Cannon Place, London, UK
Laing O'Rourke Crossrail Projects (C502 C422 & C520),
Projects update
2
Make your main title for each page in the body of the text – 24pt Arial bold• Second level copy runs from this point, please type over this paragraph to create text on your pages
• Third level – Use the guides on this page for lining up copy and pictures
• Fourth level
• Fifth level
© Laing O’Rourke 2012, all rights reserved
3
Make your main title for each page in the body of the text – 24pt Arial bold• Second level copy runs from this point, please type over this paragraph to create text on your pages
• Third level – Use the guides on this page for lining up copy and pictures
• Fourth level
• Fifth level
© Laing O’Rourke 2012, all rights reserved
44 © Laing O’Rourke 2012, all rights reserved
So what are the Laing O’Rourke Crossrail Opportunities?
55 © Laing O’Rourke 2012, all rights reserved
The Projects:
C502 Liverpool Street
C422 Tottenham Court Road
C520 Custom House
66
‘Three Projects. One Team.’
Supply Chain opportunities within the one team model.
© Laing O’Rourke 2012, all rights reserved
ProjectsC422 C502 C520
2013
Noise & Vibration MonitoringPrecast Concrete Works
Substructure WorksReinforcement
Superstructure Works
2014
CladdingStructural Steelwork
Metal DoorsGlazed CanopyM & E Works
2015
DryliningFF&E WorksDecoration
LandscapingCommissioning
77
C502 – Liverpool Street Station
© Laing O’Rourke 2012, all rights reserved
88
Broadgate Ticket Hall including the
Link Passageway AP8
Moorgate work includes:
• Moorgate Ticket Hall
• Highwalk access at Moorfields
• Completion of Moor House Draft relief ventilation shaft
Blomfield Box
Moorgate Shaft work includes:
• Moorgate Shaft internal structure
• Stabilisation and monitoring of 8 Moorfield & 87
Moorgate
Finsbury work includes:
• Finsbury Circus access shaft
• Finsbury Circus Gardens
Tunnel work includes:
• Internal Structure
• Fit-out, test and commissioning
Project Overview
99
C502 – Liverpool Street StationConstruction Programme
© Laing O’Rourke 2012, all rights reserved
Year Construction Programme
2012
Project Start Up30.04.12 Start DateOCI Design & ValidationAug 12 Commence first work site – BBX ventilation shaft
2013
Design & ProcurementBlomfield box piling and substructuresDec 2013 start Broadgate worksiteArup design stage FProcurement phase (most packages let in 2013)
2014
Substructures / structuresBlomfield box substructuresBroadgate piling and substructuresAugust 2014 - Moorgate ticket hall works commence – Demolition / structuresDec Tunnel works site starts
2015
Structures & EnvelopeBlomfield box structures complete / Envelope and fit out startsBroadgate Ticket hall structures complete / waterproofingMoorgate Ticket hall – structuresJuly – Moorgate shaft worksite startsTunnel structures & fit out starts
2016 Fit OutServices & fit out underway to all worksites
2017Complete fit and commission
Fit out completed to all worksites by mid 2017Testing & Commissioning phase
2018
Integrated commissioning & pre operation activitiesSystem wide commissioningOperational readinessHandover activitiesAug 2018 completion
1010
C422 – Tottenham Court Road
© Laing O’Rourke 2012, all rights reserved
1111
Project overview
© Laing O’Rourke 2012, all rights reserved
Western Ticket Hall (WTH)
Dean Street Box
Centre Point
Central Line
Goslett Yard Box
(GYB)
Eastbound CRL
Tunnel
Westbound CRL Tunnel
Northern Line
1212
C422 – Tottenham Court RoadConstruction Programme
© Laing O’Rourke 2012, all rights reserved
Year Construction Programme
2012Project Start Up
16.07.12 Start dateOCI Design & Validation
2013Design & Procurement
WSP design stage FProcurement phase
2014
Substructures / structuresCompletion of WSP Design / Design Acceptances/ Gate 3 Sign OffsConclusion of Package ProcurementWestern Ticket Hall (WTH) StructuresCommence Goslett Yard Box (GYB) StructuresJuly - Tunnel site works starts
2015
Structures & EnvelopeWTH & GYB Envelope WorksWTH Fitout WTH and GYB systemwide installation to vent shaftsGYB Fitout
2016Fit Out
Services & fit out underway to all worksitesSystemwide access to equipment rooms
2017Complete fit and commission
Fit out complete to all WTH and GYB by early 2017Testing & Commissioning phase
2018
Integrated commissioning & pre operation activitiesFit out complete to all platforms and tunnels by early 2018System wide commissioningOperational readinessHandover activitiesAug 2018 completion
1313
C520 Custom House
© Laing O’Rourke 2012, all rights reserved
1414
Project overview
© Laing O’Rourke 2012, all rights reserved
1515
C520 – Custom HouseProcurement Programme
© Laing O’Rourke 2012, all rights reserved
Year Construction Programme
2012Project Start Up
28th September 2012 Start dateOCI Design & Validation
2013
Design, Procurement Substructure & SuperstructureAll design worksMarch 2013 – Piling worksJune 2013 – SubstructureSeptember 2013 – Superstructure Ramboll design stage F Procurement phase (majority of packages let in 2013)
2014
Superstructure, Fit-out and M&E worksApril 2014 – ExCeL bridge installationAugust 2014 – Commence station entranceDec Tunnel works site starts
2015
Internal Finishes worksApril 2015 – DLR Bridge worksApril 2015 – Commission Station EntranceMay 2015 – Remove temporary bridgeMay 2015 – Hand Over
2016 Crossrail worksStation Wide Services
2017 No Laing O’Rourke works2018 Integrated commissioning on permanent services
1616 © Laing O’Rourke 2012, all rights reserved
LO’R Crossrail Preferred
Supply Chain Partner
Financial Appraisal (D&B Report)
Financial Capacity Checks
Health & Safety Checks (SSIP &
Building Confidence)Past Performance Data
Subcontractor Questionnaire
Compete For
How to become a LO’R Crossrail supply chain partner?
1717 © Laing O’Rourke 2012, all rights reserved
✓
X Supplier Turnover (£) Total Package Value April 13 - March 14 % of t/o April 14 - March 15 % of t/o April 15 - March 16 % of t/o
£ 12,654,248.00 £ 2,271,202.30 £245,535.38 2% £1,104,909.23 9% £920,757.69 7%
£ 3,133,000.00 £ 2,271,202.30 £245,535.38 8% £1,104,909.23 35% £920,757.69 29%
£ 2,479,595.00 £ 2,271,202.30 £245,535.38 10% £1,104,909.23 45% £920,757.69 37%
£ 955,188.00 £ 2,271,202.30 £245,535.38 26% £1,104,909.23 116% £920,757.69 96%
£ 8,859,045.00 £ 2,271,202.30 £245,535.38 3% £1,104,909.23 12% £920,757.69 10%
1818 © Laing O’Rourke 2012, all rights reserved
“Our mission is to act as an umbrella organisation to facilitate mutual
recognition between health and safety pre-qualification schemes
wherever it is practicable to do so"
Within SSIP there are:
• 39 Registered Members
• 7 Affiliate Members
• 3 Co-opted Members
Delivering trusted, meaningful connections
Achilles BuildingConfidence is and online accreditation standard used by 19
buyer organisations and over 1,500 suppliers in the UK construction sector.
1919
Past Performance
© Laing O’Rourke 2012, all rights reserved
SubContractor Questionnaire
2020 © Laing O’Rourke 2012, all rights reserved
Question: Please confirm if you were to sub-contract any works specifically for this scheme, that you would
comply with the Crossrail requirements to source potential subcontractors through CompeteFor
Project Title
Valued Opportunities on Compete For
C502 £ 20,930,758.92
C422 £ 5,215,021.00
C520 £ 2,751,326.00
2121 © Laing O’Rourke 2012, all rights reserved
Compete For•Compete For Tailored Questionnaire
•Answers Scored
•Anonymous Long list turned Top Eight Shortlist
Potential Tender Schedule•Compete For Shortlist
•LO’R Tiered Supply Chain
•Past Performance, SSIP, Building Confidence, DNBi, Capacity Modelling
Approved Tender List •Approved Tender List issued to Crossrail
2222
Unique Position
Three Projects. One Team
Significant Opportunities
Compete For
© Laing O’Rourke 2012, all rights reserved
© Laing O’Rourke 2012, all rights reserved.
No part of this presentation may be reproduced, stored on a retrieval system, disclosed or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior permission
of the copyright owner.
Thank You