+ All Categories
Transcript
Page 1: DIRECTIONAL DRILLING - dooceygroup.co.uk€¦ · Now drilling on average 20,000 metres a year we have successfully completed well over 300,000 metres of line and field work over the

Now drilling on average 20,000 metres a year we have

successfully completed well over 300,000 metres of line

and field work over the past 20 years. Doocey directional

drilling is a valuable specialist company within the

Doocey Group. Each week new projects are carried

out safely, successfully and precisely.

The directional drilling service we provide is of particular

value when open cut work is either a physical impossibility

or the disruption caused would affect environmentally

sensitive areas or transport infrastructures.

For example:

• Canals

• Rivers

• Streams

• Railways

• Fields

• Environmentally Sensitive Areas

• Roads

• Motorways

• Airport Runways

• Embankments.

A Doocey Group company having vast

experience in line and field work across

a wide variety of industry sectors including

the utility services of gas, water and electricity.

DIRECTIONAL DRILLING

For more information telephone 0121 520 9874, email [email protected] or visit dooceygroup.co.uk

Page 2: DIRECTIONAL DRILLING - dooceygroup.co.uk€¦ · Now drilling on average 20,000 metres a year we have successfully completed well over 300,000 metres of line and field work over the

CapabilitiesOur 15 tonne rigs carry out a vast part of our work and larger 40 tonne rigs are available for specialist projects.

Our specialist drillers are very passionate taking pride in every job. Working under strict instructions they make sure each site is walked prior to start, plant is checked, all utilities are identified or exposed, every safety measure is put in place and everyone must be happy before a permit is issued. They work closely with the client or site gangs to ensure all procedures are followed and satisfied before commencing on-site.

Advantages of horizontal directional drilling

• Quick, efficient and therefore economic and cost effective

• Minimal disruption to the surface infrastructure services

• Unaffected by surface obstacles

• Time saving alternative to open cut methods when installing pipes amidst extensive underground infrastructure or at significant depths

• Reduced impact on carbon footprint

• Pipework and cables can be installed in either a straight or curved alignment to help avoid underground complications and services

• HDD removes the requirement for deep excavations

• A reduced requirement for land possessions, road closures, opening notices etc, if required

• A reduced requirement for restricted working hours and premium rate working.

As with all our work Doocey Group prides itself in using its own finely tuned machinery and our experienced long standing staff and management team ensure we deliver the best service to our clients in this delicate line of work.

For more information telephone 0121 520 9874, email [email protected] or visit dooceygroup.co.uk

Our clients include:


Top Related