Dave Pearson, Director of Innovation
IHEEM Conference 27th October 2009
Using an Ammonia Chiller Plant to Deliver Lower Cooling Costs
http://www.star-ref.co.uk/star/content/view/199/145/
BHH Awards – 12th November 2009
Best Ecological Product
High efficiency, long life, low charge, natural refrigerant cooling
Food, HVAC, Process, Leisure, Retail, IT
UK Based Refrigeration Specialist
Design, Manufacture & Install
10 Branch offices
298 Employees
Who Are We?
Energy
Efficiency
Environmental
Refrigerant
LongevityPackage Solution
Proven Technology
Best Ecological Product
Ammonia Chillers
The Team
The remarkable thing about this project is not the technology, which is well established and proven to be lower cost.
The remarkable thing about this project is the selection of this technology for this market sector.
That is the prize winner!
Energy Efficiency
Refrigeration
Electricity
Other
Electricity
U.K. Energy NHS Energy
Star ammonia chiller delivers annual savings to GOSH of:
£190,000 = 7.6 Nurses
1376 Tonnes CO2 = 331 Times
* 1250kW Load with heat recovery
Environmental
HFCAmmonia
Synthetic chemical
Global warming potential 1300-4500
Cost £10 / kg
Typically 30% lost per year per chiller
Natural substance
Zero GWP
Cost £1 / kg
Longevity
1 x Star Ammonia2 x HFC Chillers
20 year lifeTypical 10 year life
1870Ammonia
2009
??
Future Proof
+
HFC Refrigerant
Package Solution
Star Ammonia Chillers
Ideal for retrofits
Pre-tested & Charged
Heat recovery option
Easy Plug & Play
Easy Maintenance
<0.1 Kg per kW
Energy
Efficiency
Environmental
Refrigerant
LongevityPackage Solution
Proven Technology
Best Ecological Product
Ammonia Chillers
Our mission is to work with the public sector to reduce carbon emissions through investment in energy
efficiency and renewable technologies.
Salix Finance
One company two
funding streams
Salix Recycling Fund Salix Energy Efficiency Loan Scheme
Characteristics of the funding
Characteristic Loan Fund Recycling Fund
Interest Free Yes Yes
Project Compliancy Criteria
Technical payback of less than 5 yearsLifetime cost of CO2 less than £100/tonneProject must be additional
Technical payback of less than 5 yearsLifetime cost of CO2 less than £100/tonneProject must be additional
Funding for Projects 100% Funded Matched Funded 50% PSO / 50% SALIX
Repayment The repayments will commence March 2011 and will be in 8 x 6 monthly equal instalments
No repayment as long as the recycling condition of minimum 60% reinvestment annually into projects is achieved
Salix Recycling Fund
• Provide a long term interest free recycling fund for investment in energy saving projects
• Salix funding is matched by client as a % of their energy bill
• Ring fenced fund is created within the organisation
• Initial funding is spent over two years
• Each individual project repays its cost back to the fund from the savings
Project Example – Car Park Lighting by Borough Council of King’s Lynn & West Norfolk (BCKLWN)
BEFORE:• 274x70W + 10x58W +48 x18W = 20.6kW• Operate for 18 Hours a day = 372kWh/day• 135,500kWh/year• £13,550/yr running costs
AFTER:• Installation of ‘Save it Easy’ e-Ballast conversion units, and replacement of T8 bulbs with T5 bulbs. • Load reduced by 32% down to 14.0kW• £3,112 energy saving / year projected• Technical payback 2.61 years• 22.5 tCO2 saved / year (projected)• 42,000kWh saved annually (projected)
.
Project completion – Oct 2008
Project knowledge – Car Park Lighting by BCKLWN
Client – BCKLWN Client contact - Samuel IllsleyTel – 01553 616471 Email – [email protected]
• High Frequency ballasts• 20,000hr lamp life – twice as long as existing bulbs• 2yr Lamp and adapter replacement warranty• Year Projection = 36,000kWh will be saved• £ Saved/ Year = £3,600• CO2 Saved = 19.3 tonnes
•Actual Savings Realised:
2007kWh
2008 kWh
Saving kWh
Oct 22368 20397 1971
Nov 23036 20142 2894
Dec 24704 21706 2998
Year 257296 249857 7863
£Saved £ 786.32
CO2 Saved 4.22
Company: Bonnyline
www.bonnyline.co.uk
Contact: Warwick Grant
Tel: 0845 459 9961
• Matched Funding needs to be secured, this can be spread over 3 budget years• 4 ready to go compliant projects of different technologies• Sign off from executive and or politicians
NB !! - A Salix Application can be embedded into your CMP with the identified projects from your SIP forming the basis of the application
Salix Recycling Fund - Applications
Operating a Salix Recycling Fund
• Makes sense from a financial, energy saving and carbon reduction perspective• It simultaneously lowers your energy bill and carbon footprint while delivering
technology and efficiency upgrades to your whole estate• Provides a focus for education and cultural change especially among employees in
maintenance, building services and procurement• Opportunity to recycle the fund for future projects
Salix Recycling Fund
Key characteristics of a successful fund
• Good people to run the fund – generally the energy manager
• Good relations with finance, sustainability, procurement and facilities management
• Ability to market the fund internally
• Processes and systems in place to identify projects
• A strong stream of compliant projects
• All public sector organisations in England are eligible to apply.
• The scheme will accept applications during 2009 until all the funding has been allocated.
• Loans will be allocated on a first come first served basis.
Salix Energy Efficiency Loans
Salix Energy Efficiency Loans
• First call closed 17 July 2009- allocated 20%
• Next call now open until 9 October 2009
• The minimum amount available is £5000 per application with no upper limit providing all projects can be completed within 9 months of agreed application.
• Repayments should be covered from the energy savings achieved by the projects
• Organisations can keep all the savings generated once the loan is repaid.
• Loans will be available for around 80 different energy efficiency technologies
Outline details
Project Type No Avg. £ Cost Avg. £ Savings pa
Avg. Technical Payback
Lighting upgrades
435 £16,536 £5,031 3.3Insulation (Loft, Cavity Wall, Roof, Double Glazing)
385 £8,572 £2,240 3.8Lighting controls
321 £11,679 £3,692 3.2Pipe work Insulation (Cooling, Heating)
230 £4,343 £1,595 2.7Boilers - replacement
201 £28,815 £6,685 4.3Voltage reduction equipment
196 £24,109 £7,461 3.4Heating (e.g. controls, zone control valves, electric to gas replacement)
183 £12,781 £4,009 3.2BEMS - remotely managed
144 £13,089 £4,498 3.2Variable speed drives
135 £12,274 £6,154 2.5Insulation - draught proofing
113 £10,407 £3,151 3.6Boilers - control systems
112 £9,447 £3,032 3.3Office Equipment Improvements (PC power management, thin computers, virtualisation
99 £24,502 £9,444 2.6Time switches
89 £1,788 £1,198 1.9Heating - TRVs
71 £6,780 £2,291 3.2Hot Water (Distribution improvements, point of use heaters)
66 £9,939 £3,037 3.3BEMS - bureau remotely managed
66 £19,628 £5,693 3.6Swimming Pool Covers (Liquid, Manual, Motorised)
51 £8,722 £6,529 1.3Ventilation (distribution, controls, air handling units)
31 £9,129 £3,849 2.4Cooling (plant replacement / upgrade, free cooling)
30 £24,250 £5,863 4.1
Project examples
Applicants will need • To complete the Project Compliance Tool and submit• The application form should be completed on line and then printed and
signed and the hard copy sent to: Salix 25 Southampton Buildings London WC2A 1AL
• Email help line available [email protected] applicants will be notified of the outcome of their application within 14 days by receipt of a commitment letter agreeing the loan funding.
Application process
• On completion of projects a completion certificate must be completed and signed and sent to Salix
• Salix will then issue a loan agreement and direct debit mandate for the authorised officer to sign and return to Salix
• On receipt of completed documentation the loan funding will be paid by BACS.
• Possibility of stage payments for large single projects
Loans process
• For both the fund and the loan schemes there is limited finance
• Opportunity for those with ready to go projects
• Others who need to carry out more work there will be another call
• If cannot make deadlines for the loan then consider the fund.
Salix
Further details
• More information is available on the Salix website.• http://www.salixfinance.co.uk/loans • http://www.salixfinance.co.uk