Motivation
• Disaster response, Convoy planning
• 100s of robots coordinating to plan
• Planning is offline• Computing is
distributed across robots
IROS 2010 3
Multiagent Path Planning
Start
Goal
IROS 2010 4
Large-Scale Path Planning
IROS 2010 5
Large-Scale Path Planning
IROS 2010 6
Large-Scale Path Planning
Multiagent Path Planning
• Many, many approaches: offline fewer robots• Take a simple, decoupled approach, prioritized
planning– [Erdman 1987], [van den Berg 2005]
• Try parallelization + scale up, see what happens– Large teams, fast convergence, low communication
• Similar to some reactive/online approaches– [Chun 1999], [Clark 2003], [Chiddawar 2009]
IROS 2010 8
Prioritized Planning
• Assign priorities to agents based on path length
[Erdman, et al 1987; van den Berg, et al 2005]
IROS 2010 9
Prioritized Planning
• Plan from highest priority to lowest priority• Use previous agents as dynamic obstacles
[Erdman, et al 1987; van den Berg, et al 2005]
Effective, but requiresn sequential planning steps
IROS 2010 10
Can we do better?
• Each agent has local computing anyway
• Let agents try to plan instead of doing nothing– Maybe we’ll need to re-plan– If we don’t re-plan, we have saved time
• Hypothesis: Agents only actually collide with few other agents, so sequential iterations << n
IROS 2010 11
Distributed Prioritized Planning
Parallelizable& Equivalent
IROS 2010 12
Distributed Prioritized Planning
• At each robot:1. Compute initial path2. Determine local priority3. Broadcast path to team4. Listen for other teammates paths5. If a higher priority path is received, add as an obstacle in
space-time6. Compute new collision-free path7. Go to step 3.
Equivalent, but n2 messages!
Reduced DPP
• DPP requires broadcasting messages to every teammate every time agents replan
• Reduce this with two assumptions– If you didn’t hear from someone, they didn’t change their
plan– If someone is higher priority, they don’t care what you do,
so don’t send them anything
Better, but still O(n2) messages
Can we send even less?
• Birthday Paradox– If everybody in a room compares birthdays, chances of two
people having the same birthday grows quickly as number of people grows
• Collision communications– If everybody in the team compares a few other agents’
paths, the chance of detecting a collision between anybody grows quickly as number of paths compared increases
– Each agent is doing a small O(n2) check
IROS 2010 14
IROS 2010 15
Can we send even less?
• Choose num_paths_sent = k * sqrt(n)
IROS 2010 16
Sparse DPP
• Goal: reduce # of messages even more than RDPP O(n*sqrt(n))1. Each robot sends path to k*sqrt(n) random neighbors2. Each robot checks for conflicts between every
combination of paths it receives, then notifies conflicting robots
3. Lower priority robots in the collision re-plan
Experimental Results
• Scaling Dataset– # robots varied: {40, 60, 80, 120, 160, 240}– Density of map constant: 8 cells per robot
• Density Dataset– # robots constant: 240– Density of map varied: {32, 24, 16, 12, 8} cells per robot
• Cellular automata to generate 15 random maps• Maps solved with centralized prioritized planning• DPP variants capped at 20 iterations• Local planner: A*
IROS 2010 17
IROS 2010 18
Same near-optimal solutions as PP
Varying Team Size Varying Density
IROS 2010 19
Fewer sequential iterations (Iteration limit = 20)
Varying Team Size Varying Density
IROS 2010 20
Sparse DPP fails to converge (Complete, Reduced DPP always converged)
Varying Team Size Varying Density
IROS 2010 21
Reduced DPP reduces communication
Varying Team Size Varying Density
Complete Communication
IROS 2010 22
DPP takes… longer?
Varying Team Size Varying Density
IROS 2010 23
Distribution of Planning Times
IROS 2010 24
• Prioritized Planning
• DPP
Replanning for the Worst Agent
ABCD
ABCD
Longest planning agents might replan multiple times
Individual agent planning times varied by >2 orders of magnitude
Potential solution:Incremental Planning
IROS 2010 25
Summary of Results
• DPP gets same quality solutions as centralized• Reduced DPP is efficient
– Many fewer sequential steps, messages– Longer wall-clock time (due to uneven planning times)
• Sparse DPP does surprisingly poorly overall – Detecting collisions alone (reactive) leads to slower
convergence, more re-planning– Better to exchange relevant paths (proactive)– In Reduced DPP, agents preemptively discover conflicts
before collisions occur
IROS 2010 26
Conclusions
• DPP shows promise for larger problems with distributed computing– Far fewer sequential planning iterations– Incremental planning should reduce execution time
• However, there are some caveats– Sensitive to collision detection– If distribution of planning times varies, can be slow
IROS 2010 27
Future Work
• Generalizing framework for distributed planning through iterative message exchange
• Asynchronous collision-detection, re-planning• Reducing necessary communication• Planning under uncertainty• Scaling to larger team sizes