Project Management Profile – Akash Dave
Page 1 of 91
Detailed Project Management Profile Version Akash Dave
Last Updated on: April 05, 2007 URL: http://www.akashdave.net, http://www.akashdave.com
Email: [email protected], [email protected]
A comprehensive listing of all the projects managed and executed till date, has been provided separately in this document. This document is an addendum to the Resume. You can also download a PDF version of this document from the URL: http://www.akashdave.net/downloads/resume/projects.pdf As a brief the projects executed till date, have been put in two categories, viz. (i) On-Demand Software Product and (ii) Shrink-wrapped Products. (i) Product Category: On-Demand Software (Saas – Software as a Service) Market Segment: Corporate Customer Location: US Total Count of Projects: 1600+ Note: All projects executed in this category were in Microsoft Technologies, viz. ASP.NET 1.1 and 2.0 with VB.Net , ASP, SQL Server 2000 and 2005, AJAX, Visual Studio.NET, Visual Studio 2005., FxCOP, and others. (ii) Product Category: Shrink-wrapped Products / Web Applications / Portals Market Segment: Retail Customer Location: India Total Count of Projects: 130+
Table of Contents ______________________________________________________________________________________
1. On-Demand Software (Saas – Software as a Service) ......................................................................... 2 2. Shrink-wrapped Products / Web Applications / Portals................................................................ 74
______________________________________________________________________________________
Project Management Profile – Akash Dave
Page 2 of 91
1. On-Demand Software (Saas – Software as a Service) Market Segment: Corporate Customer Location: US Note: All projects executed in this category were in Microsoft Technologies, viz. ASP.NET 1.1 and 2.0 with VB.Net , ASP, SQL Server 2000 and 2005, AJAX, Visual Studio.NET, Visual Studio 2005., FxCOP, and others. Below is a comprehensive List of all 1600+ projects ranging from a few person hours to person years.
# Subject Module Name Month / Year
1
System - Common - 'nsp_SYS_SavePageSetting' expects parameter '@Value', which was not supplied on error Active/Archive list pages
Backend
Jan-05
2
System - Common - 'nsp_SYS_SavePageSetting' expects parameter '@Value', which was not supplied on error Active/Archive list pages
Backend Feb-06
3 Modify existing stored procedures/views to adhere to SQL 2005 Backend Dec-06
4
Benefits - Calc/Recalc - OwnIt Mortgage - calculation page stops after a certain number of employees Benefits Jan-05
5
Benefits - All Enrollment Forms - Springer Verlag (springer) - Saved forms not displaying dependents Benefits Jan-05
6
Live site issue -- Benefits - Open Enrollment - First Insurance Company (FICOH) - The amount enrolled by empoyee is not imported properly into Ceridian.
Benefits Jan-05
7 Live Site issue -- Benefits - Other - MPG - Benefit Import issue. Benefits Jan-05
8
LIVE Site Issue - Benefits - Washington Trust (wtc) - Investigate / Clear up error messages for benefit imports into Source
Benefits
Jan-05
9
Live site issue -- Benefits - Open Enrollment - First Insurance Company (FICOH) - The amount enrolled by empoyee is not imported properly into Ceridian.
Benefits
Jan-05
10
Live Site issue -- Benefits - Enrollment Options - Orion (formerly Integrated Physicians Solutions) - Benefit Enrollment option page issue.
Benefits
Jan-05
11
Live Site Issue-Benefits - Open Enrollment - Nixon Peabody - Form Does not validate lready attached Dependents
Benefits
Jan-05
12
Live Site Issue Benefits - Open Enrollment - Kurt Salmon Associates (ksa) - Spouse Optional Life shows 0 Annual as welll as Per pay
Benefits
Jan-05
13
Benefits - Open Enrollment - All - New proposal for allowing admins to edit enrollment forms
Benefits
Jan-05
14
Benefits - Other - Impinj - Benefits Active List Benefits
Jan-05
15 Benefits - Benefits - All - Live System Bugs Benefits Jan-05
Project Management Profile – Akash Dave
Page 3 of 91
16 Benefits - Other- All - Issues related to benefit enrollment Benefits Jan-05
17
Benefits - Enrollment Options - Babb, Inc. (babb) - Text Size setting does not control all areas of the enrollment forms
Benefits
Jan-05
18 Benefits - Current Elections - - Error when viewing dependents. Benefits Jan-05
19 Benefits - Manager - Mac Compatibility Benefits Jan-05
20
Benefits - Benefit Emails - Merrick and Company - Wrong person is receiving an email notification upon submitting the benefit open enrollment form.
Benefits
Jan-05
21
Benefits - Enhancement 2005 - Rodale (rodale / zzrodale) - Adjustment to NO CHANGE feature in Enrollment Groups
Benefits May-05
22
Benefits - Open Enrollment - Arden Realty - Enrolllment form date display Benefits May-05
23
Benefits - Plan Setup - Amherst - When a Plan Name is Changed it is not updated on the Plan Config Screen
Benefits May-05
24
Kodak Polychrome Graphics (KPG) - Display the number of benficiaries and dependents on the Enrollment Form when continuing with current coverage
Benefits May-05
25
Benefits - Open Enrollment - MarcUSA - MAC Users are not seeing their beneficiary data attached to their plans
Benefits Jun-05
26 GRP_Benefits_1_of_8_HR+ Benefit Enhancement Part V Benefits Jun-05
27
GRP_Benefits_2_of_8_Open Enrollment - Suncor Energy (USA), Inc. - employees allowed to enter amounts lower than the minimum allowed
Benefits Jun-05
28
GRP_Benefits_3_of_8_Enhancement 2005 - MarcUSA - CONTINUE button on Open Enrollment form is confusing
Benefits Jun-05
29
GRP_Benefits_4_of_8_- Enhancement 2005 - SRC Management, Inc. (srcmgmt) - Allow DOCUMENT link to be customized
Benefits Jun-05
30
GRP_Benefits_5_of_8_Benefits - Enhancement 2005 - Generali Reassurance (generali) - Open Enrollment Summary page and Wizard should be consistent for Credits
Benefits Jun-05
31
GRP_Benefits_6_of_8_Having the Open Enrollment Option Available to Admins for Testing Purposes
Benefits Jun-05
32
GRP_Benefits_7_Of_8_HR+: Benefits. Add restriction to not allow an employee to submit a form if they do not have the required # of dependents attached based on the MISC1 and MISC2 values in the Client Benefit Tier choice list.
Benefits Jun-05
33 GRP_Benefits_8_Of_8_Open Enrolment- Enrollemnt Modifications Benefits Jun-05
34 Benefits- Enrollment Form- inc files Benefits Jul-05
35
Benefits - Enhancement 2005 - SRC Management, Inc. (srcmgmt) - Allow DOCUMENT link to be customized
Benefits Jul-05
36
Benefits - New Hire Enrollment - Superior - Delete button prompts -Do you want to Approve- Message
Benefits Jul-05
37
Benefits - Documentation Upload - All - Spaces are not allowed in path when uploading documents
Benefits Aug-05
38
GRP_Benefits_1_of_6_ Open Enrollment - Impinj - Allowing rejected forms to be resubmitted
Benefits Aug-05
Project Management Profile – Akash Dave
Page 4 of 91
39
GRP_Benefits_2_of_6_ Open Enrollment - All - Revamp Notes section on the Enrollment forms
Benefits Aug-05
40
GRP_Benefits_3_of_6_ Benefits - Enhancement 2005 - Generali Reassurance (generali) - Provide additional ways to restrict user changes to plans through Enrollment Changes Form
Benefits Aug-05
41 Benefits - Other - Impinj - Benefits Active List Benefits Aug-05
42
GRP_Benefits_6_of_6_Benefits - Other - PHD USA, Inc. (phdusa) - Per pay amount not showing up correctly on enrollment forms
Benefits Aug-05
43
GRP_Rajesh_1 of 1_Time Off - Time Off Entry - Check Balances are calculated properly when Time off setting is Based on Completed Time Sheet
Benefits Aug-05
44 Benefits - Beneficairies - Primary and Secondary Calculation Issue Benefits Sep-05
45
Benefits - Enrollment Options - 'I wish to decline...' option not dropping plans for Employees
Benefits Sep-05
46
live site bug - Benefits - Other - Penn Treaty Network America - providers dont come over in the export
Benefits Oct-05
47
Benefits - Carrier Interfaces - Arden Realty - Aetna Benefit export is not exporting couple of dependents information though they are attached to the Plan
Benefits Oct-05
48
Benefits - Plan Setup - Biomerieux, Inc. (bmx) - Eligibility Setup is causing server error because it includes too many departments
Benefits Nov-05
49
GRP_Nakul_1_of_2_Central Approval - All - Allow Admins to edit Enrollment forms during the approval process
Benefits Nov-05
50
GRP_Nakul_2_of_2_Benefits - Other - MarcUSA - Look at optimizing the enrollment completion pages
Benefits Nov-05
51
Live Site Issue-Benefits - Open Enrollment - MFCU (Mission Federal Credit Union) - Form saves wrong elections
Benefits Nov-05
52
Live Site BUG - Benefits - Open Enrollment - Summit Electric Supply - Benefits Dec-05
53 Benefits - Open Enrollment - enroll_edit.asp error Benefits Dec-05
54
Benefits - Open Enrollment - All - Give clients the option to display Cost Per Pay totals as 2 decimal places or 4 decimal places
Benefits Dec-05
55
Benefits - Open Enrollment - Cincinnati Lamb - Update Client Benefit Tiers level from 4 to 6
Benefits Dec-05
56
Benefits - Open Enrollment - Merrick and Company - Supplementel life and fringe plan coverage amount is displayed incorrectly on Open Enrollment Form
Benefits Dec-05
57
LIVE Site Issue - Benefits Enrollment Form - Biomerieux, Inc. (bmx) - Enrollment forms are not saving correctly for a specific type of change
Benefits Dec-05
58
Benefits - Benefit Emails - Merrick and Company - Wrong person is receiving an email notification upon submitting the benefit open enrollment form.
Benefits Jan-06
59
Benefits - Current Elections - Babb, Inc. (babb) - Dependent link not available for FSA plans
Benefits
Jun-06
60 Benefits- Public Storage- Create Benefit Interface for EBA&M Benefits Jun-06
61 Benefits- Public Storage- Create HMG Benefits Service Plan Benefits Jun-06
Project Management Profile – Akash Dave
Page 5 of 91
62 Benefits- Public Storage- Create benefit interface to Aetna dental plan
Benefits
Jun-06
63 Benefits- Public Storage- Create benefit interface for Blue Cross Corporate medical
Benefits
Jun-06
64 Benefits - Benefits - All - Live System Bugs Benefits Jun-06
65
Benefits - New Hire Enrollment - Hillcrest Bank - Declined Plan to be shown in the summary on the Confirmation Screen
Benefits
Jun-06
66 Benefits - Calc/Recalc - Public Storage - The Benefits Calc and Recalc needs to be redesigned and optimized for Large clients Benefits Dec-06
67 Benefits - Central Approval - People's Bank - Benefits Dec-06
68 Benefits - Other - All - Save button on the Enorollment form not working correctly Benefits Dec-06
69 live site bug - Benefits - Other - Public Storage - can not delete a plan once you have added it to the system. Benefits Dec-06
70
Live Site issue- Benefits - Open Enrollment - University Physicians, Inc. (upi) - Client Benefit Tier for Employee coverage can not be set.
Benefits
May-07
71
Benefits - Current Elections - People's Bank - change coverage level validation on HRPEB import format
Benefits
May-07
72
live site bug - Benefits - Available Choices - Biomerieux, Inc. (bmx) - life plans are not rounding correctly
Benefits
May-07
73
Benefits - Open Enrollment - Biomerieux, Inc. (bmx) - enrollment end date has to be the next days date you wish the form to be available
Benefits
May-07
74
Live Site Issue -Benefits - Manager - Sunsource - Employee name filter is not getting applied.
Benefits
May-07
75
GRP_Dependent Beneficiaries Screen 1 of 2 -HR+ - Customization Manager - People's Bank - Dependent Beneficiaries Screen
Benefits
May-07
76
Benefits - Master Screen - Public Storage - No way to add PCP for dependents in benefit master
Benefits
May-07
77
live site bug - Benefits - Other - Public Storage - life plans not rounding Benefits
May-07
78
Benefits - Enrollment - People's Bank - Student Status not pulling from Choice list on Enrollment Dependent screen
Benefits
Aug-07
79
Benefits - New Hire Enrollment - Hillcrest Bank - Declined Plan to be shown in the summary on the Confirmation Screen
Benefits
Aug-07
80
live site bug -Benefits - Available Choices - Public Storage - benefits manager not displaying employee name and causing error
Benefits
Dec-07
81
live site bug - Benefits - Open Enrollment - Boon Group, The - employee per pay amount is wrong on OE form for employees current plans
Benefits
Dec-07
82
Live site issue -Benefits - Open Enrollment - BSN-Jobst - Open Enrollment forms for I do not wish to change the current enrollment within this group, cannot go to confirmation page because Dependents got delinked.
Benefits
Dec-07
Project Management Profile – Akash Dave
Page 6 of 91
83
live site bug - Benefits - Master Screen - Public Storage - not able to add a dependent/beneficiary if there are no dependents attached
Benefits
Dec-07
84
live site bug - Benefits - Master Screen - Mascoma Savings Bank - FSA plans edited in master ignore fixed amounts and only use pay cycle
Benefits
Dec-07
85
live site bug - Benefits - Other - Public Storage - benefits are ending for employees who choose more than one benefit of the same type even though they are not in the same group.
Benefits
Dec-07
86
Benefits - Enrollment Changes - People's United Bank - Incorrect Effective Date when employee does a Gain of spouse
Benefits
Dec-07
87
live site bug - Benefits - Other - Biomerieux, Inc. (bmx) - Benefit Exports for Enterprise do not include dropped plans only current
Benefits
Dec-07
88
Benefits - Active List - People's Bank - Saved Forms do not display any data Benefits
Dec-07
89 Benefits - Benefits+ 2007 (Includes 5 Enhancements) Benefits Mar-08
90 Benefits - Other - People's United Bank - Relation drop down menu is not wide enough
for some client's choice list items Benefits Mar-08
91
Rewrite CA Setup Approvers and Approve and Route Pages to .NET Central Approval
Feb-07
92
Maintenance - Approval Setup - Union Labor Life Insurance Company (ullico) - Allow an Employee filter option for Approval Setup
Central Approval
Feb-07
93
Maintenance - Approval Setup - Public Storage - Phase II of New Security Role - Allow roles to be configured differently in Central Approval Setup
Central Approval
Feb-07
94
Documentation - User Guides - Make user guides page database driven Documentation
Jan-05
95
Documentation - User Guides - - Uploading User Guides on Live Documentation
Jan-05
96
Documentation - User Guides - All - Add the eSource Data Transfer Guide to Guides Download page
Documentation May-05
97
Documentation - Page-Level Help - - Project Timesheet and Scheduling Documentation Jun-05
98
Documentation - User Guides - All - Fix the broken links on the Guides upload page Documentation Jul-05
99
Documentation - User Guides - Atlantic Container Line - Documentation Jul-05
100
GRP_Abhishek_1_Of_2_Manager Filter builder bug Documentation Jul-05
101
Documentation - Page-Level Help - all - All of the Help Pages are broken Documentation Aug-05
102
Documentation - User Guides - All - Fix the broken links on the Guides upload page Documentation Oct-05
103
Documentation - User Guides - All - Fix the broken links on the Guides upload page Documentation Dec-05
Project Management Profile – Akash Dave
Page 7 of 91
104
Documentation - User Guides - All - Uploading guides on live is not uploading to the right place
Documentation Dec-05
105
Documentation - User Guides - Make user guides page database driven Documentation Jan-06
106
Documentation - User Guides - All - Uploading guides on live is not uploading to the right place
Documentation
Jun-06
107 Expense - All - Bug fixes Expense May-07
108
Expense - Live site bugs - When a user changes the tracking fields values and Saves/Submits an Expense request it does not retain the tracking fields.
Expense
Dec-07
109 Expense - - All - Major enhancements Expense Dec-07
110 Expenses Expense Jan-06
111 Expenses - Expenses Reports - All - Create Expenses Reports Expense Jun-06
112 Expenses - Convert to SOA Expense Aug-07
113
Live site Bug - HR+ - Other - Penn Treaty Network America - dependents are not getting deleted HR+ Jan-05
114 HR+ - Other - Craford Benefits Consultants - W4 and I9 creation HR+ Jan-05
115
HR+ Exports - Ceridian Benefits - Craford Benefits Consultants - Create export for Ceridian benefits format
HR+
Jan-05
116 HR+ Exports - Evolution - Bangor Savings Bank HR+ Jan-05
117
Live Site Issue -- HR+ - Employee Self-Service - WorldTravel - Duplicate Tax change request in Manager's Inbox.
HR+
Jan-05
118
HR+ Exports - Other HTE Sungard - City of Alpharetta - interface with HTE Payroll. HR+
Jan-05
119
HR+ - HR Imports - Penn Treaty Network America - ESourceFLSA file will not upload HR+
Jan-05
120
Live Site issue -HR+ - Employee Self-Service - Nixon Peabody - Pay Grade value not displayed
HR+
Jan-05
121
Live Site Issue-HR+ - Employee Self-Service - MSU Federal Credit Union (msufcu)- Submit request on the tax page generates 2 in-box entries
HR+
Jan-05
122
HR+ - Employee Self-Service - All - Issues with HR+ when using Firefox HR+
Jan-05
123
HR+ - Other - Bass Security Services, Inc. - filters dont save when you edit a HR change HR+
Jan-05
124 HR+ - Other - All - Resolve database key conflict HR+ Jan-05
125 HR+ - Other - Increase timeouts on employee deletion page. HR+ Jan-05
126
HR+ - Other - Dura Automotive - zip code does not work for Canadian postal codes HR+
Jan-05
127 HR+ - W2 - March Of Dimes (MOD) - W2's appearing out of order HR+ Jan-05
128 HR+ - Other - All - Resolve data type issue HR+ Jan-05
129
HR+ - Self-Service - WorldTravel - Tax Screen -Sate Status Choice Lists HR+
Jan-05
130
GRP_2 of 4_Rajesh_HR+ - New Hire Wizard - All - put an edit button on the new hire confirmation screen
HR+
Jan-05
Project Management Profile – Akash Dave
Page 8 of 91
131
HR+ - Central Approval - Kurt Salmon Associates (ksa) - Display the Changes in Bold for Administrators
HR+
Jan-05
132 HR+ - Employee List - Mac Compatibility HR+ Jan-05
133
HR+ - New Hire Wizard - WCA Waste Corporation - Duplicate SSN Error Message HR+
Jan-05
134 LIVE SITE BUG - HR+ - Termination Wizard - All - HR+ Jan-05
135
LIVE Site Bug - HR+ - Employee Number Setup - Magna HR, Inc. (magna) - Employee number reset not working
HR+
Jan-05
136 HR+ - HR+ - All - Live System Bug HR+ Jan-05
137 HR+ - All - All - HR+ improvements HR+ Jan-05
138
GRP_SAN_HR+OPTIMIZE 1 of 3: Put an edit button on change screen HR+ May-05
139
HR+ - HR+ Emails - MSU Federal Credit Union (msufcu) - HR+ email is being sent when it shouldn't be
HR+ May-05
140 HR+ - New Hire Wizard - oi1Numeric5 Error HR+ May-05
141
HR+ - New Hire Wizard - Magna HR, Inc. (magna) - Unable to add BANK data in the New Hire Wizard
HR+ May-05
142
HR+ - Other - Homestreet Bank - FLSA status displays value and not discription on the HR record
HR+ May-05
143 GRP_SAN_HR+ 2 of 2 : Put an edit button on change screen HR+ Jun-05
144
GRP_SAN_HR6++OPTIMIZE 1 of 3 : Country Bank - Optimization of History Pages HR+ Jun-05
145
HR+ - Other - Magna HR, Inc. (magna) - Display issues for various Magna clients HR+ Jun-05
146 HR+ - Print Confirmations - Steptoe & Johnson - Add indicator HR+ Jun-05
147 Need a way to refesh the ORG chart HR+ Jun-05
148
HR+ - Employee Number Setup - Genesis Financial Solutions - emp number drops the zeros when you go to edit record
HR+ Jul-05
149
HR+ - Manager Self-Service - Escambia County Tax Collector's Office - Compensation not calculating like it used to
HR+ Jul-05
150 HR+ : Put an edit button on change screen HR+ Jul-05
151
HR+ - New Hire Wizard - Amherst - Server Error when Admin goes to complete the New Hire form submitted by a manager
HR+ Jul-05
152
LIVE Site Bug - HR+ - Manager Self-Service - Employee Number is duplicated on employment screen -
HR+ Aug-05
153
HR+ - Central Approval - Amherst - Approves and Routes a change even if no approver is selected
HR+ Aug-05
154
HR+ - Other - Spectra International (spectra / spectracorp) - YTD data is not being included in Paystub imports
HR+ Aug-05
155
LIVE Site Bug - HR+ - Manager Self-Service - Employee Number is duplicated on employment screen -
HR+ Aug-05
156
LIVE Site Bug - HR+ - Manager Self-Service - Employee Number is duplicated on employment screen -
HR+ Aug-05
157
HR+ - Other - Selective HR Solutions, Inc. (selective) - Newly created companies have problems with HR+ Module
HR+ Aug-05
Project Management Profile – Akash Dave
Page 9 of 91
158
HR+ - Manager Self-Service - PowerPay - Emergency Contact info won't save HR+ Aug-05
159
HR+ - Employee Self-Service - WCA - State Status is not accurately reflected for Missouri
HR+ Aug-05
160
HR+ - Self-Service - World Travel - Bank EFT Screen - mask the account number field HR+ Oct-05
161
Live Site Issue - HR+ - Employee Self-Service - World Travel - Managers cannot access self service
HR+ Oct-05
162 HR+ - HR Imports - duplicate record is created in oHRCurrent HR+ Oct-05
163 HR+ Exports - ADP Pay Expert - Amherst Technologies - HR+ Oct-05
164
LIVE Site Issue - Choice Lists - PowerPay - EEO Job Class information in Self Service area is not reported properly
HR+ Oct-05
165
HR+ - New Hire Wizard - WCA Waste Corporation - User Email Issue HR+ Nov-05
166 HR+ - W2s - All Direct - Import format for W2s for direct clients HR+ Nov-05
167
HR+ - Self-Service - World Travel - Bank EFT Screen - mask the account number field HR+ Nov-05
168
Live Site Bug : HR+ - New Hire Wizard - aaae - possible error saving new hires with alpha numeric employee numbers
HR+ Nov-05
169
LIve Site Issue-HR+ - Customization Manager - Nixon Peabody - Use Advanced Access Settings , disables Manager from Employee screen views
HR+ Dec-05
170
LIVE Site Bug - HR+ - New Hire Wizard - Urbanland - Employee number no longer allowing dashes
HR+ Dec-05
171
live site bug- Time Off - Balance Entry - Kranson HR/PR/ESS/RSI - changing balances is erroring page
HR+ Dec-05
172
Live Site Bug : HR+ - New Hire Wizard - aaae - possible error saving new hires with alpha numeric employee numbers
HR+ Dec-05
173
GRP_1 of 5_Rajesh_HR+ - New Hire Wizard - WCA Waste Corporation - Form should be able to be edited and the reject button should not be on the approval form
HR+ Jan-06
174
GRP_2 of 5_Rajesh_HR+ - New Hire Wizard - All - put an edit button on the new hire confirmation screen
HR+ Jan-06
175
GRP_3 of 6_Rajesh_HR+ - New Hire Wizard - WCA Waste Corporation - Duplicate SSN Error Message
HR+ Jan-06
176
GRP_5 of 5_Rajesh_HR+ - New Hire Wizard - All - Have an option to send an email notification to the new hire
HR+ Jan-06
177
HR+ - Customization Manager - Amherst Technologies - Subcompany is not displaying even though it is enabled in customization
HR+ Jan-06
178
HR+ Exports - ADP Pay Expert - Amherst Technologies - Benefit Export is not creating the file in the proper order
HR+ Jan-06
179
HR+ - Other - Bass Security Services, Inc. - filters dont save when you edit a HR change HR+ Jan-06
180
HR+ - Re-Hire Wizard - WCA Waste Corporation - ADP Change Company Process HR+ Jan-06
181 HR+ - W2 - March Of Dimes (MOD) - W2's appearing out of order HR+ Jan-06
Project Management Profile – Akash Dave
Page 10 of 91
182
Live site Bug - HR+ - Other - Penn Treaty Network America - dependents are not getting deleted
HR+ Jan-06
183
Live Site Issue : HR+ - Other - Vesta, Inc. - misc choice list for employement do not work
HR+ Jan-06
184
Live Site Bug : HR+ - New Hire Wizard - Vesta, Inc. - other info 2 choice lists are showing other info 1 choice lists
HR+ Jan-06
185
Live site bug - Reports (General) - Other - Selective HR Solutions, Inc. (selective) - Column names to be rectified in Reports
HR+ Jan-06
186 HR+ - Employee List - Mac Compatibility HR+ Feb-06
187
HR+ - Employee Self-Service - All - Issues with HR+ when using Firefox HR+ Feb-06
188 HR+ - Other - Increase timeouts on employee deletion page. HR+ Feb-06
189 HR+ - Other - All - Resolve data type issue HR+ Feb-06
190 HR+ - Other - All - Resolve database key conflict HR+ Feb-06
191 LIVE SITE BUG - HR+ - Termination Wizard - All - HR+ Feb-06
192
Live Site Issue : HR+ - EFT Setup - phdusa - Null Routing Number Makes Bank Page Uneditable
HR+ Feb-06
193
GRP_2 of 3_Rajesh_HR+ - New Hire Wizard - All - put an edit button on the new hire confirmation screen
HR+
Jun-06
194 Live Site Bug: HR+ - Employee Self-Service - Cochlear HR+ Jun-06
195 HR+ - Employee List - Mac Compatibility HR+ Jun-06
196
GRP_3 of 3_Rajesh_HR+ - New Hire Wizard - All - Have an option to send an email notification to the new hire
HR+
Jun-06
197 HR+ - HR+ - All - Live System Bug HR+ Jun-06
198 HR+ - Other - All - Resolve database key conflict HR+ Jun-06
199
live site bug - HR+ Exports - Source 500 - Penn Treaty Network America - gender not passed in export for contacts
HR+
Jun-06
200 GRP_2 of 3_Rajesh_HR+ - New Hire Wizard - All - put an edit button on the new hire
confirmation screen
HR+
Jun-06
201 GRP_1 of 3_Rajesh_HR+ - New Hire Wizard - WCA Waste Corporation - New Hire
Form, Term Form, and Rehire Form should be able to be edited during approval
HR+
Jun-06
202 HR+ - Central Approval Setup - Public Storage - New Hire Wizard is its own approval
type but does not appear in central approval set-up and central approval in-box.
HR+
Jun-06
203 HR+ - New Hire Wizard - LTS - Add Misc fields to the New Hire Wizard
HR+
Jun-06
204
HR+ - Other - Public Storage - Misc fields in the Job, Comp, and Employment panel do not write to History
HR+
Jun-06
205 Live Site Bug : HR+ - New Hire Wizard - Vesta, Inc. - other info 2 choice lists are
showing other info 1 choice lists
HR+
Jun-06
206 HR+ - New Hire Wizard - Public Storage - Rejected New Hire, Term, and Rehire
Transactions are lost in the system
HR+
Jun-06
207 GRP_3 of 3_Rajesh_HR+ - New Hire Wizard - All - Have an option to send an email
notification to the new hire
HR+
Jun-06
208 HR+ - Other - Public Storage - Other Info 1 and Other Info 2 do not write to history
HR+
Jun-06
Project Management Profile – Akash Dave
Page 11 of 91
209
HR+ - Employee Self-Service - TSJ Group, The (tsj) - Employment Confirmation Screen does not show all the fields
HR+
Jun-06
210
GRP_1 of 3_Rajesh_HR+ - New Hire Wizard - WCA Waste Corporation - Form should be able to be edited and the reject button should not be on the approval form
HR+
Jun-06
211
HR+ - New Hire Wizard - LTS - Add Misc fields to the New Hire Wizard HR+
Jun-06
212 HR+ Exports - Deltek - LTS - HR Import for Deltek HR+ Jun-06
213
HR+ - Manager Self-Service - Magna HR, Inc. (magna) - Change Default option for Federal Pension field
HR+
Jun-06
214 HR+ - Termination Wizard - Public Storage - Termination Wizard – can we add SubCompany and Department to the wizard? HR+ Dec-06
215 HR+ - New Hire Wizard - WCA Waste Corporation - Multi-user New Hire Wizard Issue HR+ Dec-06
216 HR+ Exports - Millennium - Boon Group, The - need export for EFT HR+ Dec-06
217 HR+ - Termination Wizard - Public Storage - The effective date should be the term date not the last change date. HR+ Dec-06
218
Live Sute Bug - HR+ - Employee Self-Service - Agilysys - System Gives an Error Message While trying to Complete HR Payroll Changes Request
HR+ Feb-07
219
Benefits - Plan Configuration - Agilysys - Greater Font control required HR+ Feb-07
220
Benefits - Other - OwnIt Mortgage - employees are able to attach dependents to an employee only plan
HR+ Feb-07
221
HR+ - New Hire Wizard - WCA Waste Corporation - Multi-user New Hire Wizard Issue
HR+ Feb-07
222
HR+ - Termination Wizard - Public Storage - enhancements to the term wizard HR+ Feb-07
223
HR+ - New Hire Wizard - Public Storage - validate employee number against any new hire status not just employees in master table
HR+ Feb-07
224
HR+ - Other - Public Storage - Need to be able to insert rows into history HR+ Feb-07
225 Benefits - Master Screen - Public Storage - Not able to edit history HR+ Feb-07
226
HR+ - Other - Public Storage - show the old record and the new record when approving HR changes
HR+ Feb-07
227
HR+ - Other - Public Storage - Job Code should be tied to Pay Grade, EEO, FLSA and Worker’s Comp numbers rather than it be free flow selections
HR+ Feb-07
228 live site bug - HR+ - Manager Self-Service - dupplicating data HR+ Feb-07
229
Live Site Issue- Benefits - Open Enrollment - MPG - Saved form has issue. HR+ Feb-07
230
Live Site Issue HR+ - New Hire Wizard - Adtran - Client Defined USER ID is not accepted by New Hire Wizard
HR+ Feb-07
231
Benefits - New Hire Enrollment - Hillcrest Bank - Declined Plan to be shown in the summary on the Confirmation Screen
HR+ Feb-07
Project Management Profile – Akash Dave
Page 12 of 91
232 HR+ - W2 - Heineken USA - Uploading w-2 for Heineken. HR+ Feb-07
233
HR+ - Other - Public Storage - Job Code should be tied to Pay Grade, EEO, FLSA and Worker’s Comp numbers rather than it be free flow selections
HR+
May-07
234
HR+ - Other - Public Storage - show the old record and the new record when approving HR changes
HR+
May-07
235
LiveSite - HR+ - Termination Wizard - GINNE-Goodwill Industries of Northern New England - When the last name is entered and the filter is clicked the list of employees loades from A.
HR+
May-07
236
HR+ - New Hire Wizard - Position Control; populating HR fields based on other fields HR+
May-07
237
HR+ - Re-Hire Wizard - Public Storage - rehire wizard should have all fields that new hire wizard has
HR+
May-07
238
HR+ - Other - Public Storage - Need to be able to insert rows into history HR+
May-07
239
HR+ - New Hire Wizard - Moody Insurance Agency Inc - W4 date is still 2006. Needs to be changed to 2007
HR+
May-07
240
HR+ - Employee Number Setup - Public Storage - alteration of the employee number automation logic
HR+
May-07
241 HR+ - Other - All - Allow mass-edit of Supervisor in HR Record HR+ May-07
242 HR+ - Other - Public Storage - Need HR active list HR+ May-07
243
HR+ - New Hire Wizard - Public Storage - validate employee number against any new hire status not just employees in master table
HR+
May-07
244
HR+ - HR Imports - Public Storage - need import format for our misc fields in HR HR+
Aug-07
245
HR+ - W2 - Real Networks -Live Site issue : W2s are not working on MAC HR+
Aug-07
246
HR+ Exports - Other - Bangor Savings Bank - HR+ export to be changed to incorporate Evolution upgrade
HR+
Aug-07
247
Live Site Issue - HR+ - Payroll Changes - Agilysys - iEmployee message is Hardcoded and causes confusion.
HR+
Aug-07
248 HR+ Exports - Other - Evolution - Salary Planning HR+ Aug-07
249
HR+ - Other - Public Storage - Misc fields in the Job, Comp, and Employment panel do not write to History
HR+
Aug-07
250
HR+ - Termination Wizard - Public Storage - The effective date should be the term date not the last change date.
HR+
Dec-07
251
LIVE Site Issue - HR+ Exports - Deleting Records - People's United Bank - deleting more than 1 record in the list gives an error
HR+
Dec-07
252
Live Site Issue - HR+ - Payroll Changes - Agilysys - iEmployee message is Hardcoded and causes confusion.
HR+
Dec-07
253
Live Site Issue -- HR+ - Employee Self-Service - WorldTravel - Duplicate Tax change request in Manager's Inbox.
HR+
Dec-07
254
Live Site issue - HR+ - Central Approval - Agilysys - SSN is visible for Managers when employee request is available for approval
HR+
Dec-07
255 HR+ - W2 - Blk12 information needs to be displayed HR+ Dec-07
Project Management Profile – Akash Dave
Page 13 of 91
256
HR+ - Central Approval - Agilysys - Manager created Job request generates data which is visible by Employees
HR+
Dec-07
257 HR+ - Schedule Bonus Screen - Target Amount and Awarded Amount should not get
rounded HR+ Mar-08
258 HR+ - other - Readers' Digest - The Supervisor drop-down list on HR+ >> Job
Information screen does not show middle name initial HR+ Mar-08
259 HR+ - EFT Setup - People's United Bank - Comma gets dropped from HR+ Bank EFT
Screen after the Approval HR+ Mar-08
260 HR+ - Employee Self-Service - People's Bank - Seperate Choice Lists for Dependents
and Emergency Contacts Relation HR+ Mar-08
261 HR+ - Re-Hire Wizard - Public Storage - Enhancement on Termination and Rehire
Wizard HR+ Mar-08
262 HR+ - Other - Public Storage - Issue with employees switching sub companies for ADP
clients HR+ Mar-08
263
GRP_1_OF_3_Jignesh_Abhishek_Timesheets - iClock Time Entry - All - Issue with Iclock Validation
iClock Feb-07
264
Timesheet Exports - Ultipro - Community Care Organization Inc. - New UltiPro Timesheet export format required Interface Jan-05
265
Timesheet Exports - DELTEK - LTS - Create Deltek timesheet export
Interface Jan-05
266
Selective HR Solutions, Inc. (selective) – Creating new import format to import Multiple Pay Rates into iEmployee Interface Jan-05
267
Pay Stubs - ADP PCPW Pay Stubs - Bass Security Services, Inc. - Fixing columns on ADP paystubs Interface Jan-05
268
Timesheets - Punch Imports - All - Punch imports need to be updated to use new tables in iClock+
Interface
Jan-05
269 Benefits - Carrier Interfaces - OwnIt Mortgage - BCBS Interface Jan-05
270 Pay Stubs - interface - ComData - Create web services interface Interface Jan-05
271
Timesheet Exports - ADP PCPW - Microsoft Licensing GP - Auto-decrement breaks down when PTO exceeds entered total
Interface
Jan-05
272
Timesheet Exports - Source Daily - VNHS - Tracking Field Allocations are not being brought over when using auto-decrement feature
Interface
Jan-05
273
Live site issue -- DTW - Other - WorldTravel - Rehire email not working. Interface
Jan-05
274
Interface - Paystubs Interface - ComData - Need to create a new Paystubs screen Interface
Jan-05
275
Timesheet Exports - Cyborg - Dura Automotive - Modify the Cyborg+ tiem export for Dura's use
Interface
Jan-05
276
Timesheet Exports - ADP PCPW - WCA Waste Corporation - Add Ability to Export Earnings on a Timesheet even if there are no hours
Interface
Jan-05
277
Live Site Bug: Timesheet Exports - Liberty Plus- Twin Counties Credit Union - Interface
Jan-05
Project Management Profile – Akash Dave
Page 14 of 91
278
LIVE Site Issue - Bank EFT Export - Washington Trust (wtc) - Bank EFT Export has begun sending over NULL values that cause problems in Source
Interface
Jan-05
279
Timesheet Exports - ADP Pay Expert - Add Deduction mapping to the Export file Interface
Jan-05
280
Timesheet Exports - Liberty - American Association Of Airport Executives (AAAE) - Timesheet for only 2 employees were partially exported.
Interface
Jan-05
281 Pay Stubs - Pay Plus+ - Payplus - Issue with Revesal of check Interface Jan-05
282 GRP_SAN_DTW: Software Monitor for Source Queue Interface Jan-05
283
Timesheet Exports - Source 500 - PCHI - export needs to concatenate tracking fields Interface
Jan-05
284
GRP_3 of 4_Rajesh_LIVE Site Issue - New Hire Wizard - Magna HR, Inc. (magna) - Bank EFT, Tax, and Compensation pages not updating with New Hire Wizard data
Interface
Jan-05
285
GRP_1 of 4_Rajesh_HR+ - New Hire Wizard - WCA Waste Corporation - Form should be able to be edited and the reject button should not be on the approval form
Interface
Jan-05
286
GRP_4 of 4_Rajesh_HR+ - New Hire Wizard - All - Have an option to send an email notification to the new hire
Interface
Jan-05
287
Pay Stubs - ADP PAyExpert Paystub - Amherst Technologies - Enhancement Adding Memo's display
Interface
Jan-05
288
Pay Stubs - Source 500 Pay Stubs - MSU Federal Credit Union (msufcu) - Local Tax amount not showing on online pay stub
Interface
Jan-05
289
HR+ Exports - Source 500 - Springer Verlag (springer) - Bank EFT export not updating Source properly
Interface
Jan-05
290
Maintenance - Import File - All Seasons - New Timeclock Allocation Import File clears out data if no information is populated in that field
Interface
Jan-05
291
GRP_SAN_IMP: Import Engine Enhancement - Import Engine Enhancement Interface
Jan-05
292
Import Engine - Fix infinite loop that occurrs when certain errors arise Interface
Jan-05
293
Implementation - Other - Import Format for Logins & Passwords not restricted if passwords hidden to admins
Interface
Jan-05
294
Pay Stubs - Check Detail/Pay Stub Setup - All - Check Options should apply to ADP Pay
Interface
Jan-05
295
Benefits - Carrier Interfaces - Kodak Polychrome Graphics (KPG) - Export reports Interface
Jan-05
296
Timesheet Exports - Other - Microsoft Licensing GP - report needed for the custom export for them
Interface
Jan-05
297 GRP_INTF_Sarika_1_Of_2_Benefits - Carrier Interfaces - WCA Waste Corporation - Guardian Life – Dental Interface Dec-06
298 GRP_Sarika_PS_3_Of_3_Benefits - - Public Storage - Create benefits interface to Aetna dental plan Interface Dec-06
299 GRP_Sarika_PS_2_Of_3_Benefits - - Public Storage - Create HMG Benefits Service Plan Interface Dec-06
Project Management Profile – Akash Dave
Page 15 of 91
300 GRP_Sarika_PS_1_Of_3_Benefits - - Public Storage - Create benefits interface for VSP Vision Plan Interface Dec-06
301 Benefits - Carrier Interfaces - Arden Realty - Conexis Interface Dec-06
302 GRP_INTF_Sarika_2_Of_2_Benefits - Carrier Interfaces - WCA Waste Corporation - Great West Healthcare – Medical Interface Dec-06
303 Interface - Import - People's Bank - Automation of import of file from Cyborg to iEmployee Interface Dec-06
304 Live site bug- Timesheet Exports - Source 500 - Issues with Source 500 Export Interface Dec-06
305 Timesheet Exports - Oasis - Broadstar - previous export does not show time date stamp Interface Dec-06
306 Benefits - Carrier Interfaces - Arden Realty - Cigna (medical information) Interface Dec-06
307 LIVE Site Issue - Pay Stubs - Covenant Pay Stubs - Covenant Healthcare - Rounding on Current Hours Total incorrect Interface Dec-06
308 Timesheet Exports - Source Daily - All - Change Source Daily Export to .net Interface Dec-06
309 Benefits - Carrier Interfaces - OwnIt Mortgage - client needs changes made to ASHN benefit Interface Dec-06
310 live site bug - Benefits - Other - OwnIt Mortgage - BCBS carrier interface not bringing over dependants PCP Interface Dec-06
311 Timesheet Exports - ADP PCPW - OwnIt Mortgage - issues with exporting for employees with standard hours per pay Interface Dec-06
312 Benefits - Import Formats - People's Bank - Creation of Benefits Import formats for Available Choices, Plans & Providers Interface Dec-06
313 Pay Stubs - Other - Boon Group, The - Interface Feb-07
314
HR+ Exports - Millennium - Boon Group, The - need export for EFT Interface Feb-07
315
Payroll - Other - Spectra International - Payroll Module is not working Interface Feb-07
316
Timesheet Exports - Other - Shastique, Inc. - Add earnings to Nolapro timesheet export. Interface Feb-07
317
Live site bug : Timesheet Reports - Other - Escambia County Tax Collector’s Office - Issue with Exported Timesheet Fundware Batches Report for Escambia
Interface Feb-07
318 Benefits - Carrier Interfaces - Arden Realty - Conexis Interface Feb-07
319
Benefits - Carrier Interfaces - Arden Realty - Cigna (medical information) Interface Feb-07
320 Benefits - Carrier Interfaces - Anadigics - Interface Feb-07
321
Pay Stubs - ADP PayExpert - Paragon Development Systems - YTD required in the Paystubs
Interface Feb-07
322
Live Site Bug - Maintenance - Export Changes - Agilysys - System gives an error message while downloading large data
Interface Feb-07
323
Live Site Bug - Maintenance - Pay Stub E-Mail Notification - Agilysys - Pay stub E-mail Notification does not Function they way it should.
Interface Feb-07
Project Management Profile – Akash Dave
Page 16 of 91
324
DTW - Advanced Export Options - Agilysys - Can DTW be programmed to run by itself if used with schedular
Interface Feb-07
325
HR+ Exports - Other - Bangor Savings Bank - HR+ export to be changed to incorporate Evolution upgrade
Interface Feb-07
326
GRP_HIREN_2_OF_2_LIVE Site Bug - Pay Stubs - Covenant Pay Stubs - Covenant Healthcare - YTD Earnings in summary is rounding incorrectly
Interface Feb-07
327
GRP_HIREN_1_OF_2_LIVE Site Issue - Pay Stubs - Covenant Pay Stubs - Covenant Healthcare - Rounding on Current Hours Total incorrect
Interface Feb-07
328
Pay Stubs - Custom Pay Stubs - Covenant Healthcare - The header info on custom section inconsistent with other headers
Interface Feb-07
329
Benefits - Carrier Interfaces - WCA Waste Corporation - Great West Healthcare – Medical
Interface Feb-07
330
Benefits - Import Formats - People's Bank - Creation of Benefits Import formats for Available Choices, Plans & Providers
Interface Feb-07
331
Benefits Exports - Cyborg Interface - People's Bank - Export of Benefits Data from iEmployee to Cyborg
Interface Feb-07
332
Interface - Import - People's Bank - Automation of import of file from Cyborg to iEmployee
Interface Feb-07
333
HR+ Exports - Cyborg Interface - People's Bank - Export of HR Data from iEmployee to Cyborg
Interface Feb-07
334
Benefits - - Public Storage - Create benefits interface for Blue Cross Corporate Medical Interface Feb-07
335 Benefit Reports - Other - Public Storage - Great West carrier feed Interface Feb-07
336
Benefits - Other - Public Storage - Add like deductions in the benefits export Interface Feb-07
337
GRP_Sarika_PS_3_Of_3_Benefits - - Public Storage - Create benefits interface to Aetna dental plan
Interface Feb-07
338
GRP_Sarika_PS_1_Of_3_Benefits - - Public Storage - Create benefits interface for VSP Vision Plan
Interface Feb-07
339
GRP_HIREN_1_OF_2_Maintenance - Import Engine Enhancement - File Conversion capability
Interface Feb-07
340
live site bug - Timesheet Exports - ADP PCPW - Microsoft Licensing GP - hours in batch are not correct
Interface Feb-07
341
GRP_3_Of_3_JigneshAbhishek_Timesheets - Other - Valencia - San Jose - Timesheets - Import Punch Validation not working properly
Interface Feb-07
342
Live Site Bug :Timesheet Exports - Other - Macdonald Training Centers - Last record in export file incorrect
Interface Feb-07
343 Pay Stubs - Other - Comdata- Crown Services - Interface Feb-07
344
Live Site issue- DTW - Import data update - Nixon Peabody - Terminated employee emergency contact information not deleted
Interface Feb-07
345
Live Site Issue-Salary Planning - Salary Planning Entry - Nixon Peabody - Review rating is not exported.
Interface Feb-07
346
Timesheet Exports - Paychex - 1st Advantage - add earnings functionality to Paychex+ timesheet export
Interface Feb-07
Project Management Profile – Akash Dave
Page 17 of 91
347
Live Site Issue- Maintenance - Import File - File name more than 50 characters Interface Feb-07
348 Timesheet Exports - Other - Vantage - TurboCare - Interface Feb-07
349
Live Site Bug - Timesheet Exports - Other - Firstrust Bank - Auto Decrement Feature not working with Source 500 Export
Interface Feb-07
350
GRP_2_Of_3_JigneshAbhishek_Timesheets - iClock Time Entry - All - Issue with punch Import clock Validation
Interface Feb-07
351
Live Site Bug: Timesheet Exports - Ultipro - Mortgage Lenders Network USA - The page times out when clicking on - Create File. Also mutiple batches with the same information are created
Interface Feb-07
352
Timesheet Exports - Peoplesoft - Turbocare - New Timesheet data export Interface Feb-07
353
Live Site DTW - Other - Health Plan of San Mateo - Auto Assign Clock Number From Source As Username to New Hire.Dosent work
Interface Feb-07
354
Live Site Issue- Salary Planning - Export - Nixon Peabody - Review rating export dates are incorrect
Interface
May-07
355
HR+ - W2 - Covenant Healthcare - new W2 import template based on file generated for Federal Government
Interface
May-07
356 Timesheet Exports - Other - Vantage - TurboCare - Interface May-07
357
Live Site issue- Benefit Reports - Carrier Cigna Report - Anadigics - Export file updates are incorrect if employee work and home states are different
Interface
May-07
358
Benefits - Cyborg Interface - People's Bank - Beneficiary Export modification and incorporating dropped Beneficiaries information
Interface
May-07
359
Training+ - Training+ Imports - All - Modify Training+ Import formats for new Training+ module
Interface
May-07
360
Pay Stubs - Rounding on FIT Taxable Wages is incorrect by one cent for over 100k employees - People's Bank -
Interface
May-07
361
HR+ - HR Imports - Public Storage - need import format for other info 1 and 2 history Interface
May-07
362
Pay Stubs - Other - Dura Automotive - Take out the calculations on paystub and pass everything from file
Interface
May-07
363
Salary Planning - Total Eligible Award Field - Bangor Savings Bank - create an import format to import total eligible award field info in the salary planning form
Interface
May-07
364
Pay Stubs - Other - SkillsNet - QuickBook Enterprise Pay Stubs Import format needs to be buillt for iEmployee
Interface
May-07
365 Benefits - Carrier Interfaces - Arden Realty - Conexis Interface May-07
366
Pay Stubs - ADP PCPW Pay Stubs - Vercuity - Adding fields on Paystub. Interface
May-07
367 HR+ Exports - Other - Evolution - Salary Planning Interface May-07
368
Live Site Issue-Salary Planning - Export - Nixon Peabody - Export prints it as Basic Interface
May-07
369
HR+ Exports - Other - Bangor Savings Bank - HR+ export to be changed to incorporate Evolution upgrade
Interface
May-07
Project Management Profile – Akash Dave
Page 18 of 91
370
Live site issue -- Timesheet Exports - Source 500 - Healthquest Central Jersey Llc - Additional rates are not exported from iEmployee.
Interface
May-07
371
Pay Stubs - ADP PayExpert Macro- Wide Open West Finance (wow) - Paystub file is not generating properly
Interface
May-07
372
Pay Stubs - eSource Paystub Format - Penn Treaty Network America - Interface
Aug-07
373
DTW - Checks/Paystub Export - Purdue Pharma LP - Export not picking up the first position for Federal Tax Adjust field and the State Tax adjust field.
Interface
Aug-07
374
Timesheet Exports - Other - Columbus Metropolitan Library - New Interface Interface
Aug-07
375
DTW - Advanced Export Options - Agilysys - Can DTW be programmed to run by itself if used with schedular
Interface
Aug-07
376
Live Site issue- Timesheets - Export - Ciba Specialty Chemicals - Timesheet export times out many times,
Interface
Aug-07
377 Pay Stubs - Other - WSOS - Require New Paystub Layout for ABRA Interface Aug-07
378
Timesheet Exports - ADP Enterprise - Devry - earnings are not getting exported if you delete hours lines
Interface
Aug-07
379
Benefits - Carrier Interfaces - Arden -Reverting back last year programming code of Aetna carrier interface
Interface
Aug-07
380
Pay Stubs - Other - Comdata - Interface with Metavante - ATM Paystubs Project for Comdata
Interface
Aug-07
381
live site bug - Training+ - Other - Sypris - import format not working correctly for courses
Interface
Dec-07
382
Training+ - imports - Sypris - TRCLASS import for training module does not put the class to waitlisted if you have it waitlisted in the import
Interface
Dec-07
383
Time Off - Other - BCD Travel - Creating new Timeoff Import format use clock number Interface
Dec-07
384
Pay Stubs - Other - Comdata - Interface with Metavante - ATM Paystubs Project for Comdata
Interface
Dec-07
385
Pay Stubs - ADP PCPW Pay Stubs - Mascoma Savings Bank - Negative Paycheck is not showing up
Interface
Dec-07
386
Training+ - Program Assignment - Sypris - import format for grading history Interface
Dec-07
387
Pay Stubs - Other - People's Bank - validate oShortDesc field of oHrCheckEFT Interface
Dec-07
388
LIVE Site Issue - HR+ Exports - All - People's United Bank - deselecting an item in the export list does not deselect it from the export
Interface
Dec-07
389
Benefits - Open Enrollment - People's United Bank - Export for Open Enrollment Interface
Dec-07
390
live site bug - Timesheet Exports - Cyborg Advanced - Dura Automotive - previous batch are not correct
Interface
Dec-07
Project Management Profile – Akash Dave
Page 19 of 91
391
Training+ - imports - Sypris - Enrollment import format never moved however the import formats were signed off by QA as completed.
Interface
Dec-07
392
Pay Stubs - Cyborg - Dura Automotive - Not able to select subcompany you wish to delete without deleting out all paystubs for payperiod
Interface
Dec-07
393
Benefits - Carrier Interfaces - Wilshire Associates - Benefit Carrier Interface for VSP Interface
Dec-07
394
Benefits - Carrier Interfaces - Wilshire Associates - Benefit Carrier Interface for UPMC Interface
Dec-07
395
HR+ - HR Imports - People's United Bank - Prefix and Duplicate Dependent issue Interface
Dec-07
396
Timesheet Exports - ADP Pay Expert - Musicians Institute - need to add temp rate to the export
Interface
Dec-07
397
Expenses - New Interface - Sypris Test and Measurment - New interface needed for Cyborg
Interface
Dec-07
398 Interface with KVS Accounting software-University of Buffalo Interface Dec-07
399
Benefits - Carrier Interfaces - Wilshire Associates - Benefit Carrier Interface for AETNA medical and dental
Interface
Dec-07
400
QuickBooks Interface - Add third tracking field -Class (Possition) - Ability-Plus Interface
Dec-07
401 Pay Stubs - Other - Comdata - Interface with Metavante - ATM Paystubs Project for
Comdata Interface Mar-08
402 Timesheets - External Timeclocks - Brooklace, Inc. - stop storing rounding rules in the
.ini and have the data imported conform to the settings on iEmployee Interface Mar-08
403 Timesheet Exports - AccPac - Patriot Forge - Interface Mar-08
404 Benefits - Carrier Interfaces - Wilshire Associates - Benefit Carrier Interface for VSP Interface Mar-08
405 Benefits - Carrier Interfaces - Wilshire Associates - Benefit Carrier Interface for UPMC Interface Mar-08
406 Benefits - Carrier Interfaces - Wilshire Associates - Benefit Carrier Interface for AETNA
medical and dental Interface Mar-08
407 Benefits - Carrier Interfaces - Vercuity - The client has requested for the benefit carrier
interface for United Health care. Interface Mar-08
408 Benefits - Carrier Interfaces - IXIS - New Plan names need to be added in the CDC BCBS
Report Interface Mar-08
409 Benefits - Carrier Interfaces - MPG - Benefit Carrier Interface for AETNA Medical Interface Mar-08
410 Expenses - New Interface - Sypris Test and Measurment - New interface needed for
Cyborg Interface Mar-08
411 Timesheet Exports - CBS Accounting Package - RBOI - TA Interface Interface Mar-08
412 Expenses - New Interface - New interface for Source 500 Interface Mar-08
413 Benefits - Enrollment Changes - People's United Bank - Incorrect effective date on the
Export for change enrollment data in the events like Marriage and Death of Dependent Interface Mar-08
Project Management Profile – Akash Dave
Page 20 of 91
414 Benefits - Other - Public Storage - hrpebnv import file should not validate against plan
year Interface Mar-08
415 Timesheet Exports - Source Daily - Change connection used by Source Daily Export Interface Mar-08
416 Timesheet Exports - ADP Pay Expert - Musicians Institute - need to add temp rate to the
export Interface Mar-08
417 Payroll - Active Payroll - Villa St. Benedict - Create an Interface for iEmployee timesheet
and Freedom . Interface Mar-08
418 VTL - Compupay Interface - United Way of Greater Portland - Interface Mar-08
419 HR+ - HR Imports - DeVry - Devry would like to activate or terminate someone based
on there status and not term or rehire dates Interface Mar-08
420 Imports - HRPB and HRPEFT - People's Bank - Enhance Imports to update rather than
duplicate Interface Mar-08
421 Pay Stubs - Other - MSD - oHRCheckBase Fed Tax Adj amount displays improperly
State Tax Adj amount is too short Interface Mar-08
422 Pay Stubs - Other - MSD - oHRCheckSpec oItem and oValue need to be increased to 50
characters Interface Mar-08
423 HR+ Exports - Other - Evolution - Salary Planning Interface Mar-08
424
Benefits - Carrier Interfaces - Employees are missing in the export file if there history records are two years back
Interface May-05
425
GRP_NILESHU_TS 1 of 2 :Timesheet Exports - Auto-decrementing - Source Export Update
Interface May-05
426
GRP_NILESHU_TS 2 of 2 :Timesheet Exports - Source 500 - VNHS - Include Rate Modifier amount in Source 500 export
Interface May-05
427 GRP_SAN_TO: New MIP Time off Export Interface May-05
428 GRP_SAN_TS: MIP Timesheet Export Interface May-05
429
HR+ Exports - ADP Pay Expert - Genesis Financial Solutions - 401k deduction amount coming over instead of %
Interface May-05
430
Time Off Exports - Source 500 Time off export doesn't round the hours to 2 decimal places in the export file.
Interface May-05
431
Timesheet Exports - ADP Enterprise - Maxim Healthcare Services - Interface May-05
432
Timesheet Exports - Munis - Louden County Sanitation Authority - Export not working correctly
Interface May-05
433
Timesheet Exports - Source Daily - Babb, Inc. (babb) - Add Multiple PSID functionality to Source Daily Export
Interface May-05
434
Timesheets - External Timeclocks - Playboy - Time Off and Holiday Integration with Clock Imports
Interface May-05
435 Timesheets - Scheduling - Import Format Interface May-05
436
GRP_SAN Maintenance - Import File - All Direct Clients - Import Formats for Holiday Calendar, OT, and Pay Policy
Interface Jun-05
437
GRP_SAN_DTW - Run Final Queries - W4 Table Update (DTW and DTSA) Interface Jun-05
438
GRP_SAN_DTW: DTW - Reconcile - All - Bug in Benefit Beneficiars reconcile Interface Jun-05
439 HR+ Exports - ADP Pay Expert - Amherst - EFT Interface Jun-05
Project Management Profile – Akash Dave
Page 21 of 91
440
HR+ Exports - ADP Pay Expert - Amherst - SUI Information Needs to be passed from iEmployee to ADP
Interface Jun-05
441
HR+ Exports - Source 500 - All - Bank EFT export should always export a zero in the amount for net amounts
Interface Jun-05
442 HR+ Exports - Source 500 - Flag Changes to EFT Interface Jun-05
443
Imports - HRPM - Spectra International (spectra / spectracorp) - Add TRIM function to the HRPM import format
Interface Jun-05
444 Pay Stubs - ADP PayExpert - In House Interface Jun-05
445
Pay Stubs - Other - Spectra - Conversion to HR+ - Modify Pay Plus Pay Stub table to link to oHRBase instead of iHRBase
Interface Jun-05
446 Pay Stubs - Source 500 Pay Stubs - Nixon Peabody - Interface Jun-05
447
Time Off Exports - ADP Enterprise - Maxim Healthcare Services - Extra field in the time off export
Interface Jun-05
448
Timesheet Exports - QuickBooks+ - - View exported hours not match with exported file hours
Interface Jun-05
449
Timesheet Exports - WMIS export - Lee County Electric Co-operative (LCEC) - Modify WMIS export with new Date Field in Earnings section
Interface Jun-05
450 W2 - Quote - Washington Trust Company - Please quote Interface Jun-05
451 Esource import formats for HR+ and Benefits Interface Jun-05
452
GRP_AVI_1_OF_2_Timesheet Exports - All - View Exported Screen - Sort Order and Limit Records per Page
Interface Jul-05
453
GRP_AVI_2_OF_2_Timesheet Exports - All Timesheet and Time Off Exports - Previous export screen needs to show the date range
Interface Jul-05
454
Pay Stubs - ADP PCPW Pay Stubs - Create Export for ADP PCPW Pay Stubs Interface Jul-05
455
Pay Stubs - Fundware paystubs - Escambia Country Tax - New Paystub imports Interface Jul-05
456
Pay Stubs - Source 500 Pay Stubs - Union Labor Life Insurance Company - Check/ Paystub do not match with Source check and pay stub
Interface Jul-05
457 Time Off Exports - Other - Bangor Savings Bank - Interface Jul-05
458
Timesheet Imports - PDA Import Template - Stored Procedure - Wide Open West Finance -
Interface Jul-05
459
Pay Stubs - ADP PayExpert Pay Stubs - The 'Mass Check Detail Delete' function does not work for ADP PayExpert Paychecks
Interface Jul-05
460
Timesheet Exports - Source 500 - Sun Hydraulics Corporation - Time Type 7A Interface Jul-05
461
Timesheets - External Timeclocks - Sypris Solutions - Badges login page to show time stamp during puch in/out
Interface Jul-05
462
Timesheets and Time Off - ADP Exports - Hours is returning more than 2 decimal places -
Interface Jul-05
463
Timesheet Exports - Source Daily - Babb, Inc. (babb) - Export only works for one PSID at a time
Interface Jul-05
464
Timesheet Exports - Source 500 - Sun Hydraulics Corporation - Downloading Export Batch takes time
Interface Jul-05
Project Management Profile – Akash Dave
Page 22 of 91
465
ADP PayExpert- Genesis Financial Solutions - FSA Deduction Codes are displaying '~' in the export file.
Interface Aug-05
466
DTW - Deleting Benefits - usp_AutoImport_DeleteBenefits - Investigate stored procedure
Interface Aug-05
467
GRP_AVI_1_OF_2_Timesheet Exports - All - View Exported Screen - Sort Order and Limit Records per Page
Interface Aug-05
468
GRP_AVI_2_OF_2_Timesheet Exports - All Timesheet and Time Off Exports - Previous export screen needs to show the date range
Interface Aug-05
469
GRP_SAN_HR+ 1 of 2:HR+ Exports - ADP Pay Expert - Amherst Technologies - Export Errors out with Second Address Info Populated
Interface Aug-05
470
GRP_SAN_HR+ 2 of 2:HR+ Exports - ADP Pay Expert - Amherst Technologies - Termination Date Needs to be included in the Export File
Interface Aug-05
471
HR+ Exports - ADP Pay Expert - Amherst - Adding a Confirmation Message before deleting batch information
Interface Aug-05
472
Timesheet Exports - Munis - Charlotte County Tax Collector (cctc) - Munis Export does not support negative hours
Interface Aug-05
473 Create Timesheet Export for Powerpay Interface Aug-05
474
GRP_Nilesh_TSSLS_1_of_2Timesheet Exports - SLS - Selective HR- SLS Timesheet Export
Interface Aug-05
475
GRP_Nilesh_TSSLS_2_of_2Timesheet Exports - All - Issue with Deleteing a Previous Batch (Issue Not yet moved to Live)
Interface Aug-05
476
HR+ Exports - ADP Pay Expert - Update PayExpert export to support new import format -
Interface Aug-05
477
Pay Stubs - Other - Spectra - Conversion to HR+ - Modify Pay Plus Pay Stub table to link to oHRBase instead of iHRBase
Interface Aug-05
478
Pay Stubs - Source 500 Pay Stubs - Blackwell Sanders Peper Martin (bspm) - Special Info section runs description together if no value exists for the item
Interface Aug-05
479
Benefits - Carrier Interfaces - Arden Realty - Aetna Benefit export is not exporting couple of dependents information though they are attached to the Plan
Interface Sep-05
480 DTW - Other - March Of Dimes (MOD) - Interface Sep-05
481
GRP_SAN_HR+ 1 of 2:HR+ Exports - ADP Pay Expert - Amherst Technologies - Export Errors out with Second Address Info Populated
Interface Sep-05
482
GRP_SAN_HR+ 2 of 2:HR+ Exports - ADP Pay Expert - Amherst Technologies - Termination Date Needs to be included in the Export File
Interface Sep-05
483
HR+ Exports - ADP Pay Expert - Amherst - Termination Date needs to be added to new ADP Expert Export
Interface Sep-05
484
LIVE Site Bug - Pay Stubs - ADP Pay Expert Pay Stubs - Amherst Technologies - multiple pay stubs for the same employee is not displaying
Interface Sep-05
485 Pay Stubs - Other - ECTC - Please delete Pay Stubs for S. Whiting Interface Sep-05
Project Management Profile – Akash Dave
Page 23 of 91
486
Pay Stubs - Source 500 Pay Stubs - All - Send out an email once a paystub is uploaded Interface Sep-05
487 DTW - Other - March Of Dimes (MOD) - Interface Sep-05
488 DTW - Run-Time Error - vnhs and all - Interface Sep-05
489
GRP_SAN_HR+ 1 of 2:HR+ Exports - ADP Pay Expert - Amherst Technologies - Export Errors out with Second Address Info Populated
Interface Sep-05
490
GRP_SAN_HR+ 2 of 2:HR+ Exports - ADP Pay Expert - Amherst Technologies - Termination Date Needs to be included in the Export File
Interface Sep-05
491 Selective HR -- SLS Export - Error with Tracking Overtime Hours Interface Sep-05
492
Selective HR Solutions, Inc. (selective) - SLS Export Page -- Department Fields Optional Interface Sep-05
493
Timesheet Exports - ADP Enterprise - Maxim Healthcare Services, Inc. (maxim) - Earnings only partially exporting
Interface Sep-05
494
ADP PayExpert- Genesis Financial Solutions - FSA Deduction Codes are displaying '~' in the export file.
Interface Oct-05
495 Create Timesheet Export for Powerpay Interface Oct-05
496
HR+ - HR Imports - All - Importing a blank does not clear out the field when using HRPM
Interface Oct-05
497 Pay Stubs - Fundware pay stubs - ECTC - Few alignments issues Interface Oct-05
498 Payroll - Other - Unifund - New Timesheet inteface with Paycor Interface Oct-05
499
Selective HR Solutions, Inc. (selective) - Bug -- SLS Export can not handle negative Pay Codes
Interface Oct-05
500
Source 500 Attendance Table Export - - Nixon Peabody - Flexibility to provide Exports having different hours/ Day
Interface Oct-05
501
Time Off Exports - Other - Bangor Savings Bank - Time Off Export Needs to include the employees standard hours per pay if they did not have any exception time for the date range selected
Interface Oct-05
502
Timesheet Exports - Add company key to export stored procedures to improve performance
Interface Oct-05
503
Timesheet Exports - ADP PCPW - All Seasons - Default Field Numbers that are 5 are being exported in the position 4 spot
Interface Oct-05
504
Timesheet Exports - Source 500 - New Century Mortgage Corporation - Allow Multiple PSID’s in their Source 500 Timesheet Export
Interface Oct-05
505
Timesheet Exports - Source 500 - Rewrite the sproc: usp_TS_EXP_Sourcefile to improve performance
Interface Oct-05
506
Timesheet Reports - iClock Punch Detail Report - WCA - Iclock punch detail report does not match punches on timesheet
Interface Oct-05
507
Timesheets - Timeclock Import - Serologicals Corporation - Ceridian clients do not track employee numbers and right now the PLAYBOYPUNCH Import only looks at Employee Numbers
Interface Oct-05
508
Timesheet Exports - ADP PCPW - Microsoft Licensing GP - Auto-decrement breaks down when PTO exceeds entered total
Interface Oct-05
509
Benefits - Carrier Interfaces - Bug - Termination records are not exporting in Arden-Jefferson pilot financial benefit export
Interface Nov-05
Project Management Profile – Akash Dave
Page 24 of 91
510
Imports - Source 500 Engine - Modify Source Import Engine to allow user Flxid's to be updated if they are re-hired in Source.
Interface Nov-05
511
Pay America Pay Stubs - Pay America - Update Time off Balance Entry from Check details data.
Interface Nov-05
512
Timesheet Exports - ADP PCPW - Microsoft Licensing GP - Auto-decrement breaks down when PTO exceeds entered total
Interface Nov-05
513
Timesheet Exports - Other - Macdonald Training Centers - New Timesheet Export for Oasis Payroll
Interface Nov-05
514 Timesheet Exports - Source 500 - CSPAN - Pay Codes Exporting Interface Nov-05
515
Timesheets - Timeclock Import - Serologicals Corporation - Ceridian clients do not track employee numbers and right now the PLAYBOYPUNCH Import only looks at Employee Numbers
Interface Nov-05
516
Benefits - Carrier Interfaces - Kodak Polychrome Graphics (KPG) - Child/Student code updates
Interface Nov-05
517
DTW - Other - All - Advanced Filter does not pick up terminated employees Interface Nov-05
518
Benefits - Carrier Interfaces - OwnIt Mortgage - Vision Service Plan benefit interface Interface Dec-05
519
HR+ Exports - ADP Pay Expert - Amherst Technologies - Termination Reason is Hard Coded as T for all users
Interface Dec-05
520 HR+ Exports - Source 500 - FSA - Interface Dec-05
521
Import Engine - Import log to show details such as file name or record count Interface Dec-05
522
Interface - Other - Selective HR Solutions, Inc. (selective) - Create interface between Timesheets and Payroll Module
Interface Dec-05
523
Pay Stubs - Source 500 Pay Stubs - JWT - Zeros are being dropped in the gross pay and the net pay on the list of pay stubs
Interface Dec-05
524
Pay Stubs - Source 500 Pay Stubs - All - Send out an email once a paystub is uploaded Interface Dec-05
525
Pay Stubs - Other - ECTC - Less Taxes Information is not alligned properly Interface Dec-05
526
Selective HR Solutions, Inc. (selective) - Import File --- iClock Import Log file does not exist.
Interface Dec-05
527
Time Off Exports - Source Attend - Rodale (rodale / zzrodale) - New functionality not provided as an option; causing an issue for client
Interface Dec-05
528
Timesheet Exports - ADP PCPW - All Seasons - Earnings not exporting properly Interface Dec-05
529
Timesheet Exports - ADP PCPW - Molecular Devices - Auto-Dec Feature not Working Correctly
Interface Dec-05
530
Timesheet Exports - Cyborg - Dura Automotive - Modify the Cyborg+ tiem export for Dura's use
Interface Dec-05
531
Timesheet Exports - DELTEK - LTS - Create Deltek timesheet export Interface Dec-05
532
Timesheet Exports - Paychex - PayChex+ Export needs auto-decrement feature Interface Dec-05
Project Management Profile – Akash Dave
Page 25 of 91
533
Timesheet Exports - Source 500 - Aloha United Way - Auto decrement batch puts Rate modifier code which does not exist
Interface Dec-05
534
Timesheet Exports - Paycor - PayCor - Fix for issure related to Paycor Interface Dec-05
535 Timesheets - Other - VNHS - Timesheet Import-Flat Hours Only Interface Dec-05
536 Benefits - interface - OwnIt Mortgage – Interface Jan-06
537 Create Timesheet Export for Powerpay Interface Jan-06
538
GRP_NileshU_1_of_2_Time Off Exports - Source 500 - - advanced export options Interface Jan-06
539
GRP_NileshU_2_of_2_HR+ - Other - - (Time Off Exports - Source 500 - - advanced export options)
Interface Jan-06
540
GRP_Ben_INTF_1_Of_3_Benefits - Carrier Interfaces - OwnIt Mortgage - Hancock 401K Interface Jan-06
541 GRP_Ben_INTF_2_Of_3_Benefits - interface - OwnIt Mortgage - Interface Jan-06
542
GRP_Ben_INTF_3_Of_3_Benefits - Carrier Interfaces - OwnIt Mortgage - Benefit Interface for American Specialty Health
Interface Jan-06
543
GRP_4 of 5_Rajesh_LIVE Site Issue - New Hire Wizard - Magna HR, Inc. (magna) - Bank EFT, Tax, and Compensation pages not updating with New Hire Wizard data
Interface Jan-06
544
GRP_SAN_HR+: HR+ Exports - Other - Escambia County Tax Collector’s Office - Fundware HR+ Export
Interface Jan-06
545
LIVE SITE BUG--Timesheets and Time off- Central Approval Setup - Provident Bank - Setup Approver screen doesn't allow to save the approvers if you select PSID as filtering choice
Interface Jan-06
546
LIVE Site Issue - Bank EFT Export - Washington Trust (wtc) - Bank EFT Export has begun sending over NULL values that cause problems in Source
Interface Jan-06
547
LIVE Site Issue - Paystub Emails - Babb, Inc. (babb) - New feature for generating paystub emails does not do anything
Interface Jan-06
548
Maintenance - Import File - Look Smart - Import doesn't clearup the Termination date Interface Jan-06
549
Timesheet Exports - SLS - Restructuring SLS timesheet export to handle 200 pay codes’ Interface Jan-06
550
Timesheet Exports - Source Daily - VNHS - Tracking Field Allocations are not being brought over when using auto-decrement feature
Interface Jan-06
551
Benefits - Carrier Interfaces - Kodak Polychrome Graphics (KPG) - Export reports Interface Feb-06
552 GRP_SAN_DTW: Software Monitor for Source Queue Interface Feb-06
553
GRP_SAN_IMP: Import Engine Enhancement - Import Engine Enhancement Interface Feb-06
554
Import Engine - Fix infinite loop that occurrs when certain errors arise Interface Feb-06
555
Timesheet Exports - ADP Pay Expert - Add Deduction mapping to the Export file Interface Feb-06
556
Timesheet Exports - Source 500 - Full Time solutions - Add Tracking Field 5 capability to export
Interface Feb-06
Project Management Profile – Akash Dave
Page 26 of 91
557
Timesheet Exports - Source 500 - PCHI - export needs to concatenate tracking fields Interface Feb-06
558
Interfaces - Import Punches - All - Fix for stored procedure For Timesheet Import Interface
Jun-06
559
Pay Stubs - Other - San Francisco Redev. Agency - How to upload W2's in iemployee Interface
Jun-06
560
Pay Stubs - ADP PAyExpert Paystub - Amherst Technologies - Enhancement Adding Memo's display
Interface
Jun-06
561 Benefits- Carrier Interface- Arden Realty- Conexis Interface Jun-06
562 Benefits- Carrier Interface- Arden Realty- Cigna Interface Jun-06
563
32. GRP_SAN_HR+: HR+ Exports - Other - Escambia County Tax Collector’s Office - Fundware HR+ Export
Interface
Jun-06
564
DTW - Import Formats - Merge Technologies Incorporated - in the Esource System. Interface
Jun-06
565 Benefits- Public Storage- Create benefit interface to VSP Vision plan
Interface
Jun-06
566 Timesheet Exports - Other - Vantage - TurboCare - Interface Jun-06
567
Timesheet Exports - Peoplesoft - TurboCare, Inc. - need overtime added to reg to calc half time pay
Interface
Jun-06
568 Benefits- Carrier Interfaces- WCA Waste Corporation – Great West Healthcare
Interface
Jun-06
569 . Benefits- Carrier Interfaces- WCA Waste Corporation – Compbenefits
Interface
Jun-06
570 Benefits- Carrier Interfaces- WCA Waste Corporation – Guardian life dental
Interface
Jun-06
571 Benefits- Carrier Interfaces- WCA Waste Corporation – John Hancock – 401 K
Interface
Jun-06
572
Timesheet Exports - Peoplesoft - TurboCare, Inc. - ability to export department tracking fields
Interface
Jun-06
573
33. Import Engine - Fix infinite loop that occurrs when certain errors arise Interface
Jun-06
574
Timesheet Exports - Source 500 - PCHI - export needs to concatenate tracking fields
Interface Jun-06
575
Timesheet Exports - ADP Pay Expert - Add Deduction mapping to the Export file
Interface Jun-06
576 Timesheet Exports - Oracle/Gevity - United Pacific Mortgage - Interface Jun-06
577
Timesheet Exports - CCO Ultipro Export - Community Care Organization Inc. - Export puts Multiple lines
Interface
Jun-06
578
Timesheet Exports - - Konover - Create timesheet export for Viewpoint Accounting Software
Interface
Jun-06
579 Expenses - Exports for ADP, Source, and Quickbooks Interface Jun-06
580 W2 - Comdata - W2 has display issues Interface Jun-06
581
Benefits - Carrier Interfaces - Vercuity - Create Guardian Dental Interface Interface
Jun-06
582 Benefits - Carrier Interfaces - Vercuity - Great West Medical Interface Jun-06
583
IVR - Goodwill - IVR Tracking field templates need to be enhanced so that the user can key in the tracking fields.
IVR
May-07
Project Management Profile – Akash Dave
Page 27 of 91
584
Maintenance - Export Engine - First Insurance Company (FICOH) - Export file cannot be created
Maintenance
Jan-05
585
Maintenance - Policy Assignments - Dura Automotive - Automating Policy Assignments
Maintenance
Jan-05
586
Please refer the <LIVE_ Manager Filter – Administrator cannot edit the manager filter.doc> for further details.
Maintenance
Jan-05
587
Maintenance - Email Notifications - Replace direct access to cEmail table with proper client-side, disconnected recordsets
Maintenance
Jan-05
588
Rewrite CA Setup Approvers and Approve and Route Pages to .NET Maintenance
Jan-05
589
Maintenance - Import File - Bangor Savings Bank - FTE is not importing into iEmployee Maintenance
Jan-05
590
Create New Global CSS Style Sheet based on the attached Style Guides for iEmployee Maintenance
Jan-05
591
Maintenance - Choice Lists - Maxim Healthcare Services, Inc. (maxim) - Confirm that the site is standardized in the way that department data is displayed
Maintenance
Jan-05
592
Maintenance - Choice Lists - Maxim Healthcare Services, Inc. (maxim) - Ability to sort choice lists
Maintenance
Jan-05
593
Login - Login - All - Display message when logging in using a browser other than IE Maintenance
Jan-05
594 Maintenance - Enhanced Security - Avid - Maintenance Jan-05
595 My Company - Other - All - Optimize the page Maintenance Jan-05
596
Maintenance - Email Notifications - Maxim Healthcare Services, Inc. (maxim) - Mass User Notification gets spoofed
Maintenance
Jan-05
597
Maintenance - Other User Options - Dura Automotive - update user logins does not work for rehire
Maintenance
Jan-05
598
Maintenance - Import File - MA Society Prevention of Cruelty to Animals - Do not allow to import any data if SSN is other than 9 digits
Maintenance
Jan-05
599
Maintenance - Security Access - HR+ New Hire Wizard Maintenance
Jan-05
600
Maintenance - Choice Lists - VSA - Order The Primary State By Description Instead of Value
Maintenance
Jan-05
601
Maintenance - Manager Filter - Egenera (egenera) - AND operation not working properly
Maintenance
Jan-05
602
Maintenance Reports - Other - Selective HR Solutions, Inc. (selective) - Exception Employee Report
Maintenance
Jan-05
603
System - WN/CS Setup - All - What's New/Coming Soon Setup Issues Maintenance
Jan-05
604 System - Billing Info - New Clients - Automate New Client Form Maintenance Jan-05
605
Maintenance - Other - Vesta, Inc. - shift diff rules show in drop down even if assigned in business rule
Maintenance
Jan-05
606
Maintenance - Security Access - USRUPD import format should only accept active roles in a company.
Maintenance
Jan-05
607
Filters - Functionality - Union Labor Life Insurance Company (ullico) - Filters do not recognize ENTER button when used
Maintenance
Jan-05
Project Management Profile – Akash Dave
Page 28 of 91
608
LIVE Site Issue - Employee Yearly Calendar - Union Labor Life Insurance Company (ullico) - Yearly calendar is not showing Archived time off requests
Maintenance
Jan-05
609 System - - Nixon Peabody - Forgot USER ID feature required Maintenance Jan-05
610
Maintenance - Enhanced Security - All - Spelling error in Secret Question functionality Maintenance
Jan-05
611
.NET - Application_PreRequestHandlerExecute - nsp_SYS_CheckAuthorization - None of the .NET pages are increasing the session timeout in the database.
Maintenance May-05
612 Add filtering options and check boxes to My Documents page Maintenance May-05
613 Country Bank - Allow editing history records Maintenance May-05
614
System - Feedback Emails - All - Remove the hard-coded email addresses from the system
Maintenance May-05
615
Implementation - Other - - import format for timeclock allocation screen Maintenance Jun-05
616
Maintenance - Enhanced Security - ALL - Repeart New Password must be changed Maintenance Jun-05
617
Maintenance - Enhanced Security - All - Spelling error in Secret Question functionality Maintenance Jun-05
618
Rewrite CA Setup Approvers and Approve and Route Pages to .NET Maintenance Jun-05
619
Survey - - All - Change Survey times from every 90 days to every 180 days (6 months) Maintenance Jun-05
620 System - Enhanced Security - - Maintenance Jun-05
621
System - Survey - Add a required field for clients to provide a reason for all delayed surveys
Maintenance Jun-05
622
System - Survey - All - When I update a record in survey list, I get an error Maintenance Jun-05
623
Central Approval Setup - Setup - Stored Procedure usp_APP_ViewExisting causing error
Maintenance Jul-05
624
System - Conversion Tool - Non-Source to Source - Moving Timesheet data Maintenance Jul-05
625
System - Conversion Tool - Non-Source to Source - Moving Timesheet data Maintenance Jul-05
626 System - Survey - - Survey reference update Maintenance Jul-05
627
General - Central Approval - The viewstate is invalid for this page and might be corrupted
Maintenance Aug-05
628
Maintenance - Email Notifications - All - Hard-code the from email address in user notifications to [email protected]
Maintenance Aug-05
629
Maintenance - Other - All - Business Rules Assign Employees Page's Subcompany filter is broken
Maintenance Aug-05
630
Maintenance - Other - Ciba Specialty Chemicals - Warning Message required while deleting a Pay Policy
Maintenance Aug-05
631
System - Conversion Tool - Non-Source to Source - Moving Timesheet data Maintenance Aug-05
632
System - Other - Tickets.com - Forgot password leads to non-secured zone Maintenance Aug-05
Project Management Profile – Akash Dave
Page 29 of 91
633
LIVE Site Issue - Security - WNA (wna / zzgencas / zzwna) - Masking secret question answers does not work as expected
Maintenance Sep-05
634 MOD - e-signatures survey Maintenance Sep-05
635
My Company - Company Events - Checklist Setup - Mac Compatibility Maintenance Sep-05
636
My Company - My Documents - March Of Dimes (MOD) - Copy all the documents from their HR to HR+ company.
Maintenance Sep-05
637
Maintenance - Check Options - Nixon Peabody - Throws Server error Maintenance Sep-05
638
System - Conversion Tool - Non-Source to Source - Moving Timesheet data Maintenance Oct-05
639
Maintenance - Users - New Century Mortgage Corporation - Auto Assign Clock Number from Source as Username
Maintenance Nov-05
640
My Company - Company Resources - Power Pay - Alllow secondary browser windows to be resized
Maintenance Nov-05
641
My Company - Company Resources - resource links on splash pages do not open properly -
Maintenance Nov-05
642
LIVE Site bug - New User Email - Magna HR, Inc. (magna) - URL improperly formatted; can't locate where this has been changed for this company
Maintenance Nov-05
643 All - Dotnet - All - Remove Ctlsession from all dotnet netreports Maintenance Dec-05
644
Central Approval - Rewrite usp_APP_ReturnInbox sproc to improve server performance
Maintenance Dec-05
645
Maintenance - Import Log - Playboy Enterprises (playboy) - Add 'Select All' functionality to the Import Log
Maintenance Dec-05
646
Maintenance - Other - Ciba Specialty Chemicals - Time Type Order is not refreshed for the Pay Policies
Maintenance Dec-05
647
Maintenance - Policy Assignments - Dura Automotive - Automating Policy Assignments
Maintenance Dec-05
648
Maintenance - Security Access - USRUPD import format should only accept active roles in a company.
Maintenance Dec-05
649 Billing - Billing Reports - ComData - New Billing report Maintenance Jan-06
650 Implementation - Implementation Folder in Outlook Maintenance Jan-06
651
LIVE SITE Issue : Tracking Fields - All - When User Tracking Fields enabled, initial tracking field dropdown lists unpopulated
Maintenance Jan-06
652
Login - Login - All - Display message when logging in using a browser other than IE Maintenance Jan-06
653
Maintenance - Enhanced Security - All - Spelling error in Secret Question functionality Maintenance Jan-06
654
Maintenance - Other User Options - Dura Automotive - update user logins does not work for rehire
Maintenance Jan-06
655 Maintenance - Security Access - HR+ New Hire Wizard Maintenance Jan-06
656
Maintenance - Email Notifications - Replace direct access to cEmail table with proper client-side, disconnected recordsets
Maintenance Jan-06
657 My Company - Other - All - Optimize the page Maintenance Jan-06
658
Pay Stubs - ADP PAyExpert Paystub - Amherst Technologies - Enhancement Adding Memo's display
Maintenance Jan-06
Project Management Profile – Akash Dave
Page 30 of 91
659
Pay Stubs - Source 500 Pay Stubs - MSU Federal Credit Union (msufcu) - Local Tax amount not showing on online pay stub
Maintenance Jan-06
660
Please refer the <LIVE_ Manager Filter – Administrator cannot edit the manager filter.doc> for further details.
Maintenance Jan-06
661
Rewrite CA Setup Approvers and Approve and Route Pages to .NET Maintenance Jan-06
662
Implementation - Other - Import Format for Logins & Passwords not restricted if passwords hidden to admins
Maintenance Feb-06
663
Maintenance - Import File - Bangor Savings Bank - FTE is not importing into iEmployee Maintenance Feb-06
664
Maintenance - Email Notifications - Maxim Healthcare Services, Inc. (maxim) - Mass User Notification gets spoofed
Maintenance Feb-06
665 Maintenance - Enhanced Security - Avid - Maintenance Feb-06
666 System - Billing Info - New Clients - Automate New Client Form Maintenance Feb-06
667
Menus - Top Menu - Dura - Adjustments to the Top Menu style menus Maintenance
Jun-06
668
52. System - Billing Info - New Clients - Automate New Client Form Maintenance
Jun-06
669 System - - Nixon Peabody - Forgot USER ID feature required Maintenance Jun-06
670
Maintenance - Choice Lists - Public Storage - Add a Active / Inactive toggle to the choice lists
Maintenance
Jun-06
671 System - Other - New Homepage Maintenance Jun-06
672 Maintenance - Biometric Allocation - System is accepting the same fingerprints for
multiple users in the same company Maintenance Jun-06
673 Start Page - User settings - All - User can't change start page Maintenance Jun-06
674 GRP_SAN_DTW: Software Monitor for Source Queue Maintenance Jun-06
675 53. Mod to Report Admin for New Expenses Reports Maintenance Jun-06
676 Training+ - Active List - All - Create Active/Archive Lists for Training+ Maintenance Jun-06
677 22. Live Site Bug - Maintenance - Scheduling - All - Scheduling needs to have overnight
shift handling Maintenance Jun-06
678 General - Menus/Security - All - Ability for us to turn on or off new Menus/Security
Roles Maintenance Jun-06
679
Maintenance - Mass Delete - Boon Group, The - no way to mass delete paystubs for direct clients Maintenance Jun-06
680
77. Maintenance - Other - Jackson Organization - Filter in Tracking field favorites. Maintenance
Jun-06
681
Maintenance - Other - Penn Treaty Network America - Custom Flags under Approval Setup does not display the entire message
Maintenance
Jun-06
682 Part 1 : Warn the user if the browser is closed using the X button. Maintenance Jun-06
683
My Company - Company Resources - All - Require employees to sign off that they have read documents
Maintenance
Jun-06
684 Maintenance - Mass Delete - Boon Group, The - W2's Maintenance Jun-06
685 Maintenance - Other - Internal - Provide Support and Implementation with access to the
sys admin login information that is on sarla.
Maintenance
Jun-06
Project Management Profile – Akash Dave
Page 31 of 91
686 LIVE SITE ISSUE - HR+ - Customization Manager - Heineken USA - HR+ Personal History screen Maintenance Dec-06
687 Live Site Issue- Maintenance - Check Detail Control - Sunsource - Certain Pay codes are not captured from the check control page. Maintenance Dec-06
688 Maintenance - Other - Clearwire Corporation - Shift diffs do not work with time zone. Maintenance Dec-06
689 Menus - Top Menu - Dura - Adjustments to the Top Menu style menus Maintenance Dec-06
690 Maintenance - Other - Cornerstone Fellowship - holiday calendar time type keeps disappearing from the config screen Maintenance Dec-06
691 Maintenance - Choice Lists - Public Storage - Add a Active / Inactive toggle to the choice lists - Maintenance Maintenance Dec-06
692 Live site Issue - Maintenance - - Franklin Institute, The - Terminated employees showing in Assign Favorites screen. Maintenance Dec-06
693 Maintenance - Other - Dura Automotive - automated pay policies not running when scheduled Maintenance Dec-06
694
Implementation - Other - The Overtime Administration under the Sarla login shows 'Inactive' for Clients after being setup as Active..happens periodically...this affects the display of View Calculated & View original buttons on the employee / Manager scr Maintenance Dec-06
695 Live Site Bug - Maintenance - Pay Stub E-Mail Notification - Agilysys - Pay stub E-mail Notification does not Function they way it should. Maintenance Dec-06
696 22. Live Site Bug - Maintenance - Scheduling - All - Scheduling needs to have overnight shift handling Maintenance Dec-06
697 Maintenance - Choice Lists - Public Storage - Add a Active / Inactive toggle to the choice lists - Reports Maintenance Dec-06
698 live site bug - Maintenance - Email Notifications - Microsoft Licensing GP - user login is missing from the drop down Maintenance Dec-06
699 Maintenance - Choice Lists - Public Storage - Add a Active / Inactive toggle to the choice lists - Maintenance Maintenance Dec-06
700 Maintenance - Import Engine Enhancement - File Conversion capability Maintenance Dec-06
701
Maintenance - Other - Dura Automotive - automated pay policies not running when scheduled
Maintenance
May-07
702
Live Site Bug - Maintenance - Email Notifications - F5 Network Inc. - User Account Email Notification - Customized Text is not working.
Maintenance
May-07
703
22. Live Site Bug - Maintenance - Scheduling - All - Scheduling needs to have overnight shift handling
Maintenance
May-07
704
Maintenance - Other User Options - Dura Automotive - inactivate terms after X number of days
Maintenance
May-07
705
Maintenance - Other User Options - People's Bank - Cyborg - Inactivate terminated employees
Maintenance
May-07
706
Maintenance - Other - Dura Automotive - need automatic way to email new hires brought over from the HRPM file
Maintenance
May-07
Project Management Profile – Akash Dave
Page 32 of 91
707
Maintenance - Approval Setup - Public Storage - Phase II of New Security Role - Allow roles to be configured differently in Central Approval Setup
Maintenance
May-07
708
Approval Setup - Email Function - Genelogic - Option to disable the email notification to the Approvers after completing the Time off request.
Maintenance
Aug-07
709
Maintenance - Users - BCD Travel - The system should force employees to change password when the password is reset by the admin.
Maintenance
Aug-07
710
live site bug - Maintenance - Users - Devry - Everytime someone who has a term date is rehired there role is changed each time the HRPM feed is imported
Maintenance
Aug-07
711
Maintenance - Enhanced Security - HireSynergy - 'Change password after initial login' does not work with E-signature
Maintenance
Aug-07
712
Maintenance - ESignature - Internal - Enhancement needed to eSignature feature on iEmployee.
Maintenance
Aug-07
713
Maintenance - Business Rules - C-Span - TAT and Shift Diff if assigned together in a policy, the one that has the first order calculates & the second one fails (does not
calculate correctly)
Maintenance
Aug-07
714
Live site issue - Maintenance - Other User Options - Babb, Inc. (babb) - Emails send to new hire when imported to iEmployeee has Link of Babb.
Maintenance
Aug-07
715
Maintenance - Other User Options - Dura Automotive - inactivate terms after X number of days
Maintenance
Aug-07
716
Maintenance - Company Info - Real Networks - The default start page is not changing to the Check/Paystubs page in New Menu Structure
Maintenance
Aug-07
717
Maintenance Reports - Manager Filter Report - Save the Children - Make the Manager Filter Report user friendly
Maintenance
Aug-07
718
All Modules - All Features - All - Testing of all modules on Internet Explorer 7 - Reports.
Maintenance
Aug-07
719
Maintenance - Other - Dura Automotive - need automatic way to email new hires brought over from the HRPM file
Maintenance
Aug-07
720
Maintenance - Approval Setup - Union Labor Life Insurance Company (ullico) - Allow an Employee filter option for Approval Setup
Maintenance
Aug-07
721
Maintenance - Other - Dura Automotive - Need to be able to use URL address for audit reports
Maintenance
Dec-07
722
Maintenance - Other - People's United Bank - HR+ Setup Options - Pay Grade page not found when you click cancel button
Maintenance
Dec-07
723
Maintenance - Email Notifications - Advanced Financial Solutions (AFS) - User login information email
Maintenance
Dec-07
724
Maintenance - Users - Dura Automotive - add the ability to see the active/inactive status on the select page
Maintenance
Dec-07
725 Maintenance - Users - F5 Networks Inc. - Passwords should should be reset to system
generated ones whenever they are sent out to employees Maintenance Mar-08
Project Management Profile – Akash Dave
Page 33 of 91
726 Maintenance - Users - BCD Travel - The system should force employees to change
password when the password is reset by the admin. Maintenance Mar-08
727 Maintenance - Enhanced Security - BCD Travel - Password Security Maintenance Mar-08
728 Maintenance - Users - Dura Automotive - add the ability to see the active/inactive
status on the select page Maintenance Mar-08
729 Maintenance - Other User Options - Springer Science and Business Media - Email
Notification of Login details for newly added employees are not working Maintenance Mar-08
730 System - Other - To Add Paystubs and Salary Planning option in Parent company Maintenance Mar-08
731
Marketing - Marketing Web Pages - - Programming requirements for New Demo Page Marketing Nov-05
732
Marketing - Marketing Web Pages - - Programming requirements for New Demo Page Marketing Nov-05
733 Marketing - Marketing Web Pages - reciprocal link page - Marketing Dec-05
734
WBT - Create a page for the storage and password protected entry to the training files Marketing Dec-05
735 Marketing - Marketing Web Pages - Coming Soon for Oct 2006 - Marketing Dec-06
736 Marketing - Marketing Web Pages - Whats New for October 2006 - Marketing Dec-06
737 Marketing - Marketing Web Pages -whats new for June - Marketing Dec-06
738
Enhanced Security - Other Settings - Purdue Pharma LP - Force users to change password after “Forgot password or Security Alerts Email.
Menu Feb-07
739
Live Site - Log In Page - Others - Devry - Forgot Password Link shoud be Forgot password / user id
Menu Feb-07
740
Maintenance - Other User Options - Fallon Community Health - Settings not getting Saved
Menu Feb-07
741 System - Single sign-on functionality / login page redesign Menu Feb-07
742
Maintenance - Other User Options - All - assign supervisor role option not working for eSource clients
Menu Feb-07
743
Maintenance - ESignature - Internal - Enhancement needed to eSignature feature on iEmployee.
Menu Feb-07
744
Live Site Issue: Benefit Reports - Other - Superior Dental reports are blocking resources in the database, nolock hints need to be present for every table
Reports Jan-05
745
LIVE Site Issue - Benefit Reports - Missing Open Enrollment Form Report - All - Saved forms not displaying Reports Jan-05
746
GRP_Santosh_2_Of_2_LIVE Site Issue - Total Hours by Time Type Report - WNA (wna / zzgencas / zzwna) - Total Hours by Time Type report is not showing timesheets with zero hours
Reports Jan-05
747
Reports (General) - Other - Microsoft Licensing GP - iReports timesheet details report
Reports Jan-05
748
Benefit Reports - Benefit Eligibility - OwnIt Mortgage - client needs to have dept on report Reports Jan-05
749 Billing - Billing Reports - ComData - New Billing report Reports Jan-05
Project Management Profile – Akash Dave
Page 34 of 91
750
Timesheet Reports - Timesheet Details by Employee - Synta Pharmaceuticals - G/L Interface Report - Export Reports Jan-05
751
Timesheet Reports - Timesheet Details by Employee - Synta Pharmaceuticals - customized version of this report
Reports
Jan-05
752
HR+ Reports - Headcount/Salary by Department - Synta Pharmaceuticals - Total Company Headcount by Department and Employee
Reports
Jan-05
753
Benefit Reports - Benefit Eligibility - OwnIt Mortgage - client needs to have dept on report
Reports
Jan-05
754
Time Off Reports - Other - Egenera (egenera) - Enhancement to custom report Egenera Accrual Report
Reports
Jan-05
755 Reports (General) - All - All - Fix Reports for 2006 issue Reports Jan-05
756
Timesheet Reports - iClock Detail Report - All - Convert to an iReport and make compatible with iClock+
Reports
Jan-05
757
Timesheet Reports - iClock Punch Detail Report - All - Convert to an iReport and make compatible with iClock+
Reports
Jan-05
758
Timesheet Reports - Time In/Out Report - All - Convert to an iReport and make compatible with iClock+
Reports
Jan-05
759
Timesheet Reports - Other - Instrumentation, Systems, and Automation Society - Employee level report required.
Reports
Jan-05
760 iReport -- Project Timesheets by Hours & Percent Reports Jan-05
761
Maintenance Reports - Other - Dura Automotive - Add Filters (Subcompany, Department, Division, etc.) to ALL Maintenance Reports
Reports
Jan-05
762
Timesheet Reports - Custom Report - Serologicals Corporation - Convert Serologicals Custom iClock Report to be Compatible with iClock+
Reports
Jan-05
763
Timesheet Reports - Timesheet Details by Employee - Synta Pharmaceuticals - Salary Allocation by Department Report
Reports
Jan-05
764
Timesheet Reports - Timesheet Details by Employee - Synta Pharmaceuticals - G/L Interface Report - Export
Reports
Jan-05
765
Timesheet Reports - Total Time Analysis - Synta Pharmaceuticals - Total R&D Time Summary by Project
Reports
Jan-05
766
Timesheet Reports - Total Time Analysis - Synta Pharmaceuticals - Total R&D Time Summary by Function
Reports
Jan-05
767
Timesheet Reports - Time by Tracking Fields - Synta Pharmaceuticals - R&D Departmental Time Summary by Project
Reports
Jan-05
768 Reports (General) - Other - All - Update all reports for iClock+ Reports Jan-05
769
Timesheet Reports - Project Timesheet iReports - All - include additional column in report
Reports
Jan-05
770 Usage Report -- 1 of 2 -- By Imp Eng Reports Jan-05
771 Usage Report -- 2 of 2 -- By Company Reports Jan-05
772
Benefit Reports - Springer Cigna Export - Springer Verlag (springer) - Custom report not working
Reports
Jan-05
773
Timesheet Reports - Time Type Report (by day) - Hills Bank - Totals hours showing a difference of 0.01 hours compared to Timesheets total hours
Reports
Jan-05
Project Management Profile – Akash Dave
Page 35 of 91
774
GRP_SK2_1_of_2 - Timesheet Reports - Multiple - Union Labor Life Insurance Company (ullico) - Add Clock # data
Reports
Jan-05
775
iReports -- Expenses -- Cash Advance Report Reports
Jan-05
776 Reports (General) -- Expenses -- Expense Detail Report Reports Jan-05
777 Reports (General) - Expenses by Expense Type Report Reports Jan-05
778
Custom Benefit Report - FSA Aetna HRPLUS Report - Cincinnati Lamb - MInor chage in existing carrier Interface.
Reports
Jan-05
779
Live site Bug - Timesheet Reports - Sched. Time vs. Act & Adj - Exceptions - Computerx -
Reports
Jan-05
780
Timesheet Reports - Selective HR Solutions, Inc. (selective) - Custom Report -- Exception Report for Realtime
Reports
Jan-05
781 IReports - iReports Setup - All - List boxes for iReports Reports Jan-05
782
Reports (General) - Other - Amherst Technologies - Absence By Employee Report Not Pulling Any Data
Reports
Jan-05
783
Timesheet Reports - Urbanland-Time by TF& Time Type with Approval notes (custom) - Urban Land Institute - Optimize report
Reports
Jan-05
784 Reports (General) - Saved Reports - Mac Compatibility Reports Jan-05
785
Benefit Reports - Other - IXIS-Advisors (ixisag) - Modify Custom Reports to work with HR+
Reports
Jan-05
786
Reports (General) - Other - Change the Procedure name prefix from sp to nsp on TSHoursByTF1TF2RPT.asp
Reports
Jan-05
787 Mod to Report Admin for New Expenses Reports Reports Jan-05
788 iReport -- Expenses -- Expenses Pending Approval Reports Jan-05
789 iReport -- Expenses -- Expenses Pending Completion Reports Jan-05
790 iReports- Time Off taken by Department Reports Jan-05
791
Reports (General) - Other - Maxim Healthcare Services, Inc. (maxim) - Convert Total Hours By Time Type Report to iReport
Reports
Jan-05
792
Benefit Reports - Benefit Changes - BSN-Jobst - When client tried to run The medical/dental/vision changes report, they got the error.
Reports
Jan-05
793 iReport -- Project Code by Hours -- Reports Jan-05
794
Reports (General) - Other - WCA Waste Corporation - iReports not able to select more than one value from the list
Reports
Jan-05
795
Live Site Bug : Reports (General) - iReports - vnhs - Earnings Report Not Running Reports
Jan-05
796 Reports (General) - Other - Avid - Building Filters for iReports Reports Jan-05
797
Benefit Reports - Benefit Changes Report (Med/Dent/Vision) - BSN-Jobst - add FSA plans
Reports
Jan-05
798
Timesheet Reports - Task Hours by Project Code - Serologicals Corporation - Hours column heading should also include percentage
Reports
Jan-05
799
Time Off Reports - All Balance Reports - Babb, Inc. (babb) - Allow all reports that show Current Balances to show Available Balances
Reports
Jan-05
800
Reports (General) - Report Engine - WCA Waste Corporation - No 'In' Clause in Report Writer
Reports
Jan-05
Project Management Profile – Akash Dave
Page 36 of 91
801
GRP_SK1_1_of_3 - Time Off Reports - Time Off by Time Type - Union Labor Life Insurance Company (ullico) - Alter syntax of Exclude Reason Code option
Reports
Jan-05
802
Benefit Reports - Aetna Disability Report - Kodak Polychrome Graphics (KPG) - billing salary amounts that are not effective yet
Reports May-05
803
Bug/Issue -- Time Off Reports - Comp Time Report for Alta California Regional Reports May-05
804 GMT FIX -1- Timesheet Reports - Time In / Out Report Reports May-05
805
GRP_SAN_TIMERPT 1 of 2 Timesheet Reports - Time Type Report (by day) - Hills Bank - issue with the report showing punch errors and comments section shows no info
Reports May-05
806
HR+ Reports - Changes Report - Rodale (rodale / zzrodale) - Not all fields are included in the download version of the report
Reports May-05
807 iReport -- Mod to Ts Pending Approval Reports May-05
808 iReport -- Time Off Request Pending Reports May-05
809 Missing New Hire Enrollment Forms Report Reports May-05
810 Report Security does not list out all the modules Reports May-05
811 Reports (General) - Missing Timesheet Report has issues - - Reports May-05
812
Reports (General) - Other - All - Modifications to the Timesheets Pending Completion iReport
Reports May-05
813
Reports (General) - Other - All - Modifications to the TS Hour by Time Type iReport Reports May-05
814
Reports (General) - Other - Amherst - Unable to download Supervisor Report Reports May-05
815
Reports (General) - Report Engine - Wide Open West Finance - Report window too small and doesn't expand
Reports May-05
816
Timesheet Reports - Non-Completed Timesheet - DHW - Cannot generate Employee email
Reports May-05
817
Timesheet Reports - Time by Tracking Fields (Filtered) - Denver Museum of Nature & Science - Report is not pulling all data for the criteria entered
Reports May-05
818
Benefit Reports - Benefits Monthly Information - Punahou - Small header change in the report
Reports Jun-05
819
Benefit Reports - Other - Punahou -Hawaii Dental report drops employe having no base comp record
Reports Jun-05
820 Billing - Billing Reports - ALL - ABC Client REport Reports Jun-05
821
Custom Benefit Reports - Cincinnati Machine Aetna FSA Export - Cincinnati Lamb - Minor tweak in the report to include the new PSIDs
Reports Jun-05
822 GMT FIX -- Timesheet Reports - iClock Detail Report Reports Jun-05
823 iReport -- Time Off Request Pending Reports Jun-05
824 iReports - Report Definition for Timesheets Not Submitted Report Reports Jun-05
825
Remove sp_TSR_TotalHoursEmpRPT loop from TSTotalHoursEmpRPT report. Reports Jun-05
826
Reports (General) - Other - All - Modifications to the Timesheets Pending Completion iReport
Reports Jun-05
Project Management Profile – Akash Dave
Page 37 of 91
827
Reports (General) - Other - All - Modifications to the TS Hour by Time Type iReport Reports Jun-05
828
Time Off Reports - Completed Time Off Requests - Secura Insurance Company (secura) - Report not returning any data
Reports Jun-05
829
Time Off Reports - Time Off by Department - NovaStar - Report Times Out Reports Jun-05
830 Time type report, Time type is not printed Reports Jun-05
831
Timesheet Reports - All - Maxim Healthcare Services - Reports default to 01/01/2004 to 12/31/2004
Reports Jun-05
832 iReport -- Mod to Ts Pending Approval Reports Jun-05
833
Timesheet Reports - Time In/Out Report - Bruce Fox - Print all pages button does not work
Reports Jun-05
834
Custom Timesheet Report - SFRA Billable Salary Report - San Francisco Redev. Agency - report needs to be upgraded to work with the HR+ system
Reports Jul-05
835
GRP_jitu_1_of_2_Time Off Reports - Current Time Off Balances - Secura Insurance Company (secura) - report takes too long to run
Reports Jul-05
836 Time Off Reports - Current Time Off Balances - World Travel - Reports Jul-05
837
GRP_SAN_RPT 1 of 2 :Reports (General) - Report Engine - Florida Blood Services - no field for location description under Current Data Section
Reports Jul-05
838
GRP_SAN_RPT 2 of 2 :Reports (General) - Report Engine - Florida Blood Services - multiple records returned
Reports Jul-05
839
iReports - Report Definition for Timesheet Hours by Tracking Field Reports Jul-05
840
iReports: HR+ Reports - Employment Anniversary - Burr & Forman LLP - employees missing on the anniversary report
Reports Jul-05
841 iReports: Timesheet Status Reports Jul-05
842 iReports: Total Time Analysis Reports Jul-05
843
Maintenance Reports - Employee Count by Status - Jeff Hutch - Report shows the same company twice with different counts
Reports Jul-05
844
Reports (General) - iReports - Changing a filter does not refresh (or republish) iReport Reports Jul-05
845
Reports (General) - Other - Escambia County Tax Collector’s Office - New iReports do not include the Timeclock Pending Status
Reports Jul-05
846 Reports (General) - Other - None - Percent Usage XML report. Reports Jul-05
847
Time Off Reports - Time Off by Department - NovaStar - Report Times Out Reports Jul-05
848
Time Off Reports - Completed Time Off Requests - Secura Insurance Company (secura) - Report not returning any data
Reports Jul-05
849
Timesheet Reports - Exported Timesheet Source 500 Batches Report - Springer Verlag (springer) - Timesheet should be displayed alphabetically and be downloaded
Reports Jul-05
850 Timesheet Reports - Other - Cabot Oil - Custom Report Reports Jul-05
851
Timesheet Reports - iClock Detail Report - Bruce Fox - timesheet reports defaulting to wrong year
Reports Jul-05
Project Management Profile – Akash Dave
Page 38 of 91
852
Billing - Billing Reports - All - Usage Report by Implementation Engineer Reports Aug-05
853
HR+ Reports - Check H&E Detail - Factset (factset / factsetexp) - Records showing multiple times
Reports Aug-05
854
Reports (General) - Report Engine - Add (NOLOCK) to all SQL in the report engine component
Reports Aug-05
855 iReports: Timesheet Status with Notes Reports Aug-05
856
Reports (General) - Custom Reports - Factset (factset / factsetexp) - Review Custom Reports prior to HR+ conversion
Reports Aug-05
857
Reports (General) - Other - Sypris Solutions - Custom Time Off Report Reports Aug-05
858
Timesheet Reports - Cera custom report - problems with CERA custom report 'costed hours by band'
Reports Aug-05
859
HR+ Reports - Employee Anniversary Report - Amherst Technologies - Reports Sep-05
860 iReports: Earnings Report Reports Sep-05
861
LIVE site Bug - System - Billing Reports - All - Cannot run Usage Report by Implementation engineer - Unauthorized to view.
Reports Sep-05
862
Live site Bug - Timesheet Reports - Sched. Time vs. Act & Adj - Exceptions - Computerx -
Reports Sep-05
863
Live site Bug - Timesheet Reports - Sched. Time vs. Act & Adj - Exceptions - Computerx -
Reports Sep-05
864
Time Off Reports - Non-Completed Requests - Maxim Healthcare Services, Inc. (maxim) - Does not include requests unless both the begin and the end date fall between the date range selected
Reports Sep-05
865 Training+ - Manager Reports - Class List by Course Code Reports Sep-05
866 Training+ - Manager Reports - Class List by Employee Reports Sep-05
867 Training+ - Manager Reports - Class List by Instructor Reports Sep-05
868 Training+ - Manager Reports - Class List by Location Reports Sep-05
869 Training+ - Manager Reports - Class List by Start Date Reports Sep-05
870
Time Off Reports - Time Off by Time Type - Hawaii Pacific University (hpu) - include Reason Codes alongwith Time Off Types
Reports Sep-05
871
GRP_Santosh_2_Of_2_Reports (General) - iReport Engine - Report Admin page allows you to add an ASP file for an RDL report
Reports Oct-05
872 iReport -- Project Timesheets by Hours & Percent Reports Oct-05
873
iReports: Timesheet Reports - Other - All - A Report to show infor on Policy and Calendar Allocation screen
Reports Oct-05
874
Live Site Bug - Timesheet Reports - Task Hours by Project Code - Cambridge Energy Research Associates -
Reports Oct-05
875
live site bug - Timesheet Reports - Total Hours by Time Type - Computerx - iReports hours totaling by employee name
Reports Oct-05
876
LIVE SITE BUG --Timesheet Reports - iClock Punch Detail Report - Doctors Company, The - Punch Detail Report should show the seconds to display the correct adjusted or rounded time
Reports Oct-05
Project Management Profile – Akash Dave
Page 39 of 91
877
Time Off Reports - Completed Time Off Requests - Union Labor Life Insurance Company (ullico)- Completed Time off request with current balance shows incorrect Balance as of dates
Reports Oct-05
878
Time Off Reports - Other - Maxim Healthcare Services, Inc. (maxim) - Audit Report Reports Oct-05
879
Timesheet Reports - Other - Maxim Healthcare Services, Inc. (maxim) - Export Audit Report
Reports Oct-05
880
Timesheet Reports - Time by Tracking Fields (Filtered) - Avid - Server Error Reports Oct-05
881
Timesheet Reports - Time Off on a Timesheet - Springer Verlag (springer) - Totals not always displayed at the bottom of the page when running report for individual departments
Reports Oct-05
882
Custom Benefit Reports - CM - Aetna FSA Export - Cincinnati Lamb - Make this report HR+ compatible
Reports Oct-05
883
LIVE Site Issue - Standard Reports - Prenova - Employee Number not populating for all employees on Timesheet Details By Employee
Reports Oct-05
884
Live Site Issue - Time Off Reports - Other - American Academy of Family Physicians (aafp) - The Total Time Off Hours shown on the Report Differs from the Actual Requested Time Off Hours.
Reports Oct-05
885
Reports (General) - Other - Microsoft Licensing GP - iReports timesheet details report Reports Oct-05
886 Timesheet Reports - Earning Detail Report - WMIS - Fix For WMIS Reports Oct-05
887
Timesheet Reports - Other - Modern Language Association -Timesheet Custom Report Reports Oct-05
888
GRP_Santosh_2_Of_2_Reports (General) - iReport Engine - Report Admin page allows you to add an ASP file for an RDL report
Reports Nov-05
889
HR+ Reports - Changes Report - Allow Managers and Supervisor to run Changes Report
Reports Nov-05
890
LIVE site Issue-Benefit Reports - Benefits Monthly Information - Punahou - Change the hard coded information
Reports Nov-05
891
Live site Issue-HR+ Reports -Open Enrolment Report (Forms Submitted) - MFCU (Mission Federal Credit Union) - Report prints multiple status
Reports Nov-05
892
Remove sp_TSR_TotalHoursEmpRPT loop from TSTotalHoursEmpRPT report. Reports Nov-05
893
Timesheet Reports - Custom Time by Tracking Fields (Filtered) - Fischione - Reports Nov-05
894
Timesheet Reports - Custom Time by Tracking Fields (Filtered) - Fischione - Reports Nov-05
895
Timesheet Reports - Other - Escambia County Tax Collector’s Office - Auto-Decrement Report
Reports Nov-05
896
Timesheet Reports - Other - Fischione - Custom Task Hours by Project Code Reports Nov-05
897
Timesheet Reports - Other - Serologicals Corporation - CLient wants report report which will only show the employee records who has a missed punch punch
Reports Nov-05
Project Management Profile – Akash Dave
Page 40 of 91
898
Timesheet Reports - Time by Tracking Fields and Type - Avid - Report is not downloading correctly
Reports Nov-05
899
Timesheet Reports - Time In/Out Report (Employee) - Serologicals - Reports Nov-05
900
Timesheet Reports - Time Type Report (by day) - Hills Bank - Totals hours showing a difference of 0.01 hours compared to Timesheets total hours
Reports Nov-05
901
Timesheet Reports - Timesheet Exported Status - CARR America - Exported Status does not match status in Active List
Reports Nov-05
902
LIVE Site Issue: Timesheet Reports - Exported Timesheet Source 500 Batches Report - All - Report not displaying correct data
Reports Nov-05
903
Timesheet Reports - Employee Absence - Sun Hydraulics Corporation - Customized Absence report
Reports Nov-05
904
Timesheet Reports - Other - Modern Language Association -Timesheet Custom Report Reports Nov-05
905
Benefit Reports - Other - IXIS - Modify Custom Reports to work with HR+ Reports Dec-05
906
GRP_ChangesRpt_1 of 2_Live Site Issue : Reports (General) - Saved Reports - pdspc - Changes Report CSV Generation Unusable
Reports Dec-05
907
GRP_ChangesRpt_2 of 2_LIVE Site Bug - Changes Report - Biomerieux, Inc. (bmx) - Downloading a Changes Report file throws a server error
Reports Dec-05
908
HR+ Reports - Changes Report - Allow Managers and Supervisor to run Changes Report
Reports Dec-05
909
Oxford - Timesheet Reports - Other - Oxford Global Resources, Inc. - custom report Reports Dec-05
910
Timesheet Reports - Cera custom report - problems with CERA custom report 'costed hours by band'
Reports Dec-05
911
Timesheet Reports - Custom Report - Serologicals Corporation - Convert Serologicals Custom iClock Report to be Compatible with iClock+
Reports Dec-05
912
Timesheet Reports - Custom Report - Oxford Global Resources, Inc. - Modify their custom report for Supervisors/Mgrs/Adminsisa
Reports Dec-05
913 Timesheet Reports - Other - AC - Custom Report Reports Dec-05
914
Timesheet Reports - Other - Modern Language Association -Timesheet Custom Report Reports Dec-05
915
Timesheet Reports - Sched. Time vs. Act & Adj - Variance - Fidlar Company - Reports Dec-05
916
LIVE Site Issue - Timesheet Reports - Total Hours by Time Type - Homebuyer's Warranty -
Reports Dec-05
917
Benefit Reports - Benefit Changes Report (Med/Dent/Vision) - BSN-Jobst - add FSA plans
Reports Jan-06
918
HR+ Reports - EEO Report - Amherst Technologies - EEO Reports do not work off of Ethinicity Choice List
Reports Jan-06
919 iReport -- Project Code by Hours -- Reports Jan-06
920 iReport -- Project Timesheets by Hours & Percent Reports Jan-06
Project Management Profile – Akash Dave
Page 41 of 91
921 IReports - iReports Setup - All - List boxes for iReports Reports Jan-06
922
LIVE Site Issue - Benefit Reports - Missing Open Enrollment Form Report - All - Saved forms not displaying
Reports Jan-06
923
Live Site Bug: Timesheet Exports - Liberty Plus- Twin Counties Credit Union Reports Jan-06
924
Live site Bug - Timesheet Reports - Sched. Time vs. Act & Adj - Exceptions - Computerx -
Reports Jan-06
925
Live Site Issue - HR+ Reports - Employee Termination - WCA Waste Corporation - date range does not work correctly
Reports Jan-06
926
Live Site Issue -Timesheet Reports - iReports -Timesheet hours by Time type - Nixon Peabody - Returns data for 2004
Reports Jan-06
927
Reports - Timesheets - Remove year selection from timesheet reports page. Reports Jan-06
928
Reports (General) - Saved Reports - Carmeuse - Timesheet detail report by Employee Reports Jan-06
929
Salary Planning Reports - Other - RodaleSalary - Salary Planning Totals by Subdivision custom iReport
Reports Jan-06
930
Time Off Reports - All Balance Reports - Babb, Inc. (babb) - Allow all reports that show Current Balances to show Available Balances
Reports Jan-06
931
Time Off Reports - Other - Egenera (egenera) - Enhancement to custom report Egenera Accrual Report
Reports Jan-06
932
Timesheet Reports - Custom Report - All - Convert Serologicals Custom iClock Report to be Compatible with iClock+
Reports Jan-06
933
Timesheet Reports - iClock Detail Report - All - Convert to an iReport and make compatible with iClock+
Reports Jan-06
934
Timesheet Reports - iClock Punch Detail Report - All - Convert to an iReport and make compatible with iClock+
Reports Jan-06
935
Timesheet Reports - Time In/Out Report - All - Convert to an iReport and make compatible with iClock+
Reports Jan-06
936
Timesheet Reports - Custom Time by Tracking Fields (Filtered) - Fischione - Reports Jan-06
937
Timesheet Reports - Other - Fischione - Custom Task Hours by Project Code Reports Jan-06
938 Usage Report -- 1 of 2 -- By Imp Eng Reports Jan-06
939 Usage Report -- 2 of 2 -- By Company Reports Jan-06
940
Reports (General) - Increase Query timeout for long running report. Reports Feb-06
941
Timesheet Reports - Task Hours by Project Code - Serologicals Corporation - Hours column heading should also include percentage
Reports Feb-06
942 IReports - iReports Setup - All - List boxes for iReports Reports Jun-06
943
Benefit Reports - Benefit Changes Report (Med/Dent/Vision) - BSN-Jobst - add FSA plans
Reports
Jun-06
944
Timesheet Reports - Total Hours - Instrumentation, Systems, and Automation Society - si not printing Employe number
Reports
Jun-06
945
iReports: HR+ Reports - Changes Report - Magna HR, Inc. (magna) - Include Earning/Deduction TYPE in Changes Report
Reports
Jun-06
Project Management Profile – Akash Dave
Page 42 of 91
946
Timesheet Reports - Missing Timesheet - National FFA Organization (ffa) - EMail confirmation inconsistent
Reports
Jun-06
947
Live Site Issue-HR+ Reports - Employment Anniversary - Paragon Development Systems - is not pulling data
Reports
Jun-06
948
Reports (General) - Report Engine - WCA Waste Corporation - No 'In' Clause in Report Writer
Reports
Jun-06
949
Maintenance Reports - Active Users Report - Wide Open West Finance (wow) - Listing of New roles required with User names.
Reports
Jun-06
950
System - Billing Reports - All - Create a report to get a list of clients that use specific features
Reports
Jun-06
951 Timesheet Reports - iReport - Time In/Out Report - All - Reports Jun-06
952 35. iReport -- Project Code by Hours -- Reports Jun-06
953
Reports (General) - Other - All - Remove code loop from iClock Detail Report and other fixes
Reports
Jun-06
954
Reports (General) - Other - All - Remove code loop from Billable Hours Report Reports
Jun-06
955
Reports (General) - Other - All - Remove code loop from Time In/Out Timesheet Report Reports
Jun-06
956
Reports (General) - Other - All - Remove code loop from Time Type Detail Report Reports
Jun-06
957
Reports (General) - Other - All - Remove code loop from Timesheet Details Report by Employee
Reports
Jun-06
958
Live Site Issue-Reports (General) - Other - American Trucking Association - Timesheet Detail Report by an employee is not pulling up Terminated employee.
Reports
Jun-06
959
Live site issue -- Timesheet Reports - iReport -- Project timesheet by Hours - JStor - Project timesheet by hours report not returning correct data.
Reports
Jun-06
960
Live Site isue- Reports (General) - iclock punch detail report - Mascoma Savings Bank - Difference in timings in iclock punch detail report
Reports
Jun-06
961
Timesheet Reports - Reinforced Earth Project Code hours Report - Reinforced Earth - Reports
Jun-06
962
Live site bug Timesheet Reports - Time In/Out Report (Employee) - Serologicals Corporation - Time In/Out Report (Employee) not showing the hours properly.
Reports
Jun-06
963 iReports- Time Off taken by Department Reports Jun-06
964 57. iReports -- Expenses -- Cash Advance Report Reports Jun-06
965 Reports (General) -- Expenses -- Expense Detail Report Reports Jun-06
966 Reports (General) - Expenses by Expense Type Report Reports Jun-06
967 58.iReport -- Expenses -- Expenses Pending Completion Reports Jun-06
968 iReports: Time by Tracking Field Report Reports Jun-06
969
Timesheet Reports - Other - Molecular Devices (moldev) - Exported Timesheet Batches Detail Report has incorrect hours Reports Jun-06
970 Security - Passwords - WNA (wna / zzgencas / zzwna) - Client Request for Strong
Password requirements Reports Jun-06
971 55. iReport -- Expenses -- Expenses Pending Approval Reports Jun-06
Project Management Profile – Akash Dave
Page 43 of 91
972
Timesheet Reports - Missing Timesheet - Ullico - Convert Missing Timesheet report to iReport
Reports
Jun-06
973
Reports (General) - Report Security - Copic Companies - Total hours by time type report needs to be made available to the Employees
Reports
Jun-06
974
iReports: Timesheet Reports - Other - We need to create new reports that show $$$ values
Reports
Jun-06
975 Reports (General) -- Expenses -- Expense Detail Report Reports Dec-06
976 Reports (General) - Expenses by Expense Type Report Reports Dec-06
977 Timesheet Reports - DCU Custom Report - Digital Federal Credit Union - Enhancement required in the Custom Report Reports Dec-06
978 Reports (General) - Other - All - Optimize Non Completed report for best performance Reports Dec-06
979 Time Off Reports - Current Time Off Balances - Atlantic Container Line - displays server error only for Supervisors Reports Dec-06
980 Reports (General) - Time In Out Report - West Texas National Bank - When you download the report, the header are displayed incorrectly Reports Dec-06
981 live site bug - Benefits - Other - OwnIt Mortgage - BCBS carrier interface not bringing over dependants PCP Reports Dec-06
982 Live Site Issue - Timesheet Reports - iClock Detail Report - Treiber Group, The - Adjustment to the meal break in the report Reports Dec-06
983 Live site bug : Timesheet Reports - Other - Escambia County Tax Collector’s Office - Issue with Exported Timesheet Fundware Batches Report for Escambia Reports Dec-06
984 Reports (General) - Reports - All - Optimization of DB2 report sp and raw sql Reports Dec-06
985 Usage Report -- 1 of 2 -- By Imp Eng Reports Dec-06
986 Benefit Reports - Other - Biomerieux, Inc. (bmx) - Add the three bioMereiux Benfits Audit reports to the system Reports Dec-06
987 HR+ Reports - Changes Report - Public Storage - need custom changes report Reports Dec-06
988 Live site bug : Timesheet Reports - Other - Escambia County Tax Collector’s Office - Issue with Exported Timesheet Fundware Batches Report for Escambia Reports Dec-06
989 Benefit Reports - Other - Public Storage - Great West carrier feed Reports Dec-06
990 Time Off Reports - Non-Completed Requests - Clearwire Corportation - report does not work for employees with apostrophes in their name Reports Dec-06
991 Timesheet Reports - Time by Tracking Fields and Type - Save the Children - Add description to the report Reports Dec-06
992 Timesheet Reports - Time by Tracking Fields (Filtered) - Save the Children - Add description to the report Reports Dec-06
993 Timesheet Reports - Time by Tracking Fields - Save the Children - Add description to the report. Reports Dec-06
994 Timesheet Reports - Other - Microsoft Licensing GP - changes need to custom report Reports Dec-06
Project Management Profile – Akash Dave
Page 44 of 91
995 Reports (General) - Time In Out Report - West Texas National Bank - When you download the report, the header are displayed incorrectly Reports Dec-06
996 Timesheet Reports - Other - New England Center for Children - Customized reports for the timesheets created by the Managers Reports Dec-06
997 35. iReport -- Project Code by Hours -- Reports Dec-06
998 Benefit Reports - Benefit Eligibility - Biomerieux, Inc. (bmx) - report needs to handle pages and not all in one Reports Dec-06
999 Reports (General) - Other - PowerPay - EEO Ethnicity and EEO Job Class Reports Dec-06
1000
Live site issue-Timesheet Reports - Missing Timesheet - Adaptis Inc. - Generate Employee Email in Missing timesheet Report send emails to the employees with the To showing the email address of the person who generated the emails. Reports Dec-06
1001 Timesheet Reports - Missing Timesheet - OwnIt Mortgage - subcompany filter should show the name and not the value Reports Dec-06
1002
Benefit Reports - Other - Boon Group, The - need to be able to run a report to see who declined benefits
Reports Feb-07
1003
Time Off Reports - Current Time Off Balances - Atlantic Container Line - displays server error only for Supervisors
Reports Feb-07
1004
Training+ - Instructor Report - The Dolben Company, Inc. - To pull information for the list of employees enrolling for his class along with their status of Enrollment.
Reports Feb-07
1005
Training+ Reports - Class Enrollment - The Dolben Company, Inc. - Reports Feb-07
1006
Timesheet Reports - Total Hours by Time Type - Wisconsin Public Power (WPPI) - Reports Feb-07
1007
Timesheet Reports - Time by Tracking Fields and Type - Save the Children - Add percentage column to the report
Reports Feb-07
1008
Timesheet Reports - Custom Report - Save the Children - Exported Timesheet Report Reports Feb-07
1009
Timesheet Reports - Missing Timesheet - Save the Children - Customize the report to add timesheet date range column
Reports Feb-07
1010
Timesheet Reports - Other - Save the Children - Custom Reversal batch report Reports Feb-07
1011
Time Off Reports - Non-Completed Requests - Clearwire Corportation - report does not work for employees with apostrophes in their name
Reports Feb-07
1012
live site bug - Timesheet Reports - Other - Microsoft Licensing GP - ADP PCPW Batches report does not show correct reg hours
Reports Feb-07
1013
Benefit Reports - Other - Biomerieux, Inc. (bmx) - custom report for life plan Reports Feb-07
1014
Benefit Reports - Other - Biomerieux, Inc. (bmx) - custom report for suppelmental life plans
Reports Feb-07
1015
Benefit Reports - Other - Biomerieux, Inc. (bmx) - custom report for AD&D plans Reports Feb-07
Project Management Profile – Akash Dave
Page 45 of 91
1016
Benefit Reports - Other - Biomerieux, Inc. (bmx) - custom report for STD plans Reports Feb-07
1017
Benefit Reports - Other - Biomerieux, Inc. (bmx) - custom report for LTD plans Reports Feb-07
1018
Benefit Reports - Other - Biomerieux, Inc. (bmx) - custom report for dependent life plans
Reports Feb-07
1019
Benefit Reports - Benefit Eligibility - Biomerieux, Inc. (bmx) - report needs to handle pages and not all in one
Reports Feb-07
1020
Reports (General) - Other - Maxim - Time Off by Department Report is looping sprocs Reports Feb-07
1021
Timesheet Reports - Earnings Report - Maxim - Add employees' home department to report
Reports Feb-07
1022
HR+ Reports - Other - Public Storage - custom report for termination wizard Reports Feb-07
1023
Reports (General) - Other - PowerPay - EEO Ethnicity and EEO Job Class Reports Feb-07
1024 Reports (General) - Other - - Live Site Error Report Reports Feb-07
1025 Reports (General) - Other - - Dimitri's Billing Report Reports Feb-07
1026
LIVE Site Issue - Timesheet Reports - Multivac FST Timesheet Report - iReport - Multivac - Custom report not working properly
Reports Feb-07
1027
LIVE Site Issue - Reports (General) - Report Engine - All - fields missing from HR+ Report Engine
Reports Feb-07
1028
Live Site Issue - Timesheet Reports - Standard Report - Time by Tracking Fields (Filtered) gives Server Error - Save the Children
Reports Feb-07
1029
Reports (General) - Other - BOC Edwards - Custom Timesheet report to show the ovetime for non Exempt Employees
Reports Feb-07
1030 Timesheet Reports - Other - BOC Edwards - Reports Feb-07
1031
Salary Planning - Other - Heineken USA - The salary planning master report is not pulling any data.
Reports Feb-07
1032
Live Site Issue :Timesheet Reports - iClock Punch Detail Report - United Bank - iClock punch detail is not working for HR/Benefits Client
Reports Feb-07
1033
Live site : Timesheet Reports - Total Hours - Dean Health Plan - Total hours reports gives a server error when you click on the Next button to go to next page
Reports Feb-07
1034
Live site issue-Timesheet Reports - Missing Timesheet - Adaptis Inc. - Generate Employee Email in Missing timesheet Report send emails to the employees with the To showing the email address of the person who generated the emails.
Reports Feb-07
1035
Timesheet Reports - iClock Punch Detail Report - Advanced Orthopedic Centers P.C. - Reports Feb-07
1036
HR+ Reports - Other - Public Storage - change needed to employee demographics report
Reports
May-07
1037
Live Site Issue - iReports - Time Off Reports - Non Completed Time Off Report - Mascoma Savings Bank -
Reports
May-07
Project Management Profile – Akash Dave
Page 46 of 91
1038
Timesheet Reports - Timesheet Details by Employee - Food Product Association - Custom Timesheet Details by Employee Report
Reports
May-07
1039 Time Off Reports - Other - Maxim - Non-Exported Time Off Report Reports May-07
1040
Timesheet Reports - Other - Look Smart - Client has reported problem with the Calcutaion of pro-rated hours and the number of days in the Capitalization report
Reports
May-07
1041
Timesheets - Timesheet Report - Ciba Specialty Chemicals - Timesheet Notes and Status report to have timestamp
Reports
May-07
1042
Timesheet Reports - Custom Report - Save the Children - Exported Timesheet Report Reports
May-07
1043
Reports (General) - iReport - iClock Punch Detail Report - Mascoma Savings Bank - After exporting the report in .CSV format, the first line is not displayed
Reports
May-07
1044
Time Off Reports - Completed Time Off Requests - Loral Skynet - Additional fields on the completed time off requests report.
Reports
May-07
1045
Timesheet Reports - Timesheets Created by Managers/ Supervisors - New England Center for Children - Customized report needs to display the timesheets created by the Managers/ Supervisors for themselves
Reports
May-07
1046
Time Off Reports - Time Off by Time Type - Maxim - Add SubCompany Filter to TO By TT Report
Reports
May-07
1047
Benefit Reports - Other - Biomerieux, Inc. (bmx) - custom report for life plan Reports
May-07
1048
Timesheet Reports - Other - BOC Edwards - Salary non exempt report Reports
May-07
1049
Timesheet Reports - Other - Fischione - Custom Task Hours by Project Code Reports
May-07
1050
LIVE Site Issue - Timesheet Reports - Missing Punch Detail Report - Treiber Group, The - report displays employee even if punched in
Reports
May-07
1051
Timesheet Reports - Custom Time by Tracking Fields (Filtered) - Fischione - Reports
May-07
1052
Live Site Issue :Timesheet Reports - iClock Punch Detail Report - United Bank - iClock punch detail is not working for HR/Benefits Client
Reports
May-07
1053 Salary Planning Reports - Other - Public Storage - Custom Report Reports May-07
1054
Reports (General) - Other - Maxim - Time Off by Department Report is looping sprocs Reports
May-07
1055
Reports - Timesheet Report - Save the Children - Custom Effort Report Reports
Aug-07
1056
Timesheet Reports - Other - Clearwire Corportation - need to be able to report on timesheet notes for certain date range by employee
Reports
Aug-07
1057 Reports - Time In/Out Report - Appleton Ideas (appleton) - Reports Aug-07
1058
Live Site Issue-Benefit Reports - MPG Oxford Export - MPG - not pulling all the Oxford Plans
Reports
Aug-07
Project Management Profile – Akash Dave
Page 47 of 91
1059
Timesheet Reports - Total Hours by Time Type - Wisconsin Public Power (WPPI) - Reports
Aug-07
1060 Timesheet Reports - Other - Playboy Enterprises (playboy) - Reports Aug-07
1061
Benefit Reports - Missing New Hire Enrollment - Public Storage - request modificaitons Reports
Aug-07
1062
Timesheet Reports - Timesheet Details Report by Employee - Save the Children Reports
Aug-07
1063
Timesheet Reports - Other - Devry - need to be able to filter out system generated notes from employee generated notes on timesheets
Reports
Aug-07
1064
Time Off Reports - Time Off Balances from Payroll - Queen Liliuokalani Children's Center - It is showing duplicate lines and Department is showing description instead of
State codes.
Reports
Aug-07
1065
Training+ - All iReports - Bangor Savings Bank - all Training+ iReports need to have spaces at the beginning of the from date removed
Reports
Aug-07
1066
Timesheet Reports - Other - Clearwire Corportation - OT Reporting Reports
Aug-07
1067
Live Site Bug -Time Off Reports - Non-Completed Requests - Timberland Bank (timberland) - Incorrect Desciption in the To field of the email notification sent to the
employee
Reports
Aug-07
1068
Timesheets - Timesheet Report - Ciba Specialty Chemicals - Timesheet Notes and Status report to have timestamp
Reports
Aug-07
1069
live site bug - Timesheet Reports - Non-Completed Timesheet - Clearwire Corportation - report is sending two emails to the admin when running the report
Reports
Aug-07
1070
Benefit Reports - Other - Public Storage - filter for hire/last hire date for all the benefit reports that show employees not enrolled
Reports
Aug-07
1071
Timesheet Reports - Missing Timesheet and Non-Completed Timesheet Report- Devry - Need to add a filter for 'Divisions' .
Reports
Aug-07
1072
Benefit Reports - Benefit Election - WCA Waste Corporation - Benefit Elections Report--Vison Plan does not show coverage on the report.
Reports
Dec-07
1073 HR+ Reports - Other - Public Storage - custom report Reports Dec-07
1074
HR+ Reports - Additional Rate information - Healthquest Central Jersey Llc - We need a custom report to get the information on all the additional rates assigned to the employees.
Reports
Dec-07
1075
Timesheet Reports - Other - Look Smart - Client has reported problem with the Calcutaion of pro-rated hours and the number of days in the Capitalization report
Reports
Dec-07
1076
Timesheet Reports - Other - BOC Edwards - BocEdwards hourly employee overtime report
Reports
Dec-07
1077
Timesheet Reports - Time In/Out Report (Now showing correct hours)- Helms Mulliss & Wicker -
Reports
Dec-07
1078
Live Site Issue - Reports (General) - Time Type Report (by Day) - Readers' Digest - The last line on the report displays incorrectly in the following week.
Reports
Dec-07
Project Management Profile – Akash Dave
Page 48 of 91
1079
Timesheet Reports - - Cytonome -Timesheet details by employee (employee) showing no records
Reports
Dec-07
1080
HR+ Reports - Dependent/Emergency Contact - Cell Phone Field needs to populate - Escambia County Tax Collector’s Office -
Reports
Dec-07
1081
live site bug - Time Off Reports - Other - Microsoft Licensing GP - timesheet remaining balance hours export shows employees with 0 hours
Reports
Dec-07
1082
Timesheet Reports - Time Type Report (by day) - Dura Automotive - add FLSA filter to the report
Reports
Dec-07
1083
Live Site Issue - HR+ Reports - Check H&E Detail - Visiting Nurse - Report can not run on IE 7.0
Reports
Dec-07
1084
Timesheet Reports - Other - Microsoft Licensing GP - timesheet details and time type report add cost center to the summary line
Reports
Dec-07
1085
Timesheet Reports - Other - Delta Dental - User Type report, standard or iReport, for Timesheet Timeclock allocation
Reports
Dec-07
1086
Reports (General) - Other - University Physicians, Inc. (upi) - Optimizing the Time Off by Day of the Week Report.
Reports
Dec-07
1087
Timesheet Reports - Other - Clearwire Corportation - Audit report for punches Reports
Dec-07
1088
Live Site Issue:Timesheet Reports - Total Hours by Time Type - BCD Travel - Report getting timed out
Reports
Dec-07
1089
Benefit Reports - total compensation report - Biomerieux, Inc. (bmx) - custom report Reports
Dec-07
1090
Expense Report - Expense Report by Employee - Swingtide - Not able to download expense report into excel file format
Reports
Dec-07
1091 Benefit Reports - Other - Arden - changes in group number and new plan addition Reports Mar-08
1092 Benefit Reports - total compensation report - Biomerieux, Inc. (bmx) - custom report Reports Mar-08
1093 Reports (General) - Other - Glacier Park Inc. - Custom Report Reports Mar-08
1094 Timesheet Reports - Pay Exception Report- Edwards - need to add new codes and fields
to report Reports Mar-08
1095 Expense - Report - Sypris - Report needed to track expenses charged to tracking fields Reports Mar-08
1096 Report - eGenera Report accural report - American Lung Association of Midland States
- Add SICK time off type into report Reports Mar-08
1097 HR+ Reports - MOD -Annual Pension Report - March of Dimes - Not pulling the correct
information. Reports Mar-08
1098 Reports (General) - Report Security - Save the Children - Time type by tracking field
and type (Percentage Report) for Managers and Supervisor role Reports Mar-08
1099 live site bug - Benefit Reports - Other - Public Storage - missing new hire enrollment
form is defaulting to the previous supervisor in the list if the employee has none Reports Mar-08
1100 Timesheet Reports - Missing Timesheet - Save the Children - Report -Report should
look at the employment history Reports Mar-08
Project Management Profile – Akash Dave
Page 49 of 91
1101 Timesheet Reports - iClock Punch Detail Report - Preferred One - Report doesnt pull
data of past years. Reports Mar-08
1102 Timesheet Reports - Timesheet Exported Status - Maxim - Reports Mar-08
1103 Timesheet Reports - Timesheet Details by Employee - Dura Automotive - sub company
filter does not work correctly Reports Mar-08
1104 Time Off Reports - Other - QBE Regional - Improve Time Off Balance Report by
Departments Reports Mar-08
1105 Time Off Reports - Time Off by Time Type - QBE Regional - The timetypes are getting
chopped off from the Report Filter Screen. Reports Mar-08
1106
Timesheet Reports - Total Hours by Time Type - All South Federal Credit Union (allsouth) - Total Hours by Time Type report is not showing the data for the Timesheets
of 2006 Reports Mar-08
1107 Timesheet Reports - Other - Modern Language Association - Timesheet Employee Cost
Report Reports Mar-08
1108 Live site : Timesheet Reports - Total Hours - Dean Health Plan - Total hours reports
gives a server error when you click on the Next button to go to next page Reports Mar-08
1109 Time Off Reports - Other - Mizuho Corporate Bank - Consecutive Days Time Off report
should only pull time off requests greater than zero Reports Mar-08
1110 Timesheet Reports - Missing Timesheet and Non-Completed Timesheet Report- Devry -
Need to add a filter for 'Divisions' . Reports Mar-08
1111 HR+ Reports - - March of Dimes - Custom report to export Termination records Reports Mar-08
1112 Timesheet Reports - Missing Timesheet - Dura Automotive - add employee number to
report Reports Mar-08
1113 Timesheet Reports - Non-Completed Timesheet - Dura Automotive - add employee
number to report Reports Mar-08
1114 Reports - All Standard Reports - All - all standard reports need to be downloadable Reports Mar-08
1115 Billing - Billing Reports - Other - Discrepanices in Monthly report generated from Sarla Reports Mar-08
1116 Timesheet Reports - Time Off on a Timesheet - New England Center for Children - Reports Mar-08
1117
Salary Planning - Salary Planning Entry - RodaleSalary - Add a Notes field to salary planning forms
Salary Planning Jan-05
1118
Salary Planning - Salary Planning Entry - RodaleSalary - Add percentage data to BALANCE item in Salary Planning Guidelines
Salary Planning Jan-05
1119
Salary Planning Reports - Other - RodaleSalary - Salary Planning Totals by Subdivision custom iReport
Salary Planning Jan-05
1120
Salary Planning - Other - Bangor Savings Bank - Salary planning is exporting for the person that made the change as opposed to for the person the change is affecting
Salary Planning
Jan-05
1121
grp_salp_1_Salary Planning Phase 2: Performance Review Defaulted to Not Reviewed Salary Planning Jan-05
1122
grp_salp_2_Salary Planning Phase 2: Limit the number of Salary Plan Submissions an Employee can be on in a specific period
Salary Planning Jan-05
Project Management Profile – Akash Dave
Page 50 of 91
1123
GRP_SALP_1_OF_2_Salary Planning - Other - All - Make Salary Planning Work for Direct Clients
Salary Planning Jan-05
1124
Salary Planning Phase 2: Submission Process Salary Planning Jan-05
1125
Salary Planning Reports - Other - RodaleSalary - Salary Planning Totals by Subdivision and Department Report
Salary Planning Jan-05
1126
Salary Planning - Salary Planning Entry - Babb, Inc. (babb) - Other Comp values being displayed in wrong columns
Salary Planning
Jun-05
1127
Salary Planning Phase 2: Salary Planning New Auditing report Salary Planning
Jun-05
1128
Salary Planning Phase 2: Salary Planning New Auditing report Salary Planning
Aug-05
1129
GRP_SALP_1_OF_2_Salary Planning - Other - All - Make Salary Planning Work for Direct Clients
Salary Planning
Oct-05
1130
GRP_SALP_2_OF_2_Salary Planning - Salary Planning Setup - Scheduled Bonus Settings
Salary Planning
Oct-05
1131
LIVE Site Issue - Salary Planning Report - Babb, Inc. (babb) - No data is being returned on Salary Planning - Salary and Scheduled Bonus Summary
Salary Planning
Nov-05
1132
Salary Planning - Migration issue with Choice list Salary Planning
Nov-05
1133
GRP_SALP_1_Of_3_Salary Planning - Salary Planning Setup - Rodale (rodale / zzrodale) - Allow Users to Edit the Default Effective Date in Salary Planning+
Salary Planning
Dec-05
1134
GRP_SALP_2_Of_3_Salary Planning - Salary Planning Setup - Rodale (rodale / zzrodale) - Hide the Review Column on the Salary Planning+ Form
Salary Planning
Dec-05
1135
GRP_SALP_3_Of_3_Salary Planning - Salary Planning Setup - Rodale (rodale / zzrodale) - Limit to guideline grouping options causing an error
Salary Planning
Dec-05
1136
GRP_SALP_1_OF_2_Salary Planning - Other - All - Make Salary Planning Work for Direct Clients
Salary Planning
Dec-05
1137
Live site issue -- Salary Planning - Other - Babb, Inc. (babb) - Salary Planning export file is showing wrong amount.
Salary Planning Jun-06
1138
Live Site Issue-Salary Planning - Export - Nixon Peabody - Export prints it as Basic Salary Planning Jun-06
1139
Salary Planning - Salary Planning Entry - Babb - Allow users to enter in a negative amount on the Salary Planning
Salary Planning
Feb-07
1140
Salary Planning - Budget Setup - Bangor Savings Bank - The Budget should have the option to be set as a dollar amount
Salary Planning May-07
1141
Salary Planning - Salary Planning Entry - Nixon Peabody - Not able to Add employees to the Saved Salary Planning list
Salary Planning May-07
1142
Salary Planning - Salary Planning Setup - Heineken USA - Customization of Pro-rate calculation for Salary Planning
Salary Planning May-07
1143
Salary Planning - Salary Planning Entry - Nixon Peabody - Flaxible field width on Salalry planning list page
Salary Planning May-07
Project Management Profile – Akash Dave
Page 51 of 91
1144
Salary Planning - Salary Planning Entry - All - Active List and Archived List for Salary Planning
Salary Planning May-07
1145
Salary Planning - Salary Planning Entry - Babb - Allow users to enter in a negative amount on the Salary Planning
Salary Planning May-07
1146
Salary Planning - Approval Details - Bangor Savings Bank - Highlight changes made by approving manager when rejected
Salary Planning May-07
1147
Live site Issue - Salary Planning - Salary Planning Entry - Anadigics - Server error when clicked on employee name in the Salalry Planning form.
Salary Planning
Dec-07
1148
Salary Planning - Other - Wilshire Associates - Populate specific HR screens onto both the DETAILED and MAIN FORM for salary planning
Salary Planning
Dec-07
1149
Salary Planning - Derive specific fields from HR-COMPSENSATION PAGE onto SP form - Wilshire Associates -
Salary Planning Dec-07
1150 Live Site Issue- Salary Planning - Salary Planning Entry printing - Anadigics - Salary
Planning Mar-08
1151 Salary Planning - Salary Planning Entry - Nixon Peabody - Not able to Add employees
to the Saved Salary Planning list Salary
Planning Mar-08
1152 Salary Planning - Salary Planning Entry - All - Active List and Archived List for Salary
Planning Salary
Planning Mar-08
1153 System - Other - All - Typos System Feb-07
1154
Time Off - Balance Setup - Virginia Housing Development Authority - Remove the effective date option in submitted and approved request option in the set up balance screen .
Time Off Feb-07
1155 GRP_HOL_jitu 1 of 2: Holiday Calendar-Exempt Employees Time Off Feb-07
1156
LIVE Site Bug - System - Time Off Migration - Direct Holdings Worldwide (DHW) - time off migration is not working
Time Off Feb-07
1157
Time Off - Active List - BCD Travel - Functionality to sort Active list by number of hours
Time Off Feb-07
1158
Live Site Issue - Time Off - Other - MLN USA - Rejected T/O displays the wrong Approver's name.
Time Off Feb-07
1159
Time Off - Balance Entry - Misukanis & Odden - Cut down to two digits after the decimal point, currently rounding too much
Time Off Feb-07
1160
Live site bug - Time Off - Central Approval - Mortgage Lenders Network USA - The option -Requests (Approved Status) for future dates are in GREEN.- in the time off approval screen works only for Manager/ Supervisor role but not for the Admin Role.
Time Off Feb-07
1161
Live Site Issue - Time Off - Date Stamp not appearing for completed Time off Request in the Notes - Genelogic
Time Off Feb-07
1162
Time Off - Central Approval - Need to build Paging functionality into Inbox Time Off Feb-07
1163
Time Off - Central Approval - Optimize nsp_TO_ActiveList_GetActiveList_Paging Time Off Feb-07
1164
Time Off - Other - Playboy Enterprises (playboy) - Manager/Supervisor cannot approve and Route individual request further
Time Off Feb-07
Project Management Profile – Akash Dave
Page 52 of 91
1165
GRP_HOL_Jitu_2_of_2Time Off - Holiday Calendar - All - Time Off - Holiday Calendar - All - Issues with Holiday Calendar
Time Off Feb-07
1166 Time Off - Advanced Time Off Settings - Waters - Time Off Feb-07
1167
Live site issue Time Off - Time Off Emails - Babb, Inc. (babb) - The email sent while Time off request is unsubmitted has a link mentioned in Company info page.
Time Off Feb-07
1168 Live Site Issue- Time Off - Issues Time Off Dec-07
1169
Time Off - Other Time Off Settings - Aloha United Way - Error submitting the timesheet when the timeoff balance is zero for the employee
Time Off
Jan-05
1170
Time Off - Time Off Imports - - Import Time off requests hours for the date ranges Time Off
Jan-05
1171
LIVE Site Issue - Time Off - WNA (wna / zzgencas / zzwna) - Time Off requests can be submitted for 0 hours even though settings should prevent that
Time Off
Jan-05
1172
Time Off - Time Off Entry - Union Labor Life Insurance Company (ullico) - Enlarge the dropdown fields for Time Type and Reason Code selections
Time Off
Jan-05
1173
Time Off - Other Time Off Settings - All - Unsubmit wording should be changed Time Off
Jan-05
1174 Time Off - Balance Entry - Homebuyer's Warranty - Time Off Jan-05
1175
Time Off - Other - Babb, Inc. (babb) - unsubmitted requests do not show on the notes section that anything happen to the time off request
Time Off
Jan-05
1176
Time Off - Sorting TIme Off - Boston Communications Group (BCGI) - TIme Off is not getting sorted in Chronological order.
Time Off
Jan-05
1177
Live Site issue -- Time Off - Balance Entry - JStor (Artstor) - Wrong display of Time Off hours.
Time Off
Jan-05
1178
Time Off - Central Approval - Bangor Savings Bank - If the employee is an eligible approver their name appears in the drop-down list
Time Off
Jan-05
1179
Live Site Issue - Time Off - Manager Calendar - WorldTravel - Department Filter on Calendar
Time Off
Jan-05
1180
Live site bug - Time Off - Advanced Time Off Settings - Newport News Shipbuilding Credit Union - manager entry not validating advance settings
Time Off
Jan-05
1181
Advanced Time Off Settings are not forced when an approver makes a change to an existing Time Off Request
Time Off
Jan-05
1182
Live Site Issue : Time Off - Time Off Emails - Adaptis Inc. - Multiple Emails Being Sent Time Off
Jan-05
1183
Time Off - Balance Setup - All - Allow balance calculations to be based on User Type, Pay Type, or FLSA Status
Time Off
Jan-05
1184
WorldTravel - Time off list screen (employee view) - Enhancements to the Employee Lists
Time Off
Jan-05
1185
Time Off - Employee Calendar - Time Off Lists - Mac Compatibility Time Off
Jan-05
Project Management Profile – Akash Dave
Page 53 of 91
1186
Time Off Reports - Time Off Requests w/ Balances - CARR America - Not Displaying All of the Employees it Should
Time Off
Jan-05
1187
Time Off - Time Off Entry - All - make the Time Off Entry page display the correct date according to the time zone
Time Off
Jan-05
1188
Time Off - Other Time Off Settings - Serologicals Corporation - Time Off Requests with no Balances associated with it should not appear in Red.
Time Off
Jan-05
1189 Time Off - Time Off Entry - All - Issues in Time Off using Firefox Time Off Jan-05
1190
Time Off - Active List - Secura Insurance Company (secura) - Partially Exported is displayed if 0 hours entered
Time Off May-05
1191
Time Off - Balance Entry - employee list goes back to first page everytime you make change
Time Off May-05
1192
Time Off - Balance Entry - WNA (wna / zzgencas / zzwna) - Adjustment to new Balance Entry features
Time Off May-05
1193
Time Off - Other - All - The View Totals message on the active and archived list needs to be reworded
Time Off May-05
1194
Capital Z--Employee calendar view should give the employee a yearly view of all of their time off requests pending and completed
Time Off Jun-05
1195
GRP_Jitu_1_of_2_ Time Off - Central Approval Setup - Egenera (egenera) - Inactive approvers should not show up in drop-down list for employees to submit to
Time Off Jun-05
1196
GRP_Jitu_2_of_2_ Time Off - Manager Time Off Entry - Prenova - Terminated employees are visible in the approve & route list
Time Off Jun-05
1197
GRP_SAN_TO : Time Off - Other Time Off Settings - WNA (wna / zzgencas / zzwna) - Enhancements to Balance As Of Dates
Time Off Jun-05
1198
Time Off - Other Time Off Settings - Babb, Inc. (babb) - Time Off by day setting is rounding when it should not do so
Time Off Jun-05
1199
Time Off - Other Time Off Settings - e-Management Inc. - reason codes Time Off Jun-05
1200
Time Off - Other Time Off Settings - WNA (wna / zzgencas / zzwna) - Enhancements to Balance As Of Dates
Time Off Jun-05
1201
Time Off - Time Off Entry - Verify Time off Balances are calculated properly while requesting for a Time off
Time Off Jun-05
1202 Time Off - Time Off Entry - Alacare Home Health - Time Off Jun-05
1203
Capital Z--Time Off module should record and display Time Off data by days and hours instead of hours only
Time Off Jul-05
1204
HBW - Time off request entered from time off manager for exception only users Time Off Jul-05
1205
Limiting Time Types in Pay Policy should also Apply to the Time Off Module Time Off Jul-05
1206
Time Off - Central Approval - CARR America - Do not allow Approver to complete the 'Time Off' requests until the Request date has been passed.
Time Off Jul-05
1207
Time Off - Central Approval - Egenera (egenera) - Do not allow Approver to complete the 'Time Off' requests until the Request date has been passed not working as it should
Time Off Jul-05
Project Management Profile – Akash Dave
Page 54 of 91
1208
Time Off - Manager Time Off Entry - World Travel - New Enhancements to the Manager TO Entry page
Time Off Jul-05
1209
Time Off - Other - American Board of Pediatrics, Inc. - balance display is incorrect for completed requests
Time Off Jul-05
1210
Time Off - Other - Microsoft Licensing GP - Disable NEXT button on Page 4 of Time Off Setup
Time Off Jul-05
1211
Time Off - Other Time Off Settings - Modification to Enhancements to Balance As Of Dates
Time Off Jul-05
1212
Time Off - Time Off Entry - Independent Container (ic) - Unable to request a Time Off Time Off Jul-05
1213
GRP_Rajesh_2 of 2_Time Off - Time Off Entry - Balance value and 'available hours' value do not match
Time Off Aug-05
1214
Time Off - Employee Calendar - Raining Data - Populate calendar with Holiday Calendar
Time Off Aug-05
1215
Time Off - Manager Time Off Entry - American Academy of Family Physicians (aafp) - While checking Time Off via Manager, Total hours displayed are different than actual hours.
Time Off Aug-05
1216
Time Off - Time Off Entry - Timberland Bank (timberland) - Warning for time off requests that duplicate/overlap existing requests
Time Off Aug-05
1217
LIVE SITE ISSUE : Time Off - Balance Imports - World Travel - effective date being updated for all the time types
Time Off Sep-05
1218
Time Off - Manager Calendar - CWFM - View Multiple Departments at the same time Time Off Sep-05
1219
Time Off - Notes - Double quotes in the note field causes the cheetah to run continuously
Time Off Sep-05
1220
GRP_SAN_TS 12 of 12 Time Off - Other - Lionbridge (lionbridge) - the time off is integrating onto the completed timesheet.
Time Off Sep-05
1221
Time Off - Balance Entry - Union Labor Life Insurance Company (ullico) - Balance Entry page limits time off balances to less than 3500
Time Off Oct-05
1222
Time Off - Other Time Off Settings - Babb, Inc. (babb) - Balances by day settings still not saving properly.
Time Off Oct-05
1223
Time Off - Other - All - Rectify time off export list page of ADP Enterprise export Time Off Oct-05
1224
Time Off - Archive List - Yaskawa - View Archived List in Employee login Time Off Oct-05
1225
GRP_Jitu_1_Time Off - Remove included stored procedures from code loops Time Off Dec-05
1226
GRP_Jitu_2_Capital Z--Employee calendar view should give the employee a yearly view of all of their time off requests pending and completed
Time Off Dec-05
1227 GRP_Jitu_3_Time Off - Manager Calendar - Molecular Devices - Time Off Dec-05
1228
GRP_Jitu_TOBalance_1_of_2_Time Off - Rewrite SP_TO_GetRemainHoursTO sproc to improve server performance.
Time Off Dec-05
1229
GRP_Jitu_TOBalance_2_of_2_Time Off - Balance Entry - Constangy, Brooks & Smith, LLC -
Time Off Dec-05
Project Management Profile – Akash Dave
Page 55 of 91
1230 GRP_SAN_HOL : Holiday Calendar-Exempt Employees Time Off Dec-05
1231
Live site bug - Time Off - Central Approval - Kranson - central approval settings bug Time Off Dec-05
1232
LIVE Site Issue - Benefits Open Enrollment Form - Rodale (rodale / zzrodale) - Tier's are sorted by literal values, which is causing a problem for the client
Time Off Dec-05
1233
Time Off - Time Off Entry - New Century Mortgage Corporation - Disable Time OFF Request Button
Time Off Dec-05
1234
LIVE Site Bug - Time Off - Other - When a time off request is completed, the hours are put into a project timesheet in the incorrect format
Time Off Dec-05
1235
Advanced Time Off Settings are not forced when an approver makes a change to an existing Time Off Request
Time Off Jan-06
1236
Live Site issue: Time Off - Time Off Emails - VNHS - Email Notification for saved Time off request
Time Off Jan-06
1237
Live site bug - Time Off - Advanced Time Off Settings - Newport News Shipbuilding Credit Union - manager entry not validating advance settings
Time Off Jan-06
1238
Live Site Issue : Time Off - Time Off Emails - Adaptis Inc. - Multiple Emails Being Sent Time Off Jan-06
1239
Live Site Issue- Time Off - Balance Entry - Ciba Specialty Chemicals - TimeOff entries having no impact on the balances
Time Off Jan-06
1240
Time Off - Balance Setup - All - Allow balance calculations to be based on User Type, Pay Type, or FLSA Status
Time Off Jan-06
1241
Time Off - Employee Calendar - Time Off Lists - Mac Compatibility Time Off Jan-06
1242 Time Off - Time Off Entry - All - Issues in Time Off using Firefox Time Off Jan-06
1243
World Travel - Time off list screen (employee view) - Enhancements to the Employee Lists
Time Off Jan-06
1244
Time Off - Time Off Imports - - Import Time off requests hours for the date ranges Time Off Feb-06
1245 GRP_SAN_HOL : Holiday Calendar-Exempt Employees Time Off Jun-06
1246
WorldTravel - Time off list screen (employee view) - Enhancements to the Employee Lists
Time Off
Jun-06
1247
Time Off Reports - Time Off on Timesheet Report - Synta Pharmaceuticals - provide report to employees
Time Off
Jun-06
1248
Time Off - Active List - UPI - Allow manager to edit and save time off requests from active list
Time Off
Jun-06
1249 Time Off - Active List - WNA (wna / zzgencas / zzwna) - Provide additional approver
options similar to what is present in Timesheet Active list
Time Off
Jun-06
1250 Time Off - Employee Calendar - WNA (wna / zzgencas / zzwna) - Allow option to
hide request hours from Employee Calendar
Time Off
Jun-06
1251
Time Off - Other - Babb, Inc. (babb) - unsubmitted requests do not show on the notes section that anything happen to the time off request
Time Off
Jun-06
Project Management Profile – Akash Dave
Page 56 of 91
1252
29. Time Off - Holiday Calendar - All - Issues with Holiday Calendar Time Off
Jun-06
1253
Time Off Reports - All Balance Reports - Babb, Inc. (babb) - Allow all reports that show Current Balances to show Available Balances
Time Off
Jun-06
1254
Time Off - Sorting TIme Off - Boston Communications Group (BCGI) - TIme Off is not getting sorted in Chronological order.
Time Off
Jun-06
1255 Time Off - Manager Time Off Entry - University Physicians, Inc. (upi) - Status to be included in timeoff not populated on Timesheet page
Time Off
Dec-06
1256 Time Off - Active List - BCD Travel - Functionality to sort Active list by number of hours
Time Off
Dec-06
1257 GRP_jpatel_1_of_3_Time Off - Setup Options - MLN - Setting 'Populate Time Off Calendars with holidays from the Holiday Calendar ' should be redefined
Time Off
Dec-06
1258
Time Off - Balance Setup - Virginia Housing Development Authority - Remove the effective date option in submitted and approved request option in the set up balance screen .
Time Off
Dec-06
1259 Time Off - Time Off Entry - Change Time Off Entry Save Routine Time Off Dec-06
1260 GRP_HOL_jitu 2 of 4: 29. Time Off - Holiday Calendar - All - Issues with Holiday Calendar
Time Off
Dec-06
1261 GRP_HOL_jitu 3 of 4: Holiday Calendar-Exempt Employees Time Off Dec-06
1262
GRP_jpatel_1_of_2_Live Site Issue:- Maintenance - Scheduling - MA Society Prevention of Cruelty to Animals - Assigned Schedule for a week as well as a time off request, then the line with the default time type (Regular) gets duplicated.
Time Off
May-07
1263
Live Site issue- Time Off Reports - Consecutive day report - Mizuho Corporate Bank - Consecutive days Detailed report
Time Off
Aug-07
1264
Time Off - Manager Calendar & Time off approvals - PowerPay - 371921 - Time off hours not populating correctly
Time Off
Aug-07
1265
live site bug - Time Off - Advanced Time Off Settings - Devry - increment restrictions are not allowing requests with 0
Time Off
Aug-07
1266
Time Off - Balance Entry - American Academy of Family Physicians (aafp) - Balance Entry not accepting values above 999
Time Off
Aug-07
1267
Time Off Reports - Other - All South Federal Credit Union (allsouth) - iReport version of Time Off Balance from Payroll reoprt is showing up balances upto 9 digits after
decimal point
Time Off
Aug-07
1268
Live Site Issue - Time Off - Time Off Entry - Rodale - Timeoff entry on Safari Browser on Mac does not work.
Time Off
Aug-07
1269
GRP_HOL_Jitu_2_of_2: Time Off - Holiday Calendar - All - Time Off - Holiday Calendar - All - Issues with Holiday Calendar
Time Off
Aug-07
1270 TS/TO Integration - - Mascoma Savings Bank - PTO requested is populating twice on
iClock timesheets
Time Off
Mar-08
1271
GRP_SAN_TS 10 of 16 Timesheets - Manager Time Entry - Pay Policie pay cycles are not applied to manager time entry - Timesheets Jan-05
1272
Timesheets - Central Approval - All - Allow Mass Complete of iclock timesheets once they have been approved and routed iClock Jan-05
1273 Timesheets - Other - VNHS - Timesheet Import-Flat Hours Only Timesheets Jan-05
Project Management Profile – Akash Dave
Page 57 of 91
1274
LIVE Site Issue - Business Rules Calculation - Molecular Devices (moldev) - Business rules did not calculate correctly for many employeesa
Timesheets Jan-05
1275
Timesheets - Business Rules - Molecular Devices (moldev) - Semi Monthly Consecutive Day Rule Timesheets Jan-05
1276 iClock Basic iClock Jan-05
1277
Live Site Issue: Timesheet - Time Off - Exception Only Employees -Timesheet does not get created for two Consecutive pay periods Timesheets Jan-05
1278
Live Site Issue -- Timesheets - TS/TO Integration - American Academy of Family Physicians (aafp) - AAFP has reported an issue with the Exception only timesheets.
Timesheets Jan-05
1279 Timesheets - External Timeclocks - Valencia Hotels - Timesheets Jan-05
1280
Timesheets - Business Rules - CSPAN - Prospect would like Shift Diffs based on time of punch, not hard coded time Timesheets Jan-05
1281
Project Timesheets Refactoring 1 of 3 : Timesheets - Project Time Entry - All - Adding date fields and Business Rules compatibility to Project TS
Timesheets
Jan-05
1282
Timesheets - iClock Time Entry - All - Update the Biometric login page to handle iClock+
iClock
Jan-05
1283
Timesheets - iClock Time Entry - All - Update the badge swipe login page to handle iClock+
iClock
Jan-05
1284
Timesheets - Business Rules - MolDev - Semi Monthly Consecutive Day Rule Timesheets
Jan-05
1285
Timesheets - Central Approval - Bangor Savings Bank - iclock Auto-forward is not designed to suit companies' needs
iClock
Jan-05
1286
Timesheets - TS/TO Integration - Escambia County Tax Collector’s Office - Create timesheets for employees who have time off requests in the system but no timesheets
Timesheets
Jan-05
1287
Timesheets - Badge Swipe Page - WCA Waste Corporation - Color the text of the confirmation message
Timesheets
Jan-05
1288
Live Site Issue: Timesheets - Business Rules - Houghton Mifflin Company (promissor) - Approver cannot route the Timesheet
Timesheets
Jan-05
1289
Project Timesheets Refactoring 2 of 3 : Timesheets - Project Time Entry - JSTOR - Allow users to toggle between pay periods
Timesheets
Jan-05
1290
Project Timesheets Refactoring 3 of 3 : Timesheets - Project Time Entry - JSTOR - Notes do not display correctly
Timesheets
Jan-05
1291
Timesheets - Archive List - Adtran - If a timesheet is archived an employee can create another timesheet for the same period
Timesheets
Jan-05
1292
LIVE SITE BUG--Timesheets and Time off- Central Approval Setup - Provident Bank - Setup Approver screen doesn't allow to save the approvers if you select PSID as filtering choice
Timesheets
Jan-05
1293
Timesheets - Central Approval - All - add PSID filter to central approval Timesheets
Jan-05
1294
Additional enhancements to Forward and Backward functionality in Timesheets Timesheets
Jan-05
1295
Timesheets - on/off selection in Timesheets Setup for Time Entry popup Timesheets
Jan-05
Project Management Profile – Akash Dave
Page 58 of 91
1296
Timesheets - Central Approval Setup - University Physicians, Inc. - If Region is selected the info does not appear when view existing filters is selected
Timesheets
Jan-05
1297
Live Site Bug : Timesheets - Favorites - franklin - Favorites Not Importing Timesheets
Jan-05
1298
Timesheets - iClock Time Entry - WCA Waste Corporation - Meal Breaks assigned rather than a company wide setting
iClock
Jan-05
1299
Timesheets - Other - Metrociti Mortgage - Automatically punch salaried employees out after punched in for just Metrociti
Timesheets
Jan-05
1300
Timesheets - Policies and Calendars - New Century Mortgage Corporation - Report on Policy and Calendar configurations
Timesheets
Jan-05
1301
LIVE SITE Issue: Timesheets - Scheduling - Dura Automotive - FLSA hard coded Timesheets
Jan-05
1302
LIVE Site Issue - Timesheet Active List - Union Labor Life Insurance Company (ullico) - Timesheet Active List is displaying incorrect timesheet data
Timesheets
Jan-05
1303
GRP_SAN_NOTES : Timesheet - Notes should be allowed modify for a saved Timesheet
Timesheets
Jan-05
1304
Timesheets - Other - Metrociti Mortgage - Automatically punch salaried employees out after punched in
Timesheets
Jan-05
1305
LIVE Site Issue - Time Off and Timesheets - Subordinates View - Synta Pharmaceuticals - View All Subordinates option not working properly
Timesheets
Jan-05
1306
Timesheets - Archive List - Adtran - If a timesheet is archived an employee can create another timesheet for the same period
Timesheets
Jan-05
1307
Timesheets - Standard Time Entry - All - Issues in Timesheets using Firefox Timesheets
Jan-05
1308
Timesheets - Determine if the array list built from sp_TS_tf_list_admin can be optimized
Timesheets
Jan-05
1309
LIVE SITE Issue : Tracking Fields - All - When User Tracking Fields enabled, initial tracking field dropdown lists unpopulated
Timesheets
Jan-05
1310
LIVE Site Issue - Timesheets - Tracking Fields - Metrociti Mortgage - Approval/OT looking at Sublist setup
Timesheets
Jan-05
1311
Timesheets - Central Approval - American Trucking Association (ata) - Change default for Admin Approve & Route function on the Central Approval page for Timesheets
Timesheets
Jan-05
1312
GRP_SAN_MG : Timesheets - Manager Time Entry - WorldTravel - New Enhancements to the Manager TS Entry page
Timesheets
Jan-05
1313 Full iClock Spec Basic and Advanced iClock Jan-05
1314 Mass Submission of timeclock timesheets Timesheets May-05
1315
Timesheets - Active List - Golf Course Superintendents Ass. - displayed -Partially Exported- for 0 hours
Timesheets May-05
1316
Timesheets - iClock Time Entry - Aloha United Way - Time Entry In/Out calculation has changed
iClock May-05
1317
Timesheets - Other - All - The View Totals message on the active and archived list needs to be reworded
Timesheets May-05
1318 VTL - Auto Submission of iClock Timesheets iClock May-05
Project Management Profile – Akash Dave
Page 59 of 91
1319
GRP_SAN_IMP Timesheets - Imports - Playboy - Fix for Playboy to bypass import queue when importing clock data
Timesheets Jun-05
1320
Timesheet scheduling-Golf Saving Bank-Duplicate lines when Holiday populates the timesheet
Timesheets Jun-05
1321
Timesheets - Active List - Whidbey Island Bank (whidbey) -Supervisro gets error message in active list
Timesheets Jun-05
1322
Timesheets - Other - MIles Properties - Earning codes do not show on printed timesheets
Timesheets Jun-05
1323
Timesheets - Scheduling - Golf Savings Bank - Duplicate lines when Holiday populates the timesheet
Timesheets Jun-05
1324 Ability to validate free text tracking fields Timesheets Jun-05
1325
GRP_SAN_TS 1 of 6 Timesheets - TS/TO Integration - World Travel - TO on TS should be read only
Timesheets Jun-05
1326
GRP_SAN_TS 2 of 6 QUOTE VNHS- Capture Earnings on a Daily Basis Timesheets Jun-05
1327
GRP_SAN_TS 3 of 6 : World Travel - Employee view of submitted timesheets Timesheets Jun-05
1328
GRP_SAN_TS 4 of 6: Timesheets - Ability to validate free text tracking fields Timesheets Jun-05
1329
GRP_SAN_TS 5 of 6 Timesheets - Standard Time Entry - Timesheet Bugs on Live Timesheets Jun-05
1330
GRP_SAN_TS 6 of 6 Timesheets - Other - MIles Properties - Earning codes do not show on printed timesheets
Timesheets Jun-05
1331
Timesheets - Standard Time Entry - All - Fix for TS-To Integration and PRinted Timesheets
Timesheets Jun-05
1332
Timesheets - TS/TO Integration - World Travel - TO on TS should be read only Timesheets Jun-05
1333 GRP_Abhishek_2_Of_2_Manager Filter Builder Limitation Timesheets Jul-05
1334
GRP_SAN_QO 1 of 4 :Timesheets - Earnings Setup - Miles Properties, Inc. - Timesheets Jul-05
1335
GRP_SAN_QO 2 of 4 :Timesheets - timesheet.asp - single quote in department causes page error -
Timesheets Jul-05
1336
GRP_SAN_QO 3 of 4 :Timesheets - Time Entry - Too many earnings codes causes java error
Timesheets Jul-05
1337
GRP_SAN_QO 4 of 4 : Timesheets - Time Type Setup - Ent Federal Credit Union - Timeoff Time type having + sign creates Multiple lines of entry
Timesheets Jul-05
1338
Pay policy - holiday calendar - Bug in Stored Procedure nsp_HOL_CopyHolidayCalendar -
Timesheets Jul-05
1339 Timesheets - Ability to validate free text tracking fields Timesheets Jul-05
1340
Timesheets - Central Approval - Escambia County Tax Collector’s Office - make the timesheet open to the full screen
Timesheets Jul-05
1341
Timesheets - Other - PCHI - job code tracking field not showing on timesheet for badge swipes
Timesheets Jul-05
1342 World Travel - Employee view of submitted timesheets Timesheets Jul-05
1343
Timesheets - Earnings Setup - Lee County Electric Co-operative (LCEC) - Minor changes
Timesheets Jul-05
Project Management Profile – Akash Dave
Page 60 of 91
1344
Timesheets - iClock Time Entry - Citizens Bank of Farmington New Mexico (CBNM) - View Progress option
iClock Jul-05
1345
Timesheets - Earnings Setup - VNHS - If an employee only has earnings on their timesheet, it is not included in the Source Daily Timesheet export file
Timesheets Aug-05
1346
Total column displays the summed percentage and not the hours for Project TS Timesheets Aug-05
1347
LIVE Site Issue - Other - Babb, Inc. (babb) - Timestamp data has appeared on balance 'as of' dates, causing problems
Timesheets Sep-05
1348
Timesheets - Active List - Union Labor Life Insurance Company (ullico) - Active list 'Exported' status incorect -
Timesheets Sep-05
1349 Timesheets - Other - hcu - Error Handling and Semi Monthly bug Timesheets Sep-05
1350
Timesheets - Other - VNHS - Time IN/Out Feature is not calculating correctly Timesheets Sep-05
1351
GRP_SAN_TS 1 of 12 LIVE Site Bug - Timesheets - Tracking Fields - Avid - Items in Tracking Field are quadrupling on timesheets even though they are only listed once in the tracking field setup
Timesheets Sep-05
1352
GRP_SAN_TS 2 of 12 Timesheets - TS/TO Integration - Maxim Healthcare Services, Inc. (maxim) - iclock timesheets not updating with time off requests.
iClock Sep-05
1353
GRP_SAN_TS 3 of 12 Timesheets - Timesheet Emails - Springer Verlag (springer) - Print function won't email the timesheet
Timesheets Sep-05
1354
GRP_SAN_TS 4 of 12 LIVE SITE ISSUE -- Timesheets - Other - World Travel - Missing Hours On rejected Timesheet for Employees
Timesheets Sep-05
1355
GRP_SAN_TS 5 of 12 Timesheets - TS/TO Integration - World Travel - TO on TS should be read only
Timesheets Sep-05
1356
GRP_SAN_TS 6 of 12 Timesheets - Pay Policy - - OT shows in the drop down even if business rule is assigned to them.
Timesheets Sep-05
1357
GRP_SAN_TS 7 of 12 Timesheets - TS/TO Integration - World Travel - multiple TO lines for the same week and time type
Timesheets Sep-05
1358
GRP_SAN_TS 8 of 12 :Timesheets - TS/TO Integration - All - Unsubmitting TO requests should zero out hours on timesheet
Timesheets Sep-05
1359
GRP_SAN_TS 9 of 12 : Timesheets - TS/TO Integration - All - Rejecting TO requests should zero out hours on timesheet
Timesheets Sep-05
1360
GRP_SAN_TS 10 of 12 Timesheets - Manager Time Entry - Pay Policie pay cycles are not applied to manager time entry -
Timesheets Sep-05
1361
GRP_SAN_TS 11 of 12 :Timesheets - timesheet.asp - single quote in department causes page error -
Timesheets Sep-05
1362
GRP_SAN_TS 2 of 12 Timesheets - TS/TO Integration - Maxim Healthcare Services, Inc. (maxim) - iclock timesheets not updating with time off requests.
iClock Sep-05
1363
Timesheets - Other Timesheet Setup - National Association of Social Workers (nasw) - Timesheets Sep-05
1364
GRP_SAN_TS 15 of 15 Timesheets - TS/TO Integration - Escambia County Tax Collector’s Office - Timesheet not being updated with time off hours when it is opened
Timesheets Sep-05
Project Management Profile – Akash Dave
Page 61 of 91
1365
GRP_SAN_TS 2 of 12 Timesheets - TS/TO Integration - Maxim Healthcare Services, Inc. (maxim) - iclock timesheets not updating with time off requests.
iClock Sep-05
1366
Timesheets - External Time clocks – Selective HR - Lunch deduct import not working correctly
Timesheets Sep-05
1367
Timesheets - Manager Time Entry - Gilman and Ciocia (gilman) - Business Rules are forced onto Approvers' Direct Report in Manager Time Entry
Timesheets Sep-05
1368
Timesheets - Other - Bruce Fox - iclock badge swipe displayng wrong name and time iClock Sep-05
1369
GRP_1_OF_5_ABHISHEK_ Total column displays the summed percentage and not the hours for Project TS
Timesheets Oct-05
1370
GRP_2_OF_5_ABHISHEK_Project Time Entry - rejected project timesheets cannot be re-submitted
Timesheets Oct-05
1371
GRP_3_OF_5_ABHISHEK_Project Time Entry - JSTOR - Project Timesheets canbe submitted even if you do not select an approver
Timesheets Oct-05
1372
GRP_4_OF_5_ABHISHEK_ LIVE SITE ISSUE - Timesheets - Active List - Carmeuse - Routed to column showing blank for approved timesheets
Timesheets Oct-05
1373
GRP_5_OF_5_ABHISHEK_ Project Time Entry - JSTOR - When user saves a project timesheet multiple timesheets appear in the active list
Timesheets Oct-05
1374
LIVE Site Issue- Timesheets - Timesheet Emails - Starr Commonwealth - Notifications is sent when Email address is missing
Timesheets Oct-05
1375
Timesheet - Archive List - VSA - Server Error on Employment Screen Timesheets Oct-05
1376
Timesheets - Archive List - Digital Federal Credit Union - Employee Archived List does not allow to filter for 2005 date range
Timesheets Oct-05
1377
Timesheets - Business Rules - WorldTravel - Consecutive Days Not Calculating Correctly When a Day Has Less Than 1 Hour
Timesheets Oct-05
1378
Timesheets - iClock import - Too many argumants specified for sp_TS_SaveTSApproval iClock Oct-05
1379
Timesheets - iClock Time Entry - Swedish Physicians Division (swedish) - ADD LINE to iClock timesheets does not autopopulate tracking fields
Timesheets Oct-05
1380 Timesheets - iClock Time Entry - Timesheet Status Being Set Blank iClock Oct-05
1381
Timesheets - Standard Time Entry - World Travel - Multiple timesheets are allowed to be created
Timesheets Oct-05
1382
Timesheets - Timeclock Allocation - Maxim Healthcare Services, Inc. (maxim) - If Approver is changed during the pay period, the timesheet is still going to the original approver and not to the new approver
Timesheets Oct-05
1383
LIVE Site Bug: Timesheets - Business Rules - Semi consecutive rules not calculating correctly
Timesheets Oct-05
Project Management Profile – Akash Dave
Page 62 of 91
1384
Timesheets - Archive List - Stoel Rives - LIVE Site Bug - Accessing Timesheet Archive List throws an error
Timesheets Oct-05
1385 Timesheets - Biometrics - Oasis - Timesheets Oct-05
1386
Timesheets - Central Approval - iClock timesheets disappearing from approver's lists - iClock Oct-05
1387
GRP_SAN_TS 1 of 10:live site bug - Timesheets - Scheduling - Bass Security Services, Inc. - blank line of regular is added for each week.
Timesheets Nov-05
1388
GRP_SAN_TS 2 of 10:Live site bug - Timesheets - Tracking Fields - WCA Waste Corporation - dept tracking field not populating all holiday time types
Timesheets Nov-05
1389
GRP_SAN_TS 3 of 10:Live site Bug -Timesheets - Other - Serologicals Corporation - time off hours displaying twice on timesheet
Timesheets Nov-05
1390
GRP_SAN_TS 4 of 10:LIVE Site Bug: TS/TO Integration - Synta Pharmaceuticals - time off populating timesheet incorrectly
Timesheets Nov-05
1391
GRP_SAN_TS 5 of 10:LIVE Site Issue - Time Off/Timesheet Integration - Babb, Inc. (babb) - Rejected Time Off Request was only partially removed from Timesheet
Timesheets Nov-05
1392
GRP_SAN_TS 6 of 10:Timesheets - Date Submitted changing after initial submission Timesheets Nov-05
1393
GRP_SAN_TS 7 of 10:Timesheets - Scheduling - Golf Savings Bank - Duplicate lines when Holiday populates the timesheet
Timesheets Nov-05
1394
GRP_SAN_TS 8 of 10:Timesheets - Tracking Fields - e-Management Inc. - the value of the tracking fields dispaly in the approvers view instead of the discription
Timesheets Nov-05
1395
GRP_SAN_TS 9 of 10:Timesheets - TS/TO Integration - Northwest Insurance Agency - Hours auto populated from holiday Calendar is adding two lines of holiday time type to the timeclock timesheet
Timesheets Nov-05
1396
GRP_SAN_TS 10 of 10:Timesheets - TS/TO Integration - WCA Waste Corporation - Time Off default tracking fields are not being populated for clients using the badge page
Timesheets Nov-05
1397
LIVE Site Issue - Timesheet Details by Employee - Prenova - Subcompany filter not working as expected
Timesheets Nov-05
1398
Timesheets - iClock Time Entry - Swedish Physicians Division (swedish) - ADD LINE to iClock timesheets does not autopopulate tracking fields
iClock Nov-05
1399
GRP_Abhishek_1_OF_3_Timesheets - Project Time Entry - ithaka - Tracking Field Value Not Displaying
Timesheets Dec-05
1400
GRP_Abhishek_2_OF_3_Live Site Issue : Timesheets - Project Time Entry - JSTOR - Project Timesheets are not adding up properly
Timesheets Dec-05
1401
GRP_Abhishek_3_OF_3_Timesheets - Project Time Entry - JSTOR - Project Timesheet Fails to Submit
Timesheets Dec-05
1402
GRP_SAN_MG : Timesheets - Manager Time Entry - World Travel - New Enhancements to the Manager TS Entry page
Timesheets Dec-05
Project Management Profile – Akash Dave
Page 63 of 91
1403
GRP_SAN_TS 4 of 10:LIVE Site Bug: TS/TO Integration - Synta Pharmaceuticals - time off populating timesheet incorrectly
Timesheets Dec-05
1404
LIVE Site Bug - Timesheets - Display issue opening timesheets from the List pages, In/Out Board, and Manager Time Entry
Timesheets Dec-05
1405
LIVE Site Issue - Other - Babb, Inc. (babb) - Timestamp data has appeared on balance 'as of' dates, causing problems
Timesheets Dec-05
1406
Live Site Issue : Timesheets - Standard Timesheet Setup - N/A - Drop Down List for Pages Not Updating
Timesheets Dec-05
1407
Live Site Issue : Timesheets - Standard Timesheets - University Physicians, Inc. - Using Calculate Timesheet Submits timesheet to wrong person
Timesheets Dec-05
1408
Timesheets - Live Site Bug - Biometrics - iSarla, Inc (isarla) - biometrics and barcode do not work for monthly timesheets
Timesheets Dec-05
1409
Timesheets - Exceptional - All - Create Timesheet from Timeoff for Exceptional employees based on Timesheet Date Range
Timesheets Dec-05
1410
Timesheets - Pay Policy - FHLBSF - Server Error on Pay Policy Detail Page Timesheets Dec-05
1411
Timesheets - Tracking Fields - Cambridge Energy Research Associates (CERA) Timesheets Dec-05
1412
Timesheets - Tracking Fields - none - Validation on Tracking Field Setup Page Timesheets Dec-05
1413
Timesheets - TS/TO Integration - WorldTravel - Blank Lines On Timesheet Timesheets Dec-05
1414
Additional enhancements to Forward and Backward functionality in Timesheets Timesheets Jan-06
1415
GRP_SAN_TS 10 of 16 Timesheets - Manager Time Entry - Pay Policie pay cycles are not applied to manager time entry -
Timesheets Jan-06
1416
Project Timesheets Refactoring 1 of 3 : Timesheets - Project Time Entry - All - Adding date fields and Business Rules compatibility to Project TS
Timesheets Jan-06
1417
Project Timesheets Refactoring 2 of 3 : Timesheets - Project Time Entry - JSTOR - Allow users to toggle between pay periods
Timesheets Jan-06
1418
Project Timesheets Refactoring 3 of 3 : Timesheets - Project Time Entry - JSTOR - Notes do not display correctly
Timesheets Jan-06
1419
Timesheets - Business Rules - CSPAN - Prospect would like Shift Diffs based on time of punch, not hard coded time
Timesheets Jan-06
1420
Timesheets - Central Approval - All - add PSID filter to central approval Timesheets Jan-06
1421
Timesheets - Central Approval - Bangor Savings Bank - iclock Auto-forward is not designed to suit companies' needs
iClock Jan-06
1422
Timesheets - Central Approval Setup - University Physicians, Inc. - If Region is selected the info does not appear when view existing filters is selected
Timesheets Jan-06
1423
Timesheets - Central Approval - All - Allow Mass Complete of iclock timesheets once they have been approved and routed
iClock Jan-06
1424
Timesheets - iClock Time Entry - All - Update the badge swipe login page to handle iClock+
Timesheets Jan-06
Project Management Profile – Akash Dave
Page 64 of 91
1425
Timesheets - iClock Time Entry - All - Update the Biometric login page to handle iClock+
iClock Jan-06
1426
Timesheets - on/off selection in Timesheets Setup for Time Entry popup Timesheets Jan-06
1427
Timesheets - Punch Imports - All - Punch imports need to be updated to use new tables in iClock+
iClock Jan-06
1428
Timesheets - TS/TO Integration - Escambia County Tax Collector’s Office - Create timesheets for employees who have time off requests in the system but no timesheets
Timesheets Jan-06
1429
GRP_SAN_NOTES : Timesheet - Notes should be allowed modify for a saved Timesheet
Timesheets Feb-06
1430
Timesheets - Central Approval - American Trucking Association (ata) - Change default for Admin Approve & Route function on the Central Approval page for Timesheets
Timesheets Feb-06
1431
Timesheets - Standard Time Entry - All - Issues in Timesheets using Firefox Timesheets Feb-06
1432
LIVE SITE Issue : Tracking Fields - All - When User Tracking Fields enabled, initial tracking field dropdown lists unpopulated
Timesheets
Jun-06
1433
LIVE Site Issue - Timesheets - Tracking Fields - Metrociti Mortgage - Approval/OT looking at Sublist setup
Timesheets
Jun-06
1434
Timesheets - Standard Timesheet Setup - Oxford Global Resources, Inc. - would like the ability to disable the print button on timesheets
Timesheets
Jun-06
1435
Timesheets - Determine if the array list built from sp_TS_tf_list_admin can be optimized
Timesheets
Jun-06
1436 Live Site Issue - iClock+ - Admin not allowed to Edit IN punch iClock Jun-06
1437
Timesheets - iClock Time Entry - All - Add and Edit Punches settings are tied to each other
iClock
Jun-06
1438 Timesheets - iClock Time Entry - All - Trap TF Error iClock Jun-06
1439
Timesheets - Tracking Fields - Avid - for iClock+ Tracking Fields are being displayed in iButton incorrectly
iClock
Jun-06
1440
Live Site Issue -- Timesheets - TS/TO Integration - Babb, Inc. (babb) - Time Off line duplication on the timesheet & Time off populating the timesheet without request.
Timesheets
Jun-06
1441
Live site -Timesheets - Tracking Fields - Beekley Corporation - Unable to enter tracking field in the badge login screen
Timesheets
Jun-06
1442
Timesheets - Automated Policy Assignments - Dura - No way to remove an automatic policy assignment and Time Out issue
Timesheets
Jun-06
1443
Timesheets - Other - Franklin Institute, The - Process timesheet for holidays is not creating timesheet for correct pay schedule.
Timesheets
Jun-06
1444
Timesheets - Scheduling - Golden Northwest Aluminum Holding Co. - Scheduling to work with manager time entry
Timesheets
Jun-06
1445
Live SIte Bug - Timesheets - Other - Hometown Bank (Hometrust) - Problem with iReports (Status and Notes)
Timesheets
Jun-06
1446
Live Site Bug : Timesheets - Project Time Entry - Ithaka - Extra options in drop down Timesheets
Jun-06
Project Management Profile – Akash Dave
Page 65 of 91
1447
Live Site Bug : Timesheets - Project Timesheet Setup - Ithaka - Cannot save setup with no lines
Timesheets
Jun-06
1448
GRP_HOL_AB 2 of 2 Live Site: Timesheets - Other - Jackson Organization - Timesheets – Holiday Hours can be entered in TS by an employee in spite of having a Holiday
Calendar setup.
Timesheets
Jun-06
1449
Live Site Issue-Timesheets - - Swedish Physicians Division - Date Submitted changes when the Manager edits the timesheet and recalculates
Timesheets
Jun-06
1450
GRP_HOL_AB 1 of 2 LIVE Site Issue - Timesheets - Union Labor Life Insurance Company (ullico) - Users can enter holiday data by using ADD A LINE, even when
they should not be able to do so
Timesheets
Jun-06
1451 Timesheets - Holiday Timesheet Processing - ALL - enhance functionality to look at
term date rather than user account status
Timesheets
Jun-06
1452
Timesheets - Timeoff - Active List - - Incorrect Timestamp - (Date submitted) Timesheets
Jun-06
1453 Timesheets - iClock Time Entry - All - IST Rounding Issues iClock Jun-06
1454 Timesheets - Active List - F5 Networks Inc. - Timesheets Jun-06
1455 Timesheets - Timeclock Allocation - Serologicals Corporation - Have the ability to
default the Approver in Timeclock Allocation to be the user's supervisor Timesheets Jun-06
1456 Timesheets - Standard Timesheet Setup - Catholic Charities, Inc. - Date range issue Timesheets Jun-06
1457
Live Site Bug : Timesheets - Project Time Entry - Ithaka - Project TImesheet will no open
Timesheets Jun-06
1458 Timesheets - Central Approval - WCA - Create a backup approver process for iClock
timesheets in Central Approval iClock Jun-06
1459 Timesheets - iClock Time Entry - Integration with IVR system - Timesheets Jun-06
1460
Timesheets - TS/TO Integration - Escambia County Tax Collector’s Office - Create timesheets for employees who have time off requests in the system but no timesheets
Timesheets
Jun-06
1461
Timesheets - External Timeclocks - Valencia - Invalid Data Can be Imported Into Punch Table
Timesheets
Jun-06
1462
8. Timesheets - Tracking Fields - All iClock - Blank Tracking Fields Getting Populated By Timesheet Pages
iClock
Jun-06
1463
LIVE SITE BUG -Timesheets - Business Rules - Unifund - Issues with the system properly splitting Regular and Overtime
Timesheets
Jun-06
1464
Timesheets - Other - Union Labor Life Insurance Company (ullico) - Timesheet Forward/Backward behavior
Timesheets
Jun-06
1465
Timesheets - Other(Timesheet Notes) - United Bank - Timesheet notes are not getting updated upon recalculation.
Timesheets
Jun-06
1466
6. GRP_OT_AB 2 of 2 Timesheets - Business Rules - Visiting Nurse - Shift Differential Calculation issue
Timesheets
Jun-06
1467
Timesheet - Shift Differential Rules - rule not working when the date changes from one calender day to another
Timesheets
Jun-06
1468
Timesheets - TS/TO Integration - Cleveland Scholarship Inc - Admin splits the Time Off hours on Timesheet
Timesheets
Jun-06
Project Management Profile – Akash Dave
Page 66 of 91
1469
Timesheets - iClock Timesheet Setup - Xact Duplicating (xact) - 1/2 hour break to get automatically deducted once the employee works for straight 6 hours shift till 13.59
hours
iClock
Jun-06
1470
Timesheets - Central Approval Setup - Adtran - Auto_forwarding should be allowed for Adminitsrators login
Timesheets
Jun-06
1471
GRP_abiswas_1_Of_2_Live Site Issue--Timesheets - Active List - Appleton Ideas (appleton) - The Date submitted Timestamp under Active Timesheet list for Standard timesheets is Incorrect. Timesheets Dec-06
1472
GRP_jdalal_1_Of_2_Timesheets - iClock Timesheet Setup(IVR System) - GINNE- Goodwill Industries of Northern New England - Configure GINNE's live site to work with IVR and 1 tracking fileld. iClock Dec-06
1473
GRP_jdalal_2_Of_2_Live Site Bug - Timesheets - iClock Time Entry (IVR System) - GINNE-Goodwill Industries of Northern New England - Issues while Punch in using IVR system. Timesheets Dec-06
1474 Live Site Issue Timesheets - TS/TO Integration - Charlotte County Tax Collector (cctc) - Holiday Calendar not populating on iClock timesheet iClock Dec-06
1475 Timesheets - iClock Time Entry - All - Add and Edit Punches settings are tied to each other Timesheets Dec-06
1476 Timesheets - Active List - F5 Networks Inc. - Timesheets Timesheets Dec-06
1477
Live Site Issue - Timesheets - iClock Time Entry - Mascoma Savings Bank - Time Stamp shown on Punch In/Out Page randomly shows Military time, and sometimes a 12-Hour Clock. iClock Dec-06
1478 Timesheets - Project Time Entry - Misukanis & Odden - Project timesheets cannot be submitted or saved Timesheets Dec-06
1479 Timesheets - Active List - Partners in Development - Rounding Issue - Project timesheet shows 99.99% Timesheets Dec-06
1480 LIVE Site Issue - Timesheets - Auto Meal Break Deduction - Treiber Group, The - terminated employees included in the meal break deduction list Timesheets Dec-06
1481 Timesheets - Business Rules - Penn Treaty Network America - Shift Differentail Rules are not working correctly Timesheets Dec-06
1482 Timesheets - Automated Policy Assignments - Dura - No way to remove an automatic policy assignment and Time Out issue Timesheets Dec-06
1483 Live Site Issue - Timesheets - Other - Coastal Farm & Home Supply - iClock timesheets do not auto submit (internal rounding issue) iClock Dec-06
1484 LIVE Site Bug - Tracking Field Set up - Sublist option - Save the Children Timesheets Dec-06
1485 Live Site Bug - Timesheets - Archive List - Agilysys - Amounts/Earnings row displays the word -Read Only- when the T/S is archived Timesheets Dec-06
1486 Timesheets - Active List - F5 Networks Inc. - HR/Benefits Timesheets Dec-06
1487 Timesheets - iClock Auto-Submission Emails - Multivac - Auto-Submit not sending emails iClock Dec-06
Project Management Profile – Akash Dave
Page 67 of 91
1488
GRP_pmaru_1_of_2_LIVE Site Bug - Tracking Field Set up - Sublist option - Save the Children
Timesheets Feb-07
1489 Timesheets - Active List - F5 Networks Inc. - Timesheets Timesheets Feb-07
1490
Timesheets - iClock Auto-Submission Emails - Multivac - Auto-Submit not sending emails
iClock Feb-07
1491
Timesheets - Other Timesheet Setup - Maxim - Have alert for over X hours per day Timesheets Feb-07
1492
Maintenance - Email Notifications - BCD Travel - Existing Employees are receiving New Hire Wizard every time the DTW is Run
Timesheets Feb-07
1493
Maintenance - Email Engine - BCD Travel - Employees should receive emails when the timesheet is approved
Timesheets Feb-07
1494
Maintenance - Other - Dura Automotive - automated pay policies not running when scheduled
Timesheets Feb-07
1495
Live Site issue - Timesheets - OT Calculation - Metrocities Mortgage - Weekly OT is miscalculated in a semi-monthly iclock timesheet if the last week of previous pay period does not have any punches
iClock Feb-07
1496
Timesheets - Automated Policy Assignments - Dura - No way to remove an automatic policy assignment and Time Out issue
Timesheets Feb-07
1497
Timesheets - Pvroject Time Entry - Misukanis & Odden - Project timesheets cannot be submitted or saved. - Working
Timesheets Feb-07
1498
Timesheets - Archive List - Save the Children - Archived timesheets not printer-friendly Timesheets Feb-07
1499
Maintenance - Other - Partners in Development - add validation to the time types setup page to prevent special characters from being entered.
Timesheets Feb-07
1500
Timesheets - Active List - Ciba Specialty Chemicals - Completed Timesheet to have timestamp
Timesheets Feb-07
1501
LIVE Site Issue - Timesheets - Approval Page for Alt. Approver - All - Timesheet status does not display for Alt. Approver
Timesheets Feb-07
1502 Timesheets - Other - All - Timesheets Improvements Timesheets Feb-07
1503
Timesheets - Other Timesheet Setup - All - Timesheets pay period doesn't pick up the right dates due to Schedule 1 and Schedule 2 settings.
Timesheets Feb-07
1504
22. Live Site Bug - Maintenance - Scheduling - All - Scheduling needs to have overnight shift handling
Timesheets Feb-07
1505
Timesheets - Other - Tidewater Direct, LLC - Live Site Issue: Timesheets is not saving extra added hours
Timesheets Feb-07
1506
Live Site Bug - Maintenance - Timesheet setup - SonoCare, LLC - Error while accessing timesheet setup
Timesheets Feb-07
1507
Live site issue Timesheets - iClock Time Entry - Hawaii Automotive Retailing Group Inc. - Duplicate timesheet for any OUT Punch after 6 pm hawaii time on the last day of the pay period.
iClock Feb-07
1508
Timesheets - Manager Time Entry - cyberThink, Inc. - Mass Submit for managers/supervisors OR Mass Complete for Admins
Timesheets
May-07
Project Management Profile – Akash Dave
Page 68 of 91
1509 Timesheets - iClock Time Entry - All iClock - Offline iClock Time Collection Application iClock May-07
1510
Timesheets - Manager Time Entry - WSOS - If the timesheet is Saved Empty then the timesheet is not displayed on any screen.
Timesheets
May-07
1511
live site bug - Timesheets - Other - Microsoft Licensing GP - Notes on timesheets are adding spaces
Timesheets
May-07
1512
LIVE Site Bug - Timesheets - Standard Timesheet Setup - Readers' Digest - setting in text box for limiting number of pay periods to forward or reverse disappears when making another change on another page of the timesheet setup wizard
Timesheets
May-07
1513
GRP_jpatel_2_of_2_Live Site Issue:-Maintenance - Scheduling - MA Society Prevention of Cruelty to Animals - when we save the schedule and reopen it, system shows two regular time types in the drop down
Timesheets
May-07
1514
Timesheets - iClock Auto-Submission Emails - Multivac - Auto-Submit not sending emails
iClock
May-07
1515
Timesheets - Standard Timesheet Setup - C-Span - Display for View Calculated Hours Custom Timesheet to be displayed as per clients requirements
Timesheets
May-07
1516
Live site issue -- Timesheets - Other - Goldberg Kohn - Time clock Timesheet notes not updating if the timesheet is forwarded or Auto-forwarded.
Timesheets
May-07
1517
Timesheets - Automated Policy Assignments - Dura - No way to remove an automatic policy assignment and Time Out issue
Timesheets
May-07
1518
Timesheets - Tracking Fields - Stone Belt - Tracking field values are not populated when timesheet is created using Process Timesheets for holidays under holiday calendar.
Timesheets
May-07
1519
Live site bug - Timesheets - Other - C-Span - Custom Timesheet that was created for c-span doesnot show the correct hours.
Timesheets
May-07
1520
Maintenance - Business Rules - C-Span - TAT and Shift Diff if assigned together in a policy, the one that has the first order calculates & the second one fails (does not calculate correctly)
Timesheets
May-07
1521
Live Site Bug-TwinStar- Timesheets- The Timetype Dropdown in the Timesheet in the Active list shows a value None
Timesheets
May-07
1522
Live Site Bug - Timesheets - Other - Defenders of Wildlife - Default Values of tracking fields does not auto populate in regular row
Timesheets
May-07
1523
Timesheets - Tracking Fields - cyberThink, Inc. - Blank field chosen in tracking field is overwritten when timesheet is saved
Timesheets
May-07
1524
GRP_pmaru_1_of_2_LIVE Site Bug - Tracking Field Set up - Sublist option - Save the Children
Timesheets
May-07
1525
live site bug - Timesheets - Central Approval - Clearwire Corportation - pending iclock timesheets are in the inbox before the end of the pay period
iClock
May-07
1526 Full iClock Spec Basic and Advanced - New Timesheets May-07
1527 Full iClock Spec Basic and Advanced - Enchancement iClock May-07
1528
Timesheets - Active List - Devry - have an option to disable the delete button from the active list page
Timesheets
Aug-07
Project Management Profile – Akash Dave
Page 69 of 91
1529
LIVE Site Bug - Timesheets - Standard Time Entry - Readers' Digest - iButton doesn't turn back to white from green when info is deleted
Timesheets
Aug-07
1530
Timesheets - Business Rules - Devry - Daily Overtime Rule not working properly Timesheets
Aug-07
1531
Live Site Issue - Timesheets - External Timeclocks - Masons Supply Company - Timeclock punches are not pulled for the last day of the pay period if the pay period is
semi monthly.
Timesheets
Aug-07
1532
Timesheets - iClock Timesheet Setup - Shamrock Foods - Auto Deduct calculated incorrectly for iClock Timesheet Users.
iClock
Aug-07
1533
Timesheets - Archive List - Readers' Digest - Provide the 'View Original' button on archived timesheets as well.
Timesheets
Aug-07
1534
LIVE Site Issue - Timesheets - Auto-Deduct Individual Settings - Readers' Digest - the individual setting setup page behaves incorrectly when filtering
Timesheets
Aug-07
1535
iClock Timesheets - Employee - Displays 'Routed To' while in 'Pending-Timeclock' Encyclopaedia Britanicca -
iClock
Aug-07
1536
Timesheets - Business Rules - C-Span - TAT rule not working properly Timesheets
Aug-07
1537
Timesheets - Standard Time Entry - C-Span - The Custom Timesheet needs to be reprogramed to hide the time type 'Banked Hours' & its hours.
Timesheets
Aug-07
1538
Timesheets - Email Notification - Omega World Travel - Subject of the Email Notification for Approve and Route option is not working correctly
Timesheets
Aug-07
1539
Live Site Bug - Timesheets - Other - Oregon Clinic - Timesheet Approval - under Supervised by is showing Terminated Employees.
Timesheets
Aug-07
1540
LIVE Site Bug - Tracking Field Set up - Sublist option - Save the Children Timesheets
Aug-07
1541
Timesheets - Archive List - All - Archived Timesheets not displaying as archived in the status
Timesheets
Aug-07
1542
LIVE Site Issue - Timesheet Reports - Missing Punch Detail Report - Treiber Group, The - report displays employee even if punched in
Timesheets
Aug-07
1543
Timesheets - Tracking Fields - Stone Belt - Tracking field values are not populated when timesheet is created using Process Timesheets for holidays under holiday calendar.
Timesheets
Aug-07
1544
Timesheet Reports - Other - Clearwire Corportation - Audit report for punches Timesheets
Aug-07
1545
Timesheet Exports - Other - Bel Air Excavating - New timesheet export - Viewpoint Construction
Timesheets
Aug-07
1546
Timesheets - Pay Policy - Devry - Schedule 2 TS settings creating timesheets for Schedule 1 date range.
Timesheets
Aug-07
1547
Timesheets - Notes on the In/Out Board - Computerx - Client wants the notes to be refreshed/removed at periodic intervals.
Timesheets
Aug-07
1548
LIVE Site Issue - Timesheets - Approval Page for Alt. Approver - All - Timesheet status does not display for Alt. Approver
Timesheets
Aug-07
Project Management Profile – Akash Dave
Page 70 of 91
1549
Timesheets - Timeclock Allocation - BCD Travel - Automating the Timeclock allocation page.
Timesheets
Aug-07
1550
Live site - Timesheets - Active List - Community Care Organization Inc. - Timesheet Tracking field on View Original is missing
Timesheets
Aug-07
1551
Timesheets - Other - Columbus Metropolitan Library - Timesheet entry - Validation for daily totals
Timesheets
Aug-07
1552
Timesheets - iClock Timesheet Setup - Oasis - Force managers/supervisors to edit punches from the timeclock timesheet with a popup punch screen
iClock
Aug-07
1553
LIVE Site issue - Timesheets - Auto-Forward - Platte Valley Financials - timesheets incorrect submission
Timesheets
Dec-07
1554
Timesheets - Active List - Avid Technology - Archiving Exported Timesheets Timesheets
Dec-07
1555
live site bug - Timesheets - Scheduling - Edwards - scheduling not working unless a timesheet exists
Timesheets
Dec-07
1556
Timesheets - TS/TO Integration - Firstrust Bank - Dept & Div not getting autopopulated on saved timesheet
Timesheets
Dec-07
1557
Timesheets - iClock Time Entry - CCAC - The client is looking to have a feature which can automatically punches out every employee at scheduled time or regular intervals.
iClock
Dec-07
1558
Live Site Bug - Timesheets - In/Out Board - Santa Barbara Regional Health Authority - Manager time entry through In/Out Board is not showing the Tracking Fields.
Timesheets
Dec-07
1559
live site bug - Timesheets - Other - Devry - conditional line from holiday calendar not populating for the week if the employees date of hire is that same week.
TImesheets
Dec-07
1560 Full iClock Spec Basic and Advanced - Enchancement iClock Dec-07
1561 Full iClock Spec Basic and Advanced - New Timesheets Dec-07
1562 iClock+ - Convert to SOA iClock Mar-08
1563 Timesheets - In/Out Board - E2E Serwiz Solutions, LTD. - Timesheets Mar-08
1564 Timesheets - Archive List - Reader's Digest - Timesheets Mar-08
1565 Timesheets - Archive List - Save The Children - Tracking Field Blanked Out From
Archived Timesheet Timesheets Mar-08
1566 Timesheet Reports - Missing Timesheet - Maxim - Missing time sheets from the
approver inbox Timesheets Mar-08
1567 Timesheets - Timeclock Allocation - All - Add Supervisor as an option under Approver
Drop Down. Timesheets Mar-08
1568
Training_Update 4 of 4 : Training+ - Manager Self-Service - All - Create a Waitlist Administration screen
Training+
Jan-05
1569
Training+ - Central Approval - All - Bug when accessing Central Approval to approve Training+ forms
Training+
Jan-05
1570
Training_Update 1 of 4 : Training+ - Waitlist - All - Create Waitlisting logic Training+
Jan-05
1571
Training_Update 2 of 4 : Training+ - Central Approval - All - Make Training+ work with Direct Write
Training+
Jan-05
Project Management Profile – Akash Dave
Page 71 of 91
1572
Training_Update 3 of 4 : Training+ - Employee Self-Service - All - Create a Training+ Course Resources page
Training+
Jan-05
1573
Training+ - Training+ Imports - All - Modify Training+ Import formats for new Training+ module
Training+
Jan-05
1574
Training+ - All - All - Enhancements to Training+ *** will move into LIVE Beta as soon as testing is complete
Training+ Jul-05
1575
Training+ - Calendars - All - Mgr and Instructor calendars list dates twice when filtering by class
Training+ Aug-05
1576
Training+ - Grading - All - Grading page filters should say Subcompany for direct clients instead of PSID
Training+ Sep-05
1577
GRP_Santosh_1_Of_2_Training+ - Manager Reports - Class Enrollment Report Training+ Oct-05
1578
GRP_Santosh_1_Of_2_Training+ - Manager Reports - Class Enrollment Report Training+ Nov-05
1579
Training+ - Cancellation Notices - All - Spelling error when submitting a cancellation notice
Training+ Nov-05
1580
Training+ - Manager Self-Service - All - Admins should be allowed to override Prerequisites and Seat Availability
Training+ Dec-05
1581
Training+ - Manager Self-Service - All - Admins should be allowed to override Prerequisites and Seat Availability
Training+ Jan-06
1582
Training+ - Training+ Imports - All - Modify Training+ Import formats for new Training+ module
Training+ Jan-06
1583
11. Training_Update 2 of 4 : Training+ - Central Approval - All - Make Training+ work with Direct Write
Training+
Jun-06
1584
Training_Update 3 of 4 : Training+ - Employee Self-Service - All - Create a Training+ Course Resources page
Training+
Jun-06
1585 Training+ - Training+ Imports - All - Modify Training+ Import formats for new
Training+ module Training+ Jun-06
1586
Training+ - Grading - All - Allow users to choose a grade from a choice list or enter as free text
Training+
Jun-06
1587
Training+ - Class Setup - All - Allow users to set up recurring sessions Training+
Jun-06
1588
Training_Update 1 of 4 : Training+ - Waitlist - All - Create Waitlisting logic Training+
Jun-06
1589
Training_Update 4 of 4 : Training+ - Manager Self-Service - All - Create a Waitlist Administration screen
Training+
Jun-06
1590
Training+ - Employee Self-Service - Florida Blood Services - Allow employees to add external classes to enrollment form
Training+
Jun-06
1591 Training_Update 1 of 4 : Training+ - Waitlist - All - Create Waitlisting logic Training+ Dec-06
1592 Training_Update 4 of 4 : Training+ - Manager Self-Service - All - Create a Waitlist Administration screen Training+ Dec-06
1593
Live Site Enhancement -- Training+ -- Instructor Setup - GINNE-Goodwill Industries of Northern New England - Instructors/Employees can not access the Historical Data related to their previous trainings.
Training+ Feb-07
1594 Training+ - Instructor Setup - Craford - Prime - Training+ Feb-07
Project Management Profile – Akash Dave
Page 72 of 91
1595
Training_Update 1 of 4 : Training+ - Waitlist - All - Create Waitlisting logic Training+ Feb-07
1596
Training_Update 4 of 4 : Training+ - Manager Self-Service - All - Create a Waitlist Administration screen
Training+ Feb-07
1597
Live Site Bug -Training+ -Enrollment Timestamp- Bangor Savings Bank - Training+
May-07
1598
Training+ - Training Emails - Bangor Savings Bank - no email functionality in Approval Setup for submitted training forms
Training+
May-07
1599
Training+ - Class Setup - Bangor Savings Bank - When Editing the Session Time on an existing Class, the Instructor and Class Location default to the first in the drop-down, not remain at the selected option.
Training+
May-07
1600
Training+ - Active List - All - Create Active/Archive Lists for Training+ Training+
May-07
1601
Training+ - Class Setup - All - Allow users to set up recurring sessions Training+
May-07
1602
Training+ - Manager Enrollment - The Dolben Company, Inc. - Enrolled class disappears from the system after refreshing the page
Training+
Aug-07
1603
Training+ - Training Emails - Bangor Savings Bank - no email functionality in Approval Setup for submitted training+ cancellation notice
Training+
Aug-07
1604 Training+ - Other - Sypris - Add Date field to grading page Training+ Aug-07
1605
live site bug - Training+ - active list - Sypris - dot net error happens when you try to delete a form from the active list
Training+
Dec-07
1606
Training+ - Course Setup - Sypris - not able to see the entire course name when assigning pre-requisites to courses
Training+
Dec-07
1607
Training+ - Course Setup - Sypris - need to increase the length of the course name to 125 characters
Training+
Dec-07
1608
Training+ - Manager Reports - Sypris - need to add instructors name and location field to the class list by employee report
Training+
Dec-07
1609
Training+ - Other - Sypris - Mananger Enrollment- To assign Instructor's name and Location dynamic
Training+
Dec-07
1610 Training+ - Instructor- Sypris - Adding Grading Comments Text box to Grading option
for the instructor Training+ Mar-08
1611 live site bug - Training+ - Other - Sypris - employee can't enroll in a class if the class
does not have an end date in the session Training+ Mar-08
1612 live site bug - Training+ - Central Approval - Sypris - subcompany filter not working,
all approvers appear in drop down Training+ Mar-08
1613 live site bug -Training+ - Other - Sypris - if you change the grades in choice lists you get
an error when you go to grade someone if they have grades from the old values Training+ Mar-08
1614 Training+ - Central Approval Setup - All - Training+ Customs Flags for Enrollment and
Cancellation are not working Training+ Mar-08
1615 Training+ - Employee Self-Service - Sypris Test and Measurements - employees can't
view the entire name of the class when they enroll Training+ Mar-08
Project Management Profile – Akash Dave
Page 73 of 91
1616 Live Site Bug:-Training+ - Other-Resources - Resources Cannot be Edited and Deleted -
Bangor Savings Bank - Training+ Mar-08
Project Management Profile – Akash Dave
Page 74 of 91
2. Shrink-wrapped Products / Web Applications / Portals Market Segment: Retail Customer Location: India Project Sr. No. 1 Project Title Navneet.com (Vacations - Portal) Client Navneet Board of Directors Employer Navneet Edutainment Limited Team Size 5 Project Duration 2 months Skills/Technology MS-SQL Server, ASP Methodology Waterfall/Iterative Project Description The project was required by the Directors to provide travelling-related
orientation to end-users especially students (the target addressees of Navneet Products). The Portal was a section on the Navneet.com web-site. Two sets of information design and Navigation structures were created to provide a travel-based metaphor. These designs were as follows: Option 1: Map of India > Zoomed Map of a region > Hotspot of the place of visit > Details of the Place of visit Option 2: DHTML menu with submenus which also included additional options such as wildlife sanctuaries, Essays, Tourist Offices, etc.
My Role As an Information Architect cum Project Manager was involved in planning, designing, architecting, sourcing content and successful deployment of the site. Reviewing of all project deliverables. The project involved interfacing with the Board of Directors, Domain Experts, etc. on a regular basis for business rules, content sourcing and constraint understanding and for generating the requirements definition, specifications and functional specifications documents. In other words, I was involved in the entire life cycle management.
Project Sr. No. 2 Project Title Navneet.com (Revamp and Development of Product Catalogue) Client Navneet Board of Directors Employer Navneet Edutainment Limited Team Size 5 Project Duration 2 months Skills/Technology Oracle 8i, ASP, Microsoft Index Server, Java, Photoshop, Fireworks Methodology Waterfall/Iterative Project Description The project was required by the Directors to revamp the site and to match
the contemporary look and feel while creating a new, ‘tech image’ of Navneet group to the outside world, by providing e-commerce functionality, job hosting and posting services, administrative modules via Extranet, and online processing.
My Role As Information Architect and Project Manager, was involved in the planning, designing, architect and successful deployment of the site.
Project Management Profile – Akash Dave
Page 75 of 91
Reviewing of all project deliverables. The project involved interfacing with the Board of Directors, Business Group Heads etc. on a regular basis for business rules and constraint understanding and for generating the requirements definition, specifications and functional specifications documents.
Project Sr. No. 3 Project Title Connectschool.com (Education Portal for the Indian Education Sector) Client Indian Student / Navneet Board of Directors Employer Navneet Edutainment Limited Team Size 24 Project Duration 2 months Skills/Technology Oracle 8i, ASP, Macromedia Flash, Photoshop, Fireworks Methodology Waterfall/Iterative Project Description The project was required to promote the presence of the Navneet Group in
technology-based education. Leveraging its knowledge of the Indian Education Sector, the portal was designed to provide school and education related information to the Parents, Students, Teachers and Education Administrators. The entire site including the content, information design, technology architecture, etc. was developed from scratch.
My Role As Information Architect and Project Manager, was involved in the planning, designing, architecting and successful deployment of the site. Reviewing of all project deliverables. The project involved interfacing with the Board of Directors, Educators, Content Writers, etc. on a regular basis for content sourcing & development, business rules and constraint understanding as well as for generating the requirements definition, specifications and functional specifications documents.
Project Sr. No. 4 Project Title Lifeline (Exam-oriented web-based interactive service for Maharashtra
Board Standard X Students) Client Indian Student (Free Web-based Service – Accessibility on Registration,
only) Employer Navneet Edutainment Limited Team Size 22 Project Duration 1 month Skills/Technology Oracle 8i, ASP, Java, Macromedia Flash, Photoshop, Fireworks Methodology Waterfall/Incremental Project Description The project focuses on delivery of interactive exam-related content to
Indian school students for last minute exam revision. The service was available to the student only on registering to www.connectschool.com The content as well as the web module was developed within a short span of just 1 month. The entire module consisted of huge content archive and delivery mechanisms including 10 subjects such as Science, Mathematics, Hindi, Marathi, etc. The project was crucial for Navneet since, it was the first project of its kind
Project Management Profile – Akash Dave
Page 76 of 91
and the Board of Directors wanted to demonstrate Navneet’s technical capabilities along with its education and content development capabilities. The Project was developed for Maharashtra Board Standard X Students.
My Role As Information Architect and Project Manager, was involved in the planning, designing, architecting and successful deployment of the entire project. Also involved in the implementation, review and delivery of all project requirements as well as finer aspects such as Flash animation, scripts, code pieces, etc.
Project Sr. No. 5 Project Title Brainiac – Web based Interactive Course No. of Projects / Courses
10 Projects (For MSB X Science I, MSB X Science II, MSB X Algebra, MSB X Geometry, CBSE X Science, CBSE X Math, CBSE IX Science, CBSE IX Math, CBSE VIII Science, CBSE VIII Math)
Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 23 Project Duration 4 months (For all Projects) Skills/Technology ASP, Oracle 8i, Index Server, Java, Dream weaver, Flash, Photoshop,
Fireworks Methodology Waterfall/Incremental Project Description The project focused on the delivery of interactive educational content for
Indian school students. Students are expected to purchase a retail Pin number based product from the market and then create an account with Connectschool.com. The PIN will allow them to create an account with username and password for accessing the purchased course and learn at will through an assortment set of Flash, Shockwave and Java enabled content! (The PIN is generated through a proprietary PIN System. The development of the PIN system was also done in-house. Details of the system are also available, hereinafter)
My Role As Information Architect and Project Manager, was involved in planning, designing, architecting and successful deployment of the service. Reviewing of all project deliverables including Flash animation, scripts, code pieces, etc. In other words, involved from conceptualisation to implementation to deployment.
Project Sr. No. 6 Project Title Answer Machine - Web based Interactive Query System
(For MSB X Science I, MSB X Science II, MSB X Algebra, MSB X Geometry, CBSE X Science, CBSE X Math, CBSE IX Science, CBSE IX Math, CBSE VIII Science, CBSE VIII Math)
Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 5 Project Duration 1 month Skills/Technology ASP, Oracle 8i, Index Server, Dream weaver, XML, MS Project 2000.
Project Management Profile – Akash Dave
Page 77 of 91
Methodology Waterfall/Incremental Project Description The Answer Machine service was a retail product that allowed students to
ask curriculum-related queries to Navneet Teachers through a web-based interface. The service offered to provide responses with 48 hours. The service was designed and implemented based on popular web-based e-mail service and was as easy-to-use. The service utilized a synchronization of in-house built content software system to answer queries. The service was available as a retail product. (Similar to Brainiac)
My Role As Information Architect and Project Manager, was involved in planning, designing, architecting and successful deployment of the service. Reviewing of all project deliverables including Flash animation, scripts, code pieces, etc. In other words, involved from conceptualisation to implementation to deployment.
Project Sr. No. 7 Project Title Payment System for Online Subscriptions (PIN Generation and
Maintenance System) Client Navneet Edutainment Limited Employer Navneet Edutainment Limited Team Size 10 Project Duration 4 months Skills/Technology Visual Basic 6.0, ASP, MS-IIS 5.0, Oracle 8i, MS-Access, Crystal Reports,
Farpoint Controls, Dream weaver, XML MS Project 2000. Methodology Waterfall Model Project Description The scope of the IT solution for the development of Payment System for
Online Subscriptions can be broadly classified as: � Development of a pin management system
o Generation of sixteen digit alphanumeric PINs based on Product Ids
o Encryption and Decryption of PINs for display, use and transfer
o Maintenance of PIN Batches o Printing of PINs on Security PIN forms
� Integration of the pin management system with the registration module on the www.connectschool.com web site
� PIN authentication and product registering process on the website. � Automated Transferring / uploading / Synchronization of pins from
the local server to the Online Web-server. � Web Administration module to monitor Live as well as Non-activi
PINs My Role As Information Architect and Project Manager, was involved in planning,
designing, architecting and successful deployment of the application. Before the commencement of the project, was also responsible in the research of working out and documenting the most relevant and feasible payment system. During that period, I evaluated that the most feasible solution for Navneet would be an offline system, where students can buy Navneet products through a retail outlet and therefore decided on a PIN-based system. Though the application was developed by SIFY programmers, reviewing of all project deliverables, scripts, code pieces etc, as well as devising new functionality, requirements engineering was
Project Management Profile – Akash Dave
Page 78 of 91
entirely my responsibility. This was one of the most challenging projects since; it was the first phase of revenue generation from a technology-based solution perspective. (Brainiac and Answer Machine have been part of this initiative)
Project Sr. No. 8 Project Title Top Scorer – Web-based Interactive Revision Courses (Exam Oriented) No. of Projects / Courses
4 Projects (For MSB X: Science I, Science II, Algebra, Geometry; CBSE X Science, Math; MSB XII Physics, Chemistry, Biology & MSB XII Math)
Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 30 Project Duration 2 months (For all Projects) Skills/Technology ASP, Oracle 8i, Index Server, Dreamweaver, XML MS Project 2000,
Macromedia Flash 5.0, Macromedia Fireworks. Methodology Waterfall / Incremental Project Description The service is similar to Brainiac (e-learning courses) and extension of
Lifeline (Exam-based service) except that these were exam-oriented courses with instructional strategy targeted for last minute revision.
My Role As Head – Projects, was involved in planning, designing, architecting and successful deployment of the service. Reviewing of all project deliverables, Flash animation, scripts, code pieces etc, devising new functionality, requirements engineering to deployment. Reviewing and formation of content authoring guidelines and linguistics guidelines. Also involved in the implementation, review and delivery of all project requirements as well as finer aspects such as Flash animation, scripts, code pieces, etc. In other words, involved from conceptualisation to implementation to deployment.
Project Sr. No. 9 Project Title Navneet Top Scorer Workbook Plus (CD-ROM Based Courses for
Practice) No. of Projects / CD-ROMs
11 Projects (For MSB X Science I, MSB X Science II, MSB X Geography / Economics, MSB X History / Civics, MSB IX Science I, MSB IX Science II, MSB IX Geography / Economics, MSB IX History / Civics, MSB VIII General Science, MSB VIII Geography, MSB VIII History / Civics.)
Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 30 Project Duration 5 months (For all Projects) Skills/Technology Visual Basic 6.0, MS Access, Dreamweaver, XML, MS Project 2000, ADO,
Encryption, Oracle 8i, ASP, CorelDraw 9.0. Methodology Waterfall / Incremental Project Description This product provided powerful content delivery and evaluation system,
which tests a user randomly by throwing questions at him through ADO filtered, data driven record sets. The user’s performance is shown in Excel
Project Management Profile – Akash Dave
Page 79 of 91
like grid and can be plotted on a bar chart by changing score selection criteria. Detailed analysis is done based on various parameters such as time spent, speed, receptivity etc. Reports are dynamic, and generated on the fly. The content is decrypted on the fly and presented to the user. The content was secured in-house under my guidance wherein I provided the guidance to design and develop complex encryption algorithms based on a third-party encryption control. Internally this OCX control uses the 128-bit AES encryption block cipher.
My Role As Head – Projects, was responsible for planning, designing, architecting and successful deployment of the service. Reviewing of all project deliverables, Flash animation, scripts, code pieces etc, devising new functionality, requirements engineering to deployment. Reviewing and formation of content authoring guidelines and linguistics guidelines. Object modelling, functional specifications, Product packaging review, Instruction Booklet design and draft approvals, draft of propositions of features, design of the installation billboard text and technical review. Involved in end-to-end management of this and all other projects in parallel with multiple teams.
Project Sr. No. 10 Project Title Navneet Top Scorer Digest Plus (CD-ROM Courses for reinforcement of
classroom teaching) No. of Projects / CD-ROMs
10 Projects (For MSB X Science I, MSB X Science II, MSB X Algebra, MSB X Geometry, CBSE X Science, CBSE X Math, CBSE IX Science, CBSE IX Math, CBSE VIII Science, CBSE VIII Math)
Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 35 Project Duration 9 months Skills/Technology Visual Basic 6.0, MS Access, Dream weaver, XML, MS Project 2000, ADO,
Encryption, Oracle 8i (Migration Support), XML, Internet Explorer Browser Control, Windows API, low level audio control, Microsoft Agent (was only used for prototype), Text to Speech Engine (was only used for prototype), Voice Command Operations, Macromedia Flash 5.0, Macromedia Fireworks, CorelDraw 9.0.
Methodology / Standards
Incremental/Prototype, 3 Tier application design, OOAD to support the COM framework, Windows User Interface Guidelines.
Project Description A complex, feature-rich software e-learning product quick and personalized content delivery mechanism. In-house coded features such as notepad, bookmarks, spell check, performance evaluation system, comprehensive search, clipart manager (visual gallery), statistical analysis of board paper trends, interactive question papers, on the fly reports and chapter level performance details to name a few, added to a good experience. Enhanced version of this product remains a flagship at NED and is placed competitively in the Indian retail market. Easily one the finest in its league at Rs. 175/- (current price).
My Role As Head – Projects, was involved in planning, designing, architecting,
Project Management Profile – Akash Dave
Page 80 of 91
conversion from web to Desktop and successful deployment of the product. (It must be noted that content of 6 products / CD-ROMs was already available in Brainiac and therefore, converting all this content and re-deploying to a Desktop-based application was a challenge. Reviewing of all project deliverables, Flash animation, scripts, code pieces etc, devising new functionality, requirements engineering to deployment. Reviewing and formation of content authoring guidelines and linguistics guidelines. Since at an entire series of products were to be released, the architecture and a massive functional specification document posed a challenge and thus a lot of code was designed to be written as re-useable. Was involved in all the phases of the [products design and development right from the Marketing Analysis, Requirements Engineering to Review of Test Plans, Deployment. From Product Cost Matrix for Retail Positioning to Design of PowerPoint Presentation for the Marketing Team and Training as well as Product Briefing. Was involved in Functional specifications, Product packaging review, Instruction Booklet design and draft approvals, draft of propositions of features, design of the installation billboard text and technical review. My role involved end-to-end management of this and all other projects in parallel with multiple teams.
Project Sr. No. 11 Project Title Navneet Top Scorer Digest Plus (Reference Material for International
Market) No. of Projects / CD-ROMs
6 Projects (For Beginners Level Science, Beginners Level Mathematics, Intermediate Level Science, Intermediate Level Mathematics, Advanced Level Science, Advanced Level Mathematics,)
Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 10 Project Duration 4 months Skills/Technology Visual Basic 6.0, MS Access, Dreamweaver, XML, MS Project 2000, ADO,
Encryption, Oracle 8i (Migration Support), XML, Internet Explorer Browser Control, Windows API, low level audio control, Macromedia Flash 5.0, Macromedia Fireworks, CorelDraw 9.0.
Methodology / Standards
Incremental/Prototype, Windows User Interface Guidelines.
Project Description Similar to the Navneet Top Scorer Digest Plus application customized for the International Market. This product was sold in the International market with good success. The sales of this product formed a major part of the company’s revenues.
My Role As Head – Projects, was involved in planning, designing, architecting the solution (Product). Reviewing of all project deliverables, Flash animation, scripts, code pieces etc, devising new functionality, requirements engineering to deployment. Reviewing and formation of content authoring guidelines and linguistics guidelines. Involved in end-to-end management of this and all other projects in
Project Management Profile – Akash Dave
Page 81 of 91
parallel with multiple teams. Project Sr. No. 12 Project Title Navneet Top Scorer 21 Plus (CD-ROM-based Interactive Revision
Courses [Exam Oriented]) No. of Projects / CD-ROMs
10 Projects (For MSB X Science I & II, MSB X Algebra & Geometry, MSB X Hist. – Civ / Geog-Eco, CBSE X Science, CBSE X Math, CBSE X Social Science, MSB XII Math, MSB XII Physics Chemistry Biology)
Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 10 Project Duration 2 months Skills/Technology Visual Basic 6.0, MS Access, Dreamweaver, XML, MS Project 2000, ADO,
Encryption. Methodology Simple waterfall Project Description This product was designed to re-use the content hosted on the web version
and provide students a fast and crisp learning product near the exams. This project is managed wherein I was involved in channelling and managing the re-using of code generated in Digest Plus and Workbook Plus and thus serves as a classical example of code re-use. This project successfully re-utilized 90% of code and database structures as is to expedite the delivery of 8 CD-ROM products for this sub-brand. The products hit the market before time and boast of one of its kind in its category.
My Role As Head - Projects –was involved in revamping, planning, designing, architecting and successful deployment of the service. Reviewing of all project deliverables, Flash animation, scripts, code pieces etc, devising new functionality, requirements engineering to deployment. Reviewing and formation of content authoring guidelines and linguistics guidelines. Functional specifications. Involved end-to-end management of this and all other projects in parallel with multiple teams.
Project Sr. No. 13 Project Title Navneet Top Scorer MH-CET Client Indian Software Retail Market Employer Navneet Edutainment Limited Team Size 12 Project Duration 3 months Skills/Technology Visual Basic 6.0, MS Access, Dreamweaver, XML, MS Project 2000, ADO,
Encryption. Methodology Simple waterfall Project Description Yet another product that leverages on the code engines, and components
written for Digest Plus, Workbook Plus and 21 Plus. This product was designed from scratch to provide students a fast and crisp learning experience for success in MHCET exams (Medical Entrance Examination for Maharashtra).
Project Management Profile – Akash Dave
Page 82 of 91
The product offers dynamic reporting by using more than 6 evaluation structures and tabulated archives associated with exam performance. The product uses a unique prescriptive feedback mechanism which is personalized to provide the student with inputs / guidance on improving his performance, each time he completes an evaluation. This project successfully re-utilized 90% of code and database structures as is to expedite the delivery of 8 CD-ROM products for this sub-brand. The product hit the market before time and is currently the largest selling product amongst Navneet Top Scorer CD-ROMs.
My Role As Head - Projects – Was involved in planning, designing, architecting and successful deployment of the service. Reviewing of all project deliverables, Flash animation, scripts, code pieces etc, devising new functionality, requirements engineering to deployment. Reviewing and formation of content authoring guidelines and linguistics guidelines. Object modelling, functional specifications. Involved in end-to-end management of this and all other projects in parallel with multiple teams.
Project Sr. No. 14 Project Title Navneet Top Scorer Digest Plus / Workbook Plus Demo CD Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 7 Project Duration 1 months Skills/Technology Visual Basic 6.0, MS Access, Dreamweaver, XML, MS Project 2000, ADO,
Encryption, Oracle 8i (Migration Support), XML, Internet Explorer Browser Control, Windows API, low level audio control, Voice Command Operations.
Methodology / Standards
Incremental/Prototype, 3 Tier application design, OOAD to support the COM framework, Windows User Interface Guidelines.
Project Description A demo CD-ROM with the entire functionality of Digest Plus as well as Workbook Plus. The demo consisted a single chapter for each title of the entire product portfolio for the academic year. The Demo was divided into two separate applications and both the applications were made available in a single CD-ROM. Targeted for the marketing team, the application consisted of all the functionalities of the original applications while keeping in mind that a malicious user cannot re-use / re-engineer the application.
My Role As Head – Projects, was involved in planning, designing, architecting, and successful deployment of the application. Reviewing of all project deliverables, Flash animation, scripts, code pieces etc, devising new functionality, requirements engineering to deployment. Was involved in Functional specifications, Instruction Booklet design and draft approvals, draft of propositions of features, design of the installation billboard text and technical review.
Project Sr. No. 15 Project Title Navneet Top Scorer Digest Plus (Reference Material for International
Market) – Version 2
Project Management Profile – Akash Dave
Page 83 of 91
No. of Projects / CD-ROMs
6 Projects (For Beginners Level Science, Beginners Level Mathematics, Intermediate Level Science, Intermediate Level Mathematics, Advanced Level Science, Advanced Level Mathematics,)
Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 10 Project Duration 1 months Skills/Technology Visual Basic 6.0, MS Access, Dreamweaver, XML, MS Project 2000, ADO,
Encryption, Oracle 8i (Migration Support), XML, Internet Explorer Browser Control, Windows API, low level audio control, Macromedia Flash 5.0, Macromedia Fireworks, CorelDraw 9.0.
Methodology / Standards
Incremental, Windows User Interface Guidelines.
Project Description Upgrade of Navneet Top Scorer Digest Plus developed for the previous market. This product was also sold in the International market to a different target audience. The project involved minimal changes in the application but a good amount of changes in the content.
My Role As Head – Projects, was involved in planning, re-designing, the solution (Product). Reviewing of all project deliverables till deployment. Reviewing and formation of content authoring guidelines and linguistics guidelines. Involved in end-to-end management of this and all other projects in parallel with multiple teams.
Project Sr. No. 16 & 17 Project Title Navneet Top Scorer Digest Plus – Version 2 (CD-ROM Courses for
reinforcement of classroom teaching) No. of Projects / CD-ROMs
10 New Titles (For MSB X Hist / Civics, MSB X Geog / Economics, MSB IX Hist / Civics, MSB IX Geog / Economics, MSB VIII General Science, MSB VIII Hist / Civics, MSB VIII Geog / Economics, MSB VIII & IX Geometry, MSB VIII, IX & X English Grammar) 15 Updation Titles (For MH-CET, MSB XII Science, MSB XII Mathematics, MSB X Science I, MSB X Science II, MSB X Algebra, MSB X Geometry, MSB IX Science I, MSB IX Science II, CBSE VIII Science, CBSE VIII Mathematics, CBSE IX Science, CBSE IX Mathematics, CBSE X Science, CBSE X Mathematics)
Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 52 Project Duration 12 months Skills/Technology Visual Basic 6.0, MS Access, Macromedia Dreamweaver, XML, MS Project
2000, ADO, Encryption, Oracle 8i (Migration Support), Internet Explorer Browser Control, Windows API, Sound Editing with Sound Forge, Macromedia Flash 5.0, Macromedia Fireworks, CorelDraw 9.0.
Methodology / Standards
Incremental/Prototype, 3 Tier application design, OOAD to support the COM framework, Windows User Interface Guidelines.
Project Description An enhanced version of Digest Plus with additional feature rich-content. New instructional strategies were introduced, Changed user-interface with
Project Management Profile – Akash Dave
Page 84 of 91
Windows XP Look and Feel, Introduced new reporting strategy / formats, Enhanced Animations with Voice-overs and consistent user-interface with branding characteristics. Voice-overs were introduced at the beginning and end of the animation for introduction and summary.
My Role As Head – Projects, was involved in planning, designing, architecting, re-structuring and successful deployment of the product. Reviewing of all project deliverables including Flash animation, voice-over text, scripts, code pieces, etc, devising new functionality and requirements engineering to deployment. Reviewing and formation of Content Creation Guidelines and linguistics guidelines. Reusability of code was the prime thrust. Was also involved in all the phases of the [products design and development right from the Marketing Analysis, Requirements Engineering to Review of Test Plans, Deployment. From Product Cost Matrix for Retail Positioning to Design of PowerPoint Presentation for the Marketing Team and Training as well as Product Briefing as in Digest Plus Version 1. Was involved in Functional specifications, Product packaging review, Instruction Booklet design and draft approvals, draft of propositions of features, design of the installation billboard text and technical review. Involved in end-to-end management of this and all other projects in parallel with multiple teams.
Project Sr. No. 18 Project Title Edge - Pilot (Online Evaluation and Reporting System) Client Edge, Plc. (United Kingdom) Employer Navneet Edutainment Limited Team Size 3 Project Duration 1 month Skills/Technology ASP, Macromedia Dreamweaver, XML, Macromedia Flash MX, MS Project
2000, Macromedia Fireworks, CorelDraw 9.0. Methodology / Standards
Waterfall
Project Description The client wanted Navneet to develop a short inventory and interactive exercise to assess the Listening, Valuing and Responding [LVR] behaviours of individuals. The exercise was divided into two steps, as follows:
1. Evaluating the individual through a short questionnaire 2. Generation of an LVR Profile Report
When answering the questions the LVR Inventory is a self-report of the user’s interactional communications style.
My Role As Head – Projects, Was involved in planning, designing, architecting, re-structuring and successful deployment of the product. Reviewing of all project deliverables including Flash animations, voice-over text, scripts, code pieces, user interface elements, user experience aspects, etc, devising new functionality and requirements engineering to deployment. Was involved in all the phases of the development From Product Cost Matrix for Retail Positioning to Product Briefing. Was involved in Functional specifications, Product packaging review,
Project Management Profile – Akash Dave
Page 85 of 91
design of the installation billboard text and technical review. My role involved end-to-end management of this project.
Project Sr. No. 19 & 20 Project Title Navneet Top Scorer Digest Plus – Version 3 (CD-ROM Courses for
reinforcement of classroom teaching) No. of Projects / CD-ROMs
6 New Titles (Released) (For CBSE X Social Science, CBSE IX Social Science, CBSE VII Science, CBSE VI Science, CBSE VIII, IX & X English Grammar, Nursery Rhymes) 4 New Titles (Under Development) (For CBSE VIII Social Science, CBSE VII Social Science, CBSE VI Social Science, CBSE PMT) 24 Updation Titles (For MH-CET, MSB XII Science, MSB XII Mathematics, MSB X Science I, MSB X Science II, MSB X Algebra, MSB X Geometry, MSB X Hist. / Civ., MSB X Geog / Eco., MSB IX Science I, MSB IX Science II, MSB IX Hist. / Civ., MSB IX Geog / Eco., MSB VIII General Science, MSB VIII Hist. / Civ, MSB VIII Geog., MSB VIII / IX Geometry, MSB VIII / IX / X English Grammar, CBSE VIII Science, CBSE VIII Mathematics, CBSE IX Science, CBSE IX Mathematics, CBSE X Science, CBSE X Mathematics)
Client Indian Software / Education Retail Market Employer Navneet Edutainment Limited Team Size 32 Project Duration 6 months (On Going) Skills/Technology Visual Basic 6.0, MS Access, Macromedia Dreamweaver, XML, MS Project
2000, ADO, Encryption, Oracle 8i (Migration Support), Internet Explorer Browser Control, Windows API, Sound Editing with Sound Forge, Macromedia Flash 5.0, Macromedia Fireworks, CorelDraw 9.0.
Methodology / Standards
Incremental/Prototype, 3 Tier application design, OOAD to support the COM framework, Windows User Interface Guidelines.
Project Description An enhanced version of Digest Plus Version 2 with game-based instructional strategies. Introduced game-based learning such as Crosswords, Jumble–Grid, Memory Map Quizzes, Jigsaw Puzzle, Label Diagrams, Match the Columns (Text and Picture based) Enhanced Animations with Voice-overs throughout the animation. Developed Study Planner with one of the most complex algorithms to deliver study plans based on the most minimal selection.
My Role As Head – Projects, was involved in re-structuring, planning, re-designing, architecting, and successful deployment of all products. Reviewing of all project deliverables including Flash animation, voice-over text, scripts, code pieces, etc, devising new functionality and requirements engineering to deployment. Reviewing and formation of Content Creation Guidelines and linguistics guidelines. Was also involved in all the phases of the [products design and development right from the Marketing Analysis, Requirements Engineering to Review of Test Plans, Deployment. From Product Cost Matrix for Retail Positioning to Design of PowerPoint Presentation for the Marketing Team and Training as well as Product Briefing as in Digest Plus Version 1.
Project Management Profile – Akash Dave
Page 86 of 91
Was involved in Functional specifications, Product packaging review, Instruction Booklet design and draft approvals, draft of propositions of features, design of the installation billboard text and technical review. Involved in end-to-end management of this and all other projects in parallel with multiple teams.
Project Sr. No. 21 Project Title Navneet Nursery Rhymes (Cel Animated CD-ROM with Lively Music) Client Indian Retail Market Employer Navneet Edutainment Limited Team Size 5 Project Duration 6 months Skills/Technology Macromedia Flash 5.0, Visual Basic 6.0, Macromedia Dreamweaver, XML,
MS Project 2000, Encryption, Windows API, Sound Editing with Sound Forge, Macromedia Fireworks, CorelDraw 9.0.
Methodology / Standards
Waterfall
Project Description Nursery Rhymes was a one of its kind project for Navneet. The project was primarily developed considering the fact that a Nursery Rhymes Music Audio CD was already in the Market. The idea was to develop animations based on the existing music and synchronize the animation and character movements, accordingly. Further, the CD-ROM was developed with a perspective that it becomes easier for children of 3 to 4 years to view and run the application with little or no help at all.
My Role As Head – Projects, was involved in planning, designing, architecting, re-structuring and successful deployment of the product. Reviewing of all project deliverables including Flash animations, voice-over text, scripts, code pieces, user interface elements, user experience aspects, etc, devising new functionality and requirements engineering to deployment. was involved in all the phases of the development From Product Cost Matrix for Retail Positioning to Product Briefing. Was involved in Functional specifications, Product packaging review, design of the installation billboard text and technical review. Involved in end-to-end management of this project.
Project Sr. No. 22 Project Title Navneet Digest Plus Video CD (Animated Video CD) Client Indian Education Retail Market (Prototype) Employer Navneet Edutainment Limited Team Size 3 Project Duration 1 month Skills/Technology Macromedia Flash 5.0, Macromedia Dreamweaver, MS Project 2000, Video
Editing with Adobe Premiere, Video Encoding with TMPEG Encoder. Sound Editing with Sound Forge, Macromedia Fireworks, CorelDraw 9.0.
Methodology / Standards
Waterfall / Prototype
Project Management Profile – Akash Dave
Page 87 of 91
Project Description The project involved converting the key learning points, memory maps and animations from the existing Digest Plus CD-ROM titles into engaging animations, such that the students can use the product even if they do not have a PC at their disposal. The product was proposed to be Hybrid in a manner that it will run both on a PC as well as on a Video CD Player. The CD-ROM when inserted in a computer CD-ROM Driver will use the auto-run VB application and launch a full fledged interactive Digest Plus application, whereas, when inserted into a Video CD Player will display a menu of chapters, which the student can select using the standard functions of the VCD remote. Owing to inadequate market research and associative costs, the product was not released.
My Role As Head – Projects, I was involved in conceptualizing planning, designing, architecting, re-structuring and successful deployment of the product. Was involved in all the phases of the development from Product Cost Matrix for Retail Positioning to Product Briefing. Was involved in Functional specifications, Technical Specification, and Content Development. Reviewing of all project deliverables including Flash animations, voice-over text, scripts, code pieces, user interface elements, user experience aspects, etc, devising new functionality and requirements engineering to deployment. Involved in end-to-end management of this project.
Project Sr. No. 23 Project Title Navneet Learning Solutions Demo CD (Flash based Demo CD) Client Prospective Navneet Clients Employer Navneet Edutainment Limited Team Size 3 Project Duration 1 month Skills/Technology Macromedia Flash 5.0, Macromedia Dreamweaver, Sound Editing with
Sound Forge, Macromedia Fireworks, CorelDraw 9.0. Methodology / Standards
Waterfall / Prototype
Project Description The project involved three phases viz. (i) Documenting the technological and content development profile of Navneet Edutainment Limited, (ii) Designing a Flash-based User-Interface with a soothing and easy-to-use conceptual framework, and (iii) Developing the application with Auto-Run capabilities and ensure that the same can also be deployed on the web.
My Role As Head – Projects, was involved in conceptualizing planning, copy-writing, editing, designing, architecting, re-structuring and successful deployment of the CD-ROM. Was involved in all the phases of the development life cycle. My role involved end-to-end management of this project.
Project Sr. No. 24 Project Title Animated Book (Flash based CD with Hybrid – Mac and PC
compatibility) No. of Titles 2 New Titles
Project Management Profile – Akash Dave
Page 88 of 91
(i) What is Colour Book and (ii) Colours Around Us Book Client The Michael Wilcox School of Colour (United Kingdom) Employer Navneet Edutainment Limited Team Size 3 Project Duration 2 months Skills/Technology Macromedia Flash 5.0, Macromedia Dreamweaver, Sound Editing with
Sound Forge, Macromedia Fireworks, CorelDraw 9.0. Platforms Macintosh G4 - OS 10x / PC Windows Methodology / Standards
Waterfall / Prototype
Project Description This UK-based publisher wanted to convert his existing children-based book titles into interactive animated books with sounds effects and voice-overs. The project involved five phases, viz. (i) Developing storyboard for each page of the book, (ii) Converting existing book content into Flash, (iii) Developing interactive animations, (iv) Recording and integrating Voice-over text pieces with sound effects, and (v) Deploying the entire animated book into a CD-ROM compatible for both the Macintosh as well as Windows Platforms. [Additionally, the client specifically required the following: (a) That except the file for the title animation, no other file should be visible, on either platforms, (b) That the CD-ROM should be auto-run on both platforms, (c) That no compiled file, if opened, can be reverse engineered for modification.
My Role As Head – Projects and Technology, was involved in Developing the proposal, conceptualisation, planning, project costing, copy-writing, editing, designing, architecting, technical evaluation and, client communication, successful deployment (and also, payment follow-ups) for both the titles. Was involved in all the phases of the development life cycle. Was also involved in the end-to-end management of this project to the client’s satisfaction.
Project Sr. No. 25 Project Title Online Tutoring – Pilot (Technical Feasibility and Arrangement) Client eSylvan and Educate, Inc. (United States) Employer Navneet Edutainment Limited Team Size 8 Project Duration 2 months Skills/Technology Java-based proprietary application, Graphic Pads, 512 Kbps DSL Line,
Head Sets with Earphones and Microphones. Methodology / Standards
Waterfall / Prototype
Project Description This US-based e-learning company wanted to experiment with conducting online tutoring sessions with Indian teachers. The project involved training US Students on Math Topics by Navneet teachers through an interactive voice-oriented technology-based system. The setup was somewhat similar to a call-center with 5 seats. The training sessions were typically conducted during nights. The project did not involve any software-development aspects.
Project Management Profile – Akash Dave
Page 89 of 91
My Role As Head of Projects and Technology, was involved in developing the proposal, planning and deploying the infrastructure, project costing, initial training, technology monitoring, remote monitoring, systems uptime, client communication and guiding the content / tutoring team on the technological aspects. (The content and training aspects were taken care of by the content manager.)
Project Sr. No. 26 Project Title Math Development for Online Tutoring (Currently in Process) Client eSylvan and Educate, Inc. (United States) Employer Navneet Edutainment Limited Team Size 40 Project Duration 6 months Skills/Technology Macromedia Dreamweaver, XML, XSL, MS Project 2000, Macromedia
Fireworks, CorelDraw 9.0, MathType, FrontPage. Methodology / Standards
Waterfall / Prototype
Project Description This US-based e-learning company after convincing itself about the key-members in the project team, awarded a Math Content Development Project for its Online Tutoring Engine. The key task was to develop content from the academic as well as technical perspectives.
My Role As Head of Projects and Technology, have been involved in developing the proposal, planning and designing the workflow, technical evaluation, designing the process methodology, project costing, initial training, project monitoring, client communication and guiding the content / tutoring team on the technological aspects. (The content and training aspects were taken care of by the content manager.)
Project Sr. No. 27 Project Title Phonics Book Development (Two Titles) Client Navneet Publications (India) Limited (Exports Division) Employer Navneet Edutainment Limited Team Size 8 Project Duration 2 months Skills/Technology Macromedia Fireworks, CorelDraw 9.0, Adobe PageMaker, MS Project
2000. Methodology / Standards
Waterfall / Prototype
Project Description The project involved developing an illustration-based book series on Phonics for the International Market.
My Role As Head – Projects, was involved in conceptualising planning, designing, and successful completion of the book series. Was involved in all the phases of the development from Product Cost Matrix to Product Briefing. From specifications to Content Development. Reviewing of all project deliverables including illustrations, content, cover-pages, promotional material, etc. was my responsibility. Also involved in the end-to-end management of this project.
Project Management Profile – Akash Dave
Page 90 of 91
Project Sr. No. 28 Project Title Examination Practice Kit (Three Titles) Client Navneet Publications (India) Limited (Stationery Division) Employer Navneet Edutainment Limited Team Size 20 Project Duration 2 months Skills/Technology Macromedia Fireworks, CorelDraw 9.0, Adobe PageMaker, Cyfroset 4.0,
MS Project 2000. Methodology / Standards
Waterfall / Prototype
Project Description The project involved developing an examination-based practice material similar to test series in exact lines on the Board Examination. The objective was to enable the parents / educators to simulate the board examination environment with all the required stationery items including, question papers, answer pages, Holograph Stickers, threads, etc.
My Role As Head – Projects, involved in conceptualizing planning, designing, and successful completion of the series. I was involved in all the phases of the development from Product Cost Matrix to Product Briefing. From specifications to Content Development. Reviewing of all project deliverables including content, cover-pages, promotional material, etc. was my responsibility. Also involved in the end-to-end management of this project.
Project Sr. No. 29 Project Title Screen Selection Systems Client TATA Robins Fraser Limited (TRF Ltd.) Employer AKROH Team Size 2 Project Duration 3 months Skills/Technology PowerBuilder 5.0, SQLAnywhere Methodology Waterfall Project Description TATA Robins Fraser is an engineering firm in the manufacture and
marketing of machinery and equipments for the Mining sector. The marketing team takes critical decisions with regards to making right offers to their clients, based on a sieve analysis and material properties for customized screen selection. The system facilitates these operations by recommending offers and generating techno-commercial data rooted on historical figures over the past few years of the companies. The system allowed analysis of such data for at least 600 different product categories. The project was awarded to AKROH based on its interaction with the key stakeholders of TRF.
My Role As a key programmer and also as a partner in AKROH, was involved in project costing, proposal development, project analysis, requirements engineering, project documentation, database design, coding, testing, technical support & training for the entire system.
Project Sr. No. 30 Project Title Customer Invoicing and Tracking System (CITS) Client Schuler (India) Ltd.
Project Management Profile – Akash Dave
Page 91 of 91
Employer AKROH Team Size 2 Project Duration 3 months Skills/Technology PowerBuilder 5.0. MS-Access 97. Methodology Waterfall Project Description Schuler India, is an international firm dealing in heavy machinery for oil
companies. The administration department in the company was responsible generate invoices and keep track of all correspondence with respective clients. In that context the client required a scaled-down version of an eCRM sans the facility of directly e-mailing from the system. The system was developed to facilitate automated invoicing and tracks all correspondence with the clients. Though, it was insisted by the client that all correspondence should be mapped, manually, to enable selective inclusion in the system. The project was awarded to AKROH subsequent a successful training assignment in the company.
My Role As a key programmer and also as a partner in AKROH, was involved in project costing, proposal development, project analysis, requirements engineering, project documentation, database design, coding, testing, technical support & training for the entire system.
Project Sr. No. 31 Project Title Pay-Slip Generation System Client Network Institute of Computer Education Employer Network Institute of Computer Education Team Size 8 Project Duration 2 months Skills/Technology PowerBuilder 5.0, MS-Access Methodology Waterfall / Iterative Project Description Network Institute of Computer Education had been imparting software
training to corporate as well as retail customers. The company had a network of training centers located at key locations in Mumbai. The company wanted to develop a system to generate of monthly pay-slips for all employees including tutors (permanent as well as freelancers) along with the total no. of training hours completed, Feedback Points received, Participant Satisfaction Levels earned, etc.
My Role As a Consultant (AKROH) to the company in training as well as software development activites, was involved in the entire project development life-cycle. The tasks included project analysis, requirements engineering, project documentation, database design, coding, testing, technical support & training for the entire system.