EDUCATION CITY, SOUTH SITE UTILITYTUNNEL

Facts Project DescriptionDesign (structural) and construction of utility tunnels (length 8,800 m) for Qatar Foundation,Education City Doha. System includes civil works, installation of chilled water pipes,potable water, fire water and irrigation water pipes, power supply, telecommunication,infrastructure and SCADA system. The foundation level is located approx. 10 m below thesurface of the campus of Doha's Education City.

Original Scope of Work completed and Completion Certificates for all phases issued byClient. Testing and Pre-Commissioning for all systems completed.

Within Qatar University and branch campuses of American, French, as well as, UKUniversities, Education City aims to be the center of Middle East educational excellence.Furthermore, one out of the 12 soccer stadiums for the Soccer World Cup 2022 in Qatarwill be located in the Education City Campus.

PROJECT DATA:Total number of Blocks: 785 blocksExcavation: 485,000 m³Concrete: 85,000 m³Reinforcement: 14,000 tonsChilled water pipes: 17,500 mDuctile iron pipes: 26,460 mCable trays and ladders: 60,000 mBackfilling: 270,000 m³

City/Country

Doha / Qatar

Client

Qatar Foundation, Doha

Architect

KEO International Consultants

Contract Value

€ 142,21 Mio.

Construction Period

9/2009 - 6/2013 (46 months)

.