schacht aslani architects
GREEN LAKE SMALL CRAFT CENTERSEATTLE DESIGN COMISSION - CONCEPT REVIEW
4 OCTOBER 2018
schacht aslani architectsConcept Review
schacht aslani architectsConcept Review
ASSOCIATED RECREATION COUNCIL (ARC) GROUPS AT GLSCC
• Green Lake Crew
• Seattle Sailing Club
• Seattle Canoe and Kayak Club
ROWING ADVISORY COUNCIL (RAC)
• Oversees decisions regarding budget, equipment, race development and fundraising for the ARC groups at the center
• Manages instruction and training of individuals at the center
• Operates under a MOU with Seattle Parks and Recreation
• Leading the parallel private fundraising efforts
ORGANIZATIONS AT THE CENTER
schacht aslani architectsConcept Review
ROWING SPECIAL EVENTS
• Frostbite Regatta (November)
• Green Lake Spring Regatta (April)
• Summer Rowing Extravaganza (August)
• Ted Houk Regatta (June)
EVENTS AT THE CENTER
schacht aslani architectsConcept Review
STEWARDSHIP
• Provide a safe and secure place for rowing and paddling programs through improved accessibility, building upgrades & seismic compliance
PROGRAMS
• Meet increased demand for public rowing and paddling programs through boat storage and program support spaces
ACCESS
• Expand facilities to reach underserved populations and continue the legacy for “access for all” through accessible facilities
COMMUNITY
• Foster youth activities that promote teamwork, health and bonding and create more opportunities for the public to enjoy Green Lake
PROJECT GOALS
schacht aslani architectsConcept Review
CONTEXT
schacht aslani architectsConcept Review
SITE CONTEXT
AURO
RA 9
9
I-5
N
KEY1 GREEN LAKE PARK
2 SMALL CRAFT CENTER
3 GOLF COURSE
4 WOODLAND PARK
5 WOODLAND PARK ZOO
6 SPORTS FIELDS
7 GREEN LAKE WAY N
8 EAST GREEN LAKE WAY N
9 WEST GREEN LAKE WAY N
1
2
3
456
7
8
9
schacht aslani architectsConcept Review
KEY 1 SITE
SITE HISTORY - OLMSTED PLAN
schacht aslani architectsConcept Review
N140’
20’ 60’0’
1950Aqua Theatre
1951Shell House
1958Concessions and Toilet
1966Shell Facility Launching Pier
1966Sail Boat Facility Pier
SITE HISTORY - 1950’S/1960’S
schacht aslani architectsConcept Review
N140’
20’ 60’0’
1980New Pier
1980Alteration of Aqua Theater
1980Remodel of original Shell House with a new steel truss roof
1980Construction of new small craft center within the removed grandstand sections with a new steel truss roof
1980New Rescue Boat House
1984New wood Deck
SITE HISTORY - 1980’S
schacht aslani architectsConcept Review
N
KEY1 GREEN LAKE PARK
2 SHELLHOUSE
3 SMALL CRAFT CENTER
4 AQUATHEATER
5 GOLF COURSE
6 PARKING
7 WEST GREEN LAKE WAY N
8 GREEN LAKE TRAIL
EXISTING SMALL CRAFT CENTER
3
3
2
5
6
6
7
8
1
schacht aslani architectsConcept Review
EXISTING SMALL CRAFT CENTER
schacht aslani architectsConcept Review
EXISTING SMALL CRAFT CENTER
schacht aslani architectsConcept Review
SITE & BUILDING PLANNING
schacht aslani architectsConcept Review
1298
172.245
CW
1297
172.393
CW
1296
172.471
CW
1295
CW
1294
172.259
CW
1293
172.043
CW
1292
171.931
CW
1298
172.245
CW
1297
172.393
CW
1296
172.471
CW
1295
CW
1294
172.259
CW
1293
172.043
CW
1292
171.931
CW
1298
172.245
CW
1297
172.393
CW
1296
172.471
CW
1295
CW
1294
172.259
CW
1293
172.043
CW
1292
171.931
CW
1298
172.245
CW
1297
172.393
CW
1296
172.471
CW
1295
CW
1294
172.259
CW
1293
172.043
CW
1292
171.931
CW
1298
172.245
CW
1297
172.393
CW
1296
172.471
CW
1295
CW
1294
172.259
CW
1293
172.043
CW
1292
171.931
CW
1298
172.245
CW
1297
172.393
CW
1296
172.471
CW
1295
CW
1294
172.259
CW
1293
172.043
CW
1292
171.931
CW
1298
172.245
CW
1297
172.393
CW
1296
172.471
CW
1295
CW
1294
172.259
CW
1293
172.043
CW
1292
171.931
CW
schacht aslani architects Green Lake Small Craft Center08/17/17 P-02
Existing Floor Plan
1/16" = 1'-0"P-021 Level 1
1
2
3
4
56
7
8
910
11
12
13
1415
KEY1 SHELL HOUSE
2 RESTROOMS
3 RESCUE BOAT HOUSE
4 CANOE & KAYAK
5 OFFICES
6 MEETING ROOM
7 WORKOUT ROOM
8 CUBBIES/CHANGING
9 TOILET/KITCHENETTE
10 SEWER PUMP
11 ERG ROOM
12 REPAIR/STORAGE ROOM
13 SHELL STORAGE
14 TRIP STORAGE ROOM
15 CANOE & KAYAK STORAGE
N
EXISTING
schacht aslani architectsConcept Review
SPACE NEEDS
Program Area Existing Preferred OptionMultipurpose Room & Support 0 1,489Parks Office 760 912Boat Program Support 2,530 1,779Boat Storage 6,995 8,110Shared Support Spaces 465 657Aqua Theater (unassigned) Incl. above 4,145
Total (ASF) *10,750 **17,092
* 6,605 sf in existing Boathouse and Shellhouse
** Mt Baker Rowing and Sailing Center = 17,147 sf
schacht aslani architectsConcept Review
AQUA THEATER
SIGNIFICANT
TREES
SHELLHOUSE
LAKE
PROJECT SITE
N
SITE CONSTRAINTS
OHM SETBACK
schacht aslani architectsConcept Review
50' OHM SETBACK
20' OHM SETBACK
FLOATING PIER(PROPOSED)
WAKELESS LAUNCH STORAGE(PROPOSED)
PREFERRED OPTION - LEVEL 1
KEY1 STORAGE/FLEX 2 CANOE/KAYAK 3 LOBBY/COUNTER 4 SHELL STORAGE - NEW 5 PIER
12
34
5
12,947 ASF (TOTAL)
schacht aslani architectsConcept Review
KEY1 VESTIBULE 2 LOBBY 3 BOAT STORAGE
1
2
3
PREFERRED OPTION - LEVEL 1
schacht aslani architectsConcept Review
50' OHM SETBACK
20' OHM SETBACK
FLOATING PIER(PROPOSED)
WAKELESS LAUNCH STORAGE(PROPOSED)
KEY
8
9
10
7
6
6 EXTERIOR DECK 7 PARKS OFFICE 8 MULTIPURPOSE ROOM 9 KITCHEN 10 BOAT PROGRAM
PREFERRED OPTION - LEVEL 2
12,947 ASF (TOTAL)
schacht aslani architectsConcept Review
KEY1 OFFICES
2 MULTIPURPOSE
3 LOCKER ROOM
4 RESTROOM
5 SHOWER
6 LAUNDRY
7 KITCHEN
8 MEETING ROOM
9 ELECTRICAL
1 2
3
3
3
3
4 4
55 76 8
9
PREFERRED OPTION - LEVEL 2
schacht aslani architectsConcept Review
KEY1 CIP CONCRETE RAMP
WITH HANDRAILS 1:12 MAX. SLOPE
2 CIP CONCRETE STAIRS WITH HANDRAILS
3 CIP CONCRETE PLANTING CURB
4 PEDESTRIAN-SCALE LIGHT FIXTURE
5 CRUSHED GRAVEL PATH
6 EXISTING TREES TO REMAIN
7 DROUGHT-TOLERANT GRASSES
8 BIORETENTION POND
9 BENCH
10 OVERLOOK WITH GUARDRAIL
LANDSCAPE
1
1
9
9
9
4
4
2
7
7
7
7
8
3
7
102
2
66
6
6
5
EXISTING SHELL HOUSE
PROPOSED NEW BUILDING
PROPOSED NEW PIER
EXISTING AQUATHEATER
schacht aslani architectsConcept Review
DROUGHT-TOLERANT GRASSES
BIORETENTION
LANDSCAPE
Drought-Tolerant Grasses
Bioretention
Drought-Tolerant Grasses
Bioretention
schacht aslani architectsConcept Review
PREFERRED OPTION - SECTION
schacht aslani architectsConcept Review
SUSTAINABLE STRATEGIESBUILDING
• LEED v4 Gold Certification - EPD, HPD and LEM materials credits
• Natural daylighting and LED lighting
• Ultra-Low flow plumbing fixtures
• Ultra-high efficiency heat pumps (2x more efficient than SEC).
SITE
• Native and/or drought-tolerant planting palette
• Smart irrigation system to reduce water use
• Paving materials designed to reduce heat island effect
• On-site natural drainage bioretention for stormwater
• Sewer pump station replacement
schacht aslani architectsConcept Review
MASS & MATERIALS
schacht aslani architectsConcept Review
ARCHITECTURAL COLOR GUIDE
MATERIALS
WOOD SIDING POLYCARBONATECORRUGATED METALSTOREFRONTCONCRETE
schacht aslani architectsConcept Review
EXTERIOR ELEVATIONS
NORTH ELEVATION
EAST ELEVATION
schacht aslani architectsConcept Review
EXTERIOR ELEVATIONS
SOUTH ELEVATION
WEST ELEVATION
schacht aslani architectsConcept Review
NORTH ENTRY PLAZA
schacht aslani architectsConcept Review
WATERS EDGE
schacht aslani architectsConcept Review
PATH SIDE
schacht aslani architectsConcept Review
FROM W GREEN LAKE WAY N
schacht aslani architectsConcept Review
BIRD’S-EYE VIEW
schacht aslani architectsConcept Review
MILESTONE SCHEDULEDESIGN
• July 2018 - April 2019
PERMITTING
• Jan 2019 - April 2019
CONSTRUCTION
• June 2019 - April 2020
GRAND RE-OPENING
• May 2020