OVERVIEW OF TANZANIA NATIONAL WATER POLICY 2002;
Despite significant investment in the Water Supply services since the early 1970s, water supply coverage is not satisfactory. The 1991 National Water Policy set a goal of providing clean and safe water to the population within 400 meters from their households by the year 2002. Today only about 50% of the rural population has access to a reliable water supply service. Due to poor operational and maintenance arrangements, over 30% of the rural water schemes are not functioning properly
TANZANIA AND WATER MANAGEMENT
Urban water supply Rural Water SupplyWater resources
managemet
The Tanzania National Water Policy is the main hub of water management in the country
Concept
& Processes
THE SPECIFIC POLICY OBJECTIVES
– To provide adequate, affordable and sustainable water supply services to the rural population,
– To define roles and responsibilities of various stakeholders, – To emphasize on communities paying for part of the capital
costs, and full cost recovery for operation and maintenance of services as opposed to the previous concept of cost sharing,
– To depart from the traditional supply-driven to demand-responsive approach in service provision,
– To manage water supplies at the lowest appropriate level as opposed to the centralized command control approach
– To promote participation of the private sector in the delivery of goods and services,
– To improve health through integration of water supply, sanitation and hygiene education
NAWAPO 2002
Concept
& Processes
Minimum policy standards appaly:
•25l/per/day
•250hab./water point.
•300 – 450 meter meter
MODEL OF LEGAL ASSOCIATONS FOR WATER
MANAGEMENT
ISF is enabling community members to establish an autonomous, legally recognized community entity responsible for ensuring smooth operation and maintenance of completed water supply facilities in a sustainable way
No Model of legal Association Operation area Managing Organization
1 Water User Group (WUG) Water Point Level WUG Committee
2 Water Users Association Village /Scheme Level WUA Board/Executive Committee
3 WATSAN COMMITTEE Village level WATSAN Committee
4 Water Users Coop. Socities Village /Scheme Level Board/Executive Committee
5Water Users companies Limited by Guarantees Scheme level Board of Directors
6 Trusteeship (Board of trustees) Scheme level Board of Trustees
Concept
& Processes
RESPONSIBILITIES IN RURAL WATER MANAGEMENT
HOWEVER, OBLIGATION OF SUPERVISION OF THE RURAL WATER MANAGEMENT ENTITY IS PUT UNDER BWO & LOCAL GOVERNMENT AUTHORITY(DISTRICTS).
....although there are defined functions at various levels...
Concept
& Processes
WATER USERS ASSOCIATION
(WUA)
WATER USERS GROUP (WUG)
WATER USERS GROUP (WUG)
VILLAGE GOVERNMENT
DISTRICT BASIN
FUNCTIONAL STRUCTURE OF WUA MODEL
Concept
& Processes
COMMUNITY MANAGEMENT
• Community decides:• Type of system (technology) • Management model (organization)• Tariff model (cost recovery)• Bylaws (regulation)
• The community is responsible for:• Operation and maintenance• Regulation of facilities• Cost recovery• Extensions and connections (service level)
Concept
& Processes
OBJECTIVES OF COMMUNITY MANAGEMENT
• Transparency and accountability to users• Information in assemblies and offices• Reporting system enabled
• Equity• Pro-poor regulation• Gender balance• HIV/AIDS and vulnerable groups
• Sustainability• Appropriate technology• Lower level of service according to national standards• Maintenance of small repairs• Supply chain for maintenance
Concept
& Processes
WATER MANAGEMENT & SUSTAINABILITY
USERS LEVEL MANAGEMENT SYSTEM:
• Management at DP Level-Water user Groups (Supervise all issues related to DP)
• Collection of funds, Cleaness of DP&Sorrounding
• Reporting to WUA, Management at system level(Water users Association)
• Executive committee(Chair person,Secretary and Tresuary)
• Supervise O&M, WUA is the highest management entity
• WUGs and WUA members are facilitated in acquiring management
NAWAPO 2002: Implementation of cost – recovery system to assure sustainability
People not used to pay for water and have access to other sources, but unsafe!
Concept
& Processes
FINNANCING RURAL WATER SUPPLY
• Sources of funding• Taxes (government) and external funds• Initial contribution (5%) and Tariffs (users)
• Funding goes to:• Initial investment • Planning, supervision and policy guidelines• Operation and maintenance• Extensions and improvements in service level
• Tariff types• Flat rate• Pay as you fetch• Block rates (crossed subsidies)• Connection rates for private users
Concept
& Processes
users
government
GUIDELINES FOR FACILITATING COMMUNITIES TO ESTABLISH LEGAL WUE
1. Facilitation Service Providers and DWSTs orient to water users different management models and facilitate them to choose appropriate management systems
2. Initial meeting with village council leaders and WATSAN committeein order to enable them appreciate the need to institute a sustainable water user legal entity
3. Facilitate village assembly meetings to insure that water users havea clear understanding on need of legal water user entity followed by Facilitate Formation of WUGs
4. Facilitate the interim committee to prepare a draft of the preferred wateruser entity’s constitution
5. Processing the legal registration of the community water users’ entity 6. Official presentation of the registration certificate to the WUE
Concept
& Processes
STEP BY STEP APROACH
THE SITUATION,,,
• Deficit of CoverageLess than 50% of coverage in rural areas
• Deficit of operation and maintenance 30% of the systems are not functional
• Deficit of quantity and continuity Shortage of water during dry seasons
• Deficit of quality of water Contamination or salinity
• Plannining and investment of resourcesLack of institutional and technical capacities
Water Access in rural Tanzania
Context
THE WATER COVERAGE SITUATION IN TANZANIA
Map by water Aid
Context
OPPORTUNITY
IMPACT OF ISF ApD IN RURAL WATER SUPPLY MANAGEMENT IN TANZANIA
Ingeniería Sin FronterasISF ApD
ISF IN TANZANIA
KIGOMA SAME
MAN'GOLA
HYDROSANITARY PROGRAMS :
MANG’OLA VALLEY (from 1996)
KIGOMA RURAL DISTRICT (from 2002)
SAME DISTRICT (from 2006)
PRESENTATION OF WATER MANAGMENT IN KIGOMA RURAL DISTRICT
Clemence MwecheField Coordinator, Kigoma
Ingeniería Sin FronterasISF ApD
MKONGORO II WATER SUPPLY SCHEME
VILLAGES WITHIN THE PROJECT• Chankabwimba• Mahembe• Msimba• Kamara• Simbo• Kasuku
EXPECTED POPULATION TO BE SERVED 43,000
STATUS OF MANAGMENT FACILITATION• A total of 33 participants from all the village selected and participated in the selection of
managment entiy (The Water Users Assosiation is model proposed)• Follow up step by step approach, a total of 107 WUGs formed in the 5 villages and the
process of registration for water users is on going to last village• Formation of WUGs and selection of leaders and members done also in the five village and is
on going to the last village (The total DPs in all 6 vilage will be 155)• Community facilitated by selected Focus group from the community themselves and the
objective is to make the communites understand the need of legal water user entity – About 186 selected members formed a focus group from 4 villages and managed to make cost
recovery awareness sessions in those villages. Three thousand, three hundred and twenty seven (3327) among of three thousand, nine handred and seventy five (3975) heads of households which is an average of 79.3% participated in the sessions
– During the cost recovery sessions in 4 villages the community leaders and about 99.7% of villagers in those communities proposed the WUA model and flat rate tariff to be used
MODEL OF LEGAL WATER ENTITY PROPOSED
Chair person
SecretaryTreasurer
Members
Village Water committee
WUG Committee
Wug1 Wug2 Wug4Wug3
Manager
Chief WA
O&M WA
Security Guards
WUA _Board
THE STEPS DONE IN THE FACILITATIONS AND PREPARATION OF CONSTITUTION
• Case study done in the multi projects of Uchira, Uroki bomang’ombe and Uparu in Kilimanjaro region and Mkongoro I water supply projects in Kigoma District with the objective of facilitating the communities to select the best management entity and formation of constitution
• Review of the costitution coping with the proposed model of entity above is on progress before presenting in the interim commitee of the WUA members for ammendments and preparation of the final draf
PREPARATION WITH COMMUNITIES TOWARDS O&MCASH CONTRIBUTION Before started the project, the condition following the NAWAPO 2002 the donor can implement the project
according to situation but the concept of contribution should be put to consideration hence each community of Mkongoro II system agreed to contribute1 million TSH for operation and maintenance and the money are going to be used once the project finish and start to operate
Status of contribution All the community managed to contribute 4.1 million which is about 68.3% out of 6 millions which issupposed to be contributed
Challenges Facing the contribution The village leaders are not committed to raise contribution Information gapes or lack of transparency with the money contributed Lack of understand on the expenditure with the money once the project starts to operate Lack of understanding the new NAWAPO 2002 as water is not free facility No motivations for collectors Political interest which overrides the projects interests
KIND CONTRIBUTION
The participatory approach is the one used to implement the project, despite the communityto contribute in cash but also they are participated by providing manpower for constructing the project
Human Participation in the construction work
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
140.00%
160.00%
180.00%
200.00%
Blockproduction
Distributionpipes
Distributiontanks
DP Intake Main linefrom Bitaleto villages
tanks
Main linefrom intake
to Bitale tank
Main tank
Activity
% o
f P
art
icip
ati
on
Chankabwimba's participation onworks
Mahembe's participation on works
Msimba's participation on works
Kamara's participation on works
Simbo's participation on works
Kasuku's participation on works
Kigoma DC participate in the pipe lying withChankabwimba people
Construction of Tank _ Chankabwimba
HUMAN PARTICIPARTION
JOINT CONTRUCTION COMMITTEE (JCC)This is the committe formed by the selected members from the community for implementing the roles of organising all the leaders and community smoothly in the contruction of the project
- There 95 members in total from all the villages - The members of this committee are Councelors, Ward Excutive Officers (WEO), Village Excutive officers (VEO), Village Chairmans, Hamlets Leaders and Six Democrat members from each village
HOW THE JCC IS WORKINGIn order to, plan and to organize local leaders properly, the JCC used to conduct a meet once per month and all members are supposed to participate in order to contribute the agenda raised
To assist the JCC working propery in the construction of the project, ISF used to have pri meeting before the meeting arrangment for the matter of updating vorious issue related in the prgress of the project so that to be discussed in the meeting
THE WATER COMMITTEE There are about 54 water committee members 9 from each village of Mkongoro 2 system who selected from the community themselves
The roles of the water committee in the communityTo educate and disseminating the concept of NAWAPO 2002To mobilize the community to participate in the project (Cash and Kindly)To assist the village Leaders in the collection of initial contributionTo assist the village leaders in the registration of water users
WATER POINT MAPPING (WPM)
In order to assist the district to have the planning tool and to know the realsituation of water problems in Kigoma District, ISF implement the exercise ofcollecting the data to over 75 village of Kigoma District
The strong objective of the project was to help the District of Kigoma to have aplanning and monitoring tool which can be practice by the district to priorities the area for interventionsHow do the exercise doneIFS contract GeoData organization who are the expert of WPM project and with thequestionnaire developed by ISF and inputs from the district the datas in 75 villageswhere collectedTraining of using the ToolThe training for using the tool where conducted to 3 District and 3 ISF staffs by PCRfrom Madrid university The objective of the training was to capacitate the District staff and ISF team to usethe toolFor the District the tool should be updated, they can
facilitate the exercise
SAME
Ingeniería Sin FronterasISF ApD
Gasary Gratian Programme Coordinator, Same
ECONOMIC SITUATION: • The majority of households in Same district depend much on
subsistence farming. About 80% of the total population are small farmers dealing with small scale farming system and livestock keeping.
• Suitable land for irrigation is 12,000ha out of which only 8,200ha are utilized for irrigation. Also the District is famous in the Region for Pastoralism
POPULATION:The District is estimated to have 218,983 inhabitants (by 2002
Census) with an average population density of 41 people per square km (by 2002 Census). According to the Regional
Socio-Economic Survey of year 2005, the Capital Income of Same District resident was Tshs. 436,900/= per annum.
ADMINISTRATION:• Administratively District is divided into 6 Divisions, 25 Wards,
83 Villages and 454 registered Sub-Village. The District also has two parliamentary constituencies (Same East & Same West). At the beginning of the 2008 year the Council has established Same Township Authority and it is in operation.
*according to Same District Water Department (2008)
SAME WATER SECTOR SITUATION*
SAME WATER SECTOR SITUATION*
WATER SUPPLY STATUS• General objective of the sector is to ensure that
Socio-economic infrastructure, agro- economic and rural financial services improved by 2010. The specific objective of district water department is to make sure that the supply of accessible, affordable, adequate and potable water reach the coverage of 65% in 2010. Also Sanitation and Hygiene are improved and given priority.
• Water supply service in Same can be categorized in two groups based in the geographical location, The first group is of the villages in the eastern mountains, mostly upland plateau where is the source of four rivers Nakombo, Hingilili, Saseni and Yongoma. The other group is of western Middle plateaus and lowland, where river Pangani (Ruvu) passed. In the former group,gravity water supply schemes dominates while shallow and deep wells are mostly located in the west, this is because there is no visible, reliable sources like springs and rivers located in the East.
SOURCES• There exist several water sources in form of Springs and
streams, these are tributaries and distributaries of the main four Rivers mostly located in Shengena Forest, other is Ruvu river,the downstream of Nyumba ya Mungu Dam.The number of water sources identified is 61
COVERAGE• Among 83 villages, the schemes above have
spread in 53 villages leaving 29 villages essentially without having any piped water scheme. The assessment defined the average coverage being 51%.
• This is to say, among 244089 people (2008 projection) leaving in Same District only 124485 people have access to piped water. This is below National Water coverage of 53.4%.However, this is not safe water (quality) coverage, it is an access and minimum quantity coverage.
EXISTING WATER SCHEMES• Numbers of water supply schemes present are as follows:• 24 Gravity shemes• 3 B/H Electrical Power driven pump. • 3 B/H Diesel Engine driven pump.• 32 Hand pumps• 1 Windmill• 2 Solar power driven pump
*according to Same District Water Department (2008)
OPERATION AND MAINTANANCE• The schemes handover operation done in 1990’s were
preceded by Establishment of Water user administrative entities in the respective villages . The exercise aimed mainly to create the sense of ownership to the communities benefited in the project leadig to sustainability.
• In Same District, many water committees to almost all villages and One Board (Same town) was established. The exercise was followed by contribution to start village water fund. Up to now 78 villages have a total of 8,926,889Tshs water funds deposit money in the bank. There is 1047 domestic points, 408 of them not function .
CHALLENGES• As it is observed,The situation of water supply is not good,
coverage is very low with many villages without any defined scheme. Western side of Same District suffer more because there is no reliable sources of water. The area depend on wells , in most cases Deep wells more than 120m and saline water is sometimes found from these.!
• The quality of water is a challenge, analysis of the water point mapping prevail.
• Lack of enough fund to do major construction and rehabilitation of water schemes this is because many schemes are old and need major rehabilitation examples of these water schemes include Hedaru, Same, Maore, Ndungu, Kihurio,Kisiwani and vudee w/s.
• The administrative entities are not capable of running the existing projects well. Village water committee in the villages has shown remarkable fail.
• The lack of expertise and human resources – especially in electrical and pump mechanics, an experienced electrical engineer and a water engineer is needed for both town and rural w/s
• Willingness to pay , as it was shown in the O & M• Participation with stakeholders.-some of the NGO’s don’t seek
advise or inform about some of the interventions done in the villages.
REQUIREMENTS• To archive the coverage of 90%(Development vision for
Tanzania 2025), we need to have, among other things, an addition of:-
• -5 gravity schemes, each sufficiently to cover more than one village and 20 small
• gravity schemes for one sub village or community because of the district
• geographical features.• -9 Deep wells diesel or electric driven• -12 Shallow wells• -2 small Dams• -Water treatment facilities in old and new schemes
SAME WATER SECTOR SITUATION*
*according to Same District Water Department (2008)
Water infrastructure and functionality in Same District
RUVU
NJORO
KISIWANI
MAORE
HEDARU
NDUNGUMAKANYA
MWEMBE
VUNTA
SAME URBAN
MTII
SUJI
MSINDO
BENDERA
CHOME
VUDEE
MSHEWA
BW
AM
BO
KIHURIO
MY
AM
BA
MHEZI
KIRANGARE
BOMBO
MP
INJI
VUJEVUJE
MP
INJI
BOMBO
KIRANGARE
MHEZI
MY
AM
BA
KIHURIO
BW
AM
BO
MSHEWA
VUDEE
CHOME
BENDERA
MSINDO
SUJI
MTII
SAME URBAN
VUNTA
MWEMBE
MAKANYANDUNGU
HEDARU
MAORE
KISIWANI
NJORO
RUVU
20 0 20 40 Kilometers
N
SAME DISTRICTWATER POINTS DENSITY BY WARDS IN 2006
Key
less than 1 water point per 1,000 peoplebetween 1 and 2 water points per 1,000 peoplebetween 2 and 4 water points per 1,000 peoplegreater than 4 water points per 1,000 peopleUrban Ward Not Included in the Study
MP
INJI
VUJEVUJE
MP
INJI
BOMBO
KIRANGARE
MHEZI
MY
AM
BA
KIHURIO
MSHEWA
VUDEE
CHOME
BENDERA
MSINDO
SUJI
MTII
SAME URBAN
VUNTA
MW EMBE
MAKANYANDUNGU
HEDARU
MAORE
KISIWANI
NJORO
RUVU
20 0 20 40 Kilometers
N
SAME DISTRICTFUNCTIONAL WATER POINTS DENSITY BY WARDS IN 2006
Key
less than 1 water point per 1,000 peoplebetween 1 and 2 water points per 1,000 peoplebetween 2 and 4 water points per 1,000 peoplegreater than 4 water points per 1,000 peopleUrban Ward Not Included in the Study
Context
ISF Programme in Same District, Kilimanjaro
MA
MA
Pilot phase
Period: 2006 - 2008
Beneficiaries:5.657 Inhabitants (Njoro, Ishinde, and Vumari
Investment: 399, 270 EUROS (District Council Of Madrid, Junta de Extremadura , private funds & ISF)
Objectives:Reduction of Child mortality rate through access to safe drinking water and sanitation.
History
Period: 2008 -2012
Beneficiaries:30.000 Inhabitants
Investment: 3.000.000 EUROS aprox. (European Union, District Council of Madrid, Castilla La Mancha, Murcia Region, private funds & ISF)
Objectives:Gender balanced poverty reduction in Same District through the access to water and sanitation services
Zone 1
Zone 3
Zone 2
Zone 4
Pilot PHASE
R1: Increased access to a sufficient amount of safe water
Hydrosanitary Programme in Same District, Kilimanjaro
Pilot PHASE
Technical possibilities + Village needs and agreements =
Selected system to be designed
…this approach is very significant independently of the existance of the NAWAPO 2002…..
Decision Making and Sustainability
• The process starts from the beginning (Create sense of Ownership & decision making)
Hydrosanitary Programme in Same District, Kilimanjaro
Community Mobilization & Participation COMMUNITY INVOLVED IN: DECISION MAKING: PRA, DP LOCATION, SELECTION OF SYSTEM (APPROPIATE TECHNOLOGY) IMPLEMENTATION: MONETARY AND LABOUR CONTRIBUTION MANAGEMENT AND REPORTING
Hydrosanitary Programme in Same District, Kilimanjaro
Enhanced the capabilities of the communities to manage and maintain their respective water systems :
Hydrosanitary Programme in Same District, Kilimanjaro
Pilot PHASE
Ownership of communities. Community based organisation for management of the systems (WUGs/WUAs).
Other types of Capacity Building........Water Resources InventoryWater Point Mapping, GvSIGEquipment and tools donations
local distict government,
RESULTS BY NUMBERS
Hydrosanitary Programme in Same District, Kilimanjaro
Results, Pilot
PHASE
Emuguri Kiriveni Matongo Chini Matongo Juu Ighire
Water source Borehole Borehole Springs Borehole Borehole Borehole
Technology usedEngine&Pump
Distribution by gravity Handpump Gravity Handpump Handpump Handpump
Water Users' Groups (WUG) 3 1 10 1 1 1Water Users' Associations (WUA) 1 1
Water users' entities
WATER FACILITIES INVENTORY ISF PROGRAMME IN SAME DISTRICT
Engine&Pump Distribution by gravity
Vumari
15
1
Njoro Ishinde
Borehole
VIP LATRINES CONSTRUCTION
By village Vulnerable Schools
Vumari 10 4
Njoro 12 4
Ishinde 11 14
HYGIENE PROMOTERS TRAINED IN PHAST
By village Nº of promoters Percentage women
Vumari 22 35%
Njoro 22 54%
Ishinde 18 55%
Water management structure
DUS, under proposal
WUA
WUG
DISTRICT(DWD)
BASIN Office
WUA
WUG WUG WUG
VG VGCBO H&S
The approach...promoting sustainability as key for development in rural water supply management!
Economical sustainability Management sustainability O&M sustainability Institutional sustainability …
Hydrosanitary Programme in Same District, Kilimanjaro
Information collection, analysis, and
dissemination at all levels...it is important.
Challenges;• Read and write• Politics• Capacity of the district• Traditional model, even not following the former of
the government• Capacity to contribute by cash• Knowledge on NAWAPO2002 in rural areas• Not many NGOs, CBO, are willing and having
capacity to facilitate community management, ...no adequate platform and forums.
GENERAL CHALLENGES IN THE PROGRAMMES
All in all...• All plans are shared and done together with district councils
(Planning,implementation and evaluation)• Coucil supports legal procedures of reconizing water entities specificaly District
Water department• Are main supervisors after phase out of program• Collaboration goes together with village goverment/community leaders and basin• ISF supports the partner departments in acquiring technology that will easen
monitoring of all its water schemes in rural area (GIS training and other database system)
• Its this linkage that justify the sustainability of water supply and sanitation at village level (scaling up from projects to services)
GENERAL CONCLUSIONS