COMPANY PROFILE
SAEKYUNG CONSTRUCTION
‣ POLICY
‣ OPERATION
‣ ACTION PLAN
- HONESTY - TO DO BEST - SATISFACTION ( FOR CLIENT)
A LOVING HEART ADVENTUROUS THINKING ASSERTIVE BEHAVIOUR
◆ Satisfaction for client - Check list for high quality - Removal of inconsistence factor - Recording of data ◆ Make safety , cleaning site - All staffs is safety guard - Zero point of safety accident - Cleaning of working site ◆ ISO 9001/ISO 14001 - We keep requlation of ISO 9001, ISO 14001
1. Company management policy
Page 1
2. Company Profile
1999.10 Founded Saekyung Construction Co., LTD in Busan, Korea
1999.11 Obtained Earth Works
2001.11 Obtained Boring, Grouting
2003.07 Obtained Water supply, Sewage treatment
2005.10 Established Kyung Dong equipment
2007.07 Obtained Scaffolding works
2007.07 Obtained Underwaterr Construction works
2007.12 Obtained ISO 9001/ ISO 14001 ( ICR)
2013.12 Established an oversea corporation in VietNam
NAME SAEKYUNG CONSTRUCTION CO.,LTD
Address 108-11 Chungyoul-daero, Onchon-dong, Dongrae-gu, Busan, Korea
Director JUNG KOOK MIN
Co.firm Corporation
Capital 5.000.000 USD
Contact Tel : + 82-51-505-0649 Fax : + 82-51-501-0823
NAME SAEKYUNG CONSTRUCTION VIETNAM CO.,LTD
Address Room 207-IPC tower, 1489 Nguyen Van Linh, Tan Phong Ward, District 7, HCM. City
Director KIM TAE SUK
Co.firm Corporation
Capital 500.000 USD
Contact Tel : + 84 – 8 - 3776 – 0710 & 0701 Fax : + 84 – 8 – 3776 - 0088
2-1. Company History
2-2. Sae Kyung Korea
2-3. Sae Kyung Vietnam
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
Page 2
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
2-4. ISO - Certificate
Page 3
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
ITEM DESCRIPTION
Sheet pile work Sheet pile stock 7.000 ton
Piling work (onshore, offshore ) S.I.P, C.I.P, S.D.A, P.R.D
Earth work General earth work
Site renovation
Temporary steel work by H-beam H-beam stock :3.300 ton
DCM (onshore, offshore )
•Softground improvement
•Depth 55m
•Foundation pile
•Retaining wall
•Foundation under sea
Ground Anchor Method Stability of slope
Jumbo special pile Softground foundation &waterproof for existing structure
Soil Nailing Method Stability for cutting slope & steep slope
2-5. Registed Corporative Construction Companies
Name of Co. Remarks
1 Samsung C&T
2 GS E&C
3 Hyundai Engineering
4 POSCO E&C
5 Hyosung Construction
6 ShindongAh Construction
2-6. Business field
2. Company Profile
Page 4
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
2. Company Profile
2-7. Owned Equipment List
Equipment Size Q’ty Remarks
1 Crawler Crane
50 ton
65 ton
100 ton
150 ton
250 ton
280 ton
300 ton
400 ton
450 ton
600 ton
2
1
7
1
5
1
1
1
1
2
2 Marine Crane
160 ton
200 ton
225 ton
1
2
1
Pilling Offshore
3 Pile Driver
PD 135
DHJ 60-2
DH 608
DH 658
DH 758
1
1
1
2
3
DCM, SDA,PRA Vietnam
4 DCM Plant SET 4 1 Set Vietnam
5 Vibro Hammer
60 KW
90 KW
135 KW
3
2
2
6 Silent Piler 150 ton 2
7 Hydro Hammer 7 ton 1 Piling
8 Excavator
B/H 10
B/H 08
B/H 02
2
4
1
1 Vietnam Piling
9 Generator
350 KW
250 KW
120 KW
2
2
2
Piling
10 Doughnut Auger Earth Auger Mixer Plant
120, 240 HP
150, 200 H
SET
9
5
3
SDA,PRD,SIP
Page 5
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
2-8. Equipment view
2. Company Profile
Page 6
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
Page 7
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
Page 8
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
PROJECT NAME CONTRACTOR PERIOD
Samcheok LNG Jetty
Korea Gas corp.(Hyundai)
04/2013-03/2014
Nohwa - Gudo Bridge ( RCD)
Posco 03/2013-02/2014
GwangYang Posco SNNC
Posco
06/2012-06/2013
Samcheok Sea port Korea Gas corp. 03/2013-12/2013
Hyundai Heavy Clair Ridge
Hyundai Heavy 11/2014-09/2015
PROJECT NAME CONTRACTOR PERIOD
Hwajeon industrial complex BMC 10/2011-08/2012
Myongji Int'l Industrial complex LH corp. 02/2012-12/2012
Myongji Ocean city Samjung const. 06/2012-01/2013
Masan Seaport offshore DCM Dongbu. 03/2014-03/2015
Hyundai Daejuk industrial complex ( offshore )
Halla Corp. 09/2014-03/2015
Piling offshore
DCM works
At Vietnam
PROJECT NAME CONTRACTOR PERIOD
Hot Rolling Mill (HaTinh) DCM Formosa (Posco) 05/2013-08/2013
LG electronic (HaiPhong) DCM LG(GS & Serveone) 09/2013-11/2013
Hot Rolling Mill (HaTinh) Bored pile Formosa (Posco) 03/2013-05/2013
By-Product Area ( HaTinh) DCM Formosa (Posco) 04/2014-06/2014
Ben Luc – Long Thanh Express DCM Samwhan Corp. 08/2015~12/2016
2.9 . Experience records
2. Company Profile
Page 9
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
PROJECT NAME CONTRACTOR PERIOD
Hyunbseong Huefore APT Hyunbseong Corp. 11/2014-10/2015
Bando U-bora APT Bando Corp. 10/2014-09/2015
WhaMyong IC ( RDC) Kumho 02/2014-04/2016
Highway 65 lime (Samcheok, lot2) Hyundai Development 04/2010-12/2014
JinJu-GwangYang Railway ( lot 4) Hyundai Development 04/2010-12/2014
Buan bongduk3 APT LH Corp. 05/2013-11/2014
Buyoung APT Buyoung const. 03/2013-10/2013
I-park APT Hyundai Development 03/2013-12/2013
Tech center Hyundai amco 07/2013-08/2013
Marine housing Changwon city 07/2013-02/2014
Amco town Hyundai amco 02/2012-08/2013
GwangYang Posco BFG
Posco 05/2012-05/2013
Kia motors serive center Huyndai motor 12/2012-03/2013
Busan seaport terminal BMC 10/2012-08/2013
Highway 551 (Naeng-Busan) 8 1st Korea highway corp. 11/2011-05/2013
Piling onshore
PROJECT NAME CONTRACTOR PERIOD
Nakdong river 1st gate Z type Korea minstry of const. 01/2011-12/2011
Tongyoung Sewage 6 1st KECO 01/2011-08/2011
Oil station Deog Jae const. 03/2010-05/2010
Sheet piling
Page 10
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
PROJECT NAME CONTRACTOR PERIOD
Miryang 2 Area Korea minstry of const 02/2013-05/2013
Nakdong River cycle road Korea minstry of const 03/2013-06/2013
Asan city sewage treatment KECO 03/2013-08/2013
Myong Ji the west Samjeong const. 04/2010-12/2014
Railway ( Hyoja - Goedong ) Korea railway corp. 11/2014-09/2015
East sea port East sea marine corp. 06/2012-10/2012
Myong Ji ocean city Samjung const. 06/2012-01/2013
Tae In 2 Bridge Posco 12/2012-10/2013
Kim hae Jangyoo Water park Lotte 05/2012-12/2013
PROJECT NAME CONTRACTOR PERIOD
Jinhae-Geoje Main Pipling ( lot 1) Hyundai 12/2013-12/2014
Gunsan waste landfill ( SCW ) Chinhung 11/2013-12/2014
Jangji Tunnel grouting SH corp. 06/2013-01/2015
Jangji Earth anchor SH corp. 07/2013-01/2015
Mokpo sewage (JSP) KECO 08/2011-10/2013
Yeongju Muti Dam Korea water corp 03/2011-12/2011
Busan Newport 2-3 (container) Busan Port corp. 06/2010-12/2010
Sheet piling
Others ( JSP, Anchor, soil nailing etc.)
Page 11
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
3. Experience picture view
3-1 . DCM
Page 12
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
PROJECT: HOT ROLLING MILL( FORMOSA HATINH)
PROJECT: LG ELECTRONIC HAI PHONG VIET NAM
Page 13
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
3-2 . DCM offshore
3-3 . S.D.A
3. Experience picture view
Page 14
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
3.4 . S.C.W
3. Experience picture view
Page 15
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
3-5. R.C.D
3. Experience picture view
Page 16
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
3-6 . Piling off shore
3. Experience picture view
Page 17
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
3-7 . Sheet pile
3. Experience picture view
Page 18
COMPANY PROFILE
SAEKYUNG CONSTRUCTION
3-7 . Sheet pile
3. Experience picture view
Page 19