94889 | Nov-20 | 96627 | Mar-21 | FY18 Q3 | Y | Y | Y | 9 | 2940 | 8113 | 036 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15 Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | 8385 | Dec-20 | 885 | Nov-21 | FY18 Q3 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | 2571 | Jun-19 | 2627 | Nov-19 | FY18 Q3 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8 | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8reg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 85006 | Feb-13 | 85666 | Feb-13 | FY18 Q3 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15 Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | 23634 | Jul-20 | 25304 | Jul-20 | FY18 Q3 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 5753 | Nov-13 | 5753 | Nov-13 | FY16 Q3 | N | N | 0 | 0 | -11 | -14 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1098 | Mar-15 | 1098 | Mar-15 | FY18 Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 9 | 1 | 707 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 120243 | Jul-20 | 128226 | Jul-20 | FY18 Q3 | N | N | 0 | 0 | 24 | 27 | 5783 | 5783 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15 Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 694 | Jun-17 | 706 | Aug-17 | KDP-E May-17 | N | N | 0 | 0 | 10 | 3 | 1013 | 603 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | 7953 | Dec-21 | 8969 | Sep-22 | FY18 Q3 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | 0 | 00346060676 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 115315 | Jun-12 | 115315 | Jun-12 | FY15 Q1 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | -39 | -28 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4245 | Jul-14 | 4245 | Jul-14 | FY17 Q1 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -3 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | 113388 | Mar-18 | 113388 | May-18 | FY18 Q3 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orion | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orionreg | 1 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 116581 | Jun-22 | 116581 | Jun-22 | Jun-18 | 8483 | 3746 | 116581 | Jun-22 | 116581 | Jun-22 | FY18 Q3 | Y | N | 7 | 3 | 1013 | (1013) | 3347 | 030 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 9975 | Sep-16 | 10532 | Sep-16 | FY18 Q3 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 0 | -1 | (100) | (100) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13821 | Aug-18 | 15482 | Aug-18 | FY18 Q3 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -1 | -03 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 129364 | Feb-17 | 129364 | Feb-17 | FY18 Q3 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 22 | 16 | 3050 | 3050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1251 | Sep-19 | 1261284 | Nov-19 | Path Forward APMC Dec 2016 | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 4 | 4 | 223 | 267 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16 Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLSreg | 1 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 9734 | Dec-19 | 9843 | Jun-20 | Dec-17 | 1340 | 148 | 98029 | Dec-19 | 98029 | Dec-19 | FY18 Q3 | Y | Y | Y | 14 | 2 | 2433 | 1927 | 4060 | 047 | 1 | -04 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | Jan-15 | 8899 | Jan-15 | FY18 Q3 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 307 | (197) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 3433 | Feb-20 | 3866 | Feb-20 | FY18 Q3 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -7 | -11 | 3753 | 1627 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIAreg | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 15874 | Feb-14 | 15949 | Feb-14 | FY18 Q3 | Y | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | 7049 | Apr-21 | 7549 | Apr-22 | FY18 Q3 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 181242 | Sep-17 | 197242 | Nov-17 | FY18 Q3 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | -94 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 3333 | Apr-18 | 3333 | Jun-18 | FY18 Q3 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -3 | -12 | 403 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mean | 90 | 88 | 50 | 81 | 1773 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02045454545 | Median | 82 | 49 | 10 | 60 | 16233 | 0374 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Standard Deviation | 118 | 164 | 77 | 97 | 13962 | 0647 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum | -7 | -10 | -71 | -31 | 147 | - 0 | SPP | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum | 38 | 59 | 244 | 345 | 7433 | 242 | EUCLIDreg | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GSDO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Paste data from above to this table for analysis | ORION | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-7 | -10 | 607 | 817 | 1923 | 042 | SLS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-3 | -7 | - 0 | - 0 | 147 | - 0 | TEMPO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -7 | 1113 | 1113 | 1887 | 059 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
0 | -6 | - 0 | 613 | 1897 | 032 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total KDPs Within Cost Range of Prior KDP | Total KDPs Within Schedule Range of Prior KDP | -2 | -5 | 303 | 910 | 510 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | -3 | -3 | - 0 | - 0 | 503 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MALow at or below Preceding KDP Low | 14 | 31 | 45 | 31 | MALow at or below Preceding KDP Low | 27 | 26 | 53 | 51 | 6 | 0 | 410 | (100) | 1217 | 008 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABCHigh at or below Preceding KDP High | 19 | 33 | 52 | 37 | ABCHigh at or below Preceding KDP High | 21 | 32 | 53 | 40 | 0 | 0 | (203) | 403 | 167 | 242 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 2 | 810 | 307 | 500 | 061 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-B Cost | KDP-A to KDP-B Schedule | 33 | 5 | - 0 | 100 | 800 | 013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 11 | 8 | 103 | 103 | 2670 | 004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B Low at or below KDP-A Low | 4 | 10 | 14 | 29 | KDP-B Low at or below KDP-A Low | 13 | 9 | 22 | 59 | 9 | 9 | (203) | 503 | 1983 | 025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B High at or below KDP-A High | 9 | 12 | 21 | 43 | KDP-B High at or below KDP-A High | 12 | 10 | 22 | 55 | 11 | 10 | (103) | 1320 | 3243 | 041 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | 10 | 2437 | 3147 | 1610 | 195 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | 10 | 613 | 613 | 3450 | 018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B to KDP-C Cost | KDP-B to KDP-C Schedule | -2 | 11 | 813 | 603 | 1687 | 036 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 9 | 13 | 917 | 1930 | 2433 | 079 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-B Low | 10 | 21 | 31 | 32 | MA at or below KDP-B Low | 14 | 17 | 31 | 45 | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-B High | 10 | 21 | 31 | 32 | ABC at or below KDP-B High | 9 | 22 | 31 | 29 | 16 | 18 | - 0 | 607 | 707 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 31 | 1217 | 1830 | 1027 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-C Cost | KDP-A to KDP-C Schedule | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 29 | 59 | 2233 | 3450 | 7433 | 046 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-A Low | 2 | 7 | 9 | 22 | MA at or below KDP-A Low | 5 | 12 | 17 | 29 | added | 5 | 0 | - 0 | - 0 | 813 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-A High | 5 | 11 | 16 | 31 | ABC at or below KDP-A High | 3 | 14 | 17 | 18 | added | -0 | -0 | 103 | 1013 | 1017 | 100 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 7 | 4 | - 0 | - 0 | 1323 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-C (MA) | KDP-C (ABC) | Replan (MA) | Replan (ABC) | KDP-C to Replan (MA) | KDP-C to Replan (ABC) | KDP-C (or Replan) to PresentFinal (MA) | KDP-C (or Replan) to PresentFinal (ABC) | added | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Percentage of Project CostSchedule HighLow Estimates Within Prior KDP Range Estimates | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B Estimate at or below A Estimate | C Estimate at or below B Estimate | C Estimate at or below A Estimate | Total at or below Preceding KDP Estimate | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - High | 43 | 32 | 31 | 37 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - Low | 29 | 32 | 22 | 31 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - High | 55 | 29 | 18 | 40 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - Low | 59 | 45 | 29 | 51 |
Development Cost Metrics When Controlling for Launch Vehicle Cost Variation
28Avg LV Proportion of Dev Cost Baseline
-8Avg Post-Baseline LV Cost Variation
7
Development Cost Performance When Controlling for Launch Vehicle Cost VariationHow would our development cost reporting metrics change
Lower LV costs can provide unexpected funds to cover growth in reporting
Lower LV costs sometimes have no effect on cost reporting
Higher LV costs can mask otherwise good cost performance
8
bull NASA cost performance has drastically improved since the early 2000rsquos
We are falling short of our portfolio goal of 70 projects hitting cost targets
Our cost and schedule ranges at KDP-A and KDP-B are optimistic and more often than do not capture the eventual high cost or schedule commitments at KDP-C baseline
Development cost reporting metrics can misrepresent how our projects are performing (both positively and negatively) if the LV contract award is well above or below the estimate included in the KDP-C baseline
bull
bull
bull
9
Back-up
10
1111
1212
Total KDPs Within Cost Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 14 31 45 31ABCHigh at or below Preceding KDP High 19 33 52 37
Total KDPs Within Schedule Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 27 26 53 51ABCHigh at or below Preceding KDP High 21 32 53 40
KDP-A to KDP-B CostYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 4 10 14 29KDP-B High at or below KDP-A High 9 12 21 43
KDP-A to KDP-B ScheduleYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 13 9 22 59KDP-B High at or below KDP-A High 12 10 22 55
KDP-B to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-B Low 10 21 31 32ABC at or below KDP-B High 10 21 31 32
KDP-B to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-B Low 14 17 31 45ABC at or below KDP-B High 9 22 31 29
KDP-A to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-A Low 2 7 9 22ABC at or below KDP-A High 5 11 16 31
KDP-A to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-A Low 5 12 17 29ABC at or below KDP-A High 3 14 17 18
COST ($M)
KDP-C to Replan (MA)595000000000000281704999999999999750000000000000014025429999999999993-178400000000000095115-85999999999999943826-25999999999996248E-200911-518999999999999773-1220000000000004531770000000000005117000000000000176266192299999999999951671-2800000000000011401112644044106389999999999965159999999999999425999999999999972-1246900000000005125710000000000002140107999999999999551896472000000000000171666999999999998263820000000000005922000000000000459114748445624775539999999999999103258999999999999811180000000000001939999999999999151167299999999999384830000000000109-33599999999999909-5550000000000011416020000000000005-3200000000000002831553639000000000000974113401372999999999999515260000000000002-5800000000000011429476-180455789999999999997710099999999999994-76000000000000227KDP-C to Replan (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS59500000000000028211499999999999918399999999999977392842000000000001592E-2-3084000000000000941809999999999991-8599999999999994344599999999999994-46999999999997044E-210860399999999999994316E-2978-45-281000000000000238420000000000004520329999999999995419999999999998866751153799999999999951802-108000000000000111623851847387182770000000000073628999999999999770-4297100000000000423299999999999983142-039999999999997726203338000000000000119256712921999999999999321011613781300000000000186840000000000000658600000000000023553999999999999910349911780000000000001329999999999999729948999999999996437460000000000036-88599999999999909-5720000000000004511440000000000009-32000000000000028235100000000000023453000000000000711081481372999999999999503989999999999997729551-18045-210000000000002270-21600000000000023
COST Change ($M)
B to C (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS01047535211267606203370517928286851448611111111110973E-2075077759107650046E-4-98804985102361215E-201486366383447687-7818181818181813E-2030674002751031632-37226838174140057E-4013440860215052999E-30-46012269938650305E-2-61086956521739177E-201085051546391753202363403859567541916901408450704179E-200227818101022070730-65060240963855487E-2071729957805907171E-20592556945781199880779814665592264319368421052631587E-20314499999999999890-4630495689655173E-288694328130947783E-2017749999999999999-42462845010613295E-400166502463054187263934495959166312E-2093093699515347267E-200048437693738375709067597185373168792E-20526615969581748940003366676193198057128745644599303111E-296699259374453242E-233198918775202764E-2-732231404958677E-2-5100766898519711E-279499652536483736E-2-27777777777777801E-203746613545816733204003014143287735301290322580645161315265600825167612E-20176206365503080030010075757575757570-061063923386687424-27818254073387508E-30-54000000000000055E-2
COST Change ()
Cost - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate04285714285714285503225806451612903103125036538461538461536Schedule - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate054545454545454541029032258064516131017647058823529413039622641509433965Cost - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate02857142857142857032258064516129031022222222222222221031111111111111112Schedule - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate059090909090909094045161290322580644029411764705882354050943396226415094
High Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (high)01682251932581422Category 2 Change (high)60501935980863335E-2Category 3 Change (high)37110484780157868E-2Total Change (high)014626442296281486
Low Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (low)010106870229007633Category 2 Change (low)19806591564406897Category 3 Change (low)0Total Change (low)21873131670301591
KDP-A to KDP-B Schedule Growth - Low Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion0-9-49-2-1-100000200912326273242
KDP-A to KDP-B Schedule Growth - High Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion-36-8-8-3-2-1-1000002569121726414451
Cost Variation Against Baselines
13
Methodology and Assumptions
The first step in conducting this analysis was to verify and validate the cost baseline information using source documentation KDP-C figures takes priority as the definitive baseline Where KDP-C decision memoranda was not available as in the case of many projects baselined prior to approximately 2009 figures were pulled from the first appearance as a development project in a Presidentrsquos Budget as the baseline against which to measure In a few cases notificationsreports to Congress (eg NSPD-49 reports) were used to identify a baseline figure MA figures were pulled solely from decision memoranda and thus our dataset with regard to MArsquos is smaller as it excludes many of the older projects that did not have standardized baseline documentation with MArsquos noted Variance to the baseline was then measured by using the most recent quarterly cost and schedule report Latest cost data is valid through the FY18 Q3 reporting period Slide 3 charts illustrate each project in the dataset with respective LCC and dev cost variances
The confidence level policy applied to each project was noted using source documentation as well as a cross-reference against when policy changes were implemented recognizing that a subset of projects received waivers to new policies during policy transition Certain exclusions were applied to ensure a dataset comparable across projects For example SOFIA had conducted a JCL on a replan but the decision memorandum made clear the baseline was not changing therefore the JCL confidence level could not fairly be applied to measure performance against the baseline Another example is GPM which was excluded as it was one of the very first projects baselined after JCL policy implementation and was not a ldquotruerdquo JCL with the decision memorandum noting that the intent was met while a JCL DPMC would be held many months later to evaluate progress There were a couple of additional exclusions applied
When a project is confirmed at KDP-C cost performance measurements were applied to that baseline If a project was then rebaselined a ldquonewrdquo project was added to the dataset using the rebaselined figures against which to measure as the Agency made the decision at that point to press ahead with the project and Congress provided reauthorization The ldquooriginalrdquo project was ldquofrozenrdquo in terms of development phase to fairly capture the contemporary phase performance (eg the ldquooriginalrdquo OCO-2 cost growth will always be categorized within the ldquoprojects in developmentrdquo performance category while the rebaselined OCO-2 cost performance falls into the ldquoprojects launchedrdquo category) The latest cost figures however were used to measure cost performance across both original baselines and rebaselines in order to fairly capture the accuracy of original estimates against final outcomes
This insight while placing an emphasis on the JCL while measuring performance does not intend to convey a discovered causal relationship between JCL and cost performance There have been many other related programmatic and technical advancements over the past 10 to 20 years that have influenced cost and schedule performance in the overall positive direction Other insights look into other influencers of costschedule performance
13
Dev Cost Metrics Controlling for LV Cost Variation
14
Methodology and Assumptions
SID pulled a number of data elements from a total of 22 SMD projects to conduct this analysis Data elements from a projectrsquos baseline include total development cost and the launch services cost estimate and have been sourced from KDP documentation quarterly reports and Cost Analysis Data Requirements (CADREs) These data were compared to currentactual total development and launch services costs from the most recent KDPquarterly reports Other data elements include Division Lead Center type of launch vehicle LCC category and current phase
SID calculated the overall development cost deltas from the baseline cost and verified the percentage growth with external reporting data where applicable SID then calculated the percent change in launch services development cost from baseline to currentactual The development cost percent change was calculated after removing launch services from the inputs
For further insight these same calculations were conducted by Division Lead Center type of launch vehicle and LCC category Division Lead Center and LCC category were then further broken down by looking only at projects currently in development
The 22 projects used in this analysis include Mars 2020 ICESat-2 ICON InSight SOC PSP SWOT TESS Juno Landsat-8 MMS OSIRIS-REx SMAP MAVEN GRAIL NuSTAR RBSP IRIS LADEE OCO-2 CYGNSS and Landsat 9 Representation includes seven planetary science seven earth science six heliophysics and two astrophysics missions twelve GSFC-led projects and eight JPL-led projects (LaRC and ARC representing the other two) ten Atlas V one Delta IV-H two Falcon 9 four Delta II four Pegasus and one Minotaur V rockets and six category 1 thirteen category 2 and three category 3 projects Seven projects assessed are currently in development
Other projects considered were excluded if launch was or is to be on a ride-share and launch services costs were negligible (eg RBI) Projects launching on internationally-contributed rockets were also excluded (eg GPM JWST) Other exclusions were based on data limitations at the time of analysis (eg no launch services costs available from baseline)
Did not add GPM international launchSOFIA no launchJWST international launch
RBI rideshareSentinel-6 international launch
Dawn no launch vehicle numbers availableSNPP No baseline LV estimate available
NISAR international launchLCRD rideshare
GRACE-FO rideshare
14
Formulation KDPs
15
Methodology and Assumptions
Comparative analysis was conducted where possible (ie when highlow costschedule figures were available in KDP-ABC decision memoranda This analysis does not attempt to explain why the majority of costschedule estimates at KDPrsquos exceed prior estimates
Cost and schedule ranges were extracted from KDP-A and KDP-B decision memoranda Agency Baseline Commitments and Management Agreements were extracted from KDP-C decision memoranda Lifecycle cost was used in all cases (as opposed to development cost only) A project did not need to have all KDP-A through C figures to be included in the analysis (eg a project that did not have a KDP-A range was still included in the KDP-B to KDP-C statistics)
This analysis includes data from KDP-A KDP-B and KDP-C milestones At KDP-A and KDP-B a high and low estimate is established for both cost and schedule At KDP-C a Management Agreement and an Agency Baseline Commitment is established for both cost and schedule For ease of conveyance this analysis equates the Management Agreement as the low estimate for KDP-C and equates the Agency Baselines Commitment as the high estimate for KDP-C
15
Column1 | KDP-C Date | Lead Center | Division | Launch Vehicle | LCC Category | Phase | Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | Notes | |||||||||||||||||
Juno | Aug-08 | JPL | Planetary | Atlas V | 1 | Ops | $ 7423 | $ 7089 | $ 1904 | $ 1817 | $ 5519 | $ 5272 | -45 | -46 | -45 | ||||||||||||||||||
RBSP | Dec-08 | GSFC | Helio | Atlas V | 2 | Ops | $ 5338 | $ 5040 | $ 1336 | $ 1324 | $ 4002 | $ 3716 | -56 | -09 | -71 | ||||||||||||||||||
GRAIL | Jan-09 | JPL | Planetary | Delta II | 2 | Ops | $ 4270 | $ 3983 | $ 1528 | $ 1508 | $ 2742 | $ 2475 | -67 | -13 | -97 | ||||||||||||||||||
MMS | Jun-09 | GSFC | Helio | Atlas V | 1 | Ops | $ 8573 | $ 8753 | $ 1942 | $ 1788 | $ 6631 | $ 6965 | 21 | -79 | 50 | ||||||||||||||||||
NuSTAR | Sep-09 | JPL | Astro | Pegasus | 3 | Ops | $ 1099 | $ 1162 | $ 358 | $ 332 | $ 741 | $ 830 | 57 | -73 | 120 | ||||||||||||||||||
Landsat-8 | Dec-09 | GSFC | Earth | Atlas V | 2 | Ops | $ 5830 | $ 5028 | $ 1264 | $ 1218 | $ 4566 | $ 3810 | -138 | -36 | -166 | ||||||||||||||||||
LADEE | Aug-10 | ARC | Planetary | Minotaur V | 2 | Ops | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||
OCO-2 | Sep-10 | JPL | Earth | Delta II | 2 | Ops | $ 2490 | $ 3200 | $ 676 | $ 1368 | $ 1814 | $ 1832 | 285 | 1024 | 10 | against original baseline rebaseline primary LV-driven aside from some RWA issues | |||||||||||||||||
MAVEN | Oct-10 | GSFC | Planetary | Atlas V | 2 | Ops | $ 5672 | $ 4720 | $ 1870 | $ 1541 | $ 3802 | $ 3179 | -168 | -176 | -164 | ||||||||||||||||||
IRIS | Nov-10 | GSFC | Helio | Pegasus | 3 | Ops | $ 1407 | $ 1430 | $ 404 | $ 426 | $ 1003 | $ 1004 | 16 | 54 | 01 | ||||||||||||||||||
SMAP | May-12 | JPL | Earth | Delta II | 2 | Ops | $ 4857 | $ 4543 | $ 1319 | $ 1201 | $ 3538 | $ 3342 | -65 | -89 | -55 | ||||||||||||||||||
SOC | Mar-13 | GSFC | Helio | Atlas V | 2 | Dev | $ 3769 | $ 3100 | $ 2500 | $ 1727 | $ 1269 | $ 1373 | -178 | -309 | 82 | ||||||||||||||||||
OSIRIS-REx | May-13 | GSFC | Planetary | Atlas V | 1 | Ops | $ 7786 | $ 6156 | $ 2340 | $ 1888 | $ 5446 | $ 4268 | -209 | -193 | -216 | ||||||||||||||||||
CYGNSS | Feb-14 | LaRC | Earth | Pegasus | 3 | Ops | $ 1511 | $ 1287 | $ 523 | $ 623 | $ 988 | $ 664 | -148 | 191 | -328 | ||||||||||||||||||
InSight | Mar-14 | JPL | Planetary | Atlas V | 2 | Ops | $ 5418 | $ 6483 | $ 1599 | $ 1685 | $ 3819 | $ 4798 | 197 | 54 | 256 | ||||||||||||||||||
PSP | Mar-14 | GSFC | Helio | Delta IV-H | 1 | Dev | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||
ICESat-2 | May-14 | GSFC | Earth | Delta II | 1 | Dev | $ 7637 | $ 7441 | $ 1188 | $ 1183 | $ 6449 | $ 6258 | -26 | -04 | -30 | ||||||||||||||||||
ICON | Oct-14 | GSFC | Helio | Pegasus | 2 | Dev | $ 1960 | $ 1982 | $ 543 | $ 563 | $ 1417 | $ 1419 | 11 | 37 | 01 | ||||||||||||||||||
TESS | Oct-14 | GSFC | Astro | Falcon 9 | 2 | Ops | $ 3232 | $ 2799 | $ 1141 | $ 874 | $ 2091 | $ 1925 | -134 | -234 | -79 | ||||||||||||||||||
SWOT | May-16 | JPL | Earth | Falcon 9 | 2 | Dev | $ 5715 | $ 5715 | $ 1313 | $ 1078 | $ 4402 | $ 4638 | 00 | -179 | 53 | ||||||||||||||||||
Mars 2020 | Jun-16 | JPL | Planetary | Atlas V | 1 | Dev | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||
Landsat 9 | Dec-17 | GSFC | Earth | Atlas V | 2 | Dev | $ 6342 | $ 6342 | $ 1544 | $ 1542 | $ 4798 | $ 4800 | 00 | -01 | 00 | ||||||||||||||||||
Projects in Development | $ 52749 | $ 52336 | $ 14819 | $ 12738 | $ 37930 | $ 39598 | -08 | -140 | 44 | ||||||||||||||||||||||||
Projects in Operations | $ 66588 | $ 63555 | $ 18647 | $ 18196 | $ 47941 | $ 45359 | -46 | -24 | -54 | ||||||||||||||||||||||||
Total | $ 119337 | $ 115891 | $ 33466 | $ 30935 | $ 85871 | $ 84956 | -29 | -76 | -11 | ||||||||||||||||||||||||
Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | |||||||||||||||||||||||||
GSFC Project Total | $ 68103 | $ 63294 | $ 20377 | $ 18325 | $ 47726 | $ 44969 | -71 | -101 | -58 | ||||||||||||||||||||||||
JPL Projects Total | $ 48041 | $ 49428 | $ 12122 | $ 11384 | $ 35919 | $ 38044 | 29 | -61 | 59 | ||||||||||||||||||||||||
Did not add | GPM | international launch | GSFC Projects in Ops | $ 37838 | $ 33926 | $ 10297 | $ 9059 | $ 27541 | $ 24867 | -103 | -120 | -97 | |||||||||||||||||||||
SOFIA | no launch | JPL Projects in Ops | $ 25557 | $ 26460 | $ 7384 | $ 7911 | $ 18173 | $ 18549 | 35 | 71 | 21 | ||||||||||||||||||||||
JWST | international launch | GSFC Projects in Dev | $ 30265 | $ 29368 | $ 10080 | $ 9266 | $ 20185 | $ 20102 | -30 | -81 | -04 | ||||||||||||||||||||||
RBI | rideshare | JPL Projects in Dev | $ 22484 | $ 22968 | $ 4738 | $ 3473 | $ 17746 | $ 19495 | 22 | -267 | 99 | ||||||||||||||||||||||
Sentinel-6 | international launch | ||||||||||||||||||||||||||||||||
Dawn | no launch vehicle numbers available | Astro | $ 4331 | $ 3961 | $ 1499 | $ 1206 | $ 2832 | $ 2755 | -85 | -195 | -27 | ||||||||||||||||||||||
SNPP | No baseline LV estimate available | Planetary | $ 49020 | $ 47566 | $ 13109 | $ 11437 | $ 35911 | $ 36129 | -30 | -128 | 06 | ||||||||||||||||||||||
NISAR | international launch | Helio | $ 31604 | $ 30808 | $ 11030 | $ 10078 | $ 20574 | $ 20730 | -25 | -86 | 08 | ||||||||||||||||||||||
LCRD | rideshare | Earth | $ 34382 | $ 33556 | $ 7827 | $ 8213 | $ 26555 | $ 25343 | -24 | 49 | -46 | ||||||||||||||||||||||
GRACE-FO | rideshare | ||||||||||||||||||||||||||||||||
Astro - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
Planetary - Dev Only | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||||||||
Helio - Dev Only | $ 16286 | $ 15585 | $ 7348 | $ 6540 | $ 8938 | $ 9045 | -43 | -110 | 12 | ||||||||||||||||||||||||
Earth - Dev Only | $ 19694 | $ 19498 | $ 4045 | $ 3803 | $ 15649 | $ 15695 | -10 | -60 | 03 | ||||||||||||||||||||||||
Atlas V | $ 72920 | $ 69964 | $ 19725 | $ 16926 | $ 53195 | $ 53038 | -41 | -142 | -03 | ||||||||||||||||||||||||
Delta IV-H | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||||||||
Falcon 9 | $ 8947 | $ 8514 | $ 2454 | $ 1952 | $ 6493 | $ 6562 | -48 | -205 | 11 | ||||||||||||||||||||||||
Delta II | $ 19254 | $ 19167 | $ 4711 | $ 5260 | $ 14543 | $ 13907 | -05 | 117 | -44 | this is skewed by OCO-2 which switched from the baseline Taurus XL to the Delta-II at the rebaseline | |||||||||||||||||||||||
Pegasus | $ 5977 | $ 5861 | $ 1828 | $ 1944 | $ 4149 | $ 3917 | -19 | 63 | -56 | ||||||||||||||||||||||||
Minotaur V | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||||||||
Category 1 | $ 58745 | $ 57195 | $ 15104 | $ 13322 | $ 43641 | $ 43873 | -26 | -118 | 05 | ||||||||||||||||||||||||
Category 2 | $ 56575 | $ 54817 | $ 17076 | $ 16232 | $ 39499 | $ 38585 | -31 | -49 | -23 | ||||||||||||||||||||||||
Category 3 | $ 4017 | $ 3879 | $ 1285 | $ 1381 | $ 2732 | $ 2498 | -34 | 75 | -86 | ||||||||||||||||||||||||
Category 1 - Dev Only | $ 34963 | $ 35197 | $ 8918 | $ 7829 | $ 26045 | $ 27368 | 07 | -122 | 51 | ||||||||||||||||||||||||
Category 2 - Dev Only | $ 17786 | $ 17139 | $ 5900 | $ 4909 | $ 11886 | $ 12230 | -36 | -168 | 29 | ||||||||||||||||||||||||
Category 3 - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
LV of Total Dev at Baseline | 280 | ||||||||||||||||||||||||||||||||
LV of Total Dev at FY18 Q3 | 267 | ||||||||||||||||||||||||||||||||
Launch Vehicle Percent Cost Variation from Baseline Estimate in Chronological Order |
Mission | LCC Category | KDP-A (low) | KDP-A (high) | KDP-B (low) | KDP-B (high) | Low Delta (months) | High Delta (months) | KDP-C MA | MA Variance from A | KDP-C ABC | ABC Variance from A | |||||||||||||||
Restore-L | 2 | Jun-20 | Dec-23 | Jun-20 | Dec-20 | 0 | -36 | |||||||||||||||||||
SLS | 1 | Dec-17 | Dec-17 | Mar-17 | Apr-17 | -9 | -8 | Dec-17 | 0 | Nov-18 | 11 | |||||||||||||||
PACE | 2 | Dec-22 | Dec-23 | Aug-22 | Apr-23 | -4 | -8 | |||||||||||||||||||
WFIRST | 1 | Dec-24 | Dec-26 | Sep-25 | Sep-26 | 9 | -3 | |||||||||||||||||||
OCO-3 | 3 | Sep-16 | Dec-16 | Jul-16 | Oct-16 | -2 | -2 | Mar-18 | 18 | May-18 | 17 | |||||||||||||||
PSP | 1 | Aug-18 | Aug-18 | Jul-18 | Jul-18 | -1 | -1 | Aug-18 | 0 | Aug-18 | 0 | |||||||||||||||
LCRD | 2 | Mar-17 | Mar-17 | Feb-17 | Feb-17 | -1 | -1 | Jun-19 | 27 | Nov-19 | 32 | |||||||||||||||
Euclid | 3 | Dec-14 | Dec-14 | Dec-14 | Dec-14 | 0 | 0 | May-15 | 5 | May-16 | 17 | |||||||||||||||
GRACE-FO | 2 | Aug-17 | Aug-17 | Aug-17 | Aug-17 | 0 | 0 | Aug-17 | 0 | Feb-18 | 6 | |||||||||||||||
Mars 2020 | 1 | Jul-20 | Jul-20 | Jul-20 | Jul-20 | 0 | 0 | Jul-20 | 0 | Jul-20 | 0 | |||||||||||||||
SAGE-III | 3 | Aug-14 | Aug-14 | Aug-14 | Aug-14 | 0 | 0 | Aug-14 | 0 | Aug-14 | 0 | |||||||||||||||
SWOT | 2 | Oct-20 | Oct-20 | Oct-20 | Oct-20 | 0 | 0 | Apr-21 | 6 | Apr-22 | 18 | |||||||||||||||
LADEE | 3 | Mar-12 | Mar-12 | May-12 | May-12 | 2 | 2 | May-13 | 14 | Nov-13 | 20 | |||||||||||||||
DART | 2 | Dec-20 | Dec-20 | Dec-20 | May-21 | 0 | 5 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | ||||||||||||||||||
NISAR | 2 | Dec-20 | Dec-21 | Dec-20 | Jun-22 | 0 | 6 | Dec-21 | 12 | Sep-22 | 9 | |||||||||||||||
JASON-3 | 3 | Jul-13 | Jul-13 | Apr-14 | Apr-14 | 9 | 9 | Mar-15 | 20 | Mar-15 | 20 | |||||||||||||||
MMS | 1 | Oct-13 | Oct-13 | Oct-14 | Oct-14 | 12 | 12 | Aug-14 | 10 | Mar-15 | 17 | |||||||||||||||
ECOSTRESS | 3 | May-17 | Mar-18 | Aug-17 | Aug-19 | 3 | 17 | Aug-17 | 3 | Aug-19 | 17 | |||||||||||||||
SMAP | 2 | Mar-13 | Mar-13 | May-15 | May-15 | 26 | 26 | Oct-14 | 19 | Mar-15 | 24 | |||||||||||||||
XARM | 3 | Oct-19 | Oct-19 | Jan-22 | Mar-23 | 27 | 41 | |||||||||||||||||||
SOC | 2 | Apr-15 | Apr-15 | Dec-17 | Dec-18 | 32 | 44 | Jan-17 | 21 | Oct-18 | 42 | |||||||||||||||
Orion | 1 | Dec-17 | Dec-17 | Jun-21 | Mar-22 | 42 | 51 | Aug-21 | 44 | Apr-23 | 64 | |||||||||||||||
MAIA | 3 | NA | NA | Dec-19 | Mar-21 | NA | NA | |||||||||||||||||||
ICON | 3 | NA | NA | Feb-17 | Jun-17 | NA | NA | |||||||||||||||||||
GOLD | 3 | NA | NA | Dec-17 | Dec-17 | NA | NA | |||||||||||||||||||
GeoCarb | 3 | NA | NA | Jun-22 | Jun-23 | NA | NA | |||||||||||||||||||
IXPE | 3 | NA | NA | Dec-20 | Dec-20 | NA | NA | |||||||||||||||||||
Landsat 9 | 2 | NA | NA | Dec-20 | Nov-21 | NA | NA | |||||||||||||||||||
Lucy | 2 | NA | NA | Oct-21 | Nov-21 | NA | NA | |||||||||||||||||||
TROPICS | 3 | NA | NA | Sep-19 | Sep-20 | NA | NA | |||||||||||||||||||
JUICE | 3 | NA | NA | Sep-19 | Sep-19 | NA | NA | |||||||||||||||||||
Psyche | 2 | NA | NA | Aug-22 | Aug-22 | NA | NA | |||||||||||||||||||
Clipper | 1 | NA | NA | Jun-22 | Jul-23 | NA | NA | removed Clipper from schedule calculations due to no KDP-A schedule estimate | ||||||||||||||||||
CLARREO-PF | 3 | Jan-20 | Jan-22 | |||||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
of Pp | (LowMA) | (HighABC) | (LowMA) | (HighABC) | ||||||||||||||||||||||
Category I | 7 | 62 | 165 | 88 | 85 | |||||||||||||||||||||
Category II | 12 | 38 | 109 | 59 | 40 | |||||||||||||||||||||
Category III | 15 | - | -07 | 56 | 96 | |||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
(LowMA) | (HighABC) | (LowMA) | (HighABC) | |||||||||||||||||||||||
Average | 80 | 118 | 66 | 70 | ||||||||||||||||||||||
Median | 15 | - | 00 | 00 | ||||||||||||||||||||||
Standard Deviation | 145 | 233 | 129 | 189 | ||||||||||||||||||||||
Minimum | -12 | -65 | -9 | -36 | ||||||||||||||||||||||
Maximum | 417 | 745 | 42 | 51 |
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | KDP-C MA | KDP-C ABC | MA Variance From A | ABC Variance From A | |||||||||||||||||
Clipper | 1 | $ 4000 | $ 4000 | $ - 0 | 00 | $ 3000 | $ 3100 | $ 100 | 33 | ||||||||||||||||||||||
DART | 2 | $ 270 | $ 291 | $ 21 | 78 | $ 175 | $ 248 | $ 73 | 417 | ||||||||||||||||||||||
Euclid | 3 | $ 110 | $ 110 | $ - 0 | 00 | $ 100 | $ 100 | $ - 0 | 00 | Combined KDP-AB so no possible change | 964 | 1014 | -4 | -8 | |||||||||||||||||
GRACE-FO | 2 | $ 470 | $ 460 | $ (10) | -21 | $ 409 | $ 404 | $ (5) | -12 | 4059 | 4319 | -1 | -8 | ||||||||||||||||||
JASON-3 | 3 | $ 159 | $ 166 | $ 7 | 44 | $ - 0 | $ 158 | 1552 | 1552 | -2 | |||||||||||||||||||||
LADEE | 3 | $ 214 | $ 200 | $ (14) | -65 | $ - 0 | $ 184 | 2359 | 2629 | 23 | |||||||||||||||||||||
LCRD | 2 | $ 239 | $ 239 | $ 0 | 02 | $ 239 | $ 239 | $ 0 | 02 | 2571 | 2627 | 8 | 10 | ||||||||||||||||||
Mars 2020 | 1 | $ 2350 | $ 2351 | $ 1 | 00 | $ 2140 | $ 2186 | $ 46 | 21 | 22727 | 24435 | 6 | 4 | ||||||||||||||||||
MMS | 1 | $ 777 | $ 990 | $ 213 | 275 | $ 777 | $ 928 | $ 151 | 195 | 10026 | 10826 | 29 | 39 | ||||||||||||||||||
NISAR | 2 | $ 808 | $ 808 | $ - 0 | 00 | $ 718 | $ 718 | $ - 0 | 00 | 7953 | 8669 | 11 | 7 | ||||||||||||||||||
OCO-3 | 3 | $ 120 | $ 111 | $ (9) | -71 | $ 100 | $ 101 | $ 1 | 13 | 1108 | 1148 | 11 | -4 | ||||||||||||||||||
Orion | 1 | $ 6391 | $ 10288 | $ 3897 | 610 | $ - 0 | $ 8534 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | 108098 | 112835 | 77 | ||||||||||||||||||||
PACE | 2 | $ 850 | $ 850 | $ - 0 | 00 | $ 805 | $ 805 | $ - 0 | 00 | ||||||||||||||||||||||
PSP | 1 | $ 1300 | $ 1439 | $ 139 | 107 | $ 1000 | $ 1233 | $ 233 | 233 | 13932 | 15534 | 39 | 19 | ||||||||||||||||||
Restore-L | 2 | $ 787 | $ 753 | $ (34) | -43 | $ 500 | $ 628 | $ 128 | 256 | ||||||||||||||||||||||
SAGE-III | 3 | $ 112 | $ 115 | $ 3 | 27 | $ - 0 | $ 104 | 101 | 112 | 0 | |||||||||||||||||||||
SLS | 1 | $ 8855 | $ 8587 | $ (268) | -30 | $ - 0 | $ 7653 | 8394 | 9695 | 9 | |||||||||||||||||||||
SMAP | 2 | $ 514 | $ 649 | $ 135 | 263 | $ - 0 | $ - 0 | $ - 0 | 7218 | 9165 | 78 | ||||||||||||||||||||
SOC | 2 | $ 243 | $ 424 | $ 181 | 745 | $ - 0 | $ 371 | 3662 | 4359 | 79 | |||||||||||||||||||||
SWOT | 2 | $ 752 | $ 757 | $ 5 | 07 | $ 642 | $ 647 | $ 5 | 08 | 7049 | 7549 | 10 | 0 | ||||||||||||||||||
XARM | 3 | $ 172 | $ 217 | $ 45 | 264 | $ 161 | $ 179 | $ 18 | 110 | ||||||||||||||||||||||
Count | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta | Change (low) | Notes | ||||||||||||||||||||||
Category 1 | 6 | $ 23673 | $ 27655 | $ 3982 | 168 | $ 3275 | $ 3606 | $ 331 | 101 | ||||||||||||||||||||||
Category 2 | 9 | $ 4933 | $ 5231 | $ 298 | 61 | $ 4474 | $ 13335 | $ 8861 | 1981 | ||||||||||||||||||||||
Category 3 | 6 | $ 887 | $ 920 | $ 33 | 37 | $ - 0 | $ 7757 | $ 7757 | ERRORDIV0 | ||||||||||||||||||||||
Total | 21 | $ 29493 | $ 33807 | $ 4314 | 146 | $ 7749 | $ 24698 | $ 16949 | 2187 | ||||||||||||||||||||||
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | |||||||||||||||||||||
CLARREO-PF | 3 | $ 75 | $ (75) | -1000 | $ 64 | ||||||||||||||||||||||||||
ICON | 3 | $ 249 | $ 218 | ||||||||||||||||||||||||||||
ECOSTRESS | 3 | $ 56 | $ 49 | ||||||||||||||||||||||||||||
GeoCarb | 3 | $ 181 | $ 171 | ||||||||||||||||||||||||||||
GOLD | 3 | $ 74 | $ 64 | ||||||||||||||||||||||||||||
IXPE | 3 | $ 205 | $ 189 | ||||||||||||||||||||||||||||
JUICE | 3 | $ 119 | $ 103 | ||||||||||||||||||||||||||||
Landsat 9 | 2 | $ 928 | $ 851 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | |||||||||||||||||||||||||||
Lucy | 2 | $ 984 | $ 914 | ||||||||||||||||||||||||||||
Psyche | 2 | $ 957 | $ 907 | ||||||||||||||||||||||||||||
TROPICS | 3 | $ 30 | $ 30 | ||||||||||||||||||||||||||||
MAIA | 3 | $ 178 | $ 150 | ||||||||||||||||||||||||||||
Cost Estimate Deltas - KDP-A to KDP-B | COST Growth () | |||||||||||||||||||
Mission | Estimate | KDP-A | KDP-B | Notes | of Pp | Low (MA) | High (ABC) | |||||||||||||
SOC | High | $ 243 | 745 | $ 424 | Category I | 4 | 127 | 172 | ||||||||||||
Low | $ - 0 | $ 371 | Category II | 5 | -01 | 199 | ||||||||||||||
Orion | High | $ 6391 | 610 | $ 10288 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | Category III | 4 | 00 | 01 | |||||||||||
Low | $ - 0 | $ 8534 | ||||||||||||||||||
SMAP | High | $ 514 | 263 | $ 649 | ||||||||||||||||
Low | $ - 0 | $ - 0 | ||||||||||||||||||
SPP | High | $ 1300 | 107 | $ 1439 | ||||||||||||||||
Low | $ 1000 | 233 | $ 1233 | |||||||||||||||||
JASON-3 | High | $ 159 | 44 | $ 166 | ||||||||||||||||
Low | $ - 0 | $ 158 | ||||||||||||||||||
SAGE-III | High | $ 112 | 27 | $ 115 | ||||||||||||||||
Low | $ - 0 | $ 104 | ||||||||||||||||||
SWOT | High | $ 752 | 07 | $ 757 | ||||||||||||||||
Low | $ 642 | 08 | $ 647 | |||||||||||||||||
Mars 2020 | High | $ 2350 | 00 | $ 2351 | ||||||||||||||||
Low | $ 2140 | 21 | $ 2186 | |||||||||||||||||
NISAR | High | $ 808 | 00 | $ 808 | ||||||||||||||||
Low | $ 718 | 00 | $ 718 | |||||||||||||||||
Euclid | High | $ 110 | 00 | $ 110 | Combined KDP-AB so no change possible | |||||||||||||||
Low | $ 100 | 00 | $ 100 | |||||||||||||||||
GRACE Follow On | High | $ 470 | -21 | $ 460 | ||||||||||||||||
Low | $ 409 | -12 | $ 404 | |||||||||||||||||
SLS | High | $ 8855 | -30 | $ 8587 | ||||||||||||||||
Low | $ - 0 | $ 7653 | ||||||||||||||||||
LADEE | High | $ 214 | -65 | $ 200 | ||||||||||||||||
Low | $ - 0 | $ 184 | ||||||||||||||||||
ProgramProject Name | Category | KDP A to B analysis (13 missions) | |||||||||||||||
ASTRO-H | 3 | ASTRO-Hreg | 3 | bull13 Missions KDP-B Data Unavailable | |||||||||||||
CYGNSS | 3 | CYGNSS | 3 | bull7 Missions KDP-Crsquos have not yet occurred | |||||||||||||
DSCOVR | 3 | DSCOVR | 3 | ||||||||||||||
C | ECOSTRESS | 3 | ECOSTRESS | 3 | |||||||||||||
EUCLID | 3 | EUCLIDreg | 3 | Euclid | |||||||||||||
C | GEDI | 3 | GEDI | 3 | |||||||||||||
GOES-R | 1 | GOES-R | 1 | ||||||||||||||
GOLD | 3 | GOLD | 3 | ||||||||||||||
GPM | 2 | GPM | 2 | ||||||||||||||
GRACE-FO | 2 | GRACE-FO | 2 | GRACE Follow On | |||||||||||||
GSDO | 1 | GSDO | 1 | ||||||||||||||
ICESat-2 | 1 | ICESat-2reg | 1 | ||||||||||||||
ICON | 2 | ICON | 2 | ||||||||||||||
InSight | 2 | InSight | 2 | ||||||||||||||
IRIS | 3 | IRIS | 3 | ||||||||||||||
Jason-3 | 3 | Jason-3 | 3 | JASON-3 | |||||||||||||
JPSS-1 | 1 | JPSS-1 | 1 | ||||||||||||||
JWST | 1 | JWSTreg | 1 | ||||||||||||||
LADEE | 2 | LADEEreg | 2 | LADEE | |||||||||||||
C | LCRD | 3 | LCRD | 3 | |||||||||||||
LDCM | 2 | LDCMreg | 2 | ||||||||||||||
LDSD | 3 | LDSD | 3 | ||||||||||||||
C | Mars 2020 | 1 | Mars 2020 | 1 | Mars 2020 | ||||||||||||
MAVEN | 2 | MAVEN | 2 | ||||||||||||||
MMS | 1 | MMS | 1 | ||||||||||||||
MOMA | 3 | MOMA | 3 | ||||||||||||||
MSL | 1 | MSL | 1 | ||||||||||||||
NICER | 3 | NICER | 3 | ||||||||||||||
C | NISAR | 2 | NISAR | 2 | NISAR | ||||||||||||
NuSTAR | 3 | NuSTARreg | 3 | ||||||||||||||
OCO-2 | 2 | OCO-2 | 2 | ||||||||||||||
C | OCO-3 | 3 | OCO-3 | 3 | |||||||||||||
ORION | 1 | ORION | 1 | Orion | |||||||||||||
OSIRIS Rex | 1 | OSIRIS Rexreg | 1 | ||||||||||||||
SAGE III | 3 | SAGE III | 3 | SAGE-III | |||||||||||||
SGSS | 1 | SGSSreg | 1 | ||||||||||||||
SLS | 1 | SLS | 1 | SLS | |||||||||||||
SMAP | 2 | SMAPreg | 2 | SMAP | |||||||||||||
SOC | 2 | SOC | 2 | SOC | |||||||||||||
SOFIA | 1 | SOFIA | 1 | ||||||||||||||
PSP | 1 | PSP | 1 | PSP | |||||||||||||
C | SWOT | 2 | SWOT | 2 | SWOT | ||||||||||||
TEMPO | 3 | TEMPO | 3 | ||||||||||||||
TESS | 2 | TESS | 2 | ||||||||||||||
Clipper | |||||||||||||||||
DART | |||||||||||||||||
PACE | |||||||||||||||||
Restore-L | |||||||||||||||||
XARM |
Statistics | COST Growth ($M) | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Average | 9 | 9 | 43 | 61 | 136 | 070 | ||||||||
Median | 5 | 6 | 20 | 45 | 112 | 034 | ||||||||
Standard Deviation | 14 | 16 | 73 | 83 | 93 | 081 | ||||||||
Variance | 2 | 3 | 535 | 685 | 871 | 066 | ||||||||
Minimum | -9 | -8 | (71) | (31) | 15 | - 0 | ||||||||
Maximum | 38 | 53 | 244 | 315 | 345 | 242 | ||||||||
no JWST | ||||||||||||||
Statistics | ||||||||||||||
COST Growth | Schedule Growth (months) | Duration (months) | ||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 18 | 17 | 118 | 131 | 1989 | 065 | ||||||||
Median | 20 | 17 | 101 | 132 | 19167 | 0582 | ||||||||
Standard Deviation | 16 | 19 | 105 | 117 | 11557 | 0830 | ||||||||
Sample Variance | 3 | 4 | 1101 | 1377 | 133562 | 0688 | ||||||||
Minimum | -6 | -5 | - 0 | - 0 | 397 | - 0 | ||||||||
Maximum | 46 | 48 | 284 | 274 | 4527 | 310 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 20 | 21 | 156 | 159 | 2031 | 075 | ||||||||
Median | 21 | 20 | 132 | 147 | 20783 | 0589 | ||||||||
Standard Deviation | 17 | 25 | 174 | 155 | 11214 | 0881 | ||||||||
Sample Variance | 3 | 6 | 3035 | 2394 | 125751 | 0776 | ||||||||
Minimum | -6 | -5 | 00 | 00 | 40 | - 0 | ||||||||
Maximum | 48 | 78 | 649 | 528 | 453 | 31 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 4 | 3 | 47 | 136 | 253 | 054 | ||||||||
Median | 9 | 9 | 61 | 132 | 24333 | 042 | ||||||||
Standard Deviation | 10 | 12 | 52 | 56 | 6657 | 022 | ||||||||
Sample Variance | 1 | 1 | 273 | 311 | 44310 | 005 | ||||||||
Minimum | -7 | -11 | (10) | 82 | 1923 | 041 | ||||||||
Maximum | 11 | 11 | 92 | 193 | 3243 | 079 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | ||||||||||||
of Pp | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | ||||||||||
Category I | 6 | 4 | 4 | 22 | 78 | |||||||||
Category II | 9 | 8 | 13 | 71 | 83 | |||||||||
Category III | 8 | 6 | 11 | 28 | 52 | |||||||||
Timeline | Total Programs | 46 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDB C for comaprison | planned | Total Replans | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statictics - PresentFinal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 41416 | 14 | 9 | 9 | 8 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | |||||||||||||||||||||||||||||||||||||
ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||
ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 758 | Feb-16 | 759 | Mar-16 | FY16Q2 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -5 | -10 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||
CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 1595 | Oct-16 | 1742 | May-17 | FY16Q2 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -4 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | ||||||||||||||||||||||||||||||||||||||||
EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 179 | Dec-21 | 190 | Dec-22 | FY16Q2 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 0 | 00 | 5787 | 5480 | |||||||||||||||||||||||||||||||||||||||
GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | ||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 108295 | Oct-16 | kDP-D Sep-14 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | ||||||||||||||||||||||||||||||||||||||||||||||
GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||
GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q2 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -1 | -3 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||
GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4079 | Aug-17 | 4318 | Feb-18 | FY16Q2 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | -00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ESD | GSDO | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 26336 | Jun-18 | 28129 | Nov-18 | FY16Q2 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 9916 | Oct-17 | 10636 | Jun-18 | FY16Q2 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 232 | Jun-17 | 2527 | Oct-17 | FY16Q2 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 1 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Planetary | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | 6536 | Mar-16 | 6751 | Mar-16 | FY16Q2 | N | N | 0 | 0 | 4 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E draft | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||
JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||
LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||
Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
LDCM | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
LDCMreg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 8501 | Feb-13 | 8568 | Feb-13 | FY15Q4 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | ||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||
Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||
MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 598 | Nov-13 | 600 | Nov-13 | FY16Q1 | N | N | 0 | 0 | -7 | -11 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1121 | Sep-15 | 1121 | Sep-15 | FY16Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 11 | 4 | 1320 | 613 | |||||||||||||||||||||||||||||||||||||||||
MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 904 | Jul-18 | 1004 | Jul-18 | FY16Q2 | N | N | 0 | 0 | -1 | -1 | 3347 | 3347 | |||||||||||||||||||||||||||||||||||||||||||||||||
MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||
NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 684 | Feb-17 | 67 | Feb-17 | KDP-D Jan-16 | N | N | 0 | 0 | 9 | -2 | 613 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||
NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||
NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 166 | Jun-12 | 166 | Jun-12 | FY14Q4 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | 3 | 3 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||
OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4276 | Jul-14 | 4276 | Jul-14 | FY16Q2 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -2 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||
OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ORION | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | 108098 | Aug-21 | 112835 | Apr-23 | FY16Q2 | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 10014 | Oct-16 | 10572 | Oct-16 | FY16Q2 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 1 | -1 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13931 | Aug-18 | 15534 | Aug-18 | FY16Q2 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 1265 | Aug-16 | 133 | Aug-16 | FY16Q2 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 20 | 19 | 2437 | 2437 | |||||||||||||||||||||||||||||||||||||||||
SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||
SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1216 | Jul-19 | 1228 | Sep-19 | PPBE18 PMR | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 2 | 2 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ESD | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||
SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | May-15 | 8899 | May-15 | FY16Q2 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 707 | 203 | |||||||||||||||||||||||||||||||||||||||||
SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 2892 | Oct-18 | 3789 | Oct-18 | FY16Q2 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -27 | -13 | 2127 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
SOFIA (Budget) | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 29048 | Feb-14 | 29122 | Feb-14 | FY16Q2 | Budget Reduction | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||
TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 1809 | Sep-17 | 2178 | Nov-17 | FY16Q2 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 31976 | Dec-17 | 3517 | Jun-18 | FY16Q2 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -7 | -7 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Currently in B | Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CLARREO-PF | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DART | KDP-C in July | Mean | 13 | -13 | 55 | 28 | 1729 | 115 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Europa Clipper | 02045454545 | Median | 17 | -06 | 21 | 00 | 17483 | 0862 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GeoCarb | Standard Deviation | 84 | 68 | 88 | 87 | 10875 | 0863 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IXPE | Minimum | -27 | -13 | 00 | -72 | 397 | 050 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lucy | Maximum | 20 | 19 | 335 | 335 | 4527 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MAIA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PACE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Psyche | Paste data from above to this table for analysis | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Restore-L | -27 | -13 | 2127 | - 0 | 1610 | 050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SOC Replan | Breach notification made DM not yet final | -7 | -7 | - 0 | - 0 | 080 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TROPICS | -7 | -11 | - 0 | - 0 | 817 | 060 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
XARM | -5 | -10 | 307 | - 0 | 867 | 088 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -9 | - 0 | (717) | 2767 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -8 | 717 | 717 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -3 | - 0 | (400) | 510 | 058 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -9 | 207 | (400) | 800 | 099 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -1 | 3347 | 3347 | 2240 | 205 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -1 | - 0 | - 0 | 397 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -01 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | - 0 | - 0 | 1053 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | 407 | 1020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | -3 | 707 | 203 | 2577 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | 00 | - 0 | - 0 | 2777 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 00 | - 0 | - 0 | 1887 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | 3 | 710 | 403 | 1167 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | -4 | - 0 | - 0 | 1983 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 4 | 207 | (203) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 5 | - 0 | - 0 | 1917 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | 6 | 103 | - 0 | 2733 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | -2 | 613 | - 0 | 4527 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 1320 | 613 | 503 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 607 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 | 19 | 2437 | 2437 |
Timeline | Total Programs | 46 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDP C for comaprison | planned | Total Replans | 14 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statistics - PresentFinal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 72618 | 20 | 13 | 13 | 9 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 74855 | Feb-16 | 109271 | Mar-16 | FY17 Q1 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -7 | 30 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 159503 | Dec-16 | 159503 | Dec-16 | FY18 Q3 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -12 | 203 | (503) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | 51043 | Apr-18 | 52443 | Aug-19 | KDP-E May-18 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGS | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 27418 | Sep-18 | 28129 | Nov-18 | FY17 Q1 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 4 | 00 | 307 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGSreg | 1 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | 3145 | Dec-19 | 3231 | Jun-20 | Dec-17 | 5115 | 4181 | 31446 | Dec-19 | 31446 | Dec-19 | FY18 Q3 | Y | Y | Y | 16 | 15 | 1827 | 1927 | 3957 | 049 | -0 | -27 | - 0 | (610) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | APD | EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 206214 | Mar-20 | 223452 | Mar-20 | FY18 Q3 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 13 | 176 | 3653 | 2130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | 120774 | Nov-18 | 123774 | Mar-19 | FY18 Q3 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 10150 | Nov-16 | KDP-E Oct-16 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | 663 | Feb-18 | 73 | Apr-18 | KDP-E Dec-17 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16 Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8834 | Feb-14 | 8904 | Feb-14 | FY17 Q3 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -3 | -5 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4059 | May-18 | 4319 | May-18 | FY18 Q3 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | 00 | 910 | 297 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 10561 | Sep-18 | 10636 | Oct-18 | FY18 Q3 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 6 | 00 | 1117 | 407 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 243 | Jun-18 | 2527 | Jun-18 | FY18 Q3 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 6 | 00 | 1217 | 810 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSightreg | 2 | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 8189 | May-18 | 8289 | May-18 | Sep-16 | 1923 | 1538 | 8138 | May-18 | 8138 | May-18 | FY18 Q3 | Y | Y | Y | Y | 23 | 23 | 2637 | 2637 | 3050 | 086 | -1 | -18 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16 Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E Sep-16 | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | 1144 | Sep-19 | 127 | Sep-19 | KDP-C Apr-17 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16 Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTregreg | 1 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 94889 | Nov-20 | 96627 | Mar-21 | May-18 | 10639 | 8277 | 94889 | Nov-20 | 96627 | Mar-21 | FY18 Q3 | Y | Y | Y | 9 | 2940 | 8113 | 036 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15 Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | 8385 | Dec-20 | 885 | Nov-21 | FY18 Q3 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | 2571 | Jun-19 | 2627 | Nov-19 | FY18 Q3 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8 | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8reg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 85006 | Feb-13 | 85666 | Feb-13 | FY18 Q3 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15 Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | 23634 | Jul-20 | 25304 | Jul-20 | FY18 Q3 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 5753 | Nov-13 | 5753 | Nov-13 | FY16 Q3 | N | N | 0 | 0 | -11 | -14 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1098 | Mar-15 | 1098 | Mar-15 | FY18 Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 9 | 1 | 707 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 120243 | Jul-20 | 128226 | Jul-20 | FY18 Q3 | N | N | 0 | 0 | 24 | 27 | 5783 | 5783 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15 Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 694 | Jun-17 | 706 | Aug-17 | KDP-E May-17 | N | N | 0 | 0 | 10 | 3 | 1013 | 603 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | 7953 | Dec-21 | 8969 | Sep-22 | FY18 Q3 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | 0 | 00346060676 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 115315 | Jun-12 | 115315 | Jun-12 | FY15 Q1 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | -39 | -28 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4245 | Jul-14 | 4245 | Jul-14 | FY17 Q1 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -3 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | 113388 | Mar-18 | 113388 | May-18 | FY18 Q3 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orion | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orionreg | 1 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 116581 | Jun-22 | 116581 | Jun-22 | Jun-18 | 8483 | 3746 | 116581 | Jun-22 | 116581 | Jun-22 | FY18 Q3 | Y | N | 7 | 3 | 1013 | (1013) | 3347 | 030 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 9975 | Sep-16 | 10532 | Sep-16 | FY18 Q3 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 0 | -1 | (100) | (100) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13821 | Aug-18 | 15482 | Aug-18 | FY18 Q3 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -1 | -03 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 129364 | Feb-17 | 129364 | Feb-17 | FY18 Q3 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 22 | 16 | 3050 | 3050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1251 | Sep-19 | 1261284 | Nov-19 | Path Forward APMC Dec 2016 | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 4 | 4 | 223 | 267 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16 Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLSreg | 1 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 9734 | Dec-19 | 9843 | Jun-20 | Dec-17 | 1340 | 148 | 98029 | Dec-19 | 98029 | Dec-19 | FY18 Q3 | Y | Y | Y | 14 | 2 | 2433 | 1927 | 4060 | 047 | 1 | -04 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | Jan-15 | 8899 | Jan-15 | FY18 Q3 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 307 | (197) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 3433 | Feb-20 | 3866 | Feb-20 | FY18 Q3 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -7 | -11 | 3753 | 1627 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIAreg | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 15874 | Feb-14 | 15949 | Feb-14 | FY18 Q3 | Y | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | 7049 | Apr-21 | 7549 | Apr-22 | FY18 Q3 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 181242 | Sep-17 | 197242 | Nov-17 | FY18 Q3 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | -94 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 3333 | Apr-18 | 3333 | Jun-18 | FY18 Q3 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -3 | -12 | 403 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mean | 90 | 88 | 50 | 81 | 1773 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02045454545 | Median | 82 | 49 | 10 | 60 | 16233 | 0374 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Standard Deviation | 118 | 164 | 77 | 97 | 13962 | 0647 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum | -7 | -10 | -71 | -31 | 147 | - 0 | SPP | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum | 38 | 59 | 244 | 345 | 7433 | 242 | EUCLIDreg | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GSDO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Paste data from above to this table for analysis | ORION | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-7 | -10 | 607 | 817 | 1923 | 042 | SLS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-3 | -7 | - 0 | - 0 | 147 | - 0 | TEMPO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -7 | 1113 | 1113 | 1887 | 059 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
0 | -6 | - 0 | 613 | 1897 | 032 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total KDPs Within Cost Range of Prior KDP | Total KDPs Within Schedule Range of Prior KDP | -2 | -5 | 303 | 910 | 510 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | -3 | -3 | - 0 | - 0 | 503 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MALow at or below Preceding KDP Low | 14 | 31 | 45 | 31 | MALow at or below Preceding KDP Low | 27 | 26 | 53 | 51 | 6 | 0 | 410 | (100) | 1217 | 008 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABCHigh at or below Preceding KDP High | 19 | 33 | 52 | 37 | ABCHigh at or below Preceding KDP High | 21 | 32 | 53 | 40 | 0 | 0 | (203) | 403 | 167 | 242 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 2 | 810 | 307 | 500 | 061 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-B Cost | KDP-A to KDP-B Schedule | 33 | 5 | - 0 | 100 | 800 | 013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 11 | 8 | 103 | 103 | 2670 | 004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B Low at or below KDP-A Low | 4 | 10 | 14 | 29 | KDP-B Low at or below KDP-A Low | 13 | 9 | 22 | 59 | 9 | 9 | (203) | 503 | 1983 | 025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B High at or below KDP-A High | 9 | 12 | 21 | 43 | KDP-B High at or below KDP-A High | 12 | 10 | 22 | 55 | 11 | 10 | (103) | 1320 | 3243 | 041 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | 10 | 2437 | 3147 | 1610 | 195 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | 10 | 613 | 613 | 3450 | 018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B to KDP-C Cost | KDP-B to KDP-C Schedule | -2 | 11 | 813 | 603 | 1687 | 036 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 9 | 13 | 917 | 1930 | 2433 | 079 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-B Low | 10 | 21 | 31 | 32 | MA at or below KDP-B Low | 14 | 17 | 31 | 45 | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-B High | 10 | 21 | 31 | 32 | ABC at or below KDP-B High | 9 | 22 | 31 | 29 | 16 | 18 | - 0 | 607 | 707 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 31 | 1217 | 1830 | 1027 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-C Cost | KDP-A to KDP-C Schedule | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 29 | 59 | 2233 | 3450 | 7433 | 046 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-A Low | 2 | 7 | 9 | 22 | MA at or below KDP-A Low | 5 | 12 | 17 | 29 | added | 5 | 0 | - 0 | - 0 | 813 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-A High | 5 | 11 | 16 | 31 | ABC at or below KDP-A High | 3 | 14 | 17 | 18 | added | -0 | -0 | 103 | 1013 | 1017 | 100 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 7 | 4 | - 0 | - 0 | 1323 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-C (MA) | KDP-C (ABC) | Replan (MA) | Replan (ABC) | KDP-C to Replan (MA) | KDP-C to Replan (ABC) | KDP-C (or Replan) to PresentFinal (MA) | KDP-C (or Replan) to PresentFinal (ABC) | added | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Percentage of Project CostSchedule HighLow Estimates Within Prior KDP Range Estimates | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B Estimate at or below A Estimate | C Estimate at or below B Estimate | C Estimate at or below A Estimate | Total at or below Preceding KDP Estimate | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - High | 43 | 32 | 31 | 37 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - Low | 29 | 32 | 22 | 31 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - High | 55 | 29 | 18 | 40 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - Low | 59 | 45 | 29 | 51 |
Development Cost Performance When Controlling for Launch Vehicle Cost VariationHow would our development cost reporting metrics change
Lower LV costs can provide unexpected funds to cover growth in reporting
Lower LV costs sometimes have no effect on cost reporting
Higher LV costs can mask otherwise good cost performance
8
bull NASA cost performance has drastically improved since the early 2000rsquos
We are falling short of our portfolio goal of 70 projects hitting cost targets
Our cost and schedule ranges at KDP-A and KDP-B are optimistic and more often than do not capture the eventual high cost or schedule commitments at KDP-C baseline
Development cost reporting metrics can misrepresent how our projects are performing (both positively and negatively) if the LV contract award is well above or below the estimate included in the KDP-C baseline
bull
bull
bull
9
Back-up
10
1111
1212
Total KDPs Within Cost Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 14 31 45 31ABCHigh at or below Preceding KDP High 19 33 52 37
Total KDPs Within Schedule Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 27 26 53 51ABCHigh at or below Preceding KDP High 21 32 53 40
KDP-A to KDP-B CostYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 4 10 14 29KDP-B High at or below KDP-A High 9 12 21 43
KDP-A to KDP-B ScheduleYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 13 9 22 59KDP-B High at or below KDP-A High 12 10 22 55
KDP-B to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-B Low 10 21 31 32ABC at or below KDP-B High 10 21 31 32
KDP-B to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-B Low 14 17 31 45ABC at or below KDP-B High 9 22 31 29
KDP-A to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-A Low 2 7 9 22ABC at or below KDP-A High 5 11 16 31
KDP-A to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-A Low 5 12 17 29ABC at or below KDP-A High 3 14 17 18
COST ($M)
KDP-C to Replan (MA)595000000000000281704999999999999750000000000000014025429999999999993-178400000000000095115-85999999999999943826-25999999999996248E-200911-518999999999999773-1220000000000004531770000000000005117000000000000176266192299999999999951671-2800000000000011401112644044106389999999999965159999999999999425999999999999972-1246900000000005125710000000000002140107999999999999551896472000000000000171666999999999998263820000000000005922000000000000459114748445624775539999999999999103258999999999999811180000000000001939999999999999151167299999999999384830000000000109-33599999999999909-5550000000000011416020000000000005-3200000000000002831553639000000000000974113401372999999999999515260000000000002-5800000000000011429476-180455789999999999997710099999999999994-76000000000000227KDP-C to Replan (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS59500000000000028211499999999999918399999999999977392842000000000001592E-2-3084000000000000941809999999999991-8599999999999994344599999999999994-46999999999997044E-210860399999999999994316E-2978-45-281000000000000238420000000000004520329999999999995419999999999998866751153799999999999951802-108000000000000111623851847387182770000000000073628999999999999770-4297100000000000423299999999999983142-039999999999997726203338000000000000119256712921999999999999321011613781300000000000186840000000000000658600000000000023553999999999999910349911780000000000001329999999999999729948999999999996437460000000000036-88599999999999909-5720000000000004511440000000000009-32000000000000028235100000000000023453000000000000711081481372999999999999503989999999999997729551-18045-210000000000002270-21600000000000023
COST Change ($M)
B to C (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS01047535211267606203370517928286851448611111111110973E-2075077759107650046E-4-98804985102361215E-201486366383447687-7818181818181813E-2030674002751031632-37226838174140057E-4013440860215052999E-30-46012269938650305E-2-61086956521739177E-201085051546391753202363403859567541916901408450704179E-200227818101022070730-65060240963855487E-2071729957805907171E-20592556945781199880779814665592264319368421052631587E-20314499999999999890-4630495689655173E-288694328130947783E-2017749999999999999-42462845010613295E-400166502463054187263934495959166312E-2093093699515347267E-200048437693738375709067597185373168792E-20526615969581748940003366676193198057128745644599303111E-296699259374453242E-233198918775202764E-2-732231404958677E-2-5100766898519711E-279499652536483736E-2-27777777777777801E-203746613545816733204003014143287735301290322580645161315265600825167612E-20176206365503080030010075757575757570-061063923386687424-27818254073387508E-30-54000000000000055E-2
COST Change ()
Cost - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate04285714285714285503225806451612903103125036538461538461536Schedule - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate054545454545454541029032258064516131017647058823529413039622641509433965Cost - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate02857142857142857032258064516129031022222222222222221031111111111111112Schedule - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate059090909090909094045161290322580644029411764705882354050943396226415094
High Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (high)01682251932581422Category 2 Change (high)60501935980863335E-2Category 3 Change (high)37110484780157868E-2Total Change (high)014626442296281486
Low Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (low)010106870229007633Category 2 Change (low)19806591564406897Category 3 Change (low)0Total Change (low)21873131670301591
KDP-A to KDP-B Schedule Growth - Low Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion0-9-49-2-1-100000200912326273242
KDP-A to KDP-B Schedule Growth - High Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion-36-8-8-3-2-1-1000002569121726414451
Cost Variation Against Baselines
13
Methodology and Assumptions
The first step in conducting this analysis was to verify and validate the cost baseline information using source documentation KDP-C figures takes priority as the definitive baseline Where KDP-C decision memoranda was not available as in the case of many projects baselined prior to approximately 2009 figures were pulled from the first appearance as a development project in a Presidentrsquos Budget as the baseline against which to measure In a few cases notificationsreports to Congress (eg NSPD-49 reports) were used to identify a baseline figure MA figures were pulled solely from decision memoranda and thus our dataset with regard to MArsquos is smaller as it excludes many of the older projects that did not have standardized baseline documentation with MArsquos noted Variance to the baseline was then measured by using the most recent quarterly cost and schedule report Latest cost data is valid through the FY18 Q3 reporting period Slide 3 charts illustrate each project in the dataset with respective LCC and dev cost variances
The confidence level policy applied to each project was noted using source documentation as well as a cross-reference against when policy changes were implemented recognizing that a subset of projects received waivers to new policies during policy transition Certain exclusions were applied to ensure a dataset comparable across projects For example SOFIA had conducted a JCL on a replan but the decision memorandum made clear the baseline was not changing therefore the JCL confidence level could not fairly be applied to measure performance against the baseline Another example is GPM which was excluded as it was one of the very first projects baselined after JCL policy implementation and was not a ldquotruerdquo JCL with the decision memorandum noting that the intent was met while a JCL DPMC would be held many months later to evaluate progress There were a couple of additional exclusions applied
When a project is confirmed at KDP-C cost performance measurements were applied to that baseline If a project was then rebaselined a ldquonewrdquo project was added to the dataset using the rebaselined figures against which to measure as the Agency made the decision at that point to press ahead with the project and Congress provided reauthorization The ldquooriginalrdquo project was ldquofrozenrdquo in terms of development phase to fairly capture the contemporary phase performance (eg the ldquooriginalrdquo OCO-2 cost growth will always be categorized within the ldquoprojects in developmentrdquo performance category while the rebaselined OCO-2 cost performance falls into the ldquoprojects launchedrdquo category) The latest cost figures however were used to measure cost performance across both original baselines and rebaselines in order to fairly capture the accuracy of original estimates against final outcomes
This insight while placing an emphasis on the JCL while measuring performance does not intend to convey a discovered causal relationship between JCL and cost performance There have been many other related programmatic and technical advancements over the past 10 to 20 years that have influenced cost and schedule performance in the overall positive direction Other insights look into other influencers of costschedule performance
13
Dev Cost Metrics Controlling for LV Cost Variation
14
Methodology and Assumptions
SID pulled a number of data elements from a total of 22 SMD projects to conduct this analysis Data elements from a projectrsquos baseline include total development cost and the launch services cost estimate and have been sourced from KDP documentation quarterly reports and Cost Analysis Data Requirements (CADREs) These data were compared to currentactual total development and launch services costs from the most recent KDPquarterly reports Other data elements include Division Lead Center type of launch vehicle LCC category and current phase
SID calculated the overall development cost deltas from the baseline cost and verified the percentage growth with external reporting data where applicable SID then calculated the percent change in launch services development cost from baseline to currentactual The development cost percent change was calculated after removing launch services from the inputs
For further insight these same calculations were conducted by Division Lead Center type of launch vehicle and LCC category Division Lead Center and LCC category were then further broken down by looking only at projects currently in development
The 22 projects used in this analysis include Mars 2020 ICESat-2 ICON InSight SOC PSP SWOT TESS Juno Landsat-8 MMS OSIRIS-REx SMAP MAVEN GRAIL NuSTAR RBSP IRIS LADEE OCO-2 CYGNSS and Landsat 9 Representation includes seven planetary science seven earth science six heliophysics and two astrophysics missions twelve GSFC-led projects and eight JPL-led projects (LaRC and ARC representing the other two) ten Atlas V one Delta IV-H two Falcon 9 four Delta II four Pegasus and one Minotaur V rockets and six category 1 thirteen category 2 and three category 3 projects Seven projects assessed are currently in development
Other projects considered were excluded if launch was or is to be on a ride-share and launch services costs were negligible (eg RBI) Projects launching on internationally-contributed rockets were also excluded (eg GPM JWST) Other exclusions were based on data limitations at the time of analysis (eg no launch services costs available from baseline)
Did not add GPM international launchSOFIA no launchJWST international launch
RBI rideshareSentinel-6 international launch
Dawn no launch vehicle numbers availableSNPP No baseline LV estimate available
NISAR international launchLCRD rideshare
GRACE-FO rideshare
14
Formulation KDPs
15
Methodology and Assumptions
Comparative analysis was conducted where possible (ie when highlow costschedule figures were available in KDP-ABC decision memoranda This analysis does not attempt to explain why the majority of costschedule estimates at KDPrsquos exceed prior estimates
Cost and schedule ranges were extracted from KDP-A and KDP-B decision memoranda Agency Baseline Commitments and Management Agreements were extracted from KDP-C decision memoranda Lifecycle cost was used in all cases (as opposed to development cost only) A project did not need to have all KDP-A through C figures to be included in the analysis (eg a project that did not have a KDP-A range was still included in the KDP-B to KDP-C statistics)
This analysis includes data from KDP-A KDP-B and KDP-C milestones At KDP-A and KDP-B a high and low estimate is established for both cost and schedule At KDP-C a Management Agreement and an Agency Baseline Commitment is established for both cost and schedule For ease of conveyance this analysis equates the Management Agreement as the low estimate for KDP-C and equates the Agency Baselines Commitment as the high estimate for KDP-C
15
Column1 | KDP-C Date | Lead Center | Division | Launch Vehicle | LCC Category | Phase | Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | Notes | |||||||||||||||||
Juno | Aug-08 | JPL | Planetary | Atlas V | 1 | Ops | $ 7423 | $ 7089 | $ 1904 | $ 1817 | $ 5519 | $ 5272 | -45 | -46 | -45 | ||||||||||||||||||
RBSP | Dec-08 | GSFC | Helio | Atlas V | 2 | Ops | $ 5338 | $ 5040 | $ 1336 | $ 1324 | $ 4002 | $ 3716 | -56 | -09 | -71 | ||||||||||||||||||
GRAIL | Jan-09 | JPL | Planetary | Delta II | 2 | Ops | $ 4270 | $ 3983 | $ 1528 | $ 1508 | $ 2742 | $ 2475 | -67 | -13 | -97 | ||||||||||||||||||
MMS | Jun-09 | GSFC | Helio | Atlas V | 1 | Ops | $ 8573 | $ 8753 | $ 1942 | $ 1788 | $ 6631 | $ 6965 | 21 | -79 | 50 | ||||||||||||||||||
NuSTAR | Sep-09 | JPL | Astro | Pegasus | 3 | Ops | $ 1099 | $ 1162 | $ 358 | $ 332 | $ 741 | $ 830 | 57 | -73 | 120 | ||||||||||||||||||
Landsat-8 | Dec-09 | GSFC | Earth | Atlas V | 2 | Ops | $ 5830 | $ 5028 | $ 1264 | $ 1218 | $ 4566 | $ 3810 | -138 | -36 | -166 | ||||||||||||||||||
LADEE | Aug-10 | ARC | Planetary | Minotaur V | 2 | Ops | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||
OCO-2 | Sep-10 | JPL | Earth | Delta II | 2 | Ops | $ 2490 | $ 3200 | $ 676 | $ 1368 | $ 1814 | $ 1832 | 285 | 1024 | 10 | against original baseline rebaseline primary LV-driven aside from some RWA issues | |||||||||||||||||
MAVEN | Oct-10 | GSFC | Planetary | Atlas V | 2 | Ops | $ 5672 | $ 4720 | $ 1870 | $ 1541 | $ 3802 | $ 3179 | -168 | -176 | -164 | ||||||||||||||||||
IRIS | Nov-10 | GSFC | Helio | Pegasus | 3 | Ops | $ 1407 | $ 1430 | $ 404 | $ 426 | $ 1003 | $ 1004 | 16 | 54 | 01 | ||||||||||||||||||
SMAP | May-12 | JPL | Earth | Delta II | 2 | Ops | $ 4857 | $ 4543 | $ 1319 | $ 1201 | $ 3538 | $ 3342 | -65 | -89 | -55 | ||||||||||||||||||
SOC | Mar-13 | GSFC | Helio | Atlas V | 2 | Dev | $ 3769 | $ 3100 | $ 2500 | $ 1727 | $ 1269 | $ 1373 | -178 | -309 | 82 | ||||||||||||||||||
OSIRIS-REx | May-13 | GSFC | Planetary | Atlas V | 1 | Ops | $ 7786 | $ 6156 | $ 2340 | $ 1888 | $ 5446 | $ 4268 | -209 | -193 | -216 | ||||||||||||||||||
CYGNSS | Feb-14 | LaRC | Earth | Pegasus | 3 | Ops | $ 1511 | $ 1287 | $ 523 | $ 623 | $ 988 | $ 664 | -148 | 191 | -328 | ||||||||||||||||||
InSight | Mar-14 | JPL | Planetary | Atlas V | 2 | Ops | $ 5418 | $ 6483 | $ 1599 | $ 1685 | $ 3819 | $ 4798 | 197 | 54 | 256 | ||||||||||||||||||
PSP | Mar-14 | GSFC | Helio | Delta IV-H | 1 | Dev | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||
ICESat-2 | May-14 | GSFC | Earth | Delta II | 1 | Dev | $ 7637 | $ 7441 | $ 1188 | $ 1183 | $ 6449 | $ 6258 | -26 | -04 | -30 | ||||||||||||||||||
ICON | Oct-14 | GSFC | Helio | Pegasus | 2 | Dev | $ 1960 | $ 1982 | $ 543 | $ 563 | $ 1417 | $ 1419 | 11 | 37 | 01 | ||||||||||||||||||
TESS | Oct-14 | GSFC | Astro | Falcon 9 | 2 | Ops | $ 3232 | $ 2799 | $ 1141 | $ 874 | $ 2091 | $ 1925 | -134 | -234 | -79 | ||||||||||||||||||
SWOT | May-16 | JPL | Earth | Falcon 9 | 2 | Dev | $ 5715 | $ 5715 | $ 1313 | $ 1078 | $ 4402 | $ 4638 | 00 | -179 | 53 | ||||||||||||||||||
Mars 2020 | Jun-16 | JPL | Planetary | Atlas V | 1 | Dev | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||
Landsat 9 | Dec-17 | GSFC | Earth | Atlas V | 2 | Dev | $ 6342 | $ 6342 | $ 1544 | $ 1542 | $ 4798 | $ 4800 | 00 | -01 | 00 | ||||||||||||||||||
Projects in Development | $ 52749 | $ 52336 | $ 14819 | $ 12738 | $ 37930 | $ 39598 | -08 | -140 | 44 | ||||||||||||||||||||||||
Projects in Operations | $ 66588 | $ 63555 | $ 18647 | $ 18196 | $ 47941 | $ 45359 | -46 | -24 | -54 | ||||||||||||||||||||||||
Total | $ 119337 | $ 115891 | $ 33466 | $ 30935 | $ 85871 | $ 84956 | -29 | -76 | -11 | ||||||||||||||||||||||||
Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | |||||||||||||||||||||||||
GSFC Project Total | $ 68103 | $ 63294 | $ 20377 | $ 18325 | $ 47726 | $ 44969 | -71 | -101 | -58 | ||||||||||||||||||||||||
JPL Projects Total | $ 48041 | $ 49428 | $ 12122 | $ 11384 | $ 35919 | $ 38044 | 29 | -61 | 59 | ||||||||||||||||||||||||
Did not add | GPM | international launch | GSFC Projects in Ops | $ 37838 | $ 33926 | $ 10297 | $ 9059 | $ 27541 | $ 24867 | -103 | -120 | -97 | |||||||||||||||||||||
SOFIA | no launch | JPL Projects in Ops | $ 25557 | $ 26460 | $ 7384 | $ 7911 | $ 18173 | $ 18549 | 35 | 71 | 21 | ||||||||||||||||||||||
JWST | international launch | GSFC Projects in Dev | $ 30265 | $ 29368 | $ 10080 | $ 9266 | $ 20185 | $ 20102 | -30 | -81 | -04 | ||||||||||||||||||||||
RBI | rideshare | JPL Projects in Dev | $ 22484 | $ 22968 | $ 4738 | $ 3473 | $ 17746 | $ 19495 | 22 | -267 | 99 | ||||||||||||||||||||||
Sentinel-6 | international launch | ||||||||||||||||||||||||||||||||
Dawn | no launch vehicle numbers available | Astro | $ 4331 | $ 3961 | $ 1499 | $ 1206 | $ 2832 | $ 2755 | -85 | -195 | -27 | ||||||||||||||||||||||
SNPP | No baseline LV estimate available | Planetary | $ 49020 | $ 47566 | $ 13109 | $ 11437 | $ 35911 | $ 36129 | -30 | -128 | 06 | ||||||||||||||||||||||
NISAR | international launch | Helio | $ 31604 | $ 30808 | $ 11030 | $ 10078 | $ 20574 | $ 20730 | -25 | -86 | 08 | ||||||||||||||||||||||
LCRD | rideshare | Earth | $ 34382 | $ 33556 | $ 7827 | $ 8213 | $ 26555 | $ 25343 | -24 | 49 | -46 | ||||||||||||||||||||||
GRACE-FO | rideshare | ||||||||||||||||||||||||||||||||
Astro - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
Planetary - Dev Only | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||||||||
Helio - Dev Only | $ 16286 | $ 15585 | $ 7348 | $ 6540 | $ 8938 | $ 9045 | -43 | -110 | 12 | ||||||||||||||||||||||||
Earth - Dev Only | $ 19694 | $ 19498 | $ 4045 | $ 3803 | $ 15649 | $ 15695 | -10 | -60 | 03 | ||||||||||||||||||||||||
Atlas V | $ 72920 | $ 69964 | $ 19725 | $ 16926 | $ 53195 | $ 53038 | -41 | -142 | -03 | ||||||||||||||||||||||||
Delta IV-H | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||||||||
Falcon 9 | $ 8947 | $ 8514 | $ 2454 | $ 1952 | $ 6493 | $ 6562 | -48 | -205 | 11 | ||||||||||||||||||||||||
Delta II | $ 19254 | $ 19167 | $ 4711 | $ 5260 | $ 14543 | $ 13907 | -05 | 117 | -44 | this is skewed by OCO-2 which switched from the baseline Taurus XL to the Delta-II at the rebaseline | |||||||||||||||||||||||
Pegasus | $ 5977 | $ 5861 | $ 1828 | $ 1944 | $ 4149 | $ 3917 | -19 | 63 | -56 | ||||||||||||||||||||||||
Minotaur V | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||||||||
Category 1 | $ 58745 | $ 57195 | $ 15104 | $ 13322 | $ 43641 | $ 43873 | -26 | -118 | 05 | ||||||||||||||||||||||||
Category 2 | $ 56575 | $ 54817 | $ 17076 | $ 16232 | $ 39499 | $ 38585 | -31 | -49 | -23 | ||||||||||||||||||||||||
Category 3 | $ 4017 | $ 3879 | $ 1285 | $ 1381 | $ 2732 | $ 2498 | -34 | 75 | -86 | ||||||||||||||||||||||||
Category 1 - Dev Only | $ 34963 | $ 35197 | $ 8918 | $ 7829 | $ 26045 | $ 27368 | 07 | -122 | 51 | ||||||||||||||||||||||||
Category 2 - Dev Only | $ 17786 | $ 17139 | $ 5900 | $ 4909 | $ 11886 | $ 12230 | -36 | -168 | 29 | ||||||||||||||||||||||||
Category 3 - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
LV of Total Dev at Baseline | 280 | ||||||||||||||||||||||||||||||||
LV of Total Dev at FY18 Q3 | 267 | ||||||||||||||||||||||||||||||||
Launch Vehicle Percent Cost Variation from Baseline Estimate in Chronological Order |
Mission | LCC Category | KDP-A (low) | KDP-A (high) | KDP-B (low) | KDP-B (high) | Low Delta (months) | High Delta (months) | KDP-C MA | MA Variance from A | KDP-C ABC | ABC Variance from A | |||||||||||||||
Restore-L | 2 | Jun-20 | Dec-23 | Jun-20 | Dec-20 | 0 | -36 | |||||||||||||||||||
SLS | 1 | Dec-17 | Dec-17 | Mar-17 | Apr-17 | -9 | -8 | Dec-17 | 0 | Nov-18 | 11 | |||||||||||||||
PACE | 2 | Dec-22 | Dec-23 | Aug-22 | Apr-23 | -4 | -8 | |||||||||||||||||||
WFIRST | 1 | Dec-24 | Dec-26 | Sep-25 | Sep-26 | 9 | -3 | |||||||||||||||||||
OCO-3 | 3 | Sep-16 | Dec-16 | Jul-16 | Oct-16 | -2 | -2 | Mar-18 | 18 | May-18 | 17 | |||||||||||||||
PSP | 1 | Aug-18 | Aug-18 | Jul-18 | Jul-18 | -1 | -1 | Aug-18 | 0 | Aug-18 | 0 | |||||||||||||||
LCRD | 2 | Mar-17 | Mar-17 | Feb-17 | Feb-17 | -1 | -1 | Jun-19 | 27 | Nov-19 | 32 | |||||||||||||||
Euclid | 3 | Dec-14 | Dec-14 | Dec-14 | Dec-14 | 0 | 0 | May-15 | 5 | May-16 | 17 | |||||||||||||||
GRACE-FO | 2 | Aug-17 | Aug-17 | Aug-17 | Aug-17 | 0 | 0 | Aug-17 | 0 | Feb-18 | 6 | |||||||||||||||
Mars 2020 | 1 | Jul-20 | Jul-20 | Jul-20 | Jul-20 | 0 | 0 | Jul-20 | 0 | Jul-20 | 0 | |||||||||||||||
SAGE-III | 3 | Aug-14 | Aug-14 | Aug-14 | Aug-14 | 0 | 0 | Aug-14 | 0 | Aug-14 | 0 | |||||||||||||||
SWOT | 2 | Oct-20 | Oct-20 | Oct-20 | Oct-20 | 0 | 0 | Apr-21 | 6 | Apr-22 | 18 | |||||||||||||||
LADEE | 3 | Mar-12 | Mar-12 | May-12 | May-12 | 2 | 2 | May-13 | 14 | Nov-13 | 20 | |||||||||||||||
DART | 2 | Dec-20 | Dec-20 | Dec-20 | May-21 | 0 | 5 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | ||||||||||||||||||
NISAR | 2 | Dec-20 | Dec-21 | Dec-20 | Jun-22 | 0 | 6 | Dec-21 | 12 | Sep-22 | 9 | |||||||||||||||
JASON-3 | 3 | Jul-13 | Jul-13 | Apr-14 | Apr-14 | 9 | 9 | Mar-15 | 20 | Mar-15 | 20 | |||||||||||||||
MMS | 1 | Oct-13 | Oct-13 | Oct-14 | Oct-14 | 12 | 12 | Aug-14 | 10 | Mar-15 | 17 | |||||||||||||||
ECOSTRESS | 3 | May-17 | Mar-18 | Aug-17 | Aug-19 | 3 | 17 | Aug-17 | 3 | Aug-19 | 17 | |||||||||||||||
SMAP | 2 | Mar-13 | Mar-13 | May-15 | May-15 | 26 | 26 | Oct-14 | 19 | Mar-15 | 24 | |||||||||||||||
XARM | 3 | Oct-19 | Oct-19 | Jan-22 | Mar-23 | 27 | 41 | |||||||||||||||||||
SOC | 2 | Apr-15 | Apr-15 | Dec-17 | Dec-18 | 32 | 44 | Jan-17 | 21 | Oct-18 | 42 | |||||||||||||||
Orion | 1 | Dec-17 | Dec-17 | Jun-21 | Mar-22 | 42 | 51 | Aug-21 | 44 | Apr-23 | 64 | |||||||||||||||
MAIA | 3 | NA | NA | Dec-19 | Mar-21 | NA | NA | |||||||||||||||||||
ICON | 3 | NA | NA | Feb-17 | Jun-17 | NA | NA | |||||||||||||||||||
GOLD | 3 | NA | NA | Dec-17 | Dec-17 | NA | NA | |||||||||||||||||||
GeoCarb | 3 | NA | NA | Jun-22 | Jun-23 | NA | NA | |||||||||||||||||||
IXPE | 3 | NA | NA | Dec-20 | Dec-20 | NA | NA | |||||||||||||||||||
Landsat 9 | 2 | NA | NA | Dec-20 | Nov-21 | NA | NA | |||||||||||||||||||
Lucy | 2 | NA | NA | Oct-21 | Nov-21 | NA | NA | |||||||||||||||||||
TROPICS | 3 | NA | NA | Sep-19 | Sep-20 | NA | NA | |||||||||||||||||||
JUICE | 3 | NA | NA | Sep-19 | Sep-19 | NA | NA | |||||||||||||||||||
Psyche | 2 | NA | NA | Aug-22 | Aug-22 | NA | NA | |||||||||||||||||||
Clipper | 1 | NA | NA | Jun-22 | Jul-23 | NA | NA | removed Clipper from schedule calculations due to no KDP-A schedule estimate | ||||||||||||||||||
CLARREO-PF | 3 | Jan-20 | Jan-22 | |||||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
of Pp | (LowMA) | (HighABC) | (LowMA) | (HighABC) | ||||||||||||||||||||||
Category I | 7 | 62 | 165 | 88 | 85 | |||||||||||||||||||||
Category II | 12 | 38 | 109 | 59 | 40 | |||||||||||||||||||||
Category III | 15 | - | -07 | 56 | 96 | |||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
(LowMA) | (HighABC) | (LowMA) | (HighABC) | |||||||||||||||||||||||
Average | 80 | 118 | 66 | 70 | ||||||||||||||||||||||
Median | 15 | - | 00 | 00 | ||||||||||||||||||||||
Standard Deviation | 145 | 233 | 129 | 189 | ||||||||||||||||||||||
Minimum | -12 | -65 | -9 | -36 | ||||||||||||||||||||||
Maximum | 417 | 745 | 42 | 51 |
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | KDP-C MA | KDP-C ABC | MA Variance From A | ABC Variance From A | |||||||||||||||||
Clipper | 1 | $ 4000 | $ 4000 | $ - 0 | 00 | $ 3000 | $ 3100 | $ 100 | 33 | ||||||||||||||||||||||
DART | 2 | $ 270 | $ 291 | $ 21 | 78 | $ 175 | $ 248 | $ 73 | 417 | ||||||||||||||||||||||
Euclid | 3 | $ 110 | $ 110 | $ - 0 | 00 | $ 100 | $ 100 | $ - 0 | 00 | Combined KDP-AB so no possible change | 964 | 1014 | -4 | -8 | |||||||||||||||||
GRACE-FO | 2 | $ 470 | $ 460 | $ (10) | -21 | $ 409 | $ 404 | $ (5) | -12 | 4059 | 4319 | -1 | -8 | ||||||||||||||||||
JASON-3 | 3 | $ 159 | $ 166 | $ 7 | 44 | $ - 0 | $ 158 | 1552 | 1552 | -2 | |||||||||||||||||||||
LADEE | 3 | $ 214 | $ 200 | $ (14) | -65 | $ - 0 | $ 184 | 2359 | 2629 | 23 | |||||||||||||||||||||
LCRD | 2 | $ 239 | $ 239 | $ 0 | 02 | $ 239 | $ 239 | $ 0 | 02 | 2571 | 2627 | 8 | 10 | ||||||||||||||||||
Mars 2020 | 1 | $ 2350 | $ 2351 | $ 1 | 00 | $ 2140 | $ 2186 | $ 46 | 21 | 22727 | 24435 | 6 | 4 | ||||||||||||||||||
MMS | 1 | $ 777 | $ 990 | $ 213 | 275 | $ 777 | $ 928 | $ 151 | 195 | 10026 | 10826 | 29 | 39 | ||||||||||||||||||
NISAR | 2 | $ 808 | $ 808 | $ - 0 | 00 | $ 718 | $ 718 | $ - 0 | 00 | 7953 | 8669 | 11 | 7 | ||||||||||||||||||
OCO-3 | 3 | $ 120 | $ 111 | $ (9) | -71 | $ 100 | $ 101 | $ 1 | 13 | 1108 | 1148 | 11 | -4 | ||||||||||||||||||
Orion | 1 | $ 6391 | $ 10288 | $ 3897 | 610 | $ - 0 | $ 8534 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | 108098 | 112835 | 77 | ||||||||||||||||||||
PACE | 2 | $ 850 | $ 850 | $ - 0 | 00 | $ 805 | $ 805 | $ - 0 | 00 | ||||||||||||||||||||||
PSP | 1 | $ 1300 | $ 1439 | $ 139 | 107 | $ 1000 | $ 1233 | $ 233 | 233 | 13932 | 15534 | 39 | 19 | ||||||||||||||||||
Restore-L | 2 | $ 787 | $ 753 | $ (34) | -43 | $ 500 | $ 628 | $ 128 | 256 | ||||||||||||||||||||||
SAGE-III | 3 | $ 112 | $ 115 | $ 3 | 27 | $ - 0 | $ 104 | 101 | 112 | 0 | |||||||||||||||||||||
SLS | 1 | $ 8855 | $ 8587 | $ (268) | -30 | $ - 0 | $ 7653 | 8394 | 9695 | 9 | |||||||||||||||||||||
SMAP | 2 | $ 514 | $ 649 | $ 135 | 263 | $ - 0 | $ - 0 | $ - 0 | 7218 | 9165 | 78 | ||||||||||||||||||||
SOC | 2 | $ 243 | $ 424 | $ 181 | 745 | $ - 0 | $ 371 | 3662 | 4359 | 79 | |||||||||||||||||||||
SWOT | 2 | $ 752 | $ 757 | $ 5 | 07 | $ 642 | $ 647 | $ 5 | 08 | 7049 | 7549 | 10 | 0 | ||||||||||||||||||
XARM | 3 | $ 172 | $ 217 | $ 45 | 264 | $ 161 | $ 179 | $ 18 | 110 | ||||||||||||||||||||||
Count | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta | Change (low) | Notes | ||||||||||||||||||||||
Category 1 | 6 | $ 23673 | $ 27655 | $ 3982 | 168 | $ 3275 | $ 3606 | $ 331 | 101 | ||||||||||||||||||||||
Category 2 | 9 | $ 4933 | $ 5231 | $ 298 | 61 | $ 4474 | $ 13335 | $ 8861 | 1981 | ||||||||||||||||||||||
Category 3 | 6 | $ 887 | $ 920 | $ 33 | 37 | $ - 0 | $ 7757 | $ 7757 | ERRORDIV0 | ||||||||||||||||||||||
Total | 21 | $ 29493 | $ 33807 | $ 4314 | 146 | $ 7749 | $ 24698 | $ 16949 | 2187 | ||||||||||||||||||||||
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | |||||||||||||||||||||
CLARREO-PF | 3 | $ 75 | $ (75) | -1000 | $ 64 | ||||||||||||||||||||||||||
ICON | 3 | $ 249 | $ 218 | ||||||||||||||||||||||||||||
ECOSTRESS | 3 | $ 56 | $ 49 | ||||||||||||||||||||||||||||
GeoCarb | 3 | $ 181 | $ 171 | ||||||||||||||||||||||||||||
GOLD | 3 | $ 74 | $ 64 | ||||||||||||||||||||||||||||
IXPE | 3 | $ 205 | $ 189 | ||||||||||||||||||||||||||||
JUICE | 3 | $ 119 | $ 103 | ||||||||||||||||||||||||||||
Landsat 9 | 2 | $ 928 | $ 851 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | |||||||||||||||||||||||||||
Lucy | 2 | $ 984 | $ 914 | ||||||||||||||||||||||||||||
Psyche | 2 | $ 957 | $ 907 | ||||||||||||||||||||||||||||
TROPICS | 3 | $ 30 | $ 30 | ||||||||||||||||||||||||||||
MAIA | 3 | $ 178 | $ 150 | ||||||||||||||||||||||||||||
Cost Estimate Deltas - KDP-A to KDP-B | COST Growth () | |||||||||||||||||||
Mission | Estimate | KDP-A | KDP-B | Notes | of Pp | Low (MA) | High (ABC) | |||||||||||||
SOC | High | $ 243 | 745 | $ 424 | Category I | 4 | 127 | 172 | ||||||||||||
Low | $ - 0 | $ 371 | Category II | 5 | -01 | 199 | ||||||||||||||
Orion | High | $ 6391 | 610 | $ 10288 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | Category III | 4 | 00 | 01 | |||||||||||
Low | $ - 0 | $ 8534 | ||||||||||||||||||
SMAP | High | $ 514 | 263 | $ 649 | ||||||||||||||||
Low | $ - 0 | $ - 0 | ||||||||||||||||||
SPP | High | $ 1300 | 107 | $ 1439 | ||||||||||||||||
Low | $ 1000 | 233 | $ 1233 | |||||||||||||||||
JASON-3 | High | $ 159 | 44 | $ 166 | ||||||||||||||||
Low | $ - 0 | $ 158 | ||||||||||||||||||
SAGE-III | High | $ 112 | 27 | $ 115 | ||||||||||||||||
Low | $ - 0 | $ 104 | ||||||||||||||||||
SWOT | High | $ 752 | 07 | $ 757 | ||||||||||||||||
Low | $ 642 | 08 | $ 647 | |||||||||||||||||
Mars 2020 | High | $ 2350 | 00 | $ 2351 | ||||||||||||||||
Low | $ 2140 | 21 | $ 2186 | |||||||||||||||||
NISAR | High | $ 808 | 00 | $ 808 | ||||||||||||||||
Low | $ 718 | 00 | $ 718 | |||||||||||||||||
Euclid | High | $ 110 | 00 | $ 110 | Combined KDP-AB so no change possible | |||||||||||||||
Low | $ 100 | 00 | $ 100 | |||||||||||||||||
GRACE Follow On | High | $ 470 | -21 | $ 460 | ||||||||||||||||
Low | $ 409 | -12 | $ 404 | |||||||||||||||||
SLS | High | $ 8855 | -30 | $ 8587 | ||||||||||||||||
Low | $ - 0 | $ 7653 | ||||||||||||||||||
LADEE | High | $ 214 | -65 | $ 200 | ||||||||||||||||
Low | $ - 0 | $ 184 | ||||||||||||||||||
ProgramProject Name | Category | KDP A to B analysis (13 missions) | |||||||||||||||
ASTRO-H | 3 | ASTRO-Hreg | 3 | bull13 Missions KDP-B Data Unavailable | |||||||||||||
CYGNSS | 3 | CYGNSS | 3 | bull7 Missions KDP-Crsquos have not yet occurred | |||||||||||||
DSCOVR | 3 | DSCOVR | 3 | ||||||||||||||
C | ECOSTRESS | 3 | ECOSTRESS | 3 | |||||||||||||
EUCLID | 3 | EUCLIDreg | 3 | Euclid | |||||||||||||
C | GEDI | 3 | GEDI | 3 | |||||||||||||
GOES-R | 1 | GOES-R | 1 | ||||||||||||||
GOLD | 3 | GOLD | 3 | ||||||||||||||
GPM | 2 | GPM | 2 | ||||||||||||||
GRACE-FO | 2 | GRACE-FO | 2 | GRACE Follow On | |||||||||||||
GSDO | 1 | GSDO | 1 | ||||||||||||||
ICESat-2 | 1 | ICESat-2reg | 1 | ||||||||||||||
ICON | 2 | ICON | 2 | ||||||||||||||
InSight | 2 | InSight | 2 | ||||||||||||||
IRIS | 3 | IRIS | 3 | ||||||||||||||
Jason-3 | 3 | Jason-3 | 3 | JASON-3 | |||||||||||||
JPSS-1 | 1 | JPSS-1 | 1 | ||||||||||||||
JWST | 1 | JWSTreg | 1 | ||||||||||||||
LADEE | 2 | LADEEreg | 2 | LADEE | |||||||||||||
C | LCRD | 3 | LCRD | 3 | |||||||||||||
LDCM | 2 | LDCMreg | 2 | ||||||||||||||
LDSD | 3 | LDSD | 3 | ||||||||||||||
C | Mars 2020 | 1 | Mars 2020 | 1 | Mars 2020 | ||||||||||||
MAVEN | 2 | MAVEN | 2 | ||||||||||||||
MMS | 1 | MMS | 1 | ||||||||||||||
MOMA | 3 | MOMA | 3 | ||||||||||||||
MSL | 1 | MSL | 1 | ||||||||||||||
NICER | 3 | NICER | 3 | ||||||||||||||
C | NISAR | 2 | NISAR | 2 | NISAR | ||||||||||||
NuSTAR | 3 | NuSTARreg | 3 | ||||||||||||||
OCO-2 | 2 | OCO-2 | 2 | ||||||||||||||
C | OCO-3 | 3 | OCO-3 | 3 | |||||||||||||
ORION | 1 | ORION | 1 | Orion | |||||||||||||
OSIRIS Rex | 1 | OSIRIS Rexreg | 1 | ||||||||||||||
SAGE III | 3 | SAGE III | 3 | SAGE-III | |||||||||||||
SGSS | 1 | SGSSreg | 1 | ||||||||||||||
SLS | 1 | SLS | 1 | SLS | |||||||||||||
SMAP | 2 | SMAPreg | 2 | SMAP | |||||||||||||
SOC | 2 | SOC | 2 | SOC | |||||||||||||
SOFIA | 1 | SOFIA | 1 | ||||||||||||||
PSP | 1 | PSP | 1 | PSP | |||||||||||||
C | SWOT | 2 | SWOT | 2 | SWOT | ||||||||||||
TEMPO | 3 | TEMPO | 3 | ||||||||||||||
TESS | 2 | TESS | 2 | ||||||||||||||
Clipper | |||||||||||||||||
DART | |||||||||||||||||
PACE | |||||||||||||||||
Restore-L | |||||||||||||||||
XARM |
Statistics | COST Growth ($M) | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Average | 9 | 9 | 43 | 61 | 136 | 070 | ||||||||
Median | 5 | 6 | 20 | 45 | 112 | 034 | ||||||||
Standard Deviation | 14 | 16 | 73 | 83 | 93 | 081 | ||||||||
Variance | 2 | 3 | 535 | 685 | 871 | 066 | ||||||||
Minimum | -9 | -8 | (71) | (31) | 15 | - 0 | ||||||||
Maximum | 38 | 53 | 244 | 315 | 345 | 242 | ||||||||
no JWST | ||||||||||||||
Statistics | ||||||||||||||
COST Growth | Schedule Growth (months) | Duration (months) | ||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 18 | 17 | 118 | 131 | 1989 | 065 | ||||||||
Median | 20 | 17 | 101 | 132 | 19167 | 0582 | ||||||||
Standard Deviation | 16 | 19 | 105 | 117 | 11557 | 0830 | ||||||||
Sample Variance | 3 | 4 | 1101 | 1377 | 133562 | 0688 | ||||||||
Minimum | -6 | -5 | - 0 | - 0 | 397 | - 0 | ||||||||
Maximum | 46 | 48 | 284 | 274 | 4527 | 310 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 20 | 21 | 156 | 159 | 2031 | 075 | ||||||||
Median | 21 | 20 | 132 | 147 | 20783 | 0589 | ||||||||
Standard Deviation | 17 | 25 | 174 | 155 | 11214 | 0881 | ||||||||
Sample Variance | 3 | 6 | 3035 | 2394 | 125751 | 0776 | ||||||||
Minimum | -6 | -5 | 00 | 00 | 40 | - 0 | ||||||||
Maximum | 48 | 78 | 649 | 528 | 453 | 31 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 4 | 3 | 47 | 136 | 253 | 054 | ||||||||
Median | 9 | 9 | 61 | 132 | 24333 | 042 | ||||||||
Standard Deviation | 10 | 12 | 52 | 56 | 6657 | 022 | ||||||||
Sample Variance | 1 | 1 | 273 | 311 | 44310 | 005 | ||||||||
Minimum | -7 | -11 | (10) | 82 | 1923 | 041 | ||||||||
Maximum | 11 | 11 | 92 | 193 | 3243 | 079 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | ||||||||||||
of Pp | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | ||||||||||
Category I | 6 | 4 | 4 | 22 | 78 | |||||||||
Category II | 9 | 8 | 13 | 71 | 83 | |||||||||
Category III | 8 | 6 | 11 | 28 | 52 | |||||||||
Timeline | Total Programs | 46 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDB C for comaprison | planned | Total Replans | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statictics - PresentFinal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 41416 | 14 | 9 | 9 | 8 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | |||||||||||||||||||||||||||||||||||||
ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||
ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 758 | Feb-16 | 759 | Mar-16 | FY16Q2 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -5 | -10 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||
CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 1595 | Oct-16 | 1742 | May-17 | FY16Q2 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -4 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | ||||||||||||||||||||||||||||||||||||||||
EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 179 | Dec-21 | 190 | Dec-22 | FY16Q2 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 0 | 00 | 5787 | 5480 | |||||||||||||||||||||||||||||||||||||||
GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | ||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 108295 | Oct-16 | kDP-D Sep-14 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | ||||||||||||||||||||||||||||||||||||||||||||||
GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||
GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q2 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -1 | -3 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||
GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4079 | Aug-17 | 4318 | Feb-18 | FY16Q2 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | -00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ESD | GSDO | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 26336 | Jun-18 | 28129 | Nov-18 | FY16Q2 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 9916 | Oct-17 | 10636 | Jun-18 | FY16Q2 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 232 | Jun-17 | 2527 | Oct-17 | FY16Q2 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 1 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Planetary | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | 6536 | Mar-16 | 6751 | Mar-16 | FY16Q2 | N | N | 0 | 0 | 4 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E draft | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||
JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||
LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||
Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
LDCM | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
LDCMreg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 8501 | Feb-13 | 8568 | Feb-13 | FY15Q4 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | ||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||
Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||
MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 598 | Nov-13 | 600 | Nov-13 | FY16Q1 | N | N | 0 | 0 | -7 | -11 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1121 | Sep-15 | 1121 | Sep-15 | FY16Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 11 | 4 | 1320 | 613 | |||||||||||||||||||||||||||||||||||||||||
MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 904 | Jul-18 | 1004 | Jul-18 | FY16Q2 | N | N | 0 | 0 | -1 | -1 | 3347 | 3347 | |||||||||||||||||||||||||||||||||||||||||||||||||
MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||
NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 684 | Feb-17 | 67 | Feb-17 | KDP-D Jan-16 | N | N | 0 | 0 | 9 | -2 | 613 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||
NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||
NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 166 | Jun-12 | 166 | Jun-12 | FY14Q4 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | 3 | 3 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||
OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4276 | Jul-14 | 4276 | Jul-14 | FY16Q2 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -2 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||
OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ORION | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | 108098 | Aug-21 | 112835 | Apr-23 | FY16Q2 | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 10014 | Oct-16 | 10572 | Oct-16 | FY16Q2 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 1 | -1 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13931 | Aug-18 | 15534 | Aug-18 | FY16Q2 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 1265 | Aug-16 | 133 | Aug-16 | FY16Q2 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 20 | 19 | 2437 | 2437 | |||||||||||||||||||||||||||||||||||||||||
SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||
SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1216 | Jul-19 | 1228 | Sep-19 | PPBE18 PMR | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 2 | 2 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ESD | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||
SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | May-15 | 8899 | May-15 | FY16Q2 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 707 | 203 | |||||||||||||||||||||||||||||||||||||||||
SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 2892 | Oct-18 | 3789 | Oct-18 | FY16Q2 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -27 | -13 | 2127 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
SOFIA (Budget) | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 29048 | Feb-14 | 29122 | Feb-14 | FY16Q2 | Budget Reduction | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||
TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 1809 | Sep-17 | 2178 | Nov-17 | FY16Q2 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 31976 | Dec-17 | 3517 | Jun-18 | FY16Q2 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -7 | -7 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Currently in B | Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CLARREO-PF | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DART | KDP-C in July | Mean | 13 | -13 | 55 | 28 | 1729 | 115 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Europa Clipper | 02045454545 | Median | 17 | -06 | 21 | 00 | 17483 | 0862 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GeoCarb | Standard Deviation | 84 | 68 | 88 | 87 | 10875 | 0863 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IXPE | Minimum | -27 | -13 | 00 | -72 | 397 | 050 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lucy | Maximum | 20 | 19 | 335 | 335 | 4527 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MAIA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PACE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Psyche | Paste data from above to this table for analysis | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Restore-L | -27 | -13 | 2127 | - 0 | 1610 | 050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SOC Replan | Breach notification made DM not yet final | -7 | -7 | - 0 | - 0 | 080 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TROPICS | -7 | -11 | - 0 | - 0 | 817 | 060 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
XARM | -5 | -10 | 307 | - 0 | 867 | 088 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -9 | - 0 | (717) | 2767 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -8 | 717 | 717 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -3 | - 0 | (400) | 510 | 058 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -9 | 207 | (400) | 800 | 099 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -1 | 3347 | 3347 | 2240 | 205 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -1 | - 0 | - 0 | 397 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -01 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | - 0 | - 0 | 1053 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | 407 | 1020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | -3 | 707 | 203 | 2577 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | 00 | - 0 | - 0 | 2777 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 00 | - 0 | - 0 | 1887 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | 3 | 710 | 403 | 1167 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | -4 | - 0 | - 0 | 1983 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 4 | 207 | (203) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 5 | - 0 | - 0 | 1917 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | 6 | 103 | - 0 | 2733 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | -2 | 613 | - 0 | 4527 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 1320 | 613 | 503 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 607 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 | 19 | 2437 | 2437 |
Timeline | Total Programs | 46 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDP C for comaprison | planned | Total Replans | 14 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statistics - PresentFinal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 72618 | 20 | 13 | 13 | 9 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 74855 | Feb-16 | 109271 | Mar-16 | FY17 Q1 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -7 | 30 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 159503 | Dec-16 | 159503 | Dec-16 | FY18 Q3 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -12 | 203 | (503) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | 51043 | Apr-18 | 52443 | Aug-19 | KDP-E May-18 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGS | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 27418 | Sep-18 | 28129 | Nov-18 | FY17 Q1 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 4 | 00 | 307 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGSreg | 1 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | 3145 | Dec-19 | 3231 | Jun-20 | Dec-17 | 5115 | 4181 | 31446 | Dec-19 | 31446 | Dec-19 | FY18 Q3 | Y | Y | Y | 16 | 15 | 1827 | 1927 | 3957 | 049 | -0 | -27 | - 0 | (610) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | APD | EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 206214 | Mar-20 | 223452 | Mar-20 | FY18 Q3 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 13 | 176 | 3653 | 2130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | 120774 | Nov-18 | 123774 | Mar-19 | FY18 Q3 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 10150 | Nov-16 | KDP-E Oct-16 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | 663 | Feb-18 | 73 | Apr-18 | KDP-E Dec-17 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16 Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8834 | Feb-14 | 8904 | Feb-14 | FY17 Q3 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -3 | -5 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4059 | May-18 | 4319 | May-18 | FY18 Q3 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | 00 | 910 | 297 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 10561 | Sep-18 | 10636 | Oct-18 | FY18 Q3 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 6 | 00 | 1117 | 407 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 243 | Jun-18 | 2527 | Jun-18 | FY18 Q3 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 6 | 00 | 1217 | 810 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSightreg | 2 | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 8189 | May-18 | 8289 | May-18 | Sep-16 | 1923 | 1538 | 8138 | May-18 | 8138 | May-18 | FY18 Q3 | Y | Y | Y | Y | 23 | 23 | 2637 | 2637 | 3050 | 086 | -1 | -18 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16 Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E Sep-16 | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | 1144 | Sep-19 | 127 | Sep-19 | KDP-C Apr-17 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16 Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTregreg | 1 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 94889 | Nov-20 | 96627 | Mar-21 | May-18 | 10639 | 8277 | 94889 | Nov-20 | 96627 | Mar-21 | FY18 Q3 | Y | Y | Y | 9 | 2940 | 8113 | 036 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15 Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | 8385 | Dec-20 | 885 | Nov-21 | FY18 Q3 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | 2571 | Jun-19 | 2627 | Nov-19 | FY18 Q3 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8 | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8reg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 85006 | Feb-13 | 85666 | Feb-13 | FY18 Q3 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15 Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | 23634 | Jul-20 | 25304 | Jul-20 | FY18 Q3 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 5753 | Nov-13 | 5753 | Nov-13 | FY16 Q3 | N | N | 0 | 0 | -11 | -14 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1098 | Mar-15 | 1098 | Mar-15 | FY18 Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 9 | 1 | 707 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 120243 | Jul-20 | 128226 | Jul-20 | FY18 Q3 | N | N | 0 | 0 | 24 | 27 | 5783 | 5783 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15 Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 694 | Jun-17 | 706 | Aug-17 | KDP-E May-17 | N | N | 0 | 0 | 10 | 3 | 1013 | 603 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | 7953 | Dec-21 | 8969 | Sep-22 | FY18 Q3 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | 0 | 00346060676 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 115315 | Jun-12 | 115315 | Jun-12 | FY15 Q1 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | -39 | -28 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4245 | Jul-14 | 4245 | Jul-14 | FY17 Q1 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -3 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | 113388 | Mar-18 | 113388 | May-18 | FY18 Q3 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orion | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orionreg | 1 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 116581 | Jun-22 | 116581 | Jun-22 | Jun-18 | 8483 | 3746 | 116581 | Jun-22 | 116581 | Jun-22 | FY18 Q3 | Y | N | 7 | 3 | 1013 | (1013) | 3347 | 030 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 9975 | Sep-16 | 10532 | Sep-16 | FY18 Q3 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 0 | -1 | (100) | (100) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13821 | Aug-18 | 15482 | Aug-18 | FY18 Q3 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -1 | -03 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 129364 | Feb-17 | 129364 | Feb-17 | FY18 Q3 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 22 | 16 | 3050 | 3050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1251 | Sep-19 | 1261284 | Nov-19 | Path Forward APMC Dec 2016 | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 4 | 4 | 223 | 267 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16 Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLSreg | 1 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 9734 | Dec-19 | 9843 | Jun-20 | Dec-17 | 1340 | 148 | 98029 | Dec-19 | 98029 | Dec-19 | FY18 Q3 | Y | Y | Y | 14 | 2 | 2433 | 1927 | 4060 | 047 | 1 | -04 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | Jan-15 | 8899 | Jan-15 | FY18 Q3 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 307 | (197) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 3433 | Feb-20 | 3866 | Feb-20 | FY18 Q3 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -7 | -11 | 3753 | 1627 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIAreg | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 15874 | Feb-14 | 15949 | Feb-14 | FY18 Q3 | Y | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | 7049 | Apr-21 | 7549 | Apr-22 | FY18 Q3 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 181242 | Sep-17 | 197242 | Nov-17 | FY18 Q3 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | -94 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 3333 | Apr-18 | 3333 | Jun-18 | FY18 Q3 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -3 | -12 | 403 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mean | 90 | 88 | 50 | 81 | 1773 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02045454545 | Median | 82 | 49 | 10 | 60 | 16233 | 0374 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Standard Deviation | 118 | 164 | 77 | 97 | 13962 | 0647 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum | -7 | -10 | -71 | -31 | 147 | - 0 | SPP | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum | 38 | 59 | 244 | 345 | 7433 | 242 | EUCLIDreg | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GSDO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Paste data from above to this table for analysis | ORION | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-7 | -10 | 607 | 817 | 1923 | 042 | SLS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-3 | -7 | - 0 | - 0 | 147 | - 0 | TEMPO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -7 | 1113 | 1113 | 1887 | 059 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
0 | -6 | - 0 | 613 | 1897 | 032 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total KDPs Within Cost Range of Prior KDP | Total KDPs Within Schedule Range of Prior KDP | -2 | -5 | 303 | 910 | 510 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | -3 | -3 | - 0 | - 0 | 503 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MALow at or below Preceding KDP Low | 14 | 31 | 45 | 31 | MALow at or below Preceding KDP Low | 27 | 26 | 53 | 51 | 6 | 0 | 410 | (100) | 1217 | 008 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABCHigh at or below Preceding KDP High | 19 | 33 | 52 | 37 | ABCHigh at or below Preceding KDP High | 21 | 32 | 53 | 40 | 0 | 0 | (203) | 403 | 167 | 242 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 2 | 810 | 307 | 500 | 061 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-B Cost | KDP-A to KDP-B Schedule | 33 | 5 | - 0 | 100 | 800 | 013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 11 | 8 | 103 | 103 | 2670 | 004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B Low at or below KDP-A Low | 4 | 10 | 14 | 29 | KDP-B Low at or below KDP-A Low | 13 | 9 | 22 | 59 | 9 | 9 | (203) | 503 | 1983 | 025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B High at or below KDP-A High | 9 | 12 | 21 | 43 | KDP-B High at or below KDP-A High | 12 | 10 | 22 | 55 | 11 | 10 | (103) | 1320 | 3243 | 041 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | 10 | 2437 | 3147 | 1610 | 195 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | 10 | 613 | 613 | 3450 | 018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B to KDP-C Cost | KDP-B to KDP-C Schedule | -2 | 11 | 813 | 603 | 1687 | 036 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 9 | 13 | 917 | 1930 | 2433 | 079 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-B Low | 10 | 21 | 31 | 32 | MA at or below KDP-B Low | 14 | 17 | 31 | 45 | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-B High | 10 | 21 | 31 | 32 | ABC at or below KDP-B High | 9 | 22 | 31 | 29 | 16 | 18 | - 0 | 607 | 707 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 31 | 1217 | 1830 | 1027 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-C Cost | KDP-A to KDP-C Schedule | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 29 | 59 | 2233 | 3450 | 7433 | 046 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-A Low | 2 | 7 | 9 | 22 | MA at or below KDP-A Low | 5 | 12 | 17 | 29 | added | 5 | 0 | - 0 | - 0 | 813 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-A High | 5 | 11 | 16 | 31 | ABC at or below KDP-A High | 3 | 14 | 17 | 18 | added | -0 | -0 | 103 | 1013 | 1017 | 100 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 7 | 4 | - 0 | - 0 | 1323 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-C (MA) | KDP-C (ABC) | Replan (MA) | Replan (ABC) | KDP-C to Replan (MA) | KDP-C to Replan (ABC) | KDP-C (or Replan) to PresentFinal (MA) | KDP-C (or Replan) to PresentFinal (ABC) | added | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Percentage of Project CostSchedule HighLow Estimates Within Prior KDP Range Estimates | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B Estimate at or below A Estimate | C Estimate at or below B Estimate | C Estimate at or below A Estimate | Total at or below Preceding KDP Estimate | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - High | 43 | 32 | 31 | 37 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - Low | 29 | 32 | 22 | 31 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - High | 55 | 29 | 18 | 40 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - Low | 59 | 45 | 29 | 51 |
bull NASA cost performance has drastically improved since the early 2000rsquos
We are falling short of our portfolio goal of 70 projects hitting cost targets
Our cost and schedule ranges at KDP-A and KDP-B are optimistic and more often than do not capture the eventual high cost or schedule commitments at KDP-C baseline
Development cost reporting metrics can misrepresent how our projects are performing (both positively and negatively) if the LV contract award is well above or below the estimate included in the KDP-C baseline
bull
bull
bull
9
Back-up
10
1111
1212
Total KDPs Within Cost Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 14 31 45 31ABCHigh at or below Preceding KDP High 19 33 52 37
Total KDPs Within Schedule Range of Prior KDPYes No Total Percent At or Below
MALow at or below Preceding KDP Low 27 26 53 51ABCHigh at or below Preceding KDP High 21 32 53 40
KDP-A to KDP-B CostYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 4 10 14 29KDP-B High at or below KDP-A High 9 12 21 43
KDP-A to KDP-B ScheduleYes No Total Percent At or Below
KDP-B Low at or below KDP-A Low 13 9 22 59KDP-B High at or below KDP-A High 12 10 22 55
KDP-B to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-B Low 10 21 31 32ABC at or below KDP-B High 10 21 31 32
KDP-B to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-B Low 14 17 31 45ABC at or below KDP-B High 9 22 31 29
KDP-A to KDP-C CostYes No Total Percent At or Below
MA at or below KDP-A Low 2 7 9 22ABC at or below KDP-A High 5 11 16 31
KDP-A to KDP-C ScheduleYes No Total Percent At or Below
MA at or below KDP-A Low 5 12 17 29ABC at or below KDP-A High 3 14 17 18
COST ($M)
KDP-C to Replan (MA)595000000000000281704999999999999750000000000000014025429999999999993-178400000000000095115-85999999999999943826-25999999999996248E-200911-518999999999999773-1220000000000004531770000000000005117000000000000176266192299999999999951671-2800000000000011401112644044106389999999999965159999999999999425999999999999972-1246900000000005125710000000000002140107999999999999551896472000000000000171666999999999998263820000000000005922000000000000459114748445624775539999999999999103258999999999999811180000000000001939999999999999151167299999999999384830000000000109-33599999999999909-5550000000000011416020000000000005-3200000000000002831553639000000000000974113401372999999999999515260000000000002-5800000000000011429476-180455789999999999997710099999999999994-76000000000000227KDP-C to Replan (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS59500000000000028211499999999999918399999999999977392842000000000001592E-2-3084000000000000941809999999999991-8599999999999994344599999999999994-46999999999997044E-210860399999999999994316E-2978-45-281000000000000238420000000000004520329999999999995419999999999998866751153799999999999951802-108000000000000111623851847387182770000000000073628999999999999770-4297100000000000423299999999999983142-039999999999997726203338000000000000119256712921999999999999321011613781300000000000186840000000000000658600000000000023553999999999999910349911780000000000001329999999999999729948999999999996437460000000000036-88599999999999909-5720000000000004511440000000000009-32000000000000028235100000000000023453000000000000711081481372999999999999503989999999999997729551-18045-210000000000002270-21600000000000023
COST Change ($M)
B to C (ABC)ASTRO-HASTRO-HregCYGNSSDSCOVRECOSTRESSEGSEGSregEUCLIDEUCLIDregGEDIGOES-RGOLDGPMGPMregGRACE-FOICESat-2ICESat-2regICONInSightInSightregIRISJason-3JPSS-1JUICEJWSTJWSTregJWSTregregLADEELADEEregLandsat 9LCRDLDCMLandsat 8LDCMLandsat 8regLDSDLDSDregMars 2020MAVENMMSMOMAMSLMSLregNICERNISARNuSTARNuSTARregOCO-2OCO-2regOCO-3OrionOrionregOSIRIS RexOSIRIS RexregPSPSAGE IIISGSSSGSSregSLSSLSregSMAPSMAPregSOCSOFIASOFIAregSWOTTEMPOTESS01047535211267606203370517928286851448611111111110973E-2075077759107650046E-4-98804985102361215E-201486366383447687-7818181818181813E-2030674002751031632-37226838174140057E-4013440860215052999E-30-46012269938650305E-2-61086956521739177E-201085051546391753202363403859567541916901408450704179E-200227818101022070730-65060240963855487E-2071729957805907171E-20592556945781199880779814665592264319368421052631587E-20314499999999999890-4630495689655173E-288694328130947783E-2017749999999999999-42462845010613295E-400166502463054187263934495959166312E-2093093699515347267E-200048437693738375709067597185373168792E-20526615969581748940003366676193198057128745644599303111E-296699259374453242E-233198918775202764E-2-732231404958677E-2-5100766898519711E-279499652536483736E-2-27777777777777801E-203746613545816733204003014143287735301290322580645161315265600825167612E-20176206365503080030010075757575757570-061063923386687424-27818254073387508E-30-54000000000000055E-2
COST Change ()
Cost - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate04285714285714285503225806451612903103125036538461538461536Schedule - HighB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate054545454545454541029032258064516131017647058823529413039622641509433965Cost - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate02857142857142857032258064516129031022222222222222221031111111111111112Schedule - LowB Estimate at or below A EstimateC Estimate at or below B EstimateC Estimate at or below A EstimateTotal at or below Preceding KDP Estimate059090909090909094045161290322580644029411764705882354050943396226415094
High Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (high)01682251932581422Category 2 Change (high)60501935980863335E-2Category 3 Change (high)37110484780157868E-2Total Change (high)014626442296281486
Low Cost Estimate Change
KDP-A to KDP-B
Category 1 Change (low)010106870229007633Category 2 Change (low)19806591564406897Category 3 Change (low)0Total Change (low)21873131670301591
KDP-A to KDP-B Schedule Growth - Low Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion0-9-49-2-1-100000200912326273242
KDP-A to KDP-B Schedule Growth - High Estimate
(in months)
MissionRestore-LSLSPACEWFIRSTOCO-3PSPLCRDEuclidGRACE-FOMars 2020SAGE-IIISWOTLADEEDARTNISARJASON-3MMSECOSTRESSSMAPXARMSOCOrion-36-8-8-3-2-1-1000002569121726414451
Cost Variation Against Baselines
13
Methodology and Assumptions
The first step in conducting this analysis was to verify and validate the cost baseline information using source documentation KDP-C figures takes priority as the definitive baseline Where KDP-C decision memoranda was not available as in the case of many projects baselined prior to approximately 2009 figures were pulled from the first appearance as a development project in a Presidentrsquos Budget as the baseline against which to measure In a few cases notificationsreports to Congress (eg NSPD-49 reports) were used to identify a baseline figure MA figures were pulled solely from decision memoranda and thus our dataset with regard to MArsquos is smaller as it excludes many of the older projects that did not have standardized baseline documentation with MArsquos noted Variance to the baseline was then measured by using the most recent quarterly cost and schedule report Latest cost data is valid through the FY18 Q3 reporting period Slide 3 charts illustrate each project in the dataset with respective LCC and dev cost variances
The confidence level policy applied to each project was noted using source documentation as well as a cross-reference against when policy changes were implemented recognizing that a subset of projects received waivers to new policies during policy transition Certain exclusions were applied to ensure a dataset comparable across projects For example SOFIA had conducted a JCL on a replan but the decision memorandum made clear the baseline was not changing therefore the JCL confidence level could not fairly be applied to measure performance against the baseline Another example is GPM which was excluded as it was one of the very first projects baselined after JCL policy implementation and was not a ldquotruerdquo JCL with the decision memorandum noting that the intent was met while a JCL DPMC would be held many months later to evaluate progress There were a couple of additional exclusions applied
When a project is confirmed at KDP-C cost performance measurements were applied to that baseline If a project was then rebaselined a ldquonewrdquo project was added to the dataset using the rebaselined figures against which to measure as the Agency made the decision at that point to press ahead with the project and Congress provided reauthorization The ldquooriginalrdquo project was ldquofrozenrdquo in terms of development phase to fairly capture the contemporary phase performance (eg the ldquooriginalrdquo OCO-2 cost growth will always be categorized within the ldquoprojects in developmentrdquo performance category while the rebaselined OCO-2 cost performance falls into the ldquoprojects launchedrdquo category) The latest cost figures however were used to measure cost performance across both original baselines and rebaselines in order to fairly capture the accuracy of original estimates against final outcomes
This insight while placing an emphasis on the JCL while measuring performance does not intend to convey a discovered causal relationship between JCL and cost performance There have been many other related programmatic and technical advancements over the past 10 to 20 years that have influenced cost and schedule performance in the overall positive direction Other insights look into other influencers of costschedule performance
13
Dev Cost Metrics Controlling for LV Cost Variation
14
Methodology and Assumptions
SID pulled a number of data elements from a total of 22 SMD projects to conduct this analysis Data elements from a projectrsquos baseline include total development cost and the launch services cost estimate and have been sourced from KDP documentation quarterly reports and Cost Analysis Data Requirements (CADREs) These data were compared to currentactual total development and launch services costs from the most recent KDPquarterly reports Other data elements include Division Lead Center type of launch vehicle LCC category and current phase
SID calculated the overall development cost deltas from the baseline cost and verified the percentage growth with external reporting data where applicable SID then calculated the percent change in launch services development cost from baseline to currentactual The development cost percent change was calculated after removing launch services from the inputs
For further insight these same calculations were conducted by Division Lead Center type of launch vehicle and LCC category Division Lead Center and LCC category were then further broken down by looking only at projects currently in development
The 22 projects used in this analysis include Mars 2020 ICESat-2 ICON InSight SOC PSP SWOT TESS Juno Landsat-8 MMS OSIRIS-REx SMAP MAVEN GRAIL NuSTAR RBSP IRIS LADEE OCO-2 CYGNSS and Landsat 9 Representation includes seven planetary science seven earth science six heliophysics and two astrophysics missions twelve GSFC-led projects and eight JPL-led projects (LaRC and ARC representing the other two) ten Atlas V one Delta IV-H two Falcon 9 four Delta II four Pegasus and one Minotaur V rockets and six category 1 thirteen category 2 and three category 3 projects Seven projects assessed are currently in development
Other projects considered were excluded if launch was or is to be on a ride-share and launch services costs were negligible (eg RBI) Projects launching on internationally-contributed rockets were also excluded (eg GPM JWST) Other exclusions were based on data limitations at the time of analysis (eg no launch services costs available from baseline)
Did not add GPM international launchSOFIA no launchJWST international launch
RBI rideshareSentinel-6 international launch
Dawn no launch vehicle numbers availableSNPP No baseline LV estimate available
NISAR international launchLCRD rideshare
GRACE-FO rideshare
14
Formulation KDPs
15
Methodology and Assumptions
Comparative analysis was conducted where possible (ie when highlow costschedule figures were available in KDP-ABC decision memoranda This analysis does not attempt to explain why the majority of costschedule estimates at KDPrsquos exceed prior estimates
Cost and schedule ranges were extracted from KDP-A and KDP-B decision memoranda Agency Baseline Commitments and Management Agreements were extracted from KDP-C decision memoranda Lifecycle cost was used in all cases (as opposed to development cost only) A project did not need to have all KDP-A through C figures to be included in the analysis (eg a project that did not have a KDP-A range was still included in the KDP-B to KDP-C statistics)
This analysis includes data from KDP-A KDP-B and KDP-C milestones At KDP-A and KDP-B a high and low estimate is established for both cost and schedule At KDP-C a Management Agreement and an Agency Baseline Commitment is established for both cost and schedule For ease of conveyance this analysis equates the Management Agreement as the low estimate for KDP-C and equates the Agency Baselines Commitment as the high estimate for KDP-C
15
Column1 | KDP-C Date | Lead Center | Division | Launch Vehicle | LCC Category | Phase | Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | Notes | |||||||||||||||||
Juno | Aug-08 | JPL | Planetary | Atlas V | 1 | Ops | $ 7423 | $ 7089 | $ 1904 | $ 1817 | $ 5519 | $ 5272 | -45 | -46 | -45 | ||||||||||||||||||
RBSP | Dec-08 | GSFC | Helio | Atlas V | 2 | Ops | $ 5338 | $ 5040 | $ 1336 | $ 1324 | $ 4002 | $ 3716 | -56 | -09 | -71 | ||||||||||||||||||
GRAIL | Jan-09 | JPL | Planetary | Delta II | 2 | Ops | $ 4270 | $ 3983 | $ 1528 | $ 1508 | $ 2742 | $ 2475 | -67 | -13 | -97 | ||||||||||||||||||
MMS | Jun-09 | GSFC | Helio | Atlas V | 1 | Ops | $ 8573 | $ 8753 | $ 1942 | $ 1788 | $ 6631 | $ 6965 | 21 | -79 | 50 | ||||||||||||||||||
NuSTAR | Sep-09 | JPL | Astro | Pegasus | 3 | Ops | $ 1099 | $ 1162 | $ 358 | $ 332 | $ 741 | $ 830 | 57 | -73 | 120 | ||||||||||||||||||
Landsat-8 | Dec-09 | GSFC | Earth | Atlas V | 2 | Ops | $ 5830 | $ 5028 | $ 1264 | $ 1218 | $ 4566 | $ 3810 | -138 | -36 | -166 | ||||||||||||||||||
LADEE | Aug-10 | ARC | Planetary | Minotaur V | 2 | Ops | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||
OCO-2 | Sep-10 | JPL | Earth | Delta II | 2 | Ops | $ 2490 | $ 3200 | $ 676 | $ 1368 | $ 1814 | $ 1832 | 285 | 1024 | 10 | against original baseline rebaseline primary LV-driven aside from some RWA issues | |||||||||||||||||
MAVEN | Oct-10 | GSFC | Planetary | Atlas V | 2 | Ops | $ 5672 | $ 4720 | $ 1870 | $ 1541 | $ 3802 | $ 3179 | -168 | -176 | -164 | ||||||||||||||||||
IRIS | Nov-10 | GSFC | Helio | Pegasus | 3 | Ops | $ 1407 | $ 1430 | $ 404 | $ 426 | $ 1003 | $ 1004 | 16 | 54 | 01 | ||||||||||||||||||
SMAP | May-12 | JPL | Earth | Delta II | 2 | Ops | $ 4857 | $ 4543 | $ 1319 | $ 1201 | $ 3538 | $ 3342 | -65 | -89 | -55 | ||||||||||||||||||
SOC | Mar-13 | GSFC | Helio | Atlas V | 2 | Dev | $ 3769 | $ 3100 | $ 2500 | $ 1727 | $ 1269 | $ 1373 | -178 | -309 | 82 | ||||||||||||||||||
OSIRIS-REx | May-13 | GSFC | Planetary | Atlas V | 1 | Ops | $ 7786 | $ 6156 | $ 2340 | $ 1888 | $ 5446 | $ 4268 | -209 | -193 | -216 | ||||||||||||||||||
CYGNSS | Feb-14 | LaRC | Earth | Pegasus | 3 | Ops | $ 1511 | $ 1287 | $ 523 | $ 623 | $ 988 | $ 664 | -148 | 191 | -328 | ||||||||||||||||||
InSight | Mar-14 | JPL | Planetary | Atlas V | 2 | Ops | $ 5418 | $ 6483 | $ 1599 | $ 1685 | $ 3819 | $ 4798 | 197 | 54 | 256 | ||||||||||||||||||
PSP | Mar-14 | GSFC | Helio | Delta IV-H | 1 | Dev | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||
ICESat-2 | May-14 | GSFC | Earth | Delta II | 1 | Dev | $ 7637 | $ 7441 | $ 1188 | $ 1183 | $ 6449 | $ 6258 | -26 | -04 | -30 | ||||||||||||||||||
ICON | Oct-14 | GSFC | Helio | Pegasus | 2 | Dev | $ 1960 | $ 1982 | $ 543 | $ 563 | $ 1417 | $ 1419 | 11 | 37 | 01 | ||||||||||||||||||
TESS | Oct-14 | GSFC | Astro | Falcon 9 | 2 | Ops | $ 3232 | $ 2799 | $ 1141 | $ 874 | $ 2091 | $ 1925 | -134 | -234 | -79 | ||||||||||||||||||
SWOT | May-16 | JPL | Earth | Falcon 9 | 2 | Dev | $ 5715 | $ 5715 | $ 1313 | $ 1078 | $ 4402 | $ 4638 | 00 | -179 | 53 | ||||||||||||||||||
Mars 2020 | Jun-16 | JPL | Planetary | Atlas V | 1 | Dev | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||
Landsat 9 | Dec-17 | GSFC | Earth | Atlas V | 2 | Dev | $ 6342 | $ 6342 | $ 1544 | $ 1542 | $ 4798 | $ 4800 | 00 | -01 | 00 | ||||||||||||||||||
Projects in Development | $ 52749 | $ 52336 | $ 14819 | $ 12738 | $ 37930 | $ 39598 | -08 | -140 | 44 | ||||||||||||||||||||||||
Projects in Operations | $ 66588 | $ 63555 | $ 18647 | $ 18196 | $ 47941 | $ 45359 | -46 | -24 | -54 | ||||||||||||||||||||||||
Total | $ 119337 | $ 115891 | $ 33466 | $ 30935 | $ 85871 | $ 84956 | -29 | -76 | -11 | ||||||||||||||||||||||||
Development Baseline | Development CurrentActuals | LV Estimate at Baseline | LV CurrentActuals | Development Baseline less LV Estimates | Development CurrentActuals less LV Actuals | Development Percent Change | LV Percent Change | Development Percent Change less LV | |||||||||||||||||||||||||
GSFC Project Total | $ 68103 | $ 63294 | $ 20377 | $ 18325 | $ 47726 | $ 44969 | -71 | -101 | -58 | ||||||||||||||||||||||||
JPL Projects Total | $ 48041 | $ 49428 | $ 12122 | $ 11384 | $ 35919 | $ 38044 | 29 | -61 | 59 | ||||||||||||||||||||||||
Did not add | GPM | international launch | GSFC Projects in Ops | $ 37838 | $ 33926 | $ 10297 | $ 9059 | $ 27541 | $ 24867 | -103 | -120 | -97 | |||||||||||||||||||||
SOFIA | no launch | JPL Projects in Ops | $ 25557 | $ 26460 | $ 7384 | $ 7911 | $ 18173 | $ 18549 | 35 | 71 | 21 | ||||||||||||||||||||||
JWST | international launch | GSFC Projects in Dev | $ 30265 | $ 29368 | $ 10080 | $ 9266 | $ 20185 | $ 20102 | -30 | -81 | -04 | ||||||||||||||||||||||
RBI | rideshare | JPL Projects in Dev | $ 22484 | $ 22968 | $ 4738 | $ 3473 | $ 17746 | $ 19495 | 22 | -267 | 99 | ||||||||||||||||||||||
Sentinel-6 | international launch | ||||||||||||||||||||||||||||||||
Dawn | no launch vehicle numbers available | Astro | $ 4331 | $ 3961 | $ 1499 | $ 1206 | $ 2832 | $ 2755 | -85 | -195 | -27 | ||||||||||||||||||||||
SNPP | No baseline LV estimate available | Planetary | $ 49020 | $ 47566 | $ 13109 | $ 11437 | $ 35911 | $ 36129 | -30 | -128 | 06 | ||||||||||||||||||||||
NISAR | international launch | Helio | $ 31604 | $ 30808 | $ 11030 | $ 10078 | $ 20574 | $ 20730 | -25 | -86 | 08 | ||||||||||||||||||||||
LCRD | rideshare | Earth | $ 34382 | $ 33556 | $ 7827 | $ 8213 | $ 26555 | $ 25343 | -24 | 49 | -46 | ||||||||||||||||||||||
GRACE-FO | rideshare | ||||||||||||||||||||||||||||||||
Astro - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
Planetary - Dev Only | $ 16769 | $ 17253 | $ 3425 | $ 2395 | $ 13344 | $ 14858 | 29 | -301 | 113 | ||||||||||||||||||||||||
Helio - Dev Only | $ 16286 | $ 15585 | $ 7348 | $ 6540 | $ 8938 | $ 9045 | -43 | -110 | 12 | ||||||||||||||||||||||||
Earth - Dev Only | $ 19694 | $ 19498 | $ 4045 | $ 3803 | $ 15649 | $ 15695 | -10 | -60 | 03 | ||||||||||||||||||||||||
Atlas V | $ 72920 | $ 69964 | $ 19725 | $ 16926 | $ 53195 | $ 53038 | -41 | -142 | -03 | ||||||||||||||||||||||||
Delta IV-H | $ 10557 | $ 10503 | $ 4305 | $ 4250 | $ 6252 | $ 6253 | -05 | -13 | 00 | ||||||||||||||||||||||||
Falcon 9 | $ 8947 | $ 8514 | $ 2454 | $ 1952 | $ 6493 | $ 6562 | -48 | -205 | 11 | ||||||||||||||||||||||||
Delta II | $ 19254 | $ 19167 | $ 4711 | $ 5260 | $ 14543 | $ 13907 | -05 | 117 | -44 | this is skewed by OCO-2 which switched from the baseline Taurus XL to the Delta-II at the rebaseline | |||||||||||||||||||||||
Pegasus | $ 5977 | $ 5861 | $ 1828 | $ 1944 | $ 4149 | $ 3917 | -19 | 63 | -56 | ||||||||||||||||||||||||
Minotaur V | $ 1682 | $ 1882 | $ 443 | $ 603 | $ 1239 | $ 1279 | 119 | 361 | 32 | ||||||||||||||||||||||||
Category 1 | $ 58745 | $ 57195 | $ 15104 | $ 13322 | $ 43641 | $ 43873 | -26 | -118 | 05 | ||||||||||||||||||||||||
Category 2 | $ 56575 | $ 54817 | $ 17076 | $ 16232 | $ 39499 | $ 38585 | -31 | -49 | -23 | ||||||||||||||||||||||||
Category 3 | $ 4017 | $ 3879 | $ 1285 | $ 1381 | $ 2732 | $ 2498 | -34 | 75 | -86 | ||||||||||||||||||||||||
Category 1 - Dev Only | $ 34963 | $ 35197 | $ 8918 | $ 7829 | $ 26045 | $ 27368 | 07 | -122 | 51 | ||||||||||||||||||||||||
Category 2 - Dev Only | $ 17786 | $ 17139 | $ 5900 | $ 4909 | $ 11886 | $ 12230 | -36 | -168 | 29 | ||||||||||||||||||||||||
Category 3 - Dev Only | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERRORDIV0 | ERRORDIV0 | ERRORDIV0 | ||||||||||||||||||||||||
LV of Total Dev at Baseline | 280 | ||||||||||||||||||||||||||||||||
LV of Total Dev at FY18 Q3 | 267 | ||||||||||||||||||||||||||||||||
Launch Vehicle Percent Cost Variation from Baseline Estimate in Chronological Order |
Mission | LCC Category | KDP-A (low) | KDP-A (high) | KDP-B (low) | KDP-B (high) | Low Delta (months) | High Delta (months) | KDP-C MA | MA Variance from A | KDP-C ABC | ABC Variance from A | |||||||||||||||
Restore-L | 2 | Jun-20 | Dec-23 | Jun-20 | Dec-20 | 0 | -36 | |||||||||||||||||||
SLS | 1 | Dec-17 | Dec-17 | Mar-17 | Apr-17 | -9 | -8 | Dec-17 | 0 | Nov-18 | 11 | |||||||||||||||
PACE | 2 | Dec-22 | Dec-23 | Aug-22 | Apr-23 | -4 | -8 | |||||||||||||||||||
WFIRST | 1 | Dec-24 | Dec-26 | Sep-25 | Sep-26 | 9 | -3 | |||||||||||||||||||
OCO-3 | 3 | Sep-16 | Dec-16 | Jul-16 | Oct-16 | -2 | -2 | Mar-18 | 18 | May-18 | 17 | |||||||||||||||
PSP | 1 | Aug-18 | Aug-18 | Jul-18 | Jul-18 | -1 | -1 | Aug-18 | 0 | Aug-18 | 0 | |||||||||||||||
LCRD | 2 | Mar-17 | Mar-17 | Feb-17 | Feb-17 | -1 | -1 | Jun-19 | 27 | Nov-19 | 32 | |||||||||||||||
Euclid | 3 | Dec-14 | Dec-14 | Dec-14 | Dec-14 | 0 | 0 | May-15 | 5 | May-16 | 17 | |||||||||||||||
GRACE-FO | 2 | Aug-17 | Aug-17 | Aug-17 | Aug-17 | 0 | 0 | Aug-17 | 0 | Feb-18 | 6 | |||||||||||||||
Mars 2020 | 1 | Jul-20 | Jul-20 | Jul-20 | Jul-20 | 0 | 0 | Jul-20 | 0 | Jul-20 | 0 | |||||||||||||||
SAGE-III | 3 | Aug-14 | Aug-14 | Aug-14 | Aug-14 | 0 | 0 | Aug-14 | 0 | Aug-14 | 0 | |||||||||||||||
SWOT | 2 | Oct-20 | Oct-20 | Oct-20 | Oct-20 | 0 | 0 | Apr-21 | 6 | Apr-22 | 18 | |||||||||||||||
LADEE | 3 | Mar-12 | Mar-12 | May-12 | May-12 | 2 | 2 | May-13 | 14 | Nov-13 | 20 | |||||||||||||||
DART | 2 | Dec-20 | Dec-20 | Dec-20 | May-21 | 0 | 5 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | ||||||||||||||||||
NISAR | 2 | Dec-20 | Dec-21 | Dec-20 | Jun-22 | 0 | 6 | Dec-21 | 12 | Sep-22 | 9 | |||||||||||||||
JASON-3 | 3 | Jul-13 | Jul-13 | Apr-14 | Apr-14 | 9 | 9 | Mar-15 | 20 | Mar-15 | 20 | |||||||||||||||
MMS | 1 | Oct-13 | Oct-13 | Oct-14 | Oct-14 | 12 | 12 | Aug-14 | 10 | Mar-15 | 17 | |||||||||||||||
ECOSTRESS | 3 | May-17 | Mar-18 | Aug-17 | Aug-19 | 3 | 17 | Aug-17 | 3 | Aug-19 | 17 | |||||||||||||||
SMAP | 2 | Mar-13 | Mar-13 | May-15 | May-15 | 26 | 26 | Oct-14 | 19 | Mar-15 | 24 | |||||||||||||||
XARM | 3 | Oct-19 | Oct-19 | Jan-22 | Mar-23 | 27 | 41 | |||||||||||||||||||
SOC | 2 | Apr-15 | Apr-15 | Dec-17 | Dec-18 | 32 | 44 | Jan-17 | 21 | Oct-18 | 42 | |||||||||||||||
Orion | 1 | Dec-17 | Dec-17 | Jun-21 | Mar-22 | 42 | 51 | Aug-21 | 44 | Apr-23 | 64 | |||||||||||||||
MAIA | 3 | NA | NA | Dec-19 | Mar-21 | NA | NA | |||||||||||||||||||
ICON | 3 | NA | NA | Feb-17 | Jun-17 | NA | NA | |||||||||||||||||||
GOLD | 3 | NA | NA | Dec-17 | Dec-17 | NA | NA | |||||||||||||||||||
GeoCarb | 3 | NA | NA | Jun-22 | Jun-23 | NA | NA | |||||||||||||||||||
IXPE | 3 | NA | NA | Dec-20 | Dec-20 | NA | NA | |||||||||||||||||||
Landsat 9 | 2 | NA | NA | Dec-20 | Nov-21 | NA | NA | |||||||||||||||||||
Lucy | 2 | NA | NA | Oct-21 | Nov-21 | NA | NA | |||||||||||||||||||
TROPICS | 3 | NA | NA | Sep-19 | Sep-20 | NA | NA | |||||||||||||||||||
JUICE | 3 | NA | NA | Sep-19 | Sep-19 | NA | NA | |||||||||||||||||||
Psyche | 2 | NA | NA | Aug-22 | Aug-22 | NA | NA | |||||||||||||||||||
Clipper | 1 | NA | NA | Jun-22 | Jul-23 | NA | NA | removed Clipper from schedule calculations due to no KDP-A schedule estimate | ||||||||||||||||||
CLARREO-PF | 3 | Jan-20 | Jan-22 | |||||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
of Pp | (LowMA) | (HighABC) | (LowMA) | (HighABC) | ||||||||||||||||||||||
Category I | 7 | 62 | 165 | 88 | 85 | |||||||||||||||||||||
Category II | 12 | 38 | 109 | 59 | 40 | |||||||||||||||||||||
Category III | 15 | - | -07 | 56 | 96 | |||||||||||||||||||||
COST Growth () | Schedule Growth (months) | |||||||||||||||||||||||||
(LowMA) | (HighABC) | (LowMA) | (HighABC) | |||||||||||||||||||||||
Average | 80 | 118 | 66 | 70 | ||||||||||||||||||||||
Median | 15 | - | 00 | 00 | ||||||||||||||||||||||
Standard Deviation | 145 | 233 | 129 | 189 | ||||||||||||||||||||||
Minimum | -12 | -65 | -9 | -36 | ||||||||||||||||||||||
Maximum | 417 | 745 | 42 | 51 |
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | KDP-C MA | KDP-C ABC | MA Variance From A | ABC Variance From A | |||||||||||||||||
Clipper | 1 | $ 4000 | $ 4000 | $ - 0 | 00 | $ 3000 | $ 3100 | $ 100 | 33 | ||||||||||||||||||||||
DART | 2 | $ 270 | $ 291 | $ 21 | 78 | $ 175 | $ 248 | $ 73 | 417 | ||||||||||||||||||||||
Euclid | 3 | $ 110 | $ 110 | $ - 0 | 00 | $ 100 | $ 100 | $ - 0 | 00 | Combined KDP-AB so no possible change | 964 | 1014 | -4 | -8 | |||||||||||||||||
GRACE-FO | 2 | $ 470 | $ 460 | $ (10) | -21 | $ 409 | $ 404 | $ (5) | -12 | 4059 | 4319 | -1 | -8 | ||||||||||||||||||
JASON-3 | 3 | $ 159 | $ 166 | $ 7 | 44 | $ - 0 | $ 158 | 1552 | 1552 | -2 | |||||||||||||||||||||
LADEE | 3 | $ 214 | $ 200 | $ (14) | -65 | $ - 0 | $ 184 | 2359 | 2629 | 23 | |||||||||||||||||||||
LCRD | 2 | $ 239 | $ 239 | $ 0 | 02 | $ 239 | $ 239 | $ 0 | 02 | 2571 | 2627 | 8 | 10 | ||||||||||||||||||
Mars 2020 | 1 | $ 2350 | $ 2351 | $ 1 | 00 | $ 2140 | $ 2186 | $ 46 | 21 | 22727 | 24435 | 6 | 4 | ||||||||||||||||||
MMS | 1 | $ 777 | $ 990 | $ 213 | 275 | $ 777 | $ 928 | $ 151 | 195 | 10026 | 10826 | 29 | 39 | ||||||||||||||||||
NISAR | 2 | $ 808 | $ 808 | $ - 0 | 00 | $ 718 | $ 718 | $ - 0 | 00 | 7953 | 8669 | 11 | 7 | ||||||||||||||||||
OCO-3 | 3 | $ 120 | $ 111 | $ (9) | -71 | $ 100 | $ 101 | $ 1 | 13 | 1108 | 1148 | 11 | -4 | ||||||||||||||||||
Orion | 1 | $ 6391 | $ 10288 | $ 3897 | 610 | $ - 0 | $ 8534 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | 108098 | 112835 | 77 | ||||||||||||||||||||
PACE | 2 | $ 850 | $ 850 | $ - 0 | 00 | $ 805 | $ 805 | $ - 0 | 00 | ||||||||||||||||||||||
PSP | 1 | $ 1300 | $ 1439 | $ 139 | 107 | $ 1000 | $ 1233 | $ 233 | 233 | 13932 | 15534 | 39 | 19 | ||||||||||||||||||
Restore-L | 2 | $ 787 | $ 753 | $ (34) | -43 | $ 500 | $ 628 | $ 128 | 256 | ||||||||||||||||||||||
SAGE-III | 3 | $ 112 | $ 115 | $ 3 | 27 | $ - 0 | $ 104 | 101 | 112 | 0 | |||||||||||||||||||||
SLS | 1 | $ 8855 | $ 8587 | $ (268) | -30 | $ - 0 | $ 7653 | 8394 | 9695 | 9 | |||||||||||||||||||||
SMAP | 2 | $ 514 | $ 649 | $ 135 | 263 | $ - 0 | $ - 0 | $ - 0 | 7218 | 9165 | 78 | ||||||||||||||||||||
SOC | 2 | $ 243 | $ 424 | $ 181 | 745 | $ - 0 | $ 371 | 3662 | 4359 | 79 | |||||||||||||||||||||
SWOT | 2 | $ 752 | $ 757 | $ 5 | 07 | $ 642 | $ 647 | $ 5 | 08 | 7049 | 7549 | 10 | 0 | ||||||||||||||||||
XARM | 3 | $ 172 | $ 217 | $ 45 | 264 | $ 161 | $ 179 | $ 18 | 110 | ||||||||||||||||||||||
Count | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta | Change (low) | Notes | ||||||||||||||||||||||
Category 1 | 6 | $ 23673 | $ 27655 | $ 3982 | 168 | $ 3275 | $ 3606 | $ 331 | 101 | ||||||||||||||||||||||
Category 2 | 9 | $ 4933 | $ 5231 | $ 298 | 61 | $ 4474 | $ 13335 | $ 8861 | 1981 | ||||||||||||||||||||||
Category 3 | 6 | $ 887 | $ 920 | $ 33 | 37 | $ - 0 | $ 7757 | $ 7757 | ERRORDIV0 | ||||||||||||||||||||||
Total | 21 | $ 29493 | $ 33807 | $ 4314 | 146 | $ 7749 | $ 24698 | $ 16949 | 2187 | ||||||||||||||||||||||
Mission | LCC Category | KDP-A High | KDP-B High | Delta | Change (high) | KDP-A Low | KDP-B Low | Delta2 | Change (low) | Notes | |||||||||||||||||||||
CLARREO-PF | 3 | $ 75 | $ (75) | -1000 | $ 64 | ||||||||||||||||||||||||||
ICON | 3 | $ 249 | $ 218 | ||||||||||||||||||||||||||||
ECOSTRESS | 3 | $ 56 | $ 49 | ||||||||||||||||||||||||||||
GeoCarb | 3 | $ 181 | $ 171 | ||||||||||||||||||||||||||||
GOLD | 3 | $ 74 | $ 64 | ||||||||||||||||||||||||||||
IXPE | 3 | $ 205 | $ 189 | ||||||||||||||||||||||||||||
JUICE | 3 | $ 119 | $ 103 | ||||||||||||||||||||||||||||
Landsat 9 | 2 | $ 928 | $ 851 | KDP-BC was combined due to advanced design maturity so B highlow here is equal to ABCMA | |||||||||||||||||||||||||||
Lucy | 2 | $ 984 | $ 914 | ||||||||||||||||||||||||||||
Psyche | 2 | $ 957 | $ 907 | ||||||||||||||||||||||||||||
TROPICS | 3 | $ 30 | $ 30 | ||||||||||||||||||||||||||||
MAIA | 3 | $ 178 | $ 150 | ||||||||||||||||||||||||||||
Cost Estimate Deltas - KDP-A to KDP-B | COST Growth () | |||||||||||||||||||
Mission | Estimate | KDP-A | KDP-B | Notes | of Pp | Low (MA) | High (ABC) | |||||||||||||
SOC | High | $ 243 | 745 | $ 424 | Category I | 4 | 127 | 172 | ||||||||||||
Low | $ - 0 | $ 371 | Category II | 5 | -01 | 199 | ||||||||||||||
Orion | High | $ 6391 | 610 | $ 10288 | Moved LRD from EM-1 to EM-2 extending LCC timeframe | Category III | 4 | 00 | 01 | |||||||||||
Low | $ - 0 | $ 8534 | ||||||||||||||||||
SMAP | High | $ 514 | 263 | $ 649 | ||||||||||||||||
Low | $ - 0 | $ - 0 | ||||||||||||||||||
SPP | High | $ 1300 | 107 | $ 1439 | ||||||||||||||||
Low | $ 1000 | 233 | $ 1233 | |||||||||||||||||
JASON-3 | High | $ 159 | 44 | $ 166 | ||||||||||||||||
Low | $ - 0 | $ 158 | ||||||||||||||||||
SAGE-III | High | $ 112 | 27 | $ 115 | ||||||||||||||||
Low | $ - 0 | $ 104 | ||||||||||||||||||
SWOT | High | $ 752 | 07 | $ 757 | ||||||||||||||||
Low | $ 642 | 08 | $ 647 | |||||||||||||||||
Mars 2020 | High | $ 2350 | 00 | $ 2351 | ||||||||||||||||
Low | $ 2140 | 21 | $ 2186 | |||||||||||||||||
NISAR | High | $ 808 | 00 | $ 808 | ||||||||||||||||
Low | $ 718 | 00 | $ 718 | |||||||||||||||||
Euclid | High | $ 110 | 00 | $ 110 | Combined KDP-AB so no change possible | |||||||||||||||
Low | $ 100 | 00 | $ 100 | |||||||||||||||||
GRACE Follow On | High | $ 470 | -21 | $ 460 | ||||||||||||||||
Low | $ 409 | -12 | $ 404 | |||||||||||||||||
SLS | High | $ 8855 | -30 | $ 8587 | ||||||||||||||||
Low | $ - 0 | $ 7653 | ||||||||||||||||||
LADEE | High | $ 214 | -65 | $ 200 | ||||||||||||||||
Low | $ - 0 | $ 184 | ||||||||||||||||||
ProgramProject Name | Category | KDP A to B analysis (13 missions) | |||||||||||||||
ASTRO-H | 3 | ASTRO-Hreg | 3 | bull13 Missions KDP-B Data Unavailable | |||||||||||||
CYGNSS | 3 | CYGNSS | 3 | bull7 Missions KDP-Crsquos have not yet occurred | |||||||||||||
DSCOVR | 3 | DSCOVR | 3 | ||||||||||||||
C | ECOSTRESS | 3 | ECOSTRESS | 3 | |||||||||||||
EUCLID | 3 | EUCLIDreg | 3 | Euclid | |||||||||||||
C | GEDI | 3 | GEDI | 3 | |||||||||||||
GOES-R | 1 | GOES-R | 1 | ||||||||||||||
GOLD | 3 | GOLD | 3 | ||||||||||||||
GPM | 2 | GPM | 2 | ||||||||||||||
GRACE-FO | 2 | GRACE-FO | 2 | GRACE Follow On | |||||||||||||
GSDO | 1 | GSDO | 1 | ||||||||||||||
ICESat-2 | 1 | ICESat-2reg | 1 | ||||||||||||||
ICON | 2 | ICON | 2 | ||||||||||||||
InSight | 2 | InSight | 2 | ||||||||||||||
IRIS | 3 | IRIS | 3 | ||||||||||||||
Jason-3 | 3 | Jason-3 | 3 | JASON-3 | |||||||||||||
JPSS-1 | 1 | JPSS-1 | 1 | ||||||||||||||
JWST | 1 | JWSTreg | 1 | ||||||||||||||
LADEE | 2 | LADEEreg | 2 | LADEE | |||||||||||||
C | LCRD | 3 | LCRD | 3 | |||||||||||||
LDCM | 2 | LDCMreg | 2 | ||||||||||||||
LDSD | 3 | LDSD | 3 | ||||||||||||||
C | Mars 2020 | 1 | Mars 2020 | 1 | Mars 2020 | ||||||||||||
MAVEN | 2 | MAVEN | 2 | ||||||||||||||
MMS | 1 | MMS | 1 | ||||||||||||||
MOMA | 3 | MOMA | 3 | ||||||||||||||
MSL | 1 | MSL | 1 | ||||||||||||||
NICER | 3 | NICER | 3 | ||||||||||||||
C | NISAR | 2 | NISAR | 2 | NISAR | ||||||||||||
NuSTAR | 3 | NuSTARreg | 3 | ||||||||||||||
OCO-2 | 2 | OCO-2 | 2 | ||||||||||||||
C | OCO-3 | 3 | OCO-3 | 3 | |||||||||||||
ORION | 1 | ORION | 1 | Orion | |||||||||||||
OSIRIS Rex | 1 | OSIRIS Rexreg | 1 | ||||||||||||||
SAGE III | 3 | SAGE III | 3 | SAGE-III | |||||||||||||
SGSS | 1 | SGSSreg | 1 | ||||||||||||||
SLS | 1 | SLS | 1 | SLS | |||||||||||||
SMAP | 2 | SMAPreg | 2 | SMAP | |||||||||||||
SOC | 2 | SOC | 2 | SOC | |||||||||||||
SOFIA | 1 | SOFIA | 1 | ||||||||||||||
PSP | 1 | PSP | 1 | PSP | |||||||||||||
C | SWOT | 2 | SWOT | 2 | SWOT | ||||||||||||
TEMPO | 3 | TEMPO | 3 | ||||||||||||||
TESS | 2 | TESS | 2 | ||||||||||||||
Clipper | |||||||||||||||||
DART | |||||||||||||||||
PACE | |||||||||||||||||
Restore-L | |||||||||||||||||
XARM |
Statistics | COST Growth ($M) | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Average | 9 | 9 | 43 | 61 | 136 | 070 | ||||||||
Median | 5 | 6 | 20 | 45 | 112 | 034 | ||||||||
Standard Deviation | 14 | 16 | 73 | 83 | 93 | 081 | ||||||||
Variance | 2 | 3 | 535 | 685 | 871 | 066 | ||||||||
Minimum | -9 | -8 | (71) | (31) | 15 | - 0 | ||||||||
Maximum | 38 | 53 | 244 | 315 | 345 | 242 | ||||||||
no JWST | ||||||||||||||
Statistics | ||||||||||||||
COST Growth | Schedule Growth (months) | Duration (months) | ||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 18 | 17 | 118 | 131 | 1989 | 065 | ||||||||
Median | 20 | 17 | 101 | 132 | 19167 | 0582 | ||||||||
Standard Deviation | 16 | 19 | 105 | 117 | 11557 | 0830 | ||||||||
Sample Variance | 3 | 4 | 1101 | 1377 | 133562 | 0688 | ||||||||
Minimum | -6 | -5 | - 0 | - 0 | 397 | - 0 | ||||||||
Maximum | 46 | 48 | 284 | 274 | 4527 | 310 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 20 | 21 | 156 | 159 | 2031 | 075 | ||||||||
Median | 21 | 20 | 132 | 147 | 20783 | 0589 | ||||||||
Standard Deviation | 17 | 25 | 174 | 155 | 11214 | 0881 | ||||||||
Sample Variance | 3 | 6 | 3035 | 2394 | 125751 | 0776 | ||||||||
Minimum | -6 | -5 | 00 | 00 | 40 | - 0 | ||||||||
Maximum | 48 | 78 | 649 | 528 | 453 | 31 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | |||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | |||||||||
Mean | 4 | 3 | 47 | 136 | 253 | 054 | ||||||||
Median | 9 | 9 | 61 | 132 | 24333 | 042 | ||||||||
Standard Deviation | 10 | 12 | 52 | 56 | 6657 | 022 | ||||||||
Sample Variance | 1 | 1 | 273 | 311 | 44310 | 005 | ||||||||
Minimum | -7 | -11 | (10) | 82 | 1923 | 041 | ||||||||
Maximum | 11 | 11 | 92 | 193 | 3243 | 079 | ||||||||
Statistics | COST Growth | Schedule Growth (months) | ||||||||||||
of Pp | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | ||||||||||
Category I | 6 | 4 | 4 | 22 | 78 | |||||||||
Category II | 9 | 8 | 13 | 71 | 83 | |||||||||
Category III | 8 | 6 | 11 | 28 | 52 | |||||||||
Timeline | Total Programs | 46 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDB C for comaprison | planned | Total Replans | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statictics - PresentFinal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 41416 | 14 | 9 | 9 | 8 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | |||||||||||||||||||||||||||||||||||||
ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||
ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 758 | Feb-16 | 759 | Mar-16 | FY16Q2 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -5 | -10 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||
CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 1595 | Oct-16 | 1742 | May-17 | FY16Q2 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -4 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | ||||||||||||||||||||||||||||||||||||||||
EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 179 | Dec-21 | 190 | Dec-22 | FY16Q2 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 0 | 00 | 5787 | 5480 | |||||||||||||||||||||||||||||||||||||||
GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | ||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 108295 | Oct-16 | kDP-D Sep-14 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | ||||||||||||||||||||||||||||||||||||||||||||||
GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||
GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8936 | Feb-14 | 9006 | Feb-14 | FY16Q2 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -1 | -3 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||
GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4079 | Aug-17 | 4318 | Feb-18 | FY16Q2 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | -00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ESD | GSDO | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 26336 | Jun-18 | 28129 | Nov-18 | FY16Q2 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 9916 | Oct-17 | 10636 | Jun-18 | FY16Q2 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 232 | Jun-17 | 2527 | Oct-17 | FY16Q2 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 1 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Planetary | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | 6536 | Mar-16 | 6751 | Mar-16 | FY16Q2 | N | N | 0 | 0 | 4 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E draft | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||
JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||
LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||
Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
LDCM | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
LDCMreg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 8501 | Feb-13 | 8568 | Feb-13 | FY15Q4 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | ||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||
Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||
MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 598 | Nov-13 | 600 | Nov-13 | FY16Q1 | N | N | 0 | 0 | -7 | -11 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1121 | Sep-15 | 1121 | Sep-15 | FY16Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 11 | 4 | 1320 | 613 | |||||||||||||||||||||||||||||||||||||||||
MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 904 | Jul-18 | 1004 | Jul-18 | FY16Q2 | N | N | 0 | 0 | -1 | -1 | 3347 | 3347 | |||||||||||||||||||||||||||||||||||||||||||||||||
MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||
NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 684 | Feb-17 | 67 | Feb-17 | KDP-D Jan-16 | N | N | 0 | 0 | 9 | -2 | 613 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||
NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||
NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||
NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 166 | Jun-12 | 166 | Jun-12 | FY14Q4 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | 3 | 3 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||
OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4276 | Jul-14 | 4276 | Jul-14 | FY16Q2 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -2 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||
OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ORION | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | 108098 | Aug-21 | 112835 | Apr-23 | FY16Q2 | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 10014 | Oct-16 | 10572 | Oct-16 | FY16Q2 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 1 | -1 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13931 | Aug-18 | 15534 | Aug-18 | FY16Q2 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 1265 | Aug-16 | 133 | Aug-16 | FY16Q2 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 20 | 19 | 2437 | 2437 | |||||||||||||||||||||||||||||||||||||||||
SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||
SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1216 | Jul-19 | 1228 | Sep-19 | PPBE18 PMR | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 2 | 2 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||
ESD | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||
SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||
SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | May-15 | 8899 | May-15 | FY16Q2 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 707 | 203 | |||||||||||||||||||||||||||||||||||||||||
SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 2892 | Oct-18 | 3789 | Oct-18 | FY16Q2 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -27 | -13 | 2127 | - 0 | |||||||||||||||||||||||||||||||||||||||||
SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replaned | Replaned | Replaned | Replaned | Replaned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
SOFIA (Budget) | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 29048 | Feb-14 | 29122 | Feb-14 | FY16Q2 | Budget Reduction | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||
SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||
TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 1809 | Sep-17 | 2178 | Nov-17 | FY16Q2 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 31976 | Dec-17 | 3517 | Jun-18 | FY16Q2 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -7 | -7 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||
Currently in B | Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CLARREO-PF | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DART | KDP-C in July | Mean | 13 | -13 | 55 | 28 | 1729 | 115 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Europa Clipper | 02045454545 | Median | 17 | -06 | 21 | 00 | 17483 | 0862 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GeoCarb | Standard Deviation | 84 | 68 | 88 | 87 | 10875 | 0863 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IXPE | Minimum | -27 | -13 | 00 | -72 | 397 | 050 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lucy | Maximum | 20 | 19 | 335 | 335 | 4527 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MAIA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PACE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Psyche | Paste data from above to this table for analysis | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Restore-L | -27 | -13 | 2127 | - 0 | 1610 | 050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SOC Replan | Breach notification made DM not yet final | -7 | -7 | - 0 | - 0 | 080 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TROPICS | -7 | -11 | - 0 | - 0 | 817 | 060 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
XARM | -5 | -10 | 307 | - 0 | 867 | 088 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -9 | - 0 | (717) | 2767 | 310 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -8 | 717 | 717 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -3 | - 0 | (400) | 510 | 058 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -9 | 207 | (400) | 800 | 099 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-1 | -1 | 3347 | 3347 | 2240 | 205 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -1 | - 0 | - 0 | 397 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | -01 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | - 0 | - 0 | 1053 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | 2 | 407 | 1020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | -3 | 707 | 203 | 2577 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | 00 | - 0 | - 0 | 2777 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 00 | - 0 | - 0 | 1887 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | 3 | 710 | 403 | 1167 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | -4 | - 0 | - 0 | 1983 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | 4 | 207 | (203) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 5 | - 0 | - 0 | 1917 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | 6 | 103 | - 0 | 2733 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | -2 | 613 | - 0 | 4527 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 1320 | 613 | 503 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | 4 | 607 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 | 19 | 2437 | 2437 |
Timeline | Total Programs | 46 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Begin | End | Cost data | Note Replans have KDP B = previous KDP C for comaprison | planned | Total Replans | 14 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2010 | Present | Total LCC | Percent Replans | 30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B | KDP-C | PresentFinal | Breach Totals | Statistics (B to C) or (C to Replan) | Statistics - PresentFinal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B (LowMA) | KDP-B (HighABC) | KDP-C (MA) | KDP-C (ABC) | (MA) | (ABC) | 72618 | 20 | 13 | 13 | 9 | COST Growth | Schedule Growth (months) | Duration (months) | COST Growth | Schedule Growth (months) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DIR | ProgramProject Nameregdenotes Replan | Category | Cost | LRD | Cost | LRD | Signature Date | Cost | LRD | Cost | LRD | Notes | Signature Date | Delta B to C (MA) | Delta B to C (ABC) | Cost | LRD | Cost | LRD | Source | Replan | Breach (YN) | Schedule Breach | Cost Breach | B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | Schedule change Ratio | C to Present (MA) | C to Present (ABC) | C to Present (MA) | C to Present (ABC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-H | 3 | 568 | Aug-13 | 568 | Aug-13 | May-10 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 595 | 595 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 9 | 10 | 613 | 613 | 3450 | 018 | 21 | 34 | 2127 | 2530 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | ASTRO-Hreg | 3 | 6275 | Feb-14 | 6275 | Feb-14 | Mar-13 | 798 | Nov-15 | 839 | Mar-16 | ABC +532 SEO option in | Nov-13 | 1705 | 2115 | 74855 | Feb-16 | 109271 | Mar-16 | FY17 Q1 | Y | Y | Y | Y | 21 | 34 | 2127 | 2530 | 817 | 310 | -7 | 30 | 307 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | CYGNSS | 3 | 1028 | Oct-16 | 1728 | Apr-17 | Jul-13 | 1528 | Oct-16 | 1812 | May-17 | Feb-14 | 50 | 84 | 159503 | Dec-16 | 159503 | Dec-16 | FY18 Q3 | N | N | 33 | 5 | - 0 | 100 | 800 | 013 | 4 | -12 | 203 | (503) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | DSCOVR | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 928 | Jan-15 | Aug-13 | 0 | 928 | 928 | Jan-15 | 94 | Jan-15 | KDP-E Jan-15 | N | N | 0 | 0 | 0 | 1 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | ECOSTRESS | 3 | 485 | Aug-17 | 559 | Aug-19 | Apr-15 | 51043 | Aug-17 | 55942 | Aug-19 | Dec-15 | 2543 | 0042 | 51043 | Apr-18 | 52443 | Aug-19 | KDP-E May-18 | N | N | 5 | 0 | - 0 | - 0 | 813 | - 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGS | 1 | 28119 | Dec-17 | 31213 | Mar-18 | Feb-13 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | -1784 | -3084 | 27418 | Sep-18 | 28129 | Nov-18 | FY17 Q1 | N | N | -7 | -10 | 607 | 817 | 1923 | 042 | 4 | 00 | 307 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | EGSreg | 1 | 26335 | Jun-18 | 28129 | Nov-18 | Sep-14 | 3145 | Dec-19 | 3231 | Jun-20 | Dec-17 | 5115 | 4181 | 31446 | Dec-19 | 31446 | Dec-19 | FY18 Q3 | Y | Y | Y | 16 | 15 | 1827 | 1927 | 3957 | 049 | -0 | -27 | - 0 | (610) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | APD | EUCLID | 3 | 105 | Dec-14 | 110 | Dec-14 | Jan-13 | 964 | May-15 | 1014 | May-16 | ABC +44M for Science Center | Sep-13 | -86 | -86 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -9 | -8 | 503 | 1723 | 810 | 213 | -1 | -5 | 717 | 1117 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | EUCLIDreg | 3 | 964 | May-15 | 1454 | May-16 | Sep-13 | 179 | Mar-17 | 190 | Jun-18 | Feb-16 | 826 | 446 | 206214 | Mar-20 | 223452 | Mar-20 | FY18 Q3 | Y | Y | Y | Y | 46 | 31 | 2233 | 2537 | 2943 | 086 | 13 | 176 | 3653 | 2130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GEDI | 3 | 1208 | May-18 | 1263 | May-18 | Aug-15 | 120774 | Jun-18 | 126253 | Mar-19 | Jun-16 | -0026 | -0047 | 120774 | Nov-18 | 123774 | Mar-19 | FY18 Q3 | N | N | -0 | -0 | 103 | 1013 | 1017 | 100 | -7 | -10 | 607 | 817 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | GOES-R | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 108603 | Oct-15 | Apr-12 | 0 | 108603 | 10150 | Nov-16 | KDP-E Oct-16 | N | N | 0 | 0 | 32 | 24 | 1013 | 1320 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | GOLD | 3 | 641 | Dec-17 | 744 | Dec-17 | Feb-15 | 641 | Oct-17 | 745 | Apr-18 | Mar-15 | 0 | 01 | 663 | Feb-18 | 73 | Apr-18 | KDP-E Dec-17 | N | N | 0 | 0 | (203) | 403 | 167 | 242 | 5 | 2 | 810 | 307 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPM | 2 | Not Available | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 911 | 978 | 8936 | Feb-14 | 9006 | Feb-14 | FY16 Q1 | N | N | 0 | 0 | -2 | -8 | 717 | 717 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GPMreg | 2 | 911 | Jul-13 | 978 | Jul-13 | Dec-09 | 906 | Feb-14 | 933 | Jun-14 | Oct-11 | -5 | -45 | 8834 | Feb-14 | 8904 | Feb-14 | FY17 Q3 | Y | Y | Y | -1 | -5 | 717 | 1117 | 2240 | 050 | -3 | -5 | - 0 | (400) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | GRACE-FO | 2 | 404 | Aug-17 | 460 | Aug-17 | Aug-12 | 4059 | Aug-17 | 4319 | Feb-18 | Feb-14 | 19 | -281 | 4059 | May-18 | 4319 | May-18 | FY18 Q3 | N | N | 0 | -6 | - 0 | 613 | 1897 | 032 | 0 | 00 | 910 | 297 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2 | 2 | 686 | Apr-16 | 776 | Nov-16 | Aug-11 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | -122 | 842 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -2 | 11 | 813 | 603 | 1687 | 036 | 10 | 0 | 203 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | ICESat-2reg | 1 | 6738 | Dec-16 | 8602 | May-17 | Dec-12 | 9915 | Oct-17 | 10635 | Jun-18 | May-14 | 3177 | 2033 | 10561 | Sep-18 | 10636 | Oct-18 | FY18 Q3 | Y | Y | Y | Y | 32 | 24 | 1013 | 1320 | 1660 | 080 | 6 | 00 | 1117 | 407 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | ICON | 2 | 2177 | Oct-16 | 2485 | Jul-17 | Jun-14 | 2294 | Jun-17 | 2527 | Oct-17 | Oct-14 | 117 | 42 | 243 | Jun-18 | 2527 | Jun-18 | FY18 Q3 | N | N | 5 | 2 | 810 | 307 | 500 | 061 | 6 | 00 | 1217 | 810 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSight | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 6266 | 6751 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | InSightreg | 2 | 6266 | Mar-16 | 6751 | Mar-16 | Mar-14 | 8189 | May-18 | 8289 | May-18 | Sep-16 | 1923 | 1538 | 8138 | May-18 | 8138 | May-18 | FY18 Q3 | Y | Y | Y | Y | 23 | 23 | 2637 | 2637 | 3050 | 086 | -1 | -18 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | IRIS | 3 | Not Available | 1671 | Dec-12 | 1802 | Jun-13 | Nov-10 | 1671 | 1802 | 1873 | Jun-13 | 1873 | Jun-13 | FY16 Q1 | N | N | 0 | 0 | 11 | 4 | 607 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | Jason-3 | 3 | 158 | Apr-14 | 166 | Apr-14 | Jul-11 | 1552 | Mar-15 | 1552 | Mar-15 | Jan-13 | -28 | -108 | 1579 | Jul-15 | 1579 | Jan-16 | KDP-E Sep-16 | N | N | -2 | -7 | 1113 | 1113 | 1887 | 059 | 2 | 2 | 407 | 1020 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JASD | JPSS-1 | 1 | Not Available | 1623 | Mar-17 | Aug-13 | 0 | 1623 | 16235 | Mar-17 | KDP-D Apr-15 | N | N | 0 | 0 | 36 | 48 | 2533 | 2637 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | JUICE | 3 | 1034 | Sep-19 | 1185 | Sep-19 | Apr-16 | 1144 | Sep-19 | 127 | Sep-19 | Apr-17 | 11 | 85 | 1144 | Sep-19 | 127 | Sep-19 | KDP-C Apr-17 | N | N | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWST | 1 | 3117 | Aug-11 | 3117 | Aug-11 | Jul-03 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 1264 | 1847 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 29 | 59 | 2233 | 3450 | 7433 | 046 | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTreg | 1 | 4381 | Jun-13 | 4964 | Jun-14 | Aug-09 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 4044 | 3871 | 85104 | Oct-18 | 88254 | Oct-18 | FY16 Q2 | Y | Y | Y | Y | 48 | 78 | 6493 | 5277 | 2577 | 205 | 1 | -01 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
JWST | JWSTregreg | 1 | 8425 | Oct-18 | 8835 | Oct-18 | Sep-11 | 94889 | Nov-20 | 96627 | Mar-21 | May-18 | 10639 | 8277 | 94889 | Nov-20 | 96627 | Mar-21 | FY18 Q3 | Y | Y | Y | 9 | 2940 | 8113 | 036 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEE | 2 | 1843 | May-12 | 200 | May-12 | Dec-09 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 516 | 629 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 22 | 31 | 1217 | 1830 | 1027 | 178 | 26 | 34 | 1717 | 2433 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | LADEEreg | 2 | 2359 | May-13 | 2629 | Nov-13 | Oct-10 | 2619 | Jul-13 | 2629 | Nov-13 | May-12 | 26 | 0 | 2738 | Sep-13 | 2738 | Sep-13 | FY15 Q1 | Y | N | 10 | 0 | 203 | - 0 | 1917 | - 0 | 4 | 4 | 207 | (203) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | Landsat 9 | 2 | 851 | Dec-20 | 928 | Nov-21 | Aug-16 | 838531 | Dec-20 | 885029 | Nov-21 | Dec-17 | -12469 | -42971 | 8385 | Dec-20 | 885 | Nov-21 | FY18 Q3 | N | N | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LCRD | 2 | 2394 | Feb-17 | May-13 | 2571 | Jun-19 | 2627 | Nov-19 | Apr-17 | 2571 | 233 | 2571 | Jun-19 | 2627 | Nov-19 | FY18 Q3 | N | N | 0 | 9 | 3343 | 4770 | 070 | -6 | -5 | - 0 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8 | 2 | 710 | Dec-12 | 800 | Dec-12 | Sep-09 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 140 | 142 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 16 | 18 | - 0 | 607 | 707 | 086 | -3 | -3 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | LDCMLandsat 8reg | 2 | 850 | Dec-12 | 942 | Jun-13 | Apr-10 | 8608 | Dec-12 | 9416 | Jun-13 | Dec-10 | 108 | -04 | 85006 | Feb-13 | 85666 | Feb-13 | FY18 Q3 | Y | N | 1 | -0 | - 0 | - 0 | 867 | - 0 | -1 | -9 | 207 | (400) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSD | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)a 71208 project | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)o Insight was an AO project selected in August 2012 (AO selection is equivalent of KDP B) Recently SMD has started documenting this with a KDP B but I donrsquot believe there is one for Insight | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)Started with a NASANOAA Interagency Agreement This was a the old GORE-Sat spacecraft that had been stored and was brought back and had additional NOAA instruments added and the USAF provided LV | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 1896 | 203 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | 9 | 13 | 917 | 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STMD | LDSDreg | 3 | 1896 | Aug-15 | 203 | Aug-15 | Dec-12 | 2368 | Dec-16 | 2368 | Dec-16 | Mar-15 | 472 | 338 | 249 | Dec-16 | 249 | Dec-16 | FY15 Q4 | Y | Y | Y | Y | 20 | 17 | 1627 | 1627 | 2733 | 060 | 5 | 5 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | PSD | Mars 2020 | 1 | 2106 | Jul-20 | 2351 | Jul-20 | May-15 | 22727 | Jul-20 | 24435 | Jul-20 | STMDHEOMD added | Jun-16 | 1667 | 925 | 23634 | Jul-20 | 25304 | Jul-20 | FY18 Q3 | N | N | 7 | 4 | - 0 | - 0 | 1323 | - 0 | -2 | 10 | 2437 | 3147 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MAVEN | 2 | Not Available | 6382 | Nov-13 | 6712 | Nov-13 | Oct-10 | 6382 | 6712 | 5753 | Nov-13 | 5753 | Nov-13 | FY16 Q3 | N | N | 0 | 0 | -11 | -14 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | MMS | 1 | 9104 | Oct-14 | 9904 | Oct-14 | Nov-07 | 10026 | Aug-14 | 10826 | Mar-15 | Jun-09 | 922 | 922 | 1098 | Mar-15 | 1098 | Mar-15 | FY18 Q2 | N | N | 9 | 9 | (203) | 503 | 1983 | 025 | 9 | 1 | 707 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MOMA | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)MOMA-MS did not have a traditional path of formulation NASArsquos participation on the MOMAinstrument began as a result of a proposal to the Mars Scout 2006 and Mission of OpportunityAnnouncement of Opportunity that proposal was selected for technology development In 2010NASA determined that the original team would not be able to produce a flight instrument onschedule and within acceptable risk NASA decided to bring the instrument technology andflight system development in-house to increase the probability of success The MOMA-MStechnology development effort was assigned to the Goddard Space Flight Center in Fall 2010The Project is entering the typical Life Cycle Review (LCR) process after a tailored PreliminaryDesign Review (PDR) and Key Decision Point (KDP)-C Until the time of KDP-C no formalAgency-level gate reviews were held (lack of KDP-A and KDP-B) | 91 | Oct-15 | 101 | Oct-15 | Apr-14 | 91 | 101 | 120243 | Jul-20 | 128226 | Jul-20 | FY18 Q3 | N | N | 0 | 0 | 24 | 27 | 5783 | 5783 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSL | 1 | Not Available | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 1474 | 1613 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | MSLreg | 1 | 1474 | Sep-09 | 1613 | Sep-09 | Aug-06 | 23185 | Oct-11 | 23943 | Nov-11 | Apr-10 | 8445 | 7813 | 25176 | Nov-11 | 25304 | Nov-11 | FY15 Q1 | Y | Y | Y | Y | 36 | 48 | 2533 | 2637 | 4527 | 058 | 8 | 6 | 103 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | NICER | 3 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- the mission was selected from an AO and the down select places the project in phase B This was originally below $75 M threshold and no KDP DM were generated to document the cost and schedule | GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)This was a NOAA project and we werenrsquot getting all that information The SRR was in Nov 2009SDR June 2010 ndash but I believe those were done at the ldquoprogram seriesrdquo level (there are four GOES spacecraft being built) | 624 | Aug-16 | 684 | Feb-17 | Feb-14 | 624 | 684 | 694 | Jun-17 | 706 | Aug-17 | KDP-E May-17 | N | N | 0 | 0 | 10 | 3 | 1013 | 603 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | NISAR | 2 | 7183 | Dec-20 | 8083 | Dec-20 | Feb-15 | 7953 | Dec-21 | 8669 | Sep-22 | Aug-16 | 77 | 586 | 7953 | Dec-21 | 8969 | Sep-22 | FY18 Q3 | N | N | 10 | 7 | 1217 | 2130 | 1823 | 117 | 0 | 00346060676 | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTAR | 3 | 1052 | Oct-11 | 1052 | Oct-11 | Feb-08 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 554 | 554 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | NuSTARreg | 3 | 1606 | Aug-11 | 1606 | Jan-12 | Sep-09 | 1606 | Nov-11 | 1606 | Feb-12 | Aug-10 | 0 | 0 | 115315 | Jun-12 | 115315 | Jun-12 | FY15 Q1 | Y | N | 0 | 0 | 307 | 103 | 1167 | 009 | -39 | -28 | 710 | 403 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2 | 2 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)No KDP-B documents are available- Authorized a tailored formulation period because this was a rebuild | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 3259 | 3499 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | OCO-2reg | 2 | 3259 | Feb-13 | 3499 | Feb-13 | Sep-10 | 4377 | Jul-14 | 4677 | Feb-15 | Jan-13 | 1118 | 1178 | 4245 | Jul-14 | 4245 | Jul-14 | FY17 Q1 | Y | Y | Y | Y | 26 | 34 | 1717 | 2433 | 2767 | 088 | -3 | -9 | - 0 | (717) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | OCO-3 | 3 | 1014 | Jul-16 | 1115 | Oct-16 | Aug-13 | 1108 | Mar-18 | 1148 | May-18 | May-16 | 94 | 33 | 113388 | Mar-18 | 113388 | May-18 | FY18 Q3 | N | N | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orion | 1 | 96425 | Sep-21 | 102886 | Mar-22 | Jan-13 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 11673 | 9949 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 11 | 10 | (103) | 1320 | 3243 | 041 | ERRORVALUE | ERRORVALUE | ERRORVALUE | ERRORVALUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | Orionreg | 1 | 108098 | Aug-21 | 112835 | Apr-23 | Sep-15 | 116581 | Jun-22 | 116581 | Jun-22 | Jun-18 | 8483 | 3746 | 116581 | Jun-22 | 116581 | Jun-22 | FY18 Q3 | Y | N | 7 | 3 | 1013 | (1013) | 3347 | 030 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rex | 1 | 1085 | Oct-16 | 1210 | Oct-16 | Apr-13 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | -336 | -886 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | -3 | -7 | - 0 | - 0 | 147 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PSD | OSIRIS Rexreg | 1 | 10514 | Oct-16 | 11214 | Oct-16 | May-13 | 9959 | Oct-16 | 10642 | Oct-16 | Mar-14 | -555 | -572 | 9975 | Sep-16 | 10532 | Sep-16 | FY18 Q3 | Y | N | -6 | -5 | - 0 | - 0 | 1053 | - 0 | 0 | -1 | (100) | (100) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | PSP | 1 | 1233 | Jul-18 | 1439 | Jul-18 | Jan-12 | 13932 | Aug-18 | 15534 | Aug-18 | Mar-14 | 1602 | 1144 | 13821 | Aug-18 | 15482 | Aug-18 | FY18 Q3 | N | N | 11 | 8 | 103 | 103 | 2670 | 004 | -1 | -03 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SAGE III | 3 | 1042 | Aug-14 | 1152 | Aug-14 | Feb-12 | 101 | Aug-14 | 112 | Aug-14 | Jul-12 | -32 | -32 | 129364 | Feb-17 | 129364 | Feb-17 | FY18 Q3 | N | N | -3 | -3 | - 0 | - 0 | 503 | - 0 | 22 | 16 | 3050 | 3050 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSS | 2 | 5165 | Dec-15 | 6275 | Sep-17 | Aug-12 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 3155 | 2351 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SGSSreg | 1 | 832 | Mar-17 | 8626 | Jun-17 | Apr-13 | 11959 | Jul-19 | 12079 | Sep-19 | Jul-15 | 3639 | 3453 | 1251 | Sep-19 | 1261284 | Nov-19 | Path Forward APMC Dec 2016 | Y | Y | Y | Y | 30 | 40 | 2840 | 2740 | 2777 | 099 | 4 | 4 | 223 | 267 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLS | 1 | 7653 | Mar-17 | 8587 | Apr-17 | Aug-12 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 741 | 1108 | 8394 | Dec-17 | 9695 | Nov-18 | FY16 Q1 | N | N | 9 | 13 | 917 | 1930 | 2433 | 079 | 0 | 00 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEO | SLSreg | 1 | 8394 | Dec-17 | 9695 | Nov-18 | Aug-14 | 9734 | Dec-19 | 9843 | Jun-20 | Dec-17 | 1340 | 148 | 98029 | Dec-19 | 98029 | Dec-19 | FY18 Q3 | Y | Y | Y | 14 | 2 | 2433 | 1927 | 4060 | 047 | 1 | -04 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAP | 2 | 5845 | May-15 | 7792 | May-15 | Jan-10 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 1373 | 1373 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | SMAPreg | 2 | 7218 | Oct-14 | 9165 | Mar-15 | May-12 | 8744 | Oct-14 | 9165 | Mar-15 | Sep-12 | 1526 | 0 | 8899 | Jan-15 | 8899 | Jan-15 | FY18 Q3 | Y | N | 17 | 0 | - 0 | - 0 | 397 | - 0 | 2 | -3 | 307 | (197) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HPD | SOC | 2 | 372 | Jan-15 | 396 | Mar-16 | Dec-11 | 3662 | Jan-17 | 4359 | Oct-18 | Mar-13 | -58 | 399 | 3433 | Feb-20 | 3866 | Feb-20 | FY18 Q3 | N | N | -2 | 10 | 2437 | 3147 | 1610 | 195 | -7 | -11 | 3753 | 1627 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIA | 1 | Not Available GIANNINI ROBERT L (HQ-IN020) GIANNINI ROBERT L (HQ-IN020)SOFIA was reformulated because it was cancelled in the 2007 Budget The program went through multiple reviews until 2010 There is a file APMC Oct 6 2010 SOFIA r3 which is the confirmation review Sharedrive path USIDKDP and Other Decision MemosProjectsSOFIA | 29476 | Feb-14 | 29551 | Feb-14 | 29476 | 29551 | Replanned | Replanned | Replanned | Replanned | Replanned | N | N | 0 | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | SOFIAreg | 1 | 29476 | Feb-14 | 29551 | Feb-14 | 11431 | Feb-14 | 11506 | Feb-14 | not a KDP | Apr-14 | -18045 | -18045 | 15874 | Feb-14 | 15949 | Feb-14 | FY18 Q3 | Y | N | -158 | -61 | - 0 | - 0 | 139100 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
x | ESD | SWOT | 2 | 647 | Oct-20 | 757 | Oct-20 | Jun-14 | 7049 | Apr-21 | 7549 | Apr-22 | May-16 | 579 | -21 | 7049 | Apr-21 | 7549 | Apr-22 | FY18 Q3 | N | N | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ESD | TEMPO | 3 | 1708 | May-17 | 2178 | Dec-17 | Apr-14 | 1809 | Sep-17 | 2178 | Nov-17 | Apr-15 | 101 | 0 | 181242 | Sep-17 | 197242 | Nov-17 | FY18 Q3 | N | N | 6 | 0 | 410 | (100) | 1217 | 008 | 0 | -94 | - 0 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
APD | TESS | 2 | 350 | Sep-17 | 400 | Sep-17 | May-14 | 3424 | Dec-17 | 3784 | Jun-18 | Oct-14 | -76 | -216 | 3333 | Apr-18 | 3333 | Jun-18 | FY18 Q3 | N | N | -2 | -5 | 303 | 910 | 510 | 178 | -3 | -12 | 403 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | COST Growth | Schedule Growth (months) | Duration (months) | Schedule change Ratio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B to C (MA) | B to C (ABC) | B to C (MA) | B to C (ABC) | B to C | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mean | 90 | 88 | 50 | 81 | 1773 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02045454545 | Median | 82 | 49 | 10 | 60 | 16233 | 0374 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Standard Deviation | 118 | 164 | 77 | 97 | 13962 | 0647 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum | -7 | -10 | -71 | -31 | 147 | - 0 | SPP | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum | 38 | 59 | 244 | 345 | 7433 | 242 | EUCLIDreg | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GSDO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ICESat-2reg | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Paste data from above to this table for analysis | ORION | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-7 | -10 | 607 | 817 | 1923 | 042 | SLS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-3 | -7 | - 0 | - 0 | 147 | - 0 | TEMPO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | -7 | 1113 | 1113 | 1887 | 059 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
0 | -6 | - 0 | 613 | 1897 | 032 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Total KDPs Within Cost Range of Prior KDP | Total KDPs Within Schedule Range of Prior KDP | -2 | -5 | 303 | 910 | 510 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | -3 | -3 | - 0 | - 0 | 503 | - 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MALow at or below Preceding KDP Low | 14 | 31 | 45 | 31 | MALow at or below Preceding KDP Low | 27 | 26 | 53 | 51 | 6 | 0 | 410 | (100) | 1217 | 008 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABCHigh at or below Preceding KDP High | 19 | 33 | 52 | 37 | ABCHigh at or below Preceding KDP High | 21 | 32 | 53 | 40 | 0 | 0 | (203) | 403 | 167 | 242 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | 2 | 810 | 307 | 500 | 061 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-B Cost | KDP-A to KDP-B Schedule | 33 | 5 | - 0 | 100 | 800 | 013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 11 | 8 | 103 | 103 | 2670 | 004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B Low at or below KDP-A Low | 4 | 10 | 14 | 29 | KDP-B Low at or below KDP-A Low | 13 | 9 | 22 | 59 | 9 | 9 | (203) | 503 | 1983 | 025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B High at or below KDP-A High | 9 | 12 | 21 | 43 | KDP-B High at or below KDP-A High | 12 | 10 | 22 | 55 | 11 | 10 | (103) | 1320 | 3243 | 041 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-2 | 10 | 2437 | 3147 | 1610 | 195 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | 10 | 613 | 613 | 3450 | 018 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-B to KDP-C Cost | KDP-B to KDP-C Schedule | -2 | 11 | 813 | 603 | 1687 | 036 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 9 | 13 | 917 | 1930 | 2433 | 079 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-B Low | 10 | 21 | 31 | 32 | MA at or below KDP-B Low | 14 | 17 | 31 | 45 | 19 | 18 | (707) | (203) | 2930 | 007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-B High | 10 | 21 | 31 | 32 | ABC at or below KDP-B High | 9 | 22 | 31 | 29 | 16 | 18 | - 0 | 607 | 707 | 086 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 31 | 1217 | 1830 | 1027 | 178 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | 37 | 1520 | (307) | 820 | 037 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-A to KDP-C Cost | KDP-A to KDP-C Schedule | 34 | 53 | (203) | 307 | 1927 | 016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Yes | No | Total | Percent At or Below | Yes | No | Total | Percent At or Below | 29 | 59 | 2233 | 3450 | 7433 | 046 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MA at or below KDP-A Low | 2 | 7 | 9 | 22 | MA at or below KDP-A Low | 5 | 12 | 17 | 29 | added | 5 | 0 | - 0 | - 0 | 813 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABC at or below KDP-A High | 5 | 11 | 16 | 31 | ABC at or below KDP-A High | 3 | 14 | 17 | 18 | added | -0 | -0 | 103 | 1013 | 1017 | 100 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | - 0 | - 0 | 1217 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | -1 | -5 | - 0 | - 0 | 1623 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 7 | 4 | - 0 | - 0 | 1323 | - 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 10 | 7 | 1217 | 2130 | 1823 | 117 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KDP-C (MA) | KDP-C (ABC) | Replan (MA) | Replan (ABC) | KDP-C to Replan (MA) | KDP-C to Replan (ABC) | KDP-C (or Replan) to PresentFinal (MA) | KDP-C (or Replan) to PresentFinal (ABC) | added | 8 | 3 | 2027 | 1923 | 3347 | 057 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
added | 8 | -0 | 607 | 1823 | 2333 | 078 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Percentage of Project CostSchedule HighLow Estimates Within Prior KDP Range Estimates | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B Estimate at or below A Estimate | C Estimate at or below B Estimate | C Estimate at or below A Estimate | Total at or below Preceding KDP Estimate | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - High | 43 | 32 | 31 | 37 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cost - Low | 29 | 32 | 22 | 31 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - High | 55 | 29 | 18 | 40 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Schedule - Low | 59 | 45 | 29 | 51 |