Operating Manual for Cube1000™
Operating Instructions for
Cube1000™ IBC
Collapsed
Cube1000™
IBC ready for
usage
Pg 1/31
Operating Manual for Cube1000™
Setting up Cube1000™ IBC
for Filling process
Pg 2/31
PART 1
Operating Manual for Cube1000™
Step 1.
Raise side A
of Cube1000™
IBC
Pg 3/31
A
Operating Manual for Cube1000™
Step 2.
Raise side B
of Cube1000™
IBC
Pg 4/31
AB
Operating Manual for Cube1000™
Step 3.
Keep side A
and B erected
upright.
Pg 5/31
AB
Operating Manual for Cube1000™
Step 4.
Hold up
detachable
panel C.
Pg 6/31
B
C
Operating Manual for Cube1000™
Step 5.
Slot Panel C
onto IBC
Pg 7/31
B C
Operating Manual for Cube1000™
Step 6.
Keep
detachable
panel C firmly
locked on
both ends
Pg 8/31
C
Operating Manual for Cube1000™
Step 7.
Place folded
liner bag on
the interior of
IBC
Pg 9/31
Operating Manual for Cube1000™
Step 8.
Carefully
unfold liner
bag on IBC
Pg 10/31
Operating Manual for Cube1000™
Step 9.
Carefully push
the bag sprout
through the
IBC discharge
hole
Pg 11/31
Operating Manual for Cube1000™
Step 10.
Place locking
mechanism
on bag sprout
and secure it
with the IBC
Pg 12/31
Operating Manual for Cube1000™
Step 11.
Attach Filling
Pipe to the
liner bag
Pg 13/31
Operating Manual for Cube1000™
Step 12.
Hold up panel
D and slot it
onto IBC.
Pg 14/31
C
D
Operating Manual for Cube1000™
Step 13.
Keep
detachable
panel D firmly
locked on
both ends
Pg 15/31
DB
Operating Manual for Cube1000™
Step 14.
Commence
Filling Process.
Proceed to seal
bag upon
completion of
filling process
Pg 16/31
Operating Manual for Cube1000™
Step 15.
Close lids
and proceed
to seal the
IBC.
Pg 17/31
Operating Manual for Cube1000™
Step 16.
IBC ready for
transportation
Pg 18/31
Operating Manual for Cube1000™
Product Discharge Process
Pg 19/31
PART 2
Operating Manual for Cube1000™
Step 1.
Detach Cutting
Mechanism
from liner bag
sprout cover
Pg 20/31
Operating Manual for Cube1000™
Step 2.
Insert Cutting
Mechanism
into discharge
sprout of liner
bag
Pg 21/31
Operating Manual for Cube1000™
Step 3.
Insert PE/PP
Valve into the
IBC discharge
hole
Pg 22/31
Operating Manual for Cube1000™
Step 4.
.
Apply
considerable
force while
turning Valve.
Ensure cutting
mechanism cuts
through the
discharge
opening
Pg 23/31
Operating Manual for Cube1000™
Dismantling Cube1000™ IBC
for Storage
Pg 24/31
PART 3
Operating Manual for Cube1000™
Step 1.
.
Remove bag
locking
mechanism and
remove used
bag from IBC.
Pg 25/31
Operating Manual for Cube1000™
Step 2.
.
Remove
detachable
Panels C and
D from the IBC
Pg 26/31
C
Operating Manual for Cube1000™
Step 3.
.
Fold down Panel
A and place
detached Panels
C and D on top
of panel A
Pg 27/31
A + C + D
B
Operating Manual for Cube1000™
Step 4.
.
Fold down
panel B.
Pg 28/31
B
Operating Manual for Cube1000™
Step 5.
.
Collapsed
IBCs can now
be stacked for
storage
Pg 29/31
Operating Manual for Cube1000™
Technical Support
Pg 30/31
PART 4
Operating Manual for Cube1000™
Contact Details
Pg 31/31
Australia Office : GEP Bulk Containers Australia
Mr Paul S. Cavanagh
Tel: +613 9783 7057
Fax: +613 9782 4211
Mobile: +614 1710 7965
Email Address: [email protected] or