A
B
C
1 2 3
D
E
F
G
H
4 5 6 7 8 9 10
J
K
L
M
3 4 5 6 7 8 9 10
11 12 13
DATE
SCALE
NOSEAL
11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
DATEREVISION
KEY PLAN
GENERAL NOTES
MATERIALS KEYING LEGEND
DRAWING TITLE
DRAWN
CHECKED
PROJECT NO.
DRAWING NO
J K FARCHITECTURE
COPYRIGHT, JKF ARCHITECTURE PC, JOHN K. FARKAS, AIAC
21
14 15
6 2 5 L Y N N D A L E CT., S U I T E F, G R E E N V I L L E, N C 2 7 8 5 8 2 5 2 - 3 5 5 - 1 0 6 8
IEN
GRLLE,N.C
.
K.
JOHN
SAKRAF
V E
5922
AC H
NORTROLI
A
TS
ER
DERE
TC
IHCRA
GI ET
N
ARCHITECTURAL
BUILDING CODE ANALYSIS, LEGENDS, DRAWING INDEX:
SYMBOLS, ABBREVIATIONS, AND CAMPUS MAPA0.0
FIRST FLOOR PLANA1.1
ARCHITECTURAL ABBREVIATIONS
GENERAL PROJECT LEGEND
TOP OF PLATETOP OF SLABTOP OF WALLTYPICAL
WOOD
WITH
WINDOW
VERTICAL
WELDED WIRE FABRIC
UNLESS NOTED OTHERWISETOP OF STEEL
WDW.WD.
W/WWF
U.N.O.
TOP
T/S
VERT.
TYP.
TOSTOW
EXHAUST FANELEC.
MOUNTEDMETAL
MECHANICALMINIMUM
REFRIGERATORPAINTED
REQUIRED
PARTITION
PLATE
OVERHANGON CENTEROVERHEADOPENING
NOT TO SCALE
PLUMBING CONTRACTOR
NOT IN CONTRACT
MASONRY OPENING
SQUARE FEET
SPECIFICATIONSSTAINLESS STEELSTEEL
SIMILAR
TEMPERED
ROUGH OPENING
TRANSPARENT FINISH
ROOM
REF.
TEMP.
STL.TF
REQD.
SPECS.
RO.
S.S.
SFSIM.
RM.
N.T.S.
OPNG.
P.
PCPART.
PL.
OHD.O/COH.
MECH.
MTD.
NICMTL.
MO.MIN.
EXPOSED
EXTERIOR
EXISTING
EDGE OF SLABENCLOSUREELECTRICAL
EXPANSION JOINT
ELECTRIC WATER COOLER
EQUIPMENT CONTRACTOR
GALVANIZED
FOOTINGFURRINGGAUGE
FLOOR
HIGH POINT
INSULATIONINVERT
INTERIOR
HEIGHT
HARDWAREHOLLOW METAL
GYPSUM BOARDGLASS
FINISHED FLOOR ELEVATION
HEATING,VENTILATION,
GENERAL CONTRACTOR
LAVATORY
FIRE EXTINGUISHER
GA.
HP
LAV.
INSUL.INV.
HT.HVAC
INT.
GYP.BD.
GALV.
GL.
HMHDW
GC
FTG.FUR.
FL.
F.E.FFE
EXP.JT.EXPD.
EXT.
EXIST.
EQ.C.
EWC
EOSENCL.
ALTERNATE
ATTENUATION
BLOCKING
ALUMINUM
BOARD
ADJACENT
ANODIZED
CEILING
CENTERLINECATCH BASIN
CONTROL JOINTCEILING HEIGHT
CLEAR
CABINETBLANKET
ACOUSTICAL PANEL CEILING
CONCRETE MASONRY UNIT
ABOVE FINISHED FLOOR
CERAMIC TILEDRAWING
EACH
CONTINUOUSCONTRACTOR
CONSTRUCTIONCONCRETE
ELECTRICAL CONTRACTOR
COLUMN
CAB.
CONC.
CONTR.
CONSTR.CONT.
CT
EFEC
DWG.
EA.
CLG.HT.
COL.CMUCLG.
LC
CJCLR.
CB
ALT.
BLKG.BLKT.
ATTN.BD.
AN
AL.AFF
APCADJ.
AIR CONDITIONING
MATCH EXISTINGM.E.
EXISTINGE
EXISTING TO BE RELOCATEDEXISTING TO REMAINETR
ER
SCO ID # 21-23197-01A
MECHANICALMECHANICAL PLANM1.1
ELECTRICALPOWER & LIGHTING PLANE1.1PANEL SCHEDULE PLANE1.2
CONSTRUCTION DRAWINGS FOR:
ELIZABETH CITY STATE UNIVERSITY
SCO ID# 21-23197-01A
UNIVERSITY TOWER
ELIZABETH CITY, N.C.
ELEVATOR REPLACEMENT
51351CERT. NO.
JKF
ARCH I TECTURE , P
.C.
GREENV I L L E , NC
REG
ISTE
RED ARCHITECTURAL CORPORAT
ION
NORT H CAROL I NA
SECOND, THIRD, AND FOURTH FLOOR PLANA1.2ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONSA4.1
IEN
GRLLE,N.C
.
K.
JOHN
SAKRAF
V E
5922
AC H
NORTROLI
A
TS
ER
DERE
TC
IHCRA
GI ET
N
A
B
C
1 2 3
D
E
F
G
H
4 5 6 7 8 9 10
J
K
L
M
3 4 5 6 7 8 9 10
11 12 13
DATE
SCALE
NOSEAL
11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
DATEREVISION
KEY PLAN
GENERAL NOTES
MATERIALS KEYING LEGEND
DRAWING TITLE
DRAWN
CHECKED
PROJECT NO.
DRAWING NO
J K FARCHITECTURE
COPYRIGHT, JKF ARCHITECTURE PC, JOHN K. FARKAS, AIAC
21
14 15
6 2 5 L Y N N D A L E CT., S U I T E F, G R E E N V I L L E, N C 2 7 8 5 8 2 5 2 - 3 5 5 - 1 0 6 8
SCO ID # 21-23197-01A
IEN
GRLLE,N.C
.
K.
JOHN
SAKRAF
V E
5922
AC H
NORTROLI
A
TS
ER
DERE
TC
IHCRA
GI ET
N
A
B
C
1 2 3
D
E
F
G
H
4 5 6 7 8 9 10
J
K
L
M
3 4 5 6 7 8 9 10
11 12 13
DATE
SCALE
NOSEAL
11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
DATEREVISION
KEY PLAN
GENERAL NOTES
MATERIALS KEYING LEGEND
DRAWING TITLE
DRAWN
CHECKED
PROJECT NO.
DRAWING NO
J K FARCHITECTURE
COPYRIGHT, JKF ARCHITECTURE PC, JOHN K. FARKAS, AIAC
21
14 15
6 2 5 L Y N N D A L E CT., S U I T E F, G R E E N V I L L E, N C 2 7 8 5 8 2 5 2 - 3 5 5 - 1 0 6 8
SCO ID # 21-23197-01A
±
IEN
GRLLE,N.C
.
K.
JOHN
SAKRAF
V E
5922
AC H
NORTROLI
A
TS
ER
DERE
TC
IHCRA
GI ET
N
A
B
C
1 2 3
D
E
F
G
H
4 5 6 7 8 9 10
J
K
L
M
3 4 5 6 7 8 9 10
11 12 13
DATE
SCALE
NOSEAL
11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
DATEREVISION
KEY PLAN
GENERAL NOTES
MATERIALS KEYING LEGEND
DRAWING TITLE
DRAWN
CHECKED
PROJECT NO.
DRAWING NO
J K FARCHITECTURE
COPYRIGHT, JKF ARCHITECTURE PC, JOHN K. FARKAS, AIAC
21
14 15
6 2 5 L Y N N D A L E CT., S U I T E F, G R E E N V I L L E, N C 2 7 8 5 8 2 5 2 - 3 5 5 - 1 0 6 8
x
SCO ID # 21-23197-01A
MECHANICAL LEGEND
A
B
C
1 2 3
D
E
F
G
H
4 5 6 7 8 9 10
J
K
L
M
3 4 5 6 7 8 9 10
11 12 13
DATE
SCALE
NOSEAL
11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
DATEREVISION
KEY PLAN
GENERAL NOTES
MATERIALS KEYING LEGEND
DRAWING TITLE
DRAWN
CHECKED
PROJECT NO.
DRAWING NO
J K FARCHITECTURE
COPYRIGHT, JKF ARCHITECTURE PC, JOHN K. FARKAS, AIAC
21
14 15
P. O. B O X 2 0 6 6 2 G R E E N V I L L E, N C 2 7 8 5 8 P H O N E 2 5 2 - 3 5 5 - 1 0 6 8
ENGINEERING
N
021993
E
P
D.
ORTH CAROLINA
SEAL
ROFESSIONAL
NGINEER
W IL S ONPO
U
ENGINEERING SOURCE PROJECT NO.
MECHANICAL GENERAL NOTES: MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENTMETHOD OF COMPLIANCE:
DESIGNER STATEMENT:
HEAT PUMP INSTALLATION DETAIL
KEY PLAN
MECHANICAL PLAN
SCALE: N.T.S.ELECTRICAL CONNECTION DETAILMECHANICAL EQUIPMENT
LIGHTING PLAN KEY NOTES:
A
B
C
1 2 3
D
E
F
G
H
4 5 6 7 8 9 10
J
K
L
M
3 4 5 6 7 8 9 10
11 12 13
DATE
SCALE
NOSEAL
11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
DATEREVISION
KEY PLAN
GENERAL NOTES
MATERIALS KEYING LEGEND
DRAWING TITLE
DRAWN
CHECKED
PROJECT NO.
DRAWING NO
J K FARCHITECTURE
COPYRIGHT, JKF ARCHITECTURE PC, JOHN K. FARKAS, AIAC
21
14 15
P. O. B O X 2 0 6 6 2 G R E E N V I L L E, N C 2 7 8 5 8 P H O N E 2 5 2 - 3 5 5 - 1 0 6 8
ENGINEERING
N
021993
E
P
D.
ORTH CAROLINA
SEAL
ROFESSIONAL
NGINEER
W IL S ONPO
U
ENGINEERING SOURCE PROJECT NO.
POWER PLAN
MT HEIGHT
ELECTRICAL EQUIPMENT MOUNTING HEIGHTSDEVICE TO
LIGHTING PLAN
KEY PALN
ELECTRICAL LEGEND
A
B
C
1 2 3
D
E
F
G
H
4 5 6 7 8 9 10
J
K
L
M
3 4 5 6 7 8 9 10
11 12 13
DATE
SCALE
NOSEAL
11 12 13 14 15
A
B
C
D
E
F
G
H
J
K
L
M
DATEREVISION
KEY PLAN
GENERAL NOTES
MATERIALS KEYING LEGEND
DRAWING TITLE
DRAWN
CHECKED
PROJECT NO.
DRAWING NO
J K FARCHITECTURE
COPYRIGHT, JKF ARCHITECTURE PC, JOHN K. FARKAS, AIAC
21
14 15
P. O. B O X 2 0 6 6 2 G R E E N V I L L E, N C 2 7 8 5 8 P H O N E 2 5 2 - 3 5 5 - 1 0 6 8
ENGINEERING
N
021993
E
P
D.
ORTH CAROLINA
SEAL
ROFESSIONAL
NGINEER
W IL S ONPO
U
ENGINEERING SOURCE PROJECT NO.
KEY PLAN
TYPICAL DUPLEXRECEPTACLE INSTALLATION
LIGHT FIXTURE SCHEDULE