Page 1: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Satellite Remote Sensing and Geospatial

data in Integrated Watershed Management

Programme (IWMP)

nrsc/I

SRO

Page 2: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

“A Geo-hydrological unitfor an area that drains at acommon point.”

Watershed Development:

Source of definition: Watershed Processes, Assessment & Management – Paul A. DeBarry, John Wiley Publications (1.0 Introduction: Comprehensive Watershed Assessment & Management)

Natural Resources

Management

Water Conservation &

Land Improvement

Ecological Security Water Security, Agriculture

Productivity, Livelihoods

Sustainable Development

nrsc/I

SRO

Page 3: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Integrated Watershed Management

People

Water

Land

Forest

Livestock nrsc/I

SRO

Page 4: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Integrated Watershed Management Programme (IWMP)

• Since 1995, MoRD was implementing three programmes,

namely, Desert Development Programme (DDP), Drought

Prone Areas Programme (DPAP) and Integrated

Wastelands Development Programme (IWDP).

• On 26.02.2009, the Cabinet approved the integration of

the existing three schemes into a single modified

programme, namely, IWMP.

4

nrsc/I

SRO

Page 5: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Salient Features of IWMP

Dedicated Institutions with multi-disciplinary experts at:

– State level - State Level Nodal Agency (SLNA)

– District level - Watershed Cell cum Data Centre (WCDC)

– Project level - Project Implementing Agency (PIA)

– Village level - Watershed Committee (WC)

• Cluster Approach: Size of project about 5,000 ha.

• Cost Norms: Rs.12,000/ha. in plains; Rs.15,000/ ha in difficult/hilly areas

and upto Rs.15,000/ha in IAP districts

• Funding pattern: 90:10 between Centre & States.

• Release of funds: 2 installments (60%, 40%) as per annual requirement

• Project period: 4 -7 years, 3 Phases (Preparatory, Works & Consolidation)

• Scientific planning: IT, remote sensing techniques, GIS for planning,

monitoring and evaluation

nrsc/I

SRO

Page 6: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Salient Features of IWMP Contd…

•Implementation through Watershed Community

•Participatory Approach

•Emphasis on “our” participation in “their” plans

•Contributory approach to empower the community

•Transparency in transactions

•Direct funding to the community

•Demand Driven Watershed Dev. Plan

•Linkages with Research Institutions

•Flexibility in technology

•Arrangements for post project maintenance

nrsc/I

SRO

Page 7: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Component-wise earmarking of project cost

Component % of project cost

DPR preparation 1

Entry point activities 4

Institution & Capacity building 5

Watershed Development Works 56

Livelihoods for asset-less persons 9

Production system & micro-enterprises 10

Consolidation 3

Monitoring 1

Evaluation 1

Administration 10

Total 100

nrsc/I

SRO

Page 8: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Activities under Watershed Projects• Capacity building and awareness generation

• Encouraging people’s participation

• Democratic decentralization in decision making

• Formation of autonomous institution at the village level

• Participatory agricultural water management

(soil & moisture conservation, rain water harvesting,integrated water management of surface & ground waterresources, onfarm water management to enhance water useefficiency, conservation farming etc)

• Afforestation, horticulture and pasture development

• Livelihood activities including production systems & micro-

enterprises

• Convergence of activities / schemes

nrsc/I

SRO

Page 9: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Allocation of targets among States and

prioritization of watersheds by States

• Department allocates annual targets among States based

on criteria - DPAP/DDP areas, treatable wastelands,

SC/ST population, rainfed area and 10% mandatory

allocation for NE States.

• States prioritize watershed projects based on criteria like

poverty index, area under rainfed agriculture, moisture

index, productivity potential of the land, % of small &

marginal farmers, ground water status, drinking water etc.

nrsc/I

SRO

Page 10: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Sl Project Year Area % to TGA

1 National Wastelands Monitoring Project

2005-06 47.22 m. ha (14.91%)

2 National Wastelands Change Analysis

2008-09 46.70 m. ha (14.75%)

National Wastelands Change Analysis

Objectives:

• To generate spatial information on different classes of wastelands

of 2008 - 09 at district, state and national levels, by updating the

wasteland vector layer of 2005 - 06.

• To Identify and depict areas with major wasteland changes between

2005 - 06 and 2008 - 09.

• Preparation of category-wise spatial change statistics at national,

state and district levels and summation in the form of an atlas.

nrsc/I

SRO

Page 11: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

The Union Development Minister Rural Development Mr. Jairam

Ramesh, released “Wastelands Atlas of India 2011 (change analysis

based on temporal satellite data of 2005-06 and 2008-09),”

nrsc/I

SRO

Page 12: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Visualization of All India Wasteland Maps

nrsc/I

SRO

Page 13: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Visualization of All India Waste land Maps

nrsc/I

SRO

Page 14: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

WASTELAND CHANGES

Ahmedabad District, Gujarat

Scrub land to Industrial

Oct 2006

Oct 2009

nrsc/I

SRO

Page 15: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

WASTELAND CHANGES

Jan 2006

Feb 2009

Adilabad District, Andhra Pradesh

Scrub land to Waterbody/ Industrial

nrsc/I

SRO

Page 16: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Physical Target & Achievement - 11th & 12th Plan

11th PlanArea taken up for development (m.ha.)

Target Achievement

2009-10 5.41 6.31

2010-11 8.50 8.82

2011-12 8.74 9.08

Total 22.65 24.21

12th Plan

2012-13 5.00 5.00

2013-14 5.00 3.5

nrsc/I

SRO

Page 17: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Financial Outlay & Release – 11th Plan & 12th Plan (Rs.in Crore)

11th Plan Budget (RE) Released

2007-08 1114.54 1164.54

2008-09 1545.00 1544.40

2009-10 1819.80 1762.65

2010-11 2458.00 2456.73

2011-12 2314.20 2312.09

Total 9194.54 9240.41

12th Plan

2012-13 2903.50 2893.43

2013-14 5387 .00 1775.21

Total allocation for 12th Plan is Rs.29,296 crore. Physical target is 25 million ha.

nrsc/I

SRO

Page 18: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Implementation

• Funds are released directly to SLNA

• Projects implemented by WCDC through PIAs

• PIA can be a Panchayati Raj Institution or Line Department orreputed NGO or Corporate Entity

• PIA maintains a technical team of 4 experts calledWDT(Agriculture/Agril.Engineering/AnimalHusbandry/So-cialmobilization/Livelihoods/Forestry)

• At village level, projects are planned and executed by theWatershed Committee (WC)

nrsc/I

SRO

Page 19: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

1.Preparatory PhaseEPA: to build rapo with local people. Works based on urgentneeds of the local community such as revival of naturalresources, availability of drinking water, augmenting groundwater, productivity enhancement of existing farming systemsetc.

Community Organization: formation of WCs, UGs & SHGs

Capacity building: 5% - appropriate training programmefor all stakeholders on planning, implementation, livelihoods,micro-enterprises through NGOs, GOs & reputed institutions.

DPR: includes activities like collecting baseline data, PRAexercise, net planning, year wise phasing out of activities,convergence possibilities and finally preparation of DPR,approval by Gram Sabha, WCDC & SLNA.

19

nrsc/I

SRO

Page 20: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Capacity Building

DoLR level:

• Reputed institutes are involved - ICRISAT, MANAGE,

NRSC/RRSC, NIRD, SIRDs, CRIDA,CAZRI etc.

• Training/Workshops on specialized subjects like

promoting use of high-science tools.

nrsc/I

SRO

Page 21: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Micro Level Planning (MLP)/DPR

• Process of assessing, prioritizing, documenting,

the needs and aspirations of local communities,

pertaining to both natural as well as non land

based livelihood aspects.

• Important step in preparing community level

action plan for WDP

• MLP helps in mutual learning, involve target

group in planning, brings ownership of planned

activities, transparence, addressing gender and

equity issues.

nrsc/I

SRO

Page 22: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

SPATIAL DATA REQUIREMENT OF IWMP

THEMATIC INFORMATION

Drainage and Watershed maps

Land use & land cover

Wastelands

Land degradation

Ground water potential / Drinking Water status

Soil information

Village boundaries

Cadastral maps

Digital Elevation Models

SATELLITE DATA

IRS- LISS-IV, CARTOSAT

Satellite Ortho image database at 1:10,000 scale

Bhiwani Dist, Haryana State

nrsc/I

SRO

Page 23: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

WATERSHED DEVELOPMENT PROGRAMME

DRAINAGE MAP IRS –LISS-IV SATELLITE IMAGE GROUND WATER PROSPECTS MAPSLOPE MAP

ACTION PLAN MAPLAND USE / LAND COVER MAPSOIL MAP

nrsc/I

SRO

Page 24: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Participatory Net Planning (Use of GPS & GIS Maps)nrs

c/ISRO

Page 25: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

AP STATE

MEDAK DISTRICT

nrsc/I

SRO

Page 26: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

CART-1 PAN SHARPENED LISS IV IRS DATA AT IWMP PROJECT LEVEL

nrsc/I

SRO

Page 27: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

District

Mandal

Village

GIS BASE DATA

nrsc/I

SRO

Page 28: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Cadastral map Integrated with

Terrain features

nrsc/I

SRO

Page 29: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

SATELLITE DATA OVERLAID WITH CADASTRAL MAP

nrsc/I

SRO

Page 30: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

IWMP proposed action plan at village level

Desilting of

Checkdam

Maintenance of Plantation

DugwellStructure

Horticulture Plantation

Land Improvement

Road Improvement

Bank

nrsc/I

SRO

Page 31: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

COIMBATORE

CUDDALORE

DHARMAPURI

DINDUGAL

CHENNAI

THIRUVALLUR

KANCHEEPURAMVELLORE

KRISHNAGIRI

SALEMERODE

NILGIRIS

THENI

VILLUPURAM

THIRUVANNAMALAI

PERAMBALUR

NAMAKKAL

KARUR

THIRUCHIRA PALLI

PUDUKOTTAI

THANJAVUR

THIRUVARUR

NAGAPATTINAM

NAGAPATTINAM

KARAIKAL (PUDUCHERRY)

SIVAGANGAI

RAMANATHA PURAM

MADURAI

VIRUDHU NAGAR

THOOTHUKUDI

THIRUNELVELI

KANYAKUMARI

BAY OF BENGAL

KERALA

KARNATAKA

ANDHRA PRADESH

WATERSHED MAP OF

TAMILNADU

nrsc/I

SRO

Page 32: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

32

MAHARASHTRA

nrsc/I

SRO

Page 33: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

ProjectWeight-

ageMWS

Total

area

(ha)

Project area proposed for treatment (ha)

(Excludes assured irrigation, dense

forest & uncultivable waste land)

PIA

IWMP-III/2010-11 96 10 7193 5476 Line Dept.

IWMP-IV/2010-11 104.4 10 11683 5292 Line Dept.

IWMp-V/2010-11 101.7 10 8033 5322 Line Dept.

Acute shortage of drinking water Low level of employment

opportunitiesMore SC/ST & BPL populationHigher level of migration

KRISHNAGIRI DISTRICT

Forest Area

Tamil Nadu

nrsc/I

SRO

Page 34: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Evaluation

• Evaluation of projects after completion everyphase is mandatory by independent agencies.

• Independent evaluating agencies are to beidentified and empanelled by the SLNAs with theapproval of DoLR.

• Subsequent installments are released based onthe satisfactory report of the evaluation.

nrsc/I

SRO

Page 35: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Monitoring

• Central level, periodic reviews by Minister, Secretary,

Steering Committee, Regional Review Meetings,

Programme Division, Area Officers and NLMs

• On-line monitoring system (IWMPMIS) in place. The

website is http://iwmpmis.nic.in

• State level, by Secretary/Nodal Department of the

State Government and SLNA

• District level, by ZP/DRDA/WCDC/Nodal Deptt.

• Project level, by the PIA/WDT and WC

nrsc/I

SRO

Page 36: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

2003 2007

RS BASED IMPACT ASSESSMENT IN IWMP

nrsc/I

SRO

Page 37: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

BHUVAN SERVICES FOR IWMP

nrsc/I

SRO

Page 38: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Real time data collection on GPScoordinates, Digital Photos & userspecified parameters andtransmission from field to centralprocessing server

Mobile PDA for Collection & Dissemination of RT Field Information

Field techniques -Map Technologies

Mobile application : Interactive Data*Reporting : WebGIS

Field data /Sensor :GIS database

Field data collection using GPS enables PDA mobile device

Communication using GPRS and HTTP

Communication with SERVER

Information Stored inDatabase

Near Real Time Information in Form of Email Dissemination

Decision Making

Visualization of Information in GIS

nrsc/I

SRO

Page 39: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Use of RS, GIS & GPS Technologies in Land and Water Resources

mapping and Monitoring their sustained use, is well documented

through various pilot projects.

Up-scaling the use of above Technologies in IWMP by State Govts

throughout country is to be taken up

Some of the SLNAs in the country have started using high

Resolution IRS data sets in planning, prioritization and DPRs

preparation of IWMP projects

By realizing the vast potential of the Geomatics with the presence

of organizations like NRSC/ISRO/DOS , the value addition for the

geo-spatial datasets readily available now are to be discussed and

proper protocols to be evolved for the best use.

WAY AHEAD …..

nrsc/I

SRO

Page 40: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Published data on watershed management by different

ISRO/DOS units revel that the methodologies followed

and inputs used, vary considerably.

User organizations are flooded with voluminous

datasets mostly on small scales by giving the

information on the accessibility of various web based

Portals/sites (ISRO/DOS,NIC, State level SDMHs).

Sufficient clarity is required by the user Depts., on

minimum and reliable datasets for IWMP site specific

needs, rather than the pilots/model studies (demos) with

lots of details.

WAY AHEAD …..

nrsc/I

SRO

Page 41: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Effective implementation of IWMP calls for the following reliable geo-spatial

datasets at 1:10,000 scale:

• Base map with Drainage, Road network, Settlements etc.,

• Geo-referenced village (Cadastral) maps overlaid on recent HRS data

• Present LU/LC clearly depicting the areas under rain-fed agril, wastelands

and areas under plantation.

• Soil resources: data on texture, depth, limitations for use etc.,

• Location and classification of all surface water bodies and their condition

• Revised micro-watershed boundaries (SLUSI, 2012)

• Ground profile derived from the DEM using 1 meter contours

• Ancillary data required at regional scale on Geological and Climatic

resources

• All the above envisaged datasets can be prepared district wise for potential

areas only.

WAY AHEAD …..

nrsc/I

SRO

Page 42: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Carto-1/2 PAN sharpened LISS IV, multi-temporal data

to be made available to State user Depts., for their

regular use.

When such datasets are available, the domain experts

can create IWMP project wise spatial data records by

integrating the geo-referenced project details.

Satellite data sets created right from the pre project

conditions through the project period will form the

scientific base for post project evaluation and impact

assessment studies.

WAY AHEAD …..

nrsc/I

SRO

Page 43: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

Capacity Building:

Organizing regular capacity building activities through State Remote

Sensing Application Centers, RRCs/NRSC, NESAC

Strengthening State Remote Sensing Application Centers,

Geo-spatial Data utilization manuals are to be prepared by which

the user Depts., will get educated in accessing the data and its use.

WAY AHEAD …..

nrsc/I

SRO

Page 44: data in Integrated Watershed Management Programme (IWMP ... · data in Integrated Watershed Management Programme (IWMP) ... phase is mandatory by independent agencies. ... rather

nrsc/I

SRO


Top Related