2
Arhangelsk
Severodvinsk
Indiga
Naryan-Mar
Murmansk
Design area
3
4
Location options
Hydrometeorologicalconditions
Navigational-graphiccondition
Geological conditions
Closeness to large settlements with
developed infrastructure
Closeness to gas field
Total sum of areas
Maximum point possible 50 50 50 10 20 180
Cape Mikulkin area 20 50 25 1 2 98
Cape BolshoyRumyanichny area 35 45 25 8 18 131
Cape Chaichy area 50 40 25 9 19 143
Cape Svyatoy nos area(Cape Zhelezny) 50 15 25 10 20 120
5
Marine LNG Terminal
Site for LNG Plant Location
6
Marine LNG Terminal
Site for LNG Plant Location
7
Marine LNG Terminal
Site for LNG Plant Location
8
Options of terminal location
Length of access
channel
Dredging volume
Length of connecting
dam
Length of breakwater №1
Length of breakwater №2
Volume of rock and
stone filling
Length of cryogenicpipeline
m mln. m3 m m m mln. m3 m
B.Rumyanichnycape area 660 1,845 520
1010 490
2,628 2200
Chaichy cape area 1250 1,762 1750 3,226 3200
Zhelezny cape (Svyatoy noscape) area
12120 24,123 750 2,256 3300
9
10
1
1
6
5 4 7
2
345
6 2
3
4
5
6
7
Construction period Operation period
Fencing facility #1
Inside maneuvering basin
Fencing facility #2
Fencing facility #2
Fencing facility #1
Legend
Complex LNG transshipmentBase for maintenance of SH fleet
Complex transshipment of construction cargo
General port objectsCargo-and-passenger jetty
Explication of Jetty front facilities
Jetty for LNG unloading
Jetty for large-size and heavy-weight cargo
Jetty for multipurpose cargo
Cargo-and-passenger jetty
Jetty for transshipment of OSR aids and SNOAnd temporary icebreaker location
Jetty for SH fleet
Jetty for bunkering tanker