GULF LABORATORIES CO.
Prequalification
Gulf Laboratories Co. W.L.L
P.O. Box 4024, Doha, Qatar
Tel : +974 4607034 / 4607036
Fax : +974 4607628
e-mail : [email protected]
Website : www.gulflaboratories.com
Prequalification Document
Contents
Page No.
COMPANY PROFILE....................................................................................................... 1
ORGANIZATION .............................................................................................................. 2
EQUIPMENT AND RESOURCES .................................................................................... 3
SERVICES ....................................................................................................................... 5
APPENDICES
APPENDIX A CERTIFICATATIONS & ACCREDITATIONS
APPENDIX B ORGANIZATION CHART
APPENDIX C CURRICULUM VITAE OF GEOTECHNICAL STAFF
APPENDIX D CURRICULUM VITAE OF LABORATORY STAFF
APPENDIX E COMPANY EXPERIENCE
APPENDIX F FIELD & LABORATORY TESTING
Organization Profile
1
Company Details
QATAR
Name of Company : Gulf Laboratories Co. W.L.L
Head Office Address : P.O. Box 4024, Doha, Qatar
Commercial Reg. # : 14419
Nature of Business : Geotechnical Investigations and Materials Testing
Established : Mid-1970’s (Formerly part of Wimpey Laboratories
Owners : Mannai Corporation – Doha
Employees : 136
Office Location : Salwa Industrial Area.
Junction of Street # 2 and Al Kassarat Street
MMAA Approval Certificate Nos.
Geotechnical / Soil Investigation : No. SI012
Material Testing Laboratory : No. 061
SULTANATE OF OMAN
Name of Company : Gulf Geotechnical Services & Material Testing LLC
Head Office Address : PO Box 686, Ruwi, Sultanate of Oman
Commercial Reg. # : 1041094
Nature of Business : Geotechnical Investigations and Materials Testing
Established in Oman : 2008
Owners : Mannai Corporation & Gulf Laboratories Co. WLL
Employees : 28 (by end of 2008)
Gulf Laboratories are certified to ISO 9001:2000 and OHSAS18001 and are an ISO17025:2005 accredited laboratory.
Organization Profile
2
Organization Structure
General Manager : Andrew Slate
Drilling & Geotechn. Manager : K.P.Abdul Majeed
Laboratory Manager : Thomas Varghese
Senior Geotechnical Staff : Wael Salah
Senior Laboratory Staff : K.M. Arunan
Geologists / Engineers : Abdul Rahman, Durga Bashyal, Elizabeth Raji John, Rajendra Shrestha, M.N Sananth, Bal Dhoj Karki, J.Sujin, Allan Nabong
Drilling Supervisor : K. Kunamani
Drilling Engineer : Subrajith Nayak
Drillers & Drilling Assistants : 38 nos.
Laboratory Staff : 41 nos.
Other Support Staff : 42 nos.
Organization Profile
3
Equipment and Resources
Drilling Rigs – 17 no. Dual Purpose Truck Mounted
Hands England HE-35, Hands England HE-36
Boyles BBS 25, Dando – Bedford,
2 no. Pilcon Traveller T30 Rigs
2 no. Beretta T44 Rigs, 9 Hanjin P4000SD Rigs
Drilling Rigs – Cable Percussion
Pilcon Wayfarer Light Cable Percussion Rig
Specialized Rig
Pagani 200T Cone Penetration Rig with Piezocone
Marine Equipment
Jack-up Drilling Barge “Nautilus” (12m x 6m)
Ancillary Equipment
9 no. Holman and Ingersoll Rand Air Compressors – 250 to 750cfm
9 no. Water Bowsers and Water Tanker
Various vehicles and sundries.
Organization Profile
4
Laboratory Facilities
Physical Properties Testing Laboratory
Chemical Laboratory
Environmental testing laboratory (ICP and GCMS)
On-site Materials Testing Laboratories
Nuclear Density Testing Equipment
Geophysical Equipment
Soil Resistivity Testing Equipment
Thermal Resistivity Testing Equipment
Ground Penetrating Radar with DGPS
Pile Integrity Testing Equipment
Hydrological Resources
4 no. Submersible Pumps
2 no. V-Notch Weir Tanks
8 no. Absolute Pressure Transducer and Dataloggers
Organization Profile
5
Services
GROUND INVESTIGATION
Onshore Soil Investigations, Nearshore Soil Investigations
Contaminated Land and Environmental Investigations
Exploratory Borehole Drilling and Sampling
Trial Pitting
In-Situ Testing
Static “Dutch” Cone Penetration Testing
Probehole Surveys
Geophysical Investigations
Soil Resistivity Testing
WATER RESOURCES AND WATER MANAGEMENT
Water Well Drilling
Soakaway Borehole Drilling
Well Casing Installation
Pumping Tests and Permeability Testing
Earthing and Cathodic Protection Boreholes
LABORATORY / MATERIALS TESTING
Soil and rock mechanics laboratory testing
Water & Wastewater testing
Concrete testing
Aggregate testing
Asphalt testing
Chemical testing
Environmental testing
GEOLOGICAL INVESTIGATIONS / MINERAL RESOURCES
Geological mapping
Walk-over surveys
Exploratory drilling
GROUND ENGINEERING AND GROUND IMPROVEMENT
Pressure grouting
Gravity filling of cavities and voids
Anchor drilling
Micropiling
OTHER SERVICES
Geotechnical Consultancy
Pile Integrity Testing
Current meter and tidal monitoring
Underground Service Detection
Ground Penetrating Radar
Electromagnetic Surveys
Electrical Resistivity Surveys
Prequalification Document
APPENDIX A
CERTIFICATATIONS &
ACCREDITATIONS
Prequalification 2008
Prequalification 2008
Prequalification 2008
Prequalification 2008
ISO 9001:2000 CERTIFICATE
(Please press CTRL and click on hyperlink to access)
ISO/IEC 17025:2005 CERTIFICATE
(Will be accessible from IAS website from June 2008)
Prequalification 2008
APPENDIX B
ORGANIZATION CHART
Organization Profile
Prequalification 2008
E1
APPENDIX C
CURRICULUM VITAE OF GEOTECHNICAL
STAFF
CVs – DRILLING & GEOTECHNICAL DEPT.
CVs - LABORATORY
(Please press CTRL and click on hyperlink to access)
Prequalification 2008
E2
APPENDIX D
RESUME OF COMPANY
EXPERIENCE
Prequalification 2008
E3
Major Completed Projects
Geotechnical Investigations & Drilling Projects
2007
CLIENT PROJECT VALUE IN QRS
CDE IRELAND LTD GEOTECHNICAL INVESTIGATION FOR SAND WASHING PLANT AT AL KARANA
82,355.00
HYDRO ALUMINIUM AS QATALUM PROJECT – GEOTECHNICAL INVESTIGATION FOR BRIDGES ACROSS COOLING WATER CHANNEL
39,900.00
JGC - KBR C/O QATAR SHELL
GEOTECHNICAL WORKS FOR THE FIREWATER TANK / WEST LAYDOWN AREA LOT W7A
34,475.00
JGC KBR - QATAR SHELL POTABLE WATER & FIRE WATER SYSTEM, CAMP AREA, RASLAFFAN - GEOTECHNICAL INVESTIGATION
52,560.00
NIPPON KOEI CO. LTD / ASCO CONSULTING ENGINEER
ABU HAMOUR SOUTHERN OUT FALL - GEOTECHNICAL AND GEOPHYSICAL INVESTIGATION
819,275.00
STRABAG QATAR WLL PLANT OFFICE AREA BUILDINGS - GEOTECHNICAL INVESTIGATION
51,155.00
PRIVATE ENGINEERING OFFICE / GHD
PRIVATE BEACH VILLA AL THAKHIRA - GEO TECHNICAL INVESTIGATION
42,850.00
CONSOLIDATED CONTRACTORS INT'L CO. (CCIC)
QATARGAS II LNG FACILITIES PROJECT, RASLAFFAN - DRILLING EARTHING BORE HOLE (CONTRACT GTC-QG-11-ONS-15)
546,250.00
GEA BARWA BUSINESS CENTER - GEOTECHNICAL & HYDROLOGICAL INVESTIGATION
1,114,935.00
AL JABER ENERGY SERVICES
COMMON SULPHUR PLANT, QATAR GAS II - RLIC, GEOTECHNICAL INVESTIGATION
82,310.00
ENCANA INTERNATIONAL (QATAR) LIMITED
DRILLING WATER WELL & PUMPING TEST 223,380.00
RAS LAFFAN OLFINS COMPANY LTD (RLOC)
ETHYLENE PIPELINE - MESAIEED TOPOGRAPHICAL SURVEY
110,066.00
GEA GERMAN ENGINEERS AND ARCHITECTS
BARWA BUSINESS CENTER - GEOTECHNICAL & HYDROLOGICAL INVESTIGATION - 2ND PHASE
1,410,625.00
ATKINS QATAR FOUNDATION EDUCATION CITY - ADDITIONAL GEOTECHNICAL INVESTIGATION
239,595.00
CBI SHELL PEARL GTL TANKAGE- CBI CONTRACT NO. 153130 - GEOTECHNICAL SITE INVESTIGATION
2,932,118.00
Prequalification 2008
E4
STFA MARINE CONSTRUCTION
CONSTRUCTION OF NEW TEMPORARY BERTH NO. 7 AT MESAIEED - STAND PIPE INSTALLATION & ASS. WORKS
223,145.00
JGC MIDDLE EAST FZE GROUND WATER MONITORING WELLS CONSTRUCTION AT DOLPHIN PROJECT
198,200.00
RAFAEL VINOLY ARCHITECTS
ARAB MUSEUM OF MODERN ART - GEOTECHNICAL INVETIGATION
429,685.00
JGC KBR - QATAR SHELL STORAGE OF CORE BOXES 87,000.00
FCB QNC-3 ANCHORS IN ROCK UMMBAB - DRILLING BOREHOLES FOR ANCHORS
229,000.00
QATAR PRIMARY MATERIALS
GEOLOGICAL PROSPECTING FOR SAND DEPOSITS, SOUTH QATAR. SITE INVESTIGATION
289,450.00
QATAR PRIMARY MATERIALS
QPMC SAND WASHING PLANT-SOUTH OF AL-KARANA, GROUND INVESTIGATION
72,120.00
2006
CLIENT PROJECT VALUE IN QRS
HALCROW DEVELOPMENT OF RUWAIS PORT PHASE 2, DRILLING EARTHING BOREHOLES
325,094.00
HALCROW NEW DOHA INT’L AIRPORT, AIRLINE OPERATIONS FACILITIES GEOTECHNICAL INVESTIGATION
409,465.00
GULF EINGINEERING MULTI PURPOSE ADMIN. COMPLEX – RASLAFFAN, GEOTECHNICAL INVS.
248,200.00
PUNJ LLOYD NDIA FUEL SYSTEM-GEOTECHNICAL & GEOPHYSICAL SIOL INVESTIGATION
561,476.00
CTJV AL KHALEEJ PROJECT PHASE 2, GEOTECHNICAL & TOPOGRAPHICAL SURVEY
190,712.00
IMCO DRILLING EARTHING BOREHOLES & INSTALLATION OF EARTH RODS
147,050.00
CHIYODA TECHNIP AL KHALEEJ GAS PROJECT 102.656.00
QATAR SHELL GTL PEARL GTL PROJECT PI-017, HARBOUR TANK FARM INTERIM SITE INESTIGATION
329,585.00
HALCROW OLD DOHA PORT REDEVELOPMENT GEOTECHNICAL INVESTIGATION
102,665.00
HYDER CONSULTING LUSAIL DEVELOPMENT GROUND WATER INVESTIGATION
1,378,355.00
Prequalification 2008
E5
CLIENT PROJECT VALUE IN QRS
STS CONSULTANTS QATAR CONVENTION CENTER & TOWER GEOTECHNICAL SITE INVESTIGATION
932,780.00
ELLERBE BECKET SPECIALITY TEACHING HOSPITAL IN EDUCATION CITY, GEOTECHNICAL INVS.
177,260.00
CHIYODA TECHNIP QATAR LIQUIFIED GAS CO PMP/AGX PROJECT GEOTECHNICAL & TOPOGRAPHICAL SURVEY
352,214.00
FCB CEMENT THIRD EXTENSION OF UMMBAB CEMENT PLANT-GEOTECHNICAL INVESTIGATION
192,880.00
CHIYODA TECHNIP QATAR GAS 3 & 4 ONSHORE PROJECT TRAINS 6 & 7 SUB CONTRACTORS CAMP
114,172.00
HYDRO ALUMINIUM AS QATALUM PROJECT-GEOTECHNICAL INVESTIGATION
47,400.00
BAUER INTERNATIONAL OLD GHANIM SITE DRILLING GROUND WATER MONITORING WELL
80,780.00
QATAR KENTZ RL3 COMMON OFFLOT PROJECT-RASLAFFAN 138,100.00
QATAR KENTZ PEARL GTL PLANT TANK AREA BOREHOLE WORK 277,300.00
QATAR SHELL PEARL GTL PROJECT CONSTRUCTION CAMP TRIAL PIT WORK
111,185.00
QAPCO SIOL & WATER CONTAMINATION SURVEY IN AREA A & B OF QATOFIN PROJECT
312,520.00
CBI CBI CONTRACT # 146682, RASLAFFAN GEOTECHNICAL INVESTIGATION
323,530.00
GALFAR ALMISNAD EPIC UMMBAB TO SALWA ROAD DUAL CARRIAGE, EARTHING BOREHOLES
410,750.00
LINDE AG AIR SEPERATION UNITS, RASLAFFAN – PEARL QATAR, GEOTECHNICAL INVS.
400,300.00
JGC-KBR C/O QATAR SHELL
PEARL GTL PROJECT ADDITIONAL CAMP SOIL INVESTIGATION WORK
348,440.00
AL-JABER & PARTNERS PEARL PROJECT-EFFLUENT TREATMENT PLANT, GEOTECHNICAL INVESTIGATION
1,578,110.00
GALFAR ALMISNAD CONSTRUCTION OF ROADS, UTILITY CROSSINGS & STREET LIGHTING IN INDUSTRIAL AREA, MESAIEED GROUND WW
91,530.00
HYDRO ALUMINIUM AS QATALUM PROJECT – ADDITIONAL TOPOGRAPHICAL, BATHYMETRICAL & GEOTECHNICAL INVESTIGATION
390,925.00
Prequalification 2008
E6
2005
CLIENT PROJECT VALUE in QRS.
MANNAI CORPORATION WAREHOUSE AT STREET 23/24 SALWA INDUSTRIAL AREA
13,350.00
QATAR DREDGING CO. PEARL OF THE GULF PROJECT – DOHA 172,046.00
HYDRO ALUMINIUM AS QATAR ALUMINIUM PROJECT 974,033.00
J & P QATAR W.L.L ERC 0492/C1 AL GHARRAFFA INTERCHANGE 8,800.00
KBAS CONTRACTIN & TRADING
QUARRY FEASIBILITY AT KARAMA 62,800.00
INDUSTRIAL SERVICE GROUP
OFFICE BLDG (2B +G + 9) AT NEW NEW KHOLAIFAT 22,000.00
CHIYODA CORPORATION RASGAS NEW CAMP AREA FOR TRAIN 6 & FEED PROJECT
287,766.00
KBAS CONTG & TRADING KHALIFA STADIUM 6,725.00
MANNAI CORPORATION WARE HOUSE AT ST 23/24 SALWA INDUSTRIAL AREA – ENVIRONMENTA SAMPLING & TESTING
13,350.00
C C C RAS LAFFAN EXPANSION PROJECT GROUND WATR MONITORING WELLS
27,000.00
KBAS CONTRACTING SALAM STREET / DRILLING OF SOAKWAY BOREHOLES 20,400.00
JGC MIDDLE EAST FZE DOLPHIN – UPSTREAM AND COMPRESSION FACILITIES 66,850.00
MTC SURVEY QAFAC II & GEOTECHNICAL SURVEY 142,650.00
MTC SURVEY NEW BRITISH EMBASSY OFFICES RESIDENCE & AMENITIES TOPOGRAPHICAL & GEO TECHNICAL SURVEY
46,250.00
CHIYODA CORP SOIL INVESTIGATION & TOPOGRAPHICAL SURVEY – QATAR GAS III – PROJECT QATAR GAS 3 FEED PROJECT RASLAFFAN
1,110,957.00
J & P DRILLING BORE HOLES OUR QUOTE ER/6553 15,225.00
QATAR KENTZ WLL QATARGAS II DEVELOPMENT PROJECT RLIC CAMP AREA, RASLAFFAN, (7-BOREHOLES, SOIL & ROCK SAMPLING LAB TEST)
35,950.00
FBJ ENTERPRISES VILLA COMPLEX LUQTA – GEOTECHNICAL INVESTIGATION
21,795.00
GULF ENGINEERING & INDUSTRIAL CONSULTANCY
BMC 2004023 CONSULTANCY QTY SURVEY FOR AQUATIC & FISHERIES REASEARCH CENTRE AT WAKRAH
123,660.00
SMEC INTERNATIONAL HALUL ISLAND REMEDIATION 378,386.00
COWI A/S NORTH BEACH DEVELOPMENT ADDITIONAL BOREWELL 12,400.00
QATAR KENTZ 524-QG-II LABOUR CAMP FACILITIES PHASE II – RASLAFFAN
24,400.00
DODSAL PTE LTD DOLPHIN UPSTREAM & COMPRESSION FACILITIES PROJECT RLIC – DRILLING EARHING BOREHOLES
13,750.00
PENINSULAR PETROTECH ENG.
HALUL TANK CP SYSTEM, DRILLING BOREHOLES FOR CATHODIC PROTECTION
223,925.00
Prequalification 2008
E7
CLIENT PROJECT VALUE in QRS.
ARAB CONSULTING ENGINEERS
15 NEW SCHOOLS AROUND DOHA AND VILLAGES 183,000.00
CPC/LATTANZI DOHA AIRPORT – GEOTECHNICAL INVESTIGATION 21,042.00
QATAR PETROLEUM GEOTECHNICAL INV. FOR GABBRO PROJECT 1,266,285.00
DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 19,375.00
KELLOG BROWN ROOT FEED FOR RATIONALIZATION OF CONTROL SYSTEM AT KHATIYAH AND FAHAHIL DEGASSING STATION
57,650.00
TRAGS AL KHOR CLUB CONVERSION – EARTHING BOREHOLES 18,570.00
C.D.C BARJEEL RESIDENTIAL TOWERS AT WEST BAY – PILING AND EXCAVATION WORKS
452,030.00
J & P DRILLIJNG BORE HOLE FOR STREET LIGHTING 7,140.00
ALHUDA ENG WORKS DEVELOPMENT OF KHALIFA TENNIS & SQUASH 17,800.00
Q-CON EPIC OF 11KV DUKHAN TOWNSHIP NETWORK UPGRADE
68,650.00
ATKINS PRIMARY INFRASTRUCTURE DESIGN SERVICES FOR EDUCATION CITY
404,485.00
QATAR PETROCHEMICAL HIGH COD TANK IN ETHYLENE PLANT GEOTECHNICAL INVESTIGATION
28,350.00
ATKINS FEED FOR LPG PIPELINE FROM QP REFINARY TO NEW LPG BOTTLING PLANT
156,735.00
PRIVATE ENGINEERING OFFICE
VILLA AT AL THAKIRA – GEOTECHNICAL INVESTIGATION 20,400.00
GULF DESIGN PROPOSED BUILDING AT A-RING ROAD FOR AHMED DARWISH
19,150.00
ATKINS QATAR PRIMARY ROUTES DHUKAN HIGHWAY 270,150.00
CHIYODTECHNIP JOINT VENTURE
ADDITIONAL TOPOGRAPHICAL SURVEY OF DESALINATED WATER PIPES ROUTE AND GEOTECHNICAL INVESTIGATION AT LEAN LNG TANK AREA
105,710.00
SLAG AGGREGATE PRODUCER
QUARRY FEASIBILITY STUDY AT KARAMA 28,500.00
AL-SAAD CONSULTING ENG
2B+G+M+14+SERVICE FLOOR FOR DR. SUMAIKH AT OLD SALATA
35,700.00
CTJV RASGAS ONSHORE/ONPLOT EXPANSION PROJECT – GEOTECH INVESTIGATION
287,766.00
SILVER ARACH PROPOSED G+5 BUILDING AT UMM GHUWALINA 16,000.00
CCC/TEYSEER JV QATAR GAS II DEVELOPMENT PROJECT RASLAFFAN – DRILLING GROUND WATER
68,000.00
QATAR PETROLEUM GEOTECHNICAL INVESTIGATION FOR THE GABBRO SUPPORT SERVICES
1,266,285.00
CDC BARJEEL RESIDENTIAL TOWER AT WEST BAY – PILING AND EXCAVATION WORKS
452,030.00
TEFFEN EPIC OF RASLAFFAN, MESAIEED ETHANE TRANSMISSION PIPELINE PROJECT
135,600.00
Prequalification 2008
E8
CLIENT PROJECT VALUE in QRS.
WS ATKINS NEW DOHA INTERNATIONAL AIRPORT – INFRASTRUCTURE ROAD PRELIMINARY DESIGN
387,391.00
HALCROW LTD MUSEUM OF ISLAMIC ARTS – GEOTECHNICAL INVESTIGATION
100,575.00
2004
CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN 591,281.00
KETTANESH CONSTRUCTION
RAS LAFFAN LNG TANK-5 149,140.00
AL HUDA ENGINEERING WORKS
KHALIFA SPORTS HALL – DOHA 45,000.00
DOHA PETROLEUM CONST. CO.
HELIUM RECOVERY UNIT – RAS LAFFAN 68,500.00
AMERICAN INT’L. CONTRACTORS INC. (AICI)
MILLENNIUM VILLAGE FACILITIES – AL UDEID AIRBASE 43,250.00
CHIYODA CORPORATION AL KHALEEJ GAS PROJECT – LPG TANKS – RAS LAFFAN 184,072.00
QATAR PETROLEUM GEOTECHNICAL INVESTIGATION FOR PHOTOGRAPHY MUSEUM
152,775.00
ENELPOWER RAS LAFFAN POWER & DESALINATION STATION 54,500.00
LG ENGG. & CONST. CORP. – KOREA
QP LAB PROJECT – MESAIEED 76,525.00
OVERSEAS BECHTEL, INCORPORATED – UK
NEW DOHA INTERNATIONAL AIRPORT PROJECT 6,316,883.00
CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN (ON-PLOT)
442,325.00
W.S ATKINS & PARTNERS
DUKHAN ROAD – DETAILED DESIGN 148,160.00
AL ATTIYAH CONTG. & TRADG. CO.
ERC 0588 C1 RIW IN NORTH OF DUHAIL – STAGE 2 61,200.00
CHIYODA CORPORATION RLIC – CAMP AREA 388,518.00
DORNIER CONSULTING GROUNDWATER ASSESSMENT PROJECT – MONITORING WELLS IN DUKHAN
167,325.00
MECON QAPCO EXPANSION PROJECT – MESAIEED 96,570.00
DORNIER CONSULTING GROUNDWATER ASSESSMENT – HALUL ISLAND 91,000.00
JAMES CUBITT & PARTNERS ENGINEERING CONSULTANCY
LAFFAN TOWER (3 B+G+M+32+2 P+15) ADMINISTRATIVE TOWER AT WEST BAY
42,950.00
JOANNOU & PARASKEVAIDES QATAR W.L.L.
ERC 0492/C1 – AL GHARRAFFA INTERCHANGE 126,300.00
QATAR PETROLEUM LTC 172/03 – BASELINE SURVEY AND MONITORING OF THE GROUNDWATER MONITORING WELLS IN MESAIEED INDUSTRIAL CITY
1,027,175.00
Prequalification 2008
E9
FCB CEMENT QATAR CEMENT PLANT UMM BAB 99,000.00
CHIYODA CORPORATION QATARGAS II LNG PLANT PROJECT – SULPHUR HANDLING AREA & PIPELINE ROUTE
222,701.00
BUZWAIR E&C. ERC 0390 C5 – DESIGN & CONST. OF ACCESS ROADS TO MOTORCYCLE RACETRACK
56,400.00
MARUBENI GTC 1/2002 – POWER SUPPLY TO QATAR FOUNDATION AND 132kV OHL REPLACEMENT BY CABLE IN GHARRAFA – DOHA
189,950.00
COWI – QATAR NORTH BEACH DEVELOPMENT – DOHA 2,655,802.00
QATAR PETROLEUM SO # 30443 – FIREWALL TANK AT FAHAHIL STRIPPING PLANT
23,700.00
MMAA – DRAINAGE DEPT.
7A+7B+7E – ABU HAMOUR SOUTHERN OUTFALL 76,615.00
ATKINS NEW QASCO DIRECT REDUCTION IRON FACILITY 27,000.00
INDUSTRIAL SERVICES GROUP
TOWER BUILDING AT WEST BAY 28,500.00
NASSER S. AL HAJRI CO. LTD.
DOLPHIN ONSHORE FACILITIES PROJECT – RAS LAFFAN
500,000.00
QATAR DREDGING CO. NDIA – CORE DRILLING IN ROCK OUTCROP 42,400.00
QATAR LIQUEFIED GAS CO.
AMINE REGENERATION UNIT AREA 28,500.00
MEDGULF CONST. CO. GTC 04/175/ED – EPIC OF NEW PRODUCTION & INJECTION WELLS AT ARAB D PLANT IN DUKHAN
92,445.00
ATKINS DUKHAN HIGHWAY – ADDITIONAL BOREHOLES 61,670.00
RMJM – DUBAI DUBAI TOWER – DOHA 2,130,060.00
CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN 29,692.00
MOHAMED BIN MUBARAK SALEH AL KULAIFI
DEVELOPMENT AT WEST BAY LAGOON – DOHA 24,350.00
TRADING & AGENCY SERVICES
DUKHAN FITNESS CENTRE, DUKHAN TOWNSHIP 40,250.00
2003
GULF STYLE ENGINEERING CONSULTANCY
AL-BAKER TOWER AT WEST BAY 42,120.00
QATAR STEEL CO. LTD. NEW DRI PLANT PROJECT, QASCO, MESAIEED 34,700.00
RIZZANI DE ECCHER – QATAR BRANCH
AL UDEID PROJECT 36,250.00
MECON GTC 116/ED/02 – KHUFF WELLHEAD TREATMENT PLANTS 152,520.00
CHEVRON PHILLIPS CHEMICAL INT’L. QATAR HOLDINGS – USA
TENDER # QC2-0005 – ENGG., ANALYTICAL & OTHER SERVICES FOR RAS LAFFAN ETHYLENE PLANT – RAS LAFFAN TO MESAIEED
1,155,634.00
H.E. ABDULLAH MOHD. APARTMENT TOWER (2B+G+20) AT WEST BAY 21,300.00
Prequalification 2008
E10
AL OTHMAN – C/O. AEB
QATAR PETROLEUM STC 064/03 – SI WORK FOR RAS ABU ABOUD DEVELOPMENT PROJECT
101,625.00
DORNIER CONSULTING GROUNDWATER ASSESSMENT PROJECT 76,395.00
AL BAIDA TECHNICAL SERVICES
4 DEEP WELL DRILLING PROJECT 44,120.00
CHIYODA CORPORATION
FEED OF NGL RECOVERY FACILITIES – RAS LAFFAN 234,528.00
MMAA – DRAINAGE DEPT.
AL KHOR SEWERAGE EXTENSION TO AL KHOR STW – C517
23,450.00
GRANHERNE INTERNATIONAL LTD.
ECS FOR FEED FOR FIRE AND GAS DETECTION, PROTECTION & SAFETY UPGRADES IN DUKHAN FIELDS
63,725.00
CH2MHILL – U.K. ENVIRONMENTAL ASSESSMENT DRILLING, RAS LAFFAN 133,850.00
MMAA – DRAINAGE DEPT.
MURAIKH AREA SEWERAGE PHASE 3 41,050.00
CROSCO INTEGRATED DRILLING & WELL SERVICES CO.
WATER WELL DRILLING PROJECT – SW QATAR 47,500.00
MMAA – DRAINAGE DEPT.
INDUSTRIAL AREA SEWERAGE 116,600.00
MMAA – DRAINAGE DEPT.
SITE INVESTIGATION – GROUNDWATER QUALITY 57,000.00
QAPCO GEOTECHNICAL SOIL INVESTIGATION FOR QATOFIN PROJECT
415,335.00
MMAA – DRAINAGE DEPT.
ABU HAMOUR SOUTHERN OUTFALL – SEDIMENT SOIL SAMPLES (PART 2) & LAKE SURFACE WATER SAMPLES (PART 4)
127,010.00
WS ATKINS & PARTNERS
STATE AUDIT BUREAU HEAD QUARTERS – WEST BAY 70,000.00
KBAS CONTG. TRADG. ERC 0593/C4 ACCESS ROADS TO HOUSES AT M. KABAN – ZONE 77
170,000.00
CH2MHILL – UK Q-CHEM PLANT, MESAIEED – GROUNDWATER MONITORING WELLS
26,450.00
KETTANESH CONSTRUCTION
RAS LAFFAN LNG TANK-4 200,800.00
PETROSERV LTD. GTC 185/ED/02 – NEW DUKHAN SEWAGE TREATMENT PLANT
23,875.00
QATAR PETROLEUM LINEAR ALKYL BENZENE (LAB) PROJECT – MESAIEED 32,870.00
RIZZANI DE ECCHER AL UDEID PROJECT – PACKAGE 4 32,500.00
H.S. CONSULTANTS CONSULTANCY SERVICES FOR CLOSURE & REHABILITATION OF UMM AL AFFAI LANDFILL SITE
25,700.00
HYDER CONSULTING DOHA WEST STW – EXTENSION NO. 3 252,295.00
WORLEY QATAR GTC 149/2000 – FEED FOR RAS LAFFAN TO MESAIEED GAS PIPELINE PROJECT
155,000.00
BUZWAIR ENGG. & CONTG.
ERC 0621 RIW – AL ITTIHAD SPORTS CLUB ROADS 53,400.00
Prequalification 2008
E11
CCIC & MURRAY & ROBERTS
SPORTS HALL AT KHALIFA SPORTS CITY 291,350.00
JOANNOU & PARASKEVAIDES QATAR W.L.L.
ERC 0492/C1 – AL GHARRAFA (IMMIGRATION) INTERCHANGE
50,255.00
MARBU CONTRACTING EST.
DEVELOPMENT OF AL SAAD CLUB 42,700.00
2002
CCIC RAS LAFFAN ONSHORE EXPANSION PROJECT – GROUNDWATER MONITORING WELLS
62,850.00
MEDGULF CONSTRUCTION CO.
GTC 107/ED/02 – SITE PREPARATION & EARTH WORKS FOR LPG TANKS AT MESAIEED
95,600.00
GRANHERNE INTERNATIONAL LTD.
RAG UTILIZATION PROJECT 33,170.00
GALFAR AL MISNAD ENGG. & CONTG. EST.
GTC 188/ED/01 – TWO CRUDE OIL STORAGE TANKS IN MESAIEED TANK FARM
23,774.00
ASCO CONSULTING ENGG.
LTC 249/2001 – FEED FOR NEW DUKHAN SEWAGE TREATMENT PLANT
25,700.00
GALFAR AL MISNAD ENGG. & CONTG.
DRILLING OF SOAKAWAY BOREHOLES AT AL KHARATIYAT
252,500.00
GALFAR AL MISNAD ENGG. & CONTG.
DRILLING OF SOAKAWAY BOREHOLES AT GARAFFAH 292,500.00
GALFAR AL MISNAD ENGG. & CONTG.
DRILLING OF SOAKAWAY BOREHOLES AT DUKHAN 165,000.00
MMAA – CED GARAFFA DRAINAGE & OUTFALL SYSTEM 28,960.00
MECON GTC 116/ED/02 – EPIC OF KHUFF WELLHEAD TREATMENT PLANTS FACILITIES
60,620.00
W.S. ATKINS ERC 0638/D2 QATAR PRIMARY ROUTES – DUKHAN ROAD 223,465.00
MMAA – DRAINAGE DEPT.
ABU HAMOUR SOUTHERN OUTFALL – TIDAL LEVEL & CURRENT METER SURVEY
36,100.00
CCIC DCPT – RAS LAFFAN COMMON COOLING WATER PROJECT
14,650.00
MMAA – BED ADD. SI FOR DEEPENING OF AL RUWAIS CHANNEL 255,500.00
PETROFAC INTERNATIONAL – SHARJAH
GTC 136/EM/02 – FEED FOR RAG UTILISATION PROJECT 101,550.00
DESERT BYRNE DRILLING – OMAN
4 NO. DEEP WELL DRILLING - PUMPING TEST AND LAB TEST
170,000.00
WS ATKINS QATAR TAXI PROJECT 99,050.00
DREDGING INTERNATIONAL – DUBAI
SOIL INVESTIGATION CAMPAIGN – WEST BAY, DOHA 80,050.00
PARSONS BRINCKERHOFF LTD.
QATAR BROADCASTING COMPLEX – DESIGN SERVICES 79,970.00
Prequalification 2008
E12
MMAA – DRAINAGE DEPT.
ABU HAMOUR SOUTHERN OUTFALL – MARINE WORKS – PART 6B
61,095.00
2001
HALCROW EIC 546/D5 UMM SALAL PHASE 4 133,610.00
HALCROW EIC 546/D6 AL MANASEER 185,000.00
HYDER CONSULTING EIC 543/D3 HBK LANDS AND ABU HAMOUR WEST 98,715.00
HYDER CONSULTING ERC 1418/D1 LINK ROAD TO UMM BIRKA 97,355.00
CHIYODA RASGAS RNF PROJECT 700,000.00
HYDER CONSULTING ERC 1416/D1 DESIGN OF ROADS IN ZONE 51 105,405.00
HYDER CONSULTING EIC 543/D1 BANI HAJER NORTH PHASE 1 & 2 263,000.00
HYDER CONSULTING ERC 1412/D1 DESIGN OF ROADS IN WAKRAH AREAS 1 & 4
54,700.00
HYDER CONSULTING ERC 545/D1 WEST OF WAKRAH 62,600.00
CHIYODA-MISUI-SNAMPROGETTI
RASGAS ONSHORE EXPANSION PROJECT 89,515.00
PENCOL INTERNATIONAL
QGPC GTC 104/2000 - KHUFF GAS REPLACEMENT 60,935.00
MECON DESC FUEL STORAGE FACILITY AT MESAIEED 49,800.00
HALCROW CONSULTING ENGINEERS
BTC 7000 - DEEPENING OF CHANNELS FOR PORTS 70,685.00
QAFCO QAFCO-4 PROJECT - OFFSHORE SITE INVESTIGATION 111,277.00
STORK ENGINEERS & CONTRACTORS
EPIC OF DUKHAN FLARE UPGRADE PROJECT – DUKHAN 187,750.00
TRADING & AGENCY SERVICES LTD.
EARTHING BOREHOLES AT KHUFF 'A' STATION – DUKHAN
60,443.00
HALCROW DEEPENING PORTS AT AL WAKRAH 77,990.00
QATAR PETROLEUM ADD. CLASSROOMS & MULTIPURPOSE HALL – DUKHAN 19,828.00
DOHA PETROLEUM & CONSTRUCTIPON CO. (DOPET)
EPQ/DE2.04 AL KHALIJ FIELD DEVELOPMENT AT HALUL 34,770.00
MMAA PS41 AREA SEWERAGE PHASE 2 & PS41A 27,556.00
2000
LG ENGINEERING CONSTRUCTION
NODCO REFINERY EXPANSION PROJECT 49,000.00
QATAR ELEC. & WATER CO.
RAF 'B' STATION EXTENSION PROJECT 34,050.00
SNAMPROGETTI ITALY S.P.A
14" RAW PIPELINE FROM DUKHAN TO MESAIEED 79,767.00
Prequalification 2008
E13
QATAR FERTILISER CO.
QAFCO-4 PROJECT 357,478.00
INDUSTRIAL SERVICES GROUP
G + 6 STOREY BUILDING AT MANSOORA FOR MOHAMMED AHMED AL THANI
8,800.00
H.E SHK. ABD. BIN KHALID BIN HAMAD AL-THANI
PUMPING TESTS AT AL WAAB FARM 40,500.00
BIN SRAIYA QUARRY FEASIBILITY STUDY AT UMM AL QAHAB 18,990.00
HALCROW BTC 6010 - UPGRADING OF SHEIKH'S JETTY 24,309.00
TAMIMI CONST. CO. EARTHING BOREHOLES AT RAS LAFFAN 15,420.00
GULF INTERNATIONAL CONSULTANTS
RAS LAFFAN UTILISATION PROJECT BLDG. & UTILITIES 5,550.00
MTC SURVEYS DUKHAN FIELD GAS LIFT PROJECT 217,854.00
MMAA (CED) PS 26 & PS 25 CATCHMENTS SEWERAGE DESIGN 43,853.00
ARAB ENGINEERING BUREAU
VILLA FOR SH. SAUD BIN MOHAMMED AL THANI 39,789.00
CCIC JETTY EXTENSION - QVC PROJECT, MESAIEED 7,205.00
TECHNIP ITALY S.P.A. TOPOGRAPHICAL SURVEY - SULPHUR EXPANSION 8,525.00
DAMES & MOORE PUMPING TESTS AT RAS LAFFAN 14,100.00
PENCOL INT’L 12" RAW NGL PIPELINE REPAIR WORKS 10,300.00
GALFAR AL MISNAD ENGG. & CONTG. CO.
SOAKAWAY BOREHOLES AT RAS LAFFAN 9,000.00
JGC KELLOGG JOINT VENTURE
SEAWATER OUTFALL CHANNEL 22,310.00
QATAR PETROCHEMICAL CO.
PRELIMINARY SURVEY AT QAPCO PLANT – MESAIEED 49,100.00
DAR AL-HANDASAH SHAIR & PARTNERS
CUSTOMS CENTRE & STAFF ACC.- ABU SAMRA 128,347.50
CCIC DRILLING OF H2O MONITORING WELLS AT QVC – MESAIEED
42,043.00
TEYSEER CONTRACTING CO.
ERC 0430/C1 ROUTE 55 - MESAIEED TO SALWA RD. 9,395.50
TECHNICAL SERVICES CONS.
PROPOSED SHAHEEN PROJECT 58,785.00
TRADING & AGENCY SERVICES LTD.
GTC 111/2000 - EPIC OF KHUFF WELLHEAD TREATMENT PLANTS
22,727.00
QATAR PETROLEUM TEST WELLS FOR GROUNDWATER MONITORING AT MIC 246,853.00
RAMBOLL CONSULTING ENG.
RASGAS OFF – SPEC POND AT RAS LAFFAN 14,542.00
GALFAR AL MISNAD ENGG. & CONTG. CO.
SUBSTATION BLDG. AT MESAIEED TANK FARM 9,280.00
MANCO INT’L EPIC - 1 FIRE WATER & 4 CRUDE OIL TANKS – MESAIEED 57,824.50
*Pre-2000 project references are available on request.
Prequalification 2008
E14
Major Completed Projects
Laboratory
CLIENT PROJECT DETAILS PERIOD
CHIYODA CORPORATION
QATAR GAS LNG PROJECT, RAS LAS LAFFAN
CONCRETE TESTING 1994 - 1996
TAYLOR WOODROW
QATAR FLOUR MILL, DOHA LAB AND FIELD TESTING OF SOIL, CONCRETE & AGGREGATE
1995 - 1997
TOYO ENGINEERING
QATAR GAS UPSTREAM PROJECT, RAS LAFFAN
ALL TESTING WORKS INCLUDING ONSITE LABORATORY
1995 - 1998
MIDMAC CONTRACTING CO
QAFCO – III EXPANSION, MESAIEED
LAB AND FIELD TESTING OF SOIL, CONCRETE & AGGREGATE
1996 - 1998
DAMES & MOORE NGL-4 BASE CASE, NGL-3 AND NGL TANK FARM – ENVIRONMENTAL IMPACT ASSESSMENT
SAMPLING AND ANALYSIS OF SOIL AND WATER FOR CONTAMINATION STUDY
Aug 1999
QAFCO QAFCO – IV CONTAMINATED LAND INVESTIGATION
SAMPLING AND ANALYSIS OF SOIL AND WATER FOR CONTAMINATION STUDY
May 2000
LG ENGINEERING NODCO REFINERY EXPANSION, MESAIEED
ALL TESTING WORKS INCLUDING ONSITE LABORATORY
1999 - 2001
TECHNIP ALBA, BAHRAIN ALL TESTING WORKS INCLUDING ONSITE LABORATORY
1999 - 2001
HYDER CONSULTING
DOHA SOUTH SEWAGE TREATMENT WORKS – FLOW SAMPLING & LABORATORY TESTING
SEWAGE SAMPLING & LABORATORY TESTING
Jul2001
ERM / LAHMYER RAS ABU FONTAS, SAILIYAH, WAJBAH AND DOHA SOUTH – EIA
SAMPLING AND ANALYSIS OF SOIL AND WATER FOR CONTAMINATION STUDY
Sep 2001
MECON / KHARAFI SULPHUR RECOVERY EXPANSION
LAB AND FIELD TESTING OF SOIL, CONCRETE & AGGREGATE
2001 - 2002
QAPCO GROUND WATER MONITORING WELLS
SAMPLING AND ANALYSIS OF SOIL AND WATER FOR CONTAMINATION STUDY
Feb 2002
WSP INTERNATIONAL
RAS ABU ABOUD - EIA SAMPLING AND ANALYSIS OF SOIL AND WATER FOR CONTAMINATION STUDY
Dec 2002
CCIC QAFCO – IV EXPANSION, MESAIEED
ALL TESTING WORKS INCLUDING ONSITE LABORATORY
2002 - 2004
INTERBETON QAFCO – IV EXPANSION, MESAIEED
ALL TESTING WORKS INCLUDING ONSITE LABORATORY
May 2002 – May 2003
READINESS MANAGEMENT
U.S. AIRBASE, AL UDEID ASPHALT AND CONCRETE TESTING WORKS
Apr - Jun 2002
CCIC KHALIFA SPORTS HALL MATERIALS AND IN-SITU TESTING Sep 2003 –
Prequalification 2008
E15
CLIENT PROJECT DETAILS PERIOD
Aug 2005.
J&P IMMIGRATION & SALWA INTERCHANGES
MATERIALS AND IN-SITU TESTING Apr 2003 – Sep 2004
CCIC RAS LAFFAN EXPANSION PROJECT
MATERIALS AND IN-SITU TESTING Oct 2001 - 2004
CCIC RAS LAFFAN COMMON COOLING WATER PROJECT
MATERIALS AND IN-SITU TESTING Jun 2002 - Sep 2004
GRANDI LAVORI FINCOSIT
RAS LAFFAN COMMON COOLING WATER PROJECT
MATERIALS AND IN-SITU TESTING Jun 2002 - Nov 2003
GRANDI LAVORI FINCOSIT
CRUSHED STONE FACILITY AT MESAIEED
MATERIALS AND IN-SITU TESTING Oct 2001 - Aug 2004
GRANDI LAVORI FINCOSIT
MULTI-PRODUCTS BERTH, MESAIEED
MATERIALS AND IN-SITU TESTING Oct 2001 – Sep 2004
GRANDI LAVORI FINCOSIT
LAND RECLAMATION IN LPG STORAGE AREA AT RAS LAFFAN
MATERIALS AND IN-SITU TESTING Mar 2002 – May 2003
GULF HOUSING & CONST.
QATARGAS – DEBOTTLENECKING PROJECT, RAS LAFFAN
MATERIALS AND IN-SITU TESTING Jul 2002 – Jul 2005
MMAA – DRAINAGE DEPARTMENT
ABU HAMOUR SOUTHERN OUT FALL.
MARINE WATER, LAKE SURFACE WATER & SEDIMENT AND DISCHARGE WATER SAMPLING AND ANALYSIS FOR CONTAMINATION STUDY. OFFSHORE CURRENT AND TIDAL MONITORING.
Jun 2002 - Apr 2003
NITCO AL KHOR SEWAGE TREATMENT WORKS
LABORATORY ANALYSIS OF SEWAGE SAMPLES
May - Sep 2002
QATAR PETROLEUM
WOQOD BITUMEN STORAGE AND LOADING FACILITIES – MESAIEED
SOIL AND WATER SAMPLING AND TESTING FOR VARIOUS CONTAMINANT SPECIES
Jan 2003
MMAA – DRAINAGE DEPARTMENT
CP-505 INDUSTRIAL AREA SEWERAGE
LABORATORY ANALYSIS OF SEWAGE SAMPLES
Feb 2003
MMAA – DRAINAGE DEPARTMENT
GROUND WATER SAMPLING AND ANALYTICAL LABORATORY TESTING – PUMP STATIONS ENVIRONMENTAL IMPACT STUDY
GROUND WATER SAMPLING AND LABORATORY TESTING FOR VARIOUS CONTAMINANT SPECIES
May 2003
QP / MIC NODCO REFINERY AREA, MESAIEED
ENVIRONMENTAL ANALYSIS – HEAVY METALS AND TPH
Apr 2003
AL BAIDA TECHNICAL SERVICES
DEEP WELL DRILLING PROJECTS, SW QATAR
HEAVY METAL ANALYSIS OF GROUND WATER SAMPLES
Jul 2003
QAPCO QATOFIN PROJECT, MESAIEED
SOIL AND WATER SAMPLING AND TESTING FOR VARIOUS
Nov 2003
Prequalification 2008
E16
CLIENT PROJECT DETAILS PERIOD
CONTAMINANT SPECIES
HYDER CONSULTING
DOHA WEST SEWAGE TREATMENT WORKS - FLOW SAMPLING AND LABORATORY TESTING
SEWAGE SAMPLING AND LABORATORY TESTING
Sep - Oct 2003
OVERSEAS BECHTEL INC.
NEW DOHA INTERNATIONAL AIRPORT PROJECT
SOIL AND WATER SAMPLING AND TESTING FOR VARIOUS CONTAMINANT SPECIES
Feb - Aug 2004
SIX CONSTRUCT / MIDMAC
KHALIFA STADIUM REDEVELOPMENT – PACKAGE 3 – WEST STAND
MATERIALS AND IN-SITU TESTING Oct 2003 Mar 2005
SIX CONSTRUCT MUSEUM OF ISLAMIC ARTS MATERIALS AND IN-SITU TESTING Jan 2004 - Feb 2005
QATAR PETROLEUM
BASE LINE SURVEY OF GROUND WATER MONITORING WELLS AT MIC
GROUNDWATER SAMPLING AND LABORATORY TESTING.
Jul 2004 – Apr 2008
NASSER AL HAJRI DOLPHIN PROJECT, RAS LAFFAN
MATERIALS AND IN-SITU TESTING Oct 2004 – Ongoing
ASHGHAL AL DHAKIRA SEWAGE TREATMENT WORK
SEWAGE WATER TESTING May - Jun 2005
ITT INDUSTRIES DOHA SOUTH SEWAGE WATER ANANLYSIS
SEWAGE WATER TESTING Jun - Jul 2005
SIX CONSTRUCTION CO.
NEW INTERNATIONAL AIR PORT
CONCRETE TESTING Aug 2005 - Nov 2006
MIDMAC NEW INTERNATIONAL AIRPORT
SOIL, ASPHALT, CONCRETE AGGREGATE TESTING
Sep 2005 - Ongoing
CDC/TAKENAKA NEW INTERNATIONAL AIRPORT
SOIL, & CONCRETE TESTING Sep 2006- Ongoing
NASSER AL HAJRI QATARGAS SRU, RAS LAFFAN
MATERIALS AND IN-SITU TESTING Sep 2006- Ongoing
NASSER AL HAJRI RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU TESTING Sep 2006- Ongoing
FLUOR MIDDLE EAST
RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU TESTING Sep2006- Ongoing
ALJABER ENERGY COMMON SULPHUR, QATARGAS II, RAS LAFFAN
MATERIALS AND IN-SITU TESTING Jun 2006- Ongoing
DESCON ENG.CO OLEFIN PROJECT, RAS LAFFAN
MATERIALS AND IN-SITU TESTING Jul 2006- Ongoing
MUSHRIF CONT.CO
DOHA WEST STW MATERIALS AND IN-SITU TESTING Sep 2006- Ongoing
BOSKALIS WESTMINSTER
RAS LAFFAN ENVIRONMENTAL TESTING ON SOIL & WATER
Feb 2006 Ongoing
SATCO Int’national RAS LAFFAN ENVIRONMENTAL TESTING ON SOIL & WATER
Aug 2006 Ongoing
QATAR DREDGING NEW DOHA ENVIRONMENTAL TESTING Jan 2005 -
Prequalification 2008
E17
CLIENT PROJECT DETAILS PERIOD
CO INTERNATIONAL AIRPORT 2007
RUMAILLAH SERVICES
PUMPING STATIONS-DOHA SEWAGE WATER TESTING Spe 2005 – Sep 2006
A.A. ENGINEERING INDUSTRIAL AREA STW SEWAGE WATER TESTING Mar 2006 – Ongoing
URS CORPORATION
ORYX GTL, RAS LAFFAN ENVIRONMENTAL TESTING Mar 2006
METITO PROJECT; C705 ENVIRONMENTAL TESTING Dec 2006 – Ongoing
SYNOHYDRO GAMUDA
NEW DOHA INT’NATIONAL AIRPORT
ENVIRONMENTAL TESTING & POTABLE WATER ANALYSIS
April 2006 - Ongoing
JGC MIDDLE EAST DOLPHIN, RAS LAFFAN GROUND WATER MONITORING Oct 2005 - Ongoing
CCIC RLX, RAS LAFFAN GROUND WATER MONITORING April 2006 - Ongoing
GULF CEMENT CO NEW CEMENT FACTORY, UMMBAB-FEASIBLITY STUDY.
CHEMICAL ANALYSIS ON LIMESTONE.
Oct – Dec 2006
Prequalification 2008
APPENDIX F
FIELD AND LABORATORY TESTING
Prequalification 2008
F-1
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
1. CONCRETE
1.1 Compressive strength of cubes including weight, nominal dimensions and approximate density of specimen
BS : 1881 : Part : 116 As per project specification
As per project specification 1 Day
1.2 Compressive strength of concrete cylinders ASTM C 39 As per project specification
As per project specification 1 Day
1.3 Flexural strength of concrete beams ASTM C 78 As per project specification
As per project specification 1 Day
1.4 Indirect Tensile Strength of concrete cylinders ASTM C 496 As per project specification
As per project specification 1 Day
1.5 Compressive strength, density and visual examination and preparation, of drilled concrete cores
BS 1881 : Part : 120 Min. 2 days Length / diameter ratio is between 1 and 1.2
4 Days
1.6 Compressive strength of concrete blocks including weight and nominal dimensions of specimens
BS : 2028, Appendix F Not applicable 12 samples from each lot 2 Days
1.7 Water absorption of concrete specimen including preparation
BS 1881 : Part : 122 Age of sample shall be within 28 - 32 days
3 samples from each set 5 Days
1.8 Water absorption and volume of permeable voids including sample preparation
ASTM C 642 Not applicable 1 sample from each set 7 Days
1.9 Initial surface absorption test (ISAT) BS 1881 : Part : 208 As per project specification
As per project specification 2 Days
1.10
Concrete mix design and laboratory trial mixes
BS 1881 : Part : 125 Not applicable As per mix design
5 Days and compression test results on 7
th and
28th
day
1.11 Water permeability test DIN 1048 As per project specification
3 cubes per mix 4 Days
1.12 Chloride Permeability test ASTM C 1202 As per project specification
As per project specification 3 Days
Prequalification 2008
F-2
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
2. FRESH CONCRETE
2.1 Slump test and temperature BS 1881: Part: 102 Max. 2 hrs. After mixing Each truck Immediate
2.2 Air content BS 1881:Part: 106 Max. 2 hrs. After mixing As per project specification Immediate
2.3 Sampling and manufacture of concrete cubes 150mm size
BS 1881 Part: 108 Max. 2 hrs. after mixing As per project specification 1 Day
3. TILES / MARBLES
3.1 Water absorption ASTM C 97 Not applicable As per project specification 3 Days
3.2 Density ASTM C 97 Not applicable As per project specification 3 Days
3.3 Modulus rupture ASTM C 99 Not applicable As per project specification 2 Days
3.4 Compressive strength ASTM C 170 Not applicable As per project specification 2 Days
3.5 Transverse strength BS 4131 Not applicable As per project specification 2 Days
4. CEMENT
4.1 Initial and final setting times BS : 4550 A.S.A.P 1 Kg 2 Days
4.2 Soundness of cement BS : 4550 A.S.A.P 1 Kg 3 Days
4.3 Fineness of cement (specific surface) BS : 4550 A.S.A.P 1 Kg 2 Days
4.4 Compressive strength of mortar cubes using standard sand (set of 6 cubes)
BS : 4550 A.S.A.P 2 Kg 28 Days
Prequalification 2008
F-3
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
5. BITUMINOUS MIXTURES
5.1 Density of drilled bitmac core BS 598 As per project specification
As per project specification 2 Days
5.2 Determination of bitumen content and aggregate grading of bituminous mixtures
BS 598 A.S.A.P 20 Kgs 2 Days
6. AGGREGATES
6.1 Moisture content BS : 812 A.S.A.P 5 Kgs 1 Day
6.2 Sieve analysis BS : 812 Not specified 10 Kgs 1 Day
6.3 Clay, silt and dust content in fine or coarse aggregates
BS : 812 / ASTM C 117 Not specified 10 Kgs 2 Days
6.4 Flakiness index BS : 812 Not specified 10 Kgs 1 Day
6.5 Elongation index BS : 812 Not specified 10 Kgs 1 Day
6.6 Bulk density (compacted and uncompacted) BS : 812 Not specified 20 Kgs 1 Day
6.7 Specific gravity and water absorption BS : 812 Not specified 10 Kgs 2 Days
6.8 Shell content (visual description) BS : 812 Not specified 10 Kgs 1 Day
6.9 Aggregate impact value BS : 812 Not specified 10 Kgs 2 Days
6.10 Aggregate crushing value BS : 812 Not specified 10 Kgs 2 Days
6.11 Ten percent fines value BS : 812 Not specified 10 Kgs 3 Days
6.12 Los Angeles abrasion value ASTM C 131 Not specified 10 Kgs 3 Days
6.13 Soundness of aggregate (Sodium or Magnesium sulphate)
ASTM C 88 Not specified 10 Kgs 7 Days
Prequalification 2008
F-4
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
6.14 Immersed rotational test CML Test Method 1.97 Not specified 100 Kgs 3 Days
6.15 Clay lumps and friable particles content ASTM C 14271 Not specified 10 Kgs 3 Days
6.16 Scratch hardness ASTM C 851-76 Not specified 10 Kgs 2 Days
6.17 Drying shrinkage of aggregate BS : 812 Not specified 10 Kgs 15 Days
7. SOILS
7.1 Moisture content BS : 1377 A.S.A.P 5 Kgs 1 Day
7.2 Wet density undisturbed sample BS : 1377 A.S.A.P 2 Kgs 1 Day
7.3 Dry density undisturbed sample BS : 1377 A.S.A.P 2 Kgs 2 Days
7.4 Atterberg limits - Liquid and Plastic BS : 1377 Not specified 5 Kgs 2 Days
7.5 Specific gravity BS : 1377 Not specified 5 Kgs 2 Days
7.6 Sieve analysis BS : 1377 Part : 2, 9.2 Not specified 10 Kgs 3 Days
7.7 Sedimentation analysis BS : 1377 Part : 2 Test 9.5 Not specified 10 Kgs 3 Days
7.8 Dry density / Moisture content relationship
BS : 1377 and ASTM D 1557
Not specified 50 Kgs 2 Days
7.9 California bearing ratio (CBR) BS : 1377 Not specified 35 Kgs 6 Days
7.10 Linear shrinkage BS : 1377 Not specified 10 Kgs 3 Days
7.11 Sand Equivalent Value ASTM D 2419 Not specified 10 Kgs 2 Days
Prequalification 2008
F-5
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
8. ROCKS
8.1 Point load test - per specimen ASTM D 5731 A.S.A.P
Irregular specimen Min. size 50mm Core sample - length diameter ratio to be > 1
1 Day
8.2 Uniaxial compression test and modulus of deformation (including specimen preparation, moisture content and wet density determination)
ASTM 2938 / 3148 A.S.A.P Length diameter ratio to be > 1
2 Days
8.3 Splitting tensile strength ASTM D 3967 A.S.A.P Length diameter ratio to be > 1
2 Days
9. CHEMICAL TESTING
Aggregate / Rock
9.1 Water soluble sulphate content BS 812 : Part : 118 Not specified 5 Kgs 3 Days
9.2 Water soluble chloride content BS 812 : Part : 117 Not specified 5 Kgs 3 Days
9.3 Acid soluble sulphate content BS 812 : Part : 118 Not specified 5 Kgs 3 Days
9.4 Acid soluble chloride content BS 812 : Part : 117 Not specified 5 Kgs 3 Days
9.5 Organic matter ASTM C 40 Not specified 5 Kgs 3 Days
9.6 Potential alkali silica reactivity ASTM C 289 Not specified 5 Kgs 4 Days
9.7 Full chemical analysis ASTM C 471 Not specified 5 Kgs 4 Days
Soil (For Back fill)
9.8 pH value BS 1377 : Part : 3 Not specified 1 Kg 1 Day
9.9 Electrical conductivity BS 1377 : Part : 3 Not specified 1 Kg 1 Day
Prequalification 2008
F-6
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
9.10 Water soluble sulphate content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days
9.11 Water soluble chloride content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days
9.12 Acid soluble sulphate content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days
9.13 Acid soluble chloride content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days
9.14 Organic matter BS 1377 : Part : 3 Not specified 2 Kgs 3 Days
Soil (For Agricultural purposes)
9.15 Sodium Absorption Ratio (SAR) Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 4 days
9.16 Boron Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 3 days
9.17 Cat ion Exchange capacity Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 4 days
9.18 Exchangeable Sodium Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 3 days
9.19 Salinity Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 2 days
9.20 Chloride Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 2 days
9.21 Sulphate Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 3 days
Prequalification 2008
F-7
No. Test Standard Sample Holding Time
Required Volume Standard Turn Around Time
9.22 Phosphate Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 2 days
9.23 Total Kjeldahl Nitrogen (TKN) Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 3 days
9.24 Total Nitrogen Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 3 days
9.25 Carbonates Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 2 days
Concrete
9.26 Sulphate content BS 1881 : Part : 124 Not specified 5 Kgs 3 Days
9.27 Chloride content BS 1881 : Part : 124 Not specified 5 Kgs 3 Days
9.28 Cement content BS 1881 : Part : 124 Not specified 5 Kgs 3 Days
9.29 Depth of carbonation BS 1881 : Part : 124 Not specified 5 Kgs 1 Day
9.30 Type of cement BS 1881 : Part : 124 Not specified 5 Kgs 3 Days
Cement /Lime/ Gypsum
9.31 Full chemical analysis BS 4550 / ASTM C 71/ ASTM C114
A.S.A.P 5 Kgs 4 Days
Water for Concrete
9.32 pH Using pH meter A.S.A.P 200 ml 1 Day
9.33 Sulphate content AWWA / APHA 28 Days 200 ml 3 Days
9.34 Chloride content AWWA / APHA 28 Days 200 ml 3 Days
Prequalification 2008
F-8
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
9.35 Total dissolved solids (TDS) AWWA / APHA 28 Days 200 ml 3 Days
9.36 Total suspended solids (TSS) AWWA / APHA 28 Days 200 ml 3 Days
9.37 Carbonate & Bi carbonate AWWA / APHA 28 Days 200 ml 3 Days
Water for Drinking
9.38 Cations and anions including pH, EC, TDS & TSS AWWA / APHA 7 Days 500 ml 2 Days
9.39 Bacteria – Total & Faecal Coliforms AWWA / APHA 6 Hours 500 ml 2 Days
9.40 Trace Metals USEPA 3005/6010B 6 months (acidified) 200 ml 3 Days
9.41 Tri halo methane USEPA5030/8015 2 days
Waste water
9.42 Biochemical Oxygen Demand (BOD) AWWA / APHA 24 Hours 500 ml 6 Days
9.43 Chemical Oxygen Demand (COD) AWWA / APHA
7 Days 500 ml 2 Days
9.44 Dissolved oxygen
AWWA / APHA A.S.A.P 500 ml 1 Day
9.45 Chlorine content AWWA / APHA A.S.A.P 500 ml 1 Day
9.46 Ammonia AWWA / APHA 7 Days 500 ml 2 Days
9.47 Sulphide AWWA / APHA 7 Days 500 ml 2 Days
9.48 Nitrate AWWA / APHA 28 Days 500 ml 1 Day
9.49 Nitrite
AWWA / APHA 2 Days 500 ml 1 Day
9.50 Total Kjeldahl Nitrogen (TKN) AWWA / APHA 7 Days 500 ml 3 Days
Prequalification 2008
F-9
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
9.51 Total Nitrogen AWWA / APHA 7 days 500 ml 2 Days
9.52 Total Suspended Solids AWWA / APHA 7 Days 200 ml 1 Day
9.53 Sludge Volume Index AWWA / APHA 6 Hours 1.5 L 1 Day
9.54 Turbidity AWWA / APHA 24 hours 200 ml 1 Day
9.55 Total Faecal Coliform AWWA / APHA 6 Hours 500 ml 2 Days
9.56 Phenols AWWA / APHA 28 Days 500 ml 2 Days
9.57 Cyanides AWWA / APHA 14 days 500 ml 3 Days
9.58 Fat, Oil & Grease AWWA / APHA 28 Days 1000 ml 3 Days
9.59 Total Organic Carbon (TOC) AWWA / APHA 28 Days 200 ml 3 Days
9.60 Phosphate AWWA / APHA 48 Hours 100 ml 2 Days
9.61 Heavy metals USEPA 3010/6010B 6 months 200 ml 2 Days
10. Environmental Analysis
10.1 Total petroleum hydrocarbons (TPH) USEPA 8015 / 5030 / 3540 3510 / 1664
14 Days 2000 ml / 2 kg 5 Days
10.2 Volatile organic compounds (VOC) USEPA 8260 14 Days 500ml / 1 kg 5 Days
10.3 Semi volatile organic compounds (SVOC) USEPA 8270 14 Days 1000ml / 1 kg 5 Days
10.4 Polyaromatic hydrocarbon (PAH) USEPA 8310 14 Days 1000ml / 1 kg 5 Days
10.5 PCBs USEPA 8082 / 3540 14 Days 1000ml / 1 kg 5 Days
10.6 Pesticides USEPA 8081 14 Days 1000ml / 1 kg 5 Days
Prequalification 2008
F-10
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
10.7 Chlorinated Hydrocarbons USEPA 3510/8121 14 Days 100 ml/200gm 4 Days
10.8 BTEX USEPA 5030/8015 14 Days 100 ml/200gm 4 Days
10.9 TCLP USEPA 1311 14 Days 100 ml/200 gm 2 Days
10.10 Heavy metals USEPA 3005 / 3010/6010B 6 Months 500ml / 1 kg 5 Days
11. PULVERISED FUEL ASH (PFA)
11.1 Loss on ignition BS : 3892 Not specified 1 Kg 4 Days
11.2 Magnesia content BS : 3892 Not specified 1 Kg 4 Days
11.3 Sulphate content BS : 3892 Not specified 1 Kg 4 Days
11.4 Moisture content BS : 3892 Not specified 1 Kg 4 Days
11.5 Fineness BS : 3892 Not specified 1 Kg 4 Days
12. FIELD TESTING
12.1 Insitu Density Testing BS 1377 Part: 9 - - -
12.2 Concrete Core Drilling (Maximum 400mm depth)
BS 1881 Part: 120 - - -
12.3 California Bearing Ratio Tests, allows for reaction up to 20kN, client to provide reaction vehicle
BS 1377 Part: 9 - - -
12.4 Plate Bearing Tests 0.555m diameter plate loaded up to 900 KN/m
2.