+ All Categories
Transcript

RIG 25

Detroit 60 Series 60 DDEC III - 550 hp, Tri Steer Tri Drive Workover Rig,

300,000 Lb Double Mast, Skid Double Rig, Class III BOP and Accessories

Rig 25 is a very good clean diversified well servicing rig, it has

many unique features to operate in the Artic climates of Canada.

We have worked in far North of AB for 6 years.

All inspections are current on the mast including level 3 inspections

there are approx 4500 logged hours - 19500 hrs remaining

Its comes with 2-100 KW 3 phase gen set, fully field ready tool room

comes complete, All work areas are clean Tidy and organized.

The pump comes complete enclosed and heated, including all swivel

joints. It has 1 remote E-Shut downs and 1 - internal E- Shut Down

The tank is complete with all applicable safety devices installed incl

lighting and fluid level guages sticks, wind direction indicators.

The rig it fully field ready to operated 60.3, 73, 88.9 & 114 mm tubing.

The power tongs are 58-93, and 54-93

The double Gate BOP is Brand New 5K Townsend

all other handleing equipment has current certification on it.

The equipment skid comes with a 5000L fuel tank and 3000L Glycol

tank, included also is BOP test stump and all transportation needs

for all of the well stocked supplies this rig carries.

The rig is fully Artic winterized using J-13 Hyd fluid, Full pre Fab pack

This rig is as ready and completely stocked as you would ever get

It has been well maintained through out its short life.

This rig is currently strung up 8 lines.

This rig was built brand new in 2006, using reconditioned Kremco 650

DD draw works complete with water/glycol cooled main break drums.

The derrick Egress is the DV Escape Pod System.

This is 1 of a kind in the world, there will be no others like this rig

The Manual Cat Walk has 4 leg tumble racks that can hold up to

300,000lbs of load on properly supported ground.

There is a full V-Door and 8 ft wide catwalk. 3 Egresses from rig Floor

The Boiler is a 125 Hp 2 pass Scotch Marine type, 14M3 water tank and

5M3 fuel.

The Standby is a twin boiler system

This rig is currently in Drayton Valley AB.

MAST

112 ft Skytop Derrick @ 136 daN's ( 300,000 lb )Rating

Racking capacity

5000 M of 88 mm tubing

6000 M of 73 mm tubing

7000 M of 60 mm tubing

1-1/8 Drill line, 150 T 8 Line McKissick Block

BOP EQUIPMENT

ERCB Class III BOP NACE 5000 PSI

179 mm c/w 60.3 mm and 73 mm, 88.9 mm rams.

Work Spool with 1 - 50 mm port and Valve

73 mm EUE Safety Valve - 5000 PSI

88.9 mm Hydraulic Rod BOP 2000 PSI

88.9 mm Swab Lubricator 1000 PSI

88.9 mm Swab Valve

1-1/4 Swab tool string

DRAW WORKS

650 HP rated

Kremco 650, 42 x 10 Glycol circulated

c/w 22" Hydromatic Aux brake retarder

38 - 8 Sandline drum w/ 4200 M 9/16 line

Crown Saver/ Dead Man Break

Skid Mount Pump

30 x 10, 3 - Beam Oilfield Skid

450 HP 60 series Detroit

5x8 Triplex Oilwell 358 pump, 5000 PSI

7 Valve 5000 PSI Manifold

1M3/Minute Rate

Auxillary Equipment Skid

35 MPa BOP Test Stump

5000 L fuel Storage

3000 L glycol

500 L electric Hydraulic power pack.

Catwalk 2.5 m's x 13.8M Heavy Duty c/w 4-4 Leg tumblers

2-8x44 ramp mats and 1-8x20 beam mat

Full line of Expendables

2 -125 HP Boiler

Tank

64 M3 - 3 compartment

Trough, Degasser, Mix Hopper

100 M of 50 mm Line Pipe, 5000 PSI

15 M of 4" Suction Hose

4 - Beam Oilfield Skid

Full Walk Ways

Man Lift Rescue

2" Steam Coil

Handling Equipment

Foster 54-93 and 58-93 tubing tongs c/w Air backup

Cavin C Air Power Tubing Slips

Tubing Elevator's 60.3 mm, 73 mm, 88.9 mm, 114 mm EUE

Standard Equipment to run 60.3 mm, 73 mm 88,9 mm 114 mmEUE

5000# Kelley Hose

Crew Change Unit / Class III

Combo Crew Change 24 hr setup

2-100 KW Isuzu Light Plants

First Aid, Complete Safety Package

4 - 30# ABC Fire Extinguishers

2 - SCBA w/ spare bottle

60 Gal ERCB G-37 class III Closing unit.