Nina Kandeil
Hasti Tahafchi
Marwa Gouda
Ahad Ahmadi
Edouard Chammas
1
ERIC PALIN HALL
Group 5 | Cohort’10
IIIntroductionII I. Analysis Objective II. Building Introduction
IIBuilding codes & RegulationsII I. General and Compliance, Occupant Type, Building Height & Area II. Building Fire Safety III. Plumbing Facilities IV. Barrier‐Free Study
IIMaterials & MethodsII I. Building Envelope II. Building Systems III. Building Components
IIBIMx I. Worksharing and Collaboration II. Building Systems III. Our Future with BIM IV. Renders & Visualizations
xCONCLUSIONII
INTRODUCTION
2
ERIC PALIN HALL
Group 5 | Cohort’10
I. Analysis Objective To further understand the building components and their
assembly in addition to synthesizing an understanding of the building envelope and its relationship with the various building systems
To comprehend the architects design intention in comparison to their relative success
To generate a BIM model of the building using Revit 2016, then use it to apply the OBC and Materials & Methods principles
To further our knowledge of BIM and its applications in a team environment, as well as BIMs future initiatives in the industry
To come to a conclusion of the buildings conformity and compliance with the OBC 2012 compendium
II. Building Introduction
The building is named after Eric Palin English born educator Canadian National Railway apprentice for 21 years Trained radar technicians in the military Involved with Ryerson since early beginnings 1944 developed the School of Electronics Served as both Associate Director and Assistant
superintendent to the University Retired 1968 It was constructed in 2 phases with the first 4 floors constructed in 1971, and the next 2 in 2002. The Sally Horsfall Eaton Centre for Studies in Community Health cost was $21‐million for a 6,480 sqm addition to Eric Palin Hall.
Name & Location Eric Palin Hall 87 Gerrard Street East ,Toronto, Downtown East
Status Completed
Year Completed 1971; 2002
Architects
Architect: Crang & Boake Architect: Lett/Smith Architects Designed two storey addition, 2002. Architect: Rounthwaite, Dick & Hadley Architects designed 4 storey building 1971
General use Educational
Affiliation Ryerson University
Addition Sally Horsfall Eaton Centre for Studies in Community Health In 2002, an addition of two storeys on this building was completed, to house the Sally Horsfall Eaton Centre for Studies in Community Health.
INTRODUCTION
INTRODUCTION
3
ERIC PALIN HALL
Group 5 | Cohort’10
I. General and Compliance, Occupant Type, Building Height and Area
a) General and Compliance The main program of the building consists of indoor classrooms and laboratories which are considered assembly occupancies according to the definition in Article 1.4.1.2. The building major occupancy type is of Group A Division 2 according to table 3.1.2.1. No changes in major occupancy has been done during the construction of the extension but the occupant
load was increased by more than 15%. Therefore part 3 of the building code was applicable to the new
extension.
Division B Parts 1, 3, 5, 6, 7, 8 and 11 applicable to this building.
This study was done based on the building current condition.
b) Building Height
As per Article 1.4.1.2. “Building height means the number of storeys contained between the roof and the floor of the first storey”. Since the ground level around Eric Palin Hall is different in each elevation, the below calculations will determine the average grade level of the building: West Elevation: (2.81+1.85)/2x58.8 + (1.85+0)/2x7.2=137.004+6.66=143.664 North Elevation: (2.81+2.81)/2x58.3 = 163.823 East Elevation: (1.08+2.16)/2x49.2 + (2.16+2.81)/2x12.7 = 79.704+31.5595 = 111.2635 South Elevation: (0+0)/2x34.1 + (0+1.08)/2x24.2 = 13.068 Grade Level: (143.664+163.823+111.2635+13.068)/(66+58.3+61.9+58.3) = 431.8185/244.5= 1.76
Based on Article 1.4.1.2 “First storey: means the storey that has its floor closest to grade and its ceiling more than 1.8 m above grade”. The storey ceiling height is 3.9‐1.76‐0.3(slab thickness)=1.84m. Therefore the first floor is considered as a full storey and the building height is of 6 storeys.
BUILDING CODES & REGULATIONS
4
ERIC PALIN HALL
Group 5 | Cohort’10
c) Building Area
According to Article 1.4.1.2. “Building area means the greatest horizontal area of the building above grade,
Within the outside surface of exterior walls, or
Within the outside surface of exterior walls and the center line of firewalls. ” The areas per floor of Eric Palin Hall are as follow:
1st Floor: 3417 sqm 2nd Floor: 3448 sqm 3rd Floor: 3420 sqm
4th Floor: 3430 sqm 5th Floor: 3400 sqm 6th Floor: 3400 sqm
Being the greatest area of the building, the 2nd floor area 3448 sqm will be considered as the building area.
II. Building Fire Safety
a) Use of combustible and noncombustible materials Article 3.2.2.24 applies for our building since it is Group A, Division 2, 6 Storeys high and Sprinklered. It should be of noncombustible construction, floor assemblies shall be fire separations with 1hr fire‐resistance rating.
Load bearing elements such as walls and columns should be of the same fire‐resistance rating of the floor assembly above or below those elements as per Clause 3.2.2.24.(2)(c).
BUILDING CODES & REGULATIONS
5
ERIC PALIN HALL
Group 5 | Cohort’10
Although the building is of noncombustible concrete structure for the first 4 floors and of noncombustible steel structure for the 5th and 6th floors, minor combustible elements and components are permitted and covered by the building code from Article 3.1.5.2 to 3.1.5.26. for interior finishing elements such as carpet, decorative wood cladding. b) Limiting Distance and Unprotected Openings Since the building is sprinklered and of Group A, the Limiting Distance and the Area of Unprotected Openings reference table would be table 3.2.3.1.(D) as per Clause 3.2.3.1.(1)(b).xxxxxxxxxxxxxxxxxxxxxx
As for the construction of the exposing building face mentioned in Article 3.2.3.7. it will be extracted from the table of that same Article.
BUILDING CODES & REGULATIONS
6
ERIC PALIN HALL
Group 5 | Cohort’10
c) Fire Separations and Fire Ratings The access to exit according to Sentence 3. 3.1.3.(1) shall conform to Subsection 3.3.2. for Assembly Occupancy which requires under Sentence 3.3.2.5.(1) that the corridors used by the public as an access to exit be separated from the rest of the floor by a fire separation having a fire‐resistance rating not less than 1h. In Sentences 3.3.2.5.(3) and (4), the fire‐resistance rating and the fire separation could be waived if the floors where the corridors are located are sprinklered and the travel distance to an exit does not exceed the permitted limit in Article 3.4.2.5. which in our case is 45m according to sentence (c).
Fire‐resistance rating of vertical service space for elevator hoistway shall be a minimum of 1h since the floor assembly fire resistance rating is of 1h too according to Table 3.5.3.1. Same goes for the elevator machine rooms unless they are separated from the rest of the building by a fire separation having a FRR more than 1h. Fire resistance rating of vertical service space shall be a minimum of 45 minutes since the floor assembly fire resistance rating is of 1h according to Table 3.6.3.1.
BUILDING CODES & REGULATIONS
7
ERIC PALIN HALL
Group 5 | Cohort’10
d) Means of Egress
As per Subclause 3.2.6.1.(a)(ii) a building is considered “High Building” if it is more than “18m high, measured between grade and the floor level of the top storey, and in which the cumulative or total occupant load on or above any storey above grade, other than the first storey, divided by 1.8 times the width in metres of all exit stairs at that storey, exceeds 300 ” Since the building is higher than 18 m between grade and top floor level, and in order not to be considered a high building, a 2.5m stairs were added so that the above required calculations results does not exceed 300. This calculation is shown in the image below.
The building requires more than 1 exit since it is more than 2 storeys and the occupant load more than 60 according to Sentence 3.4.2.1.(2). The distance between those exits is set by Clause 3.4.2.3.(1)(a) which is more than half the maximum diagonal of the floor area.
BUILDING CODES & REGULATIONS
8
ERIC PALIN HALL
Group 5 | Cohort’10
At least two egress doorways are required for rooms that have an occupant load more than 60 according to Clause 3.3.1.5.(1)(b). The door swing from a room to the corridor providing an access to exit shall swing in the direction of travel if the room occupant load is more than 60 as per Clause 3.3.1.10.(2)(a). The distance between those doors should be equal or greater than the 1/3 of the room diagonal according to Sentence 3.3.1.5.(2).
Article 3.3.1.9. sets the safety requirements for a corridor used by the public and requires it to be a minimum of 1100 mm and obstructions within 680 mm and 1980 mm from floor level should not protrude more than 100 mm from the wall but can be more under 680 mm. According to Sentence 3.4.3.1.(1) the width of the exits will be determined from the occupant load of every room or floor in conformance with Subsection 3.1.17. This load will be multiplied by 6.1mm per person according to Clause 3.4.3.2.(1)(a) to determine the minimum width required for the corridors and doorways: 192 x 6.1 = 1171.2 mm. The existing corridor is 2900mm wide. The latter must not be obstructed nor diminished by the door width when hung by more than 50mm for each door leaf according to Sentence 3.4.3.4.(2).It is also permitted to have an occupancy in the corridor as long as it doesn’t reduce the unobstructed width of the corridor according to Sentence 3.3.1.9.(5).
BUILDING CODES & REGULATIONS
9
ERIC PALIN HALL
Group 5 | Cohort’10
Clear height of exits over the clear width shall be not less than 2100mm as per Sentence 3.4.3.5.(1). This height is reduced to 2050mm in stairways according to Sentence 3.4.3.5.(2). Door closers shall not reduce the clear height of a doorway to less than 1980mm according to Sentence (5) of the same Article. Since our building complies with Clauses (a) and (b) Sentence 3.4.5.1.(1), exit signs should be placed over or adjacent to all the exit door they serve. The type of sign compliance is also governed by this same Article.
e) Exit Stairs Design
The finish of landings and treads shall have a surface that is slip resistant and a colour contrast between edges according to Clauses 3.4.6.1.(1)(a) and (b). Tactile attention indicators shall be installed according to Sentence 3.4.6.1.(2). Landing and stairs should have the same width according to Sentence 3.4.6.4.(1). Also according to the previous Article Sentence (3), the door swing must not reduce the exit stairs or landing to less than 750mm.If the stairs width is more than 1100mm it shall have 2 handrails according to Sentence 3.4.6.5.(1). If stairs are more than 2200mm in width, it shall have intermediate handrails at 1650mm according to Sentence 3.4.6.5.(2). Handrail circular section should have a sectional diameter between 30 and 43 mm according to Clause 3.4.6.5.(3)(a). The height of handrail should be between 865 and 965 according to Clauses 3.4.6.5.(5)(a) and (b). It should extend horizontally not less than 300mm at the required height beyond the top riser and continue to slope for a depth of one tread beyond the bottom riser followed by a 300mm horizontal extension as per Subclause 3.4.6.5.(10)(a)(i) and (ii). The clearance between the handrail and any surface behind it shall not be less than 50mm according to Sentence 3.4.6.5.(11). Steps treads shall be between 255 and 355 mm and risers between 125 and 200 mm as per Sentences 3.4.6.8.(1) and (2). The nosing should be rounded
BUILDING CODES & REGULATIONS
10
ERIC PALIN HALL
Group 5 | Cohort’10
between 6 and 13 mm as per Sentence 3.4.6.8.(8). The doors shall open in the direction of exit travel as per Sentence 3.4.6.12.(1) and shall have a self‐closing device according to Clause 3.4.6.13.(1)(a). At least one handrail shall be continuous throughout the length of a stairway as per Sentence 3.4.6.5.(8) and shall be terminated in a manner not to obstruct pedestrian travel or create hazard Sentence 3.4.6.5.(9). f) Firefighting requirements and access Fire alarm is required in the building according to Sentences 3.2.4.1.(2)(c) and (d) since it is more than 3 storeys high and the occupant load more than 300 and could be a single or two stage system according to Sentence 3.2.4.3.(e). Since our building is sprinklered, no direct access is required from the outdoors to every floor that is below 25m above grade according to Sentence 3.2.5.1.(1). Access to roof shall be provided by a stairway or a 550x900 mm hatch from the “floor areas immediately below” as per Sentence 3.2.5.3.(1). The Access routes should be provided since the building is more than 3 storeys high and the building area more than 600 sqm as per Sentence 3.2.5.4.(1) and in our case will be located only on the North building face having the principal entrance since no other direct access is required from the other building faces. The Location should be between 3 and 15 meters from the closest portion of the access route and the building face. The standpipe system is required since the building is more than 3 storeys and more than 14 meters high according to Article 3.2.9.1. and should be located in either the exit stairs shaft or a vertical service shaft having a fire separation of 45 minutes of fire resistance rating according to table 3.6.3.1. The fire department connection to the standpipe should not be located more than 45m from the closest hydrant as per Sentence 3.2.5.16.(1). A 65 mm diameter hose connection is required in each storey according to Sentence 3.2.9.3.(2)and shall have a station in each storey according to Sentence 3.2.9.4.(1). This hose station shall be equipped with a hose rack and a 38mm diameter fire hose not longer than 30m according to Sentence 3.2.9.4.(2).
BUILDING CODES & REGULATIONS
11
ERIC PALIN HALL
Group 5 | Cohort’10
It should be in a hose cabinet that contains hose connections, valves, fire hose, nozzle, horse rack and a fire extinguisher and allow the use of a fire department standard hose key according to Sentences (3) and (4) of Article 3.2.9.4.
Those hose stations should be clearly visible and located not more than 5m from every exit and can reach all parts of the building given that the hose stream stretches 3m from the nozzle as per Sentence 3.2.9.4.(5).
III. Plumbing Facilities According to Sentence 3.7.4.2.(2), the water closets shall be divided equally between males and females. Water closets for male can be substituted with urinals but their number cannot be more than 2/3 of the required water closets according to Sentence 3.7.4.2.(3) Clause (b). One lavatory shall be provided for one or two required water closets or urinals and one more shall be added for each additional 2 water closets or urinals according to Sentence 3.7.4.2.(5). The number of water closets required is determined by table 3.7.4.3.A. The water closets, urinals and lavatories shall not be visible from the entrance door of the room as per Sentence 3.7.4.16.(2). Drinking water shall be provided within a 100 m distance of any area of the floor as per Sentence 3.7.4.18.(1).
BUILDING CODES & REGULATIONS
12
ERIC PALIN HALL
Group 5 | Cohort’10
IV. Barrier‐Free Study
Since we have 4 pedestrian entrances to the building, the number of barrier‐free entrances required is 2 according to table 3.8.1.2. One of those 2 entrances is required to be the main entrance as per Sentence 3.5.1.2.(2). As per Article 3.8.1.2. sentences (4) and (5), those entrances shall be designed in accordance with Article 3.8.3.3 and if the entrances have more than 1 doorway, then 1 doorway shall be designed in accordance to Article 3.8.3.3. At least 2 universal washrooms are required according to Table 3.8.2.3.A. and the number of barrier free water closets required is determined by Table 3.8.2.3.B. Doors shall conform to Article 3.8.3.3. minimum width and opening device. Water closet stalls shall be designed according to Article 3.8.3.8. and 3.8.3.9. and have a clear turning space of 1500 mm in diameter. Toilet seats should be between 460 and 480 mm away from wall with grab bars.
Universal washrooms should be able to fit an 810x1830 mm clear space for adult‐size change table according to Sentence 3.8.3.12.(3) and a 760x1500 mm clear space parallel to the table as per Clause 3.8.3.12.(5)(c).
V. Summary
TITLE COMPLIANCE %
MATERIAL COMBUSTIBILITY 100
LIMITING DISTANCES AND UNPROTECTED OPENINGS 100
FIRE SEPARATIONS AND FIRE RATINGS 100
MEANS OF EGRESS 100
EXIT STAIRS DESIGN 60
FIREFIGHTING REQUIREMENTS AND ACCESS 90
PLUMBING FACILITIES 80
BARRIER‐FREE STUDY 60
OVERALL COMPLIANCE 86
BUILDING CODES & REGULATIONS
13
ERIC PALIN HALL
Group 5 | Cohort’10
I. Building Envelope “The envelope has to respond both to natural forces and human values. The natural forces include rain, snow, wind and sun. Human concerns include safety, security, and task success. The envelope provides protection by enclosure and by balancing internal and external environmental forces. To achieve protection it allows for careful control of penetrations. A symbol of the envelope might be a large bubble that would keep the weather out and the interior climate in.“ Richard Rush, The Building Systems Integration Handbook
MATERIALS & METHODS
14
ERIC PALIN HALL
Group 5 | Cohort’10
II. Building Systems
MATERIALS & METHODS
15
ERIC PALIN HALL
Group 5 | Cohort’10
a) Structural
b) Moisture protection
MATERIALS & METHODS
16
ERIC PALIN HALL
Group 5 | Cohort’10
c) Foundation System Reinforced concrete foundation footings were used in tandem with the post and beam concrete
structure for the first 4 floors In 2002 with the addition of the 5th and 6th floor, shoring was needed to strengthen the foundations
and structural system An additional shaft, caisson and bell were added in concrete
MATERIALS & METHODS
17
ERIC PALIN HALL
Group 5 | Cohort’10
III. Building Components a) Roof Structural Assembly
Tie Joists are used to provide lateral support to the steel members they’re connected to An additional web system of alternating vertical and diagonal members was added as the roof joist is
over 24” This allows mechanical services to be threaded through the joists in a transverse direction
b) Wall Structural Assembly Concrete structural walls were cladded with aluminium spandrel to cover certain walls Ribbed metal was used for other walls also cladded to the concrete structural wall A curtain wall system was imbedded in a steel z‐gurt system for the 5th and 6th floors Columns on the last two floors were aluminium cladded
MATERIALS & METHODS
18
ERIC PALIN HALL
Group 5 | Cohort’10
MATERIALS & METHODS
19
ERIC PALIN HALL
Group 5 | Cohort’10
a) Structural Shear Walls
Several walls were utilized as shear walls to assist in the structural loads of the building The walls were assessed and altered during the second phase of construction in 2002
MATERIALS & METHODS
20
ERIC PALIN HALL
Group 5 | Cohort’10
b) Slab Structural Assembly Steel beams make up the structural core of the slab A substructure of decking is added to the I‐beam to support a concrete bed Spray fireproofing with polyutherene foam acts as the protective fire proofing for the structure
c) Interior Assemblies
MATERIALS & METHODS
MATERIALS & METHODS
21
ERIC PALIN HALL
Group 5 | Cohort’10
I. Worksharing and Collaboration Ahad ‐ BIM Manager:
Foundations, columns, slabs, roof, envelope, site & context, façade details, renders, materials, building pad, wall reveals
Hasti: Beams, interior doors & windows, section annotation, interior walls 3rd, 5th and 6th, room tags, annotations & details, stairs
Marwa: Furniture, wall reveals, room tags
Nina: File setup, worksets, interior walls 1st, 2nd, 4th
Envelope: includes exterior walls (including insulation build‐up and finish), curtain walls, windows, exterior doors and roofs. Interiors: includes interior partitions, glazing Structural: includes columns, core walls, shaft walls and foundation Suites: includes separate Suites in building Site & Context: includes all ramps, soil and earthwork surrounding the site and its context Shared levels & Grids: contains the grid lines and levels that pertain to the entire project
BIM
22
ERIC PALIN HALL
Group 5 | Cohort’10
II. Team Challenges and Reflection on BIM Challenging areas using software & proposed solutions
Discrepancy of Information – Most of the drawings were not available in CAD format thus slowing down
the modelling process; a lot of details regarding materiality and detailing was also missing
Maintaining the accuracy ‐ as different team members were working on various levels of the vertical
building. Solution – The envelope was created first and the various team members aligned their levels to
it
Ensuring the integrity of the central file model; utilizing the local files separate local files for the various
team members were created and synchronized regularly with the saved central model – thus preserving
its integrity and eliminating any room for error
Maintaining the workset components ‐ Elements drawn by the team members had to be initially set on
the correct worksets; constant reminders were needed
Ensuring proper wall geometry; wall join. We had an issue with the alignment of the wall joints; they
were not properly adjoining at the corners; fellow peers in adjacent groups were consulted for
suggested solution, and when the challenge could not be overcome – we turned to the internet as a
resource
Improper task sequencing. The tasks assigned
during the phases of constructing the BIM model
were not optimized, which in turn disrupted the
process of the work as finalized tasks would need to
be revisited out of order
Working with VAPPS – advantages & disadvantages
Accessibility Working virtually through the network
enabled the team to work from anywhere, and for
longer hours on our respective local files, even
when/if our computers did not have the Revit
software installed
Delays & file instability As we progressed with the
modeling, the file got significantly larger. It became
quite unstable and very slow when working through
VAPPS, and at one point working off‐campus became
redundant
BIM
23
ERIC PALIN HALL
Group 5 | Cohort’10
III. Our Future with BIM
How is BIM changing the industry: Waste = Non‐value added effort (wasted effort) Information inaccuracy causing regathering several times through the life of the project 2008 design and construction spending projections by Engineering News‐Record comes out to nearly $400B annually The owner is the primary beneficiary despite being lethargic in pushing for change 2D Renditions ‐ 3D Modeling & Visualization ‐ 4D Time ‐ 5D Cost The future of BIM modelling is to include more of the lifecycles of the building Organizations have taken initiatives to develop a US National BIM standard Government (US Naval Forces, US Airforce, US Army) Organizations (Building Smart Alliance, 7Group, AIA) Corporations (Construction industry, WBDG)
BIM
24
ERIC PALIN HALL
Group 5 | Cohort’10
IV. Renders & Visualizations
BIM
25
ERIC PALIN HALL
Group 5 | Cohort’10
Conclusion
The building addition in 2002 created several challenges that had to be mitigated from both a materials
and method standpoint as well as from an OBC perspective. The designers and consultants overcame
these challenges by addressing the foundations, structural elements, and new enclosure systems. They
also had to accommodate the additional building loads, uses and fire safety standards.
There was not much effort made towards sustainability, for example natural ventilation techniques
were not incorporated (all windows are non‐operable), solar panels, green roof, etc. ‐ the buildings net
energy is not as low as it could be. The future of design is headed towards a zero‐net energy, and this
issue could later be improved upon in further renovations.
As of this degree of analysis, the building is compliant 86% with Ontario’s current building code, and its
building systems all serve their purpose quite well
Resources & References National Institute of building sciences Building Enclosure Technology & Environment Council Whole Building Design Guide NIBS National BIM Standard Committee
CONCLUSION
END OF TRANSMISSION
1
1
2
2
3
3
4
4
5
5
6
6
8
8
7
7
E E
D D
C C
F F
G G
B B
H H
6x
Gx
Ay
A
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 120
11/0
4/20
16 3
:16:
43 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
Site Plan
No. Description Date
1 : 120
Site1
1
1
2
2
3
3
4
4
5
5
6
6
8
8
7
7
E E
D D
C C
F F
G G
B B
H H
Room
CLASSROOM CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
FOCS LABORATORY
LABORATORY
CLASSROOMSTORAGEEMBEDDED SYSTEMS LAB
ENGINEERING
CORRIDER
FOYER
MECHANICAL HEATING PLANT
ELECTRICAL ROOM
FUEL OIL PUMP RM.SERVICE CORRIDORRECEIVING & INSTRUMENT SRORAGE
MEN'S WASHROOM
MATERIAL INSPECTION LABORATORY
RESEARCH FACILITY
PARTICLE EROSION RESEARCH FACILITY
RESEARCH LAB
A.E.C.E.S.S
OFFICE
OFFICE
OFFICE
MANUFACTURING FACILITY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
FOTER
JANITOR
BIOMECHANICS LABORATORYCLASSROOM
CLASS ROOM
WOMEN' S WASHROOM
CLASSROOM
OFFICE
OFFICE
CLASSROOM
FOYER
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
OFFICE
BELL TELEPHONE
CLASSROOM
CLASSROOM
OPS RM 135 ARFA RM EPH 137CCS TRIS PARTS RM
INSTRUMENT STORAGE
WC
Room
6x
Gx
Ay
AA
9.15
m6.
09 m
9.14
m9.
14 m
9.15
m6.
10 m
4.03
m5.
11 m
6.21
m2.
94 m
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m
2.75 m 6.39 m
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m
9.15
m6.
09 m
9.14
m9.
14 m
9.15
m6.
10 m
9.14
m
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 120
11/0
4/20
16 3
:12:
27 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
First Floor
No. Description Date
1 : 120
01_First Floor1
1
1
2
2
3
3
4
4
5
5
6
6
8
8
7
7
E E
D D
C C
F F
G G
B B
CLASSROOMCLASSROOM
OPTICAL RESEARCH LABORATORY
BSW STUDENT LOUNGE
INSTRUCTOROFFICE
INSTRUCTOR OFFICE
INSTRUCTOR OFFICE
INSTRUCTOR OFFICE
INSTRUCTOR OFFICE
INSTRUCTOR OFFICE
OFFICE
INSTRUCTOR OFFICE
OFFICE
OFFICE
INSTRUCTOR OFFICE
CLASSROOM CLASSROOM CLASSROOM CLASSROOM
OPEN OFFICE AREA
OFFICE OFFICE Room OFFICE
Room
OFFICE
RYERSON FACULTY ASSOCIATION
STORESCC MEETING RM
Room
Room
STUDENT UNION OFFICE
SWAOC OFFICE
MACHINE SHOP
MEN'S WASHROOM
SERVICE CORRIDOR
LOCKER ROOM
Room
JANITOR
RESEARCH FACILITYDUCT
FOYER
INSTRUCTOR OFFICE
OFFICE
INSTRUCTOR OFFICE
INSTRUCTOR OFFICE
INSTRUCTOR OFFICE
INSTRUCTOR OFFICE
INSTRUCTOR OFFICE
OFFICE
INSTRUCTOR OFFICE
OFFICE
OFFICEMEETING RM
OFFICE
OFFICE
OFFICE OFFICE OFFICE
FACULITY OFFICES
CLASSROOM
NEW KITCHENCCS TR2S
MAIN ENTRANCE FOYER
OFFICE
OFFICE
CHAIRMAN OFFICE OFFICE OFFICE
STAFF LOUNGESTORAGE
ELEVATOR LOBBY
CCS TR2NJANITOR
DUCT
WOMEN' S WASHROOM
Room
Duct
H H
SEMINAR ROOM
OFFICE
OFFICE
6x
Gx
Ay
EQUIPMANT STORAGE EQUIPMANT STORAGE
AA
6.21
m2.
94 m
6.09
m9.
14 m
9.14
m9.
15 m
6.10
m4.
03 m
5.11
m
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m2.75 m 6.39 m
9.15
m6.
09 m
9.14
m9.
14 m
9.15
m6.
10 m
9.14
m
6.21
m2.
94 m
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 120
11/0
4/20
16 3
:13:
21 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
Second Floor
No. Description Date
1 : 120
02_Second Floor1
1
1
2
2
3
3
4
4
5
5
6
6
8
8
7
7
E E
D D
C C
F F
G G
B B
H H
BOARDROOM
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
PROJECT MANAGEMENT
OFFICE
OFFICE
Room Room
MEETING RM
RoomRoomRoom
Room
Room
OFFICE
OFFICE
Room
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEWOMEN' WASHROOMMEN'S WASHROOM
OFFICEOFFICEOFFICEOFFICEOFFICE
Room Room GRAD . STUDENTS WORK ROOM
OFFICE OFFICE OFFICE
OFFICEELECTRONIC FABRICATION WORK SHOP STORAGE
CNC MANUFACTURING LAB
AUTOMATION LABMECH. ENG. RESEARCH FACILITY
TECHNICAL OFFICER METROPOLOGYLABRATORY
LAB
MANUFSCTURI NG WORKSHOP
ADVANCED MANUFACTURINGMICRO-GRAVITY LAB
LAB
OFFICE
OFFICE
LAB
LAB
LAB
OPEN OFFICE
KITCHEN
WORK ROOM
6x
Gx
Ay
AA
9.15
m6.
09 m
9.14
m9.
14 m
9.15
m6.
10 m
4.03
m5.
11 m
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m
9.14
m6.
10 m
9.15
m9.
14 m
9.14
m6.
09 m
9.15
m
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m2.75 m 6.39 m
6.21
m2.
94 m
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 120
11/0
4/20
16 3
:17:
30 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
Third Floor
No. Description Date
1 : 120
03_Third Floor1
1
1
2
2
3
3
4
4
5
5
6
6
8
8
7
7
E E
D D
C C
F F
G G
B B
H H
OFFICE
KITCHEN
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE OFFICEOFFICE
OFFICEOFFICEOFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CLASSROOM
RESEARCH LAB
COMPUTER LAB
OFFICEOFFICE
ELECTRICALSTOR.
LAB
CLASSROOM
COMPUTER LABMEETING ROOM
DARKROOM
OFFICEOFFICECORRIDOR
LAB
LAB
LAB
OFFICE
OFFICE
OFFICE
OFFICEOFFICE
OFFICEOFFICE
CORRIDOR
LAB
OFFICE
OFFICE
LECTURE ROOM
COPM LAB
OFFICE
WOMEN' S WASHROOMMEN'S WASHROOMBOILER STORAGEOFFICE
KITCHEN
OPEN OFFICE
6x
Gx
Ay
AA
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m2.75 m 6.39 m
9.15
m6.
09 m
9.14
m9.
14 m
9.15
m6.
10 m
4.03
m5.
11 m
6.21
m2.
94 m
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m
9.14
m6.
10 m
9.15
m9.
14 m
9.14
m6.
09 m
9.15
m
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 120
11/0
4/20
16 3
:12:
54 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
Fourth Floor
No. Description Date
1 : 120
04_Fourth Floor1
1
1
2
2
3
3
4
4
5
5
6
6
8
8
7
7
E E
D D
C C
F F
G G
B B
H H
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
RoomRoomOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
CLASSROOM
LABLAB
CLASSROOM
OFFICETELECOM ROOM
OFFICEOFFICE
OFFICE
CLASSROOM
WOMEN' S WASHROOMMEN'S WASHROOM
HOUSEKEEPING
CLASSROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOMCLASSROOM
CLASSROOM
OFFICESTORAGE
MEETING ROOM LAB
STORAGE
WORK ROOM
MEETING ROOM
WORK ROOM
CLASSROOM
CORRIDOR
6x
Gx
Ay
AA
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m2.75 m 6.39 m
15.2
4 m
9.14
m9.
14 m
9.15
m6.
10 m
4.03
m5.
11 m
6.21
m2.
94 m
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m
9.14
m6.
10 m
9.15
m9.
14 m
9.14
m6.
09 m
9.15
m
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 120
11/0
4/20
16 3
:12:
03 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
Fifth Floor
No. Description Date
1 : 120
05_Fifth Floor1
1
1
2
2
3
3
4
4
5
5
6
6
8
8
7
7
E E
D D
C C
F F
G G
B B
H H
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICEOFFICEOFFICE
OFFICE
LABSTUDENT WORKSTATION
OFFICE
OFFICE
OFFICE
LAB
OFFICETELECOM ROOM
Room
CLASSROOM
CLASSROOMCLASSROOM
CLASSROOM
MEN'S WASHROOM
HOUSEKEEPING
WOMEN' S WASHROOM
OFFICEOFFICE
OFFICE
CLASSROOMRoom
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
CLASSROOM
W.R
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
Room
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CLASSROOM
CLASSROOM
CLASSROOMCLASSROOM
MEETING ROOM
MEETING ROOM
OFFICEOFFICEOFFICE
OFFICE
CLASSROOM
6x
Gx
Ay
AA
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m
5.11
m4.
03 m
6.10
m9.
15 m
9.14
m9.
14 m
6.09
m9.
15 m
4.57 m 9.14 m 9.14 m 9.14 m 9.14 m 9.14 m 4.57 m
9.15
m6.
09 m
9.14
m9.
14 m
9.15
m6.
10 m
9.14
m
2.75 m 6.39 m
6.21
m2.
94 m
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 120
11/0
4/20
16 3
:17:
07 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
Sixth Floor
No. Description Date
1 : 120
06_Sixth Floor1
1
1
2
2
3
3
4
4
5
5
6
6
8
8
7
7
E E
D D
C C
F F
G G
B B
H H
6x
Gx
Ay
AA
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 120
11/0
4/20
16 3
:12:
56 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
Roof Deck
No. Description Date
1 : 120
07_Roof Deck1
02_Second Floor4.01 m
02_Second Floor4.01 m
1 2 3 4 5 6 87
03_Third Floor
8.00 m
03_Third Floor
8.00 m
04_Fourth Floor
12.27 m
04_Fourth Floor
12.27 m
05_Fifth Floor
16.61 m
05_Fifth Floor
16.61 m
06_Sixth Floor
20.88 m
06_Sixth Floor
20.88 m
07_Roof Deck
25.24 m
07_Roof Deck
25.24 m
08_Penthouse Roof Deck
29.26 m
08_Penthouse Roof Deck
29.26 mELEV Roof Deck
28.80 m
ELEV Roof Deck
28.80 m
T/O Parapet
26.21 m
T/O Parapet
26.21 m
Vestibule slab
2.76 m
Vestibule slab
2.76 m
Entrance conopy
6.16 m
Entrance conopy
6.16 m
Precast Parapet
28.09 m
Precast Parapet
28.09 m
6x
02_Second Floor
4.01 m
02_Second Floor
4.01 m
1234568 7
03_Third Floor
8.00 m
03_Third Floor
8.00 m
04_Fourth Floor
12.27 m
04_Fourth Floor
12.27 m
05_Fifth Floor
16.61 m
05_Fifth Floor
16.61 m
06_Sixth Floor
20.88 m
06_Sixth Floor
20.88 m
07_Roof Deck
25.24 m
07_Roof Deck
25.24 m
08_Penthouse Roof Deck
29.26 m
08_Penthouse Roof Deck
29.26 mELEV Roof Deck
28.80 m
ELEV Roof Deck
28.80 m
T/O Parapet
26.21 m
T/O Parapet
26.21 m
Vestibule slab
2.76 m
Vestibule slab
2.76 m
Entrance conopy
6.16 m
Entrance conopy
6.16 m
Precast Parapet
28.09 m
Precast Parapet
28.09 m
6x
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 120
11/0
4/20
16 3
:11:
39 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
CheckerHasti Tahafchi
Elevations
No. Description Date
1 : 120
North1
1 : 120
South2
01_First Floor
0.00 m
01_First Floor
0.00 m
02_Second Floor
4.01 m
02_Second Floor
4.01 m
03_Third Floor
8.00 m
03_Third Floor
8.00 m
04_Fourth Floor
12.27 m
04_Fourth Floor
12.27 m
05_Fifth Floor16.61 m
05_Fifth Floor16.61 m
06_Sixth Floor
20.88 m
06_Sixth Floor
20.88 m
07_Roof Deck
25.24 m
07_Roof Deck
25.24 m
08_Penthouse Roof Deck29.26 m
08_Penthouse Roof Deck29.26 m
E D C
ELEV Roof Deck
28.80 m
ELEV Roof Deck
28.80 m
T/O Parapet
26.21 m
T/O Parapet
26.21 m
Vestibule slab
2.76 m
Vestibule slab
2.76 m
Entrance conopy
6.16 m
Entrance conopy
6.16 m
Precast Parapet
28.09 m
Precast Parapet
28.09 m
FG BH Gx Ay
A
02_Second Floor
4.01 m
02_Second Floor
4.01 m
03_Third Floor8.00 m
03_Third Floor8.00 m
04_Fourth Floor
12.27 m
04_Fourth Floor
12.27 m
05_Fifth Floor
16.61 m
05_Fifth Floor
16.61 m
06_Sixth Floor20.88 m
06_Sixth Floor20.88 m
07_Roof Deck25.24 m
07_Roof Deck25.24 m
08_Penthouse Roof Deck
29.26 m
08_Penthouse Roof Deck
29.26 m
EDC
ELEV Roof Deck28.80 m
ELEV Roof Deck28.80 m
T/O Parapet26.21 m
T/O Parapet26.21 m
Vestibule slab
2.76 m
Entrance conopy6.16 m
Entrance conopy6.16 m
Precast Parapet
28.09 m
Precast Parapet
28.09 m
F GB HGxAy
A
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 120
11/0
4/20
16 3
:07:
44 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
Elevation II
No. Description Date
1 : 120
East1
1 : 120
West2
01_First Floor
0.00 m
01_First Floor
0.00 m
02_Second Floor
4.01 m
02_Second Floor
4.01 m
03_Third Floor8.00 m
03_Third Floor8.00 m
04_Fourth Floor12.27 m
04_Fourth Floor12.27 m
05_Fifth Floor
16.61 m
05_Fifth Floor
16.61 m
06_Sixth Floor
20.88 m
06_Sixth Floor
20.88 m
07_Roof Deck25.24 m
07_Roof Deck25.24 m
08_Penthouse Roof Deck
29.26 m
08_Penthouse Roof Deck
29.26 m
EDC
ELEV Roof Deck
28.80 m
ELEV Roof Deck
28.80 m
T/O Parapet
26.21 m
Vestibule slab
2.76 m
Entrance conopy6.16 m
Entrance conopy6.16 m
Precast Parapet
28.09 m
Precast Parapet
28.09 m
F GB H
Foundation
-3.50 m
Foundation
-3.50 m
1
Section 2
1
Detail II
A
6Detail II
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 100
11/0
4/20
16 3
:13:
42 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
Section 1
No. Description Date
1 : 100
Section 11
01_First Floor
0.00 m
01_First Floor
0.00 m
02_Second Floor
4.01 m
02_Second Floor
4.01 m
1234568 7
03_Third Floor8.00 m
03_Third Floor8.00 m
04_Fourth Floor12.27 m
04_Fourth Floor12.27 m
05_Fifth Floor
16.61 m
05_Fifth Floor
16.61 m
06_Sixth Floor
20.88 m
06_Sixth Floor
20.88 m
07_Roof Deck25.24 m
07_Roof Deck25.24 m
08_Penthouse Roof Deck
29.26 m
08_Penthouse Roof Deck
29.26 mELEV Roof Deck
28.80 m
ELEV Roof Deck
28.80 m
T/O Parapet
26.21 m
T/O Parapet
26.21 m
Vestibule slab
2.76 m
Vestibule slab
2.76 m
Entrance conopy6.16 m
Entrance conopy6.16 m
Precast Parapet
28.09 m
Precast Parapet
28.09 m
Foundation
-3.50 m
Foundation
-3.50 m
1
Section 1
1
Detail I
7Detail II
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 100
11/0
4/20
16 3
:14:
04 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
Section 2
No. Description Date
1 : 100
Section 21
A
2Detail I
3Detail I
4Detail I
5Detail I
6Detail I
7Detail I
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
As indicated
11/0
4/20
16 3
:04:
22 P
M
Eric Palin Hall0001
Group Five
Issue Date
Hasti Tahafchi
Ahad Ahmadi
Detail I
No. Description Date
1 : 50
11
1 : 10
Section 6 - Callout 12
1 : 10
23
1 : 10
Section 6 - Callout 34
1 : 10
Section 6 - Callout 45
1 : 10
Section 6 - Callout 56
1 : 20
Section 6 - Callout 67
2Detail II
4Detail II
5Detail II
3Detail II
A
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
As indicated
11/0
4/20
16 3
:04:
25 P
M
Eric Palin Hall0001
Group Five
Issue Date
Hasti Tahafchi
Ahad Ahmadi
Detail II
No. Description Date
1 : 50
Section 71
1 : 10
Section 7 - Callout 12 1 : 10
Section 7 - Callout 1 a3
1 : 10
Section 7 - Callout 24
1 : 20
Section 7 - Callout 35
1 : 10
Section 1 - Callout 16
1 : 25
Section 2 - Callout 17
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 1
11/0
4/20
16 3
:17:
30 P
M
Eric Palin Hall0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
View I
No. Description Date
1 : 1
3D View 28_21
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 1
11/0
4/20
16 3
:17:
30 P
M
Unnamed0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
View II
No. Description Date
1 : 1
3D View 27_11 1 : 1
3D View 26_22
1 : 1
3D View 24_23
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 1
11/0
4/20
16 3
:17:
31 P
M
Unnamed0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
View III
No. Description Date
1 : 1
3D View 24_31
1 : 1
3D View 23_12
www.autodesk.com/revit
Scale
Checked by
Drawn by
Date
Project number
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
ConsultantAddressAddressPhoneFaxe-mail
1 : 1
11/0
4/20
16 3
:17:
31 P
M
Unnamed0001
Group Five
Issue Date
Ahad Ahmadi
Hasti Tahafchi
View V
No. Description Date
1 : 1