Trent60WLEPowerGenerationPackage
SCOPEOFSUPPLY
DERWICKASSOCIATES
offers
the
delivery
of
Three
(3)
Brand
New
Rolls
Royce
Trent60WetLowEmissions(WLE)GasTurbinePowerGenerationPackages,
designedinaccordancewiththespecificationsoutlinedinthisproposal,
comprisingof:
GasTurbine
Trent60
WLE
RollsRoyceIndustrialTrent60GasTurbineWLE,DualFuel
Onenginemountedlubricationpumpandhydraulicstarter
G T bi i iti t i ti f i t i i it ith l
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
4/31
GasTurbineModule
EnclosureandBase
Fabricated weatherproof painted carbon steel baseplate mounted acoustic
enclosure (85dB(A) avg. @ 1m) and base for housing the gas turbine, inlet
plenum, fuel and oil systems, exhaust volute and enclosure ventilation air
systems.
Allinternallighting(mainandemergency),maintenancepowerpoints,tubing,
pipingandcabling.
Maintenance access and features, facilitating engine / module removal
(sidewaysremovalfrompackage)andinsitumaintenance. Anchorpointsand
any
special
tooling
are
provided.
Mechanical
Handling
Skid,
standard
walkwaysandladdersgivingaccesstotheinletfilterhouseareincluded.
Fire protection and gas detection system, complete with thermal detectors
andgassensorsforGTenclosure.
T h t CO2 ti i hi t i l di t li d if ld fi
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
5/31
Maintenance featuressuchasanchorpointsandpermanent tooling (internal
filterelementhoist).
Radialairintakescrollwithcompressorwaterwashsupplyrings.
GasTurbineExhaustSystem
Gasturbineexhaustvoluteexhaustingvertically.
GasTurbineEnclosureVentilationandAirHandlingSystem
Enclosure
Ventilation
Intake
System
Air is drawn from the same filter house as the combustion air system. A
designated section of the filter house is used to supply air exclusively for
ventilation.
Thesystemincludesducting,silencingandfiredampers.
Enclosure
Ventilation
Exhaust
System
Three 50% duty AC motor belt driven induced draft ventilation fans
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
6/31
watercooledplateoilcooler,stainlesssteelpipeworkandfittings,associatedvalvesandinstrumentation.
GasTurbineHydraulicStartSystem
Gas turbine hydraulic start system comprising of one 100% duty AC motor
driven variable displacement pump and fixed displacement charge pump in
tandem,
stainless
steel
pipe
work
and
fittings,
associated
filters,
valves
and
instrumentation.
GasTurbineGasFuelSystem.
Gasfuelforwardingsystem,locatedtothesideofthegasturbine,comprising
ofmetering valves, highspeedshutoff valves, lastchance strainer,enclosure
mounted
fuel
manifolds,
stainless
steel
pipe
work
and
fittings,
associatedvalvesandinstrumentation.
ACGeneratorModule
Enclosure and Base
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
7/31
WaterWashSystem
One mobile gas turbine compressor cleaning system, suitable for unfired
washing. Attachmentpointsforthewaterwashsystemareexternallylocated
ontheoutsideoftheGasTurbineBaseplate.
LiquidFuelSystem
Highpressure
liquid
fuel
system
comprising
one
main
and
one
auxiliary
AC
electricmotordrivenfixeddisplacement,bentaxis,axialpistonpump,
meteringvalves,highspeedshutoffvalves,stainlesssteelpipeworkand
fittings,associatedvalvesandinstrumentation. Thesystemismountedona
freestandingskidtobelocatedadjacenttothegasturbinemodule.
Water
Injection
System
(for
Emissions
Control)
Waterinjectionsystemcomprisingthree(3)x33%ACelectricmotordriven
fixeddisplacement,bentaxis,axialpistonpumps,stainlesssteelpipeworkand
fittings,associatedsimplexfilters,valvesandinstrumentation. Thesystemis
mounted on a freestanding skid to be located adjacent to the gas turbine
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
8/31
AC Generator Control/Protection Panel (GCP/GPP) comprising a two baycubicle with automatic voltage regulator, generator metering and protective
relay, automatic and manual synchronizing facility, with synchroscope and
checksynchronizer,freeissuedforinstallationbyothers.
SpecialTools
Coupling
alignment
tool,
gas
turbine
transportation
stand,
lifting
beams
and
slings,packingcase,protectioncover,blanksandrestraintswillbesuppliedto
protecttheengineduringtransportationand installationatsite. These items
remain the property of PDVSA and will be returned after installation is
complete.
EquipmentTesting
Gasturbinefactorytest.
ACGeneratorfactorytest
Subsystemfactoryflushingandpressuretesting.
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
9/31
Projectdrawingsanddocumentlist.
Options(Budgetary)
Availabilityguarantee isofferedaspartoftheLongTermServiceAgreement
GeneratorRotor
Withdrawal
tool
FreightFAS,PortofExport
MCC/UPS
InletChillerCoil
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
10/31
TRENT
60
POWER
GENERATION
PACKAGE
TERMINATION
POINTS
InterfaceDescription TerminalPoints
CombustionAir
Inlet
to
intake
filter
house.
Compressedair Compressedairconnectionatskidedge.
ExhaustGas Transitionenclosurewallductjoint.Inletandoutlet
flangesofsilencersection
Ventilation Enclosureventsoutlets.
Mountings
Locationson
skid
base
plates
and
all
other
structural
members.
FuelGas Inletflangeonsideofbaseplateandventflangeon
theroofoftheenclosure.
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
11/31
TRENT60POWERGENERATIONPACKAGE
EXCLUSIONS
PDVSAdoesnotacceptresponsibilityforitemsoraspectsofequipmentwhich
areoutsidetheScopeofSupplydefinedabove. Thefollowingitemsare
excludedfromthisproposal,unlessofferedasanoption.
Sitegrounding
Lightningprotection
Compressedairsupply
Allauxiliarypowersupplies
Allfirst
fills
Allfuelsupplies,fuelsupplyandtreatment
Watersupplyandtreatment
Installation&commissioninglabor
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
12/31
ACGenerator
Rotor
Withdrawal
Fiscalmetering
Sitefacilities
Operatingandstrategicspares
Civilengineeringdesign,embedmentandworks
Grout
Erectionofequipment
Civilengineeringdesignofanykind
All interconnecting pipe work and cabling, beyond termination points,
including:
All
wiring
and
piping
to
and
from
skids
LocalLighting
StackLighting,GroundingProtectionSystem
Unloadingatsite
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
13/31
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
14/31
ATTACHMENT
SCHEDULED
DATE(S)
FCAMANUFACTURERSSITEDELIVERYSCHEDULE
THEFOLLOWINGDATESAREFORDELIVERYDATESASAPPLICABLETOTHIS
CONTRACT.UNDERNOCIRCUMSTANCESHALLANYDELIVERYDATEBEPRIORTO
THERECEIPTOFAMUTUALLYAGREEDLETTEROFCREDIT,ASDEFINEDINSECTION3.8OFTHEMAINCONTRACT.DELIVERYDATESFORTHEPACKAGEREQUIRING
ADDITIONALFIELDMODIFICATIONFOR50HZTO60HZCONVERSIONOFGENSET
PACKAGE:
Item Equipment
Description
Delivery
LeadTime
DeliveryUnit
2
Delivery
Unit3
1 MainGas March30, March30, March30,
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
15/31
Note1Thegasturbinewillbedeliveredinaccordancewiththe
customersinstallationandcommissioningscheduleneeddate,not
toexceed60daysfromMainGasTurbineSkidDelivery.
Note2
Customer
will
be
required
to
take
into
consideration
appropriatefieldsupportlaborandscheduletoinstallequipment
shippedtositedirectlyforconvertingGenSetpackagefrom50Hzto
60Hzapplicationready.
60HERTZ
CONVERSION
OF
PACKAGE
(INSTALLATION
AT
FACORY
OR
POST
FCA
DELIVERYDEPENDINGONDELIVERYDATEOPTIONSELECTED)
60 hertz compliant materials to be installed by Customer supplied. Scope of
conversiontoinclude,butnotlimitedto,
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
16/31
FUELREQUIREMENTS
1 GENERAL
RRgasturbineshavetheabilitytoburnawiderangeofgaseousfuelsasshowninTable1.Thesegasespresentabroadspectrumofpropertiesdue tobothactiveand inert components. This specification is designed to define guidelines that
must
be
followed
in
order
to
burn
these
fuels
in
an
efficient,
trouble
free
manner,
whileprotectingthegasturbineandsupportinghardware.
Table2identifiestheacceptabletestmethodstobeusedindetermininggasfuel
properties.
Notes:
1. Whenconsideringtheuseofalternatefuels,providedetailsofthefuelconstituents,fueltemperature,andexpectedengineusageconditionsandoperatingcharacteristicstoRRforevaluationandrecommendations.
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
17/31
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
18/31
PrimaryFuel
Source
TBD
SecondaryFuelSource TBD
SeismicDesignCriteria(BOPEquipment) TBD
MaximumWindSpeed(WindLoad),
MPH
TBD
NearFieldNoiseat3fthorizontaland5
ftvertical,dBANOTE1
TBD
FarFieldNoise,dBANOTE1 TBDat400ft/TBDat700ft
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
19/31
COMMERCIALTERMS
BasisofPricing
Validity
ThisproposalisvaliduntilFebruary15,2010.
Taxes
No sales or use taxes have been included in this quotation. These prices
quoted exclude any federal, state or local taxes or fees which may be
associatedwiththeexport,importorpurchaseofequipmentand/orservices.
Price
Th (3) RR T t 60 G T bi G t S t i l di d ib d i th
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
20/31
WireInformation
BENEFICIARY: DERWICKASSOCIATESCORP.
BANKNAME: JPMorganChaseBankN.A.
BANKADDRESS: 345ParkAvenue
CITY,STATE,ZIP: NewYork,NY10154
COUNTRY:
United
States
of
America
SWIFTCODE: CHASUS33
RoutingNumber/ABACode:
(ForUSAVendors)
021000021
ACCOUNTNUMBER:(withoutIBAN
details)
811156397
Payment
Schedule
Thisproposalisbaseduponreceiptofthefollowingprogresspaymentsanda
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
21/31
Milestone Milestone
Description
Evidenceof
Completion
Unit1,2
&3
Termsof
Payment
1 EquipmentContract
Signature
Receiptof
signed
Equipment
Contract
25%
Contract
Price
Payment3
daysfrom
signature
2 GasTurbinePackage
Skidavailable
EXW
Notificationof
readinessto
shipEXW
Manufacturing
Facility
35%
Contract
Value
DrawonLOC
3 ACGeneratorSkid
availableEXW
Notificationof
readinessto
shipEXW
Manufacturing
Facility
35%
Contract
Value
DrawonLOC
4 GasTurbineavailable
EXW
Notificationof
readinessto
shipEXW
5%
Contract
Value
DrawonLOC
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
22/31
Warranty
DERWICKwillprovideaone(1)yearwarrantyontheentiregasturbinegenerator
packageandanyotherbalanceofplantequipmentprovided.
Terms&Conditions
This proposal shall be valid for fifteen (15) days; provided, however, the
obligationtotreatthisproposalasconfidential,andthatitcannotbesharedwith
anythirdpartywithoutthepriorwrittenconsentofDERWICKshallsurvive.
PDVSAandDERWICKwillnegotiate ingood faith toestablishgeneral termsand
conditions
that
are
usual
and
customary
of
the
sale
of
these
new
equipments.
SiteServices
DERWICKwouldbepleasedtoalsoprovideaproposalfortheinstallation,startup
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
23/31
Attachment A
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
24/31
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
25/31
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
26/31
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
27/31
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60
28/31
8/10/2019 Hurto a PDVSA (2): Sobreprecio de $18,2MM Rolls Royce Trent60