+ All Categories
Transcript
Page 1: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

ALID

AN

O G

AW

O B

RID

GE

(GE

NE

RA

L SI

TE P

LAN

)

3-54

Page 2: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

1 -G

EN

ER

AL

PLAN

S

CA

LE1:

750

2 -G

EN

ER

AL

ELE

VATI

ON

SC

ALE

1:75

05 -

SEC

TIO

N @

ABU

TMEN

TS

CA

LE1:

150

4 -S

EC

TIO

N @

PIE

RS

CA

LE1:

150

IDA

NO

GAW

O B

RID

GE

GEN

ERAL

VIE

WTH

E B

ASIC

DES

IGN

STU

DY

ON

TH

E P

RO

JEC

T

FOR

TH

E IM

PR

OVE

ME

NT

OF

BRID

GE

S IN

NIA

S IS

LAN

D

IN T

HE

RE

PUBL

IC O

F IN

DO

NE

SIA

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

AL4-

2

3 -S

ECTI

ON

@ M

IDSP

ANS

CA

LE1:

150

3-55

Page 3: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

4-3

1 -1:

300

ELE

VA

TIO

NS

CA

LE

IDA

NO

GA

WO

BR

IDG

E G

EN

. DIM

EN

SIO

N O

F SU

PER

STR

UC

TUR

E

4 -1:

50S

EC

TIO

N @

P1~

P4, S

2S

CA

LE

2 -1:

300

P

L A

N

SC

ALE

3 -1:

300

KE

Y P

LAN

SC

ALE

5 -1:

50S

EC

TIO

N @

C1~

C24

SC

ALE

3-56

Page 4: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

IDA

NO

GA

WO

BR

IDG

E S

UB

STR

UC

TUR

E S

TRU

CTU

RAL

DIM

ENSI

ON

(AB

UTM

EN

T A

2)4-

4

2 -1:

60P

L

A

NS

CA

LE

1 -1:

60E

LEV

ATI

ON

SC

ALE

3 -1:

60E

LEV

ATI

ON

SC

ALE

4 -1:

60E

LEV

ATI

ON

SC

ALE

3-57

Page 5: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

IDA

NO

GA

WO

BR

IDG

E S

UB

STR

UC

TUR

E S

TRU

CTU

RAL

DIM

ENSI

ON

(PIE

R P

1, P

2 , P

3 &

P4)

4-5

1 -1:

50P

L

A

NS

CA

LE

2 -1:

50E

LEV

ATI

ON

SC

ALE

3 -1:

50E

LEV

ATI

ON

SC

ALE

4 -1:

50E

LEV

ATI

ON

SC

ALE

3-58

Page 6: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

IDA

NO

GAW

O B

RID

GE

APP

RO

ACH

RO

AD P

RO

FILE

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

AL4-

6

3-59

Page 7: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

ALID

AN

O G

AWO

BR

IDG

EA

PP

RO

AC

H R

OA

D C

RO

SS S

ECTI

ON

S4-

7

3-60

Page 8: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

IDA

NO

GAW

O B

RID

GE

EXI

STIN

G R

CBC

REP

AIR

WO

RK

S AN

D

DET

AIL

S (1

/2)

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

AL4-

8

1 -P

L A

NS

CA

LE1:

250

2 -E

LEV

ATI

ON

SC

ALE

1:25

0

C -E

XP

AN

SIO

N J

OIN

T D

ETAI

LS

CA

LE1:

20

A -S

ECTI

ON

SC

ALE

1:10

0

B -S

ECTI

ON

SC

ALE

1:10

0

-A-B

3-61

Page 9: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

AL

D -S

CA

LE1:

50

IDA

NO

GAW

O B

RID

GE

EXI

STIN

G R

CBC

REP

AIR

WO

RK

S AN

D

DET

AIL

S (2

/2)

3 -D

ETA

IL O

F E

XP

AN

SIO

N J

OIN

T C

ON

CR

ETE

BASE

SC

ALE

1:50

G -S

ECTI

ON

SC

ALE

1:50

4 -B

AR

BE

ND

ING

DIA

GR

AMN

OT

T

O

SC

ALE

F -E

LEV

ATI

ON

SC

ALE

1:50

DE

TAIL

OF

SID

EW

ALK

& R

AILI

NG

@ B

OX

CU

LVE

RT

E -S

CA

LE1:

50

DE

TAIL

OF

SID

EW

ALK

& R

AILI

NG

@ A

PPR

OAC

H R

OAD

4-9

3-62

Page 10: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

EP

EP

EP

EP

EP

P3

P4

P9P8

P8a

BM 5-1

BM 5-4

P10

MEZAYA BRIDGE, L=94.00M

CONCRETE BLOCK SCOURING

PROTECTION

75 EA.

GROUTED RIPRAP SLOPE

PROTECTION

GUTTER DITCH L=97.0M.

CONCRETE BLOCK PROTECTION 25

EACH

STONE MASONRY WALL

GUARD RAIL

L=4.0M

GUARD RAIL

L=8.0M

PT = 0+288.200

PC = 0+265.260

0+320

0+300

0+200

0+150.00

PI-0

1

PI-0

2

PI-05

PI-03

PI-06

PI-07

PI-04

PI-0

0

20000

PI-08

DITCH TYPE C

L=25.0M.

DITCH TYPE B

L=25.0M.

DITCH TYPE C

L=25.0M.

INLET

OUTLET

DITCH TYPE-C

L=45.0M.

STONE MA

SONRY WA

LL

L=25.0M.

H=1.0-3

.0M.

GUARD RA

IL L=25.0M.

L-SHAPED RETAINING WALL L=63.0M.

GUARD RAIL L=80.0M.

PIPE CULVERT

0.6X14. 0M.

DITCH TYPE-A L=34.0M.

7.0M.

PIPE CULVERT

0.60x6.0M.

STONE MASONRY

WALL L=7.0M.

H=3.0-1.5M.

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

ALM

EZAY

A BR

IDG

E (G

EN

ER

AL

SITE

PLA

N)

5-1

3-63

Page 11: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

EP

P8a

02

0+200 P8a

GROUTED RIPRAP

SLOPE PROTECTION

STONE MASONRY WALL

PT = 0+197.280

PC = 0+177.686

2 -G

EN

ER

AL

ELE

VATI

ON

S

CA

LE1:

500

6 -S

ECTI

ON

@ A

BUTM

ENT

A2S

CA

LE1:

150

4 -S

EC

TIO

N @

PIE

RS

CA

LE1:

150

1 -G

EN

ER

AL

PLAN

S

CA

LE1:

500

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

ALM

EZAY

A BR

IDG

E G

ENER

AL V

IEW

5-2

3 -S

EC

TIO

N @

MID

SPA

NS

CA

LE1:

150

6 -S

ECTI

ON

@ A

BUTM

ENT

A1S

CA

LE1:

150

3-64

Page 12: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

5-3

MEZ

AYA

BRID

GE

GE

N. D

IME

NS

ION

OF

SUPE

RST

RU

CTU

RE

1 -1:

300

ELE

VA

TIO

NS

CA

LE

2 -1:

300

P

L A

N

SC

ALE

3 -1:

300

KE

Y P

LAN

SC

ALE

4 -1:

50S

EC

TIO

N @

S1,

P1,

P2,

S2

SC

ALE

5 -1:

50S

EC

TIO

N @

C1~

C14

SC

ALE

3-65

Page 13: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

MEZ

AYA

BRID

GE

SU

BS

TRU

CTU

RE

STR

UC

TUR

AL D

IMEN

SIO

N(A

BU

TME

NT

A1)

5-4

2 -1:

60P

L

A

NS

CA

LE

1 -1:

60E

LEV

ATI

ON

SC

ALE

3 -1:

60E

LEV

ATI

ON

SC

ALE

4 -1:

60E

LEV

ATI

ON

SC

ALE

3-66

Page 14: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

R=8.00m

R=24.00m

R=24.00m

R=8.00m

MEZ

AYA

BRID

GE

SU

BS

TRU

CTU

RE

STR

UC

TUR

AL D

IMEN

SIO

N(A

BU

TME

NT

A2)

5-5

2 -1:

80P

L

A

NS

CA

LE

1 -1:

80E

LEV

ATI

ON

SC

ALE

4 -1:

80W

ING

WA

LL E

LEVA

TIO

NS

CA

LE

3 -1:

60E

LEV

ATI

ON

SC

ALE

5 -1:

80W

ING

WA

LL E

LEVA

TIO

NS

CA

LE

6 -1:

80S

ECTI

ON

SC

ALE

7 -1:

80S

ECTI

ON

SC

ALE

3-67

Page 15: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

MEZ

AYA

BRID

GE

SU

BS

TRU

CTU

RE

STR

UC

TUR

AL D

IMEN

SIO

N(P

IER

P1

& P

2)5-

6

1 -1:

50P

L

A

NS

CA

LE

2 -1:

50E

LEV

ATI

ON

SC

ALE

3 -1:

50E

LEV

ATI

ON

SC

ALE

4 -1:

50E

LEV

ATI

ON

SC

ALE

3-68

Page 16: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

MEZ

AYA

BRID

GE

APP

RO

ACH

RO

AD P

RO

FILE

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

AL5-

7

3-69

Page 17: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

AL

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

ALM

EZAY

A BR

IDG

EA

PP

RO

AC

H R

OA

D C

RO

SS S

ECTI

ON

S5-

8

3-70

Page 18: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

GABION

0.5X1.0X2.0X24 EA.

CONCRETE BLOCK

PROTECTION 25 EACH

CONCRETE BASE

V=62.5M

3

0+200

MEZ

AYA

BRID

GE

RET

AIN

ING

WAL

L PL

AN, P

RO

FILE

&

CR

OSS

SEC

TIO

NS

@ A

BU

T. A

25-

9

1 -1:

150

P

L A

N

SC

ALE

2 -1:

150

PR

OFI

LES

CA

LE

3 -1:

200

CR

OSS

SEC

TIO

NS

CA

LE

3-71

Page 19: IDANO GAWO BRIDGE (GENERAL SITE PLAN) THE BASIC … · idano gawo bridge existing rcbc repair works and details (1/2) the basic design study on the project for the improvement of

1 -E

LEV

ATI

ON

SC

ALE

1:10

0

THE

BAS

IC D

ESIG

N S

TUD

Y O

N T

HE

PR

OJE

CT

FO

R T

HE

IMP

RO

VEM

EN

T O

F BR

IDG

ES

IN N

IAS

ISLA

ND

IN

TH

E R

EPU

BLIC

OF

IND

ON

ESI

A

DIR

EC

TOR

ATE

GE

NER

AL O

F H

IGH

WAY

MIN

ISTR

Y O

F P

UB

LIC

WO

RKS

THE

REP

UB

LIC

OF

IND

ON

ESIA

JAP

AN

INTE

RN

ATI

ON

AL

CO

OPE

RAT

ION

AG

ENC

Y

KAT

AHIR

A &

ENG

INE

ERS

INTE

RN

ATI

ON

ALR

ETAI

NIN

G W

ALL

PLAN

, ELE

VAT

ION

, S

ECTI

ON

& B

AR B

END

ING

DIA

GR

AM5-

10

1:10

0S

CA

LEP L

A N

-2

4 -S

ECTI

ON

SC

ALE

1:50

5 -B

AR

BE

ND

ING

DIA

GR

AMN

OT

SC

ALE

TO

1:50

SC

ALE

RE

TAIN

ING

WAL

L-3

3-72


Top Related