Huawei Container DC Solution
Successful Cases
Content
7/26/2019 IDS1000 Container Data Center 20150205
3/22
3
IDS1000-A All-In-One Container DC Solution
Cabinet
Anti-fire SystemPower SystemCooling System
Cabli
Syste
Mana
Syste
Container
System
Rack
System
Highly integrated, mobile, convenient container DC solution
7/26/2019 IDS1000 Container Data Center 20150205
4/22
4
Project ScopeITEM Description
Project preparationGenerally consulting and Designing activities are necessary for a data center project, help theto choose suitable solution and products, also provide all kinds of products specification and
design, these documents are often used to make a project tender.
Site Preparation1.Construction of building or room renting for IDS2000 modular data center2. An open field and basic site construction such as civil work needed for IDS1000 container center solution.
Power system1 High voltage (HV) system, include Transformer, Diesel Generator ,Fuel Tank, HV Distribution S
Power system2Light voltage (LV) system,include UPS system for IT equipement, Battery system for ITequipement,UPS and Battery system for continuous cooling, LV Power Distribution system
Racks system All kinds of racks, Server Cabinet, Cabling Cabinet , Aisle containment , and container bodyCooling system Air-conditioner indoor units in IT room and power room
Management systemUnified data center management system, include Hardware and software, license,basicmanagement fuctions for all facilities,security system, value added fuction :energy efficiency
management fuction,asset managementFire protection system FM200, coverage, include control unit, cylinders, gas, pipe, sensors, etc
Cabling System Include Cable tray,Cat 6 UTP cable, OM3 Fiber, patch panel, for 75cabinetsTelecom cabling sy
Service Product training, I&C, maintenance
7/26/2019 IDS1000 Container Data Center 20150205
5/22
5
Layout
Summary Description:
Total area:
40 ft All-in-one container: 12.192*2.438=29.72
Battery backup time: 10 minutes
Adopts in-row precision air conditioner for
efficient cooling, and hot air containment.
Total 8 racks, the power density is 6kw/rack ;
The rack dimension is
19 inches*45U(Height)*1000m(Depth)
7/26/2019 IDS1000 Container Data Center 20150205
6/22
6
Appearance And Inner decoration
7/26/2019 IDS1000 Container Data Center 20150205
7/22
7
Power Cooling Structure FirPower Supply System:
G
ATS
lighting
In row A/C
Battery
Utility Power Outside Container,
Customer Scope:
Base, civil work etc.
UPS
AC Load + Monitoring
Container DC
Inside Container , Huawei Scope
customer scope
G
7/26/2019 IDS1000 Container Data Center 20150205
8/22
8
Power Cooling Structure Fir
N +1 Redundant Design, High Availability
Efficient and convenient Redundancy Design Reliable light
UPS efficiency reached 94.5%, saving
more energy
UPS power input range: voltage from
80V to 280V AC, frequency from 40Hz
to70Hz, adoptable in to harsh grid
Rack-mounted UPS. Easy to install,
expand and maintain
Support dual power input. The ATS is
integrated in PDB, and the switching time
is less than 1second.
UPS is 3+1 backup, and configured with
bypass switch.
Container configure
bars. IT cabinets , pow
systems are all
connected to bars.
Ground bars
connect with
grounding grid
by earthing point .
UPS input distributi
the requirement of cl
protection. The maxim
current is 60kA.Huawei UPS 2000G
Circuit diagram for 40ft AIO
l
7/26/2019 IDS1000 Container Data Center 20150205
9/22
9
Power Cooling Structure Fire
In-Row cooling: 20 kW cooling capacity in-row AC with 3+1 redundancy ,DX cooling type , horizon
Superior operation and maintenance experience
7-inch touch screen, providing query,
setting, monitoring and maintenance
interactive interface
Electrode humidifier, step
amount of humidification
humidity
A well-known bran
temperature contrUsing efficient backward EC
centrifugal fan, air volume redundant
design.
Energy-saving and Reliable In-row Precision AC
P C li St t Fi
7/26/2019 IDS1000 Container Data Center 20150205
10/22
10
Power Cooling Structure Fire
Cabinet Industry Unique Cabinet Design, Space-savi
Cabinet meet RoHS requirements, fire performance comply with UL standard.
The cabinet meets the requirements of the 19-inch mechanical structure size, ensure the strength of the cabinet
the components from damage.
Dual-cabinet:
210011201000mmAvailable space:45UX2Weight:120kg
Assodesig
Triple
supp
stand
High quality Cabinet material, reliable welding structure, protect equipment to avoid the external da
P C li St t Fi
7/26/2019 IDS1000 Container Data Center 20150205
11/22
11
Power Cooling Structure Fire
High-efficiency fire protection system, reliable and sa
Controller
Manual start/stop button
sprayer
each aisle
Smoke sensor
temperature sensor
Sound and light alarm
Emergency light
(each aisle)
Alarm bell
Gas cylinder
Pipe
Quick: alarm delay time is 6s, extinguishant spraying time is 8s.
Reliable:feature backup function, backup time is more than 48h.
Green and effective: HFA(FM200) is liquid and space-saving; after spray turn to gaseous.
Fire protection system
Use the e
fire or oth
occur.
Extinguish
the fire pro
the failure
fire.
Power Cooling Structure Fire
7/26/2019 IDS1000 Container Data Center 20150205
12/22
12
Power Cooling Structure Fire
Monitor system- ensure data center safe operation
Server Data base/operating system System interface Web UI
ECC
Water
leakageSmoke
Environment
devices
Collector
Security
Acces
Cooling devices
Air
Condition Chillers PDF UPS PDU
Power devices
Platform
T&H
Energy Mgt
Alarm Mgt
Work-flow Mgt
View MgtReport Mgt 3D View
Capacity
Mgt
Northbound
interface
Functions
http://image.baidu.com/i?ct=503316480&z=&tn=baiduimagedetail&word=%CB%AE%BD%FE%B4%AB%B8%D0%C6%F7&in=8678&cl=2&lm=-1&pn=3&rn=1&di=56604306540&ln=719&fr=&fm=result&fmq=1323996375258_R&ic=0&s=0&se=1&sme=0&tab=&width=&height=&face=0&is=&istype=2http://image.baidu.com/i?ct=503316480&z=&tn=baiduimagedetail&word=%D1%CC%B8%D0%CC%BD%B2%E2%C6%F7&in=7651&cl=2&lm=-1&pn=0&rn=1&di=25885237485&ln=1958&fr=&fm=result&fmq=1323996795086_R&ic=0&s=0&se=1&sme=0&tab=&width=&height=&face=0&is=&istype=2http://image.baidu.com/i?ct=503316480&z=&tn=baiduimagedetail&word=%B1%A6%C1%A6%C2%ED%CE%C2%CA%AA%B6%C8%B4%AB%B8%D0%C6%F7&in=30293&cl=2&lm=-1&pn=0&rn=1&di=6308582100&ln=415&fr=&fmq=&ic=0&s=0&se=1&sme=0&tab=&width=&height=&face=0&is=&istype=2http://image.baidu.com/i?ct=503316480&z=&tn=baiduimagedetail&word=%CB%AE%BD%FE%B4%AB%B8%D0%C6%F7&in=8678&cl=2&lm=-1&pn=3&rn=1&di=56604306540&ln=719&fr=&fm=result&fmq=1323996375258_R&ic=0&s=0&se=1&sme=0&tab=&width=&height=&face=0&is=&istype=27/26/2019 IDS1000 Container Data Center 20150205
13/22
13
Fast
SmartFast Flexible
Fast Deployment,
Drives Business Rapidly
8-10 week
Prefabrication in factory
Decoration
Business rapid on-line
An
RackPower
Cooling
1
Inst
7/26/2019 IDS1000 Container Data Center 20150205
14/22
14
Flexible
Flexible Combination, Come after Customer Require
SmartFast Flexible
1
3
2
Business
Power
Cooling
Copy of facility
container
Scalable dynamic design
Uninterruptible upgrade fromTier3 to Tier4Raise density
Modular structure, easy expansion
Live in the moment, plan for future
Save dispensable investment,
grow with business
On-demand Deployment
7/26/2019 IDS1000 Container Data Center 20150205
15/22
15
Smart
Dynamic
Including monitoringon UPS, PDF, ATS
and air conditioner
Environment
Monitoring DCoperation
environment throughtemp.& humi. sensor
Video
Monitoring DC ormodule through
camera
Security
Access controlthrough access door
and card reader
Multi-subsystem monitoring integrated
Know well about the running status of DC,Ensure safe operation
SmartFast Flexible
Smart NetEco6000 Management System
7/26/2019 IDS1000 Container Data Center 20150205
16/22
16
Smart
Real-time monitoring
Flexible warning
methods, like sms, e-mail, sound, displayer
E-work order
Warning data base
store the warninganalysis to guidemaintenance job
Templatebuild-inabundant reporttemplate and pattern
Customizationpossibleto customize report,more convenient
Inquiry support various
type of inquiry, datagraphic visualization
Capacity ReportCapacityvisualization of cooling,power and space
Resource Entrysupportmanual record,electronic tag auto scan
Change Management
provide suggestion ofequipment changebased on cooling, poweretc.,
Warning Report Capacity
Visualization Smart ManagemenIntelligent analysis, utmost lower management expenses
SmartFast Flexible
Smart NetEco6000 Management System
7/26/2019 IDS1000 Container Data Center 20150205
17/22
17
Excellent Environment Adaptation
Easy Delivery
ISO standard containerrecognized by classification
society, connection portsembedded, convenient to
deliver
3rdclass road1000km
delivery tested
KCC Painting
8degree anticorrosion(Pass 1000 hour salt spray test asper ASTM B117)
15year service life
Ultimate Temp.
-40to 55 degCWide Range
Weather Proof
Class IP56
Double layer adhesive
tape for container
combination
Optimized container shape, natural favorable outdoor performa
7/26/2019 IDS1000 Container Data Center 20150205
18/22
18
Huawei Container DC Solution
Successful Cases
Content
7/26/2019 IDS1000 Container Data Center 20150205
19/22
19
Challenge
6 months time-to-market
Harsh Environment
Insufficient technical support
Yangon DC Mandalay DC
Huawei solution10 weeksdeliverywith CT equipment
4 Months first call
41+7 containerized data center
Telenor Myanmar New License Project
7/26/2019 IDS1000 Container Data Center 20150205
20/22
20
Telenor Myanmar New License Project
7/26/2019 IDS1000 Container Data Center 20150205
21/22
21
Challenges Demands
Huawei Solution
DC Case: Romania 2K IDS1000 Container Data Center
The legacy data center is not enough for the fast business development
Modular design to meet the phased deployment Tier 3 certification
Annual PUE
7/26/2019 IDS1000 Container Data Center 20150205
22/22
Copyright2013 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financial product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptaninformation at any time without notice.