CCEM 2.1.5.2 1
Demo Script
CCEM: Cold Chain Equipment ManagerVersion 2.1.5.2
December 1, 2010
11/28/2010
CCEM 2.1.5.2 2
Reports
11/28/2010
CCEM 2.1.5.2 3
Country Capacity Bar Graph
11/28/2010
CCEM 2.1.5.2 4
Region Capacity Bar Graph
11/28/2010
CCEM 2.1.5.2 5
Equipment by Age
11/28/2010
CCEM 2.1.5.2 6
Electricity Type
11/28/2010
CCEM 2.1.5.2 7
Facility Type
11/28/2010
CCEM 2.1.5.2 8
Equipment Distribution
11/28/2010
CCEM 2.1.5.2 9
Forecasting
11/28/2010
CCEM 2.1.5.2 10
Baseline Forecast
11/28/2010
CCEM 2.1.5.2 11
Facility Detail
11/28/2010
CCEM 2.1.5.2 12
Vaccine Introduction
11/28/2010
CCEM 2.1.5.2 13
Schedule with PCV7
11/28/2010
CCEM 2.1.5.2 14
Schedule with PCV7 and Rota
11/28/2010
CCEM 2.1.5.2 15
Equipment Removal
11/28/2010
CCEM 2.1.5.2 16
Remove TCW 1990 from Health Centers
11/28/2010
CCEM 2.1.5.2 17
Remove 58 TCWsHC Deficit at 12 (up from 9)
11/28/2010
CCEM 2.1.5.2 18
Equipment Allocation
11/28/2010
CCEM 2.1.5.2 19
Equipment Allocation to Health Post
11/28/2010
CCEM 2.1.5.2 20
Equipment Allocation
11/28/2010
CCEM 2.1.5.2 2111/28/2010
CCEM 2.1.5.2 22
Putting it all together
11/28/2010
CCEM 2.1.5.2 2311/28/2010
CCEM 2.1.5.2 24
Equipment Lists
11/28/2010
CCEM 2.1.5.2 25
Equipment Transactions
11/28/2010
CCEM 2.1.5.2 26
Multiyear costs
11/28/2010
CCEM 2.1.5.2 27
Comparing Forecasts
11/28/2010
CCEM 2.1.5.2 28
Equipment Costs
11/28/2010
CCEM 2.1.5.2 29
Energy Costs
11/28/2010
CCEM 2.1.5.2 30
Energy savings from removing TCW 1990s from Health Centers
11/28/2010
CCEM 2.1.5.2 31
Spanish available (French in progress)
11/28/2010